Accounting System. Page 1 of 9

Similar documents
Appendix D Glossary Of Terms

This EVMS Training Snippet sponsored by the Office of Acquisition and Project Management (OAPM) covers Firm Fixed Price (or FFP type) subcontracts.

DATA ITEM DESCRIPTION Title: Integrated Program Management Report (IPMR) Number: DI-MGMT Approval Date:

Appendix B: Work Breakdown Structure (WBS)

FOREWORD. Page 2 of 88

How To Organize A Business

Project Control System Manual. Jefferson Science Associates, LLC. 200 Organization. Project Control System Manual Revision

Contract Cash Flow & Performance Analysis. PERCEPTION Helping The Shipyard Stay On Budget

NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services

Developing Work Breakdown Structures

Basic Concepts of Earned Value Management (EVM)

Head, Office of Project Management Oversight

INTERNAL CONTROL MATRIX FOR AUDIT OF ESTIMATING SYSTEM CONTROLS Version No. 3.2 June d Page 1 of 7

Earned Value Management Tutorial Module 1: Introduction to Earned Value Management. Prepared by:

Earned Value Management System Description

Patricia Mast (LCLS Project Controls Manager) Mark Reichanadter (LCLS Deputy Project Director) Signature Date

700 Analysis and Reporting

PMO Metrics Recommendations

Project Management Using Earned Value

CONVERTING TO PHYSICAL % COMPLETE METHOD OF EARNED VALUE IN MICROSOFT PROJECT

SCHEDULE AND BUDGETING

FERMI RESEARCH ALLIANCE PROCEDURES PROJECT MANAGEMENT. Head, Office of Project Management Oversight

Program/Project Management Series Work Breakdown Structure Reference Guide

Earned Value Management Best Practices

Earned Value Management and Professional Services Automation

SAMPLE WORK BREAKDOWN STRUCTURES VARIOUS TYPES OF PROJECT

EARNED VALUE MANAGEMENT SYSTEM AS A PROJECT MANAGEMENT TOOL FOR MAJOR MULTI-DISCIPLINARY PROJECTS

CPM -100: Principles of Project Management

SUCCESSFULLY INTEGRATING AGILE WITH EARNED VALUE MANAGEMENT

Project Cost Management

IS EARNED VALUE + AGILE A MATCH MADE IN HEAVEN?

Summary of GAO Cost Estimate Development Best Practices and GAO Cost Estimate Audit Criteria

AACE International Recommended Practice No. 86R 14

Training Seminars. Description. Core Courses: The core courses consist of the following:

Appendix A of Project Management. Appendix Table of Contents REFERENCES...761

Basics of Cost and Schedule Control

What is Costrac? Approval of Budget against WBS. Feasibility Study Completed. Define & Map WBS. Approval of WBS. Estimate

Spec. Standard: 11/27/ Revision: 11/27/06

Services Contracts and Earned Value Management (EVM)

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Project success depends on

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

Description of Program Management Processes (Initiating, Planning) 2011 PROGstudy.com. All rights reserved

How to successfully manage your mega-project

300 Scheduling and Budgeting

FAR Table Instructions for Submitting Cost/Price Proposals When Cost or Pricing Data Are Required

A collection of Safran Project report samples for project professionals

LECTURE -08 INTRODUCTION TO PRIMAVERA PROJECT PLANNER (P6)

CHAPTER 53 COST ACCOUNTING STANDARDS

for Sage 100 ERP Job Cost Overview Document

Cost Estimating Procedure. Table of Contents

July 6, (1) CHAPTER 11

P6 Analytics Reference Manual

Project Management System Description (PMSD)

1200 Project Control System Procedures

How To Write Ansi/Eia Evm System Acceptanceance Guide

Estimating Cost at Completion - Judgment & EV Information

Introduction to earn value management in Civil Engineering

A Gentle Introduction to Earned Value Management Systems

PROJECT TRACKING and CONTROL

1.040 Project Management

FAR UPDATE , Allowable Cost and Payment (Jun 2013)

PROJECT COST MANAGEMENT

Earned Value Management Systems Application Guide

Cash flow is the life line of a business. Many start-up

Accounts Payable and Inventory Management

Develop Project Charter. Develop Project Management Plan

MnDOT Project Management Office Presents: Schedule Updates. Presenter: Eric Costantino Senior Schedule Consultant DRMcNatty & Associates, Inc.

Earned Value Management Tutorial Module 8: Reporting. Prepared by:

Earned Value Management Guidelines

IDENTIFY ACTIVITIES STEP 2 By: Charlie Jackson (Hill International) & Hannah E. Schumacher (Kitchell Contractors)

PERCEPTION. Tracking Progress & EAC

Simple Earned Value (Using MS Project 2010)

Earned Value Management Systems Application Guide

Post Award Accounting System Audit at Nonmajor Contractors

Principles of Managerial Accounting ACC-102-TE. TECEP Test Description

ACG 3024 Accounting for Non-Financial Majors Homework Portfolio Study Guide

Collaborative Scheduling using the CPM Method

CONSTRUCTION CONTRACT TERMINOLOGY

Earned Value Management Changes to the Glossary and Chapter 7 of the PMBOK Guide Third Edition.

CLB 029 Wrap Rate Calculations

PeopleSoft Program Management

Activity Schedules in the NEC3 Engineering and Construction Contract

THE APPLICATION OF PERFORMANCE MEASUREMENT TECHNIQUE IN PROJECT MANAGEMENT : THE EARNED VALUE MANAGEMENT (EVM) APPROACH

DelDOT Professional Services Procurement Manual. Chapter Contents. Chapter Six Progress Payment and Reporting Procedures 6.1 PROGRESS PAYMENTS...

VOLUME 4, CHAPTER 20: JOB ORDER COST ACCOUNTING SUMMARY OF MAJOR CHANGES. All changes are denoted by blue font.

Understand How and Where Computers are used in Manufacturing

Chapter 1 Job Costing Using WIP Accounts

PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE

Project Time Management

SPECIFICATIONS - DETAILED PROVISIONS Section Project Control Schedule C O N T E N T S

Transcription:

Page 1 of 9 Accounting System In support of program management and Earned Value Management, the accounting system must be able to relate costs incurred to work accomplished. Not all accounting systems are designed to do this and, if a Work Breakdown Structure (WBS) has not been used, the capability may not exist. Instead, the system may only generate costs of labor, material, and other direct and indirect costs incurred by organizational elements. EIA-748 provides the characteristics required of accounting systems on major defense contracts. The WBS provides a structure that represents the work to be performed and its integration with the Organization Breakdown Structure (OBS) to form control accounts provides a logical place to collect costs. For that reason, control accounts are often called cost accounts and that term is used in earned value applied by the Department of Defense. From the control account, management information, including costs, can be summarized by WBS and by OBS enabling higher levels of management to look at performance both by element of work and by organization. Significant changes to the accounting system should not be necessary, although a WBS/OBS coding scheme must be adopted to facilitate summarization of data. At the conclusion of this lesson, you will be able to recall information the accounting system must provide to facilitate EVM.

Accounting System ''Accounting System'' used in this lesson refers to the Contractor's accounting system, or the Supplier's accounting system. It is important to recognize that the EVMS data is contractor or supplier based information. Work Breakdown Structure (WBS) A product-oriented family tree division of hardware, software, services, and other work tasks which organizes, defines, and graphically displays the product to be produced as well as the work to be accomplished to achieve the specified product. Organization Breakdown Structure (OBS) The hierarchical arrangement (organization chart) of a company's management structure, graphically depicting the reporting relationships. Normally limited to showing only managerial positions, but may depict lower organizational levels. Control Account A management control point where actual costs can be accumulated and compared to earned value. A control account is a natural point for cost/schedule planning and control since it represents the work assigned to one responsible organizational element for one work breakdown structure element. Also referred to as a cost account. A key element of an EVMS control account is that a single control account will not allocate costs to more than one WBS element and one organizational element.

Page 2 of 9 Labor Costs Labor charges normally occur at the work package level as man-hours are recorded on time cards (or equivalent) and accumulated for the control account. Since the control account manager must manage to a budget, labor cost variances should be reviewed both in terms of those variances related to performance (more hours used than planned) and those related to rates (higher cost per hour than planned). Therefore, labor hours should be priced out at the control account level to permit such analysis. In a work-team environment, which involves participants from different functional organizations, labor rates will vary and must be applied within the control account for accurate accounting.

Labor Cost Variances Labor cost variances can be either favorable or unfavorable and can be a combination of variances in usage and variances in labor rates. It is often useful to determine which variance is influencing the overall cost variance, so appropriate management action can be taken. A similar concept exists for material cost variances (material usage variance and material price variance).

Page 3 of 9 Material Cost Material costs can be more difficult to deal with for a number of reasons. There are many different kinds of materials, they are purchased and controlled differently and there are several points in time when material costs can be recorded. For example, at the time a purchase order is placed with a supplier, valuable cost information is available because it is known at that time whether the materials are going to cost more or less than planned. At the time the materials are received, performance of the vendor can be measured. When vendors are paid, the material costs are recorded in the general books of account and contractors can bill the customer. Raw materials costs or miscellaneous items purchased in economic lot quantities may be charged (BCWP earned) to the program when issued from stores or applied to work in process. In some cases involving production of common parts for various programs, parts are manufactured, put in inventory, and reissued when needed for assembly. The costs may be allocated (BCWP earned) as the parts are made or they may be held back until the parts are assigned to a specific program, depending on a variety of factors. The approach used should be the approach that more accurately depicts physical progress toward completion of a product.

Material Costs Can Be Recorded Within the EVM system, performance (BCWP) can be measured at the following points; 1) Material Delivery; 2) Withdraw from inventory to apply on the floor; 3) Progress accomplished prior to final delivery of a key component (subcontract). (Assumes progress payments are based on physical accomplishment and not simply payment of actual costs incurred.)

Page 4 of 9 Figure 9-1: Material Time Phasing Figure 9-1 illustrates the time phasing associated with the material acquisition process. As with labor, material costs should also be analyzed in terms of two components: price variance (materials cost more than planned) and usage variance (more materials used than planned). The price variance can be determined when the purchase order is placed. The usage variance is determined when the work is being done. D Long Description Figure 9-1: Material Time Phasing graphs the relationship (cost over time) for material received (material on order and inventory), work performed, and purchase orders placed.

Page 5 of 9 Price and Usage Variance An Earned Value Management system should reveal whether work performed is costing more or less than it was planned to cost. Material costs, like labor, should be recorded only when the work is performed. This approach, however, delays the visibility of material cost problems. Again, the portion of the material cost problem related to price is available at the time the purchase order is placed. Material price variances should be surfaced and incorporated into program cost estimates at that time even though the actual costs are still a long way from entering the books of account. A rational approach that accommodates Earned Value Management considerations is to record the costs of most materials at the time the materials are received. Material deliveries do represent progress of work and earned value can logically be taken at that time. However, the actual costs used for Earned Value Management would have to be "estimated actual costs", based on purchase order, invoice or other information, since the actual costs will not enter the formal books until the suppliers are paid. If necessary, an accounting adjustment can be made to ensure compatibility with the books of account after payment. Raw materials cost could continue to be booked and their value earned when they are issued to work in process. Material costs can be recorded by work package, but it is more common to charge those costs directly to the control account. Other direct costs, such as travel costs, may also be charged directly to the control account. Eventually, labor, material and other direct costs must be expressed in dollars and all elements can be converted to dollars at the control account level, whereas labor may be recorded only in terms of hours at the work package level.

Page 6 of 9 Subcontractor Reports Major subcontractors may receive a "flow down" of performance requirements and their reports must be integrated into the prime contractor's system and reports. Large subcontracts can be treated as separate WBS elements; others may be integrated with the WBS at the control account level. One problem that must be dealt with, though, is the lag time associated with subcontractor reporting. It may not be possible to align the accounting period cut-off dates so as to incorporate subcontract reporting in the current month. Consequently, users of the cost performance reports must understand that the bottom line may not represent the total program as of the reporting cut-off date. This should not be a big problem unless the subcontractor is experiencing significant difficulties. In these cases, a "flash" report from the subcontractor may be in order and the prime contractor should highlight the problem in the narrative portion of the program performance report. Electronic data interchange can also improve the timeliness of subcontractor reporting. Suppliers that get progress payments based on costs incurred and evidence of physical accomplishment must also be represented in the baseline plan. Budgets can be based on the progress payment plan with earned value and actual costs based on milestone accomplishments and actual payments made. Unlike prime contractor cost reporting, subcontractor costs include fee or profit, as applicable, which represents cost to the prime.

Page 7 of 9 Figure 9-2: WBS/OBS/Cost Element Identification The WBS/OBS integration and cost element delineation within the control account provides a structure that allows detailed visibility of cost information. D Figure 9-2 illustrates how the engineering direct labor costs for a specific WBS element can be easily identified within the system. Indirect costs are normally collected in overhead pools at a summary organizational level and then allocated back to programs and contracts using rates that are based on a ratio of direct to indirect costs. Indirect cost impacts may or may not be visible to the control account manager depending on individual company practices. Long Description Figure 9-2: WBS/OBS/Cost Element Identification illustrates how the engineering direct labor costs for a specific WBS element can be easily identified within the system. It is a 3-D representation showing how the WBS and OBS intersect with the labor, material, and other cost elements.

Page 8 of 9 Accounting Knowledge Review Which of the following describes information the contractor s accounting system must be able to provide to facilitate the use of EVM within a management system? Calculations of the value of work performed to work planned. Identification of the exact dates the work is planned to complete. Specification of the long term manufacturing goals relative to a contract. The relationship of actual costs incurred to work accomplished. Correct. Relating actual cost and the work accomplished describes information that the contractor's accounting system must be able to provide.

Page 9 of 9 End of Lesson You must click the Next button in order to receive credit for this lesson.