PROJECT RISK EVALUATION METHODS - SENSITIVITY ANALYSIS



Similar documents
CHAPTER 5 FINANCIAL BENEFIT-COST ANALYSIS

Session 3.3 Sensitivity and Risk Analysis. Introductory Course on Economic Analysis of Investment Projects 5-9 July 2010

FINANCIAL AND RISK ANALYSIS WITH RETSCREEN SOFTWARE. SLIDE 1: Financial and Risk Analysis with RETScreen Software

FINANCIAL AND ECONOMIC ANALYSES

CAPITAL PLANNING GUIDELINES

Module 10: Assessing the Business Case

PROJECT CRITERIA: ECONOMIC VIABILITY AND PROJECT ALTERNATIVES

Financial and Cash Flow Analysis Methods.

Capital Budgeting. Financial Modeling Templates

The table for the present value of annuities (Appendix A, Table 4) shows: 10 periods at 14% = = 3.93 years

PREDICTIVE ANALYSIS SOFTWARE FOR MODELING THE ALTMAN Z-SCORE FINANCIAL DISTRESS STATUS OF COMPANIES

Why Use Net Present Value? The Payback Period Method The Discounted Payback Period Method The Average Accounting Return Method The Internal Rate of

Capital Planning Guidelines

LESSON 6. Real Estate Investment Analysis and Discounting

6. FINANCIAL MANAGEMENT

Project Evolution & Estimation :cash flow forecasting, cost benefit evolution techniques, risk evolution, Cost benefit analysis

1.1 Introduction. Chapter 1: Feasibility Studies: An Overview

Pro Forma Income Statements Sales $50,000 Var. costs 30,000 Fixed costs 5,000 Depreciation 7,000 EBIT $8,000 Taxes (34%) 2,720 Net income $5,280

Project cash flows and NPVs may be estimated under different assumptions to improve the decision process.

Detailed Economic Analysis. November PNG: Maritime and Waterways Safety Project

(Relevant to AAT Examination Paper 4: Business Economics and Financial Mathematics)

CARNEGIE MELLON UNIVERSITY CIO INSTITUTE

Risk Identification in Project Management

NSSMP Technical & Financial Toolkit. Joint ADB-WB Philippine Workshop on Wastewater Management 29 January 2014

The Time Value of Money

SUPPLEMENTARY ECONOMIC ANALYSIS

RISK MANAGEMENT COMPANIES AND HEDGE ACCOUNTING

Nr. 1 (39) Nicolae BALTEŞ* baltes_n@yahoo.com Diana Elena VASIU** diana.vasiu@yahoo.com

Purchasing and Supply Chain Analysis: Tools and Techniques

WHAT IS CAPITAL BUDGETING?

Transportation Asset Management

How To Calculate Discounted Cash Flow

BENEFIT-COST ANALYSIS Financial and Economic Appraisal using Spreadsheets

FINANCIAL RISK EVALUATION BY THE TREE OF PROBABILITY DECISIONS METHOD Mariya Bruseva Varna Free University, Bulgaria

REPORT FEHMARNBELT FIXED LINK. Financial Analysis - February Main Results. March Prepared by Sund & Bælt / Femer Bælt

Understanding Financial Management: A Practical Guide Guideline Answers to the Concept Check Questions

CHAPTER 6 PROJECT CASH FLOW

Chapter 11 Cash Flow Estimation and Risk Analysis ANSWERS TO SELECTED END-OF-CHAPTER QUESTIONS

Project Management Seminars. Financial Management of Projects

11 PERFORMING FINANCIAL ANALYSIS

FINANCIAL EVALUATION OF ENERGY SAVING PROJECTS: BUILDING THE BUSINESS CASE

Net Present Value and Other Investment Criteria

CE Entrepreneurship. Investment decision making

CUSTOMER RELATIONSHIP MANAGEMENT - A NEW METHOD OF TARGETING THE 21 ST CENTURY CONSUMERS

Problem 1 (Issuance and Repurchase in a Modigliani-Miller World)

Investment Decision Analysis

Tools for Project Evaluation. Nathaniel Osgood 1.040/1.401J 2/11/2004

DISTRIBUTED DATABASES MANAGEMENT USING REPLICATION METHOD

MODULE 2. Capital Budgeting

Performing Net Present Value (NPV) Calculations

Course 3: Capital Budgeting Analysis

DISTRIBUTED DATABASES MANAGEMENT USING REMOTE ACCESS METHOD

Net Present Value (NPV)

The Cost of Capital, and a Note on Capitalization

Project Evaluation Guidelines

APPENDIXB ONTARIO ENERGY BOARD GUIDELINES FOR ASSESSING AND REPORTING ON NATURAL GAS SYSTEM EXPANSION IN ONTARIO

Chapter 9 Net Present Value and Other Investment Criteria Chapter Organization

Guidelines for Preparing Performance Evaluation Reports for Public Sector Operations

hp calculators HP 12C Net Present Value Cash flow and NPV calculations Cash flow diagrams The HP12C cash flow approach Practice solving NPV problems

CHAPTER 9 NET PRESENT VALUE AND OTHER INVESTMENT CRITERIA

CHAPTER 8 CAPITAL BUDGETING DECISIONS

Methods for Project Evaluation

REVIEW MATERIALS FOR REAL ESTATE ANALYSIS

SPECIFIC ASPECTS OF THE INFLUENCE OF HUMAN RESOURCE MANAGEMENT IN ORDER TO OBTAIN PERFORMANCE IN MULTINATIONAL ORGANIZATIONS

Time Value of Money. Background

Practice Problems on Money and Monetary Policy

CHAPTER 29. Capital Budgeting

HP 12C Calculations. 2. If you are given the following set of cash flows and discount rates, can you calculate the PV? (pg.

Lease Analysis Tools

CHAPTER 9 Time Value Analysis

EVA Issues as a Valuation Framework: Issues Solved By AFG s Economic Margin

The amortization of fixed assets in terms of deferred taxes

STUDY ON THE IMPORTANCE OF CASH FLOW ANALYSIS BASED ON RATES IN THE FINANCIAL

Community and Renewable Energy Scheme Project Development Toolkit

ADVANCED INVESTMENT APPRAISAL

(Relevant to AAT Examination Paper 4 Business Economics and Financial Mathematics)

THE ROLE OF THE COMMUNICATIONAL POLICY IN THE MARKETING ACTIVITY OF CONSTRUCTION ORGANIZATIONS

Overview of Financial Management

International Valuation Guidance Note No. 9 Discounted Cash Flow Analysis for Market and Non-Market Based Valuations

NPV Versus IRR. W.L. Silber We know that if the cost of capital is 18 percent we reject the project because the NPV

CONSIDERATIONS ON ASSESSMENT OF PAYMENT AND SETTLEMENT SYSTEM

Capital Budgeting: Decision. Example. Net Present Value (NPV) FINC 3630 Yost

rate nper pmt pv Interest Number of Payment Present Future Rate Periods Amount Value Value 12.00% 1 0 $ $112.00

Accounting Income, Residual Income and Valuation

LUCRĂRI ŞTIINŢIFICE, SERIA I, VOL. XIV (3) USE OF ACCOUNTING INFORMATION IN EUROPEAN PROJECTS

American Options and Callable Bonds

Finance for Cultural Organisations Lecture 9. Capital Budgeting: Project Analysis and Evaluation

CHAPTER 3 RESEARCH DESIGN

$1, , ,900 = $4,700. in cash flows. The project still needs to create another: $5,500 4,700 = $800

hp calculators HP 12C Internal Rate of Return Cash flow and IRR calculations Cash flow diagrams The HP12C cash flow approach

- centred on human factors (ie. ergonomics, desire to have a new computer system) - Are there unused computer terminals in the company now?

THE ROLE OF ACCOUNTING INFORMATION IN THE ECONOMIC ENTITY 1

The Role of Market Analysis in Developing Efficient Marketing Audit

Transcription:

Annals of the University of Petroşani, Economics, 9(2), 2009, 33-38 33 PROJECT RISK EVALUATION METHODS - SENSITIVITY ANALYSIS MIRELA ILOIU, DIANA CSIMINGA * ABSTRACT: The viability of investment projects is based on IRR and NPV criteria. In the economic analysis of the projects there are some aspects of project feasibility which may require sensitivity and risk analysis. Sensitivity analysis estimates the effect on achieving project objectives if certain assumptions materialize or not. This paper presents the purpose of sensitivity analysis and the steps that must be followed in order to perform a sensitivity analysis as well as a numeric example. KEY WORDS: investment project, NPV, IRR, sensitivity analysis, base-case, key variables, sensitivity indicator, switching value 1. INTRODUCTION The financial and economic benefit-cost analysis of investment projects is based on forecast of quantifiable variables. The values of these variables are estimated based on the most probable forecasts, which cover a long period of time. The values of these variables for the most probable outcome scenario are influenced by a great number of factors, and the actual values may differ considerably from the forecasted values, depending on future developments. It is therefore useful to consider the effects of likely changes in the key variables on the viability (EIRR - economic internal rate of return and FIRR - financial rate of return). We can do this performing sensitivity analysis. The viability of projects is evaluated based on a comparison of its internal rate of return (FIRR and EIRR) to the financial or economic opportunity cost of capital. Alternatively, the project is considered to be viable when the Net Present Value (NPV) is positive, using the selected EOCC or FOCC as discount rate. Sensitivity analysis focuses analyzing the effects of changes in key variables on the project s IRR or NPV, the two most widely used measures of project worth. * Lecturer, Ph.D., University of Petroşani, Romania, mirelailoiu@yahoo.com Lecturer, Ph.D., University of Petroşani, Romania, diana_csiminga@yahoo.com

34 Iloiu, M.; Csiminga, D. In the economic analysis of the projects, there are also other aspects of project feasibility which may require sensitivity analysis. These include: 1. demand analysis: to assess the sensitivity of the demand forecast to changes in population growth, per capita consumption, prices, etc. 2. least cost analysis: to verify whether the selected least-cost alternative remains the preferred option under adverse conditions 3. sustainability analysis: to assess possible threats to the sustainability of the project 4. distributional analysis: to analyse whether the project will actually benefit the poor. Sensitivity analysis is particularly concerned with factors and combinations of factors that may lead to unfavourable consequences. These factors would normally have been identified in the project (logical) framework as project risks or project assumptions. Sensitivity analysis tries to estimate the effect of achieving project objectives if certain assumptions do not, or only partly, occur. 2. THE PURPOSE OF SENSITIVITY ANALYSIS Sensitivity analysis is a technique for investigating the impact of changes in project variables on the base-case (most probable outcome scenario). Typically, only adverse changes are considered in sensitivity analysis. The purpose of sensitivity analysis is: 1. to help identify the key variables which influence the project cost and benefit streams 2. to investigate the consequences of likely adverse changes in these key variables 3. to assess whether project decisions are likely to be affected by such changes 4. to identify actions that could mitigate possible adverse effects on the project. 3. PERFORMANCE OF SENSITIVITY ANALYSIS Sensitivity analysis needs to be realized in a systematic manner. To meet the above purposes, the following steps are recommended to be followed: 1. identify key variables to which the project decision may be sensitive 2. calculate the effect of likely changes in these variables on the base-case IRR or NPV, and calculate a sensitivity indicator and/or switching value 3. consider possible combinations of variables that may change simultaneously in an adverse direction 4. analyze the direction and scale of likely changes for the key variables identified, involving identification of the sources of change. Step 1: Identifying the key variables. The base case project economic analysis incorporates many variables: quantities and their inter-relationships, prices or economic values and the timing of project effects. Some of these variables will be predictable or relatively small in value in the project context. It is not necessary to investigate the sensitivity of the measures of project worth to such variables. Other variables may be less predictable or larger in value. Variables related to sectorial policy and capacity building may also be important. As they are more difficult to quantify, they are not further considered hereafter but should be assessed in a qualitative manner.

Project Risk Evaluation Methods - Sensitivity Analysis 35 As a result of previous experience (from post-evaluation studies) and analysis of the project context, a preliminary set of likely key variables can be chosen on the following basis: 1. variables which are numerically large, ex. investment cost 2. essential variables, which may be small, but the value of which is very important for the design of the project 3. variables occurring early in the project life, ex. investment costs and initial fixed operating costs, which will be relatively unaffected by discounting 4. variables affected by economic changes, such as, changes in real income. Table 1. Base Case of an Investment Project Economic PV 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 statement @12% Benefits 2,104 0 283 339 396 453 509 566 566 566 566 Costs: 1,978 1,889 61 61 61 61 61 61 61 61 61 -Investment 1,687 1,889 0 0 0 0 0 0 0 0 0 -O&M 291 0 61 61 61 61 61 61 61 61 61 Net cash flow 126-1,889 222 278 335 391 448 505 505 505 505 Step 2 and 3: Calculation of effects of changing variables. The values of the basic indicators of project viability (EIRR and ENPV) should be recalculated for different values of key variables. This is preferably done by calculating sensitivity indicators and switching values. The meaning of these concepts is presented in table 2 as well as a sample calculation. Table 2. Use of Sensitivity Indicators and Switching Values Sensitivity Indicators Definition Compares percentage change in NPV with percentage change in a variable or combination of variables. Switching Value 1. Towards the Net Present Value The percentage change in a variable or combination of variables to reduce the NPV to zero. Expression 2. Towards the Internal Rate of Return. Compares percentage change in IRR above the cut-off rate with percentage change in a variable or combination of variables. (NPV b NPV 1 ) / NPV b SI = --------------------------------- (X b X 1 ) / X b X b value of variable in the base case NPV b value of NPV in the base case NPV 1 value of the variable in the sensitivity 2. Towards the Internal Rate of Return. The percentage change in a variable or combination of variables to reduce the IRR to the cut-off rate (=discount rate). (100 x NPV b ) (X b X 1 ) SV = ---------------------- x ------------- (NPV b NPV 1 ) X b X b value of variable in the base case NPV b value of NPV in the base case NPV 1 value of the variable in the sensitivity

36 Iloiu, M.; Csiminga, D. Calculation example (IRR b IRR 1 ) / (IRR b d) SI = ---------------------------------- (X b X 1 ) / X b X b value of the variable in the base case IRR b value of IRR in the base case IRR 1 value of the variable in the sensitivity d discount rate NPV b = 20,912 NPV 1 = 6,895 (20,912 6,895) / 20,912 SI = --------------------------------- = 6.70 (300 270) / 300 IRR b = 15,87% IRR 1 = 13,31% d = 12% (0,1587 0,1331) / (0,1587 0,12) SI = -------------------------------------------- (300 270) / 300 (100 x NPV b ) (X b X 1 ) SV = ---------------------- x ------------- (NPV b NPV 1 ) X b X b value of variable in the base case IRR b value of IRR in the base case IRR 1 value of the variable in the sensitivity d discount rate NPV b = 20,912 NPV 1 = 6,895 (100 x 20,912) (300 270) SV = ------------------- x -------------- = 14.9% (20,912 6,895) 300 IRR b = 15,87% IRR 1 = 13,31% d = 12% (100 x (0,1587 0,12) (300 270) SV = ----------------------------- x --------------- (0,1587 0,1331) 300 = 6,61 Interpretation a) percentage change in NPV respectively b) percentage change in IRR above the cut-off rate (12%) is larger than percentage change in variable: price is a key variable for the project Characteristic Indicates to which variables the project result is or is not sensitive. Suggests further examination of change in variable. = 15,1% A change of approximately 15% in the price variable is necessary before the NPV becomes zero or before the IRR equals the cut-off rate. Measures extent of change for a variable which will leave the project decision unchanged. The switching value is, by definition, the reciprocal of the sensitivity indicator. Sensitivity indicators and switching values calculated towards the IRR yield slightly different results if compared to Sis and SVs calculated towards the NPV. This is

Project Risk Evaluation Methods - Sensitivity Analysis 37 because IRR approach discounts all future net benefits at the IRR value and the NPV approach at the discount rate d. In the base case, the ENPV is 126 and the EIRR is 13.7 percent. The sensitivity of the base case ENPV has been analyzed for (adverse) changes in several key variables, as follows: 1. an increase in investment cost by 20 percent 2. a decrease in economic benefits by 20 percent 3. an increase in costs of operation and maintenance by 20 percent 4. a delay in the period of construction, causing a delay in revenue generation by one year Proposed changes in key variables should be well explained. The sensitivity analysis should be based on the most likely changes. The effects of the above changes are summarized in table 3. Table 3. Sensitivity Analysis Numerical Example Item Change NPV IRR % SI (NPV) SV(NPV) Base Case 126 13.7 Investment +20% -211 9.6 13.3 7.5% Benefits -20% -294 7.8 16.6 6% O&M costs +20% 68 12.9 2.3 43.4% Construction delays one year -99 10.8 NPV 178% lower SI = sensitivity indicator, SV = switching value Combinations of variables can also be considered. For example, the effect on the ENPV or EIRR of a simultaneous decline in economic benefits and an increase in investment cost can be computed. Step 4: Analysis of effects of changes in key variables. In the case of an increase in investment costs of 20 percent, the sensitivity indicator is 13.34. This means that the change of 20 percent in the variable (investment cost) results in a change of 266 percent in the ENPV. It follows that the higher the SI, the more sensitive the NPV is th change in the concerned variable. In the same example, the switching value is 7.5 percent which is the reciprocal value of the SI x 100. This means that a change (increase) of 7.5 percent in the key variable (investment cost) will cause the ENPV to become zero. The lower the SV, the more sensitive the NPV is to the change in the variable concerned and the higher the risk with the project. At this point the results of the sensitivity analysis should be reviewed. It should be asked: 1. Which are the variables with high sensitivity indicators; 2. How likely are the (adverse) changes (as indicated by the switching value) in the values of the variables that would alter the project decision?

38 Iloiu, M.; Csiminga, D. 4. CONCLUSIONS The paper presents two concepts: sensitivity indicator and switching value, used to perform a sensitivity analysis as well as the meaning of them. Sensitivity indicators and switching values are calculated for the NPV and IRR, as we can see in the numerical example, so we can analyze the effects of changes in key variable and minimize the project risk. REFERENCES: [1]. Bârsan, I. - Management investiţional - fezabilitatea proiectelor de investiii, Editura Universităţii Lucian Blaga, Sibiu, 2003 [2]. Ciutac (Cismaşu), E. - Analiza de sensitivitate. Concept şi aplicaţie în diagnosticul strategic al întreprinderii, Teză de doctorat, ASE Bucureşti [3]. Masse, P. - Le choix des investissements, Editura Dunod, Paris, 1964 [4]. Raţiu-Suciu, C. - Modelarea şi simularea proceselor economice, Editura Didactică şi Pedagogică, Bucureşti, 1995 [5]. Stoica, M.; Ioniţă, I.; Botezatu, M. - Modelarea şi simularea proceselor economice, Editura Economica, Bucureşti, 1997 [6]. Stoina, C.N. - Risc şi incertitudine în investiţii, Editura Teora, Bucureşti, 2008