Building Your Interlocking Concrete Pavement to Last a Lifetime

Similar documents
Division 2 Section Section 02795

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Permeable Pavement Construction Guide

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

PERMEABLE INTERLOCKING CONCRETE PAVEMENT

40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT

SECTION PERVIOUS INTERLOCKING CERAMIC PAVERS

GUIDE SPECIFICATIONS FOR CONSTRUCTION OF AQUAPAVE PERMEABLE STORMWATER MANAGEMENT SYSTEM

AUSTRALIAN PAVING CENTRE

Permeable Pavement Operation & Maintanence Guide

INSTALLATION SPECIFICATIONS FOR AQUAPERM TM PAVER

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

ICPI TECH SPEC NUMBER 10 Application Guide for Interlocking Concrete Pavements

Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Concrete pavers with sand filled joints. Bedding sand 1-1/2 in. (25-40 mm) thick

PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs

Porous Pavement Alternatives Cost Analysis

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

C. Section TESTING LABORATORY SERVICE.

Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio

SECTION UNIT PAVERS. Logo Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

Solutions Library Solution 4: Permeable Pavement

Interlocking Concrete Paving Stones

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

A guide to preventing structural damage

Guidelines for. Permeable Pavement

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Interlocking Concrete Paving Stones

Permeable Interlocking Concrete Pavements. The Stormwater Problem

Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities

Permeable Interlocking Concrete Pavement

Section 2100-Trenching and Tunneling

Specification Guidelines: Allan Block Modular Retaining Wall Systems

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

4-02 Gravel Base Ballast and Crushed Surfacing

SECTION EARTH MOVING

PAVER JOB INFORMATION SHEET

Permeable Interlocking Concrete Pavements

Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT

NEUPAVE. Permeable Pavers. A Permeable Eco-Friendly Beauty

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

How to Install Pavers

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

SUDAS Revision Submittal Form

Permeable Paving System with StormAbsorb Technology

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers

Soils, Foundations & Moisture Control

SECTION 4Aggegate Subbase

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

Replace with: Section REQUEST FOR TENDER RFT 15 ( ) PARKING LOT 2 RESURFACING ADDENDUM # 2. - Page 1 of 2 -

Table 4.9 Storm Drain Inlet Protetion Applicable for

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

Holland Stone Series Concrete Pave Stones

CID STREET INFRASTRUCTURE ASSESSMENT

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Vehicle Tracking Pad

Storm Drain Inlet Protection - IP

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

LID-01 Permeable Paving Systems

Site Development Information Worksheet for single family residential development

Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009

Permeable Interlocking Concrete Pavements

SPECIAL NOTE FOR ASPHALT WATERPROOFING MIX FOR BRIDGE-DECK OVERLAYS AND ADJACENT APPROACHES

Section 402. STORM SEWERS

DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT

>S`[SOPZS 7\bS`Z]QYW\U 1]\Q`SbS >OdS[S\b

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Permeable Interlocking Concrete Pavements

OHIO ASPHALT PAVING CONFERENCE

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

How To Get A Street Opening Permit In Belham

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

(Source: Center for Neighborhood Technology)

Improving Storm Water Management

Advancements in Permeable Pavements

symptoms of a faulty foundation

Lighthouse Engineering, L.L.C.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Low Impact Development Permeable Paving

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

INDEX DESCRIPTION MATERIALS APPROVAL OF SUBBASE COURSE CONSTRUCTION MEASUREMENT PAYMENT 6

Developer s/consultants Field Services Guidelines

SECTION PLAYGROUND SURFACING TILES

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Transcription:

Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers

Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?.... 4 Choosing Your Contractor.... 6 ICPI Certified Paver Installers... 6 Suggested Questions to Ask Contractors.... 7 What to Expect... 8 During delivery & set-up.... 8 During installation.... 8 Contractor Checklist... 9 During daily site inspection.... 10 2

Building Your Interlocking Concrete Pavement to Last a Lifetime Concrete pavers offer a variety of patterns and colors that add character to any home. They provide value as a durable yet low-maintenance surface for patios, walkways, entryways and driveways that can last a minimum of 30 years when installed correctly. Of course, your concrete paver project is just like any other home improvement. You want to do your homework so you can reap the rewards for years to come. 3

What Does Installation Involve? While ICPI offers online information for do-it-yourselfers (www.icpi.org), this brochure assumes you ll have a contractor handle installation of your pavement. The following overview will help you understand the installation basics of a good interlocking concrete pavement system. Site layout and excavation: The layout of interlocking concrete pavement is where the drawing is translated into reality. In addition to knowing the size of the interlocking concrete pavement and excavated area, the layout tells the contractor the sequence of job functions and crew involvement. Considering all factors in advance such as material storage and paving direction helps ensure a smooth operation. Preparing the soil subgrade: As with layout and excavation, proper preparation of the pavement foundation is one of the most important elements of the job. Soil subgrade and base preparation should involve up to 70% of the labor. This time should result in a well prepared soil subgrade and base. Soil type: A properly prepared soil subgrade will support the base above it and allow the base to perform its role of distributing the loads and stresses from above. The soil type should have been identified before starting the job, during the bid proposal. It can affect the estimate on labor hours and the type of equipment required for the job. Soil compaction: Once the soil type is identified, the contractor will need to compact it. Compaction achieves four main purposes: it increases the soil s load-bearing strength; prevents pavement settlement/rutting; reduces seasonal movement; helps ensure that any movement is uniform. When compacted properly, the aggregate base density will minimize deformation and/or heaving of the paved surface during freezing or thawing. Soil grading: For proper drainage, the contractor will slope the paved area away from the house at a minimum of 2%. Geotextiles (optional): Geotextiles (special fabrics) are recommended over clays or silts. They are also a good choice over soils saturated for a large portion of the year. The fabric separates fines in soils from the base and prevents them from migrating upward into the base. Base thickness: ICPI recommends minimum base thickness for different applications. For pedestrian areas, including patios and walkways, for example, 4

a minimum 4 in. (100 mm) thickness is recommended. Your contractor should know the technical requirements for base thickness that apply to your particular installation. Edge restraints: Edge restraints around the perimeter of the pavers are essential for eliminating horizontal creeping of the pavers and loss of bedding sand. They hold the pavers in place for the life of the pavement. Bedding sand: Sand is installed over the base to a consistent thickness between ¾ inch (20 mm) and 1½ inch (40 mm) according to ICPI guidelines. Proper paver types and sizes: It is important to choose the right pavers for the application. As a rule of thumb, for example, pedestrian areas and residential driveways will achieve interlock with 2 3 /8 inch (60 mm) thick pavers. (Ask your contractor whether the pavers they are using are the recommended size for the application.) The contractor will assure an even color mix by taking pavers from several bundles or pallets at a time. Cutting pavers: All jobs with concrete pavers will involve cutting. Professional contractors should take care to control the dust from cutting pavers, but you should expect that there will be dust and noise during this process. Paver compaction: Pavers are first compacted without joint sand to create initial interlock. After this is complete, dry joint sand is spread and swept and the pavers compacted again until the joints are completely full. Following compaction, you and the contractor should inspect the pavement together to ensure satisfaction. Paver sealing (optional): While pavers are extremely durable, sealing may enhance the colors and can prevent staining. Allow a minimum of 60-90 days after completion of the installation before sealing. Consult your supplier/contractor for recommendations on cleaning and sealing. 5

Choosing Your Contractor As with any significant investment, you want to be a smart consumer. You want to make sure the contractor you select is qualified and experienced for your particular type of job. How? Insist on ICPI certification and ask prospective installers plenty of questions. ICPI Certified Paver Installers Formed in 1993, the Interlocking Concrete Pavement Institute (ICPI) is the authority on interlocking concrete pavements in North America. Membership consists of manufacturers, suppliers, distributors and contractors. ICPI sets installation guidelines for the industry. ICPI certification helps contractors meet those guidelines. You can be sure that a company with a certified installer on the site is dedicated to quality installation guidelines and on-going education. An installer can verify certification by presenting a valid certificate or card from ICPI. To find an ICPI certified paver installer, visit www.icpi.org. 6

Suggested Questions to Ask Contractors How long have they been installing pavers? Have they been trained by a manufacturer or ICPI? Are they an ICPI certified installer? What percentage of their total business consists of installing concrete pavers? Will they provide you with three references, not only recent ones, but from past jobs? Can you contact their references and inspect the jobs? Do they have a portfolio of photos and testimonial letters? Is their credit in good standing? Do they have a current liability insurance certificate? While the contractor is on your property, they should be insured for any damage and injuries that might occur. (Be sure to check your homeowner s insurance policy for coverage of the contractor while on your property, too.) Can the contractor provide proof of Worker Compensation insurance covering everyone on the job? Do they install jobs per ICPI specifications? Can they supply a copy? Do they provide a written, itemized proposal outlining the scope of work and terms of payment? It should include starting and completion dates, demolition and excavation, paving and base materials, plus taxes. Do they guarantee their work for at least one year? Will they return in a year to inspect it? Are they members of the ICPI or other associations? 7

What to Expect During delivery & set-up Your contractor should work with you to identify an accessible area for the delivered pavers, crushed stone (aggregate) and bedding sand. Your contractor should follow your local municipality s regulations regarding temporary street storage of pavement materials. Be sure your contractor contacts the local utility location service to mark underground utilities. This service will generally not locate lawn irrigation pipes. Assist the contractor by identifying sprinkler lines that others have installed. You should be present when materials are delivered to ensure access to your home during construction and convenient access for the contractor s equipment. During installation As the crew begins work, there will be some dust, dirt and noise from the equipment that removes the old pavement and excavates and places the new base, bedding sand and pavers. Alert your neighbors so they can do the same. Confirm paver pattern, color(s) and anticipated cuts along the edges with the contractor prior to laying pavers. If a driveway is planned, do not leave your car in the garage. Your contractor can advise you on the best parking location for cars away from the crew and construction equipment. Keep all doors and windows closed during construction. Keep all pets and children away from the construction area. 8

Contractor Checklist CONTRACTOR INFORMATION 1 Company Name Address Phone # Contact 2 Workmanship Warranty (yrs) INSTALLATION PROCEDURES 1 Excavation Depth Width Final Elevation Agreed Upon q Yes q No 2 Base Construction Type of Material Depth of Material -- walkway (min 4 in.) -- driveway (min 8 in.) Compaction -- with moisture q Yes q No -- maximum 4 in. layers q Yes q No Woven Geotextile (optional) q Yes q No 3 Bedding Layer Coarse Sharp Sand, i.e., concrete sand q Yes q No Depth (max 1 1 /2 in.) q Yes q No 4 Pavers Quantity (Sq. Ft.) Supplier Warranty Shape Color Laying Pattern 5 Edge Restraints Type Quantity (Lin. Ft.) Base Extends beyond (min 6 in.) q Yes q No 6 Jointing Sand Fine Washed Sand, i.e., masonry sand q Yes q No Compact in Both Directions q Yes q No Sweeps into Joints q Yes q No TOTAL COST NOTES 9

During daily site inspection At the end of each day, spend a few minutes discussing the progress with the project foreman. The foreman should briefly describe work anticipated for the next day. Be certain that the pattern, color blend, cuts and detail work meet your expectations. If you have changes, notify the contractor in writing immediately and have him provide a written change order. Change orders may require additional supplies, labor and expenses. Be clear on your expectations. Inspect the site once the crew has completed its daily clean-up. The crew should remove tools, loose pavers and construction debris. Notify the project foreman of any areas that need additional attention. Upon project completion, walk the site with the foreman for your final inspection. Communicate any details that need attention. Use the checklist provided in this brochure during your daily and final inspection. Ask your contractor about care and maintenance of your new pavement. When cleaning or sealing your pavers, use products formulated specifically for concrete pavers. 10

The Best Paving System Quality concrete pavers create a surface that can last for generations. When installed to Interlocking Concrete Pavement Institute (ICPI) guidelines and placed on a well-prepared base, pavers require very little maintenance. Permeable Driveways Concrete Paver Ideas Concrete pavers are used in many different home projects. Whether for a driveway, raised patio, pool deck, water feature or walkway, concrete pavers will make them beautiful. Visit www.icpi.org to get ideas for your next project. Patios Sitting Areas Water Features Pool Decks 11

For further information about concrete pavers, installation and contractors, contact your local ICPI member. Distributed By The ICPI wishes to thank the Ontario Pavingstone Manufacturers for the use of certain material in this brochure. This brochure is intended to be used as a general guide for the installation of interlocking concrete pavers. The materials and construction methods may vary as a result of diverse conditions in every region. Contact ICPI for Additional Resources www.icpi.org 13921 Park Center Road Suite 270 Herndon, VA 20171 Tel: (703) 657-6900 Fax: (703) 657-6901 Email: icpi@icpi.org In Canada: P.O. Box 1150 Uxbridge, ON L9P 1N4 Canada