Ferry County Out Building Application

Similar documents
BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Commercial Construction Permit Application

City of Douglas Commercial Building Permit Site Application

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

City of Morro Bay Building Division 955 Shasta Ave., Morro Bay, CA ,

SUMMIT TOWNSHIP SIGN PERMIT PROCESS

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

City of Beacon Building Department

Bureau Veritas Contact Information

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

Town of Surf City Community Development. General Permit Information

APPLICATION FOR A FILL, EXCAVATION AND SITE GRADING PERMIT

TOWN OF OHIO BUILDING PERMIT APPLICATION

TENT AND STAGE CUSTOMER ASSISTANCE GUIDE

Warwick Township. Office of Code Compliance. Residential Building Permit Application. Plan Submittal Guide Our Goal is a Safe Environment

PERMIT APPLICATION REQUIREMENTS FOR RESIDENTIAL ROOF MOUNTED PHOTOVOLTAIC SYSTEMS

Depending on the nature of your project, below is a checklist of what this office requires. Make sure you include your .

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

NEW OR ADDITIONS TO GARAGE/SHOP/STORAGE PERMIT REQUIREMENTS

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Single Family Residential Basement Finish

17 East Main Street Cuba,NewYork Code Enforcement

STATE OF FLORIDA DEPARTMENT OF HEALTH APPLICATION FOR CONSTRUCTION PERMIT Permit Application Number

Quarryville Borough. 300 Saint Catherine Street Quarryville, PA Application for a Building/Zoning Permit

Zoning Department DECK PERMITS. Checklist

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

OKANOGAN COUNTY OFFICE OF PLANNING AND DEVELOPMENT FLOODPLAIN DEVELOPMENT PERMIT APPLICATION

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

Things N~eded to Obtain a Building Permit

BUSINESS USE PERMIT APPLICATION

Placement of Manufactured Homes on Private Property

NEW CONSTRUCTION FINANCING PROGRAM

THE TOWN OF COLONIAL BEACH, VIRGINIA DEPARTMENT OF PLANNING AND COMMUNITY DEVELOPMENT

Requirement checklist to obtain a building permit for a: NEW SINGLE FAMILY DWELLING RESIDENTIAL ADDITION

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

Manufactured Home Application Packet

Time/Date Stamp when received:

BEFORE YOU BUILD GUIDE

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

An Applicant s Guide to Residential Building Permits

Check Off (Below) Information That Is Submitted With Permit

Lincoln County Floodplain Development Permit Application

9. Does the County of San Diego keep home plans on file for existing homes?

dpd Seattle Permits CAM Establishing an Accessory Dwelling Unit (ADU) What is an ADU?

Requirement checklist to obtain a building permit for a: RESIDENTIAL RE-ROOF

COMMERCIAL, BUSINESS INFORMATIONAL. PACKET

Site Development Information Worksheet for single family residential development

SOLAR ENERGY PERMIT. 1. Two (2) page Building Permit Application (signed and notarized); 2. Disclosure Affidavit (signed and notarized);

Elevation Certificate Completion Guide

Section 801 Driveway Access Onto Public Right-of-Ways

COMP PLAN SUBMITTAL CHECKLIST

Kirkland Zoning Code

Cellular Antenna Proposal Form

ORANGE COUNTY EROSION CONTROL BOND PACKET

EASTTOWN TOWNSHIP CHESTER COUNTY, PENNSYLVANIA APPLICATION FOR ZONING PERMIT

Residential Building Permit & Plan Review Application. Yes, I would like to contribute $75.00 to the Rio Rancho Economic Development Corporation.

PERMIT GUIDE Residential Additions

City of Miramar Building Division

RESIDENTIAL WINDOW REPLACEMENT

Kent County Levy Court Assessment Division 555 Bay Road, Dover, DE / Fax: Office Hours: 8:00am-5:00pm Monday-Friday

REQUEST FOR ELECTRIC SERVICE Commercial

Retail Marijuana Establishment License Application

FEES BUILDING DEPARTMENT

County of San Diego, Planning & Development Services SECOND DWELLING UNIT

Charter Township of Shelby Harry Reese Building Director

PROPERTY LINE ADJUSTMENT APPLICATION

TOWN OF RAYNHAM APPLICATION FOR COMMERCIAL BUILDING PERMIT

Shed Application Package

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

Answers to Commonly Asked Questions

HOMEOWNERS/DWELLING FIRE DISCOVERY QUESTIONNAIRE

PERMIT APPLICATION. PLEASE PRINT LEGIBLY INCLUDE STREET NUMBER/NAME, CITY & STATE 1 Job Name:

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

PRE APPLICATION CONFERENCE - INTRODUCTION

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

REQUESTS FOR ANY INSPECTION MUST BE 24 HOURS IN ADVANCE.

Frequently Asked Questions

Single Family Residential Building Permit Questions & Answers

QUEEN ANNE'S COUNTY BUILDING CODE TECHNICAL ASSISTANCE BULLETIN

CHAPTER 67.2 RESIDENTIAL BUILDING CODE

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

VILLAGE OF PLEASANT PRAIRIE COMMERCIAL COMMUNICATION PERMIT

ORDINANCE NO

Planning & Development Department MANUFACTURED HOME / MOBILE HOME / MOVE ON RESIDENCE SUBMITTAL FORMS INDEX

ORDINANCE NO AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

APPLICATION FOR CONDITIONAL USE PERMIT PROPOSED USES WITHIN EXISTING BUILDING

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Rental Rehabilitation Loan Program

Residential Turf Removal Program Application Package

Teller County, Colorado Floodplain Development Permit Application

Electronic Signature and Fee Payment Confirmation

Fill out all sections or mark with N/A (not applicable)

Transcription:

Ferry County Out Building Application 1. Will the building be larger than 1000 square feet? Yes No 2. Will the building have eave projections greater than 2 feet? Yes No 3. Will the building be greater than one story in height? Yes No 4. Will the building be closer than 20 feet to a property line or other building? Yes No 5. Will the building be closer than the height of the building plus 5 feet, to a property line or other building? Yes No 6. Is there drainage plumbing in the building? Yes No 7. Is there hot water supply plumbing in the building? Yes No 8. Will the building be a place of human habitation? Yes No 9. Will the building be a place of employment? Yes No 10. Will the building be used by the public? Yes No 11. Is there a residential structure on the property or on contiguous property? Yes No If you answered no to the first ten questions, and yes to the last question, you have the option of either obtaining a Building Permit, or a Partial Exemption Building Permit. (If you answered yes to any of the first ten questions, or no to the last question, you must obtain a Building Permit, rather than a Partial Exemption Building Permit. If you are adding to an existing building, you do not qualify for a partial exemption.) In order to obtain a Building permit, you must submit construction plans. A plan review will be performed, inspections will be made, and the fee will be calculated based on the square footage of the structure. If you elect to obtain a Partial Exemption Permit, no plan review or inspections will be made. The only plan required to obtain a Partial Exemption Permit is an accurate plot plan. The plot plan must show the location of the proposed building in relation to other structures and property lines. The fee for a Partial Exemption Permit is $35.00. We also offer an optional Plan Review service. (Inspections will not be made, but you can verify that the materials you decide to use will meet code.) The fee for the plan review is $30.00. Partial Exemptions are subject to all Planning Land Use Regulations. If it becomes necessary to make a site visit, a $30.00 site visit fee will be charged. All fees can be made payable to the Ferry County Planning Department. Please circle a choice below: Partial Exemption Building Permit (Flat fee of $35.00) See above 11 questions. (Fee determined based on sq. footage, and no additional fees are collected. Plan review and shoreline staking are included in the permit fee.)

OUT BUILDING FERRY COUNTY BUILDING PERMIT CHECKLIST 1. Is there any water: river, creek, lake, pond, or wetland (circle all that apply), on or near your property? If yes, what is the distance between the building site and the water? 2. Are you planning to move over 500 cubic yards (50 dump truck loads) during building? (circle one) Yes -- No 3. Are you planning to move over 250 cubic yards (25 dump truck loads) during building? (circle one) Yes -- No 4. What is the size of your property? 5. Will proposed building have plumbing? (circle one) Yes -- No 6. Will you be building yourself or hiring a contractor? (circle one) A COPY OF THE CONTRACTOR S CURRENT LICENSE MUST BE PROVIDED TO THE PLANNING DEPARTMENT BEFORE A BUILDING PERMIT WILL BE ISSUED. 7. Have you applied for a road approach permit? (circle one) Yes -- No -- N/A 8. What is your physical address? If you do not have a physical address, please apply for one at the 911 Office in the Sheriff s Department. 10. Do you have any easements or right-of-ways on your property? (circle one) Yes -- No It is the landowner s responsibility not to encroach on any easements or right-of-ways. 11. Is the property within the jurisdiction of other agencies or a Home Owner s Association? (circle one) Yes -- No If yes, it is the responsibility of the applicant to acquire said permit(s), and to comply with all applicable rules, regulations, ordinances, and/or restrictive covenants of those jurisdictions. NAME: PHONE: 2

A permit will NOT be issued until all questions are answered And requirements are met. An accurate plot plan must be submitted before a permit can be issued. Property Owner Mailing Address City State, Zip Phone Tax Parcel # Contractor Contractor Street Address Contractor City, State, Zip License # Contractor Phone Describe fully the intended use of the structure: Ferry County PLANNING DEPARTMENT Post Office Box 305 Republic, WA 99166 Phone: (509) 775-5225 Ext 3101 FAX: (509) 775-5240 Proposed Start Date Septic Permit # Permit becomes VOID if construction has not started within 12 months of issuance OR if work is suspended for more than 180 days, unless a written request for an extension is received. I certify that I have read and understand this application and know the same to be true and correct. All provisions or laws and ordinances governing this type of work will be complied with whether specified herein or not. Owner Signature OUTBUILDING BUILDING PERMIT APPLICATION Directions to job site and physical address: Shoreline Permits may be required for projects when located 200 feet landward of a protected shoreline. Structures located in the 100-year flood plain are subject to the Flood Damage Prevention Ordinance and must have a flood area compliance endorsement. Issuance of a building permit does not exempt these or any other ordinances when applicable. OFFICE USE ONLY Dimensions Sq. Feet Cost per Valuation Garage x = x = Carport x = x = Deck x = x = Foundation--Linear Feet x = Slab x = x = Out- x = x = building Other x = x = Total Square Footage = Total Value = $ Permit Fee = $ State Building Code Fee = $ Date & Received by Total Fee = $ Permit # Date Issued Agent s Signature Valuation 3

THIS PAGE WAS LEFT BLANK INTENTIONALLY