IMQ RULES. Contents. IMQ Rules - Product certification



Similar documents
General Rules for the certification of Management Systems

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

NABL NATIONAL ACCREDITATION

Rules for the certification of event sustainability management system

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN :2009

Rules for the certification of asset management systems

TERMS AND CONDITIONS FOR THE NATIONAL MANAGEMENT SYSTEMS CERTIFICATION SCHEME

CORPORATE QUALITY MANUAL

Nuclear Safety Council Instruction number IS-19, of October 22 nd 2008, on the requirements of the nuclear facilities management system

Qualified Electronic Signatures Act (SFS 2000:832)

FMC Technologies Measurement Solutions Inc.

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities

Supplier Quality Requirements and Clauses

REGULATIONS FOR THE CERTIFICATION OF MANAGEMENT SYSTEMS

EA-7/01. EA Guidelines. on the application. Of EN Publication Reference PURPOSE

Article 1: Subject. Article 2: Orders - Order Confirmation

Working Party on Control of Medicines and Inspections. Final Version of Annex 16 to the EU Guide to Good Manufacturing Practice

Frequently Asked Questions. Unannounced audits for manufacturers of CE-marked medical devices. 720 DM a Rev /10/02

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing

Rules for the certification of Food Safety Management Systems

PLANT VARIETIES PROTECTION ACT (CHAPTER 232A, SECTION 54) PLANT VARIETIES PROTECTION RULES

UNCONTROLLED COPY FOR REFERENCE ONLY

Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment

Regulations for certification of quality management systems

INTRODUCTION OF PHASE 2 OF AN GARDA SÍOCHÁNA POLICY ON MONITORED INTRUDER ALARMS.

ISO/IEC QUALITY MANUAL

Appendix 1 ATTACHMENT A REVISED OPERATIONAL CERTIFICATION PROCEDURES (OCP) FOR THE RULES OF ORIGIN OF THE ASEAN-CHINA FREE TRADE AREA

General Description of The CMC- Services

PRCP CE. Version 5.0 of 16 June Date of entry into force: 1 July 2013

ΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΗΛΕΚΤΡΙΣΜΟΥ ΑΕ ΑΡΙΘ. ΙΑΚΗΡΥΞΗΣ : ΙΕΥΘΥΝΣΗ YΛΙΚΟΥ & ΠΡΟΜΗΘΕΙΩΝ ΜΕΤΑΦΟΡΑΣ Οδός ΥΡΡΑΧΙΟΥ 89 & ΚΗΦΙΣΟΥ

MTS GUI LICENCE SCHEDULE TO. MTS Data Terms & Conditions End Customer; or. MTS and EuroMTS Membership Documentation; or. MTS Registered ISV Agreement

General Rules for the Certification of Management Systems Code: RG

Example of a food company quality

ICCS Convention No. 28 Only the French original is authentic

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

Federal law on certification services in the area of the electronic signature

GRTGAZ NETWORK TRANSMISSION CONTRACT

NATURAL GAS STORAGE LICENCE GRANTED TO [MARATHON OIL IRELAND LIMITED]

Chapter 3 - Additional rules for the certification program: Organic Production Methods (USDA NOP)

Memorandum of Understanding

VELUX General Quality Requirements

Trading Rules of the Georgian Stock Exchange

Comparison ISO/TS (1999) to VDA 6.1 (1998)

3.3 Recording of Requests for Inspection and Inspection Certificates

VdS Guidelines for the Certification of quality management systems

Quality Management System

Criminal Justice Offender Tracking System Certification Program Requirements

DECISIONS ADOPTED JOINTLY BY THE EUROPEAN PARLIAMENT AND THE COUNCIL

Regulations for the certification of environmental management systems in conformity with UNI EN ISO 14001:2004

Electronic Documents Law

INTEROPERABILITY UNIT

How To Ensure Quality Assurance

PRODUCT CERTIFICATION REQUIREMENTS

Section IX. Annex to the Particular Conditions - Contract Forms

Guide for Custom-Made Dental Device Manufacturers on Compliance with European Communities (Medical Devices) Regulations, 1994

THIRD SUPPLEMENT TO THE GIBRALTAR GAZETTE No. 4,167 of 7th May, 2015

Generic CMMS Quality Assurance Plan

23. The quality management system

GUIDANCE NOTE FOR MANUFACTURERS OF CUSTOM-MADE MEDICAL DEVICES

Self-Audit Checklist

Office for Nuclear Regulation

Keywords: inspection; nuclear material control and accountancy (NMC&A); quality management system

ELECTRONIC COMMERCE AND ELECTRONIC SIGNATURE ACT (ZEPEP-UPB1) (Official consolidated text)

LAB 37 Edition 3 June 2013

General Regulations. Part Ⅱ - Quality Management System Rules ENGLISH VERSION 5.0

ANGUS COUNCIL SUPPLEMENTARY CONDITIONS OF CONTRACT. SC 01 - Contract Performance Guarantee Insurance

Supplier Quality Assurance

PRODUCT CERTIFICATION RULES GOVERNING THE SCHEME JANUARY 2006

NOTICE. Re: GD210: ISO 13485:2003 Quality Management System Audits Performed by Health Canada Recognized Registrars

being subordinated to the interests of the Firm's other clients (other than clients which are insurance undertakings when acting as such).

GENERAL CONDITIONS OF SALE 1/6

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION

PERMANENT COURT OF ARBITRATION OPTIONAL RULES FOR ARBITRATING DISPUTES BETWEEN TWO STATES

Terms and Conditions of Sale

COMMISSION IMPLEMENTING DECISION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

Guide to Distribution of Cosmetic Products in Ireland

EA-04/15. Accreditation. For Non-Destructive. Testing. Publication. Reference. EA - 4/15 Accreditation for Non-Destructive Testing PURPOSE

Scheme rules for thermal insulation products for building equipment and industrial installations - VDI certification scheme

Pharmaceutical Wholesaler Site Inspection Checklist

Surgi Manufacturing Quality Manual

Standard conditions of purchase

APPLICATION TO OPEN AN ACCOUNT COMPANY / NGO / EMBASSY / GOVERNMENT / REGISTERED ASSOCIATION

Rules for the certification of IT (Information Technology) Service Management Systems

LAW FOR THE ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE. Chapter two. ELECTRONIC DOCUMENT AND ELECTRONIC SIGNATURE

Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

Authorised Supplier, who will either deal with Royal Mail on the User's behalf or instruct the User to apply for a Licence directly from Royal Mail.

ISO/IEC Inspection Standard Application Document

QSS 0: Products and Services without Bespoke Contracts.

Certification process ECOCERT Ecological & Recycled Textile Standard

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

CONCRETE: CONTRACTOR S QUALITY CONTROL PLAN

JRI S STANDARD TERMS OF PURCHASE. Business Day: a day (other than a Saturday, Sunday or public holiday) when banks in London are open for business.

GENERAL TERMS AND CONDITIONS OF SUPPLY OF MONT.EL APPARECCHIATURE ELETTROELETTRONICHE S.R.L. PRODUCTS

Measuring instruments in industry.

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

Contractor Connect Scheme Electrical Contractor and Worker Handbook

GUIDELINES FOR FOOD IMPORT CONTROL SYSTEMS

Network Certification Body

1 For more information T: / E: DAP@ul.com / W: ul.com/dap

Transcription:

IMQ RULES PRODUCT CERTIFICATION "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCT OF NEW MANUFACTURING Contents IMQ Rules - Product certification Particular Rules for the Electric energy meters and meter units sector (products of new manufacturing) Acceptance This is a translation of the original text, which prevails in case of doubts. This bundle is made up of the Rules and Particular Rules, which, after being read carefully thoroughly, must be signed in acceptance by means of two signatures on the last page at the points marked and indicated by the same colour as this strip.

PARTICULAR RULES FOR THE SECTOR "ELECTRIC ENERGY METERS AND METER UNITS" PRODUCTS OF NEW MANUFACTURING Index Date of updating Art. 2 October 2006 Art. 3 March 2002 Art. 4 March 2004 Art. 5 March 2002 Art. 6 March 2004 Art. 8 March 2002 Annex 1 October 2006 Annex 2 October 2006 Annex 3 October 2006 Annex 4 October 2006 Annex 5 October 2006 Annex 6 March 2002

The following Particular Rules contain further details concerning the granting by IMQ of the licence to use IMQ marks in compliance with the standards or technical specifications for products belonging to the Electric energy meters and meter units relevant to products of new manufacturing and mass produced, in accordance with the provisions of point 1.2 of IMQ Rules Product Certification. The following text indicates the additions or modifications to each article of the Rules, using the same numeration. Article 2 - GENERAL CONDITIONS 2.1 Addition: Annex 1 lists the categories of electric energy meters and integrated meter units, as well as the relevant standards or specifications which these items must comply to. The conformity marks for these products are: IMQ In case one or more approved standards are applicable and such standards cover with a sufficient detail both safety and performance requirements of the product. IMQ Certificate with Surveillance In case the product is tested according to a particular specification approved by the Technical Committee, as well as one or more approved standards are partially applied. 2.6 Addition: In order to grant a constant conformity of the product, the following is required: - the applicant shall be the company responsible (*) for the product for which the licence to use the Mark is requested; - the applicant shall apply a quality system in conformity with standard UNI EN ISO 9001:2000, to ensure that the design, development and production, as well as tests and checks required for the electric energy meters and integrated meter units, subjected to these Rules, comply with the requirements of said series of standards. The conformity of the applicant s quality system shall be certified by an independent, recognized body; - the applicant and any other companies operating during the various stages of the production cycle shall comply with the requirements indicated in Annexes 2 and 3 of the Particular Rules herein. (*) company responsible for the product implies the company which assigns its own trade name to the product itself PARTICULAR RULES - October 2006 - ART. 2 "Electric energy meters and meter units" Page 1 of 1

Article 3 - PROCEDURE TO BE FOLLOWED FOR THE APPLICATION 3.1.03 Addition: Any manufacturing modification - relevant to standard requirements - that the applicant wishes to introduce in the model for which the approval Mark is requested must be clearly indicated on the application form. The Technical Committee shall decide, by final judgement and taking into account relevant trends in national and/or international spheres, whether the variations concerned change the product sufficiently to make it necessary for the Applicant to submit a separate application for a new model. 3.2.03 Addition: The procedures for the tests required by the standards at the end of the insulation tests, are stated in Annex 5. ARTICLE 4 - SYMBOLS 4.1 Addition: Electric energy meters and meter units allowed to use the IMQ mark shall be marked with the following symbol: Products allowed to use the IMQ Certificate with Surveillance shall be marked with the following symbol: Said mark shall be printed either on products label or on the side of at least one cap seal; in case such a seal is necessary in order to guarantee the wholeness of the energy meter or meter unit. ARTICLE 5 LICENCE CONDITIONS 5.5.02 Addition: The tests to carry out on the product before it is put on the market are stated in Annex 2, point D. PARTICULAR RULES - March 2004 - ART. 3/4/5 "Electric energy meters and meter units " Page 1 of 1

Article 6 - CONTINUOUS SURVEILLANCE OF THE USE OF THE MARK 6.1.02 Addition: IMQ will periodically assess the system implemented by the licensee to grant the conformity of products to applicable standards or specifications; it will also examine the results of verifications carried out by the licensee. These assessments shall be conducted once a year. 6.1.04 Addition: IMQ shall repeat the type tests stated in paragraph 2.4, whenever it deems necessary. In case of small lot production and/or infrequent models, IMQ may request notification of said from the licensee on a case-by-case basis and, on request, the licensee shall send the final test reports to IMQ. In case of non-continuous production, on-call inspection procedures may be applied (see Annex 4 - point 4). 6.3.02 Addition: Routine tests on the production of meters and meter units granted with the mark shall be carried out by IMQ, according to the procedures stated in Annex 4. In case the tests are carried out at the manufacturer s or at the buyer s premises, the licensee shall give evidence of the calibration status of the used testing equipment. According to the amount of production and to the specific control systems used, the Technical Committee will define, case by case, the number of samples which shall be tested at IMQ laboratories during the year. In case the licensee uses several production units, the provisions of Annex 4 are intended as being referred to each production unit. In relation to the above, when different production units are used to manufacture the same product, the production unit concerned shall be suitably specified on the product itself. ARTICLE 8 - MODIFICATIONS OF THE RULES AND/OR STANDARDS 8.1 Addition: The licensee undertakes to modify its lots of meters or meter units already approved and in stock in its warehouse according to any Amendment of relevant standards or specifications, as stated therein. PARTICULAR RULES March 2002 ART. 6/8 "Electric energy meters and meter units" Page 1 of 1

Annex 1 PRODUCTS CATEGORIES OF THE SECTOR ELECTRIC ENERGY METERS AND METER UNITS ALLOWED TO CERTIFICATION CATEGORIES MARK STANDARDS / SPECIFICATIONS THE PRODUCT MUST CONFORM TO 701 Single-phase energy meters IMQ CEI EN 62052-11:2003 CEI EN 62053-11:2003 CEI 13-15/1 st Ed. + V1:2000 702 Three-phase energy meters IMQ CEI EN 62052-11:2003 CEI EN 62053-11:2003 CEI 13-15/1 st Ed. + V1:2000 703 Three-phase energy meters with maximum power gauge IMQ CSV CEI 13-8/1 st Ed. + V1:2000 CEI EN 62052-11:2003 CEI EN 62053-11:2003 Technical tests specification no. IMQ-CTP-043 Edition II 704 Single-phase electric energy meter units IMQ CEI 13-26/3 rd Ed. 1999 705 Three-phase electric energy meter units Direct insertion three-phase watt-varhour meters integrated units for lowvoltage networks without UEPB electronic unit. TA insertion three-phase watt-varhour meters integrated units for lowvoltage networks without UEPB electronic unit. IMQ CSV CSV CEI 13-26/3 rd Ed. 1999 CEI 13-32/1 st Ed. 2000 Technical Test Specification no. IMQ-CTP-044 Ed. I/Rev. I Technical Test Specification no. IMQ-CTP-044 Ed. I/Rev. I 720 Static watt-hour meters Watt-Var-hour meters and power limiters (integrated units (GIS)) Digital electronic maximum power indicators. IMQ IMQ CSV CEI EN 62053-61:1999 CEI EN 62052-11:2003 CEI EN 62053-21:2003 CEI EN 62053-22:2003 CEI EN 62053-23:2003 CEI 13-46 Technical Test Specification no. IMQ-CTP-043 Ed. II PARTICULAR RULES - October 2006 - ANNEX 1 "Electric energy meters and meter units " Page 1 of 1

Annex 2 REQUIREMENTS CONCERNING THE DESIGN, DEVELOPMENT AND PRODUCTION OF ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS A. The executive project for static watt-hour meters or the metering system (*) used for Ferraris type electric energy meters or integrated meter units, subject of the application for licence to use the IMQ mark, shall be carried out by a company whose own quality system is in conformity with the UNI EN ISO 9001:2000 standard and is certified by an independent, recognized body. This project shall include the necessary requirements for the manufacture and final test of single components and sub-sets of the static watt-hour meter or metering system, as well as the system itself. B. During the development stage, the applicant shall grant that the type tests required for the product are carried out, according to what stated in Annex 3. C. The static watt-hour meter or metering system used for Ferraris type electric energy meters or integrated meter units, subject of the application for licence to use the IMQ mark, shall be assembled at one production unit, which must have a quality system in conformity with UNI EN ISO 9001:2000 standard and be certified by an independent, recognized body. D. As concerns finished samples, the applicant shall grant that calibration and testing take place using procedures that guarantee conformity with applicable standards; said procedures shall be described in a specific document, which shall also include considerations supporting the claim that said procedures conform to applicable standards. Moreover, the above mentioned operations shall be carried out by a company having a quality system in conformity with UNI EN ISO 9001:2000 standard and certified by an independent, recognized body. The results of testing shall be made available for IMQ to consult. (*) The definition given in paragraph 2.1 of the CEI 13-26/3 rd Ed. 1999 standard is applicable. PARTICULAR RULES - October 2006 - ANNEX 2 "Electric energy meters and meter units " Page 1 of 2

Annex 2 E. Companies operating during the various stages of the production cycle, described in previous points of Annex 2 herein, shall also meet the following, additional requirements. Said requirements are intended as being in addition to those stated in the UNI EN ISO 9001:2000 series standard. E.1 Data and basic requirements of design Product design shall be based on the relevant standards, stated in Annex 1 of this Rules. E.2 Purchase data As concerns particular requirements for product traceabilty, the operating company shall keep a copy of relative purchase documents. E.3 Product identification and traceability a) Identification In case the company assembling the products also manages to revise the electric energy meters or integrated meter units, said company shall grant that products of normal production are identified and can be distinguished from revised products at all times. b) Traceability Companies operating during the various stages of the production cycle, according to their competence, shall set out, document and maintain traceability procedures. These procedures shall define the entity of traceability and facilitate corrective measures. E.4 Quality records control All companies operating during the various stages of the production cycle shall keep quality records for at least 10 years from the delivery date of the electric energy meter or integrated meter unit. Said companies shall also create and maintain a record of each lot of electric energy meters or integrated meter units so as to allow traceability and to identify the quantities produced and sent out for distribution. Records of the lots shall be checked and authorised. PARTICULAR RULES - October 2006 - ANNEX 2 "Electric energy meters and meter units " Page 2 of 2

Annex 3 REQUIREMENTS CONCERNING TYPE TESTS TO CARRY OUT ON ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS 1. TYPE TESTS TO CARRY OUT The applicant shall grant that the type tests stated in the standard specified on Annex 1 are carried out. In case of companies operating during the various stages of the production cycle, as of Annex 2, do not have the test equipment for conducting some of the type tests in question, they may contact laboratories with whom company relations are such that they can fully and freely use the equipment in question. Alternatively, the companies may refer to independent laboratories, provided they are recognized by organisations which are signatories of international agreements (for example: EA - European cooperation for Accreditation). 2. RESULTS DOCUMENTATION The results of the type tests carried out shall be recorded in test reports set out in compliance with UNI EN ISO/IEC 17025 standard. Said reports shall be kept available for IMQ to consult. PARTICULAR RULES - October 2006 - ANNEX 3 "Electric energy meters and meter units " Page1 of 1 1

Annex 4 TESTS TO BE CARRIED OUT BY IMQ ON ELECTRIC ENERGY METERS AND INTEGRATED METER UNITS COVERED BY CERTIFICATION 1. - Number of samples to collect for sampling and tests Ferraris type meters/single-phase units: - for plants with a production equal to or above 150,000 items per year, 80 meters/units selected each month. - for plants with a production below 150,000 items per year, 80 meters/units selected every 2 months. Ferraris type meters/three-phase units: - 40 meters/units selected every 2 months. Static watt-hour meters: - for plants with a production higher than 300.000 items per year, two samples, each one made up of 40 meters. - for plants with a production equal to or above 60,000 items per year, 40 meters selected every month. - for plants with a production below 60,000 items per year, 40 meters selected every 2 months. An entire packaged set of products ready for dispatch shall constitute the above samples. With the exception of static watt-hour meters, a further 5 meters/units, not yet sealed, shall be sampled in order to carry out mechanical tests. For plants with a production higher than 300.000 items per year, at the beginning of the surveillance activity, the inspection visits will be carried out with a weekly frequency. After 4 inspections, if no points of non-compliances arise, the relevant frequency will be changed into a fortnightly one. Every time a non-compliance arises, the frequency will return to the one described before. Companies with non-continuous production may apply an on-call inspection procedure (see point 4 below). 2. - Tests to carry out and procedures a) Ferraris type electric meters and integrated meter units IMQ shall carry out tests from 1 to 10 of the CEI EN 60514:1997 standard, or tests from 2 to 11 of the CEI 13-15:1997 standard on each sample comprising 40 or 80 meters/units. It will also carry out test 11, or test 12 respectively of the above standards (mechanical test), on 5 meters/units which have not been sealed yet. PARTICULAR RULES - October 2006 - ANNEX 4 "Electric energy meters and meter units " Page1 of 4

Annex 4 b) Static watt-hour meters IMQ shall carry out tests from 1 to 10 of the CEI EN 61358:1997 standard on each sample of 40 meters, following the procedures stated in these standards: CEI EN 61358:1997, for active energy meters, classes 1 and 2 (tests from 1 to 10) Technical Test Specification n. IMQ-CPT-055 Ed. I/Rev. I for all the other type of the electrical energy meters (tests from 1 to 11) For plants with a production higher than 300.000 items per year, as far as the tests carried out at the manufacturer premises are concerned, if possible, the second sample shall be checked with a measurement device different from the one used on the first one. 3. - Assessment of results The results of tests from 1 to 10 (or from 2 to 11) shall be assessed considering both one sample and six consecutive samples. The number of defects shown in the tables below and on the next page shall not be exceeded. If the number of defects is exceeded, the licensee shall be promptly notified and requested to visit IMQ s measurements laboratory for appropriate controls and technical assessments. The results of test 11 (or 12) shall be assessed considering the outcome of the test for a single sample of meter. In case of defects, the licensee shall be promptly notified and requested to make appropriate controls and technical assessments, as well as adopt the necessary measures to eliminate said defects. In any case, IMQ reserves the right to apply some procedures (supplementary samples, sending inspectors, random checks, issuing warnings, etc.) for the purpose of checking and ensuring that production returns to normality. Ferraris type meters and/or single-phase units Standard Test number CEI EN 60514:1997 1 2 3 4 5 6 9 10 CEI 13-15:1997 2 3 4 5 6 7 10 11 Test type Insulation Operation without voltage Start up Precision Constant Sample Single 80 meters/units Six consecutive 480 meters/units Number of defects admitted 0 2 2 2 2 2 2 0 0 8 8 8 8 8 8 0 PARTICULAR RULES - October 2006 - ANNEX 4 "Electric energy meters and meter units " Page 2 of 4

Annex 4 Ferraris type meters and/or three-phase units Standard Test number CEI EN 60514:1997 1 2 3 4 5 6 7 8 9 10 CEI 13-15:1997 2 3 4 5 6 7 8 9 10 11 Test type Insulation Operation without voltage Start up Precision Constant Sample Single 40 meters/units Six consecutive 240 meters/units Number of defects admitted 0 1 1 1 1 1 1 1 1 0 0 5 5 5 5 5 5 5 5 0 Static watt-hour meters Standard CEI EN 61358:1997 Test number 1 2 3 4 5 6 7 8 9 10 CPT-055 Ed. 1/Rev.1 1 2 3 4 5 6 7 8 9 10 11 Test Type Insulation Operation without voltage Start up Precision Constant Visual check Sample Single 40 meters/units Six consecutive 240 meters/units Number of defects admitted 0 1 1 1 1 1 1 1 1 0 2 0 5 5 5 5 5 5 5 5 0 10 PARTICULAR RULES - October 2006 - ANNEX 4 "Electric energy meters and meter units " Page 3 of 4

Annex 4 4. - On-call inspection procedure During on-call inspections, the following tests and inspections shall be carried out: a) inspection to ensure that conditions for licence to use the Mark are maintained; b) check of final inspection records, according to paragraph 5.5.02; c) for test see point 2 of this annex ; d) control of the overall metering system, using a certified metering device which can be referred to nationally or internationally recognised samples; e) mechanical test (test 11 of the CEI EN 60514 standard; test 12 of the CEI 13-15 standard; not applicable to static watt-hour meters). The tests shall be carried out on 80 items for each lot, in case of Ferraris type meters/single-phase units, and on 40 items, in case of Ferraris type meters/three-phase units and static electric meters. The lot may only be handed over if all tests and inspections are successful. PARTICULAR RULES - October 2006 - ANNEX 4 "Electric energy meters and meter units " Page 4 of 4

Annex 5 TESTS TO CARRY OUT ON METERS/METER UNITS AT THE END OF INSULATION TESTS a) Ferraris type electric meters and integrated meter units The tests as indicated in the 7 sub-section of paragraph 7.3.1 of the CEI EN 62052-11:2003 standard are carried out with 100% cosϕ = 1 and cosϕ = 0.5 inductive The tests as indicated in the last sub-section of paragraph 4.2.6 of the CEI EN 13-15, standard are carried out with: 100% cosϕ = 1 and cosϕ = 0.5 inductive. In order to rate the insulation tests, the limit due to measurement uncertainties which shall not be exceeded by the error variation percentage is ± 0.5%. b) Static watt-hour meters The tests as indicated in the 7 sub-section of paragraph 7.3.1 of the CEI EN 62052-11:2003 standard are carried out with 100% cosϕ = 1 and cosϕ = 0.5 inductive In order to rate the insulation tests, the limit due to measurement uncertainties which shall not be exceeded by the error variation percentage is: ± 0.5% for static watt-hours meters, classes 2 and 3 ± 0.2% for static watt-hours meters, classes 0.2S, 0.5S and 1. PARTICULAR RULES - October 2006 - ANNEX 5 "Electric energy meters and meter units " Page 1 of 1

Annex 6 Firm A Name... Address... We declare that we produce the products of the following category:... with the trade mark... of firm B Name... Address... We are aware that company B applied for the IMQ Mark for the above mentioned products; we also know the IMQ Rules - Product Certification and, as far as we are concerned, we undertake to comply with these. In particular, we undertake to: - (art. 3.2.01)... allow IMQ to inspect us in order to verify if we have the means of production, testing or control (i.e. personnel, facilities and equipment) specified in clause 2.6; - (art. 5.5.01)... manufacture a product covered by each approval according to the approved prototype and, if we intend to make changes in the product bearing the Mark, we must notify IMQ and explain these changes in advance; IMQ may require to repeat all or some of the admission tests, at our own expense. In this case, IMQ may request us to change the type reference or the model designation; - (art. 5.5.02)... avoid using components not bearing the Mark, without express permission from IMQ, whether they are manufactured by us or not, if the product for which the Mark licence has been granted includes components that, at the time of the application, were admitted to the IMQ Mark system. PARTICULAR RULES - March 2002 - ANNEX 6 "Electric energy meters and meter units " Page 1 of 2

Annex 6 - (art. 6.1.01)... assure that our stores and laboratories are open to IMQ inspectors, who can appear at any time during working hours, even without warning; - (art. 6.1.02)... consider that IMQ inspectors have the authority to carry out all the verifications they consider useful in order to control that we meet our obligations and, especially, to examine and, if necessary, remark the results of tests performed in accordance with sub-clause 5.5.02; - (art. 6.1.03)... consider that the inspectors have the right to pick up free samples, in a measure strictly essential, of the marked products or their components in our plants or stores, in order to carry out particular tests in our laboratories or in IMQ s laboratories; - (art. 6.1.04)... enable IMQ to pick up these samples; - (art. 6.1.05)... deliver these samples to IMQ free of charge, on request of the inspector and to take all necessary precautions in order to ensure that they reach destination in a good condition within a maximum of 2 months from the date of sampling. Stamp and signature (*) Date:... ----------- (*) Firm A PARTICULAR RULES - March 2002 - ANNEX 6 "Electric energy meters and meter units " Page 2 of 2 ACCEPTANCE

The Applicant declares to have carefully read and to approve the IMQ Rules - Product Certification and the relevant Particular Rules for Electric energy meter and meter units - products of new manufacturing - that are an integral part of these Rules. Rules approved by the IMQ Board on March 27, 2002 comprising the Particular Rules updated on October 2006. Date: Signature of the legal representative* and stamp: * Legible, full signature According to the provisions of articles 1341 and 1342 of the Italian Civil Code, the Applicant hereby expressly approves articles Nos 5 (Licensee rights and duties), 6 (Continuous surveillance of the use of the Mark), 7 (Renunciation or withdrawal of the Licence for the use of the Mark), 8 (Modifications of the Rules and/or Standards), 9 (Fees), 10 (Misuse of the Mark), 11 (Claims) and 12 (Conciliation and Arbitration) of the Rules, as well as article No 3 (Application for certification) of the Particular Rules. Date: Signature of the legal representative* and stamp: * Legible, full signature This document comprises 28 pages