Case Study of Emergency Disconnect Sequence in the Gulf of Mexico



Similar documents
API Std 53 - Blowout Prevention Equipment Systems for Drilling Wells Last update: August 12, 2015

New Generation of Deepwater BOP Stacks. Dominique Allegre CAMERON Paris, October 23rd 2013

10 Wireline operations

AOG 2015 Acoustic System to Monitor Wellhead Fatigue in Real-time. March 12 th

Deepwater Horizon Accident Investigation Report

This document, and more, is available for download from Martin's Marine Engineering Page -

Deepwater Horizon Disaster

Department of the Interior

An Approach To Oil Spill Containment For Floating Drilling Operations In Canadian Beaufort Sea Pack Ice Conditions

Deepwater Horizon Summary of Critical Events, Human Factors Issues and Implications

BOP Basic Safety Functions. Katrine Harsem Lund Principal Engineer, Department Manager Scandpower AS

HPHT CAPPING STACKS AND NEW TECHNOLOGY FOR SUBSEA WELL CONTROL. December 3, 2014 Presenter: Mike Cargol

APPENDIX D. Offshore Drilling Well Control

PETROLEUM PRODUCTION MASTERCLASSES

NavDP4000 Series Dynamic Positioning Systems

LINKING SEABED TO SURFACE

Risk Assessment Data Directory. Report No. 434 A1 March Appendix 1

Troubleshooting Guide for Jacks Down LED Lights

MUX Control of subsea BOP without an Umbilical

Analysis of the Deepwater Horizon Accident in Relation to Arctic Waters

BOP PRESSURE TESTING PROCEDURE

IMPORTANT INSTRUCTIONS & OPERATING MANUAL. Houston 50 Inch Electric Wall Mounted Fireplace Black / White

WIND ALARM. Wind Speed Alarm. Wind Speed. Set Point 2. Set Point 1 NEW BEDFORD, MA USA

Fire Pump Controllers Remote Alarm Panels

Total Subsea Solutions

Offshore Structures. Offshore Drilling Equipment

Diesel Engine Driven Generators Page 1 of 6

WELL COMMANDER Versatile multi-cycle ball-activated drilling valve for mitigating downhole hazards

Understanding Emergency Power Off (EPO)

1998½-2007 Dodge Ram 5.9L Cummins

Portable Air Conditioner

Subsea Drilling Systems

Texas Oil Tools Subsea Well Intervention Equipment

creating progress for the future

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

REDACTED VERSION DEEPWATER CHAMPION EMERGENCY RESPONSE MANUAL VOLUME 1 OF 2. Non Controlled

TECHNICAL AND OPERATIONAL GUIDANCE (TECHOP) TECHOP_ODP_08_(O) (ANNUAL DP TRIALS AND GAP ANALYSIS) SEPTEMBER 2014

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Cooktop Low-Profile Ventilation Hoods

HDS Gen2 RTM 4.0 software update

The Dalian Developer A new approach to oil spill response


FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

SERVICE MANUAL FOR 12 VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOF TOP UNITS ONLY

SSP Offshore. Well Containment. April 2011

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

AGM presentation 13 May 2009

Managing risks for lay-up of OSVs and Rigs

INSTALLATION GUIDE. Card Reader & Controller with KIM Swipe Reader for Solitaire 850 / 950 / 850L Learnlok PK2930

Mobile Case Studies in Success

AADE-07-NTCE-30. Underwater Seafloor Drilling Rig Adel Sheshtawy, AADE, USDR Inc.

Model SETR-50 and SETR-51 Trim Tab Control

MODEL 5010 DUAL CHANNEL SMOKE/FIRE DETECTION MODULE

1 What is the purpose of this document?

DORMA MODEL PS-406BB POWER SUPPLY INSTALLATION INSTRUCTIONS

Solar Home System. User Manual. AEH-SHS01-10W2L Solar Home System 2 Lamps

Digital Keypad Use s Manual


..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

Vantage Pro2 Temperature/Humidity Sensor Replacement Kit

12 Volt 30 Amp Digital Solar Charge Controller

Deepwater Horizon Oil Spill. BP 2010 Gulf of Mexico Oil Spill

National Oilwell Varco uses PTC University s elearning and assessment solutions to improve design and accountability

SERVICE MANUAL 12VDC WALL THERMOSTAT AIR CONDITIONING SYSTEMS ROOFTOP UNITS ONLY

SCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E (mobile)

Utility Distribution Systems

A View from the (Deepwater) Horizon: Regulatory and Statutory Developments Affecting Offshore Drilling and. Spill Liability.

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

GPS Vehicle and personal location tracker. User manual

Installation Guide. WSD-100 Wind Speed and Direction Sensor For XR5 Data Loggers. February, 2011

2» 10» 18» 26» PD »

CATIA Tubing and Piping TABLE OF CONTENTS

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

SCHWINTEK IN-WALL SLIDEOUT TROUBLESHOOTING AND COMPONENT REPLACEMENT

WHOLESALE DIRECT INC WEST 65TH STREET

The First Offshore MH Production Test. Takami Kawamoto JOGMEC June 7, 2013

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

How To Build A Kingkong Production System

Automatic Phone-Out Home Monitoring Systems

Introduction to Subsea Production System

Installation Instructions

GHC 20 Owner s Manual

How To Get A Marine Safety License

Rigorous Qualification and Development Program

Recommendations for enhancements to well control training, examination and certification

Fatality Assessment and Control Evaluation Project

Woods Hole Group, Inc. Oceanography and Measurement Systems Division INTEGRATED REAL-TIME MONITORING SYSTEM

tidesmarine Smart Seal Temperature Alarm System Generation II Installation Instructions Starboard side cable

R02GA. July 31, Dear Blue Bird Owner:

LINE POWERED ADA TELEPHONE USER S MANUAL Use With Part Numbers , , , , , and

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

Stop Alert Flasher with G-Force sensor

Bypass transfer switch mechanisms

Azimuth thrusters. propulsors

Career on a drilling rig

VEHICLE SPEED CONTROL SYSTEM

Transcription:

Case Study of Emergency Disconnect Sequence in the Gulf of Mexico Trent Fleece Subsea BOP Operations Team Lead May 8, 2015

Case Study of Emergency Disconnect Sequence in Gulf of Mexico Industry Standards - Recommended Practice 53 - Standard 53 EDS provisions US Code of Federal Regulations Case Study - 2006 EDS on Semi-Submersible - 2006 EDS on Drillship 1-2012 unable to EDS on Drillship 1 during deadman testing after latch-up to wellhead Considerations for EDS planning 1

Industry standards API Recommended Practice 53 Blowout Prevention Equipment for Drilling Wells No provision for EDS API Standard 53 provisions - 7.4.13 Emergency Disconnect System/Sequence 7.4.13.1 An EDS shall be available on all subsea BOP stacks that are run from a dynamically positioned vessel. An EDS is optional for moored vessels. 7.4.13.2 The EDS is a programmed sequence of events that operates the functions to leave the stack and controls in a desired state and disconnect the lower marine riser package (LMRP) from the lower stack. 7.4.13.3 The number of sequences, timing, and functions of the EDS are specific to the rig, equipment, and location. 7.4.13.4 There shall be a minimum of two separate locations from which the EDS can be activated e.g. located in the primary and remote control stations. 7.4.13.5 Frequency of testing and acceptance criteria shall be in accordance with Table 6 and Table 7. Table 6 Table 7 EDS tested prior to deployment requirement to complete sequence in under 90 seconds. EDS tested subsea at Commissioning and 5 yearly requirement to complete sequence in under 90 seconds. 2

U.S. Code of Federal Regulations Requirement to prevent accidental disconnects of the LMRP - 250.442 (i) Develop and use a management system for operating the BOP system, including the prevention of accidental or unplanned disconnects of the system. The management system must include written procedures for operating the BOP stack and LMRP (including proper techniques to prevent accidental disconnection of these components) and minimum knowledge requirements for personnel authorized to operate and maintain BOP components. 3

Example 1: 2006 EDS on Semi-Submersible Preparation & Procedural Discipline 2100 19 March 2006: High environmental loads experienced - 6,844 feet water depth - Weather conditions: > 2 knots current, 30 knots wind 0730 20 March 2006: Well suspension activities started - Pull bottom hole assembly (BHA) into shoe; hang off; begin seawater displacement of riser - Environmental loads continue to increase: yellow alert declared per rig contractor policy; 6-5/8 27.7 ppf drill pipe is sheared on lower blind shear ram (LBSR) 0817: Engine #7 fuel leak; engine taken offline; > 80% power load rig contractor policy is red alert when >80% power load 0822: Offshore Installation Manager (OIM) orders emergency disconnect upon reaching red alert conditions (>85% power load at time of EDS) - EDS Sequence Casing shear closed, LBSR closed, LMRP disconnects 0825+: LMRP separated from lower BOP. Engine 5 trips offline due to temperature. 2 thrusters taken offline. Other 6 engines trip offline due to under voltage. Rig experiences blackout and drifts off location. Rig moves 1960 feet off location. 4

Well Status 6-5/8 27.7# drill pipe cut at lower blind shear rams Upper BSR Lower BSR Casing Shears Upper Pipe Rams Middle Pipe Rams Lower Pipe Rams Picture of sheared 6-5/8 drill pipe pulled to the surface 6

Example 2: 2006 EDS on Drillship 1 Preparation & Procedural Discipline 5 November 2006 Timeline: Blackout and EDS, water depth 6037 feet 0656: Port harmonic filter failure and main circuits experienced electrical power disruption (brown-out). Thrusters tripped offline and rig started drifting to northwest. Rig floor notified. 0657: Electrician notified Central Control Room (CCR) there had been an electrical fire in the port harmonic filter and that it was quickly extinguished. 0658: Yellow watch circle reached. OIM and Captain in CCR. 0659: Red watch circle reached; EDS initiated. EDS Sequence CSR closes, BSR closes, LMRP disconnects 0700: Thrusters A/D on line; attempts initiated to slow rig to a stop. 0701: Thrusters B/C/E on line; attempts initiated to slow rig to a stop. 0702: Rig blacks out. All engines and thrusters offline. 0706: Engines 1A/2B/1D started and synchronized onto bus. 0707: Aft thrusters running but problems experienced allowing thrusters to start and deliver power. 0717: Power restored thrusters. Rig drift stopped at 1,456 feet from location bearing 295. 0720: Began rig move back to well safe area at 0.3 knots. 7

2006 EDS on Drillship 1 Well Information Water depth 6037 feet Yellow watch circle of 81 feet, red watch circle of 136 feet 1.6 knots of current, 23 knots of wind All 6 thrusters online prior to incident; 2 engines online Drill pipe/cement stinger pulled above BOP in riser above the wellhead at time of incident Well secured by closing blind shear rams 8

Example 3: 2012 EDS on Drillship 1 Preparation & Procedural Discipline 22 April 2012: unable to EDS on Drillship 1 during deadman testing 8:47: Dynamic positioning (DP) logger registers the auto surge button being activated; vessel drift off starts. 8:48: Dynamic Positioning Officer (DPO) notices vessel has moved off well center. 8:49: Senior DPO takes corrective actions (manual intervention). EDS command given to driller when vessel is 131 feet off center; rig floor responds; unable to disconnect due to stack being in a dead state following deadman test upon latch-up to well 8:53: Preset position activated; vessel returns to full auto adjustment and moves back onto location. Maximum distance off center 195 feet Water depth 3,529 feet Calculates less than 4 degrees of angle on lower Flex Joint 9

Learnings from inability to EDS Drillship inadvertently taken off of auto position mode by the double function of the auto surge button which places the vessel surge axis in manual joystick control - Installed a cover over auto surge button after the event Training on personnel positioning clarify requirements for DPO and Senior DPO presence in control room BOP stack was performing deadman test upon initial latch up to a well - Deadman activated by disabling electrical power, and bleeding off hydraulic power to the control pod - BOP stack was in a dead state at time of DP event Develop and implement mitigations for performing deadman testing with the BOP latched to the wellhead Newer BOP control systems have the ability to de-energize the Loss of Electric solenoids from the control panel and to simulate Loss of Hydraulic for deadman testing with the BOP latched to the wellhead 10

EDS Considerations 3 EDS events: 1 associated with environmental load; 1 associated with dynamic position equipment failure; 1 associated with human error No standard for typical EDS from original equipment manufacturer (OEM) 1. Shearless EDS unlatch LMRP connector - May disable deadman/autoshear system (DMAS) 2. Single blind shear, unlatch LMRP connector 3. Casing shear, blind shear, unlatch LMRP connector API requirement to finish sequence in 90 seconds - Analyze shear test results of casing, heavy wall 6-5/8-inch DP Accumulator Capacity BOP stack and Surface Blackout considerations Review subsea deadman test procedure mitigations for performing deadman testing with the BOP latched to the wellhead Review of rig contractor s policy and procedures Rig drills of EDS scenarios Who is accountable? What if communication on the rig is disrupted? 11

Backup slides 12