09 00 03 GENERAL PROVISIONS



Similar documents
Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Triarch Products Over Various Interior Substrates

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

MARQUETTE UNIVERSITY: McCabe Hall

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No December 2014

ENTRANCE MATS & GRIDS

Guide Specification SECTION SHEET CARPETING PART 1 - GENERAL 1.1 SUMMARY. A. This Section includes broadloom carpet. 1.

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

PUBLIC RESTROOMS, DESIGN INTENT

17,280 square feet Overview:

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

Moisture Control. System Solutions to Prevent Mold

Sustainability in construction at Creighton

Manual lifting and handling

IMPROVEMENT COST ESTIMATE powered by HomeFixers

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Building Condition Assessment Report

Slip, Trip & Fall Program Table of Contents

Asbestos Management Program

SECTION EXISTING HAZARDOUS MATERIALS CONDITIONS

Retail Price List 2015

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

ULTIMATE GUIDE BE PREPARED FOR YOUR UPCOMING PROJECT

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

Building Condition Assessment Report

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

CONSTRUCTION IAQ MANAGEMENT PLAN During Construction

eading Performance Solutions

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

Measure Guideline: Water Management at Tub and Shower Assemblies

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Slip, Trip & Fall Program Table of Contents

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

Estimating Database Checklist

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

BUILDING PERMIT SPECIFICATIONS

Foundation. Foundation

Selecting a Carpet and Pad

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

CertainTeed. GlasRoc Tile Backer

High Performance Building Materials SCREEDS REPAIR MORTARS LEVELLING & SMOOTHING WATERPROOFING TILE ADHESIVES & GROUTS PRIMERS & ADDITIVES

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

WATERPROOFING OF WET ROOMS

RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

Cascade Remodeling Inc. PO Box Portland, OR Catalyzing Euphoria Phone (503) , FAX (503) CCB # 67007

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

Shower Walls and Tub Surrounds

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Guide to the (Non-Residential) California Green Building Standards Code. Including changes effective July 1, 2012

SECTION FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

Frequently Asked Questions LP SmartSide Siding, Trim, and Soffit

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

A. Product data. Unless otherwise indicated, submit the following for each type of product provided under work of this Section: SPECIFIER NOTE:

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Schluter -Shower System Installation Handbook Bonded Waterproofing System for Tiled Showers, Steam Showers, Steam Rooms, and Bathtub Surrounds

Successful Painting Jobs Start Here.

COMMERCIAL BUILDING APPLICATIONS

34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory

Construction Technologies Career Field Pathways and Course Structure

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

FAQs. 19. Does the sub floor need to be level before I install my new direct-to-stud bathtub or shower base?

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Certification: Building Plans Examiner. Exam ID: B3

Steel Panel Frame. Exterior Steel Sheeting. Optional Rigid Insulation. Optional Steel Insulation Liner

THINGS YOU SHOULD KNOW

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Vinyl Composition Tile Installation System

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Mold Preventing I nterior System

Insulation R-Value Comparisons

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Roof Inspection. Summary Report

Bafl-Sorb Sound Absorbing Ceiling Baffles

SECTION ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

KIEWIT CM/GC Enabling/Utilities

Inspecting to a higher standard.

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

Transcription:

09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have an existing palette that must be matched. Coordinate with the SHSU Project Manager. B. Design reviews by the SHSU Project Manager and SHSU Interior Designer are required for all finish selections. C. All specified materials must have a demonstrated history in a similar institutional setting, with similar regularity of cleaning and maintenance, for at least five years. D. Color-through homogeneous materials are preferred. E. Avoid custom-designed colors and finish materials. F. Avoid material(s) that require routine sealing or significant specialized maintenance. G. Construction documents must clearly identify and note all finishes, including their extent of coverage. H. Stencil fire rating above ceiling at all fire-rated walls, in 6 high letters at 20-0 on center. I. Coordinate requirements for attic stock with the SHSU Project Manager. J. All finishes must complete off-gassing prior to Substantial Completion. 2. Sustainable Design: A. The University promotes energy efficient green design, construction and building operations. B. Materials are to be selected and specified following SHSU s Sustainability Policy and the United States Green Building Council's LEED (Leadership in Energy and Environmental Design) Green Building Rating System. 1) Finishes should meet LEED Standard 4.2EQ (Indoor Air Quality). 2) Finishes should not exceed VOC limits established by the South Coast Air Quality Management (SCAQMD) Rule 1113. C. All materials must meet SHSU performance standards. 09 20 00 PLASTER AND GYPSUM BOARD 09 21 13 Plaster Assemblies 1. When used at ceilings or soffits, provide access panels at regular spacing where required for access. 09 21 16 Gypsum Board Assemblies 1 Follow industry standard STC levels for different occupancy types unless specifically directed otherwise by the SHSU Project Manager. 2 Gypsum board should meet LEED Standard 4MR (Recycled Content). A. Use of J mold at finished edges of drywall is required. B. Control joints will be installed at all top corners of interior doors and windows. 09 23 00 GYPSUM PLASTERING prohibited. 09 29 00 GYPSUM BOARD 1. Use fire-resistant gypsum board wherever 5/8 inch thick or greater gypsum board is used. 2. High traffic areas: 3. Wet areas and/or tile backer board: Design & Construction Standards, Revised February 2015 Division 09 Finished - 1

A. Use cement backer board for tile. 1. Required for shower stall or tub surround applications. B. Avoid paper-faced moisture resistant gypsum board panels ( green board ). 09 30 00 TILE The use of ceramic tile is encouraged for high profile/ high use public areas, restrooms, shower and locker rooms or other spaces where a durable material is appropriate. Avoid dark colors and extremely light colors for tiles. Consider the use of tile or other durable material as wainscot on high traffic corridor walls especially near classrooms. 1. Tile at floors: A. Porcelain tile is recommended. B. All floor tiles shall be non-slip and rated for heavy duty use. C. Restroom floors: Recommend 2 x2 tile pieces with matching cove base. Slope finished floor to drain over the entire room. D. Glazed or polished tiles are prohibited. 2. Tile at walls: A. Glazed tile is recommended. B. Restrooms: Provide ceramic tile finish at wet walls, to at least ±6-0 above finish floor level, in whole tile increments. Leave approximately 12 (minimum) of painted gypsum board from the ceiling. 3. Grout: A. Use epoxy type grout meeting ANSI 118.3. B. All floor tile grout shall be sealed. In frequently wet areas such as shower, floor and wall grout shall be sealed. C. Dark colors are preferred. 4. Adhesive: A. Tile adhesive should meet LEED Standards 4.1/4.2EQ (Indoor Air Quality), 4.2MR (Recycled Materials) and 5.1/5.2MR (Regional Materials). 09 40 00 TERRAZZO 1. A non-slip surface is required. A non-integral base is to be used. 09 50 00 CEILINGS 1. Review proposed ceiling types with the SHSU Project Manager. The University is open to a variety of ceiling solutions, with the following stipulations: A. All ceilings should be designed to be easily accessible for maintenance and other access requirements, such as future technology installations. B. Prefer 2-foot by 2-foot acoustical ceiling tiles. C. Restroom ceilings must be gypsum board with appropriate access panels. Design & Construction Standards, Revised February 2015 Division 09 Finished - 2

D. Prohibited: concealed spline ceiling support systems. 1 Ceiling tile should meet LEED Standards such as 1EA (Energy Performance), 4.2EQ (Indoor Air Quality), 2.3MR (Resource Reuse) and 5.1/5.2MR (Regional Materials), as appropriate for the Work. 2 Follow industry standard STC levels for different occupancy types unless specifically directed otherwise by the SHSU Project Manager. 09 53 00 ACOUSTICAL CEILING SUSPENSION ASSEMBLIES 1. Ceiling suspension assemblies shall be supported directly from the building structure and shall be supported at all four corners of fluorescent light fixtures. Location of hangers shall not interfere with access to VAV filters, valves, dampers and other items requiring maintenance. 2. Locations subject to moisture penetration or condensation: use stainless steel hanger wires for canopy or other suspension systems. 09 60 00 FLOORING 1. Public area flooring: A. Building entries: Provide and walk-off areas protected from weather at exterior doors, or provide walk off carpet with metal trim as applicable. 1. Tandus Abrrasive Action Carpet or Walk off mats (walk off mats typically supplied by SHSU). B. Elevator floors: prefer rubber tile; solid colors are discouraged. 2. Wet laboratories: use chemical resistant flooring. 3. Masonry flooring: not permitted if it has significant fill and/or requires routine sealing or significant specialized maintenance. A. Impregnated concrete sealed concrete is acceptable in Residence Life Buildings. 4. Flooring materials not permitted by SHSU: A. Specialty flooring: bamboo, cork and laminate. B. Wood flooring, except at gymnasiums and certain other specialized areas. C. Medium-density fiberboard (MDF) as a wall base. D. Solid tile or sheet vinyl products except for specialized areas. 5. Flooring should meet LEED Standards such as 4.3EQ (Low-Emitting Materials), 4MR (Recycled Content), 5MR (Regional Materials) and 6MR (Rapidly Renewable Resources), as appropriate for the Work. 09 65 00 RESILIENT FLOORING A. Unit tile is preferred. B. Homogeneous color and pattern recommended. C. Solid colors are discouraged. Design & Construction Standards, Revised February 2015 Division 09 Finished - 3

D. Off-gassing must be complete prior to Substantial Completion. 09 65 13 Resilient Base and Accessories 09 65 13.13 Resilient Base A. Meet ASTM F 1861 Type TS rubber, continuous roll. B. Typically, use standard 1/8-inch thick by 4-inch high (minimum) cove base. C. Dark neutral colors are preferred. D. The following are not permitted, unless matching existing base in a renovation project, where the majority of the existing base is to remain: 1) Straight base 2) Preformed corners, except in certain circumstances. 3) Light colors 09 65 13.23 Resilient Stair Treads and Risers 1. Integral rubber treads and nosings with separate risers are preferred. 09 65 16 Resilient Sheet Flooring 1. Heat welded seams and coved base may be required for specialized areas. Review with SHSU Project 09 68 00 CARPETING 1.0 GENERAL 1.1 SUMMARY A. The following shall be used as a guide for a minimum carpet specification. Other products with equal or better characteristics or qualities shall be considered. 2.0 PRODUCTS 2.1 CARPET SYSTEMS A. Modular vinyl backed carpet tile or six foot roll carpet with vinyl back. a. Carpet Tile shall not be used in Residence Life buildings. b. Six foot Tandus Powerbond Cushion RS backing only in Residence Life Building c. Powerbond Cushion RS backing shall be seam welded. B. Manufacturers: Interface, Lees, Mannington, Tandus C&A or acceptable substitute shall meet the following requirements: 1. Construction: Textured or level loop tufted. 2. Face Fiber: 100% Invista Antron Lumena or Antron Legacy, Antron Blend. Type 6,6 nylon - continuous filament with antisoil, anti-stain protection. 3. Dye Method: 80% solution dyed 20% yard dyed minimum. Design & Construction Standards, Revised February 2015 Division 09 Finished - 4

4 Warranty: Lifetime 20 years, non-prorated warranty against delaminating, edge ravel, zippering, moisture penetration, wear. 09 70 00 WALL FINISHES A. Use Type II, Class A materials. B. Selections should be able to withstand heavy duty commercial traffic, and be manufacturer-rated for the intended application. C. Wall and corner protection must be provided in public areas. 2. Wall materials not permitted at SHSU: A. Medium density fiberboard (MDF) as any part of a wall finish. 3. Wall finishes should meet LEED Standards such as 4.1/4.2MR (Recycled Content), 5.1MR (Regional Materials), 6MR (Renewable Materials) and 4.1/4.2EQ (Indoor Air Quality), as appropriate for the Work. Off-gassing must be complete prior to Substantial Completion. 09 90 00 PAINTING AND COATINGS 09 91 00 PAINTING 09 91 23 Interior Painting 1. Use only paints and coatings that meet: A. Green Seal Standard/GS-11 for primers. B. Green Seal Standard/GS 03 for anti-corrosive and anti-rust paints. C. SCAQMD (South Coast Air Quality Management District) South Coast Rule 1113. 2. Recommended Finishes A. Public spaces and trim: use semi-gloss finish. B. Private spaces: use semi-gloss finish. D. Restrooms & Concrete Block: Epoxy paint. C. Prohibited: flat finish. E. Do not use multi-color enamels. F. Woodwork shall be primed and painted using latex or latex acrylic. G. Interior and exterior metal fixtures, doors and jambs, handrails, stairwell metal, and any metal frames shall be primed and painted using latex or latex acrylic paints. H. All new construction that is painted shall require a minimum of 1 primer coat and 2 finish coats. I. Residence Life Maintenance buildings; No Epoxy Paint, No Oil Base Paint, preferred interior paint Zinsser Perma-White semi-gloss mold and mildew proof self-priming tint-able paint. Design & Construction Standards, Revised February 2015 Division 09 Finished - 5

3. Paints and coatings should meet LEED Standard 4.2EQ (Indoor Air Quality). All off-gassing must be complete prior to Substantial Completion. Design & Construction Standards, Revised February 2015 Division 09 Finished - 6