Gorgon Gas Development and Jansz Feed Gas Pipeline



Similar documents
Barrow Island Quarantine:

Cliff Head Oil Field Development- 20 km south of Dongara, Shire of Irwin Roc Oil (WA) Limited

CHAPTER 24: ENVIRONMENTAL MANAGEMENT

./01&2/M./T34 1MP36T ST3T.M./T. 1a$t3l$4 536e-al4 13$ %3te9. Sol9ara 1 Pro;ect. !"l$%e ( Mai$ &e(ort. Te-t. )e*te%,e- 2//0 :; <//0=>=?

Appendix C. Re-vegetation and Rehabilitation Sub-Plan

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

Note on Draft Progress Report Template

Appendix C. Municipal Planning and Site Restoration Considerations

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

1. Purpose and scope. 2. SEPA's role in hydropower and planning

SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY

CALDER PARK PROJECT STAGE 1. EPBC Act Approval Compliance Report (EPBC 2012/6439)

This Chapter was compiled by GCS (2014) as part of the EMP Consolidation for MP 30/5/1/2/2/133MR and remains pertinent.

Gorgon Gas Development and Jansz Feed Gas Pipeline

Minerals Regulatory Guidelines MG5. Guidelines for miners: tailings and tailings storage facilities in South Australia

GENERAL SPECIFICATION

Proposal for a RECOMMENDATION OF THE EUROPEAN COMMISSION

Heritage Place Code. Heritage Place Code

Traffic Management Issue 1.0 Revision: v2 October 2014

Plan. Weed Management Plan. Environment. August PL-EN-0013

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body

Wildlife Ecologist. Mount Gibson Wildlife Sanctuary

Health, Safety and Environment Management System

Incident Reporting Requirements

2015 AVAGO 2D SEISMIC SURVEY ENVIRONMENTAL MANAGEMENT PLAN SUMMARY

Environmental Guidelines for Preparation of an Environmental Management Plan

Regional Ecologist: Southwest Australia

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

Crown Land Management

Comparison of HSESAP Revisions 2 and 3

Appendix A1. Register of legal and other requirements

MANAGEMENT STANDARD CLOSURE PLANNING

15 Guiding Principles

APPENDIX 4. Risk Tables

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

1.7.0 Floodplain Modification Criteria

Cultural Heritage Management Plan - Commissioning and Operations Phase. Pluto LNG. June Approved

APPENDIX 2A. Shah Deniz Production Sharing Agreement Extract

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

SAFETY and HEALTH MANAGEMENT STANDARDS

Exploration for natural gas

Environmental management framework 24

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

Barrow Island Quarantine: Beyond Best Practice

MAC-ENC-MTP-041 ENVIRONMENTAL MANAGEMENT STRATEGY

Restoration Planning and Development of a Restoration Bank

Department of Infrastructure and Planning: Governance Framework for Infrastructure Delivery Special Purpose Vehicles

Works Approval Conditions 1 General

CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS

CITY UTILITIES DESIGN STANDARDS MANUAL

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

2.1 Environmental Responsibility & Land Capability

ENVIRONMENTAL AND SOCIAL RISK ASSESSMENT IN LENDING

Emergency Spillways (Sediment basins)

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Prattsville Berm Removal Project. 1.0 Project Location

ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION

Birmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description

Health & Safety Management System Manual

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

Designed and produced by geo-graphicsdesign.com DP 300 3/02

ecologia KOOLAN ISLAND IRON ORE MINE AND PORT FACILITY Conceptual Closure Plan E N V I R O N M E N T

HUNTER WATER CORPORATION Review of Environmental Factors Guidance Notes EG0041

PROPOSED TERMS OF REFERENCE

Mine Plan of Operations Reclamation Bond Checklist

THE SECRETARY OF THE INTERIOR WASHINGTON

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

Guide to agrichemical use in Resource Management Plans Northland Region as at October 2011

AUSTRALIA PACIFIC LNG. Australia Pacific LNG Remediation, Rehabilitation, Recovery and Monitoring Plan Q-LNG01-15-MP-0107

INTEGRATED RISK MANAGEMENT SOLUTIONS

Fire Management needs assessment and priority actions

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Proposed Terms of Reference for EIA studies

FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances

Environmental guidelines for preparation of an Environment Management Plan

The world s leading sustainability consultancy. Sustainable Solutions for the Oil and Gas Industry

Appendix J Online Questionnaire

Integrated Risk Management Solutions

Management of Contractors and Suppliers Procedure

KITSAULT MINE PROJECT ENVIRONMENTAL ASSESSMENT. Section Summary of Commitments

Accident/Incident Investigation & Reporting Procedure

Colorado Natural Heritage Program

Basements and Deep Building Construction Policy 2014

720 Contour Grading. General. References. Resources. Definitions

Our Environment, Our Future

Port and Rail Operations Noise Environmental Management Plan

A Developer s Guide: Watershed-Wise Development

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

Pollution Response RESPONDING TO AN OIL SPILL

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Transcription:

Gorgon Gas Development and Jansz Feed Gas Pipeline Document No: G1-NT-PLNX0000303 Copy No: IP Security: Public Chevron Australia Pty Ltd

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Table of Contents Terminology, Definitions, and Abbreviations... 8 1.0 Introduction... 12 1.1 Proponent... 12 1.2 Project... 12 1.3 Location... 12 1.4 Approvals... 15 1.5 Purpose of this Plan... 16 1.5.1 Legislative Requirements... 16 1.5.2 Objectives... 16 1.5.3 Requirements... 16 1.5.4 Hierarchy of Documentation... 18 1.5.5 Relevant Standards and Guidelines... 21 1.5.6 Stakeholder Consultation... 21 1.5.7 Public Availability... 23 2.0 Relevant Facilities and Activities... 24 2.1 Terrestrial Facilities... 24 2.1.1 Overview... 24 3.0 Risk Assessment... 26 3.1 Overview... 26 3.2 Methodology... 26 3.3 Rehabilitation Risks... 27 4.0 Management of Rehabilitation... 28 4.1 Key Management Elements... 28 4.1.1 Vegetation Management... 28 4.1.2 Topsoil and Soil Management Strategies... 29 4.1.3 Weed Management... 30 4.1.4 Surface Drainage Management... 30 4.2 Rehabilitation Tasks... 31 4.3 Fire and Rehabilitation... 35 4.4 Integration with Island-wide Management... 36 4.5 Monitoring and Adaptive Management... 36 4.5.1 Soil Monitoring... 36 4.5.2 Vegetation Monitoring... 37 4.5.3 Fauna Recolonisation Monitoring... 37 4.5.4 Adaptation to Climate Change... 37 4.6 Identification of Knowledge Gaps... 37 Chevron Australia Pty Ltd Public Page 5 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 4.6.1 Recalcitrance of Plant Species... 38 4.6.2 Return of Fauna Habitat... 38 4.6.3 Recolonisation of Invertebrate Fauna... 39 4.6.4 Recolonisation of Mycorrhizal Fungi... 39 5.0 Objectives, Performance Standards, and Relevant Documentation... 40 5.1 Overview... 40 5.2 Objectives... 40 5.3 Performance Standards... 41 5.4 Relevant Documentation... 41 5.5 Completion Criteria... 41 6.0 Implementation... 48 6.1 Environmental Management Documentation... 48 6.1.1 Overview... 48 6.1.2 Chevron ABU OE Documentation... 48 6.1.3 Gorgon Gas Development Documentation... 48 6.2 Training and Inductions... 50 7.0 Auditing, Reporting, and Review... 51 7.1 Auditing... 51 7.1.1 Internal Auditing... 51 7.1.2 External Auditing... 51 7.2 Reporting... 51 7.2.1 Compliance Reporting... 51 7.2.2 Environmental Performance Reporting... 51 7.2.3 Incident Response and Reporting... 52 7.3 Review of this Plan... 52 8.0 References... 53 Appendix 1 Chevron Integrated Risk Prioritization Matrix... 58 Appendix 2 Compliance Reporting Table... 59 List of Tables Table 1-1 Requirements of this Plan... 17 Table 3-1 Risk Assessments Relevant to this Plan... 26 Table 4-1 Summary Management Measures for Rehabilitation... 31 Table 5-1 Objectives, Performance Standards, and Relevant Documentation... 42 Table 5-2 Rehabilitation Objectives, Completion Criteria, and Performance Targets... 44 Page 6 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: List of Figures Figure 1-1 Location of the Greater Gorgon Area... 13 Figure 1-2 Location of the Gorgon Gas Development and Jansz Feed Gas Pipeline... 14 Figure 1-3 Hierarchy of Gorgon Gas Development Environmental Documentation... 19 Figure 1-4 Deliverable Development, Review, and Approval Flow Chart... 23 Figure 2-1 Gorgon Gas Development Terrestrial Facilities on Barrow Island... 25 Chevron Australia Pty Ltd Public Page 7 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Terminology, Definitions, and Abbreviations Terms, definitions and abbreviations used in this document are listed below. These align with the terms, definitions and abbreviations defined in Schedule 2 of the Western Australian Gorgon Gas Development Ministerial Implementation Statement No. 800 (Statement No. 800). ABU Additional Support Area APPEA ARI AS/NZS ASBU Carbon Dioxide (CO 2 ) Injection System CO 2 Construction Construction Period Cth DBNGP DEC DEWHA DMP DotE DPaW Edaphic Australasia Business Unit Gorgon Gas Development Additional Construction, Laydown, and Operations Support Area Australian Petroleum Production and Exploration Association Assessment on Referral Information (for the proposed Jansz Feed Gas Pipeline dated September 2007) as amended or supplemented from time to time. Australian Standard/New Zealand Standard Australasia Strategic Business Unit The mechanical components required to be constructed to enable the injection of reservoir carbon dioxide, including but not limited to compressors, pipelines and wells. Carbon dioxide Construction includes any Proposal-related (or action-related) construction and commissioning activities within the Terrestrial and Marine Disturbance Footprints, excluding investigatory works such as, but not limited to, geotechnical, geophysical, biological and cultural heritage surveys, baseline monitoring surveys and technology trials. The period from the date on which the Gorgon Joint Venturers first commence construction of the Proposal until the date on which the Gorgon Joint Venturers issue a notice of acceptance of work under the EPCM, or equivalent contract entered into in respect of the second LNG train of the Gas Treatment Plant. Commonwealth of Australia Dampier to Bunbury Natural Gas Pipeline Former Western Australian Department of Environment and Conservation (now DPaW and/or Department of Environment Regulation) Former Commonwealth Department of the Environment, Water, Heritage and the Arts (now DotE) Western Australian Department of Mines and Petroleum Commonwealth Department of the Environment (formerly DEWHA and SEWPaC) Western Australian Department of Parks and Wildlife (formerly DEC) Produced or influenced by the soil Page 8 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: EFA EIS/ERMP EMP Ecosystem Function Analysis Environmental Impact Statement/Environmental Review and Management Programme (for the Proposed Gorgon Development dated September 2005) as amended or supplemented from time to time. Environmental Management Plan EP Act Western Australian Environmental Protection Act 1986 EPA Western Australian Environmental Protection Authority EPBC Act Commonwealth Environment Protection and Biodiversity Conservation Act 1999 EPBC Reference: 2003/1294 EPBC Reference: 2005/2184 EPBC Reference: 2008/4178 EPCM GIS Gorgon Gas Development Gorgon Gas Development Footprint GUJV Ha HDD HES IMS ISO Commonwealth Ministerial Approval (for the Gorgon Gas Development) as amended or replaced from time to time Commonwealth Ministerial Approval (for the Jansz Feed Gas Pipeline) as amended or replaced from time to time. Commonwealth Ministerial Approval (for the Revised Gorgon Gas Development) as amended or replaced from time to time. Engineering, Procurement and Construction Management Geographic Information System The Gorgon Gas Development as approved under Statement Nos. 800 and 965, and EPBC References: 2003/1294 and 2008/4178 (as varied by the Commonwealth Environment Minister), as amended or replaced from time to time. Consists of the cleared areas and uncleared areas approved to be cleared on Barrow Island used for the construction and operation of the Gorgon Gas Development and Jansz Feed Gas Pipeline. Gorgon Upstream Joint Venture Hectare Horizontal Directional Drilling Health, Environment, and Safety Impact Mitigation Strategy International Standards Organization Jansz Feed Gas Pipeline The Jansz Feed Gas Pipeline as approved in Statement No. 769 and EPBC Reference: 2005/2184, as amended or replaced from time to time. KJVG LFA LNG MOF MTPA Kellogg Joint Venture Gorgon Landscape Function Analysis Liquefied Natural Gas Materials Offloading Facility Million tonnes per annum Chevron Australia Pty Ltd Public Page 9 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 NIS OE OEMS OEPA Operations (Gorgon Gas Development) PER Performance Standards Practicable QMS Revised Proposal ROW Non Indigenous Species Operational Excellence Operational Excellence Management System Western Australian Office of the Environmental Protection Authority In relation to Statement No. 800,for the respective LNG trains, this is the period from the date on which the Gorgon Joint Venturers issue a notice of acceptance of work under the Engineering, Procurement and Construction Management (EPCM) contract, or equivalent contract entered into in respect of that LNG train of the Gas Treatment Plant; until the date on which the Gorgon Joint Venturers commence decommissioning of that LNG train. Public Environmental Review for the Gorgon Gas Development Revised and Expanded Proposal dated September 2008, as amended or supplemented from time to time. Are matters which are developed for assessing performance, not compliance, and are quantitative targets or where that is demonstrated to be not practicable, qualitative targets, against which progress towards achievement of the objectives of conditions can be measured. For the purposes of Statement No. 800 means reasonably practicable having regard to, among other things, local conditions and circumstances (including costs), and the current state of technical knowledge. Quarantine Management System Proposal comprising potential changes to the Gorgon Gas Development as described in the Gorgon Gas Development Revised and Expanded Proposal PER. Right of Way Statement No. 748 Western Australian Ministerial Implementation Statement No. 748 (for the Gorgon Gas Development), [superseded by Statement No. 800]. Statement No. 769 Western Australian Ministerial Implementation Statement No. 769 (for the Jansz Feed Gas Pipeline), as amended from time to time. Statement No. 800 Western Australian Ministerial Implementation Statement No. 800, issued for the Revised and Expanded Gas Development, as amended from time to time. Statement No. 800 supersedes the Gorgon Gas Development as originally approved by Statement No 748. The conditions of Statement No. 800 also apply to the Additional Support Area under Statement 965. Page 10 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Statement No. 865 Western Australian Ministerial Implementation Statement No. 865 (for the Gorgon Gas Development) as amended from time to time. Statement No. 965 Western Australian Ministerial Implementation Statement No. 965 (for the Gorgon Gas Development), as amended from time to time. Statement No.965 applies the conditions of Statement 800 to the Additional Support Area. Terrestrial Disturbance Footprint (TDF) Terrestrial Facilities WA WAPET WAPET Landing The area to be disturbed by construction or operations activities associated with the Terrestrial Facilities listed in Condition 6.3 of Statement No. 800, including the Additional Support Area approved by Statement No. 965, and set out in the Terrestrial and Subterranean Baseline State and Environmental Impact Report required under Condition 6.1 of Statement No. 800. In relation to Statement No. 800, the terrestrial facilities are the: Gas Treatment Plant Carbon Dioxide Injection System Associated Terrestrial Infrastructure forming part of the Proposal Areas impacted for seismic data acquisition Onshore Feed Gas Pipeline System and terrestrial component of the Shore Crossing. Terrestrial Facilities also include those defined in Condition 6.3 of Statement No. 769 (the Onshore Feed Gas pipeline system and the terrestrial component of the Shore Crossing) and Schedule 1 of Statement No. 965 (the Additional Support Area). Western Australia West Australian Petroleum Pty Ltd Proper name referring to the site of the barge landing existing on the east coast of Barrow Island prior to the date of Statement No. 800. Chevron Australia Pty Ltd Public Page 11 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 1.0 Introduction 1.1 Proponent Chevron Australia Pty Ltd (Chevron Australia) is the proponent and the person taking the action for the Gorgon Gas Development on behalf of the following companies (collectively known as the Gorgon Joint Venturers): Chevron Australia Pty Ltd Chevron (TAPL) Pty Ltd Shell Development (Australia) Pty Ltd Mobil Australia Resources Company Pty Limited Osaka Gas Gorgon Pty Ltd Tokyo Gas Gorgon Pty Ltd Chubu Electric Power Gorgon Pty Ltd. pursuant to Statement No. 800 and EPBC Reference 2003/1294 and 2008/4178. Chevron Australia is also the proponent for the Jansz Feed Gas Pipeline on behalf of the Gorgon Joint Venturers, pursuant to Statement No. 769, and will apply to be the person taking the action for the Jansz Feed Gas Pipeline, as approved under EPBC Reference 2005/2184. (Note: If the Commonwealth Minister refuses Chevron Australia s application to become the person taking the action for the Jansz Feed Gas Pipeline, this Plan will be reviewed). 1.2 Project Chevron Australia proposes to develop the gas reserves of the Greater Gorgon Area (Figure 1-1). Subsea gathering systems and subsea pipelines will be installed to deliver feed gas from the Gorgon gas field and Jansz Io gas fields to the west coast of Barrow Island. The feed gas pipeline system will be buried as it traverses from the west coast to the east coast of the Island where the system will tie in to the Gas Treatment Plant located at Town Point. The Gas Treatment Plant will comprise Liquefied Natural Gas (LNG) trains capable of producing a nominal capacity of five million tonnes per annum (MTPA) per train. The Gas Treatment Plant will also produce condensate and domestic gas. Carbon dioxide (CO2), which occurs naturally in the feed gas, will be separated during the production process. As part of the Gorgon Gas Development, Chevron Australia will inject the separated CO2 into deep formations below Barrow Island. The LNG and condensate will be loaded from a dedicated jetty offshore from Town Point and then transported by dedicated carriers to international markets. Gas for domestic use will be exported by a pipeline from Town Point to the domestic gas collection and distribution network on the mainland 1.3 Location The Gorgon gas field is located approximately 130 km and the Jansz Io field approximately 200 km off the north-west coast of Western Australia. Barrow Island is located off the Pilbara coast 85 km north-north-east of the town of Onslow and 140 km west of Karratha. The Island is approximately 25 km long and 10 km wide and covers approximately 23 500 ha. It is the largest of a group of islands, including the Montebello and Lowendal Islands. Page 12 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Figure 1-1 Location of the Greater Gorgon Area Chevron Australia Pty Ltd Public Page 13 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Figure 1-2 Location of the Gorgon Gas Development and Jansz Feed Gas Pipeline Page 14 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: 1.4 Approvals The initial Gorgon Gas Development was assessed through an Environmental Impact Statement/Environmental Review and Management Programme (EIS/ERMP) assessment process (Chevron Australia 2005, 2006). The initial Gorgon Gas Development was approved by the Western Australian State Minister for the Environment on 6 September 2007 by way of Ministerial Implementation Statement No. 748 (Statement No. 748) and the Commonwealth Minister for the Environment and Water Resources on 3 October 2007 (EPBC Reference: 2003/1294). In May 2008, under section 45C of the Western Australian Environmental Protection Act 1986 (EP Act), the Environmental Protection Authority (EPA) approved some minor changes to the Gorgon Gas Development that it considered not to result in a significant, detrimental, environmental effect in addition to, or different from, the effect of the original proposal (EPA 2008). The approved changes are: excavation of a berthing pocket at the Barge (WAPET) Landing facility installation of additional communications facilities (microwave communications towers) relocation of the seawater intake modification to the seismic monitoring program. In September 2008, Chevron Australia sought both State and Commonwealth approval through a Public Environment Review (PER) assessment process (Chevron Australia 2008) for the Revised and Expanded Gorgon Gas Development to make some changes to Key Proposal Characteristics of the initial Gorgon Gas Development (outlined in Schedule 1 of Statement No. 748), as outlined below: addition of a five MTPA LNG train, increasing the number of LNG trains from two to three expansion of the CO 2 Injection System, increasing the number of injection wells and surface drill locations extension of the causeway and the Materials Offloading Facility (MOF) into deeper water. The Revised and Expanded Gorgon Gas Development was approved by the Western Australian State Minister for the Environment on 10 August 2009 by way of Ministerial Implementation Statement No. 800 (Statement No. 800). Statement No. 800 also superseded Statement No. 748 as the approval for the initial Gorgon Gas Development. Statement No. 800 therefore provides approval for both the initial Gorgon Gas Development and the Revised and Expanded Gorgon Gas Development, which together are known as the Gorgon Gas Development. Use of an additional 32 ha of uncleared land for the Gorgon Gas Development Additional Construction, Laydown, and Operations Support Area (Additional Support Area) was approved by the Western Australian State Minister for Environment on 2 April 2014 by way of Ministerial Implementation Statement No. 965 and by Variation issued by the Commonwealth Minister for the Environment. Statement No.965 applies the conditions of Statement No.800 to the Additional Support Area and requires all implementation, management, monitoring, compliance assessment and reporting, environmental performance reporting, protocol setting and record keeping requirements applicable to the Additional Support Area under Statement No.800 to be carried out on a joint basis with the Gorgon Gas Development. On 26 August 2009, the Commonwealth Minister for the Environment and Water Resources (EPBC Reference: 2008/4178) issued approval for the Revised and Expanded Gorgon Gas Development, and varied the conditions for EPBC Reference 2003/1294. Chevron Australia Pty Ltd Public Page 15 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 The Jansz Feed Gas Pipeline was assessed via Environmental Impact Statement/Assessment on Referral Information (ARI) and EPBC Referral assessment processes (Mobil Australia 2005, 2006). The Jansz Feed Gas Pipeline was approved by the Western Australian State Minister for the Environment on 28 May 2008 by way of Ministerial Implementation Statement No. 769 (Statement No. 769) and the Commonwealth Minister for the Environment and Water Resources on 22 March 2006 (EPBC Reference: 2005/2184). This Plan covers the Gorgon Gas Development characteristics outlined in Schedule 1 of Statement No. 800 as approved by EPBC Act Reference 2003/1294 and EPBC Reference: 2008/4178, and including the Additional Support Area as approved by Statement No. 965 and as varied by the Commonwealth Minister for the Environment.. In respect of the Carbon Dioxide Seismic Baseline Survey Works Program, which were the only works approved under Ministerial Statement No,748 and under EPBC Reference 2003/1294 before the Minister approved a variation to it on 26 August 2009, note that these are authorised to continue (under Condition 1A.1 of Ministerial Statement No. 800 and Condition 1.4 of EPBC Reference 2003/1294 and 2008/4178) subject to the existing approvals for those plans, and are not the subject of this Plan. 1.5 Purpose of this Plan 1.5.1 Legislative Requirements This Plan is required under Condition 32.1 of Statement No. 800, which is quoted below: 32.1) Prior to commencement of construction of Terrestrial Facilities listed in Condition 6.3, the Proponent shall submit to the Minister a Post-Construction Rehabilitation Plan (the Plan) to cover those areas that will be disturbed as part of construction and areas that are part of the Terrestrial Disturbance Footprint, but which are not required for the future construction and operation of the Proposal that meets the objectives set in Condition 32.4 and the requirements of Condition 32.5 as determined by the Minister, unless otherwise allowed in Condition 32.2. 1.5.2 Objectives The objectives of this Plan, as stated in Condition 32 of Statement No. 800, are to: ensure that the rehabilitation of terrestrial areas following construction is properly planned in a manner which promotes self-sustaining ecosystems able to be managed as part of their surroundings consistent with the conservation objectives of a Class A Nature Reserve design rehabilitation of native vegetation to ultimately develop into viable ecological systems which are comparable and compatible with surrounding native vegetation and its land uses, and restores as closely as practicable the pre-disturbance biodiversity and ecosystem functional values ensure planning, implementation, monitoring, and reporting on rehabilitation is carried out consistent with industry best practice ensure management of rehabilitation continues until affected areas are self-sustaining better inform any ongoing rehabilitation and post-closure rehabilitation. 1.5.3 Requirements The requirements of this Plan, as stated in Condition 32 of Statement No. 800, are listed in Table 1-1, which also identifies where they are addressed in this Plan. Page 16 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Table 1-1 Requirements of this Plan Ministerial Document Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Statement No. 800 Condition No. Requirement 32.3 In preparing the, the Proponent shall consult with the Department of Environment and Conservation (DEC) (now Department of Parks and Wildlife [DPaW]) and Department of Mines and Petroleum (DMP). 32.5 i The Plan shall identify those sites that will be disturbed for construction but are not required for the future construction and operation of the Proposal. 32.5 ii The Plan shall identify those areas that are part of the Terrestrial Disturbance Footprint not required for the future construction and operation of the Proposal that can be rehabilitated. 32.5 iii The Plan shall include objectives for rehabilitation, including any site-specific variation. Section Reference in this Plan Section 1.5.6 Section 2.0 Section 2.0 Section 5.0, Table 5-1 32.5 iv The Plan shall include plans for topsoil management. Section 4.1.2 32.5 v The Plan shall include targets for completion criteria including nutrient cycling and self-sustainability of ecosystems agreed with DEC (now DPaW). 32.5 vi The Plan shall include targets for flora and fauna recruitment, including specific targets for: a. the return of recalcitrant species b. the return of key fauna habitat c. the translocation of viable specimens of long-lived species required for fauna habitat d. the recolonisation of invertebrate fauna e. the recolonisation of mycorrhizal fungi. 32.5 vii The Plan shall include plans to restore hydrological function. 32.5 viii The Plan shall include integration with Island-wide management. 32.5 ix The Plan shall include monitoring, and adaptive management including adaptation to climate change. 32.5 x The Plan shall include identification of knowledge gaps and ongoing studies to address lack of knowledge. 32.5 xi The Plan shall include plans for appropriate plant species composition including consideration of species vulnerability to and dependence on fire. 32.5 xii The Plan shall include rehabilitation following Proposalattributable fires. 32.5 xiii The Plan shall include reporting protocols including peer review. 32.5 xiv The Plan shall include completion criteria agreed with the DEC (now DPaW). 32.6 The Proponent shall implement the Post-Construction Rehabilitation Plan. Section 5.0, Table 5-2 Section 4.6 and Section 5.0, Table 5-2 Section 4.1.4 Section 4.4 Section 4.5 Section 4.6 Table 5-1, Section 4.3 Section 4.3 Section 7.2.2 Section 7.3 Section 5.0, Table 5-1, Table 5-2 Section 6.0 and Section 7.0 Chevron Australia Pty Ltd Public Page 17 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Ministerial Document Statement No. 800 Statement No. 800 Condition No. Requirement 32.7 The Proponent shall revise as required and submit to the Minister a revised Post-Construction Rehabilitation Plan in response to the results of the monitoring program and results of any ongoing studies. In revising the Plan the Proponent shall consult with the DEC (now DPaW). 32.8 The Proponent shall also implement the Plan for other areas requiring rehabilitation prior to final project closure but not identified in Condition 32.5 Section Reference in this Plan Section 7.3 Section 6.0 and Section 7.0 Statement No.965 requires the implementation of this plan, in respect of the Additional Support Area and the Gorgon Gas Development, to be carried out on a joint basis. 1.5.4 Hierarchy of Documentation This Plan will be implemented for the Gorgon Gas Development via the Chevron Australasia Business Unit (ABU) Operational Excellence Management System (OEMS). The OEMS is the standardised approach that applies across the ABU to continuously improve the management of safety, health, environment, reliability, and efficiency to achieve world-class performance. Implementation of the OEMS enables the Chevron ABU to integrate its Operational Excellence (OE) objectives, processes, procedures, values, and behaviours into the daily operations of Chevron Australia personnel and contractors working under Chevron Australia s supervision. The OEMS is designed to be consistent with and, in some respects, go beyond Standards Australia/Standards New Zealand ISO 14001:2004 Environmental Management Systems Requirements with Guidance for Use Standards (Australia/Standards New Zealand 2004a). Figure 1-3 provides an overview of the overall hierarchy of environmental management documentation within which this Plan exists. Further details on environmental documentation for the Gorgon Gas Development are provided in Section 6.1 of this Plan. Figure 1-4 indicates the information flows between related plans and reports required to satisfy Ministerial approval conditions. Figure 1-5 shows how this Plan relates to the Gorgon Gas Development Common User Procedures, contractor Impact Mitigation Strategies (IMSs) and activity-specific Environmental Management Plans (EMPs). The Common User Procedures related to this Plan are listed in Section 6.1.3.2. The IMSs related to this Plan are listed in Section 6.1.3.4. Page 18 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Figure 1-3 Hierarchy of Gorgon Gas Development Environmental Documentation Chevron Australia Pty Ltd Public Page 19 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Figure 1-4 Relationship to Other Ministerial Approval Deliverables Page 20 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Figure 1-5 Relationship to Other OEMS Implementation Documents 1.5.5 Relevant Standards and Guidelines The following standards and guidelines have been taken into account in preparing this Plan: Environmental Protection Authority (EPA) Guidance Statement No. 6, Rehabilitation of Terrestrial Ecosystems (EPA 2006) Australian Petroleum Production and Exploration Association (APPEA) Code of Environmental Practice (APPEA 2008) Mine Rehabilitation Handbook (Department of Industry, Tourism and Resources 2006a) Mine Closure and Completion Handbook (Department of Industry, Tourism and Resources 2006b) Strategic Framework for Mine Closure (Australian and New Zealand Minerals and Energy Council and the Minerals Council of Australia 2000). 1.5.6 Stakeholder Consultation Consultation with stakeholders has been undertaken by Chevron Australia on a regular basis throughout the development of environmental impact assessment management documentation for the Gorgon Gas Development. This has included engagement with the community, Chevron Australia Pty Ltd Public Page 21 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 government departments, industry operators, and contractors to Chevron Australia via planning workshops, risk assessments, meetings, teleconferences, and the PER and EIS/ERMP and Environmental Review (Chevron Australia, 2013) formal approval processes. Condition 32.3 of Statement No. 800 specifically requires Chevron Australia to consult with the DEC (now DPaW) and DMP. This document has been prepared with input from: David Tongway (Landscape Ecologist): David Tongway independently reviewed this Plan prior to its submission to Government agencies and his comments were incorporated or otherwise resolved. The DEC (now DPaW): Workshops and meetings were held involving the DEC and Chevron Australia personnel to discuss the scope and content of this Plan during its development. The DEC reviewed draft revisions of this Plan along with the feedback of the independent reviewers. The DEC s comments have been incorporated or otherwise resolved. The DEWHA (now Department of the Environment [DotE]): The DEWHA reviewed draft revisions of this Plan along with the feedback of the independent reviewers. The DEWHA s comments have been incorporated or otherwise resolved. The Western Australian Department of Mines and Petroleum (DMP): Consultation with the DMP is required under Condition 32.3 of Statement No. 800. The DMP reviewed draft revisions of this Plan along with the feedback of the independent reviewers. The DMP comments were provided via the DEC and have been incorporated or otherwise resolved. Chevron Australia (existing oilfield operations personnel): Consulted in relation to existing rehabilitation strategies and performance criteria, and implications for Islandwide management on Barrow Island. The process for development, review, and approval of this Plan is shown in Figure 1-6. Page 22 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Figure 1-6 Deliverable Development, Review, and Approval Flow Chart 1.5.7 Public Availability This Plan will be made public as and when determined by the Minister, under Condition 35 of Statement No. 800. Chevron Australia Pty Ltd Public Page 23 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 2.0 Relevant Facilities and Activities 2.1 Terrestrial Facilities 2.1.1 Overview This Plan addresses issues associated with the Terrestrial Facilities of the Gorgon Gas Development, which are shown in Figure 2-1. The Gorgon Gas Development Terrestrial Facilities are defined in Condition 6.3 of Statement No. 800 as the: Gas Treatment Plant Carbon Dioxide Injection System Associated Terrestrial Infrastructure forming part of this Proposal Areas impacted for seismic data acquisition the Onshore Feed Gas Pipeline System and terrestrial component. Terrestrial Facilities also include those defined in Condition 6.3 of Statement No. 769 (the Onshore Feed Gas pipeline system and the terrestrial component of the Shore Crossing) and Schedule 1 of Statement No. 965 (the Additional Support Area). Additional details on the Terrestrial Facilities can be found in the Draft EIS/ERMP (Chevron Australia 2005), the section 45C approval (EPA 2008), the PER (Chevron Australia 2008) and the Environmental Review (Chevron Australia 2013a). Condition 32.1 of Statement No. 800 requires Chevron Australia (as the Proponent) to submit a that addresses disturbed areas that may become available for rehabilitation on completion of construction. Condition 32.5(i) requires Chevron Australia to identify those sites that will be disturbed for construction but are not required for the future construction and operation of the Proposal. Based on existing plans for the Gorgon Gas Development, the areas or parts of these areas may become available for rehabilitation on completion of construction: hardstand and laydown areas drill pads pipeline construction easements access tracks gravel/rock pits. Condition 32.5(ii) requires Chevron Australia to identify those areas that are part of the Terrestrial Disturbance Footprint not required for the future construction and operation of the proposal that can be rehabilitated. It is not intended to disturb any area outside the planned Gorgon Gas Development Footprint within the Terrestrial Disturbance Footprint. However, should disturbance take place, and it is not required for future construction or operation, then it will be rehabilitated according to this plan. Page 24 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Figure 2-1 Gorgon Gas Development Terrestrial Facilities on Barrow Island Chevron Australia Pty Ltd Public Page 25 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 3.0 Risk Assessment 3.1 Overview Chevron Australia has prepared the HES Risk Management: ASBU Standardized OE Process (Chevron Australia 2012a) to assess and manage HES risks, which it internally requires its employees, contractors, etc. to comply with. A number of environmental risk assessments have been completed for the Gorgon Gas Development. A strategic risk assessment was undertaken during the preparation of the Draft EIS/ERMP to determine the environmental acceptability of the Development, and identify key areas of risk requiring mitigation (Chevron Australia 2005). This original assessment was reviewed as part of the development of the Gorgon Gas Development Revised and Expanded Proposal PER (Chevron Australia 2008), in light of the changes to the Gorgon Gas Development (described in Section 1.4). The outcomes of these assessments have been reviewed and considered during the preparation of this Plan. More detailed risk assessments have been undertaken for specific scopes of work prior to the commencement of construction. The risk assessments for quarantine are described in the Terrestrial and Marine Quarantine Management System (required under Condition 10 of Statement No. 800 and Condition 1 of EPBC Reference: 2003/1294). Additional detailed risk assessments have been undertaken for specific scopes of work, using Chevron s RiskMan2 Procedure (Chevron Corporation 2008). A summary of the risk assessments that have been undertaken to date, and which have provided input into this Plan, are provided in Table 3-1. Table 3-1 Risk Assessments Relevant to this Plan Scope of Risk Assessment Method Documentation Year Entire Scope of the Approved Development Entire Scope of the Revised and Expanded Proposal Upstream Feed Gas Pipeline Construction AS/NZS 4360:2004 AS/NZS 4360:2004 RiskMan2 Draft EIS/ERMP (Chevron Australia 2005) Gorgon Gas Development PER (Chevron Australia 2008) Gorgon Upstream Joint Venture (GUJV) Onshore Construction Environmental Risk Assessment Report (GUJV 2006a) Shore Crossing Construction Environmental Risk Assessment Report (GUJV 2006b) Downstream Construction RiskMan2 Kellogg Joint Venture Gorgon (KJVG) Downstream Environmental Risk Register (KJVG 2008a) 2005 2008 2006 2008 3.2 Methodology The methodology for the environmental risk assessments undertaken during the EIS/ERMP assessment process is documented in Chapter 9 of the Draft EIS/ERMP (Chevron Australia 2005). The risk assessments were undertaken in accordance with these standards: AS/NZS 4360:2004 Risk management (Standards Australia/Standards New Zealand 2004b) Page 26 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: AS/NZS Handbook 203:2006 Environmental Risk Management Principles and Process (Standards Australia/Standards New Zealand 2006) AS/NZS 3931:1998 Risk Analysis of Technological Systems Application Guide (Standards Australia/Standards New Zealand 1998). The main components of the RiskMan2 methodology include: Hazard Identification: Identifying potential hazards that are applicable to Gorgon Gas Development activities and determining the hazardous events to be evaluated. Hazard Analysis: Determining the possible causes that could lead to the hazardous events identified; the consequences of the hazardous events; and the safeguards and controls currently in place to mitigate the events and/or the consequences. Risk Evaluation: Evaluating the risks using the Chevron Integrated Risk Prioritization Matrix (Appendix 1). The risk ranking is determined by a combination of the expected frequency of the hazard occurring (likelihood) and the consequence of its occurrence. Note that when assessing the consequence no credit is given to the hazard controls; hazard controls are taken into account in determining the likelihood of the event. Residual Risk Treatment: Reviewing the proposed management controls for each of the risks identified and proposing additional controls or making recommendations, if required. Using the Chevron Integrated Risk Prioritization Matrix (Appendix 1), identified risks are categorised into four groups that determine the level of response and effort in managing the risks. The risk-ranking categories have been used in the development of this Plan to determine whether the residual risks were acceptable or whether further mitigation was required. 3.3 Rehabilitation Risks The rehabilitation strategies included in this Plan focus on the key risks to successful rehabilitation. These key risks have been identified as: appropriate surface hydrology and soil surface stability are not re-established, leading to potential flooding or a loss of resources through erosion loss of topsoil or vegetation viability and values due to inappropriate handling, storage, and contamination soil properties (physical and chemical) are not appropriate for the target vegetation community or habitat for soil-inhabiting fauna introduction and spread of weeds target vegetation community fails to establish adequately due to: loss of topsoil viability and structure inadequate seed resources presence and/or competition from weeds presence of seed of inappropriate species grazing by fauna altered hydrology lack of understanding of the germination/establishment requirements of species in the rehabilitation of a disturbed landscape. Chevron Australia Pty Ltd Public Page 27 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 4.0 Management of Rehabilitation 4.1 Key Management Elements Key elements to the success of this Plan are: weed hygiene the appropriate management of topsoil restructure of soil profiles the identification of target vegetation communities including their ecosystem function, structure and composition and condition management of weeds and management of surface water drainage. These elements are considered to be the critical foundations for the development of an appropriate ecosystem, including fauna habitat. Tasks required to achieve this outcome are detailed in Table 4-1. The focus on topsoil management reflects its critical importance as a source of seed, nutrients, and beneficial soil organisms (Outback Ecology Services 2009a). The selection of a target vegetation community for rehabilitation in each area will be based on position in the landscape. The broad vegetation assemblages present on Barrow Island are described by Mattiske and Associates (1993). Relevant target vegetation landscape communities will be: Coastal communities (C vegetation types) Drainage and creek line communities (D vegetation types) Flats communities (F vegetation types) Limestone communities (L vegetation types) Valley slopes and escarpments communities (V vegetation types). Further detail on species composition, and their vulnerability to and dependence on fire, is presented in the Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b). 4.1.1 Vegetation Management In general, vegetative material from areas to be disturbed can be a source of seed, organic matter, and litter-inhabiting organisms. However, for areas referred to in this Plan, the overwhelming majority of the vegetative material will be Spinifex plants (Triodia spp.), which could be expected to be bulky and contain little canopy-stored seed. Experience of WA Oil (Cory Fee, pers comm. 2009) in their rehabilitation programs has shown that excessive spinifex material in topsoil reduces seed germination and seedling establishment of all species included in rehabilitation. Therefore, in large areas to be cleared (e.g. the Gas Treatment Plant site), where spinifex forms the majority of the vegetation, where practicable, this material will be burnt before topsoil is removed. Burning will be carried out according to the Fire Management Plan (Chevron Australia 2009) and the Prescribed Fire Plans. If vegetation consists of woody species that carry their seed in the canopy and this vegetation is not burnt, or if there are significant safety risks associated with burning vegetation (e.g. along Pipeline routes), then the following practices will be adopted where this is practicable: salvage vegetation from areas to be cleared only retain vegetation that is free of weeds Page 28 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: record relevant information regarding the cleared vegetation respread stockpiled vegetation on similar landforms and soil types from which it was stripped Where this is not practicable vegetation material will be burnt elsewhere or disposed of. 4.1.2 Topsoil and Soil Management Strategies The following practices will be adopted where reasonable and practicable to do so for stripping, stockpiling, reusing, and management of topsoil from the Gorgon Gas Development: Identify the boundaries of distinct vegetation communities to allow the soil from each area to be stripped, stockpiled, and respread separately. Weed infestations will be mapped and segregated with an appropriate buffer. A site specific weed hygiene management program will be developed and implemented. For the installation of the Onshore Feed Gas Pipeline vegetation and topsoil will be stored in windrows along the edge of the right of way. Reinstatement will involve direct recovery of topsoil and spreading of the vegetation. For all other areas strip topsoil using the least aggressive methods, preferably by pushing up the soil with a dozer or grader and loading into a truck, rather than using machines such as elevating scrapers. Strip topsoil to an approximate depth of 5 cm where practicable. Direct-return topsoil to areas that are ready to be rehabilitated and that are suitable for the vegetation community originally associated with the soil. If stockpiling is necessary, identify sites that: are not going to be disturbed in future operations are remote from known weed occurrences and sources do not lie in areas likely to receive surface water flow have surrounding vegetation consistent with the original vegetation from the stripped area. Store topsoil stockpiles in low-profile dumps that shall not exceed two metres in height. If available, spread vegetation mulch over topsoil stockpiles as soon as is practicable after constructed. Topsoil stockpiles formed by paddock dumping are being considered to maximise the surface area of the stockpile and promote biological development. Record relevant information regarding the soil in each stockpile, including vegetation unit, date of stripping, method of stripping, soil volumes, and seed mix (if any). Consider seeding topsoil stockpiles where soil-stored seed levels are low or vegetation establishment is poor. Use appropriate signage to clearly identify stockpiles and discourage vehicle access; record stockpile locations on site maps. Monitor topsoil stockpiles for stability, vegetation establishment, and weeds, eradicate any weed occurrences. Investigate methods to recover stockpiled topsoil while maintaining or building the biological value of the remaining stockpiled material. Chevron Australia Pty Ltd Public Page 29 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Where topsoil is limited, limit respreading to be a thickness sufficient to inoculate the rehabilitation site with the topsoil properties. The strategy for the use and distribution of topsoil will be developed in consultation with and to the satisfaction of DPaW prior to the commencement of works that involve the removal of topsoil. These practices have been taken from a review undertaken by Outback Ecology Services (Outback Ecology 2009a) for Chevron Australia specifically dealing with the soils of Barrow Island in relation to soils of the Pilbara, and general principles in regard to the values of topsoil and factors influencing topsoil from the Australian Soil and Land Survey Field Handbook (McDonald et al. 1990). 4.1.3 Management of Weeds Activities during the construction period of the Gorgon Gas Development on Barrow Island have the potential to introduce weeds or spread weeds on the Island with increased vehicle movements, land disturbance, movement of soils and rehabilitation activities. Chevron Australia acknowledges the potential impact that the introduction of weed species could have on the vegetation communities on the island. A sophisticated and extensive Quarantine Management System (QMS) will be implemented to minimise the introduction of new weeds species and programs are in place on the Island to prevent the spread of existing weed infestations. This QMS includes the NIS Management Procedure (Chevron Australia 2009d), which is supported by the Barrow Island Weed Hygiene Common User Procedure (Chevron Australia 2009a) and the WA Oil Asset (Barrow and Thevenard Island) Weed Management Plan (Astron Environmental Services 2007). The management measures detailed in these documents focus on minimising the potential for the spread of weeds during the rehabilitation process and methodology to eradicate weeds when identified. Actions include: Areas to be disturbed will be surveyed for weed infestation and if present will be mapped and segregated by appropriate buffers. Where weeds are present prior to disturbance vegetation and topsoil from these areas will not be retained or stockpiled. Where weeds are present detailed soil, plant, and vehicle hygiene procedures will be implemented. Movement of weed infested soils will be under strict hygiene control to designated areas where they will either be buried within the infected area of the construction site to prevent further spread or removed from the island in sealed containers for appropriate disposal. Monitor topsoil stockpiles and rehabilitation in accordance with the agreed surveillance plan in the QMS. Topsoil will be replaced from where it was sourced, wherever possible. Induction and education programs will be implemented to ensure all staff, contractors, carriers, and fabricators are aware of the importance of preventing the introduction and spread of weeds on the island and the potential impacts these could have on island vegetation. Equipment and staff moving between off Barrow Island operations and Barrow Island operations will undergo strict quarantine control to minimise the potential for movement of weeds onto the Island. 4.1.4 Managing Surface Drainage Surface drainage features are described in the Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b). Surface drainage patterns (hydrology) Page 30 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: will be rehabilitated on all disturbed areas to reduce erosion from surface water flow. Practices to achieve this will include: recording the surface topography of the area prior to disturbance using standard survey techniques, consideration will be given to the use of remote sensing if it can achieve adequate resolution, include information on surface stability, soil structure, and estimates of overland surface water flows rehabilitating a surface profile with properties that exhibit similar infiltration and waterretention characteristics for the targeted vegetation outcome to analogue sites unless inappropriate for the targeted vegetation outcome, encouraging local retention and infiltration of rainfall on rehabilitated areas by creating surface roughness through light cultivation on the contour, as required, and spreading vegetation mulch where available on the contour to restrict surface run-off and reduce erosion installing banks or other appropriate earthworks, if required, to direct and control surface water flow at a local scale discharging on to undisturbed stable ground where practicable reviewing and repairing gullies (>30 cm deep) on a case-by-case basis when they occur monitoring using LFA or similar to measure water infiltration and retention. 4.2 Rehabilitation Tasks The overriding strategy for the rehabilitation of areas disturbed for construction is based on the collection and management of topsoil, management of weeds, and management of vegetation resources at the time of clearing. A Task Sheet showing an example of the sort of information collected is shown in Appendix 3. Doing this will ensure that resources are returned to the appropriate site during the rehabilitation process to maximise rehabilitation success and prevent the introduction of NIS and weeds. Management of surface water flows is also critical to successful rehabilitation. The focus for water management will be to reduce flow velocity and volumes to limit erosion of soil and loss of biological resources. The activities required to achieve these outcomes have been separated into individual tasks. These are described in Table 4-1. The tasks identified in this Plan focus on the key risks to successful rehabilitation, as identified in Section 3.0. Table 4-1 Summary Management Measures for Rehabilitation Activity Summary of Management Measures Responsibility Timing 1. General 1.1 Communications This Plan shall be communicated to relevant Gorgon Gas Development personnel. 1.2 Contracts The requirements of this Plan will be specified in relevant instructions to contractors. 1.3 Monitoring and Performance The Plan will be revised in response to the results of the monitoring program and results of any ongoing studies in consultation with the DPaW. Chevron Australia Chevron Australia Chevron Australia From commencement of construction From commencement of construction From commencement of construction Chevron Australia Pty Ltd Public Page 31 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Activity Summary of Management Measures Responsibility Timing 1.4 Data Collection Pre-disturbance data will be collected to identify any specific rehabilitation requirements necessary for each area to meet the objectives of this Plan. Chevron Australia From commencement of construction 2. Site or Project Area Development 2.1 Pre-clearing The following tasks shall be completed prior to clearing taking place: Boundaries of each area will be surveyed and marked, the perimeters recorded and mapped in the Gorgon Geographic Information System (GIS) and provided to all appropriate contractors. Map and segregate NIS and weed infestations with an appropriate buffer; identify specific management requirements. An internal Ground Disturbance Certificate will be obtained. Surface topography, hydrological and soils information will be recorded for each site including: physical and topographical groundwater fauna and flora (including ecological communities, significant habitats) topsoil properties storage location. This information will be used for vegetation and soil management and to inform reconstruction of the landform during rehabilitation. If more than one vegetation community was identified on the site in initial surveys, then the boundaries of vegetation communities will be identified. If seed or fruits are present on the vegetation to be cleared, then where practicable these should be collected and stored appropriately. Chevron Australia Chevron Australia Chevron Australia Chevron Australia Chevron Australia Chevron Australia Before site disturbance Before site disturbance Before site disturbance Before site disturbance Before site disturbance Before site disturbance Page 32 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Activity Summary of Management Measures Responsibility Timing 2.2 Clearing and stripping During clearing and stripping of each area the sequence of tasks will be: Vegetative material will be either burnt (in accordance with the Fire Management Plan [Chevron Australia 2009] and Prescribed Fire Plans, or cleared and stockpiled for future burning or disposal in an appropriate area. Dust from soil stripping and earthworks will be managed where practicable, Non-saline water will be used for dust suppression, if required. Topsoil will be stripped as close to the construction date as practicable. Where practicable topsoil from the area of each vegetation community will be stripped to an approximate depth of 5 cm. Where practicable recovered topsoil will be used for direct lay or stockpiled separately on a suitable storage site for later rehabilitation Soil and vegetation stockpiles will be placed so as to avoid the need for any further disturbance until required for rehabilitation. Topsoil will be stored in low-profile dumps less than 2 m in height to avoid compaction, and assist with maintenance of viable seed, soil microorganisms, and soil nutrients. Topsoil stockpiles will be identified with appropriate signage. Subsoil or rock material may be used for construction The stockpiled soils will be respread as soon as practicable to reduce the loss of soil biological components. Chevron Australia Duration of site clearing and preparation activities Chevron Australia Pty Ltd Public Page 33 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Activity Summary of Management Measures Responsibility Timing 3. Rehabilitation 3.1 Rehabilitation When the disturbed area is available for rehabilitation, then the following tasks will be completed: Depending on the characteristics of the target vegetation and desired substrate the surface of the area to be rehabilitated will be ripped on the contour to the depth of any machineryinduced compaction. Surface drainage patterns will be reestablished to be consistent with that occurring prior to disturbance. Topsoil from a similar vegetation community will be respread at no greater depth than originally removed; if required, topsoil may be spread more thinly. If seeds of species in the target vegetation communities are available they should be respread. Should monitoring indicate that grazing is significantly impeding rehabilitation recovery, then the perimeter of rehabilitation areas may be fenced to exclude grazing fauna. The fence will be maintained until such time the vegetation is sufficiently established to withstand grazing pressure. Chevron Australia After construction 4. Monitoring and Maintenance 4.1 Monitoring Monitoring of rehabilitated and related areas will: use techniques that demonstrate the performance of rehabilitation commence on completion of rehabilitation continue until completion criteria are met or discontinued by agreement with DPaW focus on physical aspects of the rehabilitated landscape, vegetation establishment, ecosystem function, resource retention, and reestablishment of fauna habitat establish permanent photo points provide information that will be used for rehabilitation management monitoring outcomes will be reported annually. Chevron Australia Post rehabilitation Page 34 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Activity Summary of Management Measures Responsibility Timing 4.2 Maintenance Where monitoring indicates that an area of rehabilitation is failing to meet closure standards (Table 5-1), it will be investigated and a maintenance or remediation strategy developed. Where weeds are identified, they will be eradicated. 5. Specific Requirements for Drill Pads Chevron Australia During the monitoring period 5.1 Site assessment 5.2 Site rehabilitation For all drill pads: drill cuttings will be assessed, and, if considered hostile for plant growth, will be removed contaminated soil from drilling activities will be remediated or removed. For drill pads where no topsoil was recovered, then if available, topsoil will be spread to inoculate the area with seed and other biological values. Chevron Australia Chevron Australia After construction and prior to rehabilitation After site assessment 6. Specific Requirements for Buried Gas Pipelines 6.1 Reinstatement and rehabilitation After bedding and padding of pipelines in the trenches has been completed, the following steps will be undertaken: Trenches will be filled, compacted and covered with a crowned profile. Drainage will be re-established by creating breaks in the crown. Topsoil and vegetation will be respread across the pipeline easement. Chevron Australia Completion of pipeline installation 7. Specific Requirements for Tracks (includes Seismic Source Lines) 7.1 Clearing Where practicable: temporary tracks will be cleared using techniques that leave the soil intact 7.2 Restricted access vegetation will not be cleared on areas with high risk of erosion. After authorised use is completed, vehicle access will be restricted. 7.3 Monitoring Rehabilitated tracks will be monitored using visual assessment. Chevron Australia Chevron Australia Chevron Australia Chevron Australia Prior to related activity Prior to related activity Ongoing Ongoing 4.3 Fire and Rehabilitation The mature natural vegetation on Barrow Island is well-adapted to fire events. Information on species vulnerability and dependence on fire is contained in the Terrestrial and Subterranean Baseline Environmental Impact Report (Chevron Australia 2012b). However, where it is determined (from rehabilitation monitoring) that recovery from fire is inadequate under natural conditions, then, in consultation with the DPaW and Conservation Commission, the rehabilitation practices described in this Plan could be applied (Condition 12.8 of Statement No. 800 and 11.8 of Statement No. 769). Chevron Australia Pty Ltd Public Page 35 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Rehabilitated areas are unlikely to carry a fire until they are well into maturity and have developed substantial biomass. It is expected that the vegetation will have also reached reproductive maturity by this stage and a soil seed bank will have been established. 4.4 Integration with Island-wide Management The rehabilitation strategies, framework for monitoring, performance standards, and completion criteria set out in this Plan are based broadly on those already developed for the existing oilfield operations on Barrow Island, and are therefore consistent with Island-wide strategies. Chevron Australia is committed to the improvement of rehabilitation knowledge practices through a program of monitoring, application of lessons learnt, and targeted studies consistent with industry leading practice. This knowledge will be developed and shared with the other stakeholders on the Island. 4.5 Monitoring and Adaptive Management The focus of rehabilitation monitoring will be to compare the performance of rehabilitation sites against natural undisturbed analogue or reference sites in similar vegetation associations and landform positions as the rehabilitation. The analogue sites will provide the real time values for each aspect against which rehabilitation performance can be compared. Monitoring of rehabilitation in relation to meeting the objectives and performance standards (Table 5-1) and completion criteria (Table 5-2) described in this Plan will be undertaken as follows: Monitoring will commence from the completion of earthworks. Monitoring will continue until such time as data indicates the rehabilitation objectives and criteria have been met. In consultation with DPaW, the frequency and intensity of ongoing monitoring of biological aspects will be varied over the life of the Gorgon Gas Development driven by trends in ecosystem development. Monitoring is likely to be more intensive in the first three years of rehabilitation, but will decrease as the rehabilitated ecosystem matures and performance trends are positive. Benchmarking of monitoring results against equivalent best practice sites on Barrow island to enable a comparison of performance and inform if there is a need for intervention. A key aspect of the monitoring program is the use of tools, such as Landscape Function Analysis (LFA) or Ecosystem Function Analysis (EFA), which provide information that enables management decisions such as the need for intervention to be made promptly and effectively. This is consistent with the adoption of an adaptive management approach focussed on continuously improving rehabilitation practice on Barrow Island. Where the need for change is identified this will be done in consultation with DPaW and subject matter experts consistent with Condition 32.4 of Statement No. 800. 4.5.1 Monitoring of Soils Soils will be monitored using LFA (Tongway 2004) or a similar system that collects data on the stability, structure, rainfall infiltration, and nutrient recycling of the reinstated soils on rehabilitation sites. Soil indices produced from this data enable evaluation of trends in soil performance on each of these factors over time. Page 36 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: 4.5.2 Monitoring of Vegetation Vegetation will be monitored using a combination of visual observation, quantitative vegetation monitoring, and Ecosystem Function Analysis (EFA) (Tongway 2004) or equivalent. Vegetation monitoring provides information on species diversity and density following seedling emergence and early establishment. EFA measures rehabilitation performance over time through the measurement of development of ecosystem complexity, habitat establishment, and ecosystem function (the provision of increasing environmental goods and services to the developing ecosystem). Regular EFA monitoring provides information on performance trends, alerting management to the need for intervention should performance not meet the agreed outcomes. Should weeds be identified during monitoring they will be managed under the Quarantine Management System. 4.5.3 Monitoring of Fauna Recolonisation Monitoring for fauna recolonisation is based on the successful return of habitat measured by vegetation monitoring and LFA/EFA. As rehabilitation progresses and habitat re-establishes, targeted fauna monitoring will be undertaken to measure fauna activity. Monitoring for fauna re-establishment includes ants as indicator species. It is expected that fauna such as ants will re-colonise immediately, although diversity will change with time as rehabilitation progresses. Observations during EFA monitoring can also indicate fauna activity by identifying the presence of tracks, scats, scratchings, and burrowing activities. Areas will be considered to be rehabilitated when the completion criteria have been met and accepted by DPaW and the areas demonstrate that they provide appropriate habitat for fauna or when terrestrial invertebrate diversity is within the range of values of analogue sites in the targeted vegetation communities. Where monitoring indicates fauna recolonisation does not reflect the level of activity in analogue sites the causes will be investigated and mitigation measures developed and implemented in consultation with DPaW. 4.5.4 Adaptation to Climate Change Ecosystems on Barrow Island are adapted to a climate of episodic rainfall events, which may be substantial, alternating with long periods of extreme dryness. Within the context of this extreme climatic variability, variation due specifically to climate change is not considered to be a factor that can be anticipated in this Plan. However, this Plan is based on an adaptive management approach outcomes from the monitoring program will be reviewed annually and will form the basis for management decisions. 4.6 Identification of Knowledge Gaps Chevron Australia is committed to ongoing review of rehabilitation outcomes. Investigations and studies will be undertaken as required to fill gaps in knowledge, and rehabilitation methodology adapted accordingly. Chevron Australia will consider undertaking studies into a number of aspects early in the development of the Gorgon Gas Development. Current gaps in knowledge or uncertainty of outcomes appear to be: apparent recalcitrance of some plant species due to edaphic or other environmental constraints return of fauna habitat, including long-lived plant species required for habitat recolonisation of invertebrate fauna recolonisation of mycorrhizal fungi role of exclusion fencing to rehabilitate species Chevron Australia Pty Ltd Public Page 37 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 species vulnerability and dependence on fire effect of reconstructed soil properties on vegetation composition and structure. Although identified as knowledge gaps, each of these aspects may reflect the limited documented information on rehabilitation performance on the Island in regard to these specific aspects. The following have been taken into consideration: Experience elsewhere in the Pilbara indicates that the return of fauna and soil-borne fungi takes place as an integral part of well-managed and successful rehabilitation programs. The monitoring program will identify the success in re-establishing these aspects. Where monitoring shows rehabilitation has been unsuccessful, the investigation and quest for solutions will form the basis of ongoing study programs. These programs will be developed in consultation with DPaW and subject matter experts in each particular field. This is integral to the adaptive management approach to be undertaken by Chevron Australia. 4.6.1 Recalcitrance of Plant Species Although some plants have been termed as recalcitrant (Chevron Australia 2005), the use of this term may have been incorrect and misleading. Review of flora and vegetation data collected on Barrow Island indicate that of the 302 species identified, there is some uncertainty about 18 species that have not been identified in rehabilitation to date. This gap will form the basis of a collaborative study program. Early observations indicate this may be due to selective grazing in rehabilitated areas or lack of fire. An investigation of grazing impact is currently planned for Barrow Island, should this indicate grazing is affecting these species then exclusion fencing will be considered (refer to Table 4-1) Should any fires take place on the Island then Chevron Australia will collaborate with DPaW to develop a program to monitor vegetation recovery to expand knowledge on the role of fire in the ecology of island vegetation Should monitoring of rehabilitation performance indicate the failure of keystone species to re-establish, then the causes of this failure will be investigated. priority will be given to keystone species that contribute the key functional aspects of the vegetation communities species contributing known services will be the next priority. Some initial investigations have been undertaken on germination and propagation in the island nursery, this facility will be utilised for ongoing investigations into seed viability and propagation techniques. 4.6.2 Return of Fauna Habitat Dominant components of fauna habitat, including long-lived species habitat, are: soil for digging and burrowing by vertebrates and invertebrates vegetation a source of shelter and food. Therefore, returning appropriate soils and vegetation are key parts of rehabilitation management to develop suitable habitat over time; these are dealt with specifically in Table 4-1. Other more specific habitat features include Boodie warrens, termite mounds, cliffs and gorges, caves, and raptor nests. Of these, only termite mounds will be affected by the activities described in this Plan. Page 38 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Termite mounds are important physical habitat features for a diversity of fauna, including reptiles, birds, and mammals. They are not uniformly distributed, being absent from red sand dunes and limestone ridges, only occurring where there is sufficient clay material in the soil to support mound construction. There are indications that the use of mounds by fauna only relates to the presence of the termites. Termites will construct new mounds and will not reuse old mounds. Experience on Barrow Island indicates new mounds are formed early in the rehabilitation process and have achieved visible proportions within ten years (Butler, pers. comm. 2008). The retention of termite mound material in the topsoil will provide suitable material for the construction of new mounds that may promote the recolonisation of rehabilitated areas by termites. Vegetation dominated by Triodia spp. is the most important vegetative habitat for fauna on Barrow Island. However, species such as Ficus platypoda can be locally important for some fauna. Direct translocation of shrubs or trees, such as F. platypoda, has not been attempted to date on Barrow Island, and is likely to be difficult due to their habitat and the harsh climate. Ficus has germinated well in greenhouse trials on Barrow Island, and most successfully from green stem cutting (Cory Fee, pers. comm. 2009). However, factors limiting its field establishment are yet to be categorically defined (Cory Fee, pers. comm. 2009). On sites where Ficus occurred, natural recruitment of this slow-growing species will be monitored to understand whether this species will self-establish, or whether intervention should occur. Areas that become available for rehabilitation following construction that will be the subject of this Plan will be linear (as in the case of pipeline construction), or small in area (as in the case of laydown and construction areas). As a result, undisturbed fauna habitat will be in close proximity to these areas and will facilitate recolonisation as the rehabilitation develops and matures. Translocation of viable specimens of long-lived species has therefore not been considered as a rehabilitation requirement in this Plan. 4.6.3 Recolonisation of Invertebrate Fauna The most important factor in the re-establishment of invertebrates in rehabilitated areas will be the extent to which appropriate habitat is re-established and the development of a similar ecosystem. The most important factors contributing to the recolonisation and re-establishment of invertebrates will be the return of viable topsoil (Outback Ecology Services 2009a), reestablishment of native plant species at appropriate densities and species richness, the accumulation of organic matter through respreading of stored vegetation material from clearing, and the minimisation of loss of organic matter through erosion. 4.6.4 Recolonisation of Mycorrhizal Fungi Little is known about mycorrhizal fungi on Barrow Island. If targets were to be established for their return, then a program of work to understand their occurrence would first be required. At a more general level, the impact of disturbance and the pattern of recovery of mycorrhizal fungi have been studied in a range of other environments. Reflecting the outcomes from such work, re-establishing these fungi will largely be achieved by returning fresh topsoil, where practicable, and re-establishing native plant species at an appropriate density and species richness (Outback Ecology Services 2009a). Techniques such as bringing surface soil material in from the edges of rehabilitation sites (soil inoculation) can assist in the inoculation of rehabilitation soils with viable mycorrhizal material. Recolonisation and grazing of rehabilitated areas by fauna is also known to contribute to the introduction and spread of mycorrhizal fungi. It is considered that rehabilitated sites will be recolonised with mycorrhizal fungi by natural processes over time. Chevron Australia Pty Ltd Public Page 39 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 5.0 Objectives, Performance Standards, and Relevant Documentation 5.1 Overview This section summarises the environmental objectives, performance standards, and relevant documentation that have been developed as part of a systematic approach to the management of environmental risks. Specific performance indicators, targets, and criteria will be used to assess the overall environmental performance for the Gorgon Gas Development against the stated environmental objectives. Table 5-1 contains the objectives, performance standards, and documentation that relate to this Plan. These will provide input into the Environmental Performance Reports that are required under Condition 5 of Statement No. 800. Table 5-2 identifies a set of targets and completion criteria based on these objectives; the criteria have been designed to capture the key rehabilitation outcomes of this Plan: equivalent landform stable soils representative vegetation self-sustaining and functioning ecosystems effective fauna habitat minimal ongoing management. 5.2 Objectives Chevron Australia is committed to conducting activities associated with the Gorgon Gas Development in an environmentally responsible manner; and aims to implement best practice environmental management as part of a program of continual improvement. To meet this commitment, objectives have been defined that relate to the management of the identified environmental risks for the Development. These objectives are those in Condition 32 of Statement No. 800, and, where necessary, additional, more specific objectives have been developed. The objective of this Plan is to achieve the following outcomes: ensure that the rehabilitation of terrestrial areas following construction is properly planned in a manner which promotes self-sustaining ecosystems able to be managed as part of their surroundings consistent with the conservation objectives of a Class A Nature Reserve design rehabilitation of native vegetation to ultimately develop into viable ecological systems which are comparable and compatible with surrounding native vegetation and its land uses, and restores as closely as practicable the pre-disturbance biodiversity and functional values ensure planning, implementation, monitoring, and reporting on rehabilitation is carried out in a manner consistent with industry best practice ensure management of rehabilitation continues until affected areas are self-sustaining better inform any ongoing rehabilitation and post-closure rehabilitation. Table 5-1 details the objectives specific to this Plan. Page 40 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: 5.3 Performance Standards Performance standards are the measures Chevron Australia will use to assess whether or not it is meeting its objectives. For each objective and element of each objective, Chevron Australia has described a matter ( description ) that will be measured, and a quantitative target or, where there is no practicable quantitative target, a qualitative target, which is to be measured against when assessing whether the objective has been met. These targets have been developed specifically for assessing performance, not compliance, and so failure to meet the target does not represent a breach of this Plan. Rather, it indicates that an objective may not have been met and there may be a need for management action or review of this Plan. The performance standards specific to this Plan are detailed in Table 5-1. 5.4 Relevant Documentation Chevron Australia has defined the relevant documentation that contains information about whether the performance standards have been met. Relevant documentation specific to this Plan is detailed in Table 5-1. 5.5 Completion Criteria A set of interim completion criteria have been developed (Table 5-2) from the objectives in Statement No. 800. The criteria set out the objectives for rehabilitation and identify the performance outcomes targeted for the rehabilitation program. The completion criteria in Table 5-2 identify the targets required in Condition 32.5(iii), (v), (vi), (vii), (xi), (xiv) of Statement No. 800. Matters requiring the agreement of DPaW (Conditions 32.5(v) and 32.5(xiv)) have been agreed with DPaW during the course of the development of this Plan. It is proposed to refine these criteria through experience gained in implementing this Plan and through studies and trials undertaken in the lead up to implementing this Plan. The rehabilitation objectives for the completion criteria are: The rehabilitated land surface is consistent with the surrounding topography; soils are stable and resistant to erosion. Soil quality is maintained during storage and replaced in an appropriate position in the landform. Species diversity in revegetation will have similar values to surrounding undisturbed vegetation. Species present in the revegetation will have a similar ecological function and resilience as the surrounding natural system. Rehabilitation areas will provide appropriate habitat for fauna and fauna recruitment as the soil structure and vegetation develop over time. Rehabilitation areas will be free of weed species. The rehabilitated areas can be managed in the same way as the surrounding landscape in the long term. Chevron Australia Pty Ltd Public Page 41 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Table 5-1 Objectives, Performance Standards, and Relevant Documentation Objectives Description Performance Standards Target Evidence/Relevant Documentation 1. Ensure that the rehabilitation of terrestrial areas following construction is properly planned in a manner which promotes selfsustaining ecosystems able to be managed as part of their surroundings consistent with the conservation objectives of a Class A Nature Reserve Planning commences with the collection of baseline information Terrestrial baseline fauna and flora Landform Soils Ecological function Collection and storage of resources Seed Topsoil Rehabilitation of post construction areas based on baseline information and stored resources. Landform design and rehabilitation Topsoil replacement Soil surface preparation Surface water management Seeding if appropriate Weed control Monitoring and active management based on monitoring results Baseline data collected prior to disturbance Resources recovered and stored prior to disturbance Landforms rehabilitated and resources replaced on completion of construction Ongoing monitoring and management until completion criteria met Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b) Managing Topsoil from the Gorgon Project, Assessment of soil resources within the Gorgon Project area (Outback Ecology Services 2009b) Post-Construction Rehabilitation Plan (this Plan) Ecological Monitoring Common User Procedures (Chevron Australia 2009b) Gorgon Gas Development Rehabilitation Task Sheets Audit reports Page 42 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Objectives Description Performance Standards Target Evidence/Relevant Documentation 2. Design rehabilitation of native vegetation to ultimately develop into viable ecological systems which are comparable and compatible with surrounding native vegetation and its land uses, and restores as closely as practicable the pre-disturbance biodiversity and functional values 3. Ensure planning, implementation, monitoring, and reporting on rehabilitation is carried out in a manner consistent with industry best practice Design rehabilitation landform to be consistent with surrounding landform Identify and allocate appropriate topsoil and seed resources for the landform Develop a program to deal with recalcitrant vegetation if required and practicable Design surface structures to manage and control run-off and erosion Design weed management program Design a monitoring program to measure performance against completion criteria Use competent and experienced consultants, specialists, and personnel Consult with industry leaders across the Pilbara Attend rehabilitation conferences and forums Consult with DPaW and DMP Benchmark post-construction rehabilitation against best practice Barrow Island rehabilitation Landform design prepared for each area which includes surface preparation and surface water control Appropriate topsoil identified and allocated for each area Monitoring program developed prior to rehabilitation commencing Effective weed management program in place Staff and contractors are competent and suitably experienced to undertake the design and implementation of the rehabilitation tasks Review rehabilitation practices in the Pilbara prior to finalising post-construction rehabilitation plan DPaW and DMP consulted during development of the Post Construction Rehabilitation Plan (this Plan) Achieve post-construction rehabilitation performance equivalent to or better than best practice Barrow Island rehabilitation Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b) Post-Construction Rehabilitation Plan (this Plan) Managing Topsoil from the Gorgon Project, Draft Assessment of Soil Resources within the Gorgon Project area (Outback Ecology Services 2009b) Ecological Monitoring Common User Procedure (Chevron Australia 2009b) Barrow Island Weed Hygiene Common User Procedure (Chevron Australia 2012c) Post Construction Rehabilitation Plan (this Plan) Managing Topsoil from the Gorgon Project, Review of Topsoil Management Practices (Outback Ecology Services 2009a) Contractor capability statements and staff CVs Annual Environmental Performance Report Chevron Australia Pty Ltd Public Page 43 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Objectives Description Performance Standards Target Evidence/Relevant Documentation 4. Ensure management of rehabilitation continues until affected areas are self-sustaining 5. Better inform any ongoing rehabilitation and post-closure rehabilitation Monitoring and active management programs will be maintained until completion criteria are met and the affected areas are self-sustaining Experience and information will inform future rehabilitation and ultimate closure and rehabilitation of Gorgon activities on Barrow Island Rehabilitation monitoring and active management until monitoring demonstrates the affected areas are self-sustaining will be reviewed and updated as necessary based on field experience and monitoring results Post Construction Rehabilitation Plan (this Plan) Annual Environmental Performance Report Compliance with Condition 32.7 of Statement No. 800 Annual Environmental Performance Report Table 5-2 Rehabilitation Objectives, Completion Criteria, and Performance Targets Rehabilitation Objectives Description Completion Criteria Performance Target Measurement and Documentation 1. The rehabilitated land surface and soil properties are appropriate to support the target ecosystem Appropriate topsoil replaced Key fauna habitat returned Recolonisation by invertebrate fauna Recolonisation by Mycorrhizal fungi Landform and surface hydrology are consistent with, and complementary to, the overall landscape Soil surface has similar stability as surrounding soil surfaces in the target ecosystem Soil physical and chemical properties will be consistent with those of the target ecosystem. Rehabilitated landforms will be consistent with adjacent landforms Soils are returned to the correct place in the landscape Soil profiles will be consistent with adjacent soil profiles Topsoil will be replaced from where it came, where practicable, or to a similar landform Surface soil is sufficiently rough and appropriately contoured to reduce erosion, encourage infiltration of rainfall, and trap seed and other resources Rates of erosion will be consistent with adjacent landforms Objectives measured by the following techniques and reported in the Annual Environmental Performance Report: Rehabilitation Task Sheets Topsoil Records Visual and monitoring assessment Visual inspection for erosion Soil Tests LFA indices are similar for analogue and rehabilitated soils As defined in the Ecological Monitoring Common User Procedure (Chevron Australia 2009b) Managing Topsoil from the Gorgon Page 44 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Rehabilitation Objectives Description Completion Criteria Performance Target Measurement and Documentation 2. Vegetation in rehabilitated areas will have equivalent values as surrounding natural ecosystems Return of recalcitrant species Return of key fauna habitat Plant species diversity, density, plant cover, floristic composition and functional structure at rehabilitated sites representative of the target ecosystem. Measure of soil stability falls within the range of values from analogue sites in the target vegetation community Measure of infiltration is within the range of values from analogue sites in the target vegetation community Plant species are local provenance Ground cover of Triodia spp. for sites rehabilitated on Barrow Island is within the range of values from analogue sites in the target vegetation community Plant species diversity, density, cover and height, floristic composition, and functional structure for sites rehabilitated will be consistent with the target vegetation community (analogue site) No weed species present in rehabilitation on Barrow Island Project, Review of Topsoil Management Practices (Outback Ecology Services 2009a) Managing Topsoil from the Gorgon Project, Draft Assessment of Soil Resources within the Gorgon Project area (Outback Ecology Services 2009b) Objectives measured by the following techniques and reported in the Annual Environmental Performance Report Quantitative vegetation monitoring Ecosystem Function Analysis (EFA) or similar As defined in the Ecological Monitoring Common User Procedures (Chevron Australia 2009b) Species composition for the different vegetation associations as described in the Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b) Barrow Island Weed Hygiene Common User Procedure (Chevron Australia 2012c) Chevron Australia Pty Ltd Public Page 45 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Rehabilitation Objectives Description Completion Criteria Performance Target Measurement and Documentation 3. The rehabilitated ecosystem has equivalent functions and resilience as the target ecosystem Can be integrated with Islandwide management Key fauna habitat returned Recolonisation by invertebrate fauna Recolonisation by Mycorrhizal fungi Nutrients are cycling Ecosystem is self-sustaining 4. Rehabilitated areas provide appropriate habitat for fauna and fauna recruitment including EPBC Act (Cth) listed species Key fauna habitat returned Recolonisation by invertebrate fauna Recolonisation by Mycorrhizal fungi Nutrient cycling Self-sustaining The capacity to retain water and retain and recycle nutrient resources is equivalent to target ecosystems. Seed reserves are equivalent to target ecosystems. There will be no loss of ecosystem function. Rehabilitated ecosystems will be self-sustaining. Soil physical and chemical properties will be consistent with those of the surrounding landscape and provide equivalent habitat values. Vegetation and flora at the rehabilitated sites are representative of the target ecosystem and provide equivalent habitat values. Terrestrial invertebrate fauna diversity is representative of the target ecosystem. Measure of infiltration is within the range of values from analogue sites in the target vegetation community Measure of nutrient cycling is within the range of values from analogue sites in the target vegetation community Seed reserves are within the range of values from analogue sites in the target community Soils are returned to the correct place in the landscape Measure of nutrient cycling is within the range of values from analogue sites in the target vegetation community Plant species diversity, density, cover and height, floristic composition, and functional structure for sites rehabilitated will be consistent with the target vegetation community (analogue site) Invertebrate fauna diversity for sites rehabilitated on Barrow Island is within the range of values for analogue sites in the target vegetation community Objectives measured by the following techniques and reported in the Annual Environmental Performance Report. Ecosystem Function Analysis (EFA) or similar Monitoring for intergenerational succession, using quantitative vegetation monitoring and EFA, or similar, for long-term sustainability and function As defined in the Ecological Monitoring Common User Procedures (Chevron Australia 2009b) Objectives measured by the following techniques and reported in the Annual Environmental Performance Report Rehabilitation Task Sheets Quantitative vegetation monitoring Ecosystem Function Analysis (EFA) or similar Terrestrial invertebrate monitoring Terrestrial fauna monitoring As defined in the Ecological Monitoring Common User Procedures (Chevron Australia 2009b). Page 46 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Rehabilitation Objectives Description Completion Criteria Performance Target Measurement and Documentation 5. The rehabilitated area should be able to be managed in the same way as surrounding land Can be integrated with Islandwide management Topography and surface drainage are consistent with, and complimentary to, the overall landscape. Flora species at the rehabilitated sites are representative of the target ecosystem. Weed species are not present in rehabilitation on Barrow Island. No unauthorised vehicle access to rehabilitated areas. Rehabilitated landforms will be consistent with adjacent landforms Plant species diversity, density, cover and height, floristic composition, and functional structure for sites rehabilitated will be consistent with the target vegetation community (analogue site) Absence of weed species for sites rehabilitated on Barrow Island No unauthorised vehicle access to rehabilitated areas Objectives measured by the following techniques and reported in the Annual Environmental Performance Report Visual and survey assessment Quantitative vegetation monitoring Site inspection, Permit to Work records, and incident reports As defined in the Ecological Monitoring Common User Procedures (Chevron Australia 2009b). Chevron Australia Pty Ltd Public Page 47 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 6.0 Implementation 6.1 Environmental Management Documentation 6.1.1 Overview Figure 1-3 in Section 1.5.4 of this Plan shows the hierarchy of environmental management documentation within which this Plan exists. The following sections describe each level of documentation in greater detail. 6.1.2 Chevron ABU OE Documentation As part of the Chevron ABU the Gorgon Gas Development is governed by the requirements of the ABU OEMS, within which a number of OE Processes exist. The Gorgon Gas Development will implement internally those OE Processes (and supporting OE Procedures) that apply to the Gorgon Gas Development activities, where they are appropriate and reasonably practicable. The key ABU OE Processes taken into account during the development of this Plan, with a description of the intent of the Process, are: HES Risk Management Process (Chevron Australia 2012a): Process for identifying, assessing and managing Health, Environment and Safety (HES), operability, efficiency and reliability risks related to the Gorgon Gas Development. Environmental Stewardship Process (Chevron Corporation 2009): Applies during the Operations Phase of the Gorgon Gas Development to ensure all environmental aspects are identified, regulatory compliance is achieved, environmental management programs are maintained, continuous improvement in performance is achieved, and alignment with ISO 14001 (Standards Australia/Standards New Zealand 2004) is achieved. Management of Change (Chevron Australia 2010a): Process for assessing and managing risks stemming from permanent or temporary changes to prevent incidents. Contractor HES Management Process (Chevron Australia 2012d): Process for defining the critical roles, responsibilities and requirements to effectively manage Contractors involved with the Gorgon Gas Development. Competency, Training and Assessment Process (Chevron Australia 2012e): Process for ensuring that the workforce has the skills and knowledge to perform their jobs in an incident-free manner, and in compliance with applicable laws and regulations. Incident Reporting and Investigation Process (Chevron Australia 2012f): Process for reporting and investigating incidents (including near misses) to reduce or eliminate root causes and prevent future incidents. Emergency Management Process (Chevron Australia 2012g): Process for providing organisational structures, management processes and tools necessary to respond to emergencies and to prevent or mitigate emergency and/or crisis situations. Compliance Assurance Process (Chevron Australia 2012h): Process for ensuring that all HES- and OE-related legal and policy requirements are recognised, implemented, and periodically audited for compliance. 6.1.3 Gorgon Gas Development Documentation 6.1.3.1 Ministerial Plans and Reports In addition to this Plan, a number of other plans and reports have been (or will be) developed for the Gorgon Gas Development that are required under State and/or Commonwealth Ministerial Conditions (refer to Figure 1-3). These documents address the requirements of specific Page 48 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Conditions and provide standards for environmental performance for the Gorgon Gas Development. The key Ministerial documents that are of direct relevance to this Plan are the: Terrestrial and Subterranean Baseline State and Environmental Impact Report (Chevron Australia 2012b) Terrestrial and Subterranean Environment Protection Plan (Chevron Australia 2010b) Terrestrial and Subterranean Environment Monitoring Program (Chevron Australia 2012i) Fire Management Plan (Chevron Australia 2009a). 6.1.3.2 Common User Procedures The Gorgon Gas Development Common User Procedures support the Ministerial plans and reports, and specify more detailed requirements and relevant considerations for specific environmental issues. The following Common User Procedures support content within this Plan: Fauna Handling and Management Common User Procedure (Chevron Australia 2012j) Vegetation Clearing and Audit Common User Procedure (Chevron Australia 2012k) Barrow Island Weed Hygiene Common User Procedure (Chevron Australia 2012c) Traffic Management Common User Procedure (Chevron Australia 2012l) Ecological Monitoring Common User Procedure (Chevron Australia 2009b) Burning of Vegetation on Barrow Island Common User Procedure (Chevron Australia 2009c). 6.1.3.3 Environmental Management Plans A number of activity-specific Environmental Management Plans (EMPs) are required under Ministerial Conditions (refer to Figure 1-3); however, other internal work scope EMPs (work scope EMPs) are also being developed to effectively manage specific work scopes for the Gorgon Gas Development. These work scope EMPs will be developed and implemented such that any requirements specified in higher level documents (such as this Plan) are met. Gorgon personnel, including contractors and subcontractors, involved in a particular scope of work for the Gorgon Gas Development are internally required to comply with the work scope EMP associated with that work scope, where reasonably practicable. Any internal EMP that is required to be implemented under this Plan will be made available to the OEPA auditor. 6.1.3.4 Impact Mitigation Strategies Impact Mitigation Strategies (IMSs) are aspect-based management standards (refer to Figure 1-3). The IMSs document the detailed management requirements associated with potential impacts for the Gorgon Gas Development. Each IMS covers a particular environmental aspect that requires management (e.g. light, noise and vibration, atmospheric emissions, etc.). Personnel (including contractors and subcontractors) involved in that particular scope of work are internally required to comply with the IMSs where reasonably practicable. The IMSs also document requirements for contractors to develop internal work scope EMPs for the Gorgon Gas Development, which include work procedures to mitigate their impacts (such as such as step-by-step procedures and work method statements). The following IMSs support the content in this Plan: Chevron Australia Pty Ltd Public Page 49 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Downstream Site Reinstatement and Rehabilitation IMS (KJVG 2008b) Downstream Onshore Flora and Vegetation IMS (KJVG 2008c) Downstream Onshore Stormwater and Drainage IMS (KJVG 2008d) Downstream Onshore Fauna Interaction IMS (KJVG 2008e) Downstream Fire IMS (KJVG 2008f) Upstream Site Rehabilitation IMS (GUJV 2008a) Upstream Onshore Fire IMS (GUJV 2008b) Upstream Onshore Flora and Vegetation IMS (GUJV 2008c). Any internal IMS that is required to be implemented under this plan will be made available to the OEPA auditor. 6.1.3.5 Contractor and Subcontractor Documentation A variety of internal contractor and subcontractor documentation will be developed, including documents such as task-specific work procedures, work method statements, and Job Hazard Analyses. These are detailed documents that will specify the way activities shall be performed in a step-by-step manner. These procedural documents are therefore specific to the Gorgon Gas Development (where required) and include any environmental requirements that are detailed in higher level documentation relevant to the contractors /subcontractors scope of work (i.e. the IMSs and EMPs described in the previous sections). 6.2 Training and Inductions All personnel (including contractors and subcontractors) are required to attend environmental inductions and training relevant to their role on the Gorgon Gas Development. Training and induction programs facilitate the understanding personnel have of their environmental responsibilities, and increase their awareness of the management and protection measures required to reduce potential impacts on the environment. Chevron Australia has prepared the ABU Competency, Training and Assessment Process (Chevron Australia 2012e) to deal with the identification and assessment of required competencies for environmental roles and which it internally requires its employees, contractors, etc. to comply with. Environmental training and competency requirements for personnel, including contractors and subcontractors, are maintained in a Gorgon Gas Development HES training matrix. Page 50 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: 7.0 Auditing, Reporting, and Review 7.1 Auditing 7.1.1 Internal Auditing Chevron Australia has prepared the internal Compliance Assurance ASBU Standardized OE Process (Chevron Australia 2012h) to manage compliance, and which it internally requires its employees, contractors, etc. to comply with. This Process will also be applied to assess compliance of the Gorgon Gas Development against the requirements of Statement No. 800, where this is appropriate and reasonably practicable. In accordance with Condition 2-1 of Statement No. 965, assessment of compliance will be undertaken on a joint basis. An internal Audit Schedule has been developed and will be maintained for the Gorgon Gas Development (with input from the EPCM Contractors) that includes audits of the Development s environmental performance and compliance with the Ministerial Conditions. A record of all internal audits and the audit outcomes is maintained. Actions arising from internal audits are tracked until their close-out. 7.1.2 External Auditing Audits and/or inspections undertaken by external regulators will be facilitated via the Gorgon Gas Development s Regulatory Approvals and Compliance Team. The findings of external regulatory audits will be recorded and actions and/or recommendations will be addressed and tracked. Chevron Australia may also undertake independent external auditing during the Gorgon Gas Development. Any document that is required to be implemented under this Plan will be made available to the relevant OEPA auditor. 7.2 Reporting 7.2.1 Compliance Reporting Condition 4 of Statement No. 800 requires Chevron Australia to submit a Compliance Assessment Report annually to address the previous 12-month period. An audit table is provided in Appendix 2 to assist with auditing for compliance with this Plan for Statement No. 800. In accordance with Conditions 2-1 and 2-2 of Statement No.965, compliance assessment and compliance reporting will be carried out on a joint basis with Statement No.800. 7.2.2 Environmental Performance Reporting Condition 5.1 of Statement No. 800 requires that Chevron Australia submits an Environmental Performance Report to the Western Australian Minister for the Environment and to the Commonwealth Department of the Environment, Water, Heritage and the Arts now DotE respectively, on an annual basis, for the previous 12 month period. In addition, under Condition 5.3 of Statement No. 800, every five years from the date of the first annual Report, Chevron Australia shall submit to the Western Australian Minister for the Environment an Environmental Performance Report, including peer review of this report as appropriate (Condition 32.5.xiii), covering the previous five-year period. In accordance with Conditions 2-1 and 2-2 of Statement No.965, performance reporting will be carried out on a joint basis with Statement No.800. Specific details on the content of the Environmental Performance Report are defined in Condition 5.2 and Schedule 3 of Statement No. 800. The details listed in Schedule 3.9 of Statement No. 800 that are specific to this Plan are: i. A description of rehabilitation activities undertaken Chevron Australia Pty Ltd Public Page 51 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 ii. iii. iv. Results of the rehabilitation monitoring program including performance against completion criteria targets Results of any studies to address knowledge gaps as referenced in Condition 32.5(x) and proposals for further studies (if any), and Recommended changes to the Management Plan. Consistent with Schedule 3.9(i), Chevron Australia will provide a figure that identifies areas rehabilitated, areas planned to be rehabilitated with indicative timeframes, and disturbed areas to be retained for ongoing construction and operational needs. Justification for retention of areas for ongoing construction and operational needs will be provided in supporting text. 7.2.3 Incident Response and Reporting Chevron Australia has prepared the ASBU Emergency Management Process (Chevron Australia 2012g) and Incident Investigation and Reporting Process (Chevron Australia 2012f), which it internally requires its employees, contractors, etc. to follow in the event of environmental incidents. These processes will also be applied internally to environmental incidents identified in this Plan, where this is appropriate and reasonably practicable. 7.3 Review of this Plan Chevron Australia is committed to conducting activities in an environmentally responsible manner and aims to implement best practice environmental management as part of a program of continuous improvement. This commitment to continuous improvement means Chevron Australia will review this Plan every five years and more often as required (e.g. in response to new information). Reviews will address matters such as the overall design and effectiveness of the Plan, progress in environmental performance, changes in environmental risks, changes in business conditions, and any relevant emerging environmental issues. In accordance with Condition 32.7 of Statement No. 800, Chevron Australia will revise as required and submit to the Minister a revised in response to the results of the monitoring program and results of any ongoing studies. In revising the Plan the Chevron Australia shall consult with DPaW. If the Plan no longer meets the aims, objectives or requirements of the Plan, if works are not appropriately covered by the Plan, or measures are identified to improve the Plan, Chevron Australia may submit an amendment or addendum to the Plan to the State Minister for Environment for approval under Condition 36 of Statement No. 800 and Condition 2-3 of Statement No. 965. If Chevron Australia wishes to carry out an activity otherwise than in accordance with the Plan, Chevron will update the Plan and submit it for approval by the Minister in accordance with Condition 13 of EPBC Reference: 2003/1294. Page 52 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: 8.0 References Astron Environmental Services. 2007. WA Oil Asset (Barrow and Thevenard Islands) Weed Management Plan. Astron Environmental Services, Perth, Western Australia. Australian and New Zealand Minerals and Energy Council and the Minerals Council of Australia. 2000. Strategic Framework for Mine Closure. Commonwealth of Australia, Canberra, Australian Capital Territory. Australian Petroleum Production and Exploration Association. 2008. Code of Environmental Practice. Australian Petroleum Production and Exploration Association, Canberra, Australian Capital Territory. Butler, W.H. 2008. Conservation Consultant. Personal communication (September 2008). Chevron Australia. 2005. Draft Gorgon Environmental Impact Statement/Environmental Review and Management Programme for the Proposed Gorgon Development. Chevron Australia, Perth, Western Australia. Chevron Australia. 2006. Final Environmental Impact Statement/Environmental Review and Management Programme for the Gorgon Gas Development. Chevron Australia, Perth, Western Australia. Chevron Australia. 2008. Gorgon Gas Development Revised and Expanded Proposal Public Environmental Review. Chevron Australia, Perth, Western Australia. Chevron Australia. 2009a. Gorgon Gas Development and Jansz Feed Gas Pipeline: Fire Management Plan. Chevron Australia, Perth, Western Australia. (G1-NT-PLNX0000272) Chevron Australia. 2009b. Gorgon Gas Development and Jansz Feed Gas Pipeline: Ecological Monitoring Common User Procedure. Chevron Australia, Perth, Western Australia. (G1-PP- HES-PRC-0017) Chevron Australia. 2009c. Gorgon Gas Development and Jansz Feed Gas Pipeline: Burning of Vegetation Common User Procedure. Chevron Australia, Perth, Western Australia. (G1-PP- HES-PRC-0020) Chevron Australia. 2009d. Gorgon Gas Development and Jansz Feed Gas Pipeline: Nonindigenous Species Management Procedure. Chevron Australia, Perth, Western Australia. (G1-PP-QRT-POL-0001) Chevron Australia. 2010a. Management of Change: ABU Standardized OE Process. Chevron Australia, Perth, Western Australia. (OE-04.00.01) Chevron Australia. 2010b. Gorgon Gas Development and Jansz Feed Gas Pipeline: Terrestrial and Subterranean Environment Protection Plan. Chevron Australia, Perth, Western Australia. (G1-NT-PLNX0000294) Chevron Australia. 2012a. HES Risk Management: ASBU Standardized OE Process. Chevron Australia, Perth, Western Australia. (OE-03.01.01) Chevron Australia. 2012b. Gorgon Gas Development and Jansz Feed Gas Pipeline: Terrestrial and Subterranean Baseline State and Environmental Impact Report. Chevron Australia, Perth, Western Australia. (G1-TE-H-0000-REPX027) Chevron Australia Pty Ltd Public Page 53 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Chevron Australia. 2012c. Gorgon Gas Development and Jansz Feed Gas Pipeline: Barrow Island Weed Hygiene Common User Procedure. Chevron Australia, Perth, Western Australia. (G1-PP-HES-PRC-0016) Chevron Australia. 2012d. Contractor Health, Environment and Safety Management (CHESM) Process ABU Standardised Process. Chevron Australia, Perth, Western Australia. (OE- 06.00.01) Chevron Australia. 2012e. Competency Development: ABU Standardized OE Process. Chevron Australia, Perth, Western Australia. (OE-03.13.01) Chevron Australia. 2012f. Incident Investigation and Reporting ABU Standardised OE Process.. Chevron Australia, Perth, Western Australia. (OE-09.00.01) Chevron Australia. 2012g. Emergency Management Process: ABU Standardised OE Process. Chevron Australia, Perth, Western Australia. (OE-11.01.01) Chevron Australia. 2012h. ABU Compliance Assurance Process.. Chevron Australia, Perth, Western Australia. (OE-12.01.01) Chevron Australia. 2012i. Gorgon Gas Development and Jansz Feed Gas Pipeline: Terrestrial and Subterranean Environment Monitoring Program. Chevron Australia, Perth, Western Australia. (G1-NT-PLNX0000309) Chevron Australia. 2012j. Gorgon Gas Development and Jansz Feed Gas Pipeline: Fauna Handling and Management Common User Procedure. Chevron Australia, Perth, Western Australia. (G1-PP-HES-PRC-0009) Chevron Australia. 2012k. Gorgon Gas Development and Jansz Feed Gas Pipeline: Vegetation Clearing Audit Common User Procedure. Chevron Australia, Perth, Western Australia. (G1- PP-HES-PRC-0012) Chevron Australia. 2012l. Gorgon Gas Development and Jansz Feed Gas Pipeline: Traffic Management Common User Procedure. Chevron Australia, Perth, Western Australia. (G1- PP-HES-PRC-0010) Chevron Australia. 2013. Gorgon Gas Development, Additional Construction Laydown and Operations Support Area. Environmental Review. Chevron Australia, Perth, Western Australia. Chevron Corporation. 2008. Corporate RiskMan2 Procedure. Chevron Corporation, San Ramon, California. (OE-03.01.13) Chevron Corporation. 2009. Environmental Stewardship Standardized OE Process. Chevron Corporation, San Ramon, California. Commonwealth Government of Australia, Assistant Secretary Environmental Assessment Branch, Anne-Marie Delahunt. 2006. Decision to Approve the taking of an Action Jansz Feed Gas Pipeline (EPBC Reference: 2005/2184), 22 March 2006. Canberra, Australian Capital Territory. Commonwealth Government of Australia, Minister for the Environment and Water Resources, Malcolm Turnbull. 2007. Approval Gorgon Gas Development (EPBC Reference: 2003/1294), 3 October 2007. Canberra, Australian Capital Territory. Page 54 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Commonwealth Government of Australia, Minister for the Environment, Water, Heritage and the Arts, Peter Garrett. 2009. Approval Gorgon Gas Development (EPBC Reference: 2008/4178), 26 August 2009. Canberra, Australian Capital Territory. Department of Industry, Tourism and Resources. 2006a. Mine Rehabilitation Handbook. Commonwealth of Australia, Canberra, Australian Capital Territory. Department of Industry, Tourism and Resources. 2006b. Mine Closure and Completion Handbook. Commonwealth of Australia, Canberra, Australian Capital Territory. Environmental Protection Authority. 2006. Guidance for the Assessment of Environmental Factors Western Australia (in accordance with the Environmental Protection Act 1986) Rehabilitation of Terrestrial Ecosystems, No. 6. Environmental Protection Authority, Perth, Western Australia. Environmental Protection Authority. 2008. Change to Gorgon Gas Development on Barrow Island Nature Reserve Statement No. 748. Approval under section 45C of the Environmental Protection Act 1986. Approval letter issued 21 May 2008, EPA Ref: DEC Doc 48104. Environmental Protection Authority, Perth, Western Australia. Fee, C.H. 2009. Environmental Specialist Barrow Island Joint Venture. Personal communication (March 2009). Gorgon Upstream Joint Venture. 2006a. Onshore Construction Environmental Risk Assessment Report. Gorgon Upstream Joint Venture, Perth, Western Australia. (G1-TE-H-UG00- REP0021) Gorgon Upstream Joint Venture. 2006b. Shore Crossing Construction Environmental Risk Assessment Report. Gorgon Upstream Joint Venture, Perth, Western Australia. (G1-TE-H- UX00-REP0003) Gorgon Upstream Joint Venture. 2008a. Upstream Site Rehabilitation Impact Mitigation Strategy. Gorgon Upstream Joint Venture, Perth, Western Australia. (G1-TE-H-UG00- PLN0030) Gorgon Upstream Joint Venture. 2008b. Upstream Onshore Fire Impact Mitigation Strategy. Gorgon Upstream Joint Venture, Perth, Western Australia. (G1-TE-H-UG00-PLN0020) Gorgon Upstream Joint Venture. 2008c. Upstream Onshore Flora and Vegetation Impact Mitigation Strategy. Gorgon Upstream Joint Venture, Perth, Western Australia. (G1-TE-H- UG00-PLN0019) Government of Western Australia, Minister for the Environment, David Templeman MLA, 2007. Statement that a Proposal may be Implemented Gorgon Gas Development: Barrow Island Nature Reserve (Ministerial Statement No. 748), 6 September 2007. Perth, Western Australia. Government of Western Australia, Minister for the Environment, David Templeman MLA. 2008. Statement that a Proposal may be Implemented Jansz Feed Gas Pipeline: Barrow Island Nature Reserve (Ministerial Statement No. 769), 28 May 2008. Perth, Western Australia. Government of Western Australia, Minister for the Environment, Water, Bill Marmion MLA. 2011. Statement to Amend Conditions Applying to the Gorgon Gas Development Revised and Expanded Proposal Barrow Island Nature Reserve (Ministerial Statement No. 865) 7 June 2011. Perth, Western Australia. Chevron Australia Pty Ltd Public Page 55 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Government of Western Australia, Minister for the Environment; Heritage. Albert P. Jacob JP MLA. 2014. Statement that a Proposal may be Implemented Gorgon Gas Development Additional Construction Laydown and Operations Support Area (Ministerial Statement No. 965) 2 April 2014. Perth, Western Australia. Government of Western Australia, Minister for the Environment; Youth, Donna Faragher MLC, 2009. Statement that a Proposal may be Implemented Gorgon Gas Development Revised and Expanded Proposal: Barrow Island Nature Reserve (Ministerial Statement No. 800), 10 August 2009. Perth, Western Australia. Kellogg Joint Venture Gorgon. 2008a. Downstream Environmental Risk Register. Kellogg Joint Venture Gorgon, Perth, Western Australia. (G1-NT-LISKH150008) Kellogg Joint Venture Gorgon. 2008b. Impact Mitigation Strategy Site Reinstatement & Rehabilitation. Kellogg Joint Venture Gorgon, Perth, Australia. (G1-PP-DWN-PRC- KH150084) Kellogg Joint Venture Gorgon. 2008c. Impact Mitigation Strategy Onshore Flora and Vegetation. Kellogg Joint Venture Gorgon, Perth, Australia. (G1-PP-DWN-PRC-KH150015) Kellogg Joint Venture Gorgon. 2008d. Impact Mitigation Strategy Onshore Stormwater and Drainage. Kellogg Joint Venture Gorgon, Perth, Australia. (G1-PP-DWN-PRC-KH150050) Kellogg Joint Venture Gorgon. 2008e. Impact Mitigation Strategy Onshore Fauna Interaction For the Gorgon Project. Kellogg Joint Venture Gorgon, Perth, Australia. (G1-PP-DWN-PRC- KH150080) Kellogg Joint Venture Gorgon. 2008f. Impact Mitigation Strategy Fire For the Gorgon Project Barrow Island LNG Plant. Kellogg Joint Venture Gorgon, Perth, Australia. (G1-PP-DWN- PRC-KH150085) Mattiske, E.M. and Associates. 1993. Flora and Vegetation, Barrow Island. Unpublished report prepared for West Australian Petroleum Pty Limited, Perth, Western Australia. McDonald, R.C., Isbell, R.F., Speight, J.G., Walker, J. and Hopkins, M.S. 1990. Australian Soil and Land Survey Field Handbook. 2nd edition. Department of Primary Industry and Energy and CSIRO, Canberra, Australian Capital Territory. Mobil Australia. 2005. Referral of a Proposal to the Environmental Protection Authority under Section 38(1) of the Environmental Protection Act Jansz Feed Gas Pipeline. 7 February 2005, Perth, Western Australia. Mobil Australia. 2006. Referral of Proposed Action Jansz Feed Gas Pipeline. [Referral under EPBC Act to Department of Environment, Water, Heritage and the Arts]. 17 June 2005, Perth, Western Australia. Outback Ecology Services. 2009a. Managing Topsoil from the Gorgon Project, Review of topsoil management practices. Outback Ecology Services, Perth, Western Australia. Outback Ecology Services. 2009b. Managing Topsoil from the Gorgon Project, Draft Assessment of soil resources within the Gorgon Project area. Outback Ecology Services, Perth, Western Australia. Page 56 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Standards Australia/Standards New Zealand. 1998. AS/NZS 3931:1998 Risk Analysis of Technological Systems Application Guide. Sydney, Australia/Wellington, New Zealand. Standards Australia/Standards New Zealand. 2004a. AS/NZS ISO 14001:2004 Environmental Management Systems Requirements with Guidance for Use. Sydney, Australia/Wellington, New Zealand. Standards Australia/Standards New Zealand. 2004b. AS/NZS 4360:2004 Risk Management. Sydney, Australia/Wellington, New Zealand. Standards Australia/Standards New Zealand. 2006. HB 203:2006 Environmental Risk Management Principles and Process. Sydney, Australia/Wellington, New Zealand. Tongway, D. and Hindley, N. 2004. Landscape Function Analysis: Procedures for monitoring and Assessing Landscapes with special reference to Minesites and Rangelands. CSIRO Sustainable Ecosystems, Canberra, Australian Capital Territory. Available from: http://www.csiro.au/services/ecosystemfunctionanalysis.html [Accessed: 1 December 2008] Chevron Australia Pty Ltd Public Page 57 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Appendix 1 Chevron Integrated Risk Prioritization Matrix Page 58 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Appendix 2 Compliance Reporting Table Section Actions No. 2.0 Should disturbance take place, and it is not required for future construction or operation, then it will be rehabilitated according to this plan. 4.1 The selection of a target vegetation community for rehabilitation in each area will be based on position in the landscape. 4.1 Relevant target vegetation landscape communities will be: Coastal communities (C vegetation types) Drainage and creek line communities (D vegetation types) Flats communities (F Vegetation types) Limestone communities (L vegetation types) Valley slopes and escarpments communities (V vegetation types). 4.1.1 In large areas to be cleared (e.g. the Gas Treatment Plant site), where spinifex forms the majority of the vegetation, where practicable, this material will be burnt before topsoil is removed 4.1.1 Burning will be carried out according to the Fire Management Plan and the Prescribed Fire Plans 4.1.1 If vegetation consists of woody species that carry their seed in the canopy and this vegetation is not burnt, or if there are significant safety risks associated with burning vegetation (e.g. along Pipeline routes), then the following practices will be adopted where this is practicable: salvage vegetation from areas to be cleared only retain vegetation that is free of weeds record relevant information regarding the cleared vegetation respread stockpiled vegetation on similar landforms and soil types from which it was stripped where this is not practicable vegetation material will be burnt elsewhere or disposed of. 4.1.2 The following practices will be adopted where reasonable and practicable to do so for stripping, stockpiling, reusing and management of topsoil from the Gorgon Gas Development area on Barrow Island and the mainland: Identify the boundaries of distinct vegetation communities to allow the soil from each area to be stripped, stockpiled and respread separately Weed infestations will be mapped and segregated with an appropriate buffer. A site-specific weed hygiene management program will be developed and implemented. For the installation of the Onshore Feed Gas Pipeline and the Mainland component of the Domestic Gas Pipeline, vegetation and topsoil will be stored in windrows along the edge of the right of way. Reinstatement will involve direct recovery of topsoil and spreading of the vegetation. For all other areas strip topsoil using the least aggressive methods, preferably by pushing up the soil with a dozer or grader and loading into a truck, rather than using machines such as elevating scrapers. Strip topsoil to an approximate depth of 5 cm where practicable. Direct-return topsoil to areas that are ready to be rehabilitated, and that are suitable for the vegetation community originally associated with the soil. If stockpiling is necessary, identify sites that: Timing Construction Construction All Phases All Phases All Phases Before clearing Construction Chevron Australia Pty Ltd Public Page 59 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Section Actions No. are not going to be disturbed in future operations are remote from known weed occurrences and sources do not lie in areas likely to receive surface water flow have surrounding vegetation consistent with the original vegetation from the stripped area. Store topsoil stockpiles in low profile dumps that shall not exceed two metres in height. If available, spread vegetation mulch over topsoil stockpiles as soon as is practicable after constructed. Topsoil stockpiles formed by paddock dumping are being considered to maximise the surface area of the stockpile and promote biological development. Record relevant information regarding the soil in each stockpile, including vegetation unit, date of stripping, method of stripping, soil volumes, and seed mix (if any). Consider seeding topsoil stockpiles where soil-stored seed levels are low or vegetation establishment is poor. Use appropriate signage to clearly identify stockpiles and discourage vehicle access; record stockpile locations on site maps. Monitor topsoil stockpiles for stability, vegetation establishment and weeds, eradicate any weed occurrences. Investigate methods to recover stockpiled topsoil while maintaining or building the biological value of the remaining stockpiled material. Where topsoil is limited, limit respreading to be a thickness sufficient to inoculate the rehabilitation site with the topsoil properties. 4.1.2 The strategy for the use and distribution of topsoil will be developed in consultation with and to the satisfaction of DPaW prior to the commencement of works that involve the removal of topsoil 4.1.3 Equipment and staff moving between off Barrow Island operations and Barrow Island operations will undergo strict quarantine control to minimise the potential for movement of weeds onto the Island. 4.1.4 Surface drainage patterns (hydrology) will be rehabilitated on all disturbed areas to reduce erosion from surface water flow. Practices to achieve this will include: recording the surface topography of the area prior to disturbance using standard survey techniques, consideration will be given to the use of remote sensing if it can achieve adequate resolution, include information on surface stability, soil structure and estimates of overland surface water flows rehabilitating a surface profile with properties that exhibit similar infiltration and water retention characteristics for the targeted vegetation outcome to analogue sites unless inappropriate for the targeted vegetation outcome, encouraging local retention and infiltration of rainfall on rehabilitated areas by creating surface roughness through light cultivation on the contour, as required, and spreading vegetation mulch where available on the contour to restrict surface runoff and reduce erosion installing banks or other appropriate earthworks, if required, to direct and control surface water flow at a local scale discharging on to undisturbed stable ground where practicable reviewing and repairing gullies (>30 cm deep) on a case-by-case Timing All Phases All Phases Prior to construction and Onwards Page 60 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Section No. Table 4-1 Table 4-1 Table 4-1 Table 4-1 Actions basis when they occur monitoring using LFA or similar to measure water infiltration and retention. This Plan shall be communicated to relevant Gorgon Gas Development personnel. The requirements of this Plan will be specified in relevant instructions to contractors. The following tasks shall be completed prior to clearing taking place: Boundaries of each area will be surveyed and marked, the perimeters recorded and mapped in the Gorgon Geographic Information System and provided to all appropriate contractors. Map and segregate NIS and weed infestations with an appropriate buffer; identify specific management requirements. An internal Ground Disturbance Certificate will be obtained. Surface topography, hydrological and soils information will be recorded for each site including: physical and topographical groundwater fauna and flora (including ecological communities, significant habitats) topsoil properties storage location. This information will be used for vegetation and soil management and to inform reconstruction of the landform during rehabilitation. If more than one vegetation community was identified on the site in initial surveys, then the boundaries of vegetation communities will be identified. If seed or fruits are present on the vegetation to be cleared, then where practicable these should be collected and stored appropriately. During clearing and stripping of each area the sequence of tasks will be: Vegetative material will be either burnt (in accordance with the Fire Management Plan and Prescribed Fire Plans), or cleared and stockpiled for future burning or disposal in an appropriate area. Dust from soil stripping and earthworks will be managed where practicable, if required non saline water will be used for dust suppression during stripping of topsoil. Topsoil will be stripped as close to the construction date as practicable. Where practicable topsoil from the area of each vegetation community will be stripped to an approximate depth of 5 cm. Where practicable recovered topsoil will be used for direct lay or stockpiled separately on a suitable storage site for later rehabilitation Soil and vegetation stockpiles will be placed so as to avoid the need for any further disturbance until required for rehabilitation. Topsoil will be stored in low-profile dumps less than 2 m in height to avoid compaction, and assist with maintenance of viable seed, soil micro-organisms and soil nutrients. Topsoil stockpiles will be identified with appropriate signage. Subsoil or rock material may be used for construction Timing Construction onwards Construction onwards Before site disturbance Duration of site clearing and preparation activities Chevron Australia Pty Ltd Public Page 61 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Section No. Table 4-1 Table 4-1 Table 4-1 Table 4-1 Table 4-1 Table 4-1 Table 4-1 Actions The stockpiled soils will be respread as soon as practicable to reduce the loss of soil biological components. When the disturbed area is available for rehabilitation, then the following tasks will be completed: Depending on the characteristics of the target vegetation and desired substrate the surface of the area to be rehabilitated will be ripped on the contour to the depth of any machinery-induced compaction. Surface drainage patterns will be re-established to be consistent with that occurring prior to disturbance. Topsoil from a similar vegetation community will be respread at no greater depth than originally removed; if required, topsoil may be spread more thinly. If seeds of species in the target vegetation communities are available they should be respread. Should monitoring indicate that grazing is significantly impeding rehabilitation recovery, then the perimeter of rehabilitation areas may be fenced to exclude grazing fauna. The fence will be maintained until such time the vegetation is sufficiently established to withstand grazing pressure. Monitoring of rehabilitated and related areas will: use techniques that demonstrate the performance of rehabilitation commence on completion of rehabilitation continue until completion criteria are met or discontinued by agreement with DPaW focus on physical aspects of the rehabilitated landscape, vegetation establishment, ecosystem function, resource retention and reestablishment of fauna habitat. establish permanent photo points provide information that will be used for rehabilitation management monitoring outcomes will be reported annually. Where monitoring indicates that an area of rehabilitation is failing to meet closure standards, it will be investigated and a maintenance or remediation strategy developed. Where weeds are identified they will be eradicated For all drill pads: drill cuttings will be assessed, and, if considered hostile for plant growth will be removed. contaminated soil from drilling activities will be remediated or removed. For drill pads where no topsoil was recovered, then if available, topsoil will be spread to inoculate the area with seed and other biological values After bedding and padding of pipelines in the trenches has been completed, the following steps will be undertaken: Trenches will be filled, compacted and covered with a crowned profile. Drainage will be re-established by creating breaks in the crown Topsoil and vegetation will be respread across the pipeline easement. Where practicable: temporary tracks will be cleared using techniques that leave the soil Timing After Construction Post Rehabilitation During the monitoring period After construction and prior to rehabilitation After site assessment Completion of pipeline installation Prior to related activity Page 62 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Section No. Table 4-1 Actions intact. vegetation will not be cleared on areas with high risk of erosion. After authorised use (of tracks) is completed, vehicle access will be restricted. Ongoing Table 4-1 Rehabilitated tracks will be monitored using visual assessment. Ongoing 4.4 Chevron Australia is committed to the improvement of rehabilitation knowledge practices through a program of monitoring, application of lessons learnt and targeted studies consistent with industry leading practice. This knowledge will be developed and shared with the other stakeholders on the Island. 4.5 Monitoring of rehabilitation in relation to meeting the objectives and performance standards and completion criteria described in this Plan will be undertaken as follows: Monitoring will commence from the completion of earthworks. Monitoring will continue until such time as data indicates the rehabilitation objectives and criteria have been met. In consultation with DPaW, the frequency and intensity of ongoing monitoring of biological aspects will be varied over the life of the Gorgon Gas Development driven by trends in ecosystem development. Monitoring is likely to be more intensive in the first three years of rehabilitation, but will decrease as the rehabilitated ecosystem matures and performance trends are positive. Benchmarking of monitoring results against equivalent best practice sites on Barrow Island to enable a comparison of performance and inform if there is a need for intervention. 4.5.1 Soils will be monitored using LFA or a similar system that collects data on the stability, structure, rainfall infiltration and nutrient recycling of the reinstated soils on rehabilitation sites. 4.5.2 Vegetation will be monitored using a combination of visual observation, quantitative Vegetation Monitoring and Ecosystem Function Analysis (EFA) (Tongway 2004) or equivalent. 4.5.2 Should weeds be identified during monitoring they will be managed under the Quarantine Management System. 4.5.3 As rehabilitation progresses and habitat re-establishes, targeted fauna monitoring will be undertaken to measure fauna activity. 4.5.3 Areas will be considered to be rehabilitated when the completion criteria have been met and accepted by DPaW and the areas demonstrate that they provide appropriate habitat for fauna or when terrestrial invertebrate diversity is within the range of values of analogue sites in the targeted vegetation communities. 4.5.3 Where monitoring indicates fauna recolonisation does not reflect the level of activity in analogue sites the causes will be investigated and mitigation measures developed and implemented in consultation with DPaW. 4.6 Investigations and studies will be undertaken as required to fill gaps in knowledge and rehabilitation methodology adapted accordingly. 4.6.1 Review of flora and vegetation data collected on Barrow Island indicate that of the 302 species identified, there is some uncertainty about 18 species that have not been identified in rehabilitation to date. This gap will form the basis of a collaborative study program. Timing Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing Ongoing after rehabilitation 4.6.1 An investigation of grazing impact is currently planned for Barrow Ongoing after Chevron Australia Pty Ltd Public Page 63 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 Section No. Actions Island should this indicate grazing is affecting these species then exclusion fencing will be considered. 4.6.1 Should any fires take place on the island then Chevron Australia will collaborate with DPaW to develop a program to monitor vegetation recovery to expand knowledge on the role of fire in the ecology of island vegetation. 4.6.1 Should monitoring of rehabilitation performance indicate the failure of keystone species to re-establish, then the causes of this failure will be investigated. Priority will be given to keystone species that contribute the key functional aspects of the vegetation communities. Species contributing known services will be the next priority. 4.6.1 Some initial investigations have been undertaken on germination and propagation in the island nursery, this facility will be utilised for ongoing investigations into seed viability and propagation techniques. 4.6.2 On sites where Ficus occurred, natural recruitment of this slow growing species will be monitored to understand whether this species will self-establish, or whether intervention should occur. 6.1.3.3 Any internal EMP that is required to be implemented under this plan will be made available to the OEPA auditor. 6.1.3.4 Any internal IMS that is required to be implemented under this plan will be made available to the OEPA auditor. 7.1.2 The findings of external regulatory audits will be recorded and actions and/or recommendations will be addressed and tracked. 7.2.2 Consistent with Schedule 3.9.i) Chevron Australia will provide a figure that identifies areas rehabilitated, areas planned to be rehabilitated with indicative timeframes, and disturbed areas to be retained for ongoing construction and operational needs. Justification for retention of areas for ongoing construction and operational needs will be provided in supporting text. Timing rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation Ongoing after rehabilitation All Phases All Phases Ongoing after rehabilitation All Phases Page 64 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014

Document No: G1-NT-PLNX0000303 Gorgon Gas Development and Jansz Feed Gas Pipeline: Appendix 3 Rehabilitation Task Sheet Example for the Gorgon Gas Development Chevron: Gorgon Topsoil Worksheet Project Area: P13 Location (GDA94): GIS Plan Ref. 334383 E 7702031 N Date Assigned: Inspected By: CH, DJ & Peter Doig Feature: Old Welding Yard Task Ref. No. Disturbance Area (ha) Responsibility Delegated To: Environmental Specialist Sign: Present Status Performance Criteria The site has been cleared for use by the DEC (29/05/2009). The site used to be a welding yard and there are pipe welding rods and other scrap that requires removal. An electric cable also runs thought the centre of the site. The site was deeply ripped in 1979. The access tracks were partially rehabilitated 4 years ago by taking off the top, breaking the compaction and pushing windrows over the track. The area is quite rocky in parts and there is lots of vegetation (predominantly ribbon grass). A small area of better regrowth divides the site approximately in half. A small creek runs along the north of the site. Access would be via 2 access tracks, one to the north and one to the south. Both contain a similar level of vegetation (less than the site). The site itself is quite narrow and may prove difficult for turning and manoeuvring a truck. The site is separated into two portions by a vegetated area in the middle. The eastern portion is long and narrow and directly accessible from the access tracks. The western portion of the site is larger, wider and better for trucks, however there is no direct access to this area. Access for the western area is through the vegetated portion of the site (cleared by the DEC (29/05/2009)). Topsoil is subject to minimal erosion and is above any known flood levels. Any sediment eroding off the topsoil is contained and does not flow into waterways. Topsoil is recoverable and stored in such a manner as to minimise deterioration of quality. Scheduled Completion Date Responsible Delegate Sign Date Task Completed Environment Dep Sign Criteria Met: Yes / No Tasks Identified Photo Ref # Delegated Responsibility Sign- Off Date 1) Confirm the area to be used for topsoil storage taking into consideration the vegetated central portion of the site and the creek running along the north of the site. Topsoil should be dumped a suitable distance from this creek as to minimise any effects from flooding. - Chevron Australia Pty Ltd Public Page 65 Printed Date: 15 May 2014 Uncontrolled when Printed

Gorgon Gas Development and Jansz Feed Gas Pipeline: Document No.: G1-NT-PLNX0000303 2) 3) 4) 5) Create a map with the final storage area displayed. Determine the volume of soil that can be stored at this site. Mark out the area to be used. This will minimise the risk of extra ground being reclaimed during earthworks and topsoil dumping. Ensure access roads are suitable for machinery and trucks. Check both access tracks as both may be used. Process pipelines that run across the southern access track need to be buried to a predetermined depth (if southern access track is to be used). - - 1 2 6) Remove any large rocks from the eastern portion of the site. 3 7) 8) Create a drivable surface for machinery to access the vegetated central portion of the site. Create a path through the vegetated portion in the centre of the site (see Map sheet). Ensure the track is positioned such that it minimises the amount of clearing. 4 5 9) Bury electric cable to predetermined depth. 6 10) Remove any large rocks from the western portion of the site. These could be placed to delineate the creek to prevent topsoil being dumped too close. - 11) Remove any scrap including old corroded pipe and pipe welding rods. 7 12) Ensure surface is accessible for machinery including but not limited to loaders and trucks. 8 Possible Topsoil Dumping Approach 1) 2) If ground surface is not suitable for trucks to drive on then a drivable surface should be created by dumping topsoil, which should be spread progressively by a loader. Topsoil dumped in the eastern section of the site will likely have to be dumped off the road and moved with a loader. - - HES / Planning Considerations: Lessons Learnt: Comments to be added during works and following final inspection of completed works. Feedback is to be logged in the environmental database and used as a tool for continual improvement of processes on Barrow Island. Page 66 Public Chevron Australia Pty Ltd Uncontrolled when Printed Printed Date: 15 May 2014