Underwater Concrete Technologies in Marine Construction Projects



Similar documents
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Pavement Thickness. esign and RCC-Pave Software. Roller-Compacted Concrete Pavement: Design and Construction. October 24, 2006 Atlanta, Georgia

NOTE: FOR PROJECTS REQUIRING CONTRACTOR MIX DESIGN, THE DESIGN PROCEDURES ARE SPECIFIED IN THE SPECIAL PROVISIONS OF THE CONTRACT.

Shotcrete Quality Control and Testing for an Underground Mine in Canada

Emergency Spillways (Sediment basins)

Concrete Repair. Applications and Procedures

Moving Small Mountains Vesuvius Dam Rehab

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Division 2 Section Section 02795

GRADATION OF AGGREGATE FOR CONCRETE BLOCK

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Advancements in Permeable Pavements

SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)

SECTION ABANDONMENT OF SEWER MAINS

PROPERTIES AND MIX DESIGNATIONS

Lab 1 Concrete Proportioning, Mixing, and Testing

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Mass Concrete. Robert Moser CEE8813A Material Science of Concrete. Definitions & Standards, Thermal Cracking, and Temperature Rise

METHOD OF STATEMENT FOR STATIC LOADING TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

GEOSYNTHETICS ENGINEERING: IN THEORY AND PRACTICE

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas

Strength and Workability Characteristics of Concrete by Using Different Super Plasticizers

C. Section TESTING LABORATORY SERVICE.

CGA Standard Practices Series. Article 600 Standard for Pozzolan Enhanced Grouts Used in Annular Seals & Well Destruction

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Building Your Interlocking Concrete Pavement to Last a Lifetime

SECTION ABANDONMENT OF WATER MAINS. A. Conform to requirements of Section Submittals.

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

Example Specification for Concrete using Current Building Code Requirements

Specification Guidelines: Allan Block Modular Retaining Wall Systems

OHIO ASPHALT PAVING CONFERENCE

Onsite Wastewater Concepts, Materials, Regulations & The Application Process Part I

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

Guide Specification Precast Concrete Products

SECTION 18 - CAST IN PLACE HIGH PERFORMANCE CONCRETE (HPC)

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Safe & Sound Bridge Terminology

Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY08 SEWER POINT REPAIRS BID TABULATION

4-02 Gravel Base Ballast and Crushed Surfacing

Section 2100-Trenching and Tunneling

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

Storm Drain Inlet Protection

Preservation, Repair and Rehabilitation of Concrete Bridges, Pavements and Tunnels in Virginia

GUIDE SPECIFICATIONS FOR PRECAST CONCRETE PRODUCTS

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

Applicable Rules - Air 30 TAC Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde

Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors

No allowance will be made for classification of different types of material encountered.

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

Table 4.9 Storm Drain Inlet Protetion Applicable for

AGREGADOS RECICLADOS MITOS Y REALIDADES

Bonding Agents: The Good, the Bad, and What Works. Bond with Your Concrete

725-R-599 PIPE LINING. (Revised ) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

FIBERGLASS UNDERGROUND STORAGE TANKS Special Installation Instructions for New York City Gasoline and Diesel Motor Fuels

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

UNIFIED FACILITIES GUIDE SPECIFICATIONS

NorthEast Transportation Training and Certification Program (NETTCP) Course Registration Form

Free-Form Concrete Pool

Chapter 8 Design of Concrete Mixes

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

Outlet stabilization structure

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Lesson 3. Portland Cement and Concrete

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

SECTION EARTH MOVING

Module 7 (Lecture 24 to 28) RETAINING WALLS

Storm Drain Inlet Protection

SECTION PERMEABLE INTERLOCKING CONCRETE PAVEMENT

EMERGENCY HOME PROTECTION. Homeowner's Guide for Emergency Flood Control. Contents INTRODUCTION

City of Shelbyville Site Inspection Checklist

BRIDGES ARE relatively expensive but often are

Epoxy Crack Injection (the basics)

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Block and Gravel Inlet Protection (BIP)

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

SECTION 1 GENERAL REQUIREMENTS

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

SafetyBuletin. Concrete101 Aguidetounderstandingthequalitiesofconcrete andhowtheyaffectpumping

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

Transcription:

Underwater Concrete Technologies in Marine Construction Projects Sam X. Yao Ben C. Gerwick, Inc.

oncrete Production from a Floating Batch Plan

Conventional Tremie Placement

Concrete Delivery on Transit Mixers

Placing Concrete from a Delivery Barge

Tremie Placement with Suspended Pipes

Underwater Concrete Construction Technologies Concrete Mix Proportions Workability and Rheology Strength Development Underwater Concrete Construction Concrete Placement Planning Concrete Production/Transportatio Mass Tremie Concrete Properties Thermal Behavior Form Pressure Concrete Placement Procedures Finish and Protection Inspection and Quality Control Laitance, Bleeding, Segregation

erformance Requirements for Underwate Concrete in Structural Applications Flowability and Self-Compaction Workability Retention within Work Window Cohesion Against Washout, Segregation, and Laitance Formation Low Bleeding Low Heat of Hydration Controlled Set Time Compressive Strength Adequate Bond

Washout Test and Slump Test

Slump vs. Slump Flow

Mock-up Tremie Concrete Test

Mock-up Tremie Concrete Test

Principal Parameters in Mix Design Particle Packing Characteristics - Sand Content, Gradation, Size, and Shape The water-to-fine ratio - Enough Fine to Make It Flowable and Cohesive (0.85-1.0 by volume) Cementittious Material Content High Volume Fly Ash plus Silica Fume Dispersion characteristics - Proper Use of Chemical Admixtures HRWR and Set-retarder

Tremie Concrete Placement Planning An Overview llowable Work Window llowable Flow Distance acement Area Configuration Concrete Production & Delivery: Method & Rate Concrete Placement Sequence Tremie Placement Rate & Procedure Form Pressure ISK FACTORS rodcution & Delivery ogistics oss of Flowability ashout - Laitance egregation, Bleeding rapping of Water xcessive Disturbance rosion Tremie Pipe Layout Form Design Slope, Vent, Laitance Collector Quality control plan: Testing, sounding, inspection Concrete Protection Concrete Flow Pattern Quality of In-Situ Concrete Strength Uniformity Bond

Initiation of Tremie Placement Initiation of Placement using the Dry Pipe Method with a End Plate as the Seal

c * h + Ww * D + F W c R Hydrostatic Balance Point H = (W c h+w w D+F R ) / W c

Flow Patterns of Tremie Copncrete Layered Flow - Excessive Laitance Bulging Flow - Minimum Laitance

Tremie Pipe Spacing 3-5 Times Depth of Tremie Pours

Placement Sequence Simultaneous Placement Method Advanced Slope Method

Removal of Laitance Underwater

Lower Monumental Dam

Hydraulic Flow Pattern in Stilling Basin

Pomona Dam Stilling Basin Hydraulic Model Study

18 months after repair Kinzua Stilling Basin

Erosion Damage

Erosion Damage Repair

Erosion Repair within a Cofferdam

Undrewater Repair of a Dam

Tremie Concrete over Rock Anchor

Coarse Aggregates pecific Gravity: 2.85 bsorption: 1.1% aximum Nominal ize: 3/4-inch ppearance: Clean nd round-shaped ith smooth surface xture

Fine Aggregates Specific Gravity: 2.72 Fineness Modulus: 2.9 Absorption: 3.0% Natural River Sand

Gradations of Aggregates Volume Ratio of Fine Aggregates to Total Aggregates: 47% Volume Ratio of Coarse Aggregates to Total Solids: 42% Percentage Passing 100 90 80 70 60 50 40 30 20 10 Sand Grading Curve Combined Sand and Gravel Gravel 0 #200 #100 #50 #30 #16 #8 #4 3/8" 1/2" 3/4" 1" 1-1/2" Sieve Number

igh Volume Fly Ash Concrete for Underwater Repa Reducting the heat of hydration in mass concrete Increasing concrete flowability without compromising cohesion Facilitating concrete flowability retention and extended set time

Mix Proportions Mix No. 1 Mix No. 2 Mix No. 3 (52% F.A) (25% F.A) (control) ement Type II, lb./cy 390 580 740 ly Ash, lb./cy 350 160 0 icro Silica, lb./cy 40 40 40 oarse Agg, lb./cy 1.625 1,659 1,688 ine Agg, lb./cy 1,367 1,396 1,420 ater, lb./cy 301.8 302.5 303.3 heomac UW, oz/cwt 85.8 85.8 85.8 elvo, oz/cwt 117 117 117 lenium, oz/cy 102.6 156 189

Compressive Strength Development 12000.0 Averag e Comp ressive Streng th (p si) 10000.0 8000.0 6000.0 4000.0 2000.0 Mix 3 Mix 2 Mix 1 0.0 0 10 20 30 40 50 60 70 80 90 Age (days)

itial Concrete Slump 10 to 10-3/4 itial Slump Flow 21 to 26 inimum Requirement r Achieving 1:10 lope on Top Surface f the Concrete Pours 10 Slump and 20 lump Flow Workability Test

Workability Retention Test lump after 60 minutes 10 to 10-3/4 lump flow after 60 min. 21 to 26 nticipated work indow for a truck of oncrete 45 minutes

Set Time Test Mix No. 1 Set Time > 12 hour Mix No. 2 and No. 3 Set Time = 7 hour Anticipated Concrete Placement Duration: 12 hours

remie Concrete Placement at the Dam Sit

Tremie Concrete Placement Sequence

Tremie Concrete Slump

Tremie Concrete Placement

Concrete Cores

Conventional Dam Construction

Cofferdam Failure

Conventional Lock Construction

Cofferdam Overtopping

Cleanup After the Flood

Braddock Dam

Braddock Dam - Illustration Towing and Positioning In Dam.ppt

Braddock Grouting -In Dam.ppt

Braddock Dam Stage 5 Concrete Infill -In Dam.ppt

27.5 River Miles from Fabrication Site to Outfitting Pier Leetsdale (Fabrication Site) 3 Miles N Ohio River Emsworth L/D ashields L/D Mile 13.3 Pittsburgh Mile 14.7 Mile 6.2 Allegheny River Braddock L/D Mile 0.0 Duquesne RIDC (Outfitting Pier) Mile 11.2 Monongahela River Mile 12.8

In-the-Wet Foundation Preparation

Underwater Foundations PILE DRIVING BARGE FLOW SCREED BARGE Concurrent Operations: Dredge/Backfill Place Base Stone Screed Stone Install Piers

Fabrication Site Launch Basin Segment 1 Segment 2

Braddock Dam

Top Slab Fabrication

Segment 1 in Launch Basin

Transport of Dam Segment 1

Towing and Setting a Float-in Dam

Braddock Dam

Savings: 1 Year 5 Million Braddock Dam

Construction Complete

Florida Keys

Coral Reef in Florida Keys

One of the Ground Sites

Damaged Coral Reef

Repair Design

Precast Repair Module

Repair of Corral Reef in Florida Keys

Setting a Precast Module

Floating Batch Plants

Adding Nitrogen Cooling Agent

Repair of Coral Reef in Florida Keys Pumping Concrete Underwater

Placing Underwater Concrete

lacing Concrete in Large Holes of Corral

Finishing Underwater Concrete

Project Location

Coachella Canal Engineering Data Construction period 1938-1948 Length 123 mi Diversion capacity 2,500 cfs Typical section, earth lined: Bottom width 40-60 ft Side slopes 2:1 Water depth 10.3 ft Lining, clay-blanket 12 in Typical section, concrete lined: Bottom width 12 ft Side slopes 1.5 :1 Water depth 10.8 ft Lining thickness 3.5 in

Salton Sea/Coachella Canal One of numerous geothermal plants on the eastern side of the Salton Sea. Bombay Beach at Salton Sea. The Coachella Canal. Coachella Canal Bathers.

Installation of Liner and Concrete Overlay Kiewit received a $5.2 Million Contract to Install 1.5 miles test section at Coachella Canal. Paving half of a section at a time Average Speed: 4-ft per minute

Canal Lining Design

Liner: 30 mil thick PVC geomembrane backed with a nonwoven geotextile Nonwoven fabric prevent slippage of concrete during placement and strengthen the liner Vibrator on slip form to consolidate and maintain concrete flow Trial Testing

Completion of the Lining Construction