CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

Similar documents
CPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:

Employer s Information Requirements Version Core Content and Guidance Notes

Specification for information management for the capital/delivery phase of construction projects using building information modelling

BUILDING INFORMATION MODEL (BIM) PROTOCOL

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Collaborative production of architectural, engineering and construction information Code of practice

BIM Strategy for NHSScotland

OUTLINE SCOPE OF SERVICES FOR THE ROLE OF INFORMATION MANAGMENT

CAD Standards Guideline For Facility Documentation and Construction Projects

BIM GUIDE. Developed for

CAD Standards Guideline For Facility Documentation and Construction Projects

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

From COBie to Asset Management

White Paper Microsoft SharePoint for Engineering Document Management and Control

CITY COLLEGE OF SAN FRANCISCO (CCSF) Building Information Modeling (BIM) Standards for Design-Bid Build Projects. CCSFBIMS Version 1.

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

SharePoint for Engineering Document Management & Control

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)

PGN 03/15 Building Information Modelling (BIM)

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan

The Performance Gap. Is there a performance gap and if so is there a solution? Rob Manning. BSc(Hons) CEng FCIBSE. BIS BIM Core Team.

Building the Asset Information Model

LACCD Building Information Modeling Standards For Design-Bid Build Projects

SURVEY. and the Digital Plan of Works. Guidance from

Cross-discipline design deliverables for BIM Phase 1 report Strategy Document

School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191

Design Development Quality Management Phase Checklist Project Phase Checklist Series

BIM Management Plan Template

CONTRACT FOR THE APPOINTMENT OF AN APPROVED INSPECTOR

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

T109 Architectural Technology MTCU Code Program Learning Outcomes

Building Information Modelling and collaborative construction

Project manager services

GRAPHISOFT ArchiCAD and COBie2. How to Prepare your ArchiCAD 17 Project for COBie2 Documentation

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

Facilities Management

What s New in Autodesk Revit 2014

CAD Standards. Design Guidelines and Standards. June Office of the University Architect

BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi

New Zealand BIM Handbook Appendix D - BIM Uses definitions July A guide to enabling BIM on building projects

A Practical Approach to BIM April 23 rd 2015

Building Information Modelling Principles for Building envelopes

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

LANSING COMMUNITY COLLEGE TLC BUILDING SERVER ROOM UPGRADES SECTION SUBMITTAL PROCEDURES PART 1 - GENERAL 1.

PROFESSIONAL PRACTICE EXAM 27 MARCH 2014

Building Information Modelling

The Royal London Hospital Our BIM approach for the new building

NAPCS Product List for NAICS 54134: Drafting Services

Getting More Value from your BIM Process with Autodesk Collaboration and Data Management Products

YOU THINK YOU MIGHT WANT TO STUDY:

Procurement requirements for reducing waste and using resources efficiently

Certified Instructors & Curriculum

Execution Plan Template Design Modeling

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

A guide to appointing an architect

HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date

The Asset Information Model using BIM

Loss Prevention Standard

Certificate in Building Information Modelling (BIM) - Project Management

Government Soft Landings. Deborah Rowland Head of Property Asset Management Building Services Summit 27 th November 2014

ABBOTSFORD HOSPITAL & CANCER CENTRE

Building Plans: Electronic Submission Process and Requirements

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

5.2 Drawing Information Consultants Procedure Manual. 5.2 Drawing Information: Large Format Document Standards: Page 1 of 5

Guide to the Letters of Assurance in the B.C. Building Code 2006 December, 2010 Edition 5a

Rockwool Cladding Roll

LIABILITIES FOR DESIGN DEFECTS IN A COLLABORATIVE, INTEGRATED DIGITAL AGE. A presentation on the UK experience By Karen Gough, Barrister

BUILDING A STRATEGY FOR BIM

3Dcities INDIA. Architecture and Engineering Outsourcing Company since 1999

EUROPASS DIPLOMA SUPPLEMENT

Using the Autodesk Revit GSA Spatial Template

Legal, Contractual Considerations with BIM 360 Review

The user forum is an excellent community in which to bounce questions off other professional users, like you.

Geospatially Enabling the World: The Convergence of Geospatial and Architectural and Engineering Design

McLaren FusionLive. Comprehensive SaaS Solution for Construction Document Project Collaboration

The Role of the BIM Coordinator

Effective Collaboration

NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline

Note: All terms which are defined and which are used throughout this document appear in italicized text beginning with a CAPITAL letter.

Developing a Project

University of Northern Iowa Design Documents Standards. October 2014

Building Services & Renewable Energy Civil Engineering Architectural Technology Quantity Surveying Fire Safety Engineering Sustainable.

Schedule 5 - Design Development

Facility management briefing checklist

Practical Strategy and Workflow for Large Projects: A Realistic Solution

Design. Documentation Guidelines

BIM Extension into Later Stages of Project Life Cycle

Process Plant Construction: A Handbook for Quality Management

School of Computing and Technology

SMS0045 Construction Health and Safety Policy and Procedures

NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION

Foreword. Version Parties to the COBIM project

Contents Page. Introduction p.3. Winning Work p. 5. Design p.15. Mobilisation and Delivery p P a g e

BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W

Menu of Architecture Services 2009

ITS specification Handover and commissioning process (ITS-10-01)

Transcription:

CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published Supporting the HMG Construction Strategy

Document Control Sheet Rev. Status Page Nos. Amendment Date By R1 Published Document Final 22 March 2013 MR, DC Authored by: Mervyn Richards David Churcher Paul Shillcock David Throssell MR1 Consulting Ltd Hitherwood Consulting Ltd Operam Skanska Ltd 2013 CPIc Incorporating Avanti, BS1192:2007, PAS1192-2:2013 and the Construction Project Information Xchange Protocol (CPIx) 22/03/2013 2 Generic Document (company Name)

Publishing and liability Copyright All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior written permission of the author/publishers. 2013 Royal Institute of British Architects Royal Institution of Chartered Surveyors UK Contractors Group Institution of Civil Engineers Chartered Institution of Building Services Engineers Chartered Institute of Architectural Technologists Chartered Institute of Building Published by the Construction Project Information Committee 22/03/2013 3 Generic Document (company Name)

The Post Contract-Award Building Information Modelling Execution Plan (BEP) Preface The BEP shall list the agreed targets for responsibility, timely delivery, exchange, reuse and final handover to the clients. It will also list all of agreed elements as outlined in the Employers Information Requirements, the Brief, the BS1192:2007, PAS1192-2:2013, the CPIx Protocol and the contract documents. This BEP is structured in accordance with PAS1192-2:2013. Project Delivery Manager This document is owned and maintained by the current Project Delivery Manager listed below. Project Delivery Manager - Name Company Responsible Project Team Representatives and Role Company Name Representative and Authorised Responsible Agent Role Document Authority This project plan has been agreed by the representatives of the project team as listed above with the authority of their parent companies to accept this document as the Agreed BIM Execution Plan. 22/03/2013 4 Generic Document (company Name)

Contents 1 PROJECT INFORMATION... 7 2 INFORMATION REQUIRED BY THE EIR... 8 2.1 PLANNING OF WORK AND DATA SEGREGATION... 8 2.2 CO-ORDINATION AND CLASH DETECTION... 8 2.3 COLLABORATION PROCESS... 8 2.4 HEALTH AND SAFETY/CDM MANAGEMENT... 8 2.5 COMPLIANCE PLAN... 8 3 MANAGEMENT... 9 3.1 ROLES, RESPONSIBILITIES AND AUTHORITIES... 9 3.2 MAJOR PROJECT MILESTONES... 10 3.3 PROJECT INFORMATION MODEL DELIVERY STRATEGY... 10 3.4 SURVEY STRATEGY... 11 3.5 EXISTING LEGACY DATA USE... 11 3.6 APPROVAL OF INFORMATION... 11 3.7 PIM AUTHORIZATION PROCESS... 11 4 PLANNING AND DOCUMENTATION... 12 4.1 REVISED PROJECT IMPLEMENTATION PLAN... 12 4.2 AGREED PROJECT PROCESSES FOR COLLABORATION AND INFORMATION MODELLING... 12 4.3 AGREED MATRIX OF RESPONSIBILITIES ACROSS THE SUPPLY CHAIN... 14 4.4 TASK INFORMATION DELIVERY PLAN (TIDP)... 17 4.5 MASTER INFORMATION DELIVERY PLAN (MIDP)... 17 5 STANDARD METHOD AND PROCEDURE... 18 5.1 VOLUME STRATEGY... 18 5.2 PIM ORIGIN AND ORIENTATION... 18 5.3 FILE NAMING CONVENTION... 18 5.4 LAYER NAMING CONVENTION... 23 5.5 AGREED CONSTRUCTION TOLERANCES FOR ALL DISCIPLINES... 23 5.6 DRAWING SHEET TEMPLATES... 23 5.7 ANNOTATIONS, DIMENSIONS, ABBREVIATIONS AND SYMBOLS... 24 5.8 ATTRIBUTE DATA... 24 6 IT SOLUTIONS... 25 List of Tables 6.1 SOFTWARE VERSIONS... 25 6.2 EXCHANGE FORMATS... 25 6.3 PROCESS AND DATA MANAGEMENT SYSTEMS... 25 TABLE 1 PROJECT INFORMATION... 7 TABLE 2 ROLES AND RESPONSIBILITIES... 9 TABLE 3 ROLE AUTHORITIES... 9 TABLE 4 MAJOR PROJECT MILESTONES... 10 TABLE 5 STRATEGY FOR INFORMATION DELIVERY... 10 TABLE 6 SURVEY STRATEGY... 11 TABLE 7 SCHEDULE OF INFORMATION APPROVAL RESPONSIBILITIES... 11 TABLE 8 SUPPLIER RESOURCE SUMMARY... 12 TABLE 9 PROCESSES FOR COLLABORATION AND INFORMATION MODELLING... 12 TABLE 10 CLASH RENDITION VIEWER... 13 TABLE 11 AUTHORISATIONS FOR SECURITY, EXTRANET AND DOCUMENT DISTRIBUTION... 13 TABLE 12 RESPONSIBILITY MATRIX FOR INFORMATION PRODUCTION... 14 TABLE 13 TEMPLATE FOR TASK INFORMATION DELIVERY PLANS... 17 TABLE 14 RECORD OF INFORMATION MODEL ORIGIN AND ORIENTATION... 18 TABLE 15 TEMPLATE FOR FILE NAMING... 18 TABLE 16 PROJECT CODE(S)... 18 TABLE 17 ORIGINATOR CODES... 19 22/03/2013 5 Generic Document (company Name)

TABLE 18 TEMPLATE FOR DEFINING PROJECT VOLUMES... 19 TABLE 19 LEVEL OR LOCATION CODES... 20 TABLE 20 AGREED FILE TYPES FOR DRAWINGS AND MODELS (SEE BS1192:2007, PAS1192-2)... 20 TABLE 21 AGREED FILE TYPES FOR DOCUMENTS (SEE BS1192:2007, PAS1192-2)... 20 TABLE 22 DISCIPLINE CODES (SEE BS1192-5)... 21 TABLE 23 EXTENDED DISCIPLINE CODES FOR THIS PROJECT... 21 TABLE 24 METADATA STATUS CODES FROM PAS1192-2... 22 TABLE 25 LAYER NAMING CONVENTION... 23 TABLE 26 AGREED TOLERANCES FOR CONSTRUCTION ELEMENTS ACCORDING TO PROJECT DISCIPLINE... 23 TABLE 27 LIST OF DRAWING SHEET TEMPLATES... 23 TABLE 28 DRAWING SHEET SCALES... 24 TABLE 29 AGREED UNITS OF MEASUREMENT... 24 TABLE 30 AGREED SOFTWARE VERSIONS... 25 TABLE 31 AGREED EXCHANGE FORMATS FOR MODELS AND DRAWINGS... 25 22/03/2013 6 Generic Document (company Name)

1 Project Information Table 1 Project information Project Name Project Address Project Number (Clients Project Number or reference) Contract Form Project Design Start Date Project Construction Start Date Project Completion and Handover Date Project Description (EIR) May be an additional document, please reference. Project Brief and CDM requirements Project Deliverable as defined in the EIR and COBie project templates (see also the CPIx Protocol) May be an additional document, please reference. 22/03/2013 7 Generic Document (company Name)

2 Information required by the EIR PAS1192-2:2013 Clause 5.3 defines the minimum contents of the Employers Information Requirements. The following subsections of the BEP respond to the parts of the EIR specifically requesting bidders proposals. 2.1 Planning of work and data segregation Required in response to the EIR by PAS1192-2 Clause 5.3 a) 3). The planning of work and data segregation aspects of the project are described in later parts of the BEP, in particular Section 3 Management, Section 4 Planning and documentation and Section 5 Standard method and procedure. 2.2 Co-ordination and clash detection Required in response to the EIR by PAS1192-2 Clause 5.3 a) 4). This section of the BEP contains the bidders proposals for managing the co-ordination process. The requirements for co-ordination are stated in PAS1192-2 Clause 9.4. 2.3 Collaboration process Required in response to the EIR by PAS1192-2 Clause 5.3 a) 5). This is described in Section 4.2. 2.4 Health and safety/cdm management Required in response to the EIR by PAS1192-2 Clause 5.3 a) 6). This section of the BEP contains the bidders proposals for using BIM and the Common Data Environment to support the management of health and safety and CDM requirements. 2.5 Compliance plan Required in response to the EIR by PAS1192-2 Clause 5.3 a) 10). This section of the BEP contains the bidders proposals for managing the co-ordination process. See Section 2.2, above. 22/03/2013 8 Generic Document (company Name)

3 Management This section of the BEP covers the requirements of PAS1192-2 Clause 7.2.1 a). 3.1 Roles, responsibilities and authorities At the start of a project it is important to identify the roles and responsibilities of the design teams. Table 2 is used to record the names and contact details of the individuals fulfilling the necessary project roles Table 2 Roles and responsibilities Role Company Name Email and Telephone number Lead Designer Company... Project Delivery Manager Company Construction Manager Company... Project Information Manager Company. Company. Task Team Manager * Company. Company. Task Team Information Manager * Company. Company. Task Team Interface Manager * Company. Company. Task Team BIM Authors * Company. Company. Company. * Note specify these roles for each task team involved in the project The standard authorities of the different roles related to production and management of information are given in Table 3. Table 3 Role authorities Role Project Information Manager Lead Designer Task Team Manager Interface Manager Task Team Information Manager CAD Coordinator Authority Enforce the Project BIM Standard and ensure delivery of the Information requirement in the EIR. Enforce spatial coordination Enforce documentation standards Negotiate space allocation Reject non compliant models, drawings & documents Enforce CAD related Project BIM Standards 22/03/2013 9 Generic Document (company Name)

3.2 Major project milestones Table 4 Major project milestones Start Date Design Completion Detail Design Completion + Fabrication Construction As Constructed Models, Documents and Data Handover. Only the Major milestones are listed. A more detail and co-ordinated MIDP and Project Plan must be developed and agreed with the stakeholders. 3.3 Project information model delivery strategy The major goals and objectives for the BIM implementation must be considered and stated as a project strategy document, append to this document, under the headings listed in Table 5. Table 5 Strategy for information delivery Brief Concept Definition Design Build & Commission Handover & Closeout In use 22/03/2013 10 Generic Document (company Name)

3.4 Survey strategy Table 6 Survey strategy Survey Method Point cloud Light detecting and ranging (LIDAR) Global satellite (GNSS) <<others appropriate>> navigation systems as Delivery Format Survey Origin Details, notes 3.5 Existing legacy data use As provided and defined by the EIR. 3.6 Approval of information To ensure that model, drawing files and spreadsheet extraction are adequately checked, some form of agreed approvals process needs to be in place to enable the design teams and the contractor (or client) to approve and sign-off the development of the design information for a project and to assign responsible team members. Table 7 Schedule of information approval responsibilities Name Role or Title Models Drawings Peer Review Lead Designer/Lead Contractor Client Review Team 3.7 PIM authorization process The design and construction approval process should be specified, agreed and documented as early as possible in the project. This includes the sign off of specialist design completion information. Sign off and authorisation process to be agreed and published in coordination with the abilities of the collaboration or EDMS solution and inserted here. 22/03/2013 11 Generic Document (company Name)

4 Planning and documentation This section of the BEP covers the requirements of PAS1192-2 Clause 7.2.1 b). 4.1 Revised Project Implementation Plan The revised PIP confirms the capability of the supply chain. The PIP consists of the following completed CPIx documentation: Supply chain capability summary form, which summarises the contents of Supplier building information management assessment form(s) Supplier IT assessment form(s) Supplier resource assessment form(s) These are available as separate templates on the CPIx website. The supplier resource for the project can also be summarised as per the example in Table 8. Table 8 Supplier resource summary Supplier Discipline Resource numbers Levels of competence Years of Experience Names of individuals <<name 1>> <<name 2>> Etc Qualified Architect Architectural Technologist (CIAT) Architectural Technician Qualified Structural Engineer 2 RIBA, CAD/BIM, Specification Author 3 CIAT, CAD/BIM Trained 5 Certificate of CAD or Model Competence 3 MIStructE, 4.2 Agreed project processes for collaboration and information modelling Table 9 Processes for collaboration and information modelling Company Solution Network Database File based Comments 22/03/2013 12 Generic Document (company Name)

The clash rendition viewer to be used across the whole project. Table 10 Clash rendition viewer Agreed clash rendition viewer Version This section of the BEP also covers the agreed authorisations for security and extranet access and authority to distribute documents. Table 11 Authorisations for security, extranet and document distribution Company Authorised Manager Authority (Upload, download, change Access/Distribution) 22/03/2013 13 Generic Document (company Name)

4.3 Agreed matrix of responsibilities across the supply chain It is important to define who models what (the BIM Author) and to what Level of Detail (LOD). There are 7 levels of detail defined in the PAS1192-2 which do not reflect specific modelling guidelines for any particular software, rather a generic definition of model detail (graphical), how individual objects display themselves and the level of information as a minimum to answer the English question stated in the EIR. Table 12 Responsibility matrix for information production Plan of Work Model Authoring Example Software Native Format Exchange Format(s) 1 Brief 2 Concept 3 Definition 4 Design 5 Build & Commission 6 Handover & Closeout 7 Operation Space Planning Site, Urban Design Context Site and Existing Buildings Architectural Model Structural Design Model HVAC Design Model Building Services MEP Design Models Lighting Design Model Electrical Design Model Hydraulics Design Model Interior Layouts and Design Model HVAC Fabrication Model Structural Steel Fabrication Model 22/03/2013 14 Generic Document (company Name)

Curtain Wall Fabrication Model Road and Civil Design Landscaping and External Works Options Renovation and Refurbishment Facility Management Model Construction Model Model Analysis Brief Development Alternative Design Options Analysis Design Performance Analysis Sun and Shadow Studies Structural Analysis Thermal Simulation Sustainability Analysis LCA Analysis Model Clash Detection Rendition Cost Planning and Control Construction Scheduling / 4D Animation Security Analysis Code Checking and Regulatory Compliance Acoustic Analysis and Design 22/03/2013 15 Generic Document (company Name)

Disabled Access and Egress Fire Protection FM, Operation and Maintenance Automated/Linked Specifications Heritage Documentation and Assessment Solar Envelopes Overshading Daylight Analysis Solar Analysis Photovoltaic Collectors 22/03/2013 16 Generic Document (company Name)

4.4 Task information delivery plan (TIDP) A task information delivery plan (TIDP) for each task within the project shall be prepared using the template below so that the format is consistent with the format required for the master information delivery plan. When completed by all team members the TIDPs should be published in this document appendix and on the project extranet. Table 13 Template for task information delivery plans File identifier Model / drawing title Delivery dates Project Originator Volume Level File type Discipline Number Milestone 1 Milestone 2 Milestone 3 Milestone 4 Etc. 4.5 Master information delivery plan (MIDP) The master information delivery plan (MIDP) shall be developed from the separate TIDPs produced for each task within the project. This more detailed, co-ordinated MIDP must be developed and agreed with the stakeholders. When completed the MIDP should be published in this document appendix and on the project extranet as a project plan. 22/03/2013 17 Generic Document (company Name)

5 Standard method and procedure This section of the BEP covers the requirements of PAS1192-2 Clause 7.2.1 c). 5.1 Volume strategy See Section 5.3 (file naming convention), sub-section Volume for the definitions and abbreviations of volumes to be used on the project. 5.2 PIM origin and orientation The origin and orientation of the project are based on the project location and its reference to other global or local grids, for example Ordnance Survey. Some projects have their own grid system: Crossrail, for instance, uses the London Grid specified for that project, as did the Olympics programme. See the CPIc Production Information 2003 publication for specific requirements. Table 14 Record of information model origin and orientation Point Site local grid origin Grid origin Bottom Left Intersection Grid Intersection Bottom Right Grid Intersection Top Left Grid intersection notation Easting (m) Northing (m) Elevation or site Datum 5.3 File naming convention Table 15 Template for file naming Project Originator Volume Level or Location File Type Discipline Number See the Guide to BS1192:2007 for additional explanation. Project The project is an alphanumeric code that is used by the project team to identify the project. It should not be confused with the Project Contract number which may be different for each company working on the project. Table 16 Project code(s) Code Project Where an organisation needs to use their own internal project numbers, then they can be indicated in the drawing title block using a separate project number box. 22/03/2013 18 Generic Document (company Name)

Originator Table 17 Originator codes Code (Abbreviate to either 2 or three digits) Originator Company name Volume Each individual team will provide a copy of their volume strategy in the form of a drawing of each floor layout, section or site with volumes clearly marked named and inserted below. For volumes relating to infrastructure refer to PAS1192-2:2013. Example: When planning complex projects and determining the number of model files required, it is commonplace and good practice for the project to be divided into volumes defined by coordinates within an overall project model that will be held as separate model files. This enables multiple users to work on the project efficiently. Volumes should be allocated using cut lines to indicate their limits. Volume boundaries could be structural joints or grid lines; for road projects they could be chainage distances; or they could be defined by use e.g. a vertical distribution shaft. Each team will provide a copy of their volume strategy in the form of a drawing of each floor layout with volumes clearly marked and inserted below. Table 18 Template for defining project volumes Discipline/Originator: Code Volume (Abbreviate to 2 No. alphanumeric characters) 22/03/2013 19 Generic Document (company Name)

Level or Location The level code is a 2 or 3 character alphanumeric code that represents the level or storey of the building. For infrastructure (linear) the level is replaced by location defined as a chainage and offset. Table 19 Level or location codes Code Level Code Location File type Table 20 Agreed file types for drawings and models (see BS1192:2007, PAS1192-2) Code File Type Table 11 Agreed file types for documents (see BS1192:2007, PAS1192-2) Code File Type 22/03/2013 20 Generic Document (company Name)

Discipline A list of discipline or role codes as recommended in BS1192 Part 5 are shown in the Table below. Table 22 Discipline codes (see BS1192-5) Code A B C D E F G H I K L M P Q S T W X Y Z Discipline Architect Building Surveyor Civil Engineer Drainage, Highways Engineer Electrical Engineer Facilities Manager Geographical Information System Engineers and Land Surveyor Heating and Ventilation Designer Interior Designer Client Landscape Architect Mechanical Engineer Public Health Engineer Quantity Surveyor Structural Engineer Town and Country Planner Contractor Sub-Contractor Specialist Designer General (non-disciplinary) The discipline code is a single character indicating the discipline. On larger projects it may be useful to extend the discipline code to 2 characters and listed here. Table 23 Extended discipline codes for this project Code Discipline Number The number is a 5-character code. The number may be viewed in a number of ways: 1. Each design disciplines starts at 00001 and then allocates additional numbers to suit their own needs. 2. The first two or three characters of the number could be used to signify an element code that further classifies the file. One classification code system should be chosen and consistently used by all project teams. 22/03/2013 21 Generic Document (company Name)

Metadata Extend the standard Metadata status codes as required for the project, add to but do not change the codes in the PAS1192-2. Table 24 Metadata status codes from PAS1192-2 Status Description Work in Progress S0 Initial status or WIP Master document index of file identifiers uploaded into the extranet. Shared (Non-Contractual) S1 S2 S3 S4 S5 Suitable for Co-ordination The file is available to be shared and used by other disciplines as a background for their information. Suitable for Information Suitable for Internal Review & Comment Suitable for Construction Approval Suitable for Manufacture S6 Suitable for PIM Authorization (Information Exchanges 1-3) S7 Suitable for AIM Authorization (Information Exchange 6) D1 D2 D3 D4 AM Suitable for Costing Suitable for Tender Suitable for Contractor Design Suitable for Manufacture/Procurement As Maintained Published Documentation (Contractual) A B AB Suitable for Construction Partially signed-off: For Construction with minor comments from the Client. All minor comments should be indicated by the insertion of a cloud and a statement of in abeyance until the comment is resolved, then resubmitted for full authorization. As-Built Handover documentation, PDF, native models, COBie etc. 22/03/2013 22 Generic Document (company Name)

5.4 Layer naming convention Each discipline should provide the Design Manager and the CAD manager with a full list of all layer names to be used on the project. This list should be published to all members of the project team for information. Table 25 Layer naming convention Field Discipline Classification Presentation Description Name A - G23 - M2 _ Stairs Example Architect Stairs (Uniclass) Model graphics (2D) Some software solutions suggest that layer names are not necessary but it has been found that the convention shall be used when sharing or exchanging information. 5.5 Agreed construction tolerances for all disciplines Table 26 Agreed tolerances for construction elements according to project discipline Discipline Element Tolerance 5.6 Drawing sheet templates Table 27 List of drawing sheet templates Sheet Size A0 A1 Sheet File name All drawing template must be rendered and presented at one of a number of approved scales, which are typically defined by the CAD Manager. Scales other than those approved should not be used. The templates shall also be in the standard format for sharing and interoperability. 22/03/2013 23 Generic Document (company Name)

Table 28 Drawing sheet scales Drawing Sheet Scales All drawings must be rendered and presented at one of a number of approved scales, which are typically defined by the CAD Manager. Scales other than those approved should not be used. Scale Description of detail 1:1000 1:1000 Scale Detail shows shape and layout 1:500 1:200 1:100 1:100 Scale Detail shows shape, layout and construction elements 1:50 1:50 Scale Detail shows how the construction elements meet at junctions 1:20 1:10 1:5 1:5 Scale detail show shape, dimensions and assembly of the separate construction elements 1:2 1:2 Scale detail show shape, dimensions and assembly of the separate construction elements 1:1 All model files must be modelled at 1:1 Scale 5.7 Annotations, dimensions, abbreviations and symbols Each discipline should provide the Design Manager and the CAD manager with a full list to be used on the project. This list should be published to all members of the project team to ensure consistency of the document graphical presentation and shall be consistent throughout the project. Also see BS8541 Parts 1, 2, 3 and 4. Dimensions should be derived automatically from the underlying CAD coordinates by using the 'associative dimensioning' function of CAD systems. Dimensions should not be entered as 'text' as they are purely graphic characters having no relationship with the underlying CAD coordinates and will cause the relative positions of elements in a drawing to be compromised. The project team should agree common units of measurement. These should include distance (e.g. metre and millimetre) and angles (e.g. degrees/radians measured clockwise or counter clockwise). Table 29 Agreed units of measurement Type of information Millimetres Metres Degrees Radians Clockwise Counter Survey Roads Models Drawings 5.8 Attribute data Attribute data for the project as defined in the EIR and appropriate COBie templates. 22/03/2013 24 Generic Document (company Name)

6 IT solutions This section of the BEP covers the requirements of PAS1192-2 Clause 7.2.1 d). 6.1 Software versions The CAD software and versions that will be used by the design teams shall be agreed before starting the project. Table 30 Agreed software versions Company Database CAD software Version Format Comments 6.2 Exchange formats The agreed formats for model and drawing file exchange are Table 31 Agreed exchange formats for models and drawings Models Drawings Final drawing format Schedules or spreadsheets DWG DGN DWF PDF IFC Other 6.3 Process and data management systems The process and data management systems shall be described under section 4.2 Agreed project processes for collaboration and information modelling. 22/03/2013 25 Generic Document (company Name)