FEES BUILDING DEPARTMENT



Similar documents
CITY OF BAYTOWN Building Inspections

BUILDING INSPECTION DEPARTMENT FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

BUILDING DIVISION CONSTRUCTION PERMIT FEES

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Building Permit, Fire Inspection and Operating Permit Fee Schedule

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) Fax: (508)

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

ARTICLE 22: FEE SCHEDULE

Frequently Asked Questions

Homeowner s Guide to Residential Building Permits

Development Services Guidelines

A Guide to Building Permits for Home Owners / Renovators. Address: 1 Carden Street Guelph, Ontario N1H 3A1

CHESTERFIELD COUNTY DEPARTMENT OF BUILDING INSPECTION RESIDENTIAL FEE SCHEDULE SUMMARY 7/1/2016-6/30/2017

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

Ferry County Out Building Application

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

Development Services Guidelines

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

17 East Main Street Cuba,NewYork Code Enforcement

BUILDNG PERMIT FEES Resolution # Effective October 1, 2011

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

City of Hill Country Village Residential Construction/Development Packet

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

Contractor Information 2011

BUILDING PERMITS. Santa Rosa County Building Inspection

FREQUENTLY ASKED QUESTIONS: 1) Q: When is a building permit required?

Single Family Residential Building Permit Questions & Answers

Town of Surf City Community Development. General Permit Information

C I T Y O F P E A R S A L L

PLUMBING ROUGH IN INSPECTION

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

CITY OF CHICAGO DEPARTMENT OF BUILDINGS RULES AND REGULATIONS for CERTIFICATES OF OCCUPANCY

CITY OF MIAMI FEE ORDINANCE

Building Permit & Plan Check Fees

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

Bureau Veritas Contact Information

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

Uniform With Exceptions

Pennsylvania Uniform Construction Code Homeowner s Guide

TOWN OF TRURO BUILDING PERMIT APPLICATION

PARK COUNTY BUILDING PERMIT GUIDE PO Box 517 Fairplay, CO Fax: Inspections:

2016 BUILDING PERMIT FEES*

APPLICATION FOR BUILDING PERMIT. Date of Birth: City: State: Zip: City: State: Zip: Asbestos Removal Vacant Non-Residential

RESIDENTIAL WINDOW REPLACEMENT

VILLAGE OF BETHALTO COMMERCIAL BUILDING PERMIT APPLICATION

City of Beacon Building Department

Third Party Plan Review and Inspection Procedures

Fill out all sections or mark with N/A (not applicable)

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

KS 60, (785) (785) E-

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

Building and Other Permits Fee Schedule Effective Date: July 1, 2016 BUILDING PERMIT FEE

REGULATIONS for INSTALLATION, MAINTENANCE, and TESTING APPLICATION PACKET

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

Commercial Fee estimate The Building department will provide the actual fees at the time the permit is issued.

Schedule B to By-law

Building FAQ s. Answers to Frequently Asked Questions about Building & the Building Permit Process

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

WHEN IS A PERMIT REQUIRED?

How To Get A Fire Alarm Permit In Vail


PERMIT SUBMITTAL REQUIREMENTS

Applications for building permits will not be reviewed until all of the required information has been submitted.

CITY OF COLUMBUS, OHIO DEPARTMENT OF DEVELOPMENT BUILDING SERVICES DIVISION

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

APPLICATION. Internal Use Only 1311 Chestnut Street TDLR# Bastrop, Texas Intake Date

SECTION THREE CONSTRUCTION CODES

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

Placement of Manufactured Homes on Private Property

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

Chapter 8 BUILDING AND CONSTRUCTION REGULATIONS??

Building Code Inspections and Fees

PERMIT APPLICATION. PLEASE PRINT LEGIBLY INCLUDE STREET NUMBER/NAME, CITY & STATE 1 Job Name:

A Homeowners Guide To Code Enforcement

City of Mandeville. Guidelines for Construction and Development

MODERATE INCOME HOUSING UNIT PROGRAM PRICE & RENT SUMMARY FOR LOW INCOME ALTERNATIVE January 1 through June 30, 2016*

Department of Community Development, P. O. Box 427, Herndon, Virginia

HERNANDO COUNTY FIRE ALARM GUIDELINES

City of Riverside. Building & Safety Division Phone: (951)

City of St. Charles Basement Finish or Remodel

How To Write A Building Code In Kendall County

COUNTY OF LOS ANGELES BUILDING AND SAFETY DIVISION ELECTRICAL CODE FEE SCHEDULE (Title 27 of the County of Los Angeles Code, Ord No.

Total Cost of the Building Permit. Total Valuation*

Transcription:

FEES BUILDING DEPARTMENT ADMINISTRATIVE FEES (NON-COMMERCIAL) Sec.18-4 Residential Admin Fees (NON-REFUNDABLE) Single Family Residential New Build $300.00 Additions, Alterations..$100.00 Accessory Structures, Pole Barns, Garages etc $100.00 Electrical, Mechanical, Plumbing New Build $100.00 Electrical, Mechanical, Plumbing..$ 50.00 Electrical, Mechanical Furnace/Air..$ 25.00 Electrical, Mechanical Generator..$ 25.00 INSPECTION & LICENSE FEES (Residential & Commercial) Inspection Fee (Per Inspection)...$65.00 Re-Inspection Fee(Per Re-Inspection)..$65.00 License Fee Building, Electrical, Mechanical (3 Year). $15.00 License Fee Master Plumber (1 Year).. $ 1.00 License Fee Journeyman Plumber(1 Year) $.50 REMEMBER: ALL PERMITS HAVE ADMINISTRATIVE FEES NEW RESIDENTIAL BUILDING PERMIT FEES New Single-Family Residential Construction use group(s) (RE/F, R-1 and R-2) cover main structures and all attached buildings: Up to 1,500 square feet.$ 410.00 1,501 to 2,000 square feet..$ 500.00 2,001 to 2,500 square feet..$ 565.00 2,501 to 3,000 square feet $ 640.00 3,001 to 3,500 square feet $ 720.00 3,501 to 4,000 square feet $ 795.00 4,001 to 4,500 square feet $ 875.00 4,501 to 5,000 square feet $ 950.00 1

5,001 to 5,500 square feet $1,025.00 5,501 to 6,000 square feet $1,100.00 After 6,001 square feet, plan review and base fee plus $ 400.00 $1,000.00 over $10,000.00 construction cost $400.00 a) If a consultant review is necessary, a fee will be levied accordingly. b) Structures over 3,500 square feet shall require an architectural seal. c) Jobs started prior to permit issuance will result in double permit fees as non-refundable administration charges. d) Plan review includes the following: Plan review, footing, backfill, trench, rough, insulation, final and well inspections. e) All fees must be paid prior to a final certificate of occupancy. f) Re-inspection fees will be assessed a fee of $65.00 per inspection. REMEMBER TO ADD ADMIN FEE (NONREFUNDABLE)..$300.00 New Single Family Residential Electrical, Mechanical and Plumbing Permits: Up to 1,500 square feet $135.00 1,501 to 2,000 square feet.$160.00 2,001 to 2,500 square feet.$185.00 2,501 to 3,000 square feet.$210.00 3,001 to 3,500 square feet.$235.00 3,501 to 4,000 square feet.$260.00 4,001 to 4,500 square feet.$285.00 REMEMBER TO ADD ADMIN FEE (NON REFUNDABLE).$100.00 SINGLE FAMILY RESIDENTIAL ADDITIONS & MISCELLANEOUS STRUCTURE FEES 1) Residential Structures: Additions and Remodels a) Administration Fee..$ 100.00 b) Plan Review and Base Fee $125.00 c) Square Footage Fee..$.10 2) Miscellaneous Structures: Pole Barns, Garages, Sheds a) Administration Fee.$100.00 b) Plan Review and Base Fee.$100.00 c) Square Footage Fee $.05 2

3) Decks a) Administration Fee $ 50.00 b) Base Fee $ 50.00 c) Square Footage Fee..$.05 ADDITIONAL FEES 1) Fireplace (per unit) Mechanical Permit a) Administrative Fee $ 50.00 b) Two Inspections (Rough & Final).$130.00 2) Woodstove/Mechanical Permit a) Administrative Fee.$ 50.00 b) One Inspection (Final)..$ 65.00 3) Replacement Furnace (Needs Mechanical & Electrical Permit) Mechanical Permit Replacement Furnace a) Administrative Fee $ 25.00 b) One Inspection (Final).$ 65.00 Electrical Permit Replacement Furnace a) Administrative Fee $ 25.00 b) One Inspection (Final).$ 65.00 4) GEO Thermo Heat Pumps (Needs Mechanical & Electrical Permit) *ASK IF IT WILL BE AN OPEN LOOP OR CLOSED LOOP SYSTEM *IF IT IS AN OPEN LOOP/PUMP AND DUMP THEY MUST TELL YOU WHERE THE WATER IS BEING DISCHARGED *(IF IT IS GOING TO BE DISCHARGED INTO A POND, RIVER ETC OR INTO A WETLANDS AREA THEY MUST HAVE DEQ APPROVAL/A PERMIT OR WAIVER FROM THE DEQ MUST BE SUBMITTED TO US PRIOR TO BEING ISSUED A MECHANICAL PERMIT FROM US) a) Administrative Fee $25.00 b) One Inspection (Closed Loop or Open )..$65.00 3

5) Air Conditioning Unit (Brand New/Not A Replacement) (self-contained or split) Per Unit (Needs Mechanical & Electrical Permit) Mechanical Permit Air Conditioning Brand New Unit a) Administrative.$25.00 b) One Inspection (Final).$65.00 Electrical Permit Air Conditioning Brand New Unit a) Administrative $25.00 b) One Inspection (Final)..$65.00 Air Conditioning Replacement/Mechanical Permit a) Administrative Fee..$50.00 b) One Inspection (Final) $65.00 6) L.P. Tank(s)/A.S.T. Flammable Tanks/Mechanical Permit a) Administrative Fee $50.00 b) One Inspection (Final).$65.00 7) Hot Water Heater/Mechanical or Plumbing Permit a) Administrative Fee.$50.00 b) One Inspection (Final)..$65.00 8) Hot Tubs/Mechanical Permit a) Administrative Fee.$50.00 b) One Inspection (Final)..$65.00 9) Pools In-Ground Pool/Building Permit a) Administrative Fee.$ 50.00 b) Two Inspections (Footing & Final) $100.00 Above Ground Pool/Building Permit a) Administrative Fee...$50.00 b) One Inspection (Final).$50.00 4

Pool Heater/Mechanical Permit a) Administrative Fee.$50.00 b) One Inspection (Final)..$65.00 10) Sign(s) Sign Non-Electric/Building Permit a) Administrative Fee.$ 25.00 b) Two Inspections(Footing & Final).$100.00 Sign Electric & LED/Building Permit & Electrical Permit Required Sign Electric/Building Permit a) Administrative Fee $ 25.00 b) One Inspection (Final).$150.00 Sign Electric/Electrical Permit a) Administrative Fee.$ 25.00 b) One Inspection (Final)..$ 25.00 11) Generator/Needs Mechanical & Electrical Permit Generator Mechanical Permit a) Administrative Fee $25.00 b) One Inspection (Final).$65.00 Generator Electrical Permit a) Administrative Fee.$25.00 b) One Inspection (Final)..$65.00 12) Mobile Home in Park Permit Fees Mobile Home /Needs Building, Electrical, Mechanical & Plumbing Permit Mobile Home Set Up in Park/Building Permit a) Administrative Fee.$ 25.00 b) Two Inspections (Rough & Final)..$300.00 (Final to take place when Electrical, Plumbing & Mechanical are all approved) 5

Mobile Home Set Up in Park Electrical Permit a) Administrative Fee $50.00 b) One Inspection (Final).$65.00 Mobile Home Set Up in Park Mechanical Permit a) Administrative Fee.$50.00 b) One Inspection (Final)..$65.00 Mobile Home Set Up in Park Plumbing Permit a) Administrative Fee.$50.00 b) One Inspection (Final)..$65.00 13) Modular/Manufactured Homes (Permits same as Residential Single Family New Home Permits) 14) Temporary Certificate of Occupancy Fee $65.00 15) All Re-Inspection Fees for Residential/Commercial/Mechanical /Electrical and Plumbing..$65.00 16) Fire Department Fees a) Inspections..$65.00 b) Research, Per Hour.$45.00 c) Fire and Emergency Rescue Fees: See Ordinance #193 17) Unsafe Buildings a) Cost to property owner for hearing.$150.00 b) Hearing Officer $200.00 18) Demo Permit..$100.00 Refund of Permit Fees: If work has not started, fees may be returned with 50 percent of the administration fee retained by the Township. Request must be in writing and all original permits returned to the Township. ANY AND ALL REINSPECTIONS $65.00 6

COMMERCIAL AND INDUSTRIAL BUILDING AND CONSTRUCTION FEES COMMERCIAL ADMINISTRATIVE FEES Sec.18-4 Commercial and Industrial Building and Construction Admin Fees (NON-REFUNDABLE) New Construction: $1,000 - $5,000,000..$ 500.00 $501,000 PLUS.$1,000.00 Individual Tenant Space $ 500.00 Electrical, Mechanical, Plumbing $100.00 INSPECTION & LICENSE FEES (Residential & Commercial) Inspection Fee (Per Inspection)...$65.00 Re-Inspection Fee (Per Re-Inspection).$65.00 License Fee Building, Electrical, Mechanical (3 Year). $15.00 License Fee Master Plumber (1 Year).. $ 1.00 License Fee Journeyman Plumber(1 Year) $.50 REMEMBER ALL PERMITS HAVE AN ADMINISTRATIVE FEE 1) New Building Pre-Construction Meeting Fee..$750.00 (This is NOT the same as Pre-Construction Site Plan/at this meeting ALL INSPECTORS attend to discuss the Building of the Building) a) Non-Refundable Administrative Fee $250.00 b) Meeting (consultant(s)/inspector(s))..$500.00 c) Additional Consultant fees may be charged. 2) BOND: Commercial & Industrial (Based on Cost of Construction) (Refunded after issuance of Certificate of Occupancy) New Commercial/Industrial Buildings a) $1,000 - $250,000..$ 500.00 b) $251,001 $500,000 $1,000.00 c) $501,000 PLUS.$1,500.00 7

3) ADDITIONS & ALTERATIONS (COMMERCIAL & INDUSTRIAL) (Other Non-Residential Structures in Zoning District(s)/Churches, Hospital, Schools etc ) a) $1,000 - $10,000...$250.00 b) $10,001 - $250,000..$500.00 c) $251,000 - $500,000 $750.00 d) $501,000 PLUS $1,000.00 4) New Commercial & Industrial Construction: Total cost of improvement as adopted by the State Department of Labor Bureau of Construction Codes: a) Up to $1,000.00.$ 50.00 b) $1,000 to $10,000 + $10.00 per $1,000 over $1,000.$ 50.00 c) $10,001 to $100,000 + $3.00 per $1,000 over $10,001 $140.00 d) $100,001 to $500,000 + $3.00 per $1,000 over $100,000.$410.00 e) $500,001 + $3.00 per $1,000 over $500,001..$1,610.00 Permit to include additional plan review fees, as adopted by the State Construction Code Commission, January 31, 1979. REMEMBER TO ADD ADMINISTRATION FEE (SEE PAGE 7) 5) COMMERCIAL & INDUSTRIAL ADDITIONS & ALTERATIONS: (Based on Cost of Construction) a) $1,000 - $10,000 $ 250.00 b) $10,001 - $250,000..$ 500.00 c) $251,000 - $500,000 $ 750.00 d) $501,000 PLUS $1,000.00 Jobs started prior to permit issuance will result in double permit fees as nonrefundable administrative charges. All other construction: Construction cost valuation is based on square feet as tabulated by the latest building valuation data reported from the International Building Code. 8

6) ELECTRICAL, MECHANICAL, PLUMBING COMMERCIAL/INDUSTRIAL a) New Construction Admin Fee $100.00 Base Fee $150.00 Plus.25 a square foot b) EXISTING BUILDS (other than re-wire) Admin Fee $100.00 Base Fee $ 50.00 Inspection Fee (may need more than 1 inspection) $ 65.00 c) COMMERCIAL GENERATOR (needs Mechanical & Electrical) Mechanical Generator Admin Fee..$100.00 Inspection Fee (1 inspection).$ 65.00 Electrical Generator Admin Fee..$100.00 Inspection Fee (1 inspection)...$ 65.00 d) FIRE SUPPRESSION & ALARM SYSTEMS (needs Mechanical & Electrical) Mechanical Permit Fire Suppression Admin Fee $100.00 Base Fee $150.00 Up to 1000 square feet + $0.05 per square foot over 1000 square feet Electrical Permit Fire Alarm Admin Fee $100.00 Base Fee $150.00 Up to 1000 square feet + $0.05 per square foot over 1000 square feet 9

ADDITIONAL INSPECTIONS FOR ALL PERMITS/PER INSPECTION $65.00 RE-INSPECTION FEE FOR ALL PERMITS/PER INSPECTION.$65.00 PLAN REVIEW & BUILDING CODE REVIEW FEES: Volume of Building (cubic feet) Building Code Review (Base Fee) Energy Code (Review fee) Plumbing/Electrical /Mechanical Code Barrier Free/Fire (review fee per individual review) Up to 20,000 $90.00 $55.00 $55.00 20,001 40,000 120.00 55.00 55.00 40,001 60,000 155.00 60.00 55.00 60,001 80,000 185.00 70.00 61.00 80,001 100,000 215.00 80.00 69.00 100,001 150,000 245.00 90.00 76.00 150,000 200,000 265.00 95.00 81.00 Over 200,000 265.00 30% of base fee 25% of base fee Plus $2.50 per each 10,000 cubic feet over 200,000 cubic feet Assembly, Institutional and Mercantile Covered Malls Over 40,000 cubic feet shall be 1.5 times the indicated base fee Refund of Permit Fees: If work has not started, fees may be returned with 50 percent of the administration fee retained by the Township. Request must be in writing and all original permits are returned to the township. 10