Programming and cash flow considerations when budgeting for government building projects



Similar documents
Capital Works Management Framework

Project Evaluation Guidelines

1.1 Objective Competencies and resources required Scope Related documents Defining the objectives and scope of projects 7

Procurement Strategy and Contract Selection

Project Assessment Framework Establish service capability

PROJECT MANAGEMENT FRAMEWORK

A QUICK REFERENCE GUIDE FOR ELECTED OFFICIALS AND STAFF WHOLE-OF-LIFE COSTING

Part B1: Business case developing the business case

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

Engineering Innovation

Vehicle Capital Reserve Contributions Shortfalls. Director, Fleet Services, and Director, Financial Planning

Release: 1. BSBPMG510A Manage projects

council s Budget and Financial Planning Framework

State of Queensland. Published by the Department of Infrastructure and Planning, September 2010, 100 George Street, Brisbane Qld 4000.

Financial Strategy

NSW SENIOR EXECUTIVE SERVICE

Leasing in the Queensland Public Sector Policy Guidelines. Policy Guidelines for public sector entities considering entering into lease arrangements

Appendix A - Executive Summary

Royalties for the Regions Floodplain Security Scheme Business Case

Contents. 1.0 Introduction Project definition Project brief Accommodation guidelines Objective 4

Prodev Group Holding. VACANCY: SENIOR FINANCIAL MANAGER Prodev Group Holding Company Date:

THE RIGHT LEVEL OF IT EXPENSE

Telecom Outsourcing Delivery Not Discovery. Insights from EnterprisePM

Report to Parliament No. 4 for 2011 Information systems governance and security. Financial and Assurance audit. Enhancing public sector accountability

Risk Management Plan. Risk Management Plan Guide. Strategic Capital, Infrastructure and Projects. A guide to completing the Risk Management Plan

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa

School Construction Projects

19 May Dear Mr Hawkins

Data Communications Company (DCC) price control guidance: process and procedures

FULL COST PRICING A QUICK REFERENCE GUIDE FOR ELECTED OFFICIALS AND STAFF

RISK MANAGEMENT POLICY

Resolution of Small Business Disputes Options Paper

MINISTRY OF FINANCE & DEVELOPMENT PLANNING PUBLIC FINANCE MANAGEMENT (PFM) REFORM PROGRAMME FOR BOTSWANA

Project Management Frequently Asked Questions:

Capital Projects and Construction: Building in Risk Management and Project Controls

MANAGE BUDGETS AND FINANCIAL PLANS FACILITATOR MANUAL WITH SIMULATED ONLINE BUSINESS ASSESSMENT BSBFIM501A

WATER AND SEWERAGE FINANCIAL MANAGEMENT PLANNING

Service Risk Assessment. Consultant PQC

Illawarra Region Innovation and Investment Fund. Progress Report

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Audit of Management of Negotiation Loans. Prepared by:

GOVERNMENT OF NUNAVUT POSITION DESCRIPTION. Date: May 2015 Position Number:

Benefits realisation. Gate

Entrepreneurs Programme - Business Growth Grants

Audit summary. 1.1 Introduction

WorkCover claims. Report 18:

Audit of the Test of Design of Entity-Level Controls

2018 Commonwealth Games: progress. Report 9 :

APPENDIX B: FINANCIAL PLANNING AND CONTROL OF RESOURCES

FMCF certification checklist (incorporating the detailed procedures) certification period. Updated May 2015

Financial Projections

SBRI Healthcare: NHS England competition for development contracts

CHAPTER 3: MANAGING IMPLEMENTATION PROJECTS

PORTFOLIO, PROGRAMME & PROJECT MANAGEMENT MATURITY MODEL (P3M3)

building and sustaining productive working relationships p u b l i c r e l a t i o n s a n d p r o c u r e m e n t

Contract management: renewal and transition. Report to Parliament 10 :

An Oracle White Paper June The Benefits of Risk Assessment for Projects, Portfolios, and Businesses

Version Adoption by Council: 2013 Resolution Number: 2013/177 Current Version: V1.0 Administered by: Governance Coordinator

Cost Reduction and Cost Containment Initiatives: Not an All or Nothing Value Proposition By Gary Friedman, President, Cost Containment Specialists

INSURANCE ACT 2008 CORPORATE GOVERNANCE CODE OF PRACTICE FOR REGULATED INSURANCE ENTITIES

Results of audits: Internal control systems Report 1 :

Chapter 14 Special Report for the Public Accounts Committee Evergreen and Wackenhut Leases

Procurement of communications support for the launch of Healthy Schools London

What is PROJECT SCHEDULING?

Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education

Wandering Council Draft Plant Asset Management Plan

CAIRNS REGIONAL COUNCIL LEASING GUIDELINES

INTERNAL AUDIT REPORT REVIEW OF PHYSICAL FACILITIES MAINTENANCE AND REPAIRS

The Role of Credit Scores in Consumer Loan Securitization

Cash Management Handbook for Departments and Agencies

Queensland Reconstruction Authority. 2010/11 Queensland flood and cyclone disaster. Value for Money Strategy

GUYANA PROCUREMENT PLANNING MANUAL

APPENDIX 1: A5 Management Discussion and Analysis

Summary of significant issues identified in recent reports of the Comptroller & Auditor General and the Public Accounts Committee

Project Bank Account Awareness

BEST PRACTICE GUIDE 6: ESTABLISHING CONTRACTS. RDTL MINISTRY OF FINANCE Procurement Service

Financial Management Framework >> Overview Diagram

Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review

Head of Engineering Job Description

Introduction UNDERSTANDING BUSINESS CONTINUITY MANAGEMENT

IMPROVING BUDGET IMPLEMENTATION. OECD-Asian Senior Budget Officials Meeting Bangkok 4-5 February, 2010 David Shand PFM Consultant

ISSUES PAPER LEGAL REPRESENTATION AND JURISDICTIONAL LIMIT IN SMALL CLAIMS

Government to Government (G2G) Implementing and Funding Mechanisms Cost Reimbursement Projects

WATE R O&M S E RV I CE S An asset management perspective

Project, Programme and Portfolio Management Delivery Plan 6

UNSOLICITED PROPOSALS

2. Financial management:

Developing and Managing Internal Budgets. top-down. embed. hasing variation. allocation. forecasting. bottom-up

Collection of Tax Debts

Security Management of Government Buildings

Factsheet: Financial planning

STAG Technical Database Section 13

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting

Keys to a Successful Outsourcing Transition

ESKITP Manage IT service delivery performance metrics

Part One: Introduction to Partnerships Victoria contract management... 1

Draft Prudential Practice Guide

Portfolio Management 101:

Position Description. Management Accountant. Business unit: Responsible to: Position purpose: Direct reports: Financial delegation:

MoP Glossary of Terms - English

part I Why 70% of software projects fail and how you can ensure success

Transcription:

POLICY ADVICE NOTE Capital Works Management Framework Programming and cash flow considerations when budgeting for government building projects The Department of Housing and Public Works is pursuing a strategy aimed at improving the quality of building cost estimates associated with government building projects. In accordance with policy requirement 2 of the Capital Works Management Framework, when developing work programs for their building projects, departments must consult with the Department of Housing and Public Works regarding their provision for cost escalation and proposed cash flows before any submission is made to Government for funding. The purpose of this policy advice note is to highlight key considerations regarding the preparation of cash flow forecasts for building capital works programs. Full consideration of project lead times, realistic time allowances for construction activities, and realistic cash flow forecasting will reduce the risk of delayed project delivery and of failure to expend allocated funds. Background Each year, all government building projects estimated to exceed $250,000 in value are individually listed in the Capital Statement document (commonly referred to as Budget Paper No. 3) within the Queensland State Budget 1. Each project listing in the Capital 1 Listings in the Capital Statement are not limited to building projects; individual listings are included for all capital expenditure (e.g. transport and water infrastructure, plant and equipment) exceeding $250,000 in value.

Statement includes the total estimated project cost and the budgeted expenditure for that project for the coming financial year, together with forecasts of expenditure up to the end of the previous financial year and for subsequent financial years. This breakdown of project spending (illustrated in Figure 1) is known as the forecast project cash flow. Figure 1: Hypothetical project listing in Budget Paper No. 3 Project name Total estimated cost Expenditure to 30 June 2009 Budget 2009-10 Post 2009-10 XYZ building $12,600,000 $1,500,000 $7,000,000 $4,100,000 Managing expectations with respect to project delivery and cash flow forecasts With the publication of cash flow forecasts in Budget Paper No. 3, an expectation arises within Government and the community that funds will be expended, and projects will be delivered, in line with these forecasts. Managing these expectations can be difficult, especially when a new facility is in high demand. This task may prove even more difficult if the cash flow forecasts presented in Budget Paper No. 3 are unrealistic. As there are many projects competing for funding, stakeholders may perceive any failure to deliver and expend in line with the published forecasts as a wasted opportunity. It is therefore important that the timeframes and cash flows communicated to stakeholders through the budget papers are realistic. This will help ensure that delivery expectations are met and full expenditure of allocated funds is achieved. Key considerations when programming/forecasting cash flows The process of cash flow forecasting should be undertaken by delegated departmental officers and take into account two fundamental and interdependent requirements: budgetary requirements This encompasses all the requirements of Queensland Treasury in relation to the formulation of the State s building capital works program. At all stages of the capital works management process, project managers should bear in mind that project delivery and expenditure should align (as closely as possible) with the timeframe/cash flow forecast that appears in Budget Paper No. 3. As such, cash flow forecasts may need to be adjusted during the construction stage and updated in the next Capital Statement. construction programming requirements This requires an understanding that the actual rate of expenditure (i.e. the actual cash flow) on building projects will depend on the time taken to plan, obtain approval for, design and construct each building. Realistic (and therefore achievable) cash flow 2

forecasts will require careful consideration of the time needed to complete each of these activities. Importance of setting adequate/realistic project timeframes Realistic cash flow forecasts are made possible through judicious construction programming (i.e. through adequate allocation of time to each construction activity, including allowances for likely approval times) and are more likely to be achieved. Unreasonable and unrealistic project timeframes are often the result of: a non-negotiable, critical end date set very early in the planning phase A fixed end date means that, by default, the timeframe for procurement becomes fixed. In many cases, this fixed procurement timeframe bears no relation to a prudent allocation of time for delivery of the project. planning based on timeframes for previous similar projects without proper analysis of the extent of the similarities It is not prudent to assume that the time taken to deliver a similar project was reasonable/adequate. It is possible that this similar project suffered from acceleration costs and a range of compromises. For those projects where options are being considered with respect to commencement, staging and completion, sensitivity analysis (i.e. examination of how sensitive the project s financial and economic outcomes are to specific variables such as the commencement date or a construction program that involves staging) may be of assistance during the planning process and when forecasting cash flows. Further guidance on this analysis technique is available in the Cost-Benefit Analysis Guidelines under the Project Assurance Framework. Risks involved with inadequate planning timeframes Traditionally, there has been an emphasis on the time management of the delivery phase of building projects. However, in the context of a government building project, it is equally important that the planning phase activities are allocated sufficient time to ensure full consideration of all service delivery options. This aspect of project planning is often underestimated. Many projects are subject to compressed design and construction timeframes, resulting from delays in the planning phase combined with a failure to adjust the completion date accordingly. Factors that can cause delays in planning include: unforseen legal, technical, and environmental issues under-funding and under-resourcing delayed approvals. Lack of adequate time to conduct planning may result in: inadequate consideration of all service delivery options an inability to participate in cross-portfolio coordination 3

the setting of unachievable project budgets the setting of unachievable cash flows. Risks involved with inadequate design and construction timeframes A compressed timeframe for design and construction could lead to a range of compromised project outcomes, including: sacrifice of project or asset outcomes in favour of cash flow achievement poor design resulting in reduced functionality higher costs associated with working to unrealistic deadlines risks to the safety of site workers expected to work excessive hours, and the subsequent temptation for them to take shortcuts reduced quality of workmanship shorter or compromised commissioning and handover undermining of other projects though a diversion of effort and resources to time-critical projects increased likelihood of industrial relations issues. Prudent cash flow forecasting Achieving expenditure in line with a forecast cash flow is not always easy and can potentially be made more difficult by poor cash flow forecasting in the first instance. The rate of expenditure on a building project tends to start slowly, increase rapidly as the project progresses, and then plateau towards the end of the project. This phenomenon is illustrated by an S curve graph (refer to Figure 2). Departments should take account of this expenditure pattern when forecasting, for the purposes of the budget process, the increments in which the total project funding will be expended. Figure 2: Typical pattern/rate of building project expenditure Full expenditure of allocated funds Expenditure Nil expenditure of allocated funds Time Project commencement Project completion 4

Competencies required for cash flow forecasting Professional advice and assistance is necessary to ensure that the cash flow forecasts included in Budget Paper No. 3 are achievable. Prudent cash flow forecasting requires an understanding of both the budget process and construction programming. Construction programming requires specific knowledge of the government context and, in particular, an appreciation of the lead times necessary for planning and design activities and for approvals. An understanding of the state of the construction industry and its capacity relative to the project delivery phase is also essential. If appropriate human resources are not available within a department, this expertise will need to be outsourced. The Department of Housing and Public Works can provide assistance in this regard. For further information Building Policy Unit Building Industry and Services Building Services and Works Department of Housing and Public Works GPO Box 2457 Brisbane QLD 4001 Telephone: 07 3224 5482 Fax: 07 3224 5498 Email: bpu@publicworks.qld.gov.au Web: www.hpw.qld.gov.au November 2008 (Originally published in March 2006 as Forecasting Cashflows when Budgeting for Building Projects) The State of Queensland (Department of Housing and Public Works) 5