SUPPLIER QUALITY SYSTEM AUDIT



Similar documents
Company Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature

ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL

Surgi Manufacturing Quality Manual

The President of Inductors Inc. is the senior executive responsible for operations.

Control No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.

ISO 9001:2008 Audit Checklist

UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013

QUALITY MANUAL ISO Quality Management System

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

QUALITY MANAGEMENT SYSTEM Corporate

ONTIC UK SUPPLIER QUALITY SURVEY

DEC STD ISO Quality Systems - Model for Quality Assurance in Production and Installation

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 Gap Analysis Checklist

CENTRIS CONSULTING. Quality Control Manual

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

ISO 9001 Quality Systems Manual

UNCONTROLLED COPY FOR REFERENCE ONLY

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

ISO 9001:2008 QUALITY MANUAL. Revision B

FINE LOGISTICS. Quality Manual. Document No.: Revision: A

Quality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011

Micro Plastics, Inc. Quality Manual

Quality Management System General

MEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL

CORPORATE QUALITY MANUAL

Row Manufacturing Inc. Quality Manual ISO 9001:2008

STEEL fabrication quality SySTEmS guideline

Quality Management Systems Manual

This Business Management System Manual is based on ISO 9001:2008 requirements

ED FAGAN INC. QUALITY SYSTEM MANUAL

Technical Manufacturing Corporation (TMC) Quality Manual

SUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE

ISO-9001:2000 Quality Management Systems

QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents

Rockwell Automation Quality Management System

Quality Manual. DuraTech Industries, Inc Commerce Street La Crosse, WI MANUAL SERIAL NUMBER 1

ISO/IEC QUALITY MANUAL

Revision Date Author Description of change Jun13 Mark Benton Removed Admin. Manager from approval

NORTH AMERICA OPERATIONS. (Fairmont and Montreal Facilities) QUALITY MANUAL. Prepared to comply with the requirements of ISO 9001:2008

Eagle Machining, Inc. Quality Management System

Supplier Quality Management System Audit Checklist (ISO 9000:2000, TS 16949:2002)

QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA FAX

Qualified Contractor Management System

Quality Management Plan Procedure

Camar Aircraft Products Co. QUALITY MANUAL Revision D

Quality Management System Manual

AVNET Logistics & EM Americas. Quality Manual

QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST

The Prophotonix (UK) Ltd Quality manual

When printed the document is for reference only and is considered uncontrolled - refer to the Document Control System for the most current version

Quality Assurance System Manual

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

SUPPLIER Form #: 007 AUDIT QUESTIONNAIRE

0. 0 TABLE OF CONTENTS

DNV GL Assessment Checklist ISO 9001:2015

Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria

Contents. Management Policy Manual SEM USA Page 2 of 12

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

QUALITY MANUAL REVISION RECORD

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

QUALITY MANAGEMENT SYSTEM REVIEW AND APPROVAL TEMPLATE (DOE G A, Appendix A, )

Rev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368

AS 9100 Rev C Quality Management System Manual. B&A Engineering Systems, Inc Business Park Drive, Suite A-1 Costa Mesa, CA 92626

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

QUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O

Quality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702

Quality Management System Manual

Supplier Quality Assurance Requirements Manual

Quality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page

Uncontrolled Document

Contents of the ISO 9001:2008 Quality System Checklist

Supplier Quality Assurance Requirements Manual

Cartel Electronics. AS 9100 Quality Systems Manual

Page 1 of 7 Effective Date: 12/18/03 Software Supplier Process Requirements

Tronair Quality Manual

The following paragraphs, identified to coincide with the OHSAS 18001:2007 numbering system, provide a clause-by-clause summary of the standard.

Quality Management System Manual QM-QUA-001

ISO 9001:2008 Quality Manual Clause 3.7.4

OH&S Management Systems Audit Checklist (NAT, E3)

Quality System Manual

ABTREX INDUSTRIES, INC. QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM (QMS) MANUAL

QUALITY POLICY MANUAL Document: Revision: E Effective Date: January 15, 2010

Comparison ISO/TS (1999) to VDA 6.1 (1998)

ABC COMPANY INC ISO 9001:2000 QUALITY MANUAL

Turbo Resources International Quality Procedure

The purpose of this Supplier Quality Standard is to communicate the expectations and requirements of Baxter Healthcare Corporation to its suppliers.

ISO 9001:2008 Quality Management System QMS Manual

Exar Corporation Quality Manual

Quality Management System Manual

Mossfiel Electrical & Safety Management Pty Ltd

Quality Management System

Quality Systems Manual

MINIMUM AUTOMOTIVE QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR SUB-TIER SUPPLIERS

Transcription:

Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company Age: Plant Size: Number of Q.A. Employees: Yes No ANSI/ASQ Z1.4 Mil -Q-9858 Mil-I-45208 Other ISO 9001 ISO 9002 NADCAP Principle product produced: List major customers or programs: Special process performed (e.g. welding, plating..etc.): Comments: 1 2 Supplier has a Quality Manual Supplier has a document and data control procedure 3 4 Controlled documents are reviewed and approved prior to release by responsible parties Changes to documents are readily identified. Document control numbers and revision levels are identified. 5 Current revisions of applicable documents are maintained at point of use. Obsolete documents are removed. 6 Documents of external origin are controlled 7 A documented procedure for the control of records exists for identification, storage, protection, retrieval, retention,and disposition of records. QC256, Rev. F, lrj, Aug. 18, 2004 Supplier Quality System Audit 1

8 9 10 Types of Quality Records are identified per record control procedure. Records are maintained per procedure Supplier has a Quality Policy 11 Supplier's Quality Policy is understood, implemented, and maintained at all levels of the organization. 12 Supplier has a documented, controlled, current organizational chart (attach copy) 13 Responsibilities and authority of supplier personnel whose work affect quality is defined and documented (HOW?) 14 All personnel have the freedom to identify and record any problems affecting quality and initiate actions to correct problems and prevent recurrences 15 Supplier has provided sufficient resources including personnel and equipment for performance of work and quality system activities. 16 A member of management has been designated to establish, implement, maintain, and report on the quality system. 17 Supplier conducts management reviews of the Quality System at predefined inervals, and such reviews are documented. 18 A contract review procedure exists 19 Purchase orders, contracts, etc. are reviewed by the supplier prior to acceptance, and records of the reviews and related actions are maintained. 20 Supplier ensures he has the proper equipment / measuring instruments of sufficient accuracy (4:1) to verify all variable and attribute requirements prior to acceptance of PO, contract, etc. 21 A formal design and development control procedure exists if applicable and addresses design and development planning, inputs, outputs, review, verification, validation, & change. 22 Records of design & development are maintained. QC256, Rev. F, lrj, Aug. 18, 2004 Supplier Quality System Audit 2

24 25 26 An approved supplier list exists for purchased product. A documented procedure exists for evaluation of outside suppliers, criteria for addition to AVL, continued monitoring, and removal from AVL. Records of supplier qualification and maintenance monitoring activities are available. The supplier ensures the adequacy of purchase orders prior to placement with respect to quality requirements, technical specifications, etc. 27 28 29 30 Adequate process controls are in place to ensure conformance to product specifications. A preventative maintenance program is in effect including records of preventative maintenance activities. Work instructions are documented and available for personnel perfoming the operation. New production processes are evaluated and controlled. There is a documented procedure describing the process controls employed. 31 Process capability and process potential studies are utilized in a qualifying process. 32 33 34 35 Identification product is maintained throughout each operation. Steps completed and acceptance status of product in process is evident. Supplier uses routers, job tickets, shop travelers, computer tracking, etc. to issue production jobs and track their progress. (ATTACH, DESCRIBE FLOWCHART OF TYPICAL PROCESS FROM CONTRACT REVIEW TO ORDER FULFILLMENT) A comprehensive calibration program exists for the control of inspection, measurement, and test equipment and standards including documented procedure. Suitable standards exist for calibration activities. Calibration intervals are defined. Calibration labels are used to identify calibration status. QC256, Rev. F, lrj, Aug. 18, 2004 Supplier Quality System Audit 3

36 Supplier schedules and conducts internal audits of the quality system. A documented procedure exists for scheduling, conducting audits, reporting results, corrective actions, OFI, and auditor qualification requirements. 37 38 First Piece Inspections, First Article Inspections, or similar inspections are conducted as required. The supplier has established inspection points in the process to monitor and measure the characteristics of the product to verify compliance to specifications. 39 40 41 42 43 Statistical Process Control (SPC) is employed in monitoring process and product characteristics. Records of inspections and tests including results are maintained on file. A fomal documented non-conforming material procedure exists, including nonconforming material rewiew. A formal documented procedure exists for Material Review of non-conforming product including the Review Board Members and Chairperson, and requirement for notification to customer for their approval of "Repair" and/or "Use as is" determination. Non-conforming material is properly labeled, segregated, and stored to prevent inadvertent usage (DESCRIBE METHOD). 44 Repaired or reworked material is reinspected and the rework and re-inspection is documented. 45 Provision for customer notification when delivered product with suspected quality nonconformity exists. QC256, Rev. F, lrj, Aug. 18, 2004 Supplier Quality System Audit 4

46 The supplier has a documented Preventive Action system. 47 Product non-conformances, audit findings, customer complaints, etc. are assessed to determine if formal Corrective and/or Preventive Action is warranted. 48 Corrective Action Requests are issued to responsible individuals and investigated. Root cause as well as corrective action(s) needed to prevent recurrance of identified quality system deficiency. 49 There is a closed-loop system to ensure the effectiveness of Corrective Actions taken. 50 Corrective and Preventive Action records are maintained on file. Additional Information: Auditor Name (print): Auditor Signature: Supplier Representative during Audit: Signature of H/S Q.M. after review: Date: QC256, Rev. F, lrj, Aug. 18, 2004 Supplier Quality System Audit 5