SP Energy Networks 2015 2023 Business Plan



Similar documents
SP Energy Networks Business Plan

SP Energy Networks Business Plan

MPLS provides multi-site solution

The Profitability of BT s Regulated Services

BT Wholesale Catalogue 31 July 2012

BT s response to Ofcom s consultation on battery back-up for superfast broadband services which use fibre optic technology

Executive summary 2. 1 Introduction 4

Better Backhaul for Mobile

Meeting the challenge of voice services

The Future of Communications

Ofcom and Internet Technology

Mobile Backhaul The Next Telecoms Revolution

The UK experience of functional separation, equivalence and NGA. Andrea Coscelli, Director of Competition Economics 3 October 2013

Top Down Long Run Average Incremental Cost (LRAIC) Model Specification Paper

KANSAS CORPORATION COMMISSION IP-to-IP Interconnection Report

Electricity Distribution Price Control Review. Network costs - August forecast business plan questionnaire rules:

The Making Kent Quicker Programme covers a range of projects that Kent County Council is leading to improve broadband infrastructure.

Next Generation Access Glossary. 21CN: BT s upgrade of their core network (the backbone of the network).

Annex 5. Planning ICT Infrastructure

NEXT GENERATION BROADBAND - CASE STUDIES

Geographic market analysis: Ofcom s experiences

18 th EACO Congress, Kigali 23 rd May 2011 Barry Kingsland Fellow Institute of Directors Director - Energy & Sustainability

Information Governance Committee. Scope for the BCU Telephony Infrastructure development. Underpinning BCU Three Year operational plan

why fixed.plan? We only connect to Tier 1 partners, including Openreach, BT and Talk Talk Business, ensuring a robust and reliable service.

Business Connectivity Market Review: Leased lines charge controls and dark fibre pricing. Redacted version

UK Networks & Security An Overview. Dr Andrew Powell, ENISA Workshops on CERTs in Europe, 29 May 2008

SP Energy Networks Business Plan

Business Connectivity Market Review Review of the retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments markets

why fixed.plan? We only connect to Tier 1 partners, including Openreach, BT and Talk Talk Business, ensuring a robust and reliable service.

Swansea University. ICT Infrastructure Strategic Plan:

NIA Project Registration and PEA Document

BBC Trust Distribution Framework for BBC Services

Reducing Gigabit Leased Line Costs

RIIO T1 Business Plan Update January 2012

NETWORK OUTPUT MEASURES METHODOLOGY Authors: National Grid, SP Transmission Limited, Scottish Hydro Electric Transmission Limited

Waddesdon Local Area Forum Broadband update. Waddesdon Primary School Wednesday 20 th November 2013

Methodology & Learning Report. Work package 1.2: Data Analytics Trial

Service Schedule 5 - Internet Connectivity Services Terms & Conditions v1.0

Business connectivity market review: Jersey

National Grid Electricity Transmission s RIIO-T1 business plan overview

TAXONOMY OF TELECOM TERMS

Helping you make Network Services work for you. Vodafone Power to you

Extraordinary UK Ethernet

How to choose the right IP gateway for your VoIP migration strategy. Deployment note

BT Global Services. Access in EU. BT Connect. Networks that think

Contents 1 Introduction Technical Configuration Customer Support How to Order... 11

Wireless The answer to all our communications needs?

Wholesale Leased Lines: Review of Price Controls. Initial Notice Proposed directions to JT (Jersey) Limited

The Making Kent Quicker Programme covers a range of projects that Kent County Council is leading on to improve broadband infrastructure.

#superfaststaffordshire. Bill Murphy Managing Director, Next Generation Access BT Group

CenSus ICT Strategy ( )

ANTICIPATED ACQUISITION BY BT GROUP PLC OF EE LIMITED. Summary of hearing with UKB Group on 14 August 2015

hso:voice+ SIP Trunk Service Service Description

European policy and regulation for convergence

Broadband deployment and sharing other utilities infrastructure

UG405 IN PRACTICE INTRODUCTION

Data services. Reliable, high speed data connectivity for business

Broadband Networks Virgil Dobrota Technical University of Cluj-Napoca, Romania

ConneXon s response to Ofcom Consultation Document

ICT & Communications Services Disaster & Recovery Plan

ESKITP Authorise strategy, policies and standards relating to IT service delivery performance metrics management

VoIP in the Enterprise

White Paper. Moving from ISDN to SIP: What you should know. A guide for anyone looking to implement SIP Trunks in their business

BT s Fibre Optic Network - Outstation Testing

Business Connectivity Market Review

Registered No. SC117120

ESKISP Conduct security testing, under supervision

Determination of 2010 Transmission Allowed Revenue and Use of System Tariffs

ADSL BROADBAND BASICS FOR THE DOMESTIC USER. The Main Limitations of ADSL Broadband are as follows.

Managed Hosted IP Telephony Services shared services for Government One Network. One Planet. Infinite Possibilities.

How To Use Bbt (Bbt) For Business

Information Crib Sheet Internet Access Service Agreement

Transcription:

SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex BT21CN Mitigation Strategy SP Energy Networks 37 March 2014

March 2014 Issue Date Issue No. Document Owner Amendment Details 17 th March 2014 1.0 P. Dolan First Issue

1. Scope 3 2. Table of linkages 3 3. Introduction 4 4. Background 5 4.1. DPCR5 and ED1 Approach 5 4.2. BT21CN Timescales 5 5. Mitigation Approach 6 5.1. BT21CN Mitigation Solutions 6 5.2. Approach Efficiency 7 2

1. Scope This Annex covers our strategy for BT21CN mitigation throughout the ED1 period. 2. Table of linkages This strategy supports our ED1 Business Plan. For ease of navigation, the following table links this strategy to other relevant parts of our plan. Document Annexes Annexes Annexes Annexes Chapter / Section Chapter C6 Expenditure e. Non Load Related Investment Annex C6 Expenditure Supplementary Annex - Section 8.3.10 Annex C6 Cost Benefit Analysis SPEN - Reference 65 Annex C6 SP Manweb Company Specific Factors SPEN Section B3 Annex C5 Black Start Capability SPEN 3

3. Introduction SPD and SPM are currently reliant on leased line BT circuits for critical protection applications, including unit protection and intertripping. Since the advent of broadband the use of these leased lines has declined dramatically so much so that these services will be made obsolete by 2018 as BT develops its 21CN services. No equivalent service is available via the existing BT copper cables, the alternatives available such as broadband are not suitable for protection applications and as a result we need to identify and invest in alternative protection communications solutions. Figure 1: BT21CN Development and Impact to Leased Line Services SP Energy Networks is proactively mitigating circuits affected by BT21CN by ensuring that adequate communications services are provided for associated protection. Circuits where the BT21CN impact has been mitigated in DPCR4 and DPCR5 have required investment in alterative communications solutions and protection changes. SPEN will continue this approach for all remaining 192 circuits in SPM and 34 circuits in SPD affected by BT21CN in line with the BT lease services forced migration in 2018 Table 1: ED1 BT21CN Investment BT21CN Mitigation RIIO-ED1 SPD SPM m m BT21CN 5.0 28.3 There are elements of expenditure in this annex which relate to the SPM special factors case, details of which are contained within Annex C6 SP Manweb Company Specific Factors SPEN. 4

4. Background 4.1. DPCR5 and ED1 Approach SPM is the DNO worst affected by BT21CN because it has utilised more leased line services than any other UK DNO for protection applications. Our strategy in relation to BT21CN mitigation was outlined prior to the award of an ex-ante allowance in DPCR5 and publically disclosed in SP s Statement below. Following the NGN workshop we have reconsidered our plans for BT21CN over DPCR5 and DPCR6 to acknowledge BTs 2018 switch off for the platform associated with the analogue leased lines. To minimise the cost impact on customers during DPCR5, we have re-profiled and reduced our expenditure investment in DPCR5, and tail ended the expensive and complicated solutions into DPCR6. This strategy was supported by OFGEM at the time and SP Energy Networks was the only DNO to receive 100% of our requested ex ante allowance for both SPD and SPM https://www.ofgem.gov.uk/ofgem-publications/46803/septemberupdateletter.pdf As anticipated our planned investment in BT21CN Mitigation activity will ramp up from 2015 until 2018 and the closure of the BT20CN Lease Lines Platforms. 4.2. BT21CN Timescales SPEN has continued to monitor the BT and OFCOM position with regard to the leased lines delivered through legacy (BT20CN) platforms. BT has reinforced the 2018 closure date in recently. BT leased line volumes continue to decline, hence are becoming less economically viable to support as the majority of their users switch to BT21CN Ethernet/IP services. Sources which confirm the BT Leased Line Platform Closure Date include BT - TDM Statement Nov 2011 iss4 protected.pdf. (Nov 2011) and OFCOM - Business Connectivity Market Review: Sections 1-4 (June 2012) In line with the latest communications listed from BT and OFCOM, by 2018 BT will cease the leased line platform with no equivalent alternative being offered. 5

5. Mitigation Approach 5.1. BT21CN Mitigation Solutions SPENs BT21CN mitigation strategy is based on utilisation of a toolbox approach where least cost solutions have been selected on a circuit by circuit basis and all opportunities to utilise existing / developed infrastructure have been explored. This is demonstrated by the efficiency of our unit costs for the solutions employed to date compared to others with similar requirements in the industry. The uplift in investment requirement in ED1 reflects the increase in complexity and costs associated with individual circuit migration solutions. SPEN have increased the resource allocation on this project in recent months and will proactively develop detailed engineering plans associated with ED1 solutions and secure delivery partners in advance of the capital investment works Our toolbox approach includes building block technology solutions such as Radio (and Hill site service establishment), fibre installation and use of 3rd party telecoms services which offer adequate performance post- BT21CN. Solutions where the communications performance is lower than current provisions have been considered in tandem work to replace existing protection with new equipment compatible with the communications service BT21CN mitigation in ED1 will focus on establishment of infrastructure. Accordingly BT21CN mitigation solutions may use a combination of these building block technologies and existing infrastructure to form replacement telecoms routes for effected circuits. Where practicable and appropriate, we plan to deploy infrastructure that can be shared by a number of services requiring mitigation. Work on BT21CN mitigation aligns with our strategy to enhance systems resilience as part of the Black Start Resilience overall strategy (see Annex C5 Black Start Capability SPEN). Accordingly a minimum of one resilient communications route out of each Grid Supply Point and 132kV active network sites will be established. Figure 2 : BT21CN Solutions 6

The breakdown of BT21CN activities in ED1 is shown in the tables below. Where mitigation solutions are based on shared infrastructure development (comprising of multiples solutions), the main solution invested in to mitigate the associated circuit is listed. Table 2: BT21CN Mitigation Solutions BT21CN Mitigation Solutions Volumes SPEN Fibre 4 BT Fibre 19 SPD BT Fibre + Protection Change 2 SPEN Microwave / Radio 9 Total 34 SPEN Fibre 26 BT Fibre 42 SPM BT Fibre + Protection Change 75 SPEN Microwave / Radio 49 Total 192 5.2. Approach Efficiency SPEN has completed a Cost Benefit Analysis, Annex C6 Cost Benefit Analysis SPEN, Reference 65, which demonstrates that our best BT21CN mitigation options are circuit specific and rely on a range of solutions including suitable BT products. Our efficient approach selects the best circuit specific solution for each service to be mitigated to achieve the most cost effective overall programme. 7