THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES



Similar documents
RARE ISOTOPE ACCELERATOR (RIA) PROJECT*

Catherine LeCocq, Robert Ruland. February, 2008

Development of Radiation Resistant Quadrupoles Based on High Temperature Superconductors for the Fragment Separator

Projects and R&D activities

Introduction. Magnet Coordinate System

Straightness Measurements for Accelerator Structures

Cathode Ray Tube. Introduction. Functional principle

MSU View of RIA R&D Priorities. R.C. York August 2003

BARREL ALIGNMENT- A CRITICAL FACTOR IN REDUCING EXTRUDER WEAR

Brookhaven Magnet Division - Nuclear Physics Program Support Activities

Accurate Air Flow Measurement in Electronics Cooling

10 Project Costs and Schedule

3 LEVELLING & SURVEYING

Cryogenic Performance of Millitech Model FBI-22 Waveguide Isolator.

MYRRHA Injector Design

The process components and related data characteristics addressed in this document are:

Force on Moving Charges in a Magnetic Field

Activities at the University of Frankfurt (IAP)

Wire Position Monitoring with FPGA based Electronics. Introduction

Magnetism. d. gives the direction of the force on a charge moving in a magnetic field. b. results in negative charges moving. clockwise.

FCC JGU WBS_v0034.xlsm

The ithemba LABS Radioactive Beam Project. R A Bark

STUDY OF THE TRANSVERSE BEAM EMITTANCE OF THE BERN MEDICAL CYCLOTRON

bi directional loading). Prototype ten story

Development of a Low Frequency Superconducting RF Electron Gun. September 2010

Reliability and Availability Aspects of. the IPHI Project

DEMONSTRATION ACCELERATOR DRIVEN COMPLEX FOR EFFECTIVE INCINERATION OF 99 Tc AND 129 I

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

Installation of a CMMS piece of software aiming to improve the maintenance strategy at Ganil

Status of the SOLEIL project Commissioning from Linac to beamlines

FIVE PROJECTS OF HIGH RF POWER INPUT COUPLERS & WINDOWS FOR SRF ACCELERATORS*

Large Systems Commissioning

Should SMTF Include RIA?

Development of High Stability Supports for NSLS-II RF BPMS

INTERNATIONAL HOCKEY FEDERATION PERFORMANCE REQUIREMENTS AND TEST PROCEDURES FOR HOCKEY BALLS. Published: April 1999

T1-40 T1-40BF T1-40V T1-38 T1-38BF T1-38V

Field Application Note

Portable Digitilt Tiltmeter

Ferroxcube. For more information on Product Status Definitions, see page Sep CBW625

1. The diagram below represents magnetic lines of force within a region of space.

A Measurement of 3-D Water Velocity Components During ROV Tether Simulations in a Test Tank Using Hydroacoustic Doppler Velocimeter

5-Axis Test-Piece Influence of Machining Position

Industrial Robotics. Training Objective

E. K. A. ADVANCED PHYSICS LABORATORY PHYSICS 3081, 4051 NUCLEAR MAGNETIC RESONANCE

1. Units of a magnetic field might be: A. C m/s B. C s/m C. C/kg D. kg/c s E. N/C m ans: D

A new extraction system for the upgraded AIC-144 cyclotron

Technical Specification for the Cryogenic Testing of HTS Current Leads

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

Lecture VI Magnetic Design

TABLE OF CONTENT

Manual for simulation of EB processing. Software ModeRTL

4.3.5: High Temperature Test 3

Physics 41, Winter 1998 Lab 1 - The Current Balance. Theory

T1-40 T1-40BF T1-40V T1-38 T1-38BF T1-38V

Abrasive-Flow Machining

Expression of Interest in providing design and manufacturing of detectors for the construction of the European X-ray Free Electron Laser Facility

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

ALIGNMENT FOR NEW SUBARU RING

Digital vs. Analogue Control Systems

How To Improve The Ganil Control System

In-situ Load Testing to Evaluate New Repair Techniques

Measurement of Charge-to-Mass (e/m) Ratio for the Electron

ACCESSORIES. Radiant Heater Controller, with 3021 Radiant Heater: Stand-Alone Radiant Heater Controller, with 3021 Radiant Heater.

The Bonelle Tool and Cutter Grinder

Equipment Manual. for. Operation of Automatic Polishing Plate Control on the PM5 Precision Lapping & Polishing Machine.

General Injection Mould Specifications KONGSBERG AUTOMOTIVE GROUP

Gamma Ray Detection at RIA

Rear Impact Guard TEST METHOD 223. Standards and Regulations Division. Issued: December 2003

Free piston Stirling engine for rural development

The connector we use most in joining beams is the Technic pin. The Technic pin comes in several variants, as shown in Figure 1 below.

The Californium Source Upgrade

R&D Support Services. Ad Astra Rocket Company

Slice Emittance Measurements at the SLAC Gun Test Facility*

MONDOATHENS BASKETBALL SET (Reference PK110)

Chapter 3. Track and Wheel Load Testing

Spin Tracking with COSY INFINITY and its Benchmarking

Dual H&D Cavity for the PAX Target Polarimeter

Conceptual: 1, 3, 5, 6, 8, 16, 18, 19. Problems: 4, 6, 8, 11, 16, 20, 23, 27, 34, 41, 45, 56, 60, 65. Conceptual Questions

TPC laser calibration system

Precision Vise Combinations

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

Practical Alignment Tools and Techniques

INJECTION MOLDING COOLING TIME REDUCTION AND THERMAL STRESS ANALYSIS

E/M Experiment: Electrons in a Magnetic Field.

Proceedings of the Sixth Workshop on RF Superconductivity, CEBAF, Newport News, Virginia, USA

Types of 3D Scanners and 3D Scanning Technologies.

Servo/Hydraulic Press Brake. HG Series HG 5020, HG 8025, HG 1303, HG 1703 HG 1704, HG 2203, HG 2204

AP2 Magnetism. (c) Explain why the magnetic field does no work on the particle as it moves in its circular path.

LEReC Engineering. J. Tuozzolo, C-AD Chief Mechanical Engineer (LEReC Project Engineer)

Status of High Current Ion Sources. Daniela Leitner Lawrence Berkeley National Laboratory

Tube Control Measurement, Sorting Modular System for Glass Tube

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON

Spring Term. Lecturer: Assoc. Prof. Dr. M. Zeki COŞKUN. Department of Geomatics Engineering coskun@itu.edu.tr

Solutions Manufacturing Performance

Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford

1) Cut-in Place Thermoforming Process

OPTICAL MEASURING MACHINES

LHC MACHINE PROTECTION

A Practical Guide to Free Energy Devices

Transcription:

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES R. Beunard, GANIL, BP 55027, 14076 CAEN, CEDEX 5, France Abstract The SPIRAL2* project, located at the GANIL** facility in Caen, France, has been studied since the beginning of 2001, and is now under construction. This project aims at delivering energetic rare (radioactive) isotope beams with intensities not yet available with presently running machines. An important aspect of this project is that it will allow GANIL to deliver to users up to five different beams in parallel. This paper is focused exclusively on the alignment strategy which will be used for the LINAC superconducting cryomodules (Fig. 1). It is composed of two cryomodule families, one of low beta, called Cryomodule A, and one of high beta, called Cryomodule B. According to the beam dynamics calculations, all the cavities will operate at 88 MHz: one family at beta =0.07 and the other at beta = 0.12. The solution adopted to support the LINAC components is a welded-frame structure equipped with a guide rail. One advantage of this solution is the possibility to bring a component to a laboratory together with its support, for example, in order to do a realignment of the cavities in the cryostat, then to install it back on the beam line under the same conditions, using the guide rails. During the assembly process, once the cryomodule is closed, the interior of the superconducting cavities cannot be accessed outside a clean room. As a result, the cavity will have to be equipped with optical targets mounted on an arm in order to facilitate its alignment inside the cryostat. For the final phase, special target boxes (fiducials) will be adjusted on the sides of cryomodules supports to ensure their alignment on the guide rails. Alignment will be controlled at each stage of the assembly process [1] [2]. 20 m 35 m Figure 1 : Layout of the SPIRAL2 superconducting linac cryomodules * SPIRAL2 : Système de Production d Ions Radioactifs Accélérés en Ligne [production system of on-line accelerated radioactive ions] ** GANIL: Grand Accélérateur National d Ions Lourds [Large-scale national accelerator for heavy ions] THP2-01 1

INTRODUCTION SPIRAL2 is the project of a facility intended for the production of new beams of stable and radioactive ions at GANIL. The SPIRAL2 facility is based on a high-power superconducting driver linac which delivers a highintensity, 40-MeV deuteron beam, as well as a variety of heavy-ion beams with mass-to-charge ratio equal to 3 and energy up to 14.5 MeV/u. The driver accelerator will send stable beams to a new experimental area and to a cave for the production of radioactive ion beams (RIBs). The commissioning of the driver should start in 2011 at GANIL. Fast neutrons produced from the break-up of the 5-mA deuteron beam using a carbon converter will induce up to 10 14 fissions/s in a uranium carbide target. The extracted RIB will subsequently be accelerated to energies up to 20 MeV/u (typically 6-7 MeV/u for fission fragments) by the existing CIME cyclotron. This paper is focused mainly on the survey and alignment techniques selected for installation of the SPIRAL2 linac superconducting cryomodules. We will also present the survey instruments which will be used for alignment. THE LINAC SUPERCONDUCTING CRYOMODULES The linac itself is based on superconducting independently-phased resonators. It is composed of 2 families of quarter-wave resonators (QWRs) at 88MHz, developed respectively by the CEA/DAPNIA and the IN2P3/IPNO teams: 12 resonators (Fig. 2) with βo=0.07 (1 cavity/cryomodule) and 16 resonators (Fig. 3) at βo=0.12 (2 cavities/cryomodule). The transverse focusing is ensured by means of warm quadrupole doublets located between each cryomodule. These warm sections include also beam diagnostic boxes and vacuum pumps. The peculiarity of the cavities is that they made up of niobium. This is one of the materials used for superconducting equip ment. In the framework of the project, the Cryomodule A refers to the first family. Twelve superconducting cavities of this first kind take over the beam after the RFQ to continue the acceleration. These first cavities are optimised for speeds around 7% of the speed of light. Each cryomodule contains a single cavity. The cavity vacuum and the temperature isolation vacuum are separated. The cryomodule is box-shaped with a removable panel on each side for easy access. The cavity will be supported and Figure 2: QWR - β 0 = 0.07 CEA/DSM/DAPNIA (Saclay) fixed inside the cryomodule by ten rods. Two vertical rods support the cavity, and eight rods placed in a cross (four at the top and four at the bottom) fix the cavity vertically. The cross patterns of these eight rods prevent horizontal motion of the cavity inside the cryomodule during cool-down. Due to the thermal shrinking of the vertical rods combined with the shrinking of the stainless steel helium tank and that of the cavity niobium, the cavity beam tube will move up by about 1.1 mm during cooldown. In the framework of the project, the Cryomodule B refers to the second family. Eighteen superconducting cavities of this type will be used along the last part of the linac, so that the ions reach higher velocities. These cavities are optimised for 12% of the speed of light. Each cryomodule contains two cavities. The insulation vacuum and cavity vacuum are separated. The cavity will be supported and kept in position by means of three vertical and four horizontal rods (Fig. 4). The horizontal rods placed in a cross will prevent lateral movements during the cryomodule cooling down. For the vertical position the combined shrinkage of the rods and the cavity helium vessel will induce a Figure 3: QWR - β 0 = 0.12 CNRS-IPN (Orsay) Figure 4: View of three vertical and four horizontal rods displacement of around 1.5 mm. It is possible to adjust this position from outside the cryostat vacuum vessel once the cryomodule will be cold. Simulated values for the cavity axis displacement during cool-down may have some uncertainties and will be measured on a prototype assembly [3]. The integration aspects The solution adopted to support the linac components is a welded-frame structure equipped with a guide rail (Fig.8). One advantage of this solution is the possibility to bring a component a laboratory together with its support in order to do, for example, a realignment of the cavities in the cryostat, and then to install it back on the beam line under the same conditions, using the guide rail. The linac tunnel width is intended to be sufficient to install all the components and space is also reserved for activities like the safety and alignment processes. For THP2-01 2

survey, the necessary space on the same side as fiducials of the cryomodules was defined during the integration of drawings in the design office. Alignment tolerances The tolerated maximum static errors for the global alignment are: - ± 0.1 mm for the displacement of the quadrupoles - ± 0.03 for the rotations (X,Y) of the quadrupoles - ± 0.2 for the rotation (Z) of the quadrupoles - ± 1 mm for the displacement of the cryomodules - ± 0.3 for the rotation (X,Y) of the cryomodules - ± 0.25 mm for the displacement of the BPM Components fiducialization bench As the components cannot be aligned through the beam tube, the solution adopted is to transfer new axes outside the object (quadrupole and cryomodule), i.e. to the sides of their supports, by adjustable target boxes or fiducials (Fig. 8 and 9). These external references will allow the alignment of one cryomodule cavity with respect to the others. The transverse tilt of cryomodules will be given by a plate fixed to the cryostat. The shifting of the beam axis will be carried out on a dedicated bench. The design work is presently in progress (Fig. 5). The spatial coordinates of these fiducials would be given in the reference system of the accelerating tubes of the cavities (after alignment inside cryomodule) and the mechanical axis of the poles for the magnets. Before beginning the fiducialization, the bench rails will be carefully aligned parallel to each other by using a special tool (Fig.6). It will be necessary to pay careful attention to the alignment of these rails, particularly the guide rail, which will become the unique baseline for positioning of fiducialization tools. This bench is a section of the linac welded-frame structure. The principle is to define a line in 3D-space for each shifted axis. To realize these lines, we will fix a machined plate referenced to the guide rail at each end of the bench. These plates include the different machined holes placed according to the shifted axis, which can locate respectively a Micro-Alignment Telescopes (MAT) and a Taylor-Hobson reticule (Fig.5). The three-dimensional coordinate measurements of these fiducials will be done by means of a portable-arm coordinate-measuring machine. The measuring accuracy given by this system is ± 0.06 mm (at 2σ). To ensure the measurement accuracy by using the portable arm, it is essential to define a plane in the object volume. This plane is defined on the object s frame by three spherical-head benchmarks previously adjusted in the same plane (Fig. 7). Guide rail Figure 6: Alignment tool of the rails Figure 7: Benchmarks plane Fiducial Tilt-meter plate 0.50m Figure 8: Cryomodule A and quadrupoles fiducialization Reticule Tilt-meter plate Fiducial Telescopes 0.50 m Guide rail Figure 5: Components fiducialization bench Figure 9: Cryomodule B fiducialization Transfer methodology of the qualifying cryomodule A cavity beam axis Once the cryomodule is closed, it no longer possible to change the cavity position with respect to the vacuum tank. External references of the cavity position will allow the alignment of one cryomodule cavity with respect to THP2-01 3

the others (Fig. 10). Previous measurements of the cavity beam axis displacement during cool-down will be necessary to check the calculation. This will be made using a bare cavity [4]. Figure 10: Target arm fixtures for transferring beam axis of the cavity A by means of inter-dependent tools in the two beam tubes. The positioning of the target supports is obtained via to a rod inserted in the arms of the alignment tools (Fig.12). The target supports can be taken apart to permit chemical cleaning operations [5]. Qualifying cryomodule B: measurement of the cavities motion during vacuum tests and cooling down The technical principles include an optical method to control the cavities alignment and the possibility of vertical adjustment of the cavities from the outside once the cryomodule is cooled down (Figs 13 and 14). Some solutions are being studied to measure the displacements during vacuum tests and cooling down. The best solution for measuring the displacements of the three tubes in all directions is the capacitive technique. For reasons of cost, this solution was not adopted for the Transfer methodology of the qualifying cryomodule B cavities beam axis During the assembly process, once the cryomodule is closed, the interior of the superconducting cavities cannot be accessed outside a clean room. As a result, the cavity will have to be equipped with external references (optical targets) mounted on an arm in order to facilitate its adjustment inside the cryostat (Fig.11). The rotation of the cavity around the beam axis inside the cryostat will be adjusted by applying the angle measured by means of the tilt-meter during the operation of fiducialization. After a levelling process of the cavity, the transfer is carried out 0.50 m Figure 11: Target arm fixtures for transferring beam axis of the cavity B Figure 12: Axis located on the helium tank with respect to the measured cavity axis Figure 13: Test-bench for measurement of cavity displacements during cool-down test cryomodules [6]. Consequently, on this cryomodule, an optical measurement through on windows will be carried out by inserting targets in the beam tubes. With this solution, one will be able to measure the displacements only in two perpendicular directions. Three telescopes will be used. All these measurements could possibly be done at assembly (4K) without cleaning of the cavity. For reasons of sighting on the inserted reticules in the beam tubes, the displacement measurements will be done in two stages, i.e. per cavity (Fig. 15). So far, the measures have been carried out on an only cavity installed inside the cryostat. The analysis is in progress. Figure 14: Measurement of cavity displacements, IPN-Orsay, THP2-01 4

other laboratories involved in this project, particularly from IPN ORSAY and the DAPNIA Saclay. Figure 15: Drawing showing the points to be measured CONCLUSIONS The alignment of the superconducting cryomodules will be a challenge, especially for transferring beam axis outside both the cavities and the cryostats. During this fiducialization process, we should make corrections on the fiducials positioning according to observed displacements during vacuum tests and cooling down. These external references will allow the alignment of one cryomodule cavity with respect to the others. Presently, three techniques are discussed to align the straightness of the linac: Using laser alignment or the micro-alignment Telescope (MAT) with a CCD camera. They give both horizontal and vertical deviations simultaneously using a tacheometer combined with a digital level Using a laser tracker. We have designed a test-bench to evaluate the performances of the alignment laser and of the Micro- Alignment Telescope (MAT) with its CCD camera. It has been used to adapt the procedures for the measurements and to validate the methods which will be used for the alignment of the linac components. Today, due to a lack of availability from suppliers, the MAT has not yet been tested. REFERENCES [1] A. Mosnier, The SPIRAL2 Project, APD Report, Survey System, Chapter VII-17 to VII-20, EDMS n 004609, January 2005 [2] R. Beunard, SPIRAL2 Accelerator-Survey and Alignment Concept, Poster, SPIRAL2 2 Week, Nov. 2007 [3] A. Mosnier, The SPIRAL2 Project, APD Report, Cryomodules, Chapter III-11 to III-27, EDMS n 004609, January 2005 [4] R. Beunard, Test cryomodule A: transfer of the cavity beam axis, internal note, EDMS n 010375, March.2007 [5] R. Beunard, Test cryomodule B: transfer of the cavity beam axis, internal note, EDMS n 011823, Nov.2007 [6] R. Beunard, Survey Cryostats at 4K, internal note, EDMS n 003340, April 2004 The major parts of the superconducting SPIRAL2 accelerator devices are now under construction. The design of the building is under way and its construction will start in 2009. ACKNOWLEDGEMENT I would like to acknowledge all members of the GANIL design offices, as well as the colleagues from the THP2-01 5