Relevant. Development Name and Location. Requirement(s) under Lease



Similar documents
Smoking (Public Health) (Designation of No Smoking Areas) (Amendment) Notice 2014

Property management. Executive management s report Property review

District Address Tele No. (+852) G/F YU SUNG BOON BLDG CENTRAL DES VOEUX ROAD MELBOURNE PLAZA

SHOP NOS. S8-S12,UPPER FLOOR OF EAST FOOTBRIDGE, & SHOP NO. S30 ON SECOND FLOOR, KORNHILL PLAZA, 1-2 KORNBILL ROAD

Supported Employment Service (As at August 2014)

List of Aided Special Schools (2015/2016)

HONG KONG HOUSING AUTHORITY

The Group s attributable gross rental income in Hong Kong increased by 12% to HK$5,466 million

Company Name Address Telephone No.

Additional and Planned Places of Rehabilitation Services (From January to June 2015)

Programme on Source Separation of Commercial and Industrial Waste List of Properties and Buildings Receiving Certificate

Clearing Code and Branch Code

Stock Exchange HKSCC Prospectus Company U.S. Securities Act Stabilising Manager

Transit Oriented Development and Value Capture Hong Kong

Prospectus Company Hong Kong Stock Exchange HKSCC U.S. Securities Act Stabilizing Manager

Allied Environmental Consultants Limited Green Building Certification and Consultancy Project Job Reference

Water Supplies Department Active WSD Capital Works Contracts

Unless otherwise defined in this announcement, terms defined in the Prospectus have the same meanings when used in this announcement.

A. What to do if you have a problem with an HA hospital/hospital staff, Where to lodge a complaint

2015 Application Information and Admission Arrangement for Non-JUPAS Sub-degree and Undergraduate Programmes 1 (as at )

Legislative Council House Committee. Lead in Drinking Water Incidents

Stock Exchange HKSCC Prospectus Company U.S. Securities Act Stabilizing Manager

4) The personal data disclosed in this list should not be used for any unrelated purposes.

SiS Mobile Holdings Limited 新 龍 移 動 集 團 有 限 公 司

List of contractors/acoustic consultants having implemented successful noise abatement works in 2001

Enduring Power of Attorney and Court Order under Part II of the Mental Health Ordinance

Company Name Address Telephone No.

Central and Western District

Cataract Surgeries Programme HA List of Private Ophthalmologists

Vehicle Maintenance Workshops Charter Subscriber List A Pages 1 of 13

List of Non-Government (Voluntary) Organizations Providing Clinical Psychology Services (April 2014)

Reshaping the urban quality of Hong Kong Using the Mass Transit Railway Networks

Hong Kong College of Radiologists

List of Proposed ArchSD Projects for the Refurbishment of Government Buildings

Services and Contact Details of Voluntary Residential Drug Treatment and Rehabilitation Centres

Fire Service Installation Contractors CLASS 2

Key Personnel s Biographical Information

Hong Kong College of Pathologists

TRANSPORT NEWS December 2002

2015/16 New Asia College Scholarship List

ACQUISITION OF LAND BY PUBLIC TENDER

Property Development

* For identifi cation purposes only

Technical Notes. 1. Property Types

Education Bureau Circular Memorandum No. 127/2012. From : Secretary for Education To : Heads of Aided Primary

Nombre Categoria Estado Ciudad Domicilio Red Proveedor

JEWELLERY MARKETING & MANAGEMENT

Table of Contents. Introduction 2. Beware of Hackers 3. Protection against Malicious Software 9. Self Defence for Cyber Security 14

Executive Management s Report Railway Operations

The North Face 100 Hong Kong

53km. Deliver the New Era Network. Island Line Extension. will be added to our Hong Kong network. New Railway Projects are in progress

NOTICE OF LISTING ON THE GROWTH ENTERPRISE MARKET OF THE STOCK EXCHANGE OF HONG KONG LIMITED BY WAY OF PLACING AND PUBLIC OFFER

Information for Community Care Fund Medical Assistance Programme Application for HA Drug Items

Briefi ng Sales & investment July 2015

Hong Kong College of Physicians

Cyberport and HKNGCA jointly organize the Hong Kong Youth 3D Animation Competition to nurture young 3D animation heroes

HONG KONG GOOD DELIVERY TAEL BARS

data access 270 brands throughout the journey Over offering shopping convenience to passengers

MicroPort Scientific Corporation

Fire Service Installation Contractors CLASS 1

Facilities Provided by Holders of Private Recreational Leases (as at July 2012)

Minutes of 379 th Meeting of the Metro Planning Committee held on

DRIVING SERVICES SECTION. Guide to Taxi Written Test

KEY ACTUARIAL EMPLOYERS IN HONG KONG 2014

Facilities Provided by Holders of Private Recreational Leases

Existing Self-storage Sites are 10,000 sq ft or less

De Beers Canada Inc. OP 050 SLIPS, TRIPS, FALLS AND PEDESTRIAN SAFETY - SURFACE

TO: The Municipal Building Surveyor Telephone City of Ballarat PO Box 655 BALLARAT VIC 3353

Planning for Office Land in Hong Kong

MTR Corporation Interim Results 13 August 2015

Professional Diploma in Human Resource Management and Development SE (51)

Effective Transportation Arrangement for Patients to and from Operation Theatre

DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION

Newly Refurbished Offices To Let - Southgate, London N14

Walking and Working Surface Checklist:

Hong Kong Youth Hostels Association Report for the Year 2011/12

Experiences in Urban Logistics: Logistics Park in Santiago, Chile

REAL ESTATE DESCRIPTION

Inquiry Information Name SUPER XXX ENTERPRISES LIMITED Registered Room XXXX, XX/F., CCT Telecom Building, 11 Wo Shing Street, Fotan, Shatin, N.T.

Certificate / Advanced Certificate in ISLAMIC FINANCE

全 面 通 訊 方 案 發 放 無 限 可 能 A Total Communication Solution with Unlimited Possibility. 香 港 通 訊 有 限 公 司 Hong Kong Communications Co., Ltd.

VEHICLE / PEDESTRIAN COLLISIONS (HRM: 2013)

DISCLOSEABLE TRANSACTION PROVISION OF FINANCIAL ASSISTANCE

Education Bureau Circular No. 8/2014. Enhanced Chinese Learning and Teaching for Non-Chinese Speaking Students

Legislative Council Panel on Security

Services and Contact Details of Voluntary Residential Drug Treatment and Rehabilitation Centres

Offer details Health Check Plan (A) - Women (HBHU) HKD4,831. Detailed Medical History. Complete Physical Examination.

Study of the Integrated Rail-Property Development Model in Hong Kong

HUhttp:// Disclaimer

Exemption Policy and List of Exemptions Awarded

A Guide to Application. for. Places of Public Entertainment Licences. for Places Other Than Cinemas and Theatres

HOW TO APPLY FOR A CERTIFICATE OF ORIGIN FORM A

Fast Facts. Background CCB. CCB (Asia) About CCB

WALKING-WORKING SURFACES (SLIPS, TRIPS, AND FALLS)

Professional Diploma for ACCREDITED ACCOUNTING TECHNICIANS

MARITIME TRANSPORT AND LOGISTICS

Free MTR Rides and More for Lucky Birthday Stars Each Month Under MTR Happy Birthday Happy Journey Programme

Chapter 4: Working in Hong Kong

Sun Hung Kai Properties Limited (incorporated in Hong Kong with limited liability) (Stock Code : 16)

Garden Bridge OPERATIONS CONSULTATION August 2015

Transcription:

1 Provision of Facilities and/or Open Space required under lease for the use by the public in private developments completed in or after 1980 (as at June 2015) Mount Haven 3 Liu To Road, (a) Public Carpark (a) It provides 60 private carparking spaces and 15 coach parking spaces. It is accessible from Liu To Road. (a) Opens from 07:00 a.m. to 07:00 p.m. 2402 1107 Villa Esplanada 8 Nga Ying Chau Street, (a) Public Transport Terminus (a) It is at ground level of the development. (a) To be opened (objections from local residents and to be taken up by Transport Department). Tivoli Garden 75 Tsing King Road, (a) Covered (b) Public Right (a) It is accessible from Tsing King Road. (b) It is accessible from Tsing King Road. The Church of Jesus Christ of Latter-Day Saints 32 Tsing King Road, (a) Pedestrian (a) It is accessible from Tsing King Road. to St Paul Village (a) Upon Office's consultation with the villagers, all parties agreed to lock up the walkway's gate for security reason.

2 Tierra Verde, Maritime Square, Station, 33 Tsing King Road (a) Footbridge (a) It is across Tsing King Road. (a) Over government land. (b) MTR Station and Associated Facilities and Station Carparks (b) It is accessible from Tsing King Road. (b) Open from 05:40 a.m. to 01:15 midnight. Users of the Station Carparks need to pay fees as set by the Kerry Cargo Centre 55 Wing Kei Road, (a) Public Vehicle (a) It provides not less than 160 private car parking spaces, 380 goods vehicle parking spaces and 70 container vehicle parking spaces. It is accessible from Wing Kei Road. to pay fees set by the Ever Gain Plaza 88 Container Port Road, (a) Public Lorry (a) It provides 51 goods vehicle parking spaces, 6 container vehicle parking spaces and 4 container truck repairing bays. It is accessible from Container Port Road. to pay fees set by the A temporary waiver has been granted for use of part of the lorry park as a logistics centre. 2402 1107

3 Kerry TC Warehouse 2 35 Wing Kei Road, (a) Public Vehicle (a) It provides not less than 50 private motor vehicle parking spaces, 140 goods vehicle parking spaces and 25 container vehicle parking spaces. to pay fees as set by the Greenknoll Court 382 Castle Peak Road, (a) Footbridge (a) It is across Castle Peak Road - and connects Yip Shing Street. (b) Covered and (b) There is a passageway connecting the footbridge over Lighted Castle Peak Road- to the ground level. Ramps, Stairways and Passageways (a) On government land. Hang King Garden 9 Wing Fong Road, (a) Public Car (a) It provides not less than 198 private car parking spaces. It is accessible from Yan Fong Street. to pay fees as set by the Wah Tat Industrial Centre 8-10 Wah Sing Street, (a) Pedestrian Access (b) Pedestrian Access (a) It is accessible from Wah Sing Street and is around the periphery of the formed platforms of the existing buildings. (b) It is accessible from the two staircases connecting Castle Peak Road. (b) On government land.

4 Metroplaza 223 Hing Fong Road, (a) Footbridges (a) One is across Hing Fong Road connecting Kwai Chung Plaza, another is across Kwai Yan Road connecting Kwai Fong MTR Station. (a) On government land. Greenfield Garden 1 Fung Shue Wo Road, (a) Footbridge Support and Connection (a) It is accessible from Fung Shue Wo Road & Heung Sze Wui Road. (b) Pedestrian (b) It is accessible from Fung Shue Wo Road & Heung Sze Wui Road. (c) Pedestrian Link (c) It is accessible from Fung Shue Wo Road & Heung Sze Wui Road. Serene Garden 77 Tsing King Road, (a) Pedestrian Link (a) It is accessible from Tsing King Road and Fung Shue Wo Road. Plaza 7-11 Kwai Foo Road, (a) Covered Staircase and Ramp (a) It is accessible from two footbridges across Hing Fong Road and Kwai Foo Road. Wonderland Villas 9 Wah King Hill Road, (a) Open Space (a) Area of walking tracks and woodland are of about 10,100 sq.m. It is at ground level and is accessible from Wah King Hill Road. (a) On government land. Opens from 07:00 a.m. to 06:00 p.m. daily.

5 New Kwai Fong Gardens 12-20 Kwai Yi Road, (a) Public Right (b) Open Space (a) One is leading from the footbridge across Kwai Yi Road through the development to the bus terminus and to the MTR Station. Another one is leading from the footbridge across Kwai Foo Road through the development to the MTR Station. (b) Its size is about 6,400 sq.m. It is at podium and the roof of Kwai Fong MTR Station and is accessible from Kwai Yan Road and Kwai Yi Road. (b) Opens from 05:00 a.m. to 10:30 p.m. daily. Sun Kwai Hing Gardens 151-156 Tai Wo Hau Road 166-174 Hing Fong Road, (a) Pedestrian (a) It connects the footbridge across Road and is accessible from Hing Fong Road. (b) Public Right (b) It is accessible from Kwai Hing Road. (c) Open Space (c) Its size is about 6,000 sq.m. It is at podium and the roof of Kwai Hing MTR Station and is accessible from Tai Wo Hau Road. (c) Except otherwise specified, it is open to the public at all times. Part of the area is open to the public from 11:00 a.m. to 06:00 p.m. daily. Wah Yuen Chuen 1 & 2 Wah Yuen Drive 6, 8 & 12 Wah King Hill Road, (a) Footbridge (a) It is across Wah King Hill Road. (a) Over government land.

Garden 7-19 Tsing Luk Street, (a) Covered Pedestrian (a) It is accessible from Tsing Luk Street. Kowloon Commerce Centre 51 Kwai Cheong Road, (a) Public Right (a) One is accessible from Kwai Cheong Road, another is accessible from Tai Lin Pai Road. (b) Covered Footbridge (b) It is across Kwai Cheong Road, Road and Hing Fong Road connecting Kwai Hing MTR Station and the pavement at Hing Fong Road. (b) Over government land. Tin Hau Temple Chung Mei Road, (a) Open Space (a) Its size is about 202 sq.m. It is at ground level and is accessible from Chung Mei Road. [Note 1] 1. Unless otherwise specified, the facilities shown above are open to the public at all times and within the private lot. 2. Unless otherwise specified, the developments shown above are in multiple ownership. 3. The non-exclusive right of way shown above is not solely used by the owners and/or occupiers of the development on the lot concerned.