Optical Plumbing versus RTK-GNSS Staking out on high Levels



Similar documents
Advanced Surveying Control Services for Building the Vertical Cities.

Monitoring of Open Pit Mines using Combined GNSS Satellite Receivers and Robotic Total Stations

25 Years of wrong GPS Campaign Planning

3 LEVELLING & SURVEYING

Surveying made easy. Karl Zeiske

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Guideline for Control Surveys by Differential Levelling

Full credit for this chapter to Prof. Leonard Bachman of the University of Houston

COMPUTATIONAL ACCURACY ANALYSIS OF A COORDINATE MEASURING MACHINE UNDER STATIC LOAD

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

Leica icon build Custom-built Solutions for Building Construction. intelligent

Leica Monitoring Solutions. Leica Monitoring Solutions Certainty builds confidence.

Leica GNSS Reference Antennas White Paper

Statics of Structural Supports

A PHOTOGRAMMETRIC APPRAOCH FOR AUTOMATIC TRAFFIC ASSESSMENT USING CONVENTIONAL CCTV CAMERA

Solar Tracking Application

Analysis of RTN Measurement Results Referring to ASG-EUPOS Network

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

Practical Alignment Tools and Techniques

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Geodetic Monitoring and Deformation Analysis of a Vertical Lift Bridge

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

5-Axis Test-Piece Influence of Machining Position

Geometric Transformations Grade Four

Leica AR25 White Paper

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

THE NEED TO IMPLEMENT CONSTRUCTION DEFORMATION SPATIAL MONITORING SYSTEMS IN ROMANIA

Impact of the Target Configuration to the Precision of Total Station Measurement

GPS Precise Point Positioning as a Method to Evaluate Global TanDEM-X Digital Elevation Model

powered by Leica RedLine Tailor-made Site Solutions

Evolving a new Geodetic Positioning Framework: An Australian Perspective

Introduction into Real-Time Network Adjustment with Geo++ GNSMART

Quality assurance in building construction, based on engineering geodesy processes

New technical solutions for energy efficient buildings

Optimum proportions for the design of suspension bridge

Head Loss in Pipe Flow ME 123: Mechanical Engineering Laboratory II: Fluids

Amplification of the Radiation from Two Collocated Cellular System Antennas by the Ground Wave of an AM Broadcast Station

SURVEYING WITH GPS. GPS has become a standard surveying technique in most surveying practices

High Strain Dynamic Load Testing of Drilled Shafts

Analysis of a Tower Crane Accident

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Total Station Setup and Operation. Sokkia SET Total Station

Reinforced Concrete Design

APPLICATION OF FREE TACHEOMETRIC STATIONS IN MONITORING OF MONUMENTAL OBJECTS

Leica SmartNet UK & Ireland Network RTK User Guide

National Performance Evaluation Facility for LADARs

CALIBRATION OF A ROBUST 2 DOF PATH MONITORING TOOL FOR INDUSTRIAL ROBOTS AND MACHINE TOOLS BASED ON PARALLEL KINEMATICS

Embedded Parts Introduction - Anchors

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

GNSS and Heighting, Practical Considerations. A Parker National Geo-spatial Information Department of Rural Development and Land Reform

MONDOATHENS BASKETBALL SET (Reference PK110)

PASSIVE INFRARED INTRUSION DETECTOR PASSIVE INFRAROOD DETECTOR DETECTEUR D INTRUSION PASSIF INFRAROUGE

Günter Seeber. Satellite Geodesy 2nd completely revised and extended edition

The process components and related data characteristics addressed in this document are:

GMC 2013: Piping Misalignment and Vibration Related Fatigue Failures

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

Experimental Evaluation of the Discharge Coefficient of a Centre-Pivot Roof Window

AFREF First GNSS Station : Lessons learnt Building up a Continental Reference Frame

First 14-storey wood building in the world at Bergen in Norway Premier bâtiment en bois à 14 niveaux au monde à Bergen en Norvège

Making Better Medical Devices with Multisensor Metrology

Breakaway Walls

John F. Cotton College of Architecture & Environmental Design California Polytechnic State University San Luis Obispo, California JOHN F.

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

The Integration of GPS and Pseudolites for Bridge Monitoring

Egcobox Software Manuel Version Max Frank GmbH & Co. KG

Aluminium systems profile selection

9.3 Two-way Slabs (Part I)

Commerzbank Head Office. Frankfurt am Main

DESIGNING AESTHETIC FREEFORM OBJECTS: A COURSE FOR INDUSTRIAL DESIGN ENGINEERING STUDENTS

Laser Ranging to Nano-Satellites

d e n v e r a r t m u s e u m

Getec. The Geo Structural Monitoring Experts

The Basics of FEA Procedure

RECOMMENDATION ITU-R F (Question ITU-R 157/9) b) that systems using this mode of propagation are already in service for burst data transmission,

Leica 3D Disto Recreating the real world

Grant Agreement No SFERA. Solar Facilities for the European Research Area SEVENTH FRAMEWORK PROGRAMME. Capacities Specific Programme

TRIMBLE ATS TOTAL STATION ADVANCED TRACKING SYSTEMS FOR HIGH-PRECISION CONSTRUCTION APPLICATIONS

Application Example: Quality Control of Injection-Molded Parts

TRIMBLE 3D SCANNING FOR SURVEYORS

Force measurement. Forces VECTORIAL ISSUES ACTION ET RÉACTION ISOSTATISM

PDCA Driven-Pile Terms and Definitions

Case Study Australia. Dr John Dawson A/g Branch Head Geodesy and Seismic Monitoring Geoscience Australia. Chair UN-GGIM-AP WG1 Chair APREF.

Designed and Engineered to Perform

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

CTBUH Copyright. Formworks for High rise Construction. Jürgen Gnida. PERI Gmbh

Step 11 Static Load Testing

Solar Tracking Controller

MEASURING AND LEVELING TOOLS

SEISMIC RETROFITTING OF STRUCTURES

Prof. Ludovico Biagi. Satellite Navigation and Monitoring

Cellular Wireless Antennas

An Overview of the Finite Element Analysis

Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission

Photogrammetric 3-D Point Determination for Dam Monitoring

Structural Axial, Shear and Bending Moments

Innovative measurement technology for real professionals.

ARCHITECTURE. Asst. Prof. Meltem VATAN KAPTAN

Transcription:

47 Optical Plumbing versus RTK-GNSS Staking out on high Levels Wunderlich, Th. Technische Universität München, Faculty of Civil, Geo and Environmental Engineering, Arcisstrasse 21, 80290 Munich, Germany, Web site: www.geo.bgu.tum.de E-mail: th.wunderlich@tum.de Abstract Staking out high-rise buildings always involves the problem to ensure the absolute verticality, from storey to storey until completion of the top floor. At least from a construction height of 100 meters on, systematic and random deflections will appear due to solar radiation, constant wind pressure and gusts, varying loads of construction devices like cranes and design causes. Conservatively, engineering surveyors mostly choose precision zenith plumping to transfer stable ground networks or grids to the top; however, this proves to be a cumbersome method and affords cautious selection of observation times to be agreed with the civil engineers. On first sight RTK-GNSS observations at the highest storey could provide a splendid alternative to save time and effort. Can they really replace the plumbing work? This is to be discussed. Theoretical considerations will be illustrated and contrasted by practical experience from the recent project of building the daring twin towers of the European Central Bank in Frankfurt. Key words: high-rise buildings, construction, verticality, precision plumbing, RTK, GNSS. 1 SPECIFIC SURVEYING CHALLENGES OF SKYSCRAPERS In contrast to a few low-rise buildings with exceptional oblique design (like e.g. the famous UFA-Palace in Dresden) high-rise buildings have to strictly obey verticality. Hence, it is the surveyor s prior task to ensure rigorous verticality of the structure from the very beginning of construction until completion (Kägi, 2006). Staking out has to be accomplished according to the CAD or BIM models which assume perfect conditions in their geometrical part. In actual fact the construction is subject to various and varying loads and will thus show deformations resulting in instantaneous deviations of the actual position and attitude from the nominal one (Grethen, 2003). Insolation causes the structure to bend away from the sun with a specific delay and behaves systematically with the sun s azimuth and elevation. The influence shows a diurnal and a seasonal variation. Constant wind pressure will induce a corresponding deflection and wind gusts can stimulate an oscillation. Heavy load cranes attached to the structure will produce random tilts dependent on their particular load and working position. Moreover, some effective construction related biases have to be taken into account. We are familiar with the impact of differential subsidence, but there is also a more complex, varying effect due to the specific way of construction and the construction progress and phase. Usually only the TS 2 Networks and GNSS applications INGEO 2014 6 th International Conference on Engineering Surveying Prague, Czech republic, April 3-4, 2014

48 INGEO 2014 height component will be affected, while for fancy architectural concepts even distinctive horizontal deformations may be encountered calling for preventative counteractions of civil engineers (Bachmann, 2013). An ideal geodetic measurement system would be capable of staking out and monitoring at a time (Wunderlich, 2013). The common way of building skyscrapers is to erect a central core of reinforced concrete by slip-form technique and then to cast concrete platforms by means of climbing formwork (steel rigs), mostly lagging two storeys behind the core s raising stage. The storeys are supported by columns which are subject to compression because of the load applied. This effect increases with height and load and generates a maximum impact at the mean height of the structure as the levels themselves always are built at the nominal design elevation. It is superimposed by concrete shrinking and differential raft settlement. The key problems manifest during elevator installation and most of all when the façade assembly starts before completion of the structural work. Concluding, the surveying engineer has to set out and monitor alternately. Today s high-rise building projects require tolerances of ± 2.5 to 4 cm of which the surveyor is granted only a fifth. To meet the regulations staking out has to be ensured within a total uncertainty of ± 5 to 8 mm. 2 THEORETICAL CONSIDERATIONS As intended within the scope of the present paper, two different approaches to repeatedly establish precise geodetic reference at each storey or rig position for staking out shall be discussed. They may be distinguished as interior approach by precision plumbing and exterior approach by RTK-GNSS. In the first case we have - at specified times - to transfer the network geometry of benchmarks at the building s ground floor up to the storey under construction, in the latter one during every production cycle - we permanently determine the actual position of the top platform from exterior or virtual reference stations at stable sites. 2.1 PRECISION PLUMBING The imperative precondition for the plumbing approach is to determine the position and to enforce the execution of a sufficient number (three to six) of slab penetrations to gain vertical lines of sight, passing through all storeys. It is very important that the section is large enough to account for implementation tolerances and for deformed states of the structure. 20 x 20 cm 2 prove as minimum for buildings up to 200 m high. Having more than three holes often turns out as good provision because from time to time workers will block some of the openings. When the building has risen to more than 50 m switching to a stepped approach can be recommended considering accuracy, continuous sight and personal effort. The measurements have to be done before sunrise and daily beginning of the construction works to ensure a neutral status of the structure; i.e. from 4 to 6 o clock. At this time the builder s hoists are not in operation and they must not be used without an approved operator. It is a pity that the leading manufacturers discontinued the production of high precision optical plummets. Only a few smaller manufacturers still offer such kind of instruments. On the other hand we find a great choice of laser plummets of medium precision (Fig. 1). By observing in two or four directions of the alidade and repeating the measurements the accuracy improves. The laser points are caught by a transparent grid plate (Fig. 2) or an optical sensor above which a target can be built up. Three zenith plumbings forming a triangle of targets on the highest platform are sufficient to enable free-stationing of the total station

Wunderlich, Th.: Optical Plumbing versus RTK-GNSS Staking out on high Levels 49 there with high accuracy. By means of the TPS the main axes and control points can be staked out by only using relative measurements. In later construction phases when the cladding is assembled an additional problem arises. Where the building envelope is completed, the atmospheric conditions unfavourably change as no ventilation is active and often construction heaters blow hot air. Heavy refraction and turbulence effects of ± 5 cm magnitude are reported and can only be prevented by pipe installations (see Fig. 3). Figures 1 to 3 Laser plummet, transparent grid plate, pipe protection (Almesberger, 2014) As a matter of fact, precision plumbing is a rather cumbersome method; nevertheless, it delivers an accurate reference system on each storey and has demonstrated its successful application in many projects. It should be complemented by three dual-axis inclination sensors arranged in a vertical line at appropriate building levels to attest the required neutral status of structure during the measurement. 2.2 REAL-TIME-KINEMATIC GNSS Applying RTK technology leads to a completely different concept. Rover antennas will be mounted on the corners of the climbing formwork to continuously determine absolute position which after some corrections and transformation to the site reference system can be used to position a TPS. The measurements of the total station to 360 prisms mounted directly below the antennas are used for free-stationing and at the same time to check the results of GNSS. All data is sent to the site surveying office by WLAN communication lines, checked, combined and adjusted and swiftly returned to the TPS to load it with the actual coordinates. The process will be repeated as soon as the structure s movement requires an update. As the climbing platform will sometimes not be levelled enough, dual-axis inclinometers with sufficient working range are attached on the pile below the prism-antenna mount to deliver the tilt corrections for the GNSS-positions. One of the available solutions (Whitworth, 2010) makes use of the Leica GNSS Spider software and the SmartNet NRTK correction service as virtual reference stations are not subject to signal obstruction compared to reference receivers on site. The whole procedure of staking out by a TPS using the Collocated Active Prisms and inclination sensors (Fig. 4) is very well described in Cranenbroeck, 2010. Whitworth, 2012 reports a three-dimensional coordinate quality of better than ± 25 mm for Renzo Piano s 306 m high London skyscraper The Shard, which was the requirement for the design compliance.

50 INGEO 2014 Figure 4 Collocated Active Prism and inclinometer (Whitworth, 2010) Summing up, the modern approach saves a lot of labour and time. However, it affords considerable investment in four dual-frequency RTK receivers and special software and has to rely on robust data communication. Regarding accuracy, plumbing still proves superior. 3 PRACTICAL EXPERIENCES 3.1 NEW EUROPEAN CENTRAL BANK PREMISES (NEP) Practical experience was gained in course of the recent staking out of the NEP in Frankfurt, Germany (Fig. 5). The architects Coop Himmel(b)lau, Austria designed twin towers of 165 m and 185 m height, connected by oblique steel diagonals. The special touch of the shapes is caused by the continuous change of the floor plan from a trapezoid to a rectangle in upward direction at one tower and in the opposite way at the other one, thus resulting in torsion of the façades. At the same time this particular design leads to translations and rotations of each storey because of the changing centre of gravity and the effects described in section 1. The civil engineers therefore apply approximated initial deformations to counteract, which have to be confirmed by engineering surveying. The problem is amplified by the fact that the stiffness of both structures isn t reached until the giant steel diagonals are installed which have to fit. 3.2 APPLICATION OF PRECISION PLUMBING AND INVESTIGATION INTO RTK-GNSS To meet the challenging demands for staking out and to prove the proper impact of the counteractions, a comprehensive surveying concept was developed by the engineering company Gemmer & Leber, Germany (IGL, 2011), assisted by the TUM Chair of Geodesy. It provided 4 and 6 plumbing ducts and precision plumbing to transfer geodetic reference from ground to top. The a priori quality proof was supplied by careful selection of instruments to be

Wunderlich, Th.: Optical Plumbing versus RTK-GNSS Staking out on high Levels 51 employed, systematic planning of the application and thorough study of variance propagation. Depending on the number of steps (1 to 3), the theoretical accuracies (mean error in plane) of the plumbing procedure was found to be ± 3.8 mm for the first 50 m increasing to ± 5.5 mm for the highest storeys at 165 m, resp. 185 m. This was fair enough to ensure observing the surveyor s share of staking out by free-stationed TPS, which was ± 8 mm for the NEP project. Figure 5 NEP Twin Towers, Frankfurt (Walter Wunderlich, 2011) From a construction height of 100 m on, the concept included three inclinometers mounted at the core in a vertical line (one fixed at 70 m, the others climbing higher) and GNSS receivers at the top. The inclinometers served to monitor the deformation status while the receivers were used to investigate RTK-GNSS possibilities for replacing or at least checking plumbing. In practice plumbing fulfilled the expectations, but needed high effort and work at night. With a view to achieve accuracies better than 1 cm, RTK-GNSS had to be replaced by static

52 INGEO 2014 sessions of 45 minutes due to unfavourable signal shading of the core and protective windshields. Detailed information can be found in Almesberger, 2014 and in Amtmann, 2013. 4 CONCLUSION Precision plumbing confirms as a reliable, but laborious approach and lacks automation. It is repeated for each new construction cycle and delivers the floor reference for relative staking out by TPS. RTK-GNSS depends on good signal conditions, robust data communication, correction service availability and powerful software. Reliable transformation parameters have to be determined in advance. The GNSS approach contains high automation potential and delivers continuous absolute position and orientation of the top platform to be used by TPS for staking out. Collocated Active Prisms and inclinometers prove necessary. REFERENCES ALMESBERGER, W. 2014, EZB New Premises Frankfurt/Main baubegleitende Vermessung, vermessungstechnische Überwachung der Bauausführung, in: Wieser, A. (Ed.): Ingenieurvermessung 14 Beiträge zum 17. Internationalen Ingenieurvermessungskurs, Zürich, 2014, Wichmann Verlag, Berlin. AMTMANN, F. 2013, Nutzung von GNSS-Messungen für vermessungstechnische Arbeiten im Hochbau am Beispiel EZB-Neubau in Frankfurt/Main, Bachelor Thesis, Hochschule für Angewandte Wissenschaften, Fachhochschule Würzburg-Schweinfurt. BACHMANN, H. 2013, Verformungen im Hochhausbau am Beispiel des Neubaus der EZB und des Taunusturms in Frankfurt, in: Fischer, O. (Ed): 17. Münchner Massivbau Seminar, Tagungsband, Förderverein Massivbau der TU München e.v., München. CRANENBROECK, J. van 2010, Controlling Vertical Towers, Reporter 63, Global Magazine of Leica Geosystems, Leica, Heerbrugg. GRETHEN, M. 2003, Vermessung Messeturm Basel, Vermessung-Photogrammetrie- Kulturtechnik, Jg. 101, Nr. 3, Schweiz. IGL 2011, EZB New Premises Frankfurt/Main Konzeption baubegleitende Vermessung, vermessungstechnische Überwachung der Bauausführung, Ingenieurgesellschaft Gemmer und Leber mbh, Werneck. KÄGI, R. 2006, Staking Out Using the MOUS System, in: Ingensand, H. (Ed.): lecture notes, Geodetic Metrology and Engineering Geodesy, IGP, ETH-Zürich. WHITWORTH, J. 2010, Monitoring Europe s Tallest Building, Leica Geosystems TruStory, Leica, Heerbrugg. WHITWORTH, J. 2012, The Shard London s New Skyline, Reporter 67, Global Magazine of Leica Geosystems, Leica, Heerbrugg. WUNDERLICH, Th. 2013, Die Zukunft der geodätischen Absteckung von Bauwerken, in: Nr.8, Geodätische Arbeiten für Bundeswasserstraßen, BA f. Gewässerkunde, Koblenz.