UTILITIES COMMISSION October 2, 2013



Similar documents
RECOMMENDED PROGRAM FOR WELL AND SEPTIC SYSTEM REAL ESTATE TRANSACTION INSPECTIONS

WATER AND SEWER UTILITY COMMISSION Minutes. March 17, 2014 Brillion City Hall 6:00 pm

INTRODUCTION AND BACKGROUND

SECTION 3 SANITARY SEWER DESIGN

Seth Sheraden of Environmental Consultants

MINUTES OF THE REGULAR MEETING OF BOARD MEMBERS OF LAKE WASHINGTON SANITARY DISTRICT April 11, 2011

7C. Consideration of approving a cost-sharing plan for sanitary sewer repairs at 413 West Broadway (PID ) (MT/SB)

MINUTES RARITAN & MILLSTONE RIVERS FLOOD CONTROL COMMISSION FEBRUARY 25, 2015

President Economy called the meeting to order and the Clerk recorded the

MEMORANDUM. Doug Monn, Public Works Director Jim App, City Manager. Matt Thompson, Wastewater Resources Manager. Date: January 24, 2011

Ben Caviglia Anthony Gaetano Peter Berkley Herman Redd

SANITARY SEWER SYSTEM ASSESSMENT

EAST BAY REGIONAL SEWER PROGRAM

SANITARY SEWER SPECIFICATIONS

Sanitary Sewer Master Plan

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

KILMARNOCK PLANNING COMMISSION Tuesday July 14, 2009 Town Hall Kilmarnock, VA

Sauk Centre Public Utilities Commission - The Regular Meeting

Close-Out Documents... 9

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

REGIONAL WATER QUALITY CONTROL BOARD - SAN FRANCISCO BAY BOARD MEETING MINUTES October 20, 2004

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

Public Grants and Ordinance - Prohibit Case Study

Cypress Creek Sewer Break

CLEANING, INSPECTION, AND TESTING OF SEWERS

Upper Roanoke River (Roanoke and Botetourt Counties, Cities of Roanoke and Salem, Town of Vinton) TMDL Implementation (Cleanup) Plan Development

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

Chairman Kent Carlson and Commissioners Barbarajean Brandt, Brandon Gustafson, Scott Hemink, John McGary, Gen McJilton and Pete Onstad

STATE OF CALIFORNIA WATER RESOURCES CONTROL BOARD ORDER NO. WQ EXEC

SECTION CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

Sewer Rehabilitation Design Requirements

Beacon Hill Sewer District Standard Specifications

SANITARY GRAVITY SEWER LINE TESTING. B. Section CCTV Inspection of Gravity Sewer Lines

Pursuant to due call and notice thereof, the regular meeting of the Crosby City Council was held on Monday, January 26, 2015 at 6:00 p.m.

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

WATER SUPPLY CONTINGENCY PLAN CITY OF LAKE WOBEGON, MINNESOTA

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

Need Sewer Service? SEWER SERVICE

Beechmont Park Project

Downers Grove. Sanitary District Curtiss Street. P.O. Box Downers Grove, IL Phone: Fax:

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

THE STATE OF TEXAS COUNTY OF HARRIS HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 152

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

Sewer and Stormwater Back-ups Policy Adopted by Council October 4, 2010

REQUEST FOR PROPOSAL

State of Ontario Public Utilities Commission - CK PUC

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

PARKW A Y UTILITY DISTRICT MINUTES OF BOARD OF DIRECTORS MEETING AUGUST 19,2014

Sanitary Sewer Smoke Testing

CHARTER TOWNSHIP OF FENTON SEWER SYSTEM FINANCIAL OVERVIEW JANUARY, 2014

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

Wastewater Collection and Treatment Systems For Small Cities

ON-SITE WASTEWATER TREATMENT SYSTEMS ACT

CCTV INSPECTION OF SEWER LINES. A. Section Sanitary Gravity Sewer Lines. B. Section Sanitary Gravity Sewer Line Testing

Unauthorized Discharges and Sanitary Sewer Overflows

Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses

CITY OF PINOLE SEWER LATERAL ADMINISTRATIVE GUIDELINES

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

1. Water Line Maintenance 2. Sanitary Sewer Maintenance 3. Spill/Leak/Overflow Control, Response, and Containment

Element 4: FATS, OILS, AND GREASE (FOG) CONTROL PROGRAM

The meeting was called to order by Chairman Smith at 5:20 p.m.

Contracting Opportunities Vendor Day May 17, 2011

ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING

DID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER

Department of Public Utilities. Information for Property Owners & Residents about Sewer Backup Incidents. September 2014.

Gardnerville Water Company Regular Board Meeting Minutes Tuesday, April 8, :00 p.m. Board Room 1579 Virginia Ranch Rd Gardnerville, NV 89410

Fox Township On-lot Sewage Program

Village of St. Louis Sewer Back-up Policy

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

FIBER-OPTIC CABLE PLAN CHECK

Compliance Guidance for Motor Vehicle Waste Disposal Wells in Oregon September 2015

SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL

Monterey Regional Water Pollution Control Agency. Sewer System Management Plan

REQUEST FOR PROPOSALS MAGNA WATER DISTRICT FOR REMEDIATION SERVICES APRIL

First in Service First in Safety

CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD CENTRAL VALLEY REGION MONITORING AND REPORTING PROGRAM NO. R NPDES NO.

MINUTES OF REGULAR MEETING NORTHAMPTON MUNICIPAL UTILITY DISTRICT HARRIS COUNTY, TEXAS. January 20, 2014

MEMO. kitsappublichealth.org

Routine Maintenance and Inspection

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

P R O C E E D I N G S. Present: David W. Lighthart President/Chairman Charles M. Dwyer Treasurer

LS 2540 SEWER LATERALS AND INSPECTION TEES

The Town of Lakeshore Basement Flooding Information to Residents

SANITARY SEWER BACKUP. Causes & Prevention

From: Commissioner, Development File: Date of Meeting: Services Department E-6800 (9) June 18, 2007

Basement Flooding Prevention Grant Program

SECTION 7 UNDERDRAIN SERVICE

Point-of-Sale Program

l\finutes OF THE MEETING OF COMMlSSIONERS OF THE SILVER LAKE WATER & SEWER DISTRICT June 28,2010

DRAFT Guidelines for Manually Diverting Outdoor Wastewater to the Sanitary Sewer

Dry Weather Flow from Footing Drains and Service Connections

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

86 Main Road, Tiverton, RI Phone Fax

Transcription:

UTILITIES COMMISSION October 2, 2013 The regular meeting of the Baxter Utilities Commission was called to order at 4:00 p.m. by Chairman Rock Yliniemi. MEMBERS PRESENT: Chairman Rock Yliniemi, Commissioners Shawn Crochet, Bruce Klopfleisch, and Council Liaison Rob Moser. MEMBERS ABSENT: Commissioner Dave Franzen and Steve Houle. STAFF PRESENT: Public Works Director/City Engineer Trevor Walter and Engineering Technician Doug Schultz. OTHERS PRESENT: WSN Consulting Engineers Aric Welch, Justin Schultz and Brian Ross. APPROVAL OF MINUTES MOTION by Commissioner Crochet, seconded by Commissioner Klopfleisch to approve the Utilities Commission minutes of September 17, 2013. Motion carried unanimously. WATER ANALYSIS SAMPLES OF WELL NO. 1, 2, 3, 4 AND FORESTVIEW MIDDLE SCHOOL SAMPLES The following memo was presented and entered into the record by WSN Consulting Engineer Brian Ross: WSN sampled the four city wells and the Forestview irrigation well on August 22, 2013 for laboratory analysis of total organic carbon, ammonia, iron, and manganese. A tap water sample was also obtained from WSN s office tap. The results are attached and summarized in the attached table, which also lists analytical results from previous analyses for the City of Baxter. Be aware that the accuracy of the results could vary either way up to 10%. The current sampling results show very consistent water quality coming from the four Baxter municipal wells, with TOC around 3.0 ppm, ammonia around 1.1 ppm, iron at 4.1 ppm, and manganese just over 0.4 ppm. The current results also show the water from the Forestview irrigation well is lower in all these constituents, except for manganese. Based on the single August 22, 2013 sample, the irrigation well has about 66% of the TOC, 45% of the ammonia, and 66% of the iron, but 50% more manganese compared to the City well amounts. The irrigation well concentrations are comparable to the original test completed before Forestview was constructed, with the test well sample having somewhat high TOC and ammonia. The results show that mixing water from the irrigation well area with the city well water at a one to one ratio would decrease the concentration of ammonia going to the treatment plant by 28%. The decrease would be even less for iron and TOC concentrations and these could be partially offset by a rise in manganese levels, with respect to chemical addition required. WSN also did a review of area wells from our previous hydrogeologic study and the MDH County Well Index. There are several wells within one-half mile of the City wells that are 60 to 70 feet

deep, but none comparable to 130 foot depth of the City wells or even the 104 depth of the school irrigation well. To get water samples from additional areas, a test well would need to be installed, most likely to the east or south of the current municipal wells. Municipal Well Exploration BAXTER, MINNESOTA WSN PROJECT NO. 0102B0357.000 Total Well Sample Organic Ammonia Nitrate + Iron Manganese ID Date Carbon (NH4) Nitrite (Fe) (Mn) (TOC) (NO2+NO3) Forestview Test Well 12/12/2002 2.9 0.68 <0.20 2.40 0.590 City Well #1 2/9/2006 <2.0 1.3 <0.10 4.54 0.505 8/22/2013 3.0 1.1 NA 4.04 0.425 City Well #2 2/21/2006 2.5 1.5 0.12 4.00 0.466 8/22/2013 2.8 1.1 NA 3.89 0.403 City Well #3 3/1/2006 3.4 1.1 <0.10 4.86 0.402 8/22/2013 2.8 1.2 NA 4.10 0.413 City Well #4 3/20/2006 <2.0 2.4 <0.10 3.91 0.572 8/22/2013 3.2 1.0 NA 3.47 0.407 Forestview Irrigation Well 8/22/2013 1.9 0.49 NA 2.71 0.609 Field Blank (Office Tap) 8/22/2013 2.1 0.11 NA <0.05 <0.005 Notes: City Well #3 Sample was taken from inside the water treatment plant (raw water line) because sample port on well was plugged. Only well #3 was running during sample. All table samples values are mg/l. NA = Not Analyzed A long discussion ensued regarding location of drilling a new test well. WSN Consulting Engineer Ross indicated that there was a deep drilled residential well located in the Paris Road area. The decision was made to contact the individual to see of the City could sample their well for water quality. The cost to sample and test the well is approximately $1,200.00. MOTION by Commissioner Klopfleisch, seconded by Commissioner Crochet to recommend to City Council to approve contacting the homeowner on Paris Road to see if the City could sample their well for water quality as part of the City s evaluation of sites for a future municipal well. Motion carried unanimously. MADDEN AGREEMENT Page 2 of 5

Public Works Director/City Engineer Walter reviewed the draft Madden Agreement with the commission. Public Works Director/City Engineer Walter informed the Commission that Madden s had no issue with the agreement and have already signed the agreement and it should be returned to the City in the next few days. MOTION by Commissioner Crochet, seconded by Commissioner Klopfleisch to recommend City Council approve the Madden Agreement for Sanitary Sewer and Water. Motion carried unanimously. CEDAR SCENIC SEWER LINE REPAIR QUOTES The following memo was presented and entered into the record by Public Works Director/City Engineer Walter: The sanitary sewer backup on Cedar Scenic Road was discussed at the Utilities Commission meeting on September 4th, 2013.I have researched all questions and concerns and have the following information hopefully answering all Utilities commission questions: The sanitary sewer service line has not been flushed on an annual basis because it was on Engineering Technician Mark Matthews s calendar to do in the spring of each year. When Mr. Matthews was laid off on June 17th, 2011, it was missed and never put on anybody's yearly schedule starting in 2012. But even if it was on a yearly, bi-yearly, or quarterly schedule there is no way to guarantee it still will not plug and backup and cause significant monetary damages to the home. Last time Mr. Matthews ran the City camera down the sanitary sewer service line was in the spring of 2011 and it was not plugged therefore the line was not cleaned. Note that the sag is full of sewage all the time, it never cleans out. Erin Contracting out of Coon Rapids, MN installed the pipe on Cedar Scenic Road in 2002. By contract the warranty is only for one year therefore the warranty run out by the end of 2003. Construction Inspection was conducted by WSN, but there is no way in 2002 because of the way sanitary sewer service lines are installed to inspect the service lines after they are fully back filled with dirt on the project. That is why as the City Engineer I recommended in the winter of 2006-2007 that all projects be required to have sanitary sewer clean outs installed at the right of way line and that all sanitary sewer service lines are cleaned and televised as part of the total project. This is to make sure there are no sags in the sanitary sewer service lines at the completion of construction. City Council agreed and the additional cost of the clean out installation and cleaning/televising has been implemented on all projects since 2007. The home on Cedar Scenic Road was not built until 2009 and connected to water and sanitary sewer in the fall of 2009, seven years after the Cedar Scenic Project in 2002.The first backup occurred in 2010 at which time the City discovered that the sanitary sewer service line has a significant sag in the pipe about 7 feet from the centerline of Cedar Scenic Road. The sag has been there in Cedar Scenic Road since it was constructed in 2002. Staff took the issue to Utilities Commission in 2010 and discussed options. Commission recommended cleaning and televising yearly in the spring of each year knowing that this would not guarantee that another sewage backup would not occur in the home. There are many sags in the sanitary sewer service lines that Page 3 of 5

the City is not even aware of but most are not significant and usually clean themselves. This sag is significant meaning it is over 4 inches which is the full depth of the sanitary sewer pipe. The sanitary sewer service line has not been flushed for a little over two years and now caused another backup into the home the second time since it was installed to the new home in 2009. At the last Utilities Commission meeting the following reasons were discussed that would lean towards recommending to City Council to permanently fixing the sanitary sewer service line, but the Commission wanted to see actual cost estimates to repair from at least two contractors before making any recommendation to City Council: 1. It takes away future changes in staff and thus eliminating any human error in the future and even with inspection and cleaning on a schedule still doesn't guarantee a sanitary sewer backup will not occur. 2. Takes away future City liability of a sanitary sewer back occurring. Approximately $10,000 (Engineers Estimate) to permanently fix versus an insurance claim for what dollar amount? 3. It would eliminate the City responsibility from cleaning the sanitary sewer service line at a yearly cost for the next 100-years, which still would not guarantee that there still will not be a sanitary sewer backup into the home causing significant financial damages to the home. To date there has been no damages to the home only clean up with a wet/dry shop vacuum of about ten gallons each incident because the current homeowner has caught the backup in time. The current homeowner has not charged the City for any cleanup and has been very understanding of the situation and willing to work with the City. The current homeowner has the home up for sale and because of the sanitary sewer backups (2 to date) they have to disclose this issue to the new buyer. Two quotes were submitted by Public Works Director/City Engineer Walter for permanently fixing the sanitary sewer service sag in Cedar Scenic Road. One quote was received from Pratt s Affordable Excavating in the lump sum amount of $15,620.00 and one quote received from Anderson Brothers Construction in the lump sum amount of $9,950.00. A detailed discussion ensued and the conclusion of the Commission is the problem will never go away for the homeowner or the City if the City does not permanently fix the problem. Therefore, the Commission felt recommending awarding Anderson Brothers low quote to repair the sanitary sewer service line was the right way for the City to proceed. MOTION by Commissioner Klopfleisch, seconded by Commissioner Crochet to recommend City Council award the Anderson Brothers Construction quote in the amount of $9,950.00 for the Cedar Scenic Road Sewer Service Line Repair Project. Motion carried unanimously. Page 4 of 5

MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4) The commissioners reviewed the MS4 Audit conducted by WSN of the current permit and reviewed new requirements for new MS4 permit. The new MS4 Permit is required to be submitted to the MPCA by December 1 st, 2013. The Commission consensus was for WSN to return to the next meeting with a draft permit and estimate allocated hours to complete all the MCM requirements with the new 2013 permit. The 2013 permit will good for another 5 years. WASTEWATER TREATMENT PLANT CHARGES FOR AUGUST 2013 The Wastewater Treatment Plant Charges for August was provided to the commission as information only. CROW WING COUNTY SWCD WHISKEY CREEK INFORMATION The Cow Wing County SWCD Whiskey Creek Study update was provided to the commission as information only. OTHER BUSINESS Public Works Director/City Engineer Walter informed the Commission that the lights on the east water tower had been replaced and all lights are operating again. The replacement was done under warranty at no cost to the City of Baxter. ADJOURNMENT MOTION by Commissioner Klopfleisch, seconded by Commissioner Crochet to adjourn the meeting at 5:28 p.m. Motion carried unanimously. Approved by: Submitted by, Rock Yliniemi Chairman Mary Haugen Administrative Assistant Page 5 of 5