REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS AIR-CONDITIONING INSTALLATIONS GOVERNMENT BUILDINGS



Similar documents
1. Registered name of company/firm Under Business Registration Ordinance, Laws of Hong Kong

GENERAL INFORMATION FOR REPAIR AND MAINTENANCE OF CENTRAL AIR CONDITIONING PLANT ( Direct & Chiller ).

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING

Refrigeration & Air Conditioning

EA-6/02 M: EA Guidelines on the Use of EN and ISO/IEC for Certification to EN ISO Publication Reference PURPOSE

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

EU F-Gas Regulation Guidance Information Sheet 5: Stationary Air-conditioning and Heat Pumps

USC CFC Leak Repair and Recordkeeping Procedures

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

National Certificate in Heating, Ventilating, and Air Conditioning (Mechanical Services) (Level 5)

MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS

CODE OF PRACTICE. Safety Management. Occupational Safety and Health Branch Labour Department CODE OF PRACTICE ON SAFETY MANAGEMENT 1

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

CLIMATE CHANGE POLICY FRAMEWORK FOR REFRIGERATION AND AIR CONDITIONING SECTOR

National Certificate in Motor Industry (Automotive Air Conditioning)

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

DOCUMENTED PROCEDURE MANUAL

CCF Systems Gap Analysis Checklist. Civil Contractors Federation. Civil Construction Management Code

Chris Clement 701 Bayou Lane Thibodaux, LA

Checklist. Standard for Medical Laboratory

National Certificate in Motor Industry (Motorcycle Engineering)

2. AIRCONDITIONING AND REFRIGERATION

HOW TO APPLY FOR REGISTRATION AS A SAFETY OFFICER Under the Factories and Industrial Undertakings (Safety Officers and Safety Supervisors) Regulations

GUIDANCE NOTE ON OUTSOURCING

Optimization of Clinical Engineering in Private Healthcare

COMPETENCY ANALYSIS PROFILE Refrigeration and Air Conditioning Systems Mechanic - Branch 1 313A

COPY. Revision History: Changes were made to reflect the current practice of only including the most recent changes in the revision history.

SITE CONTRACTOR PROCEDURES

EU F-Gas Regulation Guidance Information Sheet 14: Refrigeration, Air-Conditioning and Heat Pump Contractors

Training Centre is at the back of KFC in Three Rivers. Next to Telkom

Unit ID: 482 Domain AUTOMOTIVE ELECTRICAL AND ELECTRONICS Title: Install and repair electrical lighting system of vehicles Level: 2 Credits: 6

The Prophotonix (UK) Ltd Quality manual

COMMISSION REGULATION (EU)

CHECKLIST ISO/IEC 17021:2011 Conformity Assessment Requirements for Bodies Providing Audit and Certification of Management Systems

EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY

Guidance for Stationary Refrigeration & Air- Conditioning

DOCUMENT CS/1: SCHEME DESCRIPTION AND BENEFITS

SECTION A... 3 SECTION B... 7

HomeServices Terms and Conditions

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

Contractor Connect Scheme Electrical Contractor and Worker Handbook

INSTITUTE OF ART, DESIGN AND ENTERPRISE - UNIVERSITY

10 tips for getting more reliability from your air-conditioning system [reliability]

a) To achieve an effective Quality Assurance System complying with International Standard ISO9001 (Quality Systems).

EU F-Gas Regulation Guidance Information Sheet 21: Training and Certification Requirements for Refrigeration, Air-Conditioning and Heat Pumps

How DCMA Helps To Ensure Good Measurements

ISO 9001:2008 QUALITY MANUAL. Revision B

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN :2009

Refrigeration & Air-conditioning Technician

Code of Practice for Building Energy Audit

CEA Base requirements for Installers of Automatic Fire Detection and Alarm Systems (AFDS), Intruder Alarm Systems (IAS) and/or CCTV-Systems

ISO 9001:2000 AUDIT CHECKLIST

TANZANIA BUREAU OF STANDARDS EMPLOYMENT OPPORTUNITIES

Information Security Policies. Version 6.1

Check-list for auditors. Audit visit at candidate registered laboratories

Owner-User Pressure Equipment Integrity Management Requirements

Refrigeration, Air Conditioning and Appliance Servicing

Course Curricula for Short Term Courses based on Modular Employable Skills (MES) in the Refrigeration & Air Conditioning Sector

CP14 ISSUE 5 DATED 1 st OCTOBER 2015 BINDT Audit Procedure Conformity Assessment and Certification/Verification of Management Systems

वषय/Sub :- Comprehensive Annual Maintenance Contract (CAMC) for Split & Window AC units of Doordarshan Kendra, Hyderabad for the year

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, Table of Contents

REQUIREMENTS FOR REGISTRATION OF LOW VOLTAGE EQUIPMENT

SASO XXXX:2016. (Including the modifications approved in Saudi Council Board No. XXX/2016) LARGE CAPACITY AIR CONDITIONERS

Procedure for Equipment Calibration and Maintenance

Centrifugal Water Chillers. Scott Meyerkord

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART II

HVAC/R Sector. List of qualifications:

HONG KONG ASSOCIATION OF INTERACTIVE MARKETING (HKAIM) 香 港 互 動 市 務 商 會 Certified Digital Marketer (CDM) Application Form

Health and Safety Management Standards

General Rules for the certification of Management Systems

EU F-Gas Regulation Guidance Information Sheet 22: Training and Certification Requirements for Mobile Air-Conditioning Systems

Quality Management System

Guidance for the Quality Assurance of Fire Protection Systems

This qualification has been reviewed. The last date to meet the requirements is 31 December 2018.

CODE ON PERIODIC ENERGY AUDIT OF BUILDING COOLING SYSTEM. 1 st Edition. 1 P a g e

BCA-IDA Green Mark for Existing Data Centres Version EDC/1.0

NRMCA Quality Certification. Ready Mixed Concrete Quality Management System. Certification Criteria Document

Assured Joint Integrity

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q Date: Title. Revision: QUALITY MANUAL PROCEDURE Q September 2014

Oil-Free Screw Compressors. Water-injected Technology. Rely on GD to provide the perfect fit

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE

EA IAF/ILAC Guidance. on the Application of ISO/IEC 17020:1998

Danfoss Turbocor Learning Center

2004 Standard For Performance Rating Of Positive Displacement Refrigerant Compressors And Compressor Units

CENTRIS CONSULTING. Quality Control Manual

Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry

1 RCNY CHAPTER 100

FLUXUS Energy. Manage energy effectively using non-invasive measuring technology. Heat usage, chilled flows and compressed air flow rate

your comfort. our world. DNSS EcoSave A/C remote monitoring and malfunction prediction

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Quality Management System and Procedures

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

TRAINING, EXAMINATION AND CERTIFICATION

In the compression-refrigeration loop (air conditioning), which is likely to be warmer? 1. Condenser coil 2. Evaporator coil

Transcription:

REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS IN AIR-CONDITIONING INSTALLATIONS IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION BUILDING SERVICES BRANCH ARCHITECTURAL SERVICES DEPARTMENT November 2007

URequirements for Certification Scheme for UServicing Quality for Chillers in UAir-conditioning Installations in Government Buildings of UThe Hong Kong Special Administrative Region 1. Objective of the Certification Scheme for Servicing Quality for Chillers In order to uphold the standard and level of local support services and to improve the servicing quality of chillers used in the air-conditioning installations in Government buildings, the (ArchSD) has decided to implement the Certification Scheme for Servicing Quality for Chillers (the Scheme) for chillers used in new construction projects undertaken by ArchSD. 2. Implementation of the Scheme The Scheme will be implemented in new construction projects undertaken by ArchSD on an individual project basis according to the project needs. Whenever it is specified in the Particular Specification of Air-conditioning Installation of a Contract/Sub-contract of a project that the Scheme is to be adopted for the chillers used in this project, the chillers proposed for use in that project will be required to comply with the Scheme. Under the Scheme, the supplier(s) /manufacturer(s) of the proposed chiller(s) are required to obtain certification certifying that the standard and level of local support services of their chillers complies with the minimum technical and managerial requirements for the Scheme. 3. Requirements for Certification under the Scheme The chiller to be covered in the Scheme means liquid chillers used in air-conditioning system. A liquid chiller is a machine that removes heat from a liquid via vapour compression or absorption refrigeration cycle. A liquid chiller comprises evaporator(s), refrigerant compressor(s), integral or remote condenser(s) and appropriate controls and metering devices designed to chill liquid. The types of chillers include air-cooled or water-cooled which can be driven by electric motor or other means. Similarly, heat pumps (including total energy heat pumps) that employ reverse refrigeration cycle for heating are also included in the Scheme. Page 1

In order to obtain certification under the Scheme, chiller suppliers /manufacturers are required to fulfill the Minimum Technical and Managerial Requirements for Certification Scheme for Servicing Quality for Chiller attached in Appendix A. The chiller suppliers /manufacturers can obtained the certification by either one of the following three independent assessment schemes:- (i) Accreditation of the Servicing Quality of Chiller under the ISO9000 certification (ii) Accreditation of the Servicing Quality of Chiller under the Hong Kong Q-Mark Quality Services Scheme (iii) Other certification scheme proposed by the chiller suppliers/manufacturers that is certified by recognized accreditation bodies The chiller suppliers/manufacturers shall immediately inform the certification body of any material changes in the Company which may affect their certification status under the Certification Scheme for Servicing Quality for Chillers and shall arrange re-certification if deemed necessary by the certification body. Building Services Branch November 2007 Page 2

Minimum Technical and Managerial Requirements for Certification Scheme for Servicing Quality for Chillers Ref. Aspects Objectives Manufacturer s Local Office /Authorized Agent with in-house service team Manufacturer s Local Office /Authorized Agent with maintenance services outsourced / Specialist Contractor 1. Scope To identify the chillers to be included for certification under the quality services scheme for chiller. 2. Job Experience a) To have adequate experience in providing and managing repairing services for chiller, solely and fully, including project coordination with the client, manufacturer of the chiller, user/maintenance agent and other BS/E&M/maintenance contractors. The make, type and model of chillers manufactured by the chiller supplier that the manufacturer s local office/authorized agent with in-house service team is capable of providing and managing repairing services. Min. 1 year experience in providing and managing repairing services for chillers in local market. The make, type and model of chillers authorized by the chiller supplier that the outsourced specialist contractor is capable of providing and managing repairing services. Min. 1 year experience in providing and managing repairing services for chillers in relation to the chiller supplier. 3. Registration with relevant authorities in Hong Kong To comply with statutory/regulatory requirements in carrying out chiller repairing A Registered Electrical Contractor registered under Electricity Ordinance, Cap. 406 A Specialist Contractor to be at least Group I under the category of Airconditioning of the List of Approved Suppliers of Materials and Specialist Contractors for Public Works 4. Top Management To assure the resident management having the minimum experience in managing the maintenance work 5. Technical Staff To employ minimum no(s). of resident technical staff with suitable qualification, experience and training from chiller suppliers Min. 5 years experience in managing the repairing and maintenance works. Refer to Annex I R Min. 5 years experience in managing the repairing and maintenance works. Refer to Annex I - R Page 1 of 4

Minimum Technical and Managerial Requirements for Certification Scheme for Servicing Quality for Chillers Ref. Aspects Objectives Manufacturer s Local Office /Authorized Agent with in-house service team Manufacturer s Local Office /Authorized Agent with maintenance services outsourced / Specialist Contractor 6. Plant and Equipment To have adequate nos. of calibrated testing instruments and equipment/tools for carrying out the repairing services; valid calibration certificates for testing instruments shall be available. Refer to Annex II R Refer to Annex II R 7. Workshop Facilities To have reasonably sized, suitably furnished and equipped local workshop/storage area Local office/workshop in Hong Kong. Minimum office area shall be 110 m 2 and the minimum workshop + storage area shall be 50 m 2. Documentary evidence (e.g. purchase/lease agreement) to prove right of use shall be produced. Local office/workshop in Hong Kong. Minimum office area shall be 110 m 2 and the minimum workshop + storage area shall be 50 m 2. Documentary evidence (e.g. purchase/lease agreement) to prove right of use shall be produced. 8. Training To have technical staff properly and adequately trained by the manufacturer of the chillers The training shall contain, but not limited to, the following: i) General description of the system and its associated equipment as a whole. ii) Operation procedures. iii) Check-list of all the periodic inspection and servicing of the chiller. iv) Trouble shooting procedures. v) Identification of all the possibilities of faults of chillers vi) Recommended maintenance procedures. vii) Practical training on dismantling of compressors. The training shall contain, but not limited to, the following: i) General description of the system and its associated equipment as a whole. ii) Operation procedures. iii) Check-list of all the periodic inspection and servicing of the chiller. iv) Trouble shooting procedures. v) Identification of all the possibilities of faults of chillers vi) Recommended maintenance procedures. vii) Practical training on dismantling of compressors. Page 2 of 4

Minimum Technical and Managerial Requirements for Certification Scheme for Servicing Quality for Chillers Ref. Aspects Objectives Manufacturer s Local Office /Authorized Agent with in-house service team Manufacturer s Local Office /Authorized Agent with maintenance services outsourced / Specialist Contractor 9. Spare Parts To have adequate stock/guaranteed supply of consumable spare parts including proprietary parts and generic parts for the chiller(s) under repairing & maintenance Consumables to be available within 24 hours. General major parts should be delivered to Hong Kong in 2 weeks. Other major parts such as compressors, the delivery time should be confirmed within one week. Consumables to be available within 24 hours. General major parts should be delivered to Hong Kong in 2 weeks. Other major parts such as compressors, the delivery time should be confirmed within one week. 10. Maintenance Programme and Schedule To have maintenance schedule for all types of chillers under their maintenance indicating dates for routine inspection and maintenance Manufacturer published and implemented formal Installation, Operation and Maintenance Manual to be readily available. Manufacturer published and implemented formal Installation, Operation and Maintenance Manual to be readily available. 11. Attendance and Response to Emergency Call To attend emergency calls within the time as specified in the ArchSD A/C GS a) Attend to faults and complaints arising from defective work materials and/or system operation with charge within three hours at any time and without charge within 24 hours b) To rectify or provide temporary measures to rectify the problem within 24 hours upon attendance, if practically possible. a) Attend to faults and complaints arising from defective work materials and/or system operation with charge within three hours at any time and without charge within 24 hours b) To rectify or provide temporary measures to rectify the problem within 24 hours upon attendance, if practically possible. Page 3 of 4

Minimum Technical and Managerial Requirements for Certification Scheme for Servicing Quality for Chillers Ref. Aspects Objectives Manufacturer s Local Office /Authorized Agent with in-house service team Manufacturer s Local Office /Authorized Agent with maintenance services outsourced / Specialist Contractor 12. Breakdown Repair Time To carry out breakdown repair according to the time as specified in the ArchSD A/C GS Complete permanent rectification works within 7 working days unless long component and parts delivery time is required. Complete permanent rectification works within 7 working days unless long component and parts delivery time is required. 13. Record System of Services and repairing To have a proven and traceable documentation system for recording of services provided i) Fault call report for repair/replacement carried out for the plant and equipment ii) Equipment Breakdown Report with full details of findings during investigation/examination on cause of breakdown, account of repair/replacement work needed, suggested precaution and/or action required to prevent the recurrence of similar incident. iii) The record shall be maintained for at least 12 months after expiry of maintenance contract i) Fault call report for repair/replacement carried out for the plant and equipment ii) Equipment Breakdown Report with full details of findings during investigation/examination on cause of breakdown, account of repair/replacement work needed, suggested precaution and/or action required to prevent the recurrence of similar incident. iii) The record shall be maintained for at least 12 months after expiry of maintenance contract 14. Health & Safety and Environmental Control To assure the effective management of the health & safety and environmental performance in provision the chiller repairing services In house health & safety and environmental policy In house health & safety and environmental policy 15. Measures for Continuous Improvement To have a system to review the quality of the repair services and apply corrective action. i) Review frequency at least once per year ii) Identify opportunity for improvement iii) Corrective action shall be applied to those substandard service/performance identified i) Review frequency at least once per year ii) Identify opportunity for improvement iii) Corrective action shall be applied to those substandard service/performance identified Page 4 of 4

List of Minimum Nos. of Technical Staff Annex I R Technical Support Staff A minimum of 20 nos. technical staff including technical manager, engineers, technicians, site supervisors, craftsmen and technical assistants with adequate and relevant academic qualifications and working experience shall be employed. Title Nos. Min. Academic Qualifications Technical Manager 1 no. i) MHKIE in relevant engineering field (or equivalent), or ii) Degree in relevant engineering field, or iii) N.A. Engineer 1 no. i) Higher Diploma in relevant engineering fields, or ii) Higher Certificate in relevant engineering field Site Supervisor 3 nos. An approved apprenticeship or be registered as REW grade R or Technician (A/C) 5 nos. An approved apprenticeship or be registered as REW grade R or Technician (Elect.) 2 nos. An approved apprenticeship or be registered as REW grade B or Craftsman (A/C) 2 nos. An approved apprenticeship or be registered as REW grade R or Craftsman (Elect.) 2 nos. An approved apprenticeship or be registered as REW grade A or Technician Assistant 4 nos. An approved apprenticeship or be registered as REW grade R or Min. Post-qualification Experiences 2 years 8 years 20 years of relevant working experiences 3 years 5 years 8 years 5 years 5 years 2 years 2 years 2 years

List of Tools / Equipment and Testing Instruments Annex II R Item of Assessment Minimum Requirements Remarks Welding machine 1 Mercury manometer 1 See Note 2 Voltmeter 2 See Note 2 Ammeter 2 See Note 2 Refrigerant leakage tester 2 See Note 2 Pump out unit 1 Vacuum pump 1 Charging hose 2 Refrigerant storage cylinder 1 Note : 1. All equipment should be verified that they are all at sight or with other form of proof of ownership. 2. Record of valid calibration for testing instruments must be available.