EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM



Similar documents
EMERGENCY RESPONSE PLAN. For COWICHAN BAY WATERWORKS DISTRICT

Emergency Response Planning for Small Waterworks Systems

Water Quality Contingency Planning Standard EPB 540B

December 2003 EPB 241B. Some sections are completed, some are partially complete and some are left blank.

Emergency/Disaster Response Plan

Emergency Response Plan

Fire Alarm and Protection Impairment Policy and Procedures

COMPREHENSIVE DRINKING WATER SOURCE-TO-TAP ASSESSMENT GUIDELINE

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA

British Columbia Ministry of Education. Provincial Guidelines: Maintenance of Order under section 177 of the School Act

Clark University. Water Outage Preparedness and Response Plan. Revised January 11, 2013

A cure for water damage in real estate

Abnormal Operating Conditions Emergency Plans and Public Awareness Plans for Natural Gas Systems

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

STEP-BY-STEP BUSINESS CONTINUITY AND EMERGENCY PLANNING MAY

WATER RESOURCES MANAGEMENT MASTER PROGRAM Water Utility Administration and Management Course LECTURE 13

This presentation will introduce you to the concepts and terminology related to disaster recovery planning for businesses.


Emergency Quick Reference Guide

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

GUIDE NOTES FOR SCHOOLS, ACADEMIES AND COLLEGES

Planned and Emergency Utility Outage Guidelines

Jefferson Parish Department of Water Emergency Plan

NAIT Guidelines. Implementation Date: February 15, 2011 Replaces: July 1, Table of Contents. Section Description Page

Emergency Plan. This emergency plan provides a format of data essential in an emergency situation.

APPENDIX G-Emergency Response Plan Template

Gas Legislation Guidance IGE/GL/9 Communication 1724 Guidance for large gas consumers in dealing with Natural Gas supply emergencies

Risk Management Guidelines

Regulatory Framework for Disaster Recovery Planning for the ICT Industry

Business Unit CONTINGENCY PLAN

The Village of Malta

Emergency Response Plans. More than a phone tree Less than an encyclopedia Doing it just right

MAJOR PLANNING CONSIDERATIONS CHECKLIST

Business Continuity Management

Business Continuity Exercise: Electricity Supply Failure Appendix 4.4

GUIDANCE FOR WATER UTILITY RESPONSE, RECOVERY & REMEDIATION ACTIONS FOR MAN-MADE AND/OR TECHNOLOGICAL EMERGENCIES

Coping with a major business disruption. Some practical advice

Maryland Emergency Operations Plan

CONTINUITY OF OPERATION PLAN (COOP) FOR NONPROFIT HUMAN SERVICES PROVIDERS

Water Main Breaks After Normal Operating Hours

University of Victoria EMERGENCY RESPONSE PLAN

Emergency Response Plan

INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction

Preparing a Disaster Recovery Plan (Church)

APPENDIX 7 : PHYSICAL CULTURAL RESOURCES MANAGEMENT PLAN

The red lights are gone. Now what do we do?

FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE

Drinking Water Sector - Damage Assessment Report

Appendix 3 Disaster Recovery Plan

EMERGENCY RESPONSE PLAN

Water Main Break During Normal Operating Hours

Appendix J3 - Outline Fuel Spill Contingency Response Plan. Control room receives call on fuel spill from staff or public

Emergency Response Planning Template for Public Drinking Water Systems

How To Write A Flood Emergency Response Plan For Texamona University

Emergency Response Plan

Presentation Outline. Introduction Ontario s Spill Legislation Spills Action Centre Ministry Field Response Roles and responsibilities

AMOUNT New Account Deposit $50.00 Service Delinquent $10.00 Delinquency Notification $15.00 NSF Check processing $20.00

Planned, Limited Notice and Emergency Outage Guidelines

Business Continuity Planning for Schools, Departments & Support Units

Standard Operating Procedures for Water Line Response and Repair. 2/12/2014 Illinois State University Environmental Health and Safety

CRS Report for Congress

MARQUIS DISASTER RECOVERY PLAN (DRP)

Water Shortage Contingency Plan

Date Prepared: By: Wastewater Best Practices Subgroup Final Document:

would your business stay afloat?

Business Continuity Management For Small to Medium-Sized Businesses

Claims Services and Loss Management

Risk Engineering Guideline

INCIDENT RESPONSE MANAGEMENT PLAN DECEMBER 2015

Reduce Leaks Using water audits and leak detection surveys

Putting all of your pieces in place. Continuity Planning for Nonprofit Organizations

Business Continuity and Disaster Recovery Plan

Emergency Response Plan for Drinking Water Systems in First Nations Communities. Guide and Template

Title: Disaster Recovery Plan Revision: A Date: 1/25/2014

Emergency Plans

HIPAA Security. 2 Security Standards: Administrative Safeguards. Security Topics

South Norfolk Council Business Continuity Policy

Business Continuity Plan Assessment Tool v1.0

BETTENDORF PUBLIC LIBRARY INFORMATION CENTER EMERGENCY RESPONSE AND FACILITY CLOSURE POLICY

CONTINGENCY PLANNING FOR DISRUPTED ELECTRIC POWER: The Case for Partnering with a Strong Rental Power Supplier

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

Flood Checklist ACTION TO BE TAKEN BEFORE THE FLOOD SEASON

would your business stay afloat? A guide to preparing your business for flooding

Offsite Disaster Recovery Plan

Incident Response and Investigation Procedure

Service Level Agreement (SLA) for Customer by. Cybersmart ISP. (Cloud Hosting Agreement)

Sample Emergency Contact Form

Fire and Emergency Services Guide

Repaired 24 Mainline Leaks

Emergency Operations Plan ANNEX K - UTILITIES RESTORATION ESF #3, #12 I. MNWALK REQUIREMENTS. Item #: 1, 4, 46, 53, 54

DISASTER RECOVERY PLAN

EMERGENCY PREPARDNESS / DISASTER RECOVERY WORKSHEET

BUSINESS CONTINUITY PLAN

REPORT CITY OF DAWSON CREEK. Potable Water System Emergency Response Plan

Disaster Preparedness

Tree Work on District of West Vancouver Property

Flood Events Preparedness, Remediation and Restoration. Rev 3 Dec 2014

Clear Water Projects in Cooksville Creek Watershed

SAMPLE Emergency and Business Continuity Plan

Assisted Living Facilities & Adult Care Comprehensive Emergency Management Plans

Transcription:

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM INTRODUCTION The Drinking Water Protection Act requires a water supplier to monitor and protect its drinking water. According to the new regulations the water supplier is required to submit an Emergency Response and Contingency Plan (ERCP). An ERCP is a written document that spells out a water system s plan of action for responding to potential emergencies, disasters or abnormal operational circumstances. This plan is to provide guidelines that will minimize disruption of normal customer services and protect public health and safety if an incident should occur. Each ERCP must include the following information: a) the names and telephone number of i. the management personnel for the water supply system, ii. the drinking water officer, medical health officer and public health inspector, and iii. other agencies and officials specified by the drinking water officer; b) the persons referred to in paragraph (a) to be contacted in each type of emergency or abnormal operational circumstance; c) the steps to follow in the event of an emergency or abnormal operational circumstance; d) protocols to follow respecting public notice if an immediate reporting standard cannot be met. This specific ERCP was developed by the Regional District of Fraser-Fort George for the Azu Small Waterworks System. Within this plan specific community and RDFFG staff members are identified and assigned guideline procedures and appointed responsibilities. In the case of an incident, it is vital that these identified individuals be familiar with the scope of ERCP and their appointed responsibilities. This is to insure, that if an incident should occur, the safety of the public served by this water system is guaranteed and service disruption is minimal.

EMERGENCY RESPONSE PLAN FOR AZU SMALL WATERWORKS SYSTEM TABLE OF CONTENTS EMERGENCY RESPONSE PLAN ACTION LIST...1 Type of Emergency: Power Failure... 2 Type of Emergency: Complete Pump Failure at Pump House... 3 Type of Emergency: Contamination of Water... 4 Type of Emergency: Fire (Forest fire in watershed, or fire fighting with system water)... 5 Type of Emergency: Loss of Source (Water Supply)... 6 Type of Emergency: Earth Quake Loss or Structural Damage to Pump House... 7 APPENDIX A - EMERGENCY RESPONSE PLAN RESPONSIBILITY PLAN...8 APPENDIX B F: REMOVED AS PER FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT...9

Emergency Response Plan for Azu Small Waterworks System Page 1 AZU SMALL WATERWORKS SYSTEM EMERGENCY RESPONSE PLAN ACTION LIST Type of Emergency: Broken Water Main Notify Regional District staff. Locate valve & turn off. Notify all users of interruption of service. Arrange for repairs. Advise local Public Health Office. Arrange for alternate water source if necessary. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor: Azu Water Management Member:

Emergency Response Plan for Azu Small Waterworks System Page 2 Type of Emergency: Power Failure Notify Regional District Staff. Call B.C. Hydro to determine time for power restoration. Notify users to conserve water during power outage. Hook-up to the Powder King generator as soon as possible (see Appendix B). If with out power for longer than 12 hours, arrange for alternate power plant to be brought in (see Appendix B). Advise Public Health Office. Arrange for alternate water source if necessary. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor: BC Hydro: Power Plant Rental:

Emergency Response Plan for Azu Small Waterworks System Page 3 Type of Emergency: Complete Pump Failure at Pump House Notify Regional District Staff. Secure system at pump house. Contact pump repair company. Advise Pubic Health Office. Notify all users of interruption of service. Arrange for alternate water source if necessary. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor: Azu Water Management Committee member:

Emergency Response Plan for Azu Small Waterworks System Page 4 Type of Emergency: Contamination of Water Notify Regional District Staff. Notify effected users not to use water for domestic purposes, boil advisory. Advise Public Health Office. If contamination occurs near the end of the water system, isolate from rest of system. If entire system is contaminated drain and shut down system. Arrange for alternate water source. Bring contractor out to clear water system lines. Contact government agencies for advice and assistance. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor Azu Water Management member PEP, Ministry of Environment and others as necessary, depending on severity.

Emergency Response Plan for Azu Small Waterworks System Page 5 Type of Emergency: Fire (Forest fire in watershed, or fire fighting with system water) Notify Regional District Staff. Contact government agencies for advice and assistance. Advise Public Health Office. Notify all users of possible interruption of service. Arrange for alternate water source if necessary. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor:_ Azu Water Management Member: PEP, Ministry of Environment, Ministry of Forests, and others as necessary depending on severity.

Emergency Response Plan for Azu Small Waterworks System Page 6 Type of Emergency: Loss of Source (Water Supply) Notify Regional District staff. Ensure pump is shut off at pump house. Advise Public Health Office. Notify all users of loss of service. Arrange for alternate water source. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor: Azu Water Management Member:

Emergency Response Plan for Azu Small Waterworks System Page 7 Type of Emergency: Earth Quake Loss or Structural Damage to Pump House Notify Regional District staff. Shut off the water lines. Close main in flow and out flow line from pump house. Arrange for volunteers to man the pumps. Manually operate water system from pump house if possible. Cycle pumps as required to maintain adequate pressure. Advise Public Health Office. Notify all users of possible interruption of service. Arrange for alternate water source if necessary. Arrange for structural engineer to assess damage. Contact government agencies (see below) for advice and assistance. Contacts: See Appendix B for contact names and numbers RDFFG Contact / Maintenance Contractor: Azu Water Management Member: PEP, Ministry of Environment and others as necessary depending on severity.

Emergency Response Plan for Azu Small Waterworks System Page 8 APPENDIX A - EMERGENCY RESPONSE PLAN RESPONSIBILITY PLAN Responsibility of Designated RDFFG Staff Contact/ Maintenance Contractor: Actions: to take depending on emergency: Immediately attend to emergency, assess and take appropriate action if safe to do so. Ensure pump is shut off (to protect pump). Isolate parts or close down the entire water system. For shut-off valve location map (see Appendix F). Arrange for repairs (see Appendix B). Manually operate water system from pump house. Notify the Azu Water Management Member Contact person of the nature of emergency and of the action taken and to assist with emergency and arrange for communications within the community (see Appendix B). Contact appropriate government agencies for advice and assistance (see Appendix B). Notify public health office (see Appendix B). Contact media for public announcements. For media releases (see Appendix C). Post on RDFFG web site: warnings and daily status up-dates. Arrange for alternate source of water (see Appendix B). Contact appropriate utilities before excavating Take notes and photographs for documentation. Responsibility of Designated Azu Water Management Member Contact: Actions: to take depending on emergency: Report to and continue to up-date RDFFG Designated Emergency Contact person / maintenance contractor. Notification of all users of water system by Phone Tree (see Appendix E) or Door to door message posting (see Appendix D). If all users of the water system can t be reached, contact RDFFG contact personal to issue a media release. Set-up and post appropriate signage on Road Side Sandwich notice boards e.g.: Boil advisories, contamination of water supply and conserve water (see Appendix D) Arrange for assistance from other Azu Water Management Members to help with emergency (man pumps etc).

Emergency Response Plan for Azu Small Waterworks System Page 9 APPENDIX B F: REMOVED AS PER FREEDOM OF INFORMATION AND PROTECTION OF PRIVACY ACT