HYDROGRAPHIC & GEOPHYSICAL SURVEYS ON A REEF SITE



Similar documents
Applications of Integrated Vessel-based LiDAR, Multibeam Bathymetry, and Geophysical Surveys for Geohazard Assessments and Site Characterization

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

1.0 INTRODUCTION 2.0 SCOPE OF WORK. DATE July 29, 2010 PROJECT No /2000

HV Submarine Cable Systems Design, Testing and Installation

Hydrographic and Sediment Surveying

Improving Hydrographic Rate of Effort

Survey Sensors Hydrofest Ross Leitch Project Surveyor

COMPANY PROFILE PELICAN COMPANY LIMITED

The Coast of Crystal Cove Orange County, California

Ocean Engineering, Surveying and Mapping Services

The Arctic-2010 cruise: bathymetric survey for delineation of the extended continental shelf of the Russian Federation in the Arctic

Author(s): Document owner: n/a MESH action: 2.1 Version: 1.1 Date published: File name: Language:

Offshore Renewable Energy in Virginia

Contents. 1. PROFILE p2. 2. SERVICES 2.1 Offshore Support Services p 4 Offshore support p 6 ROV operations p 8

The Integration of Hydrographic and Oceanographic Data in a Marine Geographic Information System U.S. Hydro 2015

GEO-MARINE TECHNOLOGY, INC. A Geological, Geophysical, and Hydrographic Survey Consultancy

Hydrography at IHO cat A level: Scientific Education, at Sea Training, and Interaction with the Industry. N. Debese, R. Moitié, N.

Remote Sensing, GPS and GIS Technique to Produce a Bathymetric Map

Outline. Application of AUVs for Hydrography. AUVs for hydrographic surveying AUV horizontal mapping accuracy

TECHNIQUES FOR SPATIAL ANALYSIS AND VISUALIZATION OF BENTHIC MAPPING DATA

SEABEAM ELAC1185 MULTIBEAM ECHOSOUNDER

The optimum offshore survey workflow for high-quality GIS results. by integrating CARIS & EIVA software

MARINE GEOPHYSICS. Oil & Gas PROJECT SUMMARY SHEET. Project Title: BP WEST JAVA, ONWJ, PIPELINE INSPECTION BY VESSEL BASED SURVEY.

4. DATA ACQUISITION METHODS

NEW DIGITAL TERRAIN MODELING (DTM) TOOLS FOR CABLE ROUTE PLANNING by Dr. Jose M. Andres Makai Ocean Engineering Inc.

Martin County Coastal GIS Program St Lucie Inlet Planning Tool

The Nippon Foundation / GEBCO Postgraduate Certificate in Ocean Bathymetry Training Program at the

5th International Symposium on Ecohydraulics 2004 Aquatic Habitats: Analysis & Restoration th September, Madrid, Spain

2014 Oyster Restoration Implementation Update

Creating a Seamless Model of the Littoral and Near Shore Environments

DELPH v3.0. seabed mapping software suite

Error Estimation in Positioning and Orientation Systems

Predicting Coastal Hazards: A Southern California Demonstration

An Overview of Seabed Surveys (High resolution Geophysical Site Surveys)

SURVEY RESULTS OVERVIEW. Fergal McGrath INFOMAR Team Leader Marine Institute

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

The BEAMS Program College of Charleston & University of Washington

Rachel Silverstein, Ph.D. Executive Director and Waterkeeper

This service is free for all our customers with a maintenance contract.

Norwegian Hydrographic Service. and. [Contractor] APPENDIX B. Technical Specifications. MAREANO Programme. [Date]

The Application of a Remotely-Operated Hydrographic Survey Boat for Tailings Facility Bathymetry

OCEANOGRAPHY Vol.II Morphology of Ocean Floor and Plate Tectonics - Chengsung Wang MORPHOLOGY OF OCEAN FLOOR AND PLATE TECTONICS

Managing bathymetric data in a hydrographic survey company and making the data accessible to clients

U.S. Environmental Protection Agency, Region IX Response to Comments on the Goleta Sanitary District Draft NPDES Permit and 301(h) TDD

Advances in Unmanned Surface Vessels (USV s) James Williams Managing Director

Swath-sounding techniques for near shore surveying C. R. Bates 1 and P. Byham 2

Cruise planning worksheet. Scheduling information. Equipment requirements. Date of cruise planning meeting , Monday R/V Melville

Aquaculture Monitoring Standard

KNOWLEDGE AND SKILL GUIDELINES for HYDROGRAPHIC SURVEY TECHNICIANS

Managing Our Water Retention Systems

Why Submarine Cables?

Overview of geophysical and geotechnical marine surveys for offshore wind transmission cables in the UK. September 2015

South Park Bridge Hydrographic Survey (3OOf 97) Seattle, Washington

Integration of LIDAR Data in CARIS HIPS for NOAA Charting Carol McKenzie *, Bill Gilmour, Lieutenant Edward J. Van Den Ameele, Mark Sinclair

MULTIBEAM COURSE CO-HOSTED BY THE NORWEGIAN HYDROGRAPHIC SERVICE

ADCPS IN ACTION IN AUSTRALIA!

Seabed Survey Data Model OGP Geomatics Industry Day Overview. Gareth Wright, Woodside Energy October, 2012

The concepts developed in this standard include the following: Oceans cover about 70% of the surface of the Earth.

FDOU Project 26B Task 4 Our Florida Reefs Community Working Group Scenario Planning Results

REGIONAL SEDIMENT MANAGEMENT: A GIS APPROACH TO SPATIAL DATA ANALYSIS. Lynn Copeland Hardegree, Jennifer M. Wozencraft 1, Rose Dopsovic 2 INTRODUCTION

УДК 528 Nguyen Thanh Le APPLYING MULTIBEAM ECHO-SOUNDER SYSTEM IN MAKING MULTISCALE SEABED TOPOGRAPHY MAP IN VIETNAM

Risk Management and Insurance For U.S. Offshore Wind Projects. Jeff Kehne Sept. 14, 2011

Numerical Modeling Earthquake Effects On Sea Outfall Systems : Kadýköy Sea Outfall Case

Chapter Overview. Bathymetry. Measuring Bathymetry. Echo Sounding Record. Measuring Bathymetry. CHAPTER 3 Marine Provinces

STATUS REPORT FOR THE SUBMERGED REEF BALL TM ARTIFICIAL REEF SUBMERGED BREAKWATER BEACH STABILIZATION PROJECT FOR THE GRAND CAYMAN MARRIOTT HOTEL

(1) define the objectives and intended use of the maps and spatial data and

Instrumentation for Monitoring around Marine Renewable Energy Devices

GreenPlanIT LID Site Suitability Tool. Patty Frontiera, Pete Kauhanen, Marshall Kunze,

New Coastal and Inland Water Mapping System Promises Significant Increases in Productivity with Virtual Real Time Map Production

User s Guide. Zuniga Point. Point Loma

sonobot autonomous hydrographic survey vehicle product information guide

New Technologies and Airborne LiDAR Bathymetry survey Techniques in European Environmental Coastal Mapping Projects

COMPANY CAPABILITY STATEMENT

Translating ecological research results into wind farm practice The Danish experience. Niels-Erik Clausen. 2 Risø DTU

Precision Hydrographic Services. Company Profile. Company Profile. We do it once, we do it right.

Assessment. Ian Uglow Technical Director, SLR Consulting 7 th October 2010

Bathymetric Attributed Grids (BAGs): Discovery of Marine Datasets and Geospatial Metadata Visualization

A METHODOLOGY FOR GIS INTERFACING OF MARINE DATA

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

SONOBOT AUTONOMOUS HYDROGRAPHIC SURVEY VEHICLE PRODUCT INFORMATION GUIDE

SHOALS Toolbox: Software to Support Visualization and Analysis of Large, High-Density Data Sets

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

Master of Science (MSc) in Hydrography Syllabus

Overview. NRC Regulations for Seismic. Applied to San Onofre Nuclear Generating Station. NRC History. How we Regulate

Section 401 Water Quality Certification

MPA Baseline Program. Annual Progress Report. North Coast Region

Proven expertise and total reliability to support globally recognised oil and gas clients

Error detection of bathymetry data by visualization using GIS

Operational Policy Statement. Follow-up Programs under the Canadian Environmental Assessment Act

Transcription:

HYDROGRAPHIC & GEOPHYSICAL SURVEYS ON A REEF SITE Planning a Kelp Mitigation Artificial Reef Offshore of San Clemente, California Neil Marshall & Tim Norall EcoSystems Management Associates, Inc. Robert S. Grove Southern California Edison Company M. Hany S. Elwany, Ph.D. Scripps Institution of Oceanography

Introduction Why a kelp artificial reef, and why at San Clemente? Compensate for kelp habitat impacts from the San Onofre Nuclear Generating Station In-kind, and in-place (nearby) mitigation Locate in an area physically suitable for kelp Locate in an area that minimizes impacts to existing valuable habitat and substrate

Kelp Habitat in the San Onofre area

Locations of San Clemente Kelp Mitigation Artificial Reef, San Onofre Nuclear Generating Station, and Pendleton Artificial Reef.

Kelp Reef - Siting Guidelines As governed by physical conditions and regulatory agency constraint: Suitable kelp growth depths: ~ 11 to 16 m. A thin (< 0.5 m) layer of sediment on top of bedrock or existing natural hard substrate. Near-persistent natural kelp forests. Not directly on existing natural hard-bottom substrate. At a distance from areas with major sediment deposition. At a distance from areas near wastewater discharge or other human perturbations. At a distance from areas of historical or cultural resources. As near as practical to the SONGS-impacted natural kelp reef.

Mitigation Kelp Reef Project Schedule Phase 1 General Siting and Design Studies: 1991 to 1997. Phase 1 San Clemente Site Sonar Study: 1997-1999. Phase 1 Construction, 22.4 acres: Sept. 1999. Phase 2 Sonar and Ground-Truth Studies: Sept. 2005 to Feb. 2006. Phase 2 Construction, 127.6 acres: 2007-2008.

Phase 1 Reef: Constructed in Sept. 1999 864-Acre Lease Area 356 Acres Suitable Substrate 56 Modules - Each 40 m x 40 m 22.4 Acres Total

Phase 1 Construction Derrick Barge and Supply Barge September 1999, 22.4 Acres of Reef Area Created

Phase 1 Construction Method - Derrick and Supply Barges

Aerial View, 2002, Phase 1 Reef Modules with Kelp Canopies

Kelp Habitat Phase 1 Reef Modules

Phase 2: 127.6-acre Build-out Mitigation Reef Siting Methods and Project Objectives 2005-2006: Multibeam sonar surveys bathymetry and bottom type (sand or hard-substrate) Sub-bottom sonar surveys sand thickness Diver ground-truth surveys verify bottom type and sand thickness, assess biological communities Reef siting and design planning 2007- and beyond: Kelp Mitigation Reef Construction 40-year biological and physical performance study Adaptive management process

Survey Vessel: 2005 Multibeam Sonar Surveys at the San Clemente Kelp Mitigation Reef

Methods Field Equipment for the 2005 Hydrographic and Geophysical Survey at the San Clemente Kelp Reef The M/V Locator, a 25 foot long Parker boat, was used as survey vessel for the project. The vessel was equipped with the following primary equipment for execution of the survey: Reson SeaBat 8101 Multibeam Echosounder (MBES), overthe-side mounted POS/MV 320 positioning, heading, and motion reference sensor CSI DGPS-MAX USCG Differential correction radio-beacon GeoAcoustics Model 5110 Sub-bottom Profiler (SBP), over-theside mounted Applied Microsystems Limited (AML) SmartProbe, for Sound Velocity Profiles (SVP) FPI s WinFrog navigation software Triton Elics International (TEI) Isis Sonar, DelphMap, BathyPro, & DelphSeismic Software Suite CARIS HIPS

Phase 2 Multibeam Survey, October 2005. Study area: 7.5 sq km, 52 tracks, 295 km total line length.

Phase 2 Multibeam Coverage: Bathymetry, Oct. 2005

Left: Image and Inset Location in the San Clemente Reef Study Area. Right: Sun-Illuminated Multibeam Bathymetry Image of Kelp Modules.

Comparison of kelp canopy areas - 2002 kelp aerial map (right); with substrate features from the 2005 multibeam sonar bathymetry map.

Sub-Bottom Lines (2) with Historic Core Samples (sand depths in m): Overlaid on Bathymetry

Layout of the Phase 2 Mitigation Reef Proposed Build-out Areas on the 2005 Multibeam Bathymetry Sonar Data.

Phase 2 Reef Study 2005 Multibeam sonar results: Build-out reef (127.6 acres) and contingency areas (22.4 acres) overlaid on seafloor characterization map.

Phase 2 Mitigation Reef Proposed Site (127.6 acres) Overlaid on historical kelp canopy in the lease area - 1967 to 2004. Kelp canopy areas have been geo-referenced to the substrate features of in the 2005 multibeam sonar data. Year-Sum is the cumulative number of years that kelp has occurred at a location.

Conclusions The five-year 1999-2004 study of the 22.4-acre Experimental Reef demonstrated that: Sustained kelp growth on a low-profile artificial reef is viable Well-placed reef substrate will not disappear into the sediment Minimum bottom density of reef substrate meets performancemandated kelp coverage 2005-2006 Hydrographic & Geophysical Study provides: Time-series data (1997-2006) demonstrating that the natural seafloor elevations, seafloor types, and biological communities have not change significantly in the San Clemente area Assurance that artificial reef materials in the planned polygons will avoid the potential of burial into the sand seafloor Assurance that viable existing hard-substrate biological communities will not be adversely impacted by new reef material placement An accurate map for siting the 127.6-acre build-out Kelp Mitigation Reef

The End