SECTION 724 PIPE CULVERTS



Similar documents
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION STORM DRAIN SYSTEMS PART 1 - GENERAL

Section 2100-Trenching and Tunneling

DIVISION 4300 STORM DRAINAGE

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION STORM DRAINAGE TABLE OF CONTENTS

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

X Planning X Quality X Maintenance & Operations

APPENDIX K PIPE INSPECTION

VIDEO INSPECTION AND LASER PROFILING IN FLORIDA. AASHTO SOC Conference Larry Ritchie, FDOT August 14, 2013

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

Nebraska Department of Roads Drainage and Erosion Control Manual December 2011 Appendix C: Pipe Material Policy Page C-1 PIPE MATERIAL POLICY

Section SEWER PIPE INSTALLATION AND TESTING

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Section 402. STORM SEWERS

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 600 INCIDENTAL CONSTRUCTION

550 PIPE CULVERTS, SEWERS AND DRAINS

PIPE INSPECTION AND REPAIR. Larry Ritchie

CLEANING, INSPECTION, AND TESTING OF SEWERS

SECTION STORM DRAINAGE SYSTEM

SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

SECTION 9.02 BUILDING SUBSURFACE DRAINS (PERIMETER, ETC.)

SECTION STORM DRAIN SYSTEM

CHAPTER 6 - SANITARY SEWER

SECTION PRECAST CONCRETE UTILITY STRUCTURES

SECTION POLYVINYL CHLORIDE (PVC) PIPE

LS 2540 SEWER LATERALS AND INSPECTION TEES

CULVERT AND STORM SEWER PIPE MATERIAL POLICY ON FEDERALLY FUNDED LOCAL AGENCY PROJECTS UPDATED March 2013

SECTION 200: STORM SEWER CONSTRUCTION STANDARDS

CITY OF BEVERLY RULES AND REGULATIONS - SEWER SYSTEM TESTING. General

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Wastewater Capital Projects Management Standard Construction Specification

8-11 Structural Analysis and Fill Height Tables Pipe Cover Shallow Cover Installation Fill Height Tables...

STANDARD SPECIFICATIONS SECTION INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

C. Section TESTING LABORATORY SERVICE.

Section 600 Incidental Construction

SECTION 9. All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer.

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

WILDCAT CANYON ROAD SPECIFICATION NO SLIDE REPAIR BIDDER'S PROPOSAL (continued)

ITD Pipe Materials Selection & Specification Procedures. July 2011

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

SANITARY SEWER SPECIFICATIONS

INDEX. Sec. No. Items Page Nos.

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL Testing - General

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

San Antonio Water System Standard Specifications for Construction ITEM NO SLIP-LINING SANITARY SEWERS

SECTION 7- STORM SEWER

Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

SECTION 5: SANITARY SEWER SYSTEM DESIGN

SECTION GRAVITY SANITARY SEWERS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

SECTION BUILDING SEWERS. B. Connection of building sanitary drainage system to municipal sewers.

900 SEWERAGE WORK ITEM PIPE SEWERS COMPLETE IN PLACE

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

MEMORANDUM: RECOMMENDATIONS FOR PIPE MATERIAL SELECTION

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

Bethel Township Municipal Authority (BTMA) RESIDENTIAL SEWER CONNECTION MANUAL

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

PRE INSTALLATION MANUAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

CW GRAVITY SEWERS TABLE OF CONTENTS

CITY OF ANN ARBOR PUBLIC SERVICES PLAN REVIEW CHECKLIST

Beacon Hill Sewer District Standard Specifications

San Antonio Water System Standard Specifications for Construction ITEM NO POINT REPAIRS AND OBSTRUCTION REMOVALS

STANDARD SPECIFICATIONS & CONSTRUCTION DETAILS MANUAL SECTION 5 - STORM DRAINAGE Design

SERVICE LINE EXTENSION AND SERVICE LINE CONNECTION CONDENSED SANITARY SEWER SYSTEM INSTALLATION SPECIFICATIONS

SECTION 1 GENERAL REQUIREMENTS

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

TECHNICAL SPECIFICATIONS GRAVITY AND PRESSURE SEWER LINE AND MATERIALS

Town House Center Highway North Huntingdon, PA 15642

CHAPTER 850 PHYSICAL STANDARDS

SECTION POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

Culvert Repair, Materials, and Structural Design 4.4-1

SECTION G SEWERS (STORM, SANITARY AND FDC)

SECTION FACILITY STORM DRAINAGE PIPING

The Manitoba Water Services Board SECTION Standard Construction Specifications September 2013 Page 1 of 21

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

Chapter 9 Storm Sewers

SECTION STORM DRAINAGE

September 2012 Brunswick County Engineering Department Revision 1.0. Technical Specification GRAVITY SANITARY SEWER SYSTEM

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

CHAPTER 5. Storm Sewer

HDPE PRODUCTS QUALITY, PERFORMANCE AND ECONOMY COMBINED

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

City of West Linn Public Works Standard Construction Specifications. Table of Contents

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES SITE UTILITIES

SANITARY GRAVITY SEWER LINE TESTING. B. Section CCTV Inspection of Gravity Sewer Lines

817 - PIPE CULVERTS, EROSION PIPE, STORM SEWERS, SANITARY SEWERS & END SECTIONS SECTION 817

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

CCTV of Stormwater Systems. Cairns Regional Council. Commentary Guidelines #

Transcription:

SECTION 724 PIPE CULVERTS 724.1 Description. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified. Where appropriate this specification will also apply to pipe arches. 724.1.1 The contract will specify either the type of pipe or the group of permissible types of pipe. If a group of permissible types is specified, the contractor may use any of the types listed in the specified group and size range as follows: Group A b Group B b Group C Rigid Pipe Size Size Size Reinforced Concrete Culvert Pipe ALL ALL ALL Vitrified Clay Pipe ALL ALL ALL Flexible Pipe Metal a Size Size Size Aluminum Coated Steel Pipe ALL ALL ALL Polymer Coated Steel Pipe ALL ALL ALL Aluminum Alloy Pipe ALL ALL ALL Bituminous Coated Steel Pipe NA NA ALL Zinc Coated Steel Pipe NA NA ALL Flexible Pipe - Thermoplastic Size Size Size Polypropylene Pipe Double 30 30 30 Wall Triple Wall 30 60 30 60 30 60 Polyethylene Pipe Corrugated 24 60 60 Steel 24 60 60 Reinforced Polyvinyl Chloride Pipe (PVC) 36 36 36 a Metal Pipe used for storm sewer applications shall be Type IA or Type IR b Pipe used for storm sewers under the influence of a pavement section or future anticipated influence of a pavement section which has a 3,500 ADT or greater shall be Group A pipe. Pipe used in other storm sewer applications shall be Group B. No other substitutions will be allowed. 724.1.2 If the contract specifies pipe culverts by group and the contractor elects to furnish metal pipe, the culvert shall be constructed in accordance Sec 725. If the contractor elects to furnish vitrified clay or reinforced concrete pipe, the culvert shall be constructed in accordance Sec 726. If the contractor elects to furnish thermoplastic culvert pipe, the culvert shall be constructed in accordance Sec 730. 724.1.3 When Group A, Group B and Group C pipe are specified, two pipe diameters will be shown on the plans at those locations. The first dimension will indicate the diameter of pipe that shall be provided if the contractor elects to provide pipe for that location a corrugated interior wall, and the second dimension provided in parenthesis will indicate the diameter of

pipe that shall be provided if the contractor elects to provide pipe for that location a smooth interior wall. Helical rib (Type IA) pipe may be considered to have varying hydraulic coefficients and may be substituted in accordance FHWA HD-5 hydraulic design of highway culverts considering the corrugation configuration at the joints. The specified diameters may be the same or different and will be dependent upon the design features for that pipe location. Regardless of which diameter of pipe is selected for a given location, the pipe flow line shall be maintained at the elevations shown on the plans. 724.1.4 The contractor may elect to furnish pipe one size larger than specified so long as the minimum fill heights are met. No additional compensation shall be given for the larger diameter pipe or any related items necessary to construct the larger pipe. 724.2 Construction Requirements. 724.2.1 Construction Loads. Before heavy construction equipment is operated over the pipe, the contractor shall provide adequate depth and width of compacted backfill or other cover to protect the pipe from damage or displacement. Any damage or displacement shall be repaired or corrected at the contractor s expense. 724.2.2 Installation. Pipe installation shall be according to the plans and specifications. Care shall be taken when preparing the subgrade and compacting fill around the pipe especially in the haunch areas. The contractor shall verify adequate compaction during construction of the pipe by performing density tests. 724.2.3 Pipe Plugs. The ends of all pipe stubs for future connections at inlet and manhole structures, and all pipe installed as part of future sewers, shall be sealed approved plugs. The plugs shall be installed in such a manner that infiltration of soil into the pipe is prevented. 724.3 Performance Inspection, Performance Report and Evaluation. 724.3.1 The contractor shall conduct either manual performance inspection or remote performance inspection along performance reporting and evaluation as it relates to this specification. 724.3.2 The contractor shall notify the Engineer at least five workdays before conducting a performance inspection. The inspection shall be performed no sooner than 30 days after the completion of the finished grade when not below pavement and after the completion of the aggregate base when any portion of the culvert pipe is below pavement. The condition of the culvert pipe shall allow for an accurate inspection. The contractor shall inspect the entire length of the pipe. The frequency of inspection shall be as follows: a) 100% of locations for Group A pipe b) 25% of locations for Group B. Locations to be determined by the engineer. Criteria for selection will include pipes under large fills or any locations of potential concern. c) Group C pipe shall be inspected at the discretion of the engineer. d) If issues are found any pipe from the performance inspection the engineer may require that all pipe be inspected according to this specification. 724.3.3 The actual inside diameter of flexible pipe products shall be determined for the purposes of measuring deflection by averaging nine equally spaced measurements at one location in the barrel of an unloaded pipe. If the pipe has a corrugated interior, the measurements shall be from the top of corrugation to top of corrugation as viewed from the inside of the pipe.

724.3.4 The contractor shall furnish a video recording of each inspection. The recording shall identify the date and time of the inspection, a description of the culvert pipe, the location, and the viewing direction. The recording shall be for the entire run of the culvert pipe being inspected. The contractor shall provide sufficient enough source of light to allow all areas of concern to be readily observed on the video recording in a digital, reproducible format on one of the following media types: DVD, CD or other media type approved by the engineer. 724.3.5 Manual Inspection. Perform a manual inspection by entering the culvert pipe to record video and to make measurements. Culverts should be entered only by inspection personnel trained in working confined spaces and using procedures in full compliance applicable State, Local, and Federal OSHA regulations. The manual inspection shall include the following at a minimum: 1) Measure the deflection of the culvert pipe to the nearest 1/4 inch. A minimum of three measurements shall be taken: vertically from the crown to invert (12 o clock to 6 o clock), and at 60 degrees from vertical (2 o clock to 8 o clock and 4 o clock to 10 o clock). 2) Measure crack width using a crack comparator, micrometer or a feeler gage capable of measuring 0.01 inch. Other measuring devices may be used if approved by the Engineer. Record the measurements and include them in the written inspection performance report including: For rigid culvert pipe, document the location, length, width, and greatest width of each crack exceeding.01 inch. For flexible culvert pipe (Corrugated Metal Pipe and Thermoplastic Pipe), document the location and length of all cracks. 3) For all culvert pipe, measure and record the widest gap at each joint in the run. 4) For culvert pipe manufactured seams, measure the location, length, and greatest width of any separation at the seam. 5) Measure the location, length and greatest width of each crack and the widest gap at each culvert pipe entering a drainage structure or transition. 724.3.6 Remote Inspection. Perform a remote inspection by using a crawler mounted camera low barrel distortion to record video and that has the capability to make measurements. In addition deflection shall be measured by either laser profiling and measuring technology or use of a mandrel capable of verifying deflection on a minimum of 9 points. Laser profiling and measurement technology must be certified by the company performing the work to be in compliance the calibration criteria as per MoDOT TM 84. Reports shall be submitted by electronic media in a format approved by the Engineer. 724.3.7 Inspection Criteria. Based on the type of culvert pipe, in the measurements and acceptance criteria shall be in accordance the table below. Also record the location of any other defect not listed in the table and describe the defect. Potential defects include, but are not limited to damaged coatings on corrugated metal pipe, racking, dents, protrusions, misalignment of line or grade, slabbing, and excessive corrugating of thermoplastic pipe. For each measurement location in a culvert pipe, record the length from the left end of the pipe according to roadway stationing.

Pipe Type Rigid Culvert Pipe Flexible Culvert Pipe Hydraulically Smooth Interior Flexible Culvert Pipe Corrugated Interior Inspection Criteria Measurement Type of Equipment Measurement Manual: Video Joint gaps Camera Remote: Crawler mounted camera capability Manual: Video Camera Remote: Crawler mounted camera capability and laser profiler or Crawler mounted camera capability and 9 point minimum mandrel Manual: Video Camera Remote: Crawler mounted camera capability and mandrel Crack widths Joint gaps Crack widths Deflection Joint gaps Crack widths Deflection Limitations Soiltight in accordance AASHTO PP 63-09.01 inch less than 0.10 crack 0.1 inch crack Soiltight in accordance AASHTO PP 63-09 None allowed 5% less than Soiltight in accordance AASHTO PP 63-09 None allowed 5% less than Required Action Seal joints excessive gap Note for future evaluation Seal joints excessive gap Replace deficient pipe or 50% of pay item for entire line Seal joints excessive gap Replace deficient pipe or 50% of pay item for entire line 724.3.8 Performance Report. The contractor shall provide a performance report for each performance inspection per drainage structure. Each report shall include: a) Project number and County-Route-Section b) Date of performance inspection c) Type and size of culvert pipe including any transitions in pipe run d) Time of video recording

e) Location (e.g. station and offset) and viewing direction. f) Summary of all defects including type, measurement, and location g) For remote inspections using a mandrel, indicate in the performance report the size of the mandrel and whether or not it was successfully pulled through the culvert pipe. h) For remote inspections using a crawler mounted camera laser profiler, include: 1) Three dimensional model of the culvert pipe based on the laser profile measurements. 2) Digital profile of culvert pipe extracted from the inspection video 3) Calculations of the ovality, capacity and delta of the culvert pipe 4) Explanation as to why data was unattainable for any section of the culvert pipe The contractor shall submit a performance report to the Engineer in 5 days of completing the performance inspection of the culvert pipe run. Submit the performance report in an electronic format approved by the Engineer. 724.3.9 Culvert Pipe Evaluation. The culvert pipe shall be evaluated based on the Performance report. Defects exceeding limitations in this specification will require an action plan addressing noted deficiencies. Other defects will require the contractor to submit an action plan to the Engineer. 724.3.10 Repairs. Required repairs shall be made at no additional cost to the Department and to the satisfaction of the Engineer. The contractor shall submit their required action plan including repair process and/or revised installation plan to the Engineer for approval at least 7 days before performing the repairs. The action plan shall provide written confirmation from the culvert pipe manufacturer that the repair methods are appropriate. Any repairs shall have a performance evaluation conducted of the repaired portion of the culvert pipe and any culvert pipe potentially affected by the repair work 30 days after the repair has been made, at no additional cost to the Department. 724.4 Method of Measurement. 724.4.1 Final measurement will not be made except for authorized changes during construction or where appreciable errors are found in the contract quantity. When two different diameters of pipe are shown on the plans for a given location for Group A, Group B or Group C pipe, the quantity of pipe installed will be based on the plan quantity for the larger diameter pipe and will not be considered as an appreciable error in the contract quantity if the smaller allowed diameter pipe is used. Where required, measurement of pipe, complete in place, will be made to the nearest foot along the geometrical center of the pipe. The revision or correction will be computed and added to or deducted from the contract quantity. 724.4.2 When concrete pipe is used, the length of the structure may be increased by no more than 3 feet as necessary to avoid cutting the pipe, but such increased length will not be included in the contract quantity for payment. 724.4.3 When PVC pipe is used, measurement will include any other pipe used to protect the pipe from exposure to sunlight. 724.5 Basis of Payment. 724.5.1 The accepted quantities of pipe, complete in place, including all necessary tees, bends, wyes, coupling bands, cutting and joining new pipe to existing pipe or structures,

unless otherwise specified, will be paid for at the contract unit price for each of the pay items included in the contract. 724.5.2 The accepted quantities of corrugated metal drop inlets and metal curtain walls, complete in place, including coupling bands, toeplates, nuts and bolts will be paid for at the contract unit price for each of the pay items included in the contract. 724.5.3 Unless specified otherwise, no direct payment will be made for the following: (a) Beveling, skewing or additional work required in laying pipe beveled or skewed ends. (b) Work involved in elongating pipe. (c) Any required backfilling, except as specified in Sec 206.6.3. (d) Construction of bedding or for bedding material. (e) Furnishing and installing plugs. (f) Material or work required for placing couplings on exposed ends of pipe. 724.5.4 Payment for removal of unsuitable material and for backfilling will be made in accordance Sec 206.6.3, unless the unsuitable material is a result of the contractor's operations, in which case the removal and backfilling shall be at the contractor's expense.