Application of Fuzzy Logic in Delay Analysis in Construction



Similar documents
Causes, Effects and Minimization of Delays in Construction Projects

Delay Computation Using Fuzzy Logic Approach

Who pays the Money for the Time?

Dynamic Change Management for Fast-tracking Construction Projects

Role of Project Manager from the Client s Side on the Performance of a Construction Project

Project Risk Identification. IH 635 Managed Lanes Project Exhibit A to Project Development Plan 1

CONTRACT DOCUMENTS IS EFFECTIVE TOOL FOR RISK MANAGEMENT

Risk Management of Construction - A Graduate Course

Contract Administration

METHODOLOGIES FOR DETERMINING CONSTRUCTION CONTRACT TIME AND EVALUATING CONTRACT TIME EXTENSIONS FINAL REPORT

Managing Successful Software Development Projects Mike Thibado 12/28/05

A REVIEW ON FACTORS AFFECTING CONTRACTOR PERFORMANCE IN CONSTRUCTION WORK

Time Error in Project Management: A Case Study in Yanbu, Saudi Arabia

International Accounting Standard 11 Construction Contracts

IMPROVING THE DESIGN-CONSTRUCTION INTERFACE

Fatemeh Akbari* Master of Industrial Engineering Islamic Azad University, Zahedan Brench, Iran

Construction Contracts

Raji Al-Ani and Firas I. Al-Adhmawi. Implementation of Quality

Appendix 18 NEC3 Options

Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.

The following Accounting Standards Interpretation (ASI) relates to AS 7. ASI 29 Turnover in case of Contractors

A Study On Factors Influencing Construction Contract Claim Management

Risk Workshop Overview. MOX Safety Fuels the Future

CONSTRUCTION CLAIMS AND DISPUTES: CAUSES AND COST/TIME OVERRUNS

SECTION PROJECT PLANNING AND SCHEDULING PART 1: GENERAL 1.1 DEFINITIONS

PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN

The Distinction between Manufacturing and Multi-Project And the Possible Mix of the Two. By Eli Schragenheim and Daniel P. Walsh

Evaluating Company Safety Policies

Bedford Group of Drainage Boards

PROJECT CHANGE MANAGEMENT SYSTEM

A FUZZY MATHEMATICAL MODEL FOR PEFORMANCE TESTING IN CLOUD COMPUTING USING USER DEFINED PARAMETERS

A CONSTRUCTION SCHEDULE CONTROLLING SYSTEM USING WEB-BASED KNOWLEDGE TECHNOLOGY. Will Y. Lin(a) and H. Ping Tserng(b)

NEPAL ACCOUNTING STANDARDS ON CONSTRUCTION CONTRACTS

Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy

Open Access Review of Delay Analysis Methods: A Process-Based Comparison

Accounting System. Page 1 of 9

Development of Resource-Driven Scheduling Model for Mass Housing Construction Projects

Temporary Employees And Contractors Potential OSHA And Other Liabilities

A Model for Implementing & Continuously Improving the Automated Change Management Process for Construction Mega Projects

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.

Information Technology Project Oversight Framework

Method for Calculating Schedule Delay Considering Lost Productivity

Productivity: Measurement, Improvement and its Role in Mitigating the Risks of Dispute in Construction Projects

IJSRD - International Journal for Scientific Research & Development Vol. 3, Issue 10, 2015 ISSN (online):

Position Classification Standard for Management and Program Clerical and Assistance Series, GS-0344

A Risk Management System Framework for New Product Development (NPD)

Example #1: Controller for Frequency Modulated Spectroscopy

Applicability / Objective

Project Control. 1. Schedule Updating

Module 7 Human Resources Management PMP Exam Questions

A Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition

Fuzzy Logic Based Revised Defect Rating for Software Lifecycle Performance. Prediction Using GMR

Develop Project Charter. Develop Project Management Plan

Project Management Efficiency A Fuzzy Logic Approach

108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised )

Introduction to Construction Project/Jobsite Management

Linear Schedules for Tunnel Projects

Chapter01. Introduction to Software Project Management

Quality Financial Analysis of Para-Rubber on Google-Maps Prototype System

Risk Management in Construction Projects

Construction Contracts

Fuzzy logic decision support for long-term investing in the financial market

CONTRACTOR SELECTION WITH RISK ASSESSMENT BY

Sri Lanka Accounting Standard -LKAS 11. Construction Contracts

River Stour (Kent) Internal Drainage Board Risk Management Strategy and Policy

A decision support tool for subcontractor multi-project resource allocation

A Quick Introduction to Construction Risks and Contracting Practices

Diploma in Business Management

HUMAN RESOURCES ANALYST

Sakhalin Energy Investment Company LTD. Corporate Procedure For Lifting Operations Over Live Process Areas

STRATEGIC DATA FOR EMPLOYERS CONSTRUCTION CLAIMS

RISK MANAGEMENT POLICY

PM in construction industry

Construction Contracts

Study of the Importance and Applicability of the Factor "Mark-up in the Budgeting of Construction

Schedule Risk Analysis Simulator using Beta Distribution

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

14TH INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN AUGUST 2003

CHAPTER 23. Contract Management and Administration

A FRAMEWORK FOR DEVELOPING A KNOWLEDGE-BASED DECISION SUPPORT SYSTEM FOR MANAGEMENT OF VARIATION ORDERS FOR INSTITUTIONAL BUILDINGS

Introduction to the ITS Project Management Methodology

LONG INTERNATIONAL. Long International, Inc Whistling Elk Drive Littleton, CO (303) Fax: (303)

PROJECT COMMUNICATIONS MANAGEMENT - A WEB BASED CONSTRUCTION MANAGEMENT APPROACH

REMODELING CONTRACT., remodeling contractor, whose address is, to on the property located at.

HiCAMS User Guide. Chapter 3: Contract Adjustments. Section 1: Review Claims

Change and contract management modules of intelligent-rogram management information systems (i- PgMIS) for urban renewal projects

Benefits of using PrimaveraReader in your PM environment. White Paper

CHANGE ORDER PROTOCOL

Factors Affecting Bidding Strategy in Construction

CRITICAL PATH METHOD (CPM) SCHEDULES

MATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.

PN /16/ CRITICAL PATH METHOD PROGRESS SCHEDULE

QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL

A Guide to Renovation and Repair Contract Warranties

MASTER OF ARTS WITH A MAJOR IN ECONOMICS (MANAGERIAL EMPHASIS)

1 INTRODUCTION TO SYSTEM ANALYSIS AND DESIGN

Transcription:

Application of Fuzzy Logic in Delay Analysis in Construction Shruti Singh 1 Dr. M.K. Trivedi 2 2 Civil department MITS Gwalior 474005, India 1 Civil Department MITS Gwalior, India Abstract This paper describes an application of fuzzy logic in analysis of delays in construction projects using Fuzzy toolbox of MATLAB Program Software. Delays in construction projects are inevitable and may result in claims and disputes among different construction parties. Delays in construction projects can be due to a number of causes, which need to be classified and identified. For the success of a construction project, estimation of likelihood of delay resulting from different factors is a must. Fuzzy logic provides a simple way to arrive at a definite conclusion based u pon vague, imprecise or missing input information. Fuzzy logic is a form of many-valued logic; it deals with reasoning that is approximate rather than fixed and exact. Keywords- Construction projects; Fuzzy logic; Delays; Delay cause; MATLAB; Fuzzy Logic Toolbox I.INTRODUCTION The major problem occurring in any construction project is the delays occurring during the project, which cause the project to take longer time than planned. A construction project is commonly acknowledged as successful, when it is completed on time, within budget, in accordance with the specifications. A successful project means that the project has accomplished its technical performance, maintained its schedule, and remained within budgetary costs. Projects may differ in si ze, duration, objectives, uncertainty, complexity, pace, and some other dimensions. It does not matter how different or unique a project is; there is no doubt that every project contains some degree of uncertainty. It is required to be aware of these uncertainties and to develop necessary responses to get the desired level of the project success. Schedule delays are common in various construction projects and cause considerable losses to project parties. It is widely accepted that construction project sched ule plays a key role in project management due to its influence on project success. The common results of schedule delays are: Late completion of project, increased cost, disruption of work, loss of productivity, third party claims, disputes and abandonmen t or termination of contracts. Therefore schedule delays in construction projects give rise to dissatisfaction to all the parties involved. The aim of this paper is to propose a schedule delay assessment model using Fuzzy Logic Toolbox of MATLAB Program Software. An interview was conducted in which construction project team members were asked questions about the delays taking place in the project. The delay causes were grouped and categorized in different factors. The interview results were used in the assessment model and probability of schedule delay was evaluated. According to the results obtained from the model, the areas of most concern were discussed. The results obtained were accurate and acceptable. II.CONSTRUCTION PROJECT DELAYS Construction management focuses on best practices of managing resources such as materials, equipment, and labor. The challenge that the managers face in the construction industry is how to balance time, cost, and quality. Time delays are very clear measurements of project success as a simple comparison between actual and planned time could provide managers with project status. Schedule delays in a construction project can be defined as the late completion of works as compared to the planned schedule or contract schedule. It could be possibly be interpreted as a loss of time. Time refers to the duration for completing the construction project. Time in a construction project is the construction period or in contract administration is the cont ract period. When the project period is delayed, it means the project cannot be completed within original schedule. Usually there is no way of predicting how likely it is that a given project will meet its milestones and its predicted completion date. Uncertainty is an inherent aspect of project management. In the planning phase, an estimated project schedule is modeled and a critical path determined where all activities are future events. Uncertainty arises from different aspects s uch as task duration, resources encountered in execution and the dependency of tasks on the completion of other tasks. But in the execution phase, other non-controllable factors such as weather, resource limitations, and managerial actions can cause IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 599

alterations in the planned schedule and result in delays, especially if the task is part of the critical path. Delay in critical activities or near critical activities result in project delay. Some amount of delay on non -critical-path tasks can be tolerated, but any slippage on critical-path tasks directly results in delay of the project as a whole. III.DELAY CLASSIFICATION A Several factors can contribute to delays of a project. Analyzing the causes of delays is an essential task for resolving any conflicts or claims. Although many researchers emphasize the high cost and the associated risk related to litigating delay claims, few emphasize the responsibility for project delays. To avoid delays that might result in claims and disputes, the link between the actual tasks undertaken, the time required to complete them, and the ultimate cost estimate of the resources involved all need to be examined. According to an earlier work by the author related to project schedule and project delay classification Al-Humaidi (2002), classification of delay causes can follow different logic and can be classified according to their origin, timing, and compensability. Classification of delays according to origin is when the delay is analyzed based on the party responsible for the delay. The party responsible for the delay can be the owner, the designer, or the contractor. The second classification of delay is based on compensability of delay. Compensable delays are classified further into excusable delays or non -excusable delays. The third classification of delay is based on timing of delay. If two or more delays occur simultaneously, then a concurrent delay takes place. If a single delay takes place at a time, then a non-concurrent delay occurs. Delays can be classified as: 1. ORIGIN Those over which neither party has control Those over which the owner has control Those over which the designer has control Those over which the contractor has control 2. COMPENSABILITY Excusable delays Non-excusable delays 3. TIMING Concurrent delays Non-concurrent IV.DELAY FACTORS The project team members from different construction projects were interviewed about the delays occurring in their projects. They were asked to fill in the questionnaire and give values to the delay causes ranging from 0 to 100. These values were converted into percentage values and used as fuzzy weights to be used in the Fuzzy Logic Toolbox of Matlab as rule weights to be given to the delay causes. They were also asked to give scores to the factors as Least causable ; Medium Causable and Highly Causable. The delay factors are shown below in the form of table: Causes Values Labor Project a)labor strike 0.34 b)conflicts among 0.37 labor c)inexperienced 0.70 Labor d)labor shortage 0.79 e)absent labors 0.49 a)short original 0.69 contract duration b)delay penalties 0.54 c)project complexity 0.36 d)disputes among 0.60 project parties IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 600

Consultant Contractor External a)improper project 0.56 management assistance b)inexperienced 0.72 consultants c)inspecting and 0.80 testing delays d)conflicts between 0.47 consultants and design engineer e)poor 0.74 communication and coordination with other parties f)delay in approval 0.61 of design a)poor site 0.79 management and supervision b)poor planning and 0.83 scheduling of project c)shuffling of 0.34 subcontractors d)poor 0.74 communication and coordination with other parties e)rework due to 0.50 errors f)inexperienced 0.81 contractors a)inclement weather 0.81 conditions b)variations in price 0.61 c)global financial 0.87 crisis d)changes in 0.42 government regulations and laws e)unexpected 0.79 surface and subsurface conditions IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 601

Owner Material Design Equipment f)delay in providing 0.52 services from utilities g)delay in transportation 0.35 a)slow decision making 0.76 b)delay in approving design 0.46 c)late site delivery 0.71 d)change in orders by 0.89 owners e)improper study of designs 0.55 f)progress payments delays 0.62 g)poor communication and 0.81 coordination with other parties h)inexperienced owners 0.72 a)material manufacturing 0.35 delay b)damage of material 0.42 c)material shortage 0.77 d)delay in delivery 0.73 e)rising prices of materials 0.43 a)inadequate experience of 0.64 design team b)complexity in project 0.38 design c)errors made by designers 0.62 d)delays in making design 0.65 e)unclear details in drawing 0.56 f)insufficient data collection 0.50 a)damaged equipment 0.46 b)equipment shortage 0.45 c)breakdown of equipment 0.54 d)low efficiency 0.71 e)problem in allocation 0.65 V. CASE STUDY A real case study was undertaken and an interview was conducted in a housing project in Gwalior, to assess the causes of scheduled delays in the project, thereby causing delay in the planned duration of the project. The project manager was requested to form a group of decision makers to perform the following tasks: 1. To check the delay factors cited in the questionnaire. 2. To cite additional factors if necessary. 3. To assign values to the factors ranging from 1 to 100 as probability of schedule delay (1 being probability very low and 100 being probability very high).following results were obtained after the interview. Causes Probabilit y Labor a)labor strike 20 b)conflicts among labor 60 c)inexperienced Labor 65 d)labor shortage 60 e)absent labors 30 a)short original contract 65 IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 602

Project Consultant Contractor External duration b)delay penalties 20 c)project complexity 50 d)disputes among project 40 parties a)improper project 50 management assistance b)inexperienced consultants 60 c)inspecting and testing 30 delays d)conflicts between 75 consultants and design engineer e)poor communication and 40 coordination with other parties f)delay in approval of design 60 a)poor site management and 60 supervision b)poor planning and 55 scheduling of project c)shuffling of subcontractors 35 d)poor communication and 60 coordination with other parties e)rework due to errors 65 f)inexperienced contractors 25 a)inclement weather 25 conditions b)variations in price 70 c)global financial crisis 95 d)changes in government 85 regulations and laws e)unexpected surface and 20 subsurface conditions Owner f)delay in providing 65 services from utilities g)delay in transportation 35 a)slow decision making 55 b)delay in approving design 55 c)late site delivery 40 d)change in orders by 85 owners e)improper study of designs 45 f)progress payments delays 60 g)poor communication and 50 coordination with other parties h)inexperienced owners 20 a)material manufacturing 30 IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 603

Material Design Equipment delay b)damage of material 30 c)material shortage 60 d)delay in delivery 85 e)rising prices of materials 65 a)inadequate experience of 60 design team b)complexity in project 75 design c)errors made by designers 60 d)delays in making design 70 e)unclear details in drawing 50 f)insufficient data collection 40 a)damaged equipment 50 b)equipment shortage 20 c)breakdown of equipment 30 d)low efficiency 40 e)problem in allocation 50 The project members also estimated a range from 40-60 showing a medium probablity schedule delay of the project. The results obtained from Table1 in the form of Rule viewer of Matlab Program Software, were then used to obtain graphs for probability schedule delay factors obtained from the interview, using Matlab Program Software. Fuzzy Logic Toolbox of Matlab Program Software did the calculations easily and saved time, thereby giving suitable results. Following schedule delay probability outputs of the case study was obtained using Fuzzy Logic Toolbox of Matlab Program Software: Group of Probability output Labor 44.8 Project 41 Consultant 49.1 Contractor 40.1 External 42.2 Owner 49.6 Material 57.5 Design 61.9 Equipment 36.8 Schedule Delay 47.7 VI. DISCUSSION OF RESULTS 1. Labor Probability output was calculated as 44.8 showing low-medium probability delay level. The most contributing Inexperienced labor (65) Labor strike (20) 2. Project Probability output was calculated as 41 showing low-medium probability delay level. The most contributing factors for this delay are: Short original contractor duration (65) Delay penalties (20) 3. Consultant Probability output was calculated as 49.1 showing low-medium probability delay level. The most contributing IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 604

Conflicts between consultant and design engineer(75) Inspecting and testing delays(30) 4. Contractor Probability output was calculated as 40.1 showing very low-medium probability delay level. The most contributing Rework due to error(65) Inexperienced contractors(25) 5. External Probability output was calculated as 42.2 showing very low-medium probability delay level. The most contributing Global financial crisis(95) Inclement weather condition(25) 6. Owner Probability output was calculated as 49.6 showing very low-medium probability delay level. The most contributing Change in orders by owner(85) Inexperienced owner(20) 7. Material Probability output was calculated as 57.5 showing high-medium probability delay level. The most contributing Delay in delivery(85) Material manufacturing; and damage of materials(30) 8. Design Probability output was calculated as 61.9 showing very high-medium probability delay level. The most contributing Complexity in project design(75) Insufficient data collection(40) 9. Equipment Probability output was calculated as 36.8 showing very low-medium probability delay level. The most contributing Damaged equipment, and problem in allocation(50) Equipment shortage(20) Schedule Delay Schedule delay probability output was calculated as 47.7, showing a range of medium-low probability level for this project. VII.REFRENCES [1] Hanouf M. AL-Humadi (2007): A fuzzy Logic approach to model delays in construction projects [2] Al-Humaidi 2002 After the Fact Delay Analysis Techniques, Masters Thesis, Texas A&M University, 2002. [3] Al-Ghafly, M.A. (1995) Delays in the construction of public utility projects in Saudi Arabia. Master thesis, CEM Dept., KFUPM, Dhahran, Saudi Arabia. [4] Baldwin, J. and Manthei, J. (1971) Causes of delay in the construction industry. Journal of the Construction Division ASCE, 97(2): 177-87. [5] Fuzzy Logic Toolbox 2 User s Guide (2008), MATLAB, The MathWorks, Inc. IJCER Mar-Apr 2012 Vol. 2 Issue No.2 599-605 Page 605