(1) DEMEX Consulting Engineers A/S, Denmark Abstract ID Number: 192 Author contacts Authors E-Mail Fax Postal address



Similar documents
Country specific notes on municipal waste data

European waste policy:

HUGO BOSS ENVIRONMENTAL COMMITMENT. Our claim. Our approach

How To Understand The Benefits Of An Industrial Symbiosis

Environmental Project No Miljøprojekt. Waste Indicators. Ole Dall, Carsten Lassen and Erik Hansen Cowi A/S

State of the Nation Report

ENVIRONMENTAL MANAGEMENT ACCOUNTING IMPLEMENTATION GUIDELINE

A. WASTE MANAGEMENT A.1. INTRODUCTION AND GENERAL ISSUES ON HAZARDOUS WASTES AND SOLID WASTES

4 R Guide Reduce Reuse Recycle Recover

ASBESTOS, DEMOLITION OR RENOVATION, SANDBLASTING, AND GRINDING STANDARDS

Environmental Policy. JRI Orthopaedics Limited

AURV471482A Plan and manage compliance with environmental regulations in the body repair industry

Brussels, 4 September European Cooperation in the field of Scientific and Technical Research - COST - Secretariat COST 279/01

C162 Asbestos Convention, 1986

Waste Management Policy

The Interaction between Soil and Waste Legislation in Ten European Union Countries

A clean energy solution from cradle to grave

Construction &Demolition Waste Mangagement

New environmental liabilities for EU companies

SAMI Microstar (SAMI MM, MD, MS)

Use of Substitute Fuels in Large Combustion Plants (LCPs)

Slide 1. Enviros Consulting Ltd

NAPCS Product List for NAICS 54162: Environmental Consulting Services

Waste Management. Background

Pollution Incident Response Plan

Economic and Social Council

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers

Undercover storage requirements for waste/recycling depots

Proposed (Concrete Cutting And Drilling) Environmental Management Plan

Costs of air pollution from European industrial facilities an updated assessment

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

INTEGRATED WASTE MANAGEMENT SERVICES

AGENCY SUMMARY NARRATIVE

Guide to nuclear decommissioning

State of the art sustainability marketing tools

Design and Construction policy for sustainable buildings and Campus environments

Horizon2020 Information Days on Public-Private Partnerships

Environmental technology and renewable energy solutions. The business advantage of Green Innovation, Budapest

Tomorrow s solutions today.

INDUSTRY INTRODUCTION: PLASTICS

Department of Public Works. Recycling policy for buildings and civil infrastructure

Cleaner Production as a Graduate Level Energy and Environmental Engineering and Management Course at AIT

CONSTRUCTION AND DEMOLITION WASTE IN THE REGION OF PORTO - PORTUGAL: MANAGEMENT AND SURVEY

Facility management briefing checklist

MANAGEMENT SYSTEM MANUAL

Key things to Know About Environment as a. Cross Cutting Issue In Early Recovery

INDUSTRIAL SITE SERVICES. sharing responsibility

Environmental Performance Data Calculation Standards

2013 CONSTRUCTION CONTRACTOR CATALOGUE ECATTS. Copyright ECATTS. All Rights Reserved.

Environmental Health and Safety Management Plan

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

CALL PRE ANNOUNCEMENT

Before the waste audit can start, a basic research structure must be worked out to ensure a smooth and successful investigation.

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Recycling of end-of-life building glass

Dukes of Hazard Activity Time:

ACR+ position paper on the Circular Economy Package 2.0

Site waste it s criminal A simple guide to Site Waste Management Plans

Bloomsbury Colleges Environmental Policy Statement

Recycling Old Mobile Phones

6 CONSIDERATION OF ALTERNATIVES

Environmental Accounting Guidelines

Hand Dishwashing Detergents

Construction Services

Environmental Management Plan

Bachelor s Programme in Agricultural and Environmental Management Study line: Environmental Management. Total Study description

The Management of Pharmaceuticals in the Environment (PIE) FAQ. Key questions and answers. Q: How do pharmaceuticals get into the environment?

Product Characteristics and their Relationship to End-of-Life Strategies

Greening Our Future By Educating Tomorrow s Workforce. Module 2: Lean Manufacturing and the Environment

Ingredion ANZ Pty Ltd

Annex 6 Recommendation on Safety Requirements for Contaminated Sites in Flood Risk Areas

Sustainable Development Strategy

Research for SWITCH-Asia Project: activities SO2 and SO3 IHS/Erasmus University

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Environmental Guidelines for Preparation of an Environmental Management Plan

We all take care. Vileda Professional s view on sustainability. Proudly North American.

Florida Department of Environmental Protection

Sustainability in construction at Creighton

Developments and trends shaping the future for Waste-to- Energy technology suppliers

THE MINISTRY OF ENVIRONMENTAL PROTECTION, PHYSICAL PLANNING AND CONSTRUCTION

How To Promote A Green Economy In The European Constitution

Pollution Incident Response Management Plan

EUROPASS DIPLOMA SUPPLEMENT

7th Framework Programme Theme 6 Environment (including climate change)

ISIC Rev.4 draft, Section E. Water supply; sewerage; waste management and remediation activities

IDEA CATALOGUE. Municipality to municipality cooperation between Viborg Municipality and Greater Irbid Municipality. The Arab Initiative Programme

URBACT III Programme Manual

D 8.2 Application Definition - Water Management

How To Help The European People

Procedure for the Recycling Material and Disposal of Waste from Laboratories

Transcription:

INTEGRATED DECONTAMINATION AND REHABILITATION OF BUILDINGS, STRUCTURES AND IN URBAN RENEWAL - A EUROPEAN PROJECT FOR A SUSTAINABLE CITY CONCEPT Inés García Sánchez (1) and Erik K. Lauritzen (1) (1) DEMEX Consulting Engineers A/S, Denmark Abstract ID Number: 192 Author contacts Authors E-Mail Fax Postal address Inés García Sánchez ig@demex.dk +45 3833 1317 Erik K. Lauritzen el@demex.dk +45 3833 1317 Contact person for the paper: Inés García Sánchez Presenter of the paper during the Conference: Inés García Sánchez Total number of pages of the paper (this one excluded): 10 3 DEMEX A/S, Esromgade 15, 2200 Copenhagen N, Denmark DEMEX A/S, Esromgade 15, 2200 Copenhagen N, Denmark Page 0

INTEGRATED DECONTAMINATION AND REHABILITATION OF BUILDINGS, STRUCTURES AND IN URBAN RENEWAL - A EUROPEAN PROJECT FOR A SUSTAINABLE CITY CONCEPT Inés García Sánchez (1) and Erik K. Lauritzen (1) (1) DEMEX Consulting Engineers A/S, Denmark Key words: Sustainable urban renewal, demolition, cleansing, integrated management system, decision-making tool, City Concept Abstract A project called Integrated Decontamination and Rehabilitation of Buildings, Structures and Materials in Urban Renewal (IRMA) is being conducted within the European Commission s Fifth Framework Programme Energy, Environment and Sustainable Development. This international initiative involves seventeen partners from nine European countries, representing important stakeholders with interests in urban development. The primary objective of the project is the development and implementation of a general City Concept comprising a toolbox of improved technologies and processes together with decision-making and management tools for sustainable urban renewal, focusing on contaminated buildings, in order to protect the environment from hazardous compounds and save reusable buildings and materials. The paper presents the main focal points of the project, including risk management, health and safety of construction and demolition workers, reduction of waste and preservation of buildings and resources. The holistic purpose of the project is to respond to some of the most important challenges of urban development, such as rehabilitation of old buildings, minimisation of waste and recycling of materials. Within this general context, focus will be placed on environmental aspects of demolition and reuse of the waste materials produced thereof. Firstly, cleaner techniques for selective demolition are developed, concentrating on the environmental aspects of the process in order to ensure optimal working conditions. Secondly, decontamination procedures of demolition waste are investigated so as to ensure an environmentally optimal reuse of those materials and prevent negative impacts during the re-use of the materials Page 1

1. INTRODUCTION Most buildings and structures contain substances potentially dangerous for the environment and human health. Some buildings have been constructed with materials containing substances considered harmful today, e.g. asbestos, PCB, heavy metals, certain paints, etc., which can constitute a problem both during the normal use and the renewal operations of the buildings. At the same time, some of the most important challenges of urban development are the rehabilitation of old buildings, minimisation of waste and the recycling of materials. The identification and management of contaminated structures and buildings are thus important prerequisites for an innovative environmentally-oriented approach to urban renewal. In this context, the development of measures to identify and manage the contamination of buildings and structures, and the integration of rehabilitation, demolition and recycling techniques into a common approach to urban renewal called City Concept are the main objectives of a research & development project called IRMA. IRMA stands for Integrated Decontamination and Rehabilitation of Buildings, Structures and Materials in urban renewal and it is a project carried out within the European Commission s Fifth Framework Programme Energy, Environment and Sustainable Development, Key Action 4: City of Tomorrow and Cultural Heritage. The contract no. EVK4-CT-2002-00092 contains the legal terms of the project. The Contract was signed in July 2003, the actual project s commencement date was August 2003, and it has a duration of 42 months, i.e. until February 2007. The project total cost is estimated to be 5,110,728 Euro, being half of it financed by the European Commission and the other half by the involved organisations. 2. ABOUT THE PROJECT 2.1 Project objectives The major problems encountered in the current context of urban renewal are that: very little practical applicable knowledge on the decontamination of buildings and materials is available there are no accepted technologies or guidelines for the decontamination of polluted buildings and materials there are no standards for the classification of decontaminated buildings and materials as clean the means of classification of polluted soil cannot be applied to recycled materials a considerable amount of vandalism (graffiti) results in the need for decontamination the health and safety of personnel carrying out work on contaminated buildings is insufficiently regulated The main objective of the IRMA project is to develop and implement a general City Concept comprising a toolbox of improved technologies and processes together with decision-making and management tools for sustainable urban renewal. This managerial model focuses on contaminated buildings, in order to protect the environment and the people from hazardous compounds and optimise the reusability buildings and materials. This includes: Minimisation of risk to occupants of buildings Health and safety of construction and demolition workers Reduction of waste Preservation of buildings and resources Page 2

2.2 Project participants The project consortium consists of seventeen (17) partners from eight (8) European countries. They represent important stakeholders with interests in the decontamination of buildings in urban development: housing and civil contractors, demolition contractors, recycling specialists, consultants, universities, research institutes and municipal administrators. Table 1 includes the partners participating in the project, the type of organisation they are and the country they are established at. Table 1. Information on project partners PARTNER NAME TYPE OF ORGANISATION COUNTRY Demex Consulting engineers Denmark Dansk Beton Teknik Concrete testing and R&D Denmark center Intron Technical consultancy and The Netherlands laboratory Demoliciones Técnicas Demolition contractor Spain Belgian Building Research Institute Research institute Belgium Brandis Demolition contractor Denmark Enviro Challenge Recycling contractor Belgium Contento Trade Research and technology center Italy SBS Byfornyelse Urban renewal and consultancy Denmark Hochschule Bremen University Germany Delft University of Technology University The Netherlands Brussels Institute for Management of Public administration Belgium Environment Amarsul Municipality waste Portugal management company Rotterdam Public Works Public administration The Netherlands Engineering Dr. Tech. Olav Olsen Consultant engineers Norway Meldgaard Recycling equipment suppliers Denmark Federal State of Bremen Public administration Germany 2.3 Project contents The project is organised following a modular scheme, addressing each of the main objectives in separate Work Packages (WP). Table 2 presents the contents addressed in each of the work packages. Table 2. Structure of the project into Work Packages and their contents WP 1. Compilation of data on building contamination and development of database Development of a database to be used as information tool Compilation of the relevant baseline information Description of the state-of the art on decontamination of buildings, structures and materials WP 2. Assessment of contaminated buildings and structures Identification of existing contamination and assessment of the related risk for human health and environment based on their behaviour with respect to emissions Page 3

Environmental impact and risk assessment of selected urban development scenarios comprising large groups of buildings, including contaminated buildings and structures WP 3. Development of cleansing and demolition methods Improvement or further development of clean processes for the removal of surface contamination in buildings and structures Improvement or further development of clean processes for the selective (partial) demolition of structures WP 4. Cleansing of waste materials Development of techniques for eco-efficient cleansing processes of demolition waste Development of techniques for maximum recovery and reuse of building waste materials WP 5. Development of City Concept for decontamination and rehabilitation of buildings, structures and materials Development of a model and a computer program for an integrated management system called City Concept for activities and processes related to decontamination and rehabilitation of urban structures and buildings: Demolition (partial and total) Cleansing of surfaces and materials Recycling and reuse of recycled materials WP 6. Evaluation of City Concept for European cities Feasibility study and evaluation of the "City Concept" in the following European cities and urban areas: Bremen (D), Brussels (B), Copenhagen (DK), Aarhus (DK), five municipalities on the Setubal Peninsula (P) and Rotterdam (NL) Demonstration of the City Concept during a test project in connection with an actual rehabilitation plan WP 7. Implementation and exploitation Reporting, recommendation and guidelines Development of a "Code of Good Practice for Works on Contaminated Buildings" including: Guidelines for sampling and analysis procedures for contaminated building surfaces, presentation of criteria for the emission behaviour of pollutants; and guidelines and input data for risk assessment Proposed decontamination methods for construction waste on an industrial scale with related environmental impact analysis and socio-economic optimisation Guidelines for project management, including decision making, planning, supervision and administration WP 8. Project management Project coordination and administration in accordance with the contract requirements and pursuing the highest quality of the project s outcome Despite of the presented division of work, necessary for the realisation of the project in praxis, the whole project is conceived as a unitary working process aiming at the final objective: the development and evaluation of the City Concept to be used for urban renewal processes at European level. The interrelation among the different Work Packages described in table 2 is depicted in figure 1. 2.4 Project outcome The main outputs of the project suitable for exploitation follow the objectives of the individual work packages. The outcome of the project concentrates on the introduction of Page 4

cleaner processes and maximum waste recycling in the construction and demolition industry focusing on urban rehabilitation and supporting safe and extended lives of buildings. The results of the project will be materialised in the following deliverables, all pieces of an integrated management system for decontamination and rehabilitation of buildings, structures and materials in urban renewal, i.e. the City Concept. Final Report. Descriptive document about the development and findings of the specific work packages and the project in general. Database. Database of pollutants appearing in buildings and related materials, their physico-chemical properties and their possible interactions with building materials, preferential disposition sites, methods for their quantification and efficiency of appropriate cleaning techniques among others. Code of Good Practice for Works on Contaminated Structures. Guideline providing a structured approach for the identification and safe and efficient handling of contaminated structures and leading to maximum recovery of materials and minimum consumption of resources. Dissemination material. Demonstration material including video documentation of different activities for training and further education of engineers and skilled workers in clean construction, refurbishment and demolition procedures. WP1 BASELINE Data compilation Database Sate-of-art WP2 ASSESSMENT Risk Assessment Decision-making: recycling / demolition WP3 CLEANSING / DEMOLITION Techniques Environmental assessment Efficiency WP4 CLEANING WASTE Techniques Environmental assessment Efficiency WP5 DEVELOP CITY CONCEPT Integrated Management Tool (theoretical) WP6 EVALUATION CITY CONCEPT Testing model WP7 IMPLEMENTATION Conclusions Recommendations Guidelines WP8 PROJECT MANAGEMENT Financial co-ordination Scientific co-ordination Figure 1. Interrelations among Work Packages Page 5

3. CITY CONCEPT 3.1 Description of the model Developing an integrated management approach to urban renewal is the main objective of IRMA project. This approach is compiled within a model called City Concept, which is described in this section. Figure 2 represents the conceptual model for the holistic process of urban renewal described by the City Concept. The development of an old urban area, e.g. industrial area or harbour area, towards new purposes, e.g. housing or business, includes two complementary approaches: demolition of buildings and clearance of old infrastructure - which are condemnable or not useful for the new purposes - and management of building waste materials with respect to maximum reuse rehabilitation of existing buildings and infrastructure, and reuse of these structures for new purposes DEMOLITION RECYCLING DECONTAMINATION OF City of today DECONTAMINATION OF BUILDINGS City of tomorrow REHABILITATION REUSE OF BUILDINGS Figure 2. Conceptual model of the City Concept The decisions about the renewal strategy are based on many factors, being the contamination of structures and materials a determinant one. A sequence of measures to identify and manage contamination will be designed within the first stages of the project. These measures will be implemented into the integrated management system with the following consequences for the urban renewal process: hazardous substances in buildings and structures are identified and classified toxic emissions during demolition activities are prevented the lifetime of a structure can be extended existing polluted building and structures can be rehabilitated and reused important volumes of polluted demolition waste materials (primarily concrete and masonry rubble) can be recycled the volume of contaminated building waste will be reduced materials can be recovered upon complete or selective demolition to save natural resources and to avoid the need to dispose off waste open spaces at the urban rehabilitation sites are used for the establishment of crushing and sorting machinery in order to allow all recycling to be carried out on site. Only contaminated waste and other non-recyclable materials are to be transported from the site Page 6

3.2 Elements of the City Concept Figure 3 presents the elements of the City Concept model; each of them is shortly described below. 19 HAZARDOUS WASTE 20 WASTE 21 POLLUTED SOIL 22 NATURAL 2 OBSOLETE STRUCTURE S 3 DECONTAM INATION 4 DEMOLITION 5 SITE CLEARANCE 6 CONSTRUC TION 7 NEW STRUCTURE S 15 SORTING CLEAN 1 OLD CITY 14 17 18 RUBBLES CRUSHING RECYCLED 23 NEW CITY 16 CLEANING CONTAMIN. 8 REUSABLE STRUCTURE S 9 DECONTAMI NATION 10 REHABILI TATION 11 SITE CLEARANCE 12 RECONST RUCTION 13 REUSED STRUCTURE S 19 HAZARDOUS WASTE 20 WASTE 21 POLLUTED SOIL 22 NATURAL Material Process Structure Status Figure 3. Diagram showing the elements of the City Concept 1. The Old City comprises a number of structures. Based on the assessment of the structures and depending on the city development master plan and on the existing conditions, the structures are divided in two main categories: obsolete and reusable. 2. The obsolete structures comprise all kind of structures. The structures are assessed with respect to demolition and waste management. A general master plan for demolition contamination, recycling and waste management is prepared. 3. The decontamination comprises asbestos removal, collection of hazardous waste, removal of polluted substances and structures, cleansing of surfaces. A part of the decontamination will take place during the demolition work. 4. The demolition will be performed as selective demolition in order to sort all fractions of building waste materials on the site. Contaminated structures will be classified into clean and contaminated materials in order to minimise the overall volumes of contaminated materials. 5. The site clearance will take place after completion of the demolition. Polluted soil will be removed from the site, and replaced by natural materials or recycled materials. The site clearance depends on the master plan for the new city. 6. New structures will be constructed on the cleared sites with the maximum use of recycled materials for aggregate in concrete, sub-base materials or fill. Recycled materials might also be used in construction of temporary roads and structures. Page 7

7. The new structures comprise new buildings, roads, open spaces and gardens. 8. The reusable structures, including buildings, roads and various installations are assessed with respect to their function in the new city. 9. The decontamination comprises asbestos removal, collection of hazardous waste, removal of polluted substances and structures and cleansing of surfaces. A part of the decontamination will take place during the following rehabilitation work. 10. The rehabilitation of the structure depends on the need for changes of the building and the building conditions. An important part of the rehabilitation work implies removal of installations and partial demolition of the structure. The decontamination will partly take place during the rehabilitation work. 11. The site clearance around and inside the structure will take place after completion of the partial demolition. Polluted soil will be removed from the site, and replaced by natural materials or recycled materials. 12. The reconstruction of the reused structures will take place according to the public requirements of new structures and the design of the reused structures. Recycled materials will be used to the widest extend as possible. 13. The reused structures shall comply with the public requirements for buildings and other structures, and the lifetime is expected to be the same as that of new buildings. 14. The rubbles generated during demolition and rehabilitation are collected and transported to a building waste recycling plant on site or transported to an external plant according to the demolition waste recycling plan. Clean materials and contaminated materials are stored separately. 15. The non-contaminated rubble materials are sorted in different fractions in function of the material, e.g. steel, wood, etc. 16. The rubble materials contaminated by oil, chemicals and heavy metals for example, are to be cleaned or reused for special purposes. 17. Crushing of rubble materials takes place in mobile crushing plants and sieves on-site or in stationary crushing plant outside the city area. 18. The recycled materials are intended to be used as aggregates, sub-base materials or filling materials. 19. The hazardous waste materials are to be incinerated, disposed off at controlled landfills or subjected to special treatment. 20. Those waste materials that are not recycled will be disposed off at landfills or incinerated in accordance to national and local regulations. 21. Polluted soil is removed according to national/local regulations and the intended future use of the site. The polluted soil might be treated and returned to the site. 22. Natural materials or virgin materials are transported from quarries or riverbeds from outside the city. 23. The New City will contain a mix of new and reused structures. The infrastructure will also be new or reused structures. 3.2 Economic perspective of the City Concept The diagram showing the elements of the City Concept - Figure 3 - indicates processes and streams of materials. An objective of the City Concept is to optimise the material flow with respect to economy and environment. It means that the amount of generated waste materials and the consumption of natural materials must be reduced to a minimum, which requires maximum recycling. This is schematically represented in figure 4 below. Page 8

RECYCLING & CLEANING X NATURAL A - X NEW CITY OLD CITY B - X CDW (Hazardous waste, polluted soil and other waste) TOTAL COST = COST (A-X) + COST (B-X) + COST (X) Figure 4. Economic perspective of the City Model A crucial barrier to recycling is the contamination of buildings to be demolished or rehabilitated. Hazardous waste is very expensive to dispose off on controlled landfill, to incinerate or to receive special treatment. Therefore, it is necessary firstly to separate the contaminated materials from clean materials, in order to minimise their volume and concentrate the pollution, and secondly to develop and implement appropriate cleansing techniques for buildings, structures and materials. 4. CONCLUSIONS A research & development project is being performed within the European Commission s Fifth Framework Programme Energy, Environment and Sustainable Development. The project is called IRMA, which stands for Integrated Decontamination and Rehabilitation of Buildings, Structures and Materials in urban renewal. The project - which is in its early stages - addresses some of the most important challenges of urban development, such as rehabilitation of old buildings, minimisation of waste and recycling of materials. Within the project, the identification and management of the contamination of structures and buildings are common prerequisites for the development of an innovative environmentally-oriented approach to urban renewal. A model called City Concept is the core and main objective of the project, consisting of an integrated management system, where rehabilitation, demolition and recycling techniques are combined into a common approach to urban renewal. The City Concept comprises a toolbox of improved technologies and processes, focusing on contaminated buildings in order to minimise risk to environment and people from hazardous compounds and to save reusable buildings and materials. The City Concept consists of decision-making and management tools for sustainable urban renewal, including: Minimisation of risk to the occupants of buildings Health and safety of construction and demolition workers Preservation of buildings and resources Reduction of waste This model - to be used among the city planners and construction & demolition practitioners - will guide towards a sustainable approach to urban renewal, providing the managerial and information tools necessary to integrate environment and health & safety Page 9

considerations as important factors within the decision-making process related to urban renewal. The project is still at its early stages. At this moment Work Package 1 has been completed and the baseline study contained herein provides a valuable basis for further work towards the development of the City Concept. Maximum interaction with relevant stakeholders around Europe is desirable for an optimal project outcome and in order to ensure its future usability. REFERENCES [1] Torring, M., Management of Concrete Demolition Waste, Dr. Ing. Thesis 2001:65, Department of Geology and Mineral Resources Engineering, Faculty of Applied Earth Sciences, (Trondheim Norwegian University of Science and Technology, 2001) [2] Lauritzen, E.K. and Hansen, T., Recycling of Construction and Demolition Waste 1986-1995, Environmental Review No. 6, Danish Environmental Protection Agency, Danish Ministry of Environment and Energy (1997) [3] Hendriks, C.F., Nijkerk, A.A. and van Koppen, A.E., The Building Cycle, (Æsneas technical publishers, The Netherlands, 2000) Page 10