1 FCIA Education Program Quality Module UL Qualified Contractor Firm Candidates Management System & Audit Preparation Education FCIA July 8, 2007; November 2007; March 2008
2 FCIA Management System Education & Suggested Approaches Bill McHugh, FCIA UL Support Betsy Titus, UL Business Development Manager Gary Knef, UL Field Services Mgr.
3 Management System Education 10 Sections in Checklist end of Each Section
4 UL Qualified Contractor Introduction 1. Scope 2. Definitions 3. Applicable Documents 4. QFC Quality Management Components 5. Expectations DRI, Management System 6. Inspection / Audit - Methodology Helpful Tips 7. Checklist Questions (9.2.xx Requirements) 8. Conclusion 9. How to Create Value - Contractors
5 Construction Industry Quality Issues
6 Introduction Quality Management Construction Quality ENR CSI CURT W. Edwards Deming ISO 9000 for Construction
7 FCIA Firestopping Industry Initiatives - DIIM Designed culus/opl/whi/fm Tested and Listed Systems Installed FCIA Member FM 4991 / UL Qualified Contractors Inspected ASTM E 2174 & ASTM E 2393 Inspection Maintained FCIA Member, FM / UL Contractor = Effective Firestopping for Compartmentation
8 Firestopping Industry Installation Methods All Trades He/She who pokes hole, fills hole Multiple Contracts Specialty Firestop Contractors, Subs, GC/O Single Source Specialty Firestopping Contractor Qualifications??
9 Design, manufacture, marketing, service, testing all go on forever in a cycle.. W. Edwards Deming, Quality Expert & Author Contractor Qualification & Independent Inspection The Firestopping Quality Process
10 Why UL Qualified Contractors? Quality Control Process Quantifiable Qualification Firestop Systems Planning Reduces field conflicts Reduced Installed Costs Penetrations; Joints, Edge of Slab Conditions Reduces 3 rd Party Inspection Contractor Audit Cost Minimal
11 The Quality Management System - ISO 9000/2000 Reflects Firm operations Customer / A-E Specification Requirements» AHJ / Regulatory Requirements Documented Systems Demonstrated Knowledge Systems Selection & Installation UL QFC Program & Checklist
12 The Quality Management System Based on ISO 9000/2000 Reflects Firm operations Common Sense Documentation Procedures Policies
13 The Quality Management System Why? MS Document Amount reflects your Organization Structure & Operations Company Philosophy
14 Effective Management System Benefits Non Conformances & Corrective Action Improves Operations Errors reduced Systematic Process Management Fire & Life Safety - Systems, not Stuff Firestopping, Done Right
15 UL Qualified Contractor Program Parts DRI Designated Responsible Individual Quality Management System Audit NOTE: UL QFC Program is NOT: Project Site Inspection Project Site Approval
16 UL Qualified Contractor Quality Management System Audit of Processes Properly Defined Adequately Documented - Written Effectively Implemented - Repeatability
17 1. Scope UL QFC Program Scope Management System UL Listed Systems UL Engineering Judgments Contractor Quality Manual Documented Procedures (3 req d) Records
18 2. Definitions - Sample AHJ Authority Having Jurisdiction Certificate Awarded UL QFC Firm 1 CEU = 10 Hours participation Contingency Plan DRI Corrective Action Non-Conformance Resolution Designated Responsible Individual (DRI) Contractor Designated, Meets UL requirements
19 2. Definitions - Sample MANAGEMENT SYSTEM (MS) Management systems to direct and control an organization with regard to quality MS Manual Includes Organizational structure Responsibilities Procedures Processes Resources
20 2. Definitions - Sample Nonconformity A nonconformance may be either: (A) a non-fulfillment of specified requirements: =As defined in - A contract - Reference Standard - Company MS Manual - Procedures - Work Instructions - UL Program requirements = Includes any issue identified & documented by the UL Auditor during the audit process = Reflects deviation from Program Requirements. (B) a condition adverse to quality.
21 2. Definitions Sample Nonconformities 2 categories: 1-Minor: A nonconformance that judgment and experience indicates is not likely to: result in the failure of the MS, or reduce its ability to assure controlled processes, or result in the probable installation of nonconforming firestop systems.
22 2. Definitions Sample Nonconformities: 2-Major The absence or total breakdown of a Quality Assurance Program element required to meet firestop design requirements. A number of minor nonconformities against one requirement combined can represent a total breakdown of the system and be considered a major nonconformance.
23 2. Definitions Sample Nonconformities: 2-Major These include any - nonconformance that would result in the probable installation of nonconforming Firestop Systems. - nonconformance that presents a potential safety risk - nonconformance that judgment and experience indicate: - Result in MS Program failure - Reduce controlled processes and products.
24 3. Applicable Documents UL QFC Program Requirements UL QFC Management System Checklist FCIA Manual of Practice
25 4. UL Qualified Firestop Contractor Program Tools UL Checklist Purpose Tool for MS Development Auditor Questions Self Audits Program Requirement Governing Document DRI - Designated Responsible Individual FCIA Manual of Practice
26 5.0 UL QFC Management System Manual Firm s Management Procedures Descriptions Interaction Comply with SHALL s
27 5.0 UL QFC Management System Manual SHALL = Must SHOULD = Recommended Approach
28 5.0 UL QFC Management System Manual Comply with SHALL s 2 points Management System Manual Address the 10 Elements Reflect YOUR structure & operation Comply with UL QFC Program Requirements SIMPLE, POINTED, EFFICIENT 3 Documented Procedures: Control of Non Conformances Corrective / Preventive Action Documentation & Recordkeeping
29 5.2 Documented Procedures & Records Demonstrated Knowledge & Responsibility Management System implemented and effective Compliance to UL QFC Requirements Records Completed per firm procedures or process Provides evidence of QMS implementation & compliance
30 5.1 UL QFC Management System Manual Demonstrated Knowledge DRI Designated Responsible Individual DRI Exam FCIA MOP / SIG-SAFT UL Directories System Selection
31 5.2 UL QFC MS Manual Ten Elements A. Construction Documents Requirements and Review B. Procurement of Materials C. Storage, Handling, Packaging, Preservation and Delivery D. Installation, Application and Field Quality Assurance Procedures E. Inspection, Testing and Calibration F. Control of Nonconforming Product G. Training and Qualification of Staff H. Corrective/Preventive Action I. Management System Monitoring and Improvement J. Documentation and Record Keeping
32 6.0 Inspection (Audit) Method, Outline Contractor Firm Tour Overview Inspection Instructions Questions Records Review Field Assessment Summary
33 7.0 Checklist Questions 7.1 Management System Manual MS Manual Documented? Scope of MS Manual Exclusions from UL Firestop Program Other Firm Operations NOT AUDITED Pipe Covering Insulation Attic Insulation Sealant & Waterproofing
34 8.1 Pre-Initial Audit Readiness Review Contractor Submits Quality Manual Are you ready? UL Auditor Tool Initial Interview with Contractor OPEN PAGE 6 Checklist
35 8.1 Pre-Initial Audit Readiness Review 1. Current UL QFC DRI 2. One Project that Complies w/requirements 3. Procedures Non Conforming, Corrective Action, Recordkeeping 4. Sufficient records of MS Activities 5. Demonstrated procedure for corrective actions 6. Performed one mock review
36 Policies 10 Elements - Management System Procedures 3 Procedures REQUIRED Corrective Action, Documented MS, Non Conformance Roles, Responsibilities, Process Steps Documented Undocumented Repeatable, Understood Instructions OPTIONAL Database, purchasing management, recordkeeping for focus on process step Forms RECORDS
37 Policies 10 Elements - Management System Procedures 3 Procedures REQUIRED Written by those directly involved.
38 9.0 Checklist Details Controlled and Defined Processes Procedures - YOURS Written - Documented (3 UL Required) Undocumented - Company culture / standards Documentation Document Defines Requirement Form Checklist UL Directory, Specification Record Provides evidence Completed Forms Project As Built Files
39 9.2.1 Construction Document Requirements & Review Procedures - Firm assigns qualified personnel to: Review Construction Documents Understand Scope of Work Project Review Select UL Firestop Systems Office / Field Communication to field & back Identify, resolve and record differences Communicate resolutions in field to project files Focus on As Builts RECORDS
40 9.2.1 Construction Document Requirements & Review Contract Review ABF Contractor Firm Procedures Reviews construction documents for projects awarded firm. Select Firestop Systems - meet construction documents and field requirements. May allow systems selection at office, field crew. Keeps records of contracts and amendments Record systems installed in the field (not ALL construction documents...plans/specs.) Installed firestop systems, non-conforming systems
41 9.2.2 Procurement of Materials Describe Defined Purchasing Processes Evaluate Supplier Ability Selection of Suppliers Evaluation of Suppliers Re-Evaluation of Suppliers Supplier Communication Product meets requirements Material Purchase Records verifies above Documented Procedure Optional Firm Process Understanding REQUIRED
42 9.2.2 Procurement of Materials Describe Defined Purchasing Processes Purchase Order System - OPTIONAL Record of Product Purchased for Project meeting requirements REQUIRED Got what you asked for from supplier Who is responsible for verification? What is record of verification of receipt? Project Bill of Materials of materials purchased meets specified requirements
43 9.2.2 Procurement of Materials Defined Purchasing Process Material Purchase Records for each project Should include this Manufacturer Supplier Product name & type Approval Agency label Quantity Verify what shipped, was received & ordered Incoming Material Inspection Shipping Receiving ticket / match to invoice initials = proof
44 9.2.2 Procurement of Materials Purchasing Process Review of: Suppliers MFR., Distributor, etc. Frequency stated in manual How do you verify? Supplier Files PO s, Reviews
45 9.2.3 Shall establish a process for Storage, Handling, Preservation, Delivery Prevent Misuse Contamination Damage Deterioration Storage Conditions & Shelf Life Control Warehouse - Jobsite
46 9.2.3 Storage, Handling, Packaging, Preservation, Delivery Process Temperature, Weather Exposure? Labeling rely on manufacturer Storage store in temperature controlled area to meet manufacturer specs Handling handle to not damage Packaging firm uses original containers only Preservation store covered Delivery deliver to prevent damage
47 9.2.4 Installation, Application, Field QAP Define Processes Plan & Carry Out Controlled Condition proof sources Defined Process UL Systems installation Product Information Manufacturer specific Data Sheets, Guides, Work Instructions Manufacturer Data Sheets & Work Orders Suitable Equipment Guns, Spray, Measuring Manufacturer Recommendations Process & Product Measurement Thickness
48 9.2.4 Installation, Application, Field QAP Processes Plan & Carry Out Controlled Conditions Continued Installation Environment Conditions to guidelines Temperature, humidity suitable? Verify to data sheets Surface Conditions Clean, dry, as recommended by Manufacturer / FCIA Manual of Practice Protection during curing GC provides heat Patching methods conform to UL System Patching procedure
49 9.2.4 Installation, Application, Field QAP Processes Plan & Carry Out Controlled Conditions Continued Non-Conformance Controls Traceability FCIA MOP Procedures Field Testing Records
50 9.2.4 Installation, Application, Field QAP Processes Plan & Carry Out Installation Personnel Responsibilities Non-Conformances Detection Corrective Action Official Field Test Record by Contractor Ongoing Inspection Some Inspections may not be recorded Record of Official Inspection Resolution of non-conformances
51 9.2.5 Inspection, Testing & Calibration Equipment Calibration Adjustment Identified Calibration Protected from Damage Installation Conforms to Systems Selected
52 9.2.5 Inspection, Testing & Calibration Equipment Monitoring & Measuring Devices Hand Measuring Devices Tapes, Rulers Validate Fit for Use through Observation Record of validation» Contractor decides frequency Non Conformance Discovery Validate prior measurements
53 9.2.5 Inspection, Testing & Calibration Field Inspections / Tests Inspection Reports (if in place) E 2174 & E 2393 Reports provided by others Independent Inspection Contractor Firm Inspection of own work Records Inspection Record of Field Test & Repairs Corrective Actions
54 9.2.5 Inspection, Testing & Calibration Contractor Field Inspections / Tests Systems Thinking Pipe Insulation thickness, type Sleeves Type Annular space sizes Joint width
55 9.2.5 Inspection, Testing & Calibration Field Inspections / Tests Scope of Work Compare to Systems Verify.
56 Control of Non-Conforming Materials & Systems *Requires Documented Procedure that defines the controls, related responsibilities, and authorities to deal with Non Conforming.and could include CORRECTIVE ACTION Identify Cause? PAINT ORANGE, XX,? Document Evaluate Segregation if possible Disposition scrap, return to supplier? Corrective Action
57 Control of Non-Conforming Materials & Systems CORRECTIVE ACTION Suggested Procedure - describe who & what Disposition - Return to supplier (for Credit) Identify & don t mix up!! Prevent Use Communicate to suppliers Employee Training Understand Expired Material Dates Repair & Re-inspection of systems
58 9.2.6 Control of Non-Conforming Materials and Systems Records Shall be Maintained Nonconformance Nature What was wrong? Actions - What was done? Who is authorized to make disposition?
59 9.2.6 Control of Non-Conforming Materials and Systems Corrective Action, Verification Re-verification corrected system to match listing performed repair as recommended by manufacturer.
60 9.2.6 Control of Non-Conforming Materials, Installations and Systems Control after delivery - completion Suggestion.Procedure for recall AHJ & concerned party notification
61 9.2.7 Staff Training & Qualification Personnel performing Material Selection, Installation, Inspection, Testing shall be competent Maintain Training, Qualification, Effectiveness Records - ESTE DRI, key personnel - Skill & Knowledge Education Skills Training Experience
62 5.8 Staff Training & Qualification DRI on Staff Pass Test DRI CEU s Contingency Plan DRI Loss Field Personnel Installers, inspection & repair crews Competency Verification Records of Staff Education, Training, Competency Evaluations, Training Effectiveness
63 9.2.7 Staff Training & Qualification Records of Staff Education, Training Person s Individual File/record Competency Evaluations Demonstrated Proficiency DRI, other exams Evaluation by contractor firm Contractor decides if staff needs qualification Training Effectiveness Evaluation by contractor of their own program Current, effective, deliver results. Variances by project results Management review
64 9.2.8 Corrective Action Overall MS Program Non Conforming *Requires documented Procedure defining steps for: Reviewing Nonconformities (including purchased material, installations and customer complaints). Determining the causes of Nonconformities. Determining and implementing the actions needed to correct the nonconformity and prevent recurrence. Recording the results of actions taken. Reviewing the effectiveness of actions taken.
65 9.2.8 Corrective Action Nonconformance Policies Reviewing Nonconformities Complaint, what happened Determine Cause investigate Determine / Implement Action Prevent recurrence Correct nonconformance Record & maintain results
66 9.2.8 Corrective Action Records Record & maintain results Project Focused Project Manager Corrective Action File Global Identify, Cause, Implement, Effective Cumulative File Common Chronic Problems Review action effectiveness yearly, monthly, weekly Your choice However, another record
67 9.2.9 Management System Monitoring & Improvement Measures Commitment to Program DRI Audit Procedure DRI Audit of Processes Management Review Planned Intervals (Your choice)
68 9.2.9 Management System Monitoring & Improvement Review Management System Suitability Management Objectives Customer / UL Feedback Inspection Results DRI Audits Status of Corrective Actions Staff Competencies Improvement recommendations Resources Records Results of DRI Audits, Mgt. reviews?
69 Documentation and Record Keeping - Quality Manual Procedures / Work Instructions / Visual Aids Drawing, Specifications & Installation Instructions Records Review / Approval / Distribution and Revision Control
70 Documentation and Record Keeping *Requires Documented Procedure that defines the controls for: Approval of Documents? Review and updates to documents? Revision identification & control? Availability? External Document Control? Obsolete document control? Control of Records?
71 Documentation and Record Keeping *Requires Documented Procedure that defines the controls for: Approval of Documents If created or revised, must be approved by (firm designee) prior to issue. Review and updates to documents? Revision identification & control? Availability To whom? External Document Control UL Books, Manufacturer instructions, Drawings from Architects, issued by other organizations for use. Are you up to date? NOT TYPICALLY RECORDS Obsolete document control? Control of Records Project File, Life Safety Drawings
72 Documentation and Record Keeping Control of Records - General Identification? Protection? Retention? Retrieval? Disposition?
73 Documentation and Record Keeping Control of Records The system shall ensure: Identification, Storage, Protection, Retrieval, Retention, Disposition, Employee Responsibilities for the control of records should be defined. Operational Records: Job files - Construction Documents, submittal systems, Specs, as built, inspection records, purchase orders, purchase order changes, contract revisions, engineering judgements. 7 years, or as required by code, regulations
74 5.11 Documentation and Record Keeping Required Records Construction Documents Contracts and Amendments Incoming material inspection Installation inspection & test records Equipment records including calibrations Complaints & corrective actions Non-conforming material records Staff Education, training, evaluations, training effectiveness DRI audit records Management review records
75 UL Firestop Contractor QMS Audit Summary Necessary Conclusions for Auditor / Contractor : 1. Was the system found to be established, documented, implemented and maintained in accordance with the requirements specified in program requirements? 2. Was it determined that the organization identified the criteria and methods needed to ensure the effective operation and control of the processes within the system? 3. Was it determined that the organization ensured the availability of resources and information to support the operation and monitoring of the processes within the system? 4. Was it determined that the organization identified, carried out, monitored and improved the necessary controls to ensure the effectiveness of processes in achieving requirements? 5. Was it determined that the organization complies with UL requirements and has systems in place to ensure continued compliance with UL requirements?
76 UL Firestop Contractor QMS Audit Summary Necessary Conclusions: 1. Was the system found to be 1. Established 2. Documented 3. Implemented and maintained in accordance with the requirements specified in program requirements?
77 UL Firestop Contractor QMS Audit Summary Necessary Conclusions: 2 Was it determined that the organization identified the criteria and methods needed to ensure the effective operation and control of the processes within the system?
78 UL Firestop Contractor QMS Audit Summary Necessary Conclusions: 3. Was it determined that the organization ensured the availability of resources and information to support the operation and monitoring of the processes within the system?
79 UL Firestop Contractor QMS Audit Summary Necessary Conclusions: 4. Was it determined that the organization identified, carried out, monitored and improved the necessary controls to ensure the effectiveness of processes in achieving requirements?
80 UL Firestop Contractor QMS Audit Summary Necessary Conclusions: 5. Was it determined that the organization complies with UL requirements and has systems in place to ensure continued compliance with UL requirements?
81 UL Firestop Contractor QMS Audit Summary UL Audit Results 1. Qualified 2. Qualified with Minor Non Conformances to resolve in 30 days 1. Not Qualified
82 The Quality Management System Why? Makes you a better firm Separate your firm from others MS Document Reflects your Organization Structure & Operations Company Philosophy
83 Effective Management System Benefits Non Conformances & Corrective Action = Improves Operations Errors reduced Systematic Process Management Fire & Life Safety - Systems, not Stuff Firestopping, Done Right
84 FCIA Education Program Quality Module UL Qualified Contractor Firm Candidates Management System & Audit Preparation Education FCIA July 8, 2007; November, 2007; March 2008
UL Qualified Firestop Contractor Program Management System Elements. March 13, 2013
UL Qualified Firestop Contractor Program Management System Elements March 13, 2013 UL and the UL logo are trademarks of UL LLC 2013 Benefits to becoming a Qualified Firestop Contractor Independent, 3 rd
More informationUL Qualified Firestop Contractor Program Requirements April 2012
UL Qualified Firestop Contractor Program Requirements April 2012 For more information, please contact your local UL Field Representative INTRODUCTION: In order for a firestop systems installer/contractor
More informationQUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements. Documentation Requirements. General. Quality Manual. Control of Documents
Chapter j 38 Self Assessment 729 QUALITY MANAGEMENT SYSTEM REQUIREMENTS General Requirements 1. Establishing and implementing a documented quality management system 2. Implementing a documented quality
More informationISO 9001:2008 Audit Checklist
g GE Power & Water ISO 9001:2008 Audit Checklist Organization Auditor Date Page 1 Std. 4.1 General s a. Are processes identified b. Sequence & interaction of processes determined? c. Criteria for operation
More informationThis Business Management System Manual is based on ISO 9001:2008 requirements
Page 1 of 19 (Formerly: Quality Management System Manual) When the ISO 9001:2008 standard is identifying the Quality Manual or Quality Management System, Turbonetics is representing this requirement with
More informationControl No: QQM-02 Title: Quality Management Systems Manual Revision 10 07/08/2010 ISO 9001:2008 Page: 1 of 22
ISO 9001:2008 Page: 1 of 22 Central Technologies has developed a Quality Management System, and the associated procedures and work instructions, to be compliant to ISO 9001:2008. Utilizing this Quality
More informationISO 9001:2000 AUDIT CHECKLIST
ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality
More informationThe President of Inductors Inc. is the senior executive responsible for operations.
Title: Quality Management System Manual Page: 1 of 20 INTRODUCTION Inductors Inc., founded in 1991, specializes in the distribution of inductive components, including but not limited to standard and custom
More informationISO 9001:2000 Gap Analysis Checklist
ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system
More informationCompany Quality Manual Document No. QM Rev 0. 0 John Rickey Initial Release. Controlled Copy Stamp. authorized signature
Far West Technology, Inc. ISO 9001 Quality Manual Document No.: QM Revision: 0 Issue Date: 27 August 1997 Approval Signatures President/CEO Executive Vice President Vice President/CFO Change Record Rev
More informationQuality Management System Manual
Quality Management System Manual This manual has been reviewed and approved for use by: Jack Zazulak President, Aurora Machine Limited March 07, 2011 Date - Copyright Notice - This document is the exclusive
More informationQUALITY MANUAL ISO 9001. Quality Management System
Page 1 of 20 QUALITY MANUAL ISO 9001 Quality Management System Printed copies are not controlled unless marked "CONTROLLED". Upon receipt of this document, discard all previous copies. Page 2 of 20 Approval
More informationSpecialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual
Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.
More informationISO 9001 Quality Systems Manual
ISO 9001 Quality Systems Manual Revision: D Issue Date: March 10, 2004 Introduction Micro Memory Bank, Inc. developed and implemented a Quality Management System in order to document the company s best
More informationSelf-Audit Checklist
Page 1 Company Name: Date of audit: Date of last audit performed: Name of person performing self-audit: Signature: Name of person responsible for quality system: Signature: Number of non-compliances: Page
More informationContents. Management Policy Manual SEM USA Page 2 of 12
SEM USA Page 2 of 12 Contents 1. The Schneider Electric Motion USA Management Policy... 3 2. PROCESS INTERACTION... 4 3. COMPANY OBJECTIVES:... 5 4. MANAGEMENT SYSTEM... 6 4.1. General Requirements...
More informationISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR
Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:
More informationRev: Issue 4 Rev 4 Quality Manual AOP0101 Date: 10/07/13. Quality Manual. CBT Technology, Inc. 358 North Street Randolph, MA 02368
Quality Manual CBT Technology, Inc. 358 North Street Randolph, MA 02368 Issue 4 Revision 4 Note: updates are in italics Page 1 of 18 1.0 Scope and Exclusions Scope This Quality Manual contains policies
More informationQUALITY MANAGEMENT SYSTEM Corporate
Page 1 of 12 4 Quality Management System 4.1 General Requirements The Peerless Pump Quality Management System shall include: Documented statements of a quality policy and of quality objectives; A quality
More informationDNV GL Assessment Checklist ISO 9001:2015
DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization
More informationSUPPLIER QUALITY SYSTEM AUDIT
Company Name: Date: Company Address: Quality Assurance Mgr: President: Number of employees: Is your company receptive to source inspection? List all standards the quality system is based on Web Page: Company
More informationInternal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization
Internal Quality Management System Audit Checklist (ISO9001:2015) Q# ISO 9001:2015 Clause Audit Question Audit Evidence 4 Context of the Organization 4.1 Understanding the organization and its context
More informationQUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC.
QUALITY ASSURANCE MANUAL JPM OF MISSISSIPPI, INC. Hattiesburg, MS Revision E 01/19/11 Revised to ISO 9001:2008 on July 9, 2009 JPM OF MISSISSIPPI, INC. MANAGEMENT QUALITY POLICY It is the goal of JPM of
More informationQuality Manual Printed copy valid for 24 hours from time of printing unless stamped CONTROLLED COPY in red. Page
Quality Manual Page 1 of 20 Change Log Document Revision Date Description of Change 15/04/09 Initial Release Page 2 of 20 1.0 Scope and Exclusions Scope This Quality Manual contains policies that have
More informationSurgi Manufacturing Quality Manual
Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6
More informationQuality Agreement Template
Quality Agreement Template Prepared by Dan O Leary Ombu Enterprises, LLC 3 Forest Ave. Swanzey, NH 03446 603-209-0600 This document is intended to form the basis for a Supplier Agreement. The document
More informationISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION
INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page
More informationRevision Date Author Description of change. 10 07Jun13 Mark Benton Removed Admin. Manager from approval
Page 2 of 15 Document Revision History Revision Date Author Description of change 10 07Jun13 Mark Benton Removed Admin. Manager from approval 12Feb13 Mark Benton 08 01Oct12 Mark Benton 07 8/30/2012 Refer
More informationSUPPLIER QUALITY MANAGEMENT SYSTEM QUESTIONNAIRE
Company Name Street Address City, State, Zip code Phone Number Fax Company Website Email Address ORGANIZATION NAME PHONE NUMBER EMAIL ADDRESS President/CEO General Manager Engineering Manager Production
More informationCENTRIS CONSULTING. Quality Control Manual
CENTRIS CONSULTING Quality Control Manual ISO 9001:2008 Introduction Centris Consulting developed and implemented a Quality Management System in order to document the company s best business practices,
More informationQUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST
1. QUALITY MANAGEMENT SYSTEM QUALITY MANAGEMENT SYSTEM (QMS) ASSESSMENT CHECKLIST 1.1 Quality Management System General 1.1.1 Is objective evidence available to demonstrate that the MDSAP site has defined,
More informationQUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752
QUALITY MANUAL 3 KENDRICK ROAD WAREHAM, MA 02571 508-295-9591 FAX 508-295-6752 Section 1. REVISION STATUS Revision 01 Initial Issue 02/13/95 Revision 02 ECO No.Q-0032 05/07/96 Revision 03 ECO No.97171
More informationCQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES
1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction
More informationQuality Management System
LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority
More informationCartel Electronics. AS 9100 Quality Systems Manual
Cartel Electronics AS 9100 Quality Systems Manual 1900 C Petra Lane Placentia, California 92870 Introduction Cartel Electronics, as a global supplier to the aviation, space, and space industries, has developed
More informationQuality Management System General
Audit Date: Quality Management System General Requirement: 4.1 and 4.2.2-QMS General Verify Scope Comments/Evidence/Findings: Verify the Exclusions is applicable and justified How are the processes in
More informationRockwell Automation Quality Management System
Rockwell Automation Quality Management System Our Quality Policy Rockwell Automation is committed to a global quality system focused on customer solutions. We achieve this through superior products and
More informationFINE LOGISTICS. Quality Manual. Document No.: 20008. Revision: A
FINE LOGISTICS Quality Manual Document No.: 20008 Revision: A 20008 Rev. A FINE LOGISTICS, Quality Manual Page 1 of 24 Quality Manual: Table of contents Number Section Page 1. GENERAL 3 1.1 Index and revision
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.1 Status : APPROVED Effective: 12/11/2014 Page 2 of 23 Quality Manual Table of Contents
More informationSargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054
Sargent Controls & Aerospace 5675 West Burlingame Rd. Tucson AZ 85743 PHONE: (520) 744-1000 FAX: (520) 744-8054 SUPPLIER EVALUATION CHECKLIST Date: Vendor: Address: City, State, Zip: Web Site: Prepared
More information14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988. WEB: www.texasinternational.com QUALITY MANUAL
14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic
More informationISO 9001:2008 Quality Management System Requirements (Third Revision)
ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management
More informationMEAT GRADING AND CERTIFICATION BRANCH QUALITY MANUAL
United States Department of Agriculture Marketing and Regulatory Programs Agricultural Marketing Service Livestock and Seed Program Meat Grading & Certification Branch MGC Instruction 800 May 9, 2005 Page
More informationMicro Plastics, Inc. Quality Manual
ISO 9001:2008 11 Industry Lane Flippin, Arkansas 72634 QM-001-2008-F Page 2 of 39 Introduction Micro Plastics, Inc. developed and implemented a Quality Management System in order to document the company
More informationThe Prophotonix (UK) Ltd Quality manual
The Prophotonix (UK) Ltd Quality manual Date: March 2014 Revision: D Sparrow lane, Hatfield Broad Oak, Herts, UK, CM22 7BA Tel: +44 (0)1279 717170 Fax: +44 (0)1279 717171 e-mail: info@prophotonix.com Page
More informationISO 9001:2015 Internal Audit Checklist
Page 1 of 14 Client: Date: Client ID: Auditor Audit Report Key - SAT: Satisfactory; OBS: Observation; NC: Nonconformance; N/A: Not Applicable at this time Clause Requirement Comply Auditor Notes / Evidence
More informationISO/IEC 17025 QUALITY MANUAL
1800 NW 169 th Pl, Beaverton, OR 97006 Revision F Date: 9/18/06 PAGE 1 OF 18 TABLE OF CONTENTS Quality Manual Section Applicable ISO/IEC 17025:2005 clause(s) Page Quality Policy 4.2.2 3 Introduction 4
More informationQuality Manual. DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1
Quality Manual Approval Page Document: QA1000 Issue Date: 5/29/1997 Page 1 of 17 Revision Date: 5/20/2013 DuraTech Industries, Inc. 3216 Commerce Street La Crosse, WI 54603 MANUAL SERIAL NUMBER 1 This
More informationCORPORATE QUALITY MANUAL
Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance
More informationQuality Management System Manual
Quality Management System Manual 10V Gill Street Woburn, MA USA 01801 INTRODUCTION RL CONTROLS, LLC RL Controls, LLC is a privately held company headquartered in Woburn, MA, USA. RLC has more than 80 years
More informationQuality Management System MANUAL. SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702
Quality Management System MANUAL SDIX, LLC Headquarters: 111 Pencader Drive Newark, Delaware 19702 Doc. No. G5500 Rev. 9.2 Status : APPROVED Effective: 9/25/2015 Page 2 of 23 Quality Manual Table of Contents
More informationQUALITY MANAGEMENT SYSTEM
2507 WEST GENEVA DRIVE TEMPE, ARIZONA 85282 TEL: 602.231.8616 FAX: 602.273.9135 QUALITY MANAGEMENT SYSTEM TABLE OF CONTENTS TABLE OF CONTENTS... 2 Phoenix Logistics Vision Statement... 3 1.0 SCOPE... 4
More informationISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)
ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:
More informationAVNET Logistics & EM Americas. Quality Manual
AVNET Logistics & EM Americas Quality Manual Avnet is committed to ensuring customer satisfaction while meeting all customer and applicable legal, statutory and regulatory requirements. This is accomplished
More informationONTIC UK SUPPLIER QUALITY SURVEY
MAIL-IN / ONSITE This report is intended to furnish data relative to the Suppliers capability to control the quality of supplies and services furnished to Ontic UK. Please complete this Survey and return
More informationED FAGAN INC. QUALITY SYSTEM MANUAL
ED FAGAN INC. QUALITY SYSTEM MANUAL APPROVED BY: Ed Fagan President ED FAGAN INC. January 13, 2010 TABLE OF CONTENTS 1. PURPOSE AND SCOPE 2 2. PRODUCTS, SERVICES AND CAPABILITIES 2 3. REVISION HISTORY
More informationQuality Management System Policy Manual
Quality Management System Burns Engineering, Inc. 10201 Bren Road East Minnetonka, MN 55343 4. 4.1 General Requirements The Quality Manual consists of the quality system policy documents and the quality
More informationSupplier Quality Assurance Requirements Manual
12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D
More informationISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL
8200 Brownleigh Drive Raleigh, NC 27617-7423 Phone: (919) 510-9696 Fax: (919) 510-9668 ISO 9001:2008 STANDARD OPERATING PROCEDURES MANUAL ALLIANCE OF PROFESSIONALS & CONSULTANTS, INC. - 1 - Table of Contents
More informationEagle Machining, Inc. Quality Management System
Eagle Machining, Inc. Quality Management System 1 of 10310 Antoine Drive Bldg D, Houston, Texas 77086 BUSINESS OPERATING MANUAL (QUALITY MANUAL) Revision Date: 08/01/2014 Approved By: Joseph Vu Date: 08/01/2014
More informationMEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F
MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality
More informationQuality Management System Manual
Quality Management System Manual Assurance ISO / AS Manual Quality Management System EXCEEDING ALL EXPECTATIONS Since our inception in 1965, Swiss-Tech has supplied the medical, aerospace, hydraulic, electronic
More informationCCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014
Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September
More informationQUALITY MANUAL ISO 9001:2015
Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to
More informationISO-9001:2000 Quality Management Systems
ISO-9001:2000 Quality Management Systems REQUIREMENTS 10/10/2003 ISO-9001:2000 Requirements 1 Process Based Approach C U S MANAGEMENT RESPONSIBILITY RESOURCE MANAGEMENT C U S T O M Requirements PRODUCT
More informationSupplier Quality Agreements
Supplier Quality Agreements Dan O Leary CBA, CQA, CQE, CRE, SSBB, CIRM President Ombu Enterprises, LLC Dan@OmbuEnterprises.com www.ombuenterprises.com 603-209-0600 1 Speaker Biography Dan O Leary Dan O
More informationINTEGRATED MANAGEMENT SYSTEM MANUAL IMS. Based on ISO 9001:2008 and ISO 14001:2004 Standards
INTEGRATED MANAGEMENT SYSTEM MANUAL IMS Based on ISO 9001:2008 and ISO 14001:2004 Standards Approved by Robert Melani Issue Date 30 December 2009 Issued To Management Representative Controlled Y N Copy
More information0. 0 TABLE OF CONTENTS
QUALITY MANUAL Conforming to ISO 9001:2000 0. 0 TABLE OF CONTENTS Section Description ISO 9001 Clause Page 0 TABLE OF CONTENTS n/a 2 1 PIMA VALVE, INC. DESCRIPTION n/a 3 2 QUALITY MANUAL DESCRIPTION 4.2.2
More informationQUALITY MANUAL REVISION RECORD
Page 2 of 31 REVISION RECORD Date Rev Description Jun 18, 2007 N/C Original Issue Sep 16, 2009 A Update to ISO 9001:2008 Standard. Feb 04, 2010 B Revised exclusions, removed (Except 7.3.7 from the exclusion
More informationQUALITY MANAGEMENT SYSTEM (QMS) MANUAL
QUALITY MANAGEMENT SYSTEM (QMS) MANUAL This document and the data contained herein are the property of ISOLINK, and shall not, without prior written permission, be reproduced or used for any unintended
More informationSupplier Quality Assurance
Supplier Quality Assurance Preface We strive to continually improve our process performance by meeting quality objectives. It is imperative that our suppliers operate under the zero defects and 100% on
More informationQUALITY MANUAL. IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 EFFECTIVE DATE: 11 SEPTEMBER 2015 REV O
IFS DOCUMENT CLASS: QLTY-100 IFS DOCUMENT NUMBER: QM4.2.2 PAGE 2 of 25 Introduction Value Plastics, Inc., dba Nordson MEDICAL created a Quality Management System (QMS) to document the company s best business
More informationQuality Management System Manual Revision L
This Page 1 of 35 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies
More informationAS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
More informationQuality Manual. UK Wide Security Solutions Ltd. 1 QM-001 Quality Manual Issue 1. January 1, 2011
Quality Manual 1 QM-001 Quality Manual Issue 1 January 1, 2011 This document is uncontrolled when printed. Please verify with Quality Management Representative 16 Dukes Close, West Way, Walworth Industrial
More informationChecklist. Standard for Medical Laboratory
Checklist Standard for Medical Laboratory Name of hospital..name of Laboratory..... Name. Position / Title...... DD/MM/YY.Revision... 1. Organization and Management 1. Laboratory shall have the organizational
More informationQUALITY POLICY MANUAL Document: 01-090000 Revision: E Effective Date: January 15, 2010
Section i INTRODUCTION QUALITY POLICY STATEMENT: The purpose of our business is to provide continuity of electrical power to keep businesses in business. We do this by helping clients solve their power
More informationQuality Systems Manual
Quality Systems Manual This manual was developed to support ISO 9001 elements Revision Description of Change Author Effective Date 5-28-02 Initial Release Support ISO 9001: 2000 L. Hook 5-28-02 7-01-02
More informationG & R Labs. Quality Assurance Manual. G&R Labs. 2996 Scott Boulevard Santa Clara CA 95054. Light Meters and Calibration
G & R Labs Light Meters and Calibration Quality Assurance Manual G&R Labs 2996 Scott Boulevard Santa Clara CA 95054 QM01 QUALITY MANUAL ISO9001:2008 Manual Contents QM 01 Manual Contents 2 QM 02 Copy Holder
More informationStandard Practice for Quality Control Systems for Nondestructive Testing Agencies 1
Designation: E 1212 99 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Practice for
More informationCamar Aircraft Parts Co. Procedures Manual
QUALITY ASSURANCE PROCEDURES INDEX Procedure Number Approval Procedure Title 4.2.3 R.F. Control of Documents 4.2.4 R.F. Control of Records 6.2.2 R.F. Competence, Training and Awareness 6.4 R.F. Foreign
More informationSupplier Quality Assurance Requirements Manual
1701 West Tacoma Broken Arrow, Ok. 74012 Supplier Quality Assurance Requirements Manual Approved: Bryan Sanderlin President/COO/CEO OSECO, Inc. Darrel Bilke Quality Assurance Manager OSECO, Inc. 1 Record
More informationDEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation
Digital Internal Use Only DEC STD 017-2 - ISO 9002 - Quality Systems - Model for Quality Assurance in Production and Installation DOCUMENT IDENTIFIER: A-DS-EL00017-02-0000 Rev A, ABSTRACT: This standard
More informationSchweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria 3205. www.schweppesaustralia.com.au
Schweppes Australia Head Office Level 5, 111 Cecil Street South Melbourne Victoria 3205 www.schweppesaustralia.com.au Quality Management Systems 1. Quality Management Systems develop, implement, verify
More informationUS EPA REGION III QUALITY MANAGEMENT PLAN REVIEW CHECKLIST
US EPA REGION III Organization: EPA Organization: EPA Program: Contact: EPA Contact: EPA Contract/Grant/IAG Number: Phone Number: Phone Number: Reviewer: Date Reviewed: Reviewer Organization: Check New
More informationUncontrolled Document
SOUTHWEST RESEARCH INSTITUTE QUALITY SYSTEM MANUAL July 2015 Revision 5 Quality System Manual Page iii TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 SCOPE... 1 3.0 TERMS AND DEFINITIONS... 2 4.0 QUALITY MANAGEMENT
More informationUNCONTROLLED COPY FOR REFERENCE ONLY
CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President
More informationALL PRODUCTS MFG & SUPPLY
ALL PRODUCTS MFG & SUPPLY 618 ANDERSON DRIVE ROMEOVILLE, IL 60446 PHONE: 877-255-8700 FAX: 877-255-8701 WWW. APGASKET.COM QUALITY MANAGEMENT SYSTEM MANUAL DATE: 11/20/12 REVISION 9.1 UNCONTROLLED COPY
More informationQuality management systems
L E C T U R E 9 Quality management systems LECTURE 9 - OVERVIEW Quality management system based on ISO 9000 WHAT IS QMS (QUALITY MANAGEMENT SYSTEM) Goal: Meet customer needs Quality management system includes
More informationQuality Assurance System Manual
The online version of this procedure is official. Therefore, all printed versions of this document are unofficial copies. St. Louis Public Schools Quality Assurance System Manual 801 North 11 th Street
More informationPRODUCT CERTIFICATION REQUIREMENTS
PRODUCT CERTIFICATION REQUIREMENTS SIRIM QAS International Product Certification Page 1 of 14 QUALITY SYSTEM 1. GENERAL 1.1 This document defines the responsibilities and obligations of the Licensee with
More informationFMC Technologies Measurement Solutions Inc.
Table of Contents 1 Revision History... 4 2 Company... 5 2.1 Introduction... 5 2.2 Quality Policy... 6 2.3 Quality Organization... 6 2.4 Company Processes... 7 3 Scope and Exclusions... 8 3.1 Scope...
More informationTurbo Resources International Quality Procedure
TURBO RESOURCES INTERNATIONAL QUALITY MANAGEMENT SYSTEM MANUAL APPROVALS: Revision : 46 Page : 1 of 53 TABLE OF CONTENTS INTRODUCTION 3 1. SCOPE 4 1.1 GENERAL 4 1.2 APPLICATION 5 2. NORMATIVE REFERENCE
More informationVENDOR QUALIFICATION APPROVAL FORM
COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:
More informationQuality Assurance QUALITY ASSURANCE PLAN
Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File
More informationBQ-9000 Quality Management System. Certified Marketer Requirements
BQ-9000 Quality Management System Certified Marketer Requirements Revision 3 Effective Date: February 1, 2007 This requirements document has been prepared by the National Biodiesel Accreditation Commission,
More informationISO 9001:2008 QUALITY MANUAL. Revision B
ISO 9001:2008 QUALITY MANUAL Revision B Because we want you to achieve the highest levels of performance, we connect care Because with leading we want science you to achieve continuously the highest improve,
More informationSTEEL fabrication quality SySTEmS guideline
STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written
More informationABSTRACT. The Guidelines Section F is related to the Purchasing requirements of NSQ100 (Chapter 7.4). Summary
Page 1 / 9 ABSTRACT This document is the Section F to NSQ-100 Guidelines. Its objective is to help to the understanding of NSQ-100 requirements through some examples or recommendations and descriptions
More information