Richard Hill BSc, FRICS, ACIArb, MAE



Similar documents
RICHARD HAMILTON MORRIS

Project & Building Consultancy

Rider Levett Bucknall. Taxation Services Executive Summary. state of mind

Construction Team. Peter O Brien, Partner T: E: peter.obrien@clarkewillmott.com

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s).

CRITICAL THINKING AT THE CRITICAL TIME CONSTRUCTION SOLUTIONS

Construction Team. Peter O Brien, Partner T: E: peter.obrien@clarkewillmott.com

Project manager services

Construction insurance. Product overview

Stanford University Guest Lecturer, Professor s Assistant, Advanced Construction Issues and Claims, Civil Engineering Department

MR GREGORY YAU-MING TUNG. (Bachelor of Science in Quantity Surveying with Honours) (Date of Qualification 1987)

Architects and Engineers Professional Liability Proposal Form

Measured development Construction and Engineering Training Supplement Guide

About Brasier Freeth Highlights

Thames Water Utilities Limited. Settlement deed

Back to Basics: Professional Indemnity Construction and Engineering

PLANNING & FORENSIC DELAY ANALYSIS

Project and Building Consultancy. Capabilities and track record Enhancing the physical and economic potential of built assets

Recommendations. Name: Richard Coplin Call: 1997 Languages: French (working knowledge)

DEVELOPMENTS IN AND AROUND CENTRAL WEST END

(ALL DIRECT WITH MANDATE OPPORTUNITIES) DEVELOPMENT/CONVERSION OPPORTUNITIES

Gold Property Developments welcomes you to this exhibition of the draft plans for the regeneration of the Holborn Studios site on Eagle Wharf Road.

Holman Fenwick Willan CONSTRUCTION CAPABILITY

WELCOME WELCOME TO THE PUBLIC EXHIBITION FOR THE ILONA ROSE HOUSE REDEVELOPMENT. ILONA ROSE HOUSE

Mr and Mrs Sample and future owners or occupants of the Property and Your/their mortgage lender(s).

CCC CONTRACT CONSTRUCTION CONSULTA NTS. The Contract Dispute, Arbitration & Adjudication Specialists

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

the mda group profile on central and eastern europe the mda group profile on central and eastern europe

Brighton & Hove. Waterfront Mixed Use Development Opportunity. Within Shoreham Harbour

Simon Lofthouse PRACTICE. Call Date: 1988, Silk: 2006 //

Suzanne Kupsch. Dawson Chambers Room 5, 405 Little Bourke Street Melbourne Victoria T: List Y:

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

regeneration through retail

CONCODE Guide to contract strategies for construction projects in the NHS STATUS IN WALES ARCHIVED

Tewkesbury. March 2015

Construction and International Commercial Contracts

PROPERTY: COMMERCIAL AND INDUSTRIAL

28 St Thomas Court, Bristol, BS1 6JG

Arthur J Gallagher, Construction - Technical Briefing. Battle of the Contracts Round Two The insurance implications of JCT & NEC forms

Neil Taylor Programme Manager Royal Borough of Kingston

Environment Committee 11 January 2016

INTERNATIONAL LAWYERS A GUIDE FOR AND CLIENTS

Office Profile. Ariel Greis Design

2015 PROFESSIONAL INDEMNITY INSURANCE SHORT FORM DECLARATION - SOLICITORS

BSc (Hons) Construction Management Course content

05 AREA/SITE SPECIFIC GUIDELINES

Surveyors Professional Liability Insurance Summary

Tax relief on buildings. The Grant Thornton capital allowances service

225 MARSH WALL LONDON E14 9FW Offices To Let On Flexible Terms

InvestIng In london commercial real estate

CONSTRUCTION SOLUTIONS

Property and Asset Management

Expert Witness Training Course

60 Day Expert Determination Structured to Meet the Commercial Expectations of Business Management

Welcome to Thistle Professional Indemnity Underwriting

BSc (Hons) Construction Management Part-time Course content

DAC Beachcroft. Specialist real estate services for developers, funds, investors and lenders

1 9 QUEEN ST REET M A Y F A I R L O N D O N W 1

contractors Policy Summary

IMPORTANT INFORMATION REGARDING COMPLETION OF THIS FORM

Professional Indemnity Select

Motor Legal Expenses Insurance

CONSTRUCTION COST GUIDE

Expert Witness EXPERT WITNESS

A. UK, EUROPEAN AND INTERNATIONAL CONTRACT FORMS. I. Fédération Internationale des Ingénieurs-Conseils (FIDIC)

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

2 The Braccans, London Road, Bracknell

713 Finchley Road London NW11 8DH

CONCODE Agreement for the appointment of architects, surveyors and engineers for commissions for minor works STATUS IN WALES ARCHIVED

EBBARK HOUSE BOROUGH HIGH STREET LONDON SE1 FREEHOLD OFFICE REFURBISHMENT/DEVELOPMENT OPPORTUNITY FOR SALE

CAPABILITY STATEMENT

CURRICULUM VITAE DR ALEXANDER KHAN. Chancery & Commercial Barrister; DrAlexKhan@coralhouse.co.uk

Octagon Insurance Legal Expenses Policy

Appendix 18 NEC3 Options

The Heron, Milton Court, The City of London, EC2

Octagon Insurance Legal Expenses Policy

REGULATIONS FOR THE DEGREE OF MASTER OF SCIENCE IN CONSTRUCTION PROJECT MANAGEMENT (MSc[ConstProjectMan])

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

RETAIL BRENTFORD, MIDDLESEX TW8 9BS GREAT WEST QUARTER (GWQ) GREAT WEST ROAD

Transcription:

Richard Hill is a Chartered Quantity Surveyor with over thirty five years experience in the construction industry. He has worked on a broad range of international projects across a number of sectors including infrastructure, civil engineering, process engineering, regeneration, commercial offices, fit-out, residential, hotel, leisure and retail schemes. He has worked extensively overseas in Western and Central Europe. Richard set up and ran an office in Poland from 1996 to 1999 and has worked on projects in, France, Holland, Spain, Luxemburg, Czech Republic and Serbia. Richard has experience of many standard forms of contract including FIDIC, JCT, NEC 3 and IChemE as well as many bespoke forms for specific projects. Richard has acted as advisor on construction disputes over the last 15 years. He has been appointed as an Expert Witness, acting for both the claimant and respondent, working with major firms of solicitors and barristers. He has also given oral evidence in the TCC and Chancery Division of the High Court and attended Adjudication Tribunal hearings, Planning Enquiry hearings and Mediation meetings. He has provided seminars and training on a variety of issues and has written guidance notes on subjects such as Valuation Practice and Procedure and Pricing Practices. Career Synopsis Examples of the commissions that Richard has undertaken in his professional career are set out below: Expert Witness and Expert Advice Experience Building Projects Expert report and meeting of experts on quantum issues relating to a claim for Loss and Expense. Residential development, London. Expert report, meeting of experts, preparation of Joint Statements and providing oral evidence in court on practice and procedure in a professional negligence dispute over the overvaluation of works by a Monitoring Surveyor. Residential development, Manchester. Preparation of a Single Joint Expert report and providing supplimentary report on questions raised by the parties on a Quantity Surveying practice and procedure dispute. Residential development, London Expert advice on quantum issues relating to a claim of professional negligence. Residential Development, Sheffield Expert report, meeting of experts, preparation of Joint Statements and attendance at Mediation meeting on quantum issues in a dispute over the overvaluation of works by a Monitoring Surveyor. Multiple residential developments, Manchester. Expert report, meeting of experts and preparation of Joint Statements and providing oral evidence in court on quantum issues relating to construction costs used in a development appraisal. Hotel development, Manchester. Contact details: Office Tel: 0207 209 8400 Office Fax: 0207 209 8450 Email: richard.hill@gtfairway.com www.gtfairway.com 265 Tottenham Court Road London W1T 7RQ Page 1 of 7

Providing Expert advice to respondent on Professional Negligence claim including attending Pre Action meetings and Mediation meetings with partie s representatives. Residential development, London. Expert report including meeting of experts and preparation of Joint Statements on quantum issues relating to construction costs of Office and Residential developments, London and South East. Expert report on quantum issues relating to Estimated Build Costs for Planning Enquiry including attending the hearing. Residential development, London. Expert report on quantum issues relating to construction costs used in the calculation of residual land values for a site subject to a CPO by Crossrail. Dispute centred over the additional cost of working over Crossrail station. Commercial Office development, London. Expert report on quantum issues relating to construction costs of a residential tower development used in the calculation of residual land values, London East End. Expert report and meeting of experts on quantum issues relating to construction costs for use in market ground rent dispute. Commercial Office development, City of London. Expert report on practice and procedure in a professional negligence dispute on overvaluation of works by Monitoring Surveyor. Residential development Blackburn. Expert advice and report to respondent on issues relating to Subcontracting practices and tendering of sub-contract work packages where Single Joint Expert appointed. Expert appointment on quantum issues relating to the calculation of final account and the value of scrap materials. New Retail development, North West. Expert advice on quantum issues relating to basement underpinning and façade retention works for use in assessment of costs. Residential development, London. Analysis and expert advice on quantum issues relating to cost of remedial works and extension of time related costs. Residential and Office Scheme, Guernsey. Industrial Building and Laboratory Projects Expert report on quantum issues relating to the cost of slab repair works. Warehouse, Rugby. Expert report, meeting of experts and preparation of Joint Statements and providing oral evidence in court on quantum issues relating to maintenance costs. Industrial Park, Birmingham. Expert report on practice and procedure dispute regarding the preparation of a reinstatement cost assessment (fire insurance valuation). Research and laboratory facility comprising over 60 buildings, Runcorn. Civil Engineering Projects The A10 Wadesmill - Colliers End bypass defective works to a 7.2km Duel Carriageway. Analysis and provision of advice on quantum issues relating to a claim for the cost of road replacement and repair works due to almost complete road failure as a result of inadequate sub base stabilisation. Hertfordshire. Expert report on quantum issues relating to cost of road reconfiguration and Page 2 of 7

resurfacing works undertaken in connection with Junction improvement works undertaken by the London Borough of Brent. North West London Assisting the named Expert on a highways tunnelling and bridges dispute. The works comprising a 1,216km six-lane highway was commenced in 2007. Claimed to be one of the largest public works projects in the world, construction is being undertaken by a consortium of international contractors and has been subject to delays due to significant problems with ground conditions, flooding etc. Ascertainment of quantum of design variations to the foundations of Concrete LPG Tanks to assist Adjudicator in calculation of award. LPG/ Civil engineering project, South Wales. Expert appointment on measurement and quantum issues relating to Water Utilities Infrastructure Replacement Works and dispute over valuation of the Final Account under NEC Contract. Water Mains replacement works, Yorkshire. Process Engineering Projects Expert report on quantum issues relating to design fees dispute. Process Plant design, Lithuania. Dispute Resolution Experience Building Projects Preparation of claim against Underwriters for fire damage including negotiations with Loss Adjuster. Fire damage reinstatement, London. Review of distressed projects and formulating strategy for recovery of loss and expense. Various Commercial projects, London. Providing advice on strategy and preparation of claim defence documentation for respondent in Arbitration proceedings over the delay and disruption to the construction of Office and Residential developments with shared car parking below. The dispute mainly centred on the disruption to the basement construction and car parking. Belgrade, Serbia. Providing advice on strategy for dispute resolution over final account and assisting client in subsequent Arbitration proceedings. Restaurant project, West End. Providing advice on strategy and strength of claim defence documentation. Hotel and Residential project, Liverpool. Providing advice to client and preparation of information for Adjudication over final account. Residential project, City of London. Advising on strategy over disputed fees for professional services and professional negligence counter claim. Preparing claim for subsequent Arbitration proceedings. Residential project, Hampstead. Providing advice and strategy for defending professional negligence dispute over overvaluation of works. Residential project, Islington. Providing advice to client after contractor insolvency prior to project completion. Assisting with preparing claim against Bondsman. Residential project, London. Page 3 of 7

Providing advice to client on contractor insolvency prior to project completion. Fit out project. London. Providing report and advice to client on contractor performance. Multiple schools projects, North London. Preparing report on performance of Employers Agent. Multiple residential schemes in Brighton. Forensic investigation of project status and preparing report with recommendations for project recovery. Shopping centre project, Kent. Industrial Building and Laboratory Projects Providing advice and strategy for defending professional negligence claim over delays and cost overrun. Laboratory complex, Devon. Remediation Projects Providing advice on strategy, preparation of claim documentation and representing referring party in Adjudication proceedings and hearings regarding the value of compensation events under a NEC Remediation Contract. The works included excavating, treating and backfilling the site using a combination of techniques including; soil washing, chemical treatment, some off-site disposal and included working within the validation parameters. Greater London, UK. Core Quantity Surveying Experience Anschutz Entertainment Group: O² Waterfront Leisure Destination - 100m Full Quantity Surveying duties and Employers Agent duties on the redevelopment of the Millennium Dome site including land remediation, and the construction of retail space, food and beverage outlets, 11 screen multiplex cinema, exhibition space and 2350 person capacity Indigo music club along a themed boulevard. Negotiated JCT Design and Build form of contract. All England Lawn Tennis & Croquet Club: Refurbishment of Centre Court and Members Areas - 10m Lead Cost Manager on the repair and refurbishment of the Historic Centre Court including re modelling the Members areas within. Arlington Plc: Bishop Square Development, Hatfield - 30m Full Quantity Surveying duties on the construction of a 250,000 ft² four building business park complex. Tendered JCT Design and Build form of contract. Borax Consolidated: Office and Laboratory Complex, Guildford, Surrey Cost Management of Fit Out 40,000 ft2 Office and Laboratory complex in Guildford, Surrey. The project included the complete Fit Out of the accommodation including an extensive laboratory complex. Page 4 of 7

BSI: Headquarters building, Chiswick - 18m Full Quantity Surveying duties on the refurbishment and fitting out of BSI s 200,000ft new headquarters building in Chiswick including office fitting out and seminar area fit out. Two stage tendered JCT Lump Sum form of contract with Bills of Quantities. Commonwealth Secretariat: East and West Blocks of Marlborough House - 8m Full Quantity Surveying duties on the complete refurbishment and fitting out of this Grade 1 listed Christopher Wren designed 17th Century Royal Palace. Tendered GC Works 1 form of contract with Bills of Quantities. Groveworld: St John Street, Gaskin Street, Chenies Street and City Basin - Various Full Quantity Surveying duties on five new build residential developments for Groveworld ranging in value between 2m and 12m. Tendered JCT Design and Build form of contract. Heron International: Project Stone - 120m Cost Planning duties on a 45 Story tower scheme in the City of London, including five star hotel and high quality residential apartments. Jarvis Plc: Headquarters building, Smithfield - 27m Full Quantity Surveying duties on London headquarters office building including fit out. Tendered JCT Lump Sum form of contract without Quantities. Merrill Lynch: Shopping Centre, Belgrade - 65m Full Quantity Surveying duties on the USCE Shopping Centre Development in Belgrade 110,000m² constructed area providing two levels of parking and three levels of retail and leisure facilities. Construction Management procurement. PepsiCo: Food Processing Plant, Poland - $13m. Full Quantity Surveying and Employers Agent duties on the construction of a food processing facility including the installation of all of the process equipment. Appointed on further phases. Negotiated FIDIC and IChemE forms of contract. PepsiCo: Waste Water treatment Plant, Poland - $3m. Full Quantity Surveying and Employers Agent duties on the construction of a Waste water treatment plant including the construction of large scale concrete tanks for Anaerobic Digester process. Negotiated IChemE form of contract. P&O Developments: Regents Quarter mixed use development - 35m Full Quantity Surveying duties on the redevelopment of the historic Regent Quarter site in Kings Cross to provide offices, residential apartments and retail space. Works included separate contract for demolitions and land remediation works. Two stage tendered JCT Lump Sum form of contract with Bills of Quantities. Portman Estate: Gloucester Place - 8m Full Quantity Surveying duties on the repairs and refurbishment of 8 No Grade 2 listed terrace buildings into offices and residential use. Tendered JCT Lump Sum form of contract with Bills of Quantities. Page 5 of 7

Power Generation Facility, Europe - 10bn + Providing advice on contractual and commercial issues during the procurement of one of the largest power generation projects in Europe. Activities included following strict public tender procurement requirements relating to the tender process. Prupim: Hilton Hotel - 33m Full Quantity Surveying duties on the development of a new build 210 bed Hilton 4 star international hotel, including leisure and pool facility and underground parking. Two stage JCT Design and Build form of contract. Quintain Estates: W05, W07, York House, Western Lands, Wembley - 300m Cost planning and procurement duties on this regeneration scheme comprised 400 bed four star hotel, 660 student residential units, 200 residential units and 50,000 ft² of retail space including a two level external mall. Riverview Holdings: Sir John Lyon House - 12m Full Quantity Surveying duties on a new residential scheme delivering 67 luxury riverside apartments in three linked blocks for private sale. Tendered JCT Lump Sum form of contract without Quantities. Witkoff Group: Shellmex House and Cecil Chambers - 65m Full Quantity Surveying duties and Employers Agent duties for the strip out and refurbishment of 532,000 ft2 of office space into new offices. Negotiated JCT Design and Build form of contract. Due Diligence, Monitoring Surveyor Experience Weston Group/ RBS: 41 Millharbour, London E14-40m Monitoring surveying duties on the development of 352 residential units with underground parking in the Docklands. Charles Street: Private house, London - 25m Due Diligence and contract review of this residential refurbishment project. Provided work-out strategy and contract advice for the completion of the works. Europa Property Fund, Office Development, Vienna - 80m Due Diligence and Monitoring Surveying duties on a 100,000 m2 office development project in Vienna, Austria. Page 6 of 7

EU Statistical Office: Office Development, Luxemburg - 40m Due Diligence and Monitoring Surveying duties of the construction of 35,000 m² office development project including fit out in Luxemburg. Lehman Brothers: La Defence office building - 30m Due Diligence and Monitoring surveying duties on a 50,000 m2 office refurbishment project in La Defense, Paris. Pillar Properties/Hercules Property Fund: City Point - 135m Initial Due Diligence and review of contractual arrangements. Provided contract completion advice (after purchase) for the completion works on the 35 story office tower in London. Pillar Properties European Retail Fund: European Due Diligence Studies - various Due Diligence studies on various Retail Parks in France, Belgium, Italy, Spain and Portugal including advice on procurement and build out. Speaking Engagements October 2010 Providing training course on Pricing Construction Contracts for Berwin Leighton Paisner LLP September 2011 - Guest speaker at the FIDIC Workshop Conference for Contractors and Consultants organised by Informedia Polska in Warsaw, Poland January 2014 - Panel member at the RICS Dispute Resolution Conference Risk mitigation & early intervention for construction excellence In London Page 7 of 7