Should we Really Care about Building Business. Cycle Coincident Indexes!



Similar documents
When someone asks, How s the economy. A New Look at Economic Indexes for the States in the Third District. Theodore M. Crone*

OBJECTIVE ASSESSMENT OF FORECASTING ASSIGNMENTS USING SOME FUNCTION OF PREDICTION ERRORS

PITFALLS IN TIME SERIES ANALYSIS. Cliff Hurvich Stern School, NYU

Using simulation to calculate the NPV of a project

Agenda. Business Cycles. What Is a Business Cycle? What Is a Business Cycle? What is a Business Cycle? Business Cycle Facts.

CALCULATION OF COMPOSITE LEADING INDICATORS: A COMPARISON OF TWO DIFFERENT METHODS

Industry Environment and Concepts for Forecasting 1

Evaluating Trading Systems By John Ehlers and Ric Way

16 : Demand Forecasting

VI. Real Business Cycles Models

18 ECB STYLISED FACTS OF MONEY AND CREDIT OVER THE BUSINESS CYCLE

Introduction to time series analysis

Introduction to Statistical Computing in Microsoft Excel By Hector D. Flores; and Dr. J.A. Dobelman

IT S ALL ABOUT THE CUSTOMER FORECASTING 101

OECD Composite Leading Indicators a tool for short-term analysis

The VAR models discussed so fare are appropriate for modeling I(0) data, like asset returns or growth rates of macroeconomic time series.

Section A. Index. Section A. Planning, Budgeting and Forecasting Section A.2 Forecasting techniques Page 1 of 11. EduPristine CMA - Part I

Testing for Granger causality between stock prices and economic growth

Handling attrition and non-response in longitudinal data

Executive Summary. Abstract. Heitman Analytics Conclusions:

Practical Calculation of Expected and Unexpected Losses in Operational Risk by Simulation Methods

CALL VOLUME FORECASTING FOR SERVICE DESKS

FORECASTING. Operations Management

Exponential Smoothing with Trend. As we move toward medium-range forecasts, trend becomes more important.

TIME SERIES ANALYSIS

I. Introduction. II. Background. KEY WORDS: Time series forecasting, Structural Models, CPS

Forecasting Methods. What is forecasting? Why is forecasting important? How can we evaluate a future demand? How do we make mistakes?

INFERRING TRADING STRATEGIES FROM PROBABILITY DISTRIBUTION FUNCTIONS

POSITION PAPER RIDING THE CYCLES. Understanding business, financial and monetary cycles in order to allocate fixed income

Statistics in Retail Finance. Chapter 6: Behavioural models

Analysis One Code Desc. Transaction Amount. Fiscal Period

Change-Point Analysis: A Powerful New Tool For Detecting Changes

Jobs Online Background and Methodology

Using Excel (Microsoft Office 2007 Version) for Graphical Analysis of Data

Interest rate Derivatives

Auxiliary Variables in Mixture Modeling: 3-Step Approaches Using Mplus

How Do Business and Financial Cycles Interact?

Module 6: Introduction to Time Series Forecasting

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Forecasting methods applied to engineering management

Demand forecasting & Aggregate planning in a Supply chain. Session Speaker Prof.P.S.Satish

A Trading Strategy Based on the Lead-Lag Relationship of Spot and Futures Prices of the S&P 500

6 Scalar, Stochastic, Discrete Dynamic Systems

USING TIME SERIES CHARTS TO ANALYZE FINANCIAL DATA (Presented at 2002 Annual Quality Conference)

Sensex Realized Volatility Index

From the help desk: Bootstrapped standard errors

This content downloaded on Tue, 19 Feb :28:43 PM All use subject to JSTOR Terms and Conditions

Commercial Real Estate: Economic Cycle Analysis. By Larry Souza, MD, Charles Schwab Investment Management

Intermediate Macroeconomics: The Real Business Cycle Model

TIME SERIES ANALYSIS. A time series is essentially composed of the following four components:

Methodology For Illinois Electric Customers and Sales Forecasts:

Economic indicators dashboard

Big data in macroeconomics Lucrezia Reichlin London Business School and now-casting economics ltd. COEURE workshop Brussels 3-4 July 2015

DESCRIPTIVE STATISTICS. The purpose of statistics is to condense raw data to make it easier to answer specific questions; test hypotheses.

Forecasting in STATA: Tools and Tricks

Lecture 3: Finding integer solutions to systems of linear equations

COMP 250 Fall 2012 lecture 2 binary representations Sept. 11, 2012

STT315 Chapter 4 Random Variables & Probability Distributions KM. Chapter 4.5, 6, 8 Probability Distributions for Continuous Random Variables

Evaluating System Suitability CE, GC, LC and A/D ChemStation Revisions: A.03.0x- A.08.0x

Threshold Autoregressive Models in Finance: A Comparative Approach

CALCULATIONS & STATISTICS

Analyzing and interpreting data Evaluation resources from Wilder Research

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

Optimal Risk Management Before, During and After the Financial Crisis

Chapter 6: The Information Function 129. CHAPTER 7 Test Calibration

Information Theory and Stock Market

The RBC methodology also comes down to two principles:

Composite performance measures in the public sector Rowena Jacobs, Maria Goddard and Peter C. Smith

JetBlue Airways Stock Price Analysis and Prediction

Unit 19: Probability Models

Data Preparation and Statistical Displays

The Basics of Interest Theory

Penalized regression: Introduction

Math Review. for the Quantitative Reasoning Measure of the GRE revised General Test

An Empirical Analysis of Insider Rates vs. Outsider Rates in Bank Lending

Chicago Booth BUSINESS STATISTICS Final Exam Fall 2011

On the Traffic Capacity of Cellular Data Networks. 1 Introduction. T. Bonald 1,2, A. Proutière 1,2

Business Cycles in India

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean

Time Series Analysis

SIMPLIFIED PERFORMANCE MODEL FOR HYBRID WIND DIESEL SYSTEMS. J. F. MANWELL, J. G. McGOWAN and U. ABDULWAHID

WHAT AN INDICATOR OF LABOR DEMAND MEANS FOR U.S. LABOR MARKET ANALYSIS: INITIAL RESULTS FROM THE JOB OPENINGS AND LABOR TURNOVER SURVEY

Research Division Federal Reserve Bank of St. Louis Working Paper Series

Finance 350: Problem Set 6 Alternative Solutions

Chapter 4 Lecture Notes

Exam 3 Review/WIR 9 These problems will be started in class on April 7 and continued on April 8 at the WIR.

FTS Real Time System Project: Portfolio Diversification Note: this project requires use of Excel s Solver

Using Data Mining for Mobile Communication Clustering and Characterization

Transcription:

Should we Really Care about Building Business Cycle Coincident Indexes! Alain Hecq University of Maastricht The Netherlands August 2, 2004 Abstract Quite often, the goal of the game when developing new coincident indexes of the economic activity is the comparison with NBER turning points. Using Monte Carlo simulations, this note illustrates that for the US, any random linear combination of the four coincident variables would do the job as good as other more complicated methods. JEL classification: C22, E32, E37 Keywords: Coincident indicators, Turning points, Monte Carlo. University of Maastricht, Department of Quantitative Economics, P.O.Box 616, 6200 MD Maastricht, The Netherlands. E-mail: a.hecq@ke.unimaas.nl, homepage: http://www.personeel.unimaas.nl/a.hecq. 1

1 Motivation For several decades, most countries have experienced a system of business cycle coincident, leading and sometimes lagging indicators. Whether the goal is to locate the turning points of the economic activity or to forecast its growth rate, the common feature of the different methodologies consists generally of two steps. The first step aims at identifying groups of variables that move in, before of after the recession. The early NBER attempts to monitor the US business cycle (Burns and Mitchell, 1946) focused on the distinction between these categories. The second step is linked to the need to find parsimonious statistical representations of the data to make the analysis of business cycle movements easier. The expressions coincident, lagging and leading indexes usually refer to the combination of individual indicators when forming these synthetic measures. These indexes are indeed supposed to give a better understanding of the overall economic activity than individual series because they are less dependant on any single variable. 1 Several statistical approaches exist: the dynamic factor model developed by Stock and Watson (e.g. 1993, SW hereafter) for the NBER, the standardization factors maintained by The Conference Board (TCB hereafter, see www.tcbindicators.org), the principal component approach as well as a multitude of linear and non linear methods. 2 Issler and Vahid (2004, IV hereafter) obtainanindexinaserialcorrelation common feature approach by considering the most cyclical linear combinations. In most studies, a comparison with the NBER turning points is a must and it turns out that usually, the new proposed methods are amazingly close to the NBER timing. This note 1 However, Harding and Pagan (2002) recall that Burns and Mitchell advocated the use of several indicators mainly because a monthly GDP was not available at that time. 2 Camacho and Perez-Quiros (2000) compare the forecasting performance of different procedures. 2

illustrates that for the US, any random linear combination of the four coincident variables also matches NBER turning points. 2 Economic Activity Turning Points In the US, a great care has been paid for many years to choose among a huge list of coincident variables, series which ups and downs match the turning points of the economic activity. These four famous indicators that will be combined to form a coincident index are Y 1t : Employees on nonagricultural payrolls, Y 2t : Personal income less transfer payments, Y 3t : Industrial production, Y 4t : Manufacturing and trade sale. With Y t =(Y 1t,Y 2t,Y 3t,Y 4t ) 0, a linear coincident index is defined as Z t = α 0 Y t or z t = α 0 ln Y t, t = 1...T. Different dating techniques have been proposed to locate the turning points in Z t or z t and to find the contraction periods, namely the distance between a peak and a trough. I only focus on the local peak and trough determination for the classical cycles 3 using the Bry and Boschan (1971) algorithm. A local peak (trough) is determined at time t whenever z t > (<) z t±k where k = 1...K (see Harding and Pagan, 2002). With monthly data, most practitioners take K = 5. However because I do not implement the whole Bry-Boschan procedure and in particular all the substages to detect false turning points, to smooth outliers, or to drop movements with short lived and insufficient amplitude, I choose K = 7. This rolling larger window is more robust and reproduces on raw series, recession periods in TCB index without the need of additional manipulations. Table 1 reports the NBER turning points as well as those obtained using the Bry-Boschan 3 That is to say, cycles found in the level (or log level) of coincident indexes. 3

rule on TCB, SW and IV coincident indexes. The (+) and ( ) correspond respectively to the number of months these indexes lag and lead the NBER official dates; a (0) entry means an exact matching. The last column gives the same information for a simple average (CI) ofthe four series. The data set spans the period 1959:01 to 2003:5, i.e. 535 monthly observations. For TCB and IV indexes I do not consider the genuine synthetic measures but I build them using their weights namely TCB w t = 0.5186 ln Y 1t +0.2173 ln Y 2t +0.147 ln Y 3t +0.117 ln Y 4t, IV w t = 0.84 ln Y 1t +0 ln Y 2t +0.10 ln Y 3t +0.06 ln Y 4t, CI t = 0.25 ln Y 1t 0.002308 +0.25 ln Y 2t 0.005573 +0.25 ln Y 3t 0.008237 +0.25 ln Y 4t 0.010504. For the sake of comparison I have standardized, in the CI t, the four series by the estimated standard deviations of ln Y t obtained on the full sample. Indeed, TCB equalizes the variance of the series and IV use a canonical correlation approach which constraint the variance to one. In order to propose a global summary over the different contraction periods, the last row reports a concordance index (see Harding and Pagan, 2002) Î = 1 T S 0 zt S rt +(1 S zt ) 0 (1 S rt ) ª. Where S t is a binary variable that takes the value 1 for contractions (the peak to trough distance) and 0 for expansion periods. Consequently, Î measures the fraction that two coincident indicators are simultaneously in the same state. S rt gives the information for the reference NBER turning points and S zt for any of the other coincident indexes. Î would 4

be unity when series are pro-cyclical. Î has also the advantage to be well definedonnon stationary processes, so detrending is not necessary. From Table 1, it emerges that in all cases Î is very close to unity, meaning that only in few cases, computed indexes give different locations for turning points than NBER ones. 4 INSERT TABLE 1 HERE 3 Monte Carlo Results In order to evaluate how any arbitrary index constructed from linear combinations can give turning points close to NBER ones, I multiply the four standardized series by four coefficients, each drawn at random from a uniform U[0, 1] distribution. This will be labelled Experiment 1. However, that approach downsizes the importance of some series. Consider for instance that for one replication the weights of the four series are all 0.85. The four variables are thus equally weighted with coefficients 0.25 after normalizing their sum to one. In Experiment 2, the coefficient of one out of four series is drawn from the U[0, 1] and the other three weights are obtained by subtracting that value to one before dividing by three. Doing so for the previous example, the coefficient of the first variable is 0.85 while they are 0.05 for the other series. We successively apply that procedure for each of the four variables. Experiment 3 is similar to Experiment 1 but mimics a change in the coefficients that takes place at the half 4 Notice that for the SW index I exclude for the computation of I a contration period of 3 months between April and July 1989, as well as a false trough signal in May 1967 and a false peak signal in March 1979. Only once, in March 1975, the TCB w I build gives a one month different turning point than the dating released by TCB. This could be due to the fact that I do not add any operation to the simple BB rule, that the definition of the growth rate by TCB is different than the difference of the logs I take or that TCB rounds its index after the firstdecimal.italsomakes sense that TCB and CI have the same turning points. Indeed, taking a simple average of the standardized series amounts to give weights proportional to their variability. 5

of the sample. Indeed, the revision of factors through time is often an issue for practitioners. 100,000 replications M are generated but I only keep the conformable series characterized as follows: (i) peaks and troughs should alternate, (ii) the sequence starts with a peak and ends with a trough. Usually, misleading locations of turning points such as double peaks or false signals are detected by eye or additional smoothing operations. Sometimes false signals are those that are not close enough to NBER ones. In order to do not bias the matching towards the NBER, I compare two cases. In the set of experiments indexed by A, I drop all these non conformable replications while in simulations indexed by B I treat multiple peaks and troughs. To do so, I simply select the local final peak (resp. trough) associated with the highest (resp. lowest) value in coincident indexes. In both cases, statistics are computed over the fine M A or M B replications where M A <M B <M. However, I do not exclude small amplitude or too short cycles. INSERT TABLE 2 HERE Table 2 reports M, the average of b I over M and the frequency that random indexes give a I b larger than TCB (or CI) and SW and consequently a closer matching to the NBER turning points. It emerges that I b is always very close to unity. In Experiment 2, there is clearly a trade-off between locating turning points and doing better than other indexes. Indeed, the proportion of conformable replication is about 20% if one gives more weight to the first series (employment as in IV). That means that it is easier to identify the turning points there. However, the proportion to have a degree of concordance larger than TCB is only 18%. On the other hand, it seems relatively more difficult to detect contraction periods if one gives more weight to industrial production (series 3) but this yields a better fit than TCB 6

and SW in respectively 44% and 61% of the cases. One of the best strategy is to give random weights as in Experiment 1A. Structural change does not alter the results. The comparison with the set of simulations B is very useful because it emphasizes the presence of false signals. Indeed, allowing for multiple peaks and troughs, the number of conformable simulated series doubles, but proportions of having a concordance index higher than reference indexes stay roughly the same. This shows that multiple peaks and troughs have been correctly identified by our simple procedure. However, if one gives more weight to the fourth variable (sales) that proportion goes from 50% to 17% between experiments A and B. This shows that the sales variable could yield misleading results if it gets too important in coincident indexes. Also note (result not reported) that each of the four series taken individually produce non conformable simulated processes in every replication. This would be easy to solve if the sequence starts with a trough but more difficult to interpret when peaks are detected at the end of the sample. Indeed we do not have enough information to really say if it is a true turning point, a false signal, or whether this is due to preliminary data. This also shows that considering more than a single variable is still important. 4 Conclusion To conclude and as far as turning points are concerned, we should not waste our time in the building of coincident indexes. A simple average (like the TCB) or any linear combinations are valid competitors. That also means that a two step approach that would first extract a coincident index and then find leading variables for such an index does not make a lot sense. I would advocate to jointly determine coincident and leading indexes, maybe using a system 7

approach such as in Emerson and Hendry (1996) or in Cubadda and Hecq (2001). I do not obviously claim that this cautious note generally applies for any country. It is likely that for the US, these four coincident series have been chosen with such a care that we do not improve our understanding by combining them. References [1] Bry, G. and C. Boschan (1971), Cyclical Analysis of Time Series: Selected Procedures and Computer Programs, New York, NBER. [2] Burns, A.F., and W.C. Mitchel (1946), Measuring Business Cycles, NBER Studies in Business Cycles, 2, Columbia University Press. [3] Camacho, M. and G. Perez-Quiros (2000), This is What the US Leading Indicators Lead, European Central Bank Working Paper Series, 27. [4] Cubadda, G. and A. Hecq (2001), On Non-Contemporaneous Short-Run Comovements, Economics Letters, 73, 389-397. [5] Emerson, R.A. and D.F Hendry (1996), An Evaluation of Forecasting Using Leading Indicators, Journal of Forecasting, 15, 271-291. [6] Harding, D. and A. Pagan (2002), Dissecting the Cycle: A Methodological Investigation, Journal of Monetary Economics, 49, 365-381. 8

[7] Issler, J.V. and F. Vahid (2004), The Missing Link: Using the NBER Recession Indicator to Construct Coincident and Leading Indices of Economic Activity, forthcoming in Journal of Econometrics. [8] Stock, J.H. and M.W. Watson (1993), A Procedure for Predicting Recessions with Leading Indicators: Econometric Issues and Recent Experience, in Stock and Watson (eds.), Business cycles, indicators, and forecasting. NBER Studies in Business Cycles, vol. 28. University of Chicago Press, 95-153. 9

NBER TCB w SW VI w CI Peaks Apr 1960 0-3 0 0 Dec 1969-2 -2-2 -2 Nov 1973 0 0 +8 0 Jan 1980 0 0 +1 0 Jul 1981 +1 0 0 +1 Jul 1990-1 0-1 -1 Mar 2001-3 -2-3 -3 Troughs Feb 1961 0 0 0 0 Nov 1970 0 0 0 0 Mar 1975 +1 +1 +1 +1 Jul 1980 0 0 0 0 Nov 1982 +1 +1 +1 +1 Mar 1991 0 0 +1 0 Nov 2001 0 0 +3 0 bi 1 0.983 0.975 0.961 0.983 Table 1: Timing at Cyclical Turning points - Matching (0), Leads (-) or Lags (+) Drop multiple P&T M 1 M P M i=i b I i % b I i >TCB w % b I i >SW Experiment 1A 22,900 0.977 49.88 67.92 Experiment 2A (series 1) 21,424 0.967 17.98 27.84 (series 2) 9,533 0.975 42.76 57.87 (series 3) 9,624 0.976 44.42 61.20 (series 4) 11,254 0.977 50.48 69.75 Experiment 3A 16,112 0.977 32.93 69.17 Using multiple P&T Experiment 1B 40,078 0.977 44.82 70.29 Experiment 2B (series 1) 30,338 0.970 21.47 38.89 (series 2) 18,902 0.976 42.29 65.73 (series 3) 18,209 0.976 39.50 64.29 (series 4) 49,954 0.958 16.97 31.72 Experiment 3B 35,089 0.975 26.76 64.89 Table 2: Degree of Concordance in Random Indexes, 100,000 replications 10