Public Demand Driven Innovation PCP and PPI in Horizon 2020



Similar documents
MGA for PCP and PPI cofunds in Horizon 2020

Public Demand Driven Innovation Innovation Procurement (PCP and PPI) in Horizon 2020 Updated version for calls

EU support for Innovation Procurement

ICT-36 PCP open to all areas of public interest requiring new ICT based solutions

E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants

E. Specific requirements for innovation procurement (PCP/PPI) supported by Horizon 2020 grants

Planned Healthcare in Europe for Lothian residents

INNOBAROMETER THE INNOVATION TRENDS AT EU ENTERPRISES

ERASMUS+ MASTER LOANS

ERASMUS+ MASTER LOANS

THE ROLE OF PUBLIC SUPPORT IN THE COMMERCIALISATION OF INNOVATIONS

EUROPE 2020 TARGETS: RESEARCH AND DEVELOPMENT

Alcohol Consumption in Ireland A Report for the Health Service Executive

1. Perception of the Bancruptcy System Perception of In-court Reorganisation... 4

The innovation value chain:

ANALYSIS OF THE STAKEHOLDER CONSULTATION ON

Labour Force Survey 2014 Almost 10 million part-time workers in the EU would have preferred to work more Two-thirds were women

Second Horizon 2020 Call Robotics ICT24

41 T Korea, Rep T Netherlands T Japan E Bulgaria T Argentina T Czech Republic T Greece 50.

The European Commission s strategy on Corporate Social Responsibility (CSR) : achievements, shortcomings and future challenges

EVALUATION GUIDE CALL FOR PROPOSALS 22/11 SUPPORT FOR THE DEVELOPMENT OF ON AND OFF-LINE INTERACTIVE WORKS

Operational Companies VAT Indirect Taxes. Why Luxembourg: VAT advantages for commercial companies*

ERASMUS FOR YOUNG ENTREPRENEURS : A NEW EXCHANGE PROGRAMME

Crystal Clear Contract Services Limited Application Form CIS/Sole Trader

How To Fund A Project

ERASMUS+ MASTER LOANS

Waste. Copenhagen, 3 rd September Almut Reichel Project Manager Sustainable consumption and production & waste, European Environment Agency

European Cloud Computing Strategy

EUROPEAN YOUTH: PARTICIPATION IN DEMOCRATIC LIFE

FP7 Space Research Proposal evaluation and role of the REA European Commission REA S2 Space Research

International Hints and Tips

ERMInE Database. Presentation by Nils Flatabø SINTEF Energy Research. ERMInE Workshop 2 - Northern Europe Oslo, 1. November 2006

Electricity and natural gas price statistics 1

The European Entrepreneur Exchange Programme

Energy prices in the EU Household electricity prices in the EU rose by 2.9% in 2014 Gas prices up by 2.0% in the EU

INNOVATION IN THE PUBLIC SECTOR: ITS PERCEPTION IN AND IMPACT ON BUSINESS

FEDERATION EUROPEENNE DE LA MANUTENTION Product Group. industrial trucks. A brief guide for identification of noncompliant. - Exhaust Emission -

EUF STATISTICS. 31 December 2013

SESAR. Luftfahrttechnologie - Auftaktveranstaltung zum 7. EU-Forschungsrahmenprogramm Wien, 4 Dezember 2006

International ACH: Payment Gateway to Europe

SURVEY ON THE TRAINING OF GENERAL CARE NURSES IN THE EUROPEAN UNION. The current minimum training requirements for general care nurses

Size and Development of the Shadow Economy of 31 European and 5 other OECD Countries from 2003 to 2015: Different Developments

The Community Innovation Survey 2010 (CIS 2010)

Cash machine withdrawal in the EU (+Norway and Iceland)

TPI: Traffic Psychology International on a common European curriculum for postgraduate education in traffic psychology

SEPA. Changes in the Payment System Implementation of the European SEPA Regulations for Kuna and Euro Payments

187/ December EU28, euro area and United States GDP growth rates % change over the previous quarter

99/ June EU28, euro area and United States GDP growth rates % change over the previous quarter

INTERNATIONAL TRACKED POSTAGE SERVICE

168/ November At risk of poverty or social exclusion 2 rate in the EU28, (% of total population)

Computing our Future Computer programming and coding in schools in Europe. Anja Balanskat, Senior Manager European Schoolnet

ICT 7: Advanced cloud infrastructures and services

Students: undergraduate and graduate students who are currently enrolled in universities

Electricity, Gas and Water: The European Market Report 2014

Public consultation on the contractual public-private partnership on cybersecurity and possible accompanying measures

COMMUNICATION FROM THE COMMISSION

Family benefits Information about health insurance country. Udbetaling Danmark Kongens Vænge Hillerød. A. Personal data

The Guardianship Service

ENTERING THE EU BORDERS & VISAS THE SCHENGEN AREA OF FREE MOVEMENT. EU Schengen States. Non-Schengen EU States. Non-EU Schengen States.

EXECUTIVE SUMMARY. Measuring money laundering at continental level: The first steps towards a European ambition. January 2011 EUROPEAN COMMISSION

ARE THE POINTS OF SINGLE CONTACT TRULY MAKING THINGS EASIER FOR EUROPEAN COMPANIES?

Horizon 2020 Secure Societies

ANTILOPE - HOW TO REACH INTEROPERABILITY IN E-HEALTH

Application Form: Receptionist / PA to the Senior Leadership Team

International Services tariff

Implementing the cooperation mechanisms of the RES directive current status and open questions

EUROPEAN CITIZENS DIGITAL HEALTH LITERACY

CENTRAL BANK OF CYPRUS

NEW PASSENGER CAR REGISTRATIONS BY ALTERNATIVE FUEL TYPE IN THE EUROPEAN UNION 1 Quarter

DRAFT AMENDING BUDGET N 6 TO THE GENERAL BUDGET 2014 GENERAL STATEMENT OF REVENUE

The coordination of healthcare in Europe

OVERVIEW OF RESEARCH PROJECTS IN THE ICT DOMAIN ICT statistical report for annual monitoring (StReAM)

- Assessment of the application by Member States of European Union VAT provisions with particular relevance to the Mini One Stop Shop (MOSS) -

Keeping European Consumers safe Rapid Alert System for dangerous non-food products 2014

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS

Finland must take a leap towards new innovations

The Joint Master Degrees under the Erasmus+ Programme

Ownership transfer Critical Tax Issues. Johan Fall, Anders Ydstedt March, 2010

New environmental liabilities for EU companies

The results of this consultation will feed into the Commission impact assessment which will accompany the proposal on an EU coordinated approach.

INVESTING IN INTANGIBLES: ECONOMIC ASSETS AND INNOVATION DRIVERS FOR GROWTH

COMPANIES ENGAGED IN ONLINE ACTIVITIES

Chase Online SM Wire Transfer Help Guide page 1 of 16. How to Send Wire Transfers on Chase Online SM

Program Proposal: European Network of Young Entrepreneurs Ambassadors

SMES, RESOURCE EFFICIENCY AND GREEN MARKETS

OVERVIEW OF PURCHASE AND TAX INCENTIVES FOR ELECTRIC VEHICLES IN THE EU

Definition of Public Interest Entities (PIEs) in Europe

Transcription:

Public Demand Driven Innovation PCP and PPI in Horizon 2020 Lieve Bos European Commission DG CONNECT (Communication Networks) F2 unit ( Innovation )

Part 1 slide set State of Play PCP-PPI

Dual objective Public sector efficiency Health care Climate Change Energy Efficiency Transport Security Public sector is faced with important challenges. Addressing these, often requires public sector transformations. In many cases, solutions are near the market and would be provided if clear requirements/sufficient demand expressed by the market (PPI) In other cases, still R&D required to de-risk technology, still competing solution approaches to compare before committing to large scale deployment (PCP) Public procurement/demand driven innovation can open markets for industry/researchers creating growth & jobs in Europe However, potential is underutilised in EU due to fragmentation of demand, lack of incentives -> transnational PCPs/PPIs

PPI Public Procurement of Innovative Solutions When Challenge requires solution which is almost on the market or already on the market in small quantity but not meeting public sector requirements for large scale deployment yet. No R&D involved (R&D already done, or no R&D needed to solve problem) What Public sector acts as launching customer / early adopter / first buyer for innovative products and services that are newly arriving on the market (not widely commercially available yet) How Public sector acts as facilitator establishing a buyers group with critical mass that triggers industry to scale up its production chain to bring products on the market with desired quality / price ratio within a specific time. After potentially a test / certification / labelling, the buyers group buys a significant volume of solutions.

PCP - Pre-Commercial Procurement When Challenge requires R&D to get new solutions developed. Problem clear, but pros / cons of several potential competing solutions not compared / validated yet. No commitment to deploy (PPI) yet. What Public sector buys R&D to steer development of solutions to its needs, gather info about pros / cons of alternative solutions to be better informed to make specs for a follow-up PPI possibly later, to avoid supplier lock-in (create competitive supply base) How Public sector buys R&D from several suppliers in parallel (comparing alternative solution approaches), in form of competition evaluating progress after critical milestones (design, prototyping, test phase), risks & benefits of R&D (e.g. IPRs) shared with suppliers to maximise incentives for wide commercialisation

PCP-PPI PPI Complementarity PCP to steer the development of solutions towards concrete public sector needs, whilst comparing/validating alternative solution approaches from various vendors PPI to act as launching customer / early adopter / first buyer of innovative commercial end-solutions newly arriving on the market Applied R&D / Pre-commercial Procurement (PCP) Public Procurement of Innovative Solutions (PPI) Phase 0 Curiosity Driven Research Phase 1 Solution design Supplier A Supplier B Supplier C Supplier D Phase 2 Prototype development Supplier B Supplier C Supplier D Phase 3 Original development of limited volume of first test products / services Supplier B Supplier D Phase 4 Deployment of commercial volumes of end-products Wide diffusion of newly developed solutions Supplier(s) A,B,C,D and/or X Also normally multiple sourcing here to keep competition going Objectives: Price/quality products that better fit public sector needs Earlier customer feedback for companies developing solutions Better take-up/wider commercialisation of R&D results

Complementarity / split between PCP and PPI and phased approach enables to Get 20% better value for money products(us defense data) Use PPI also if no(more) R&D needed for procurement need Use a small budget PCP to de-risk a large budget PPI PPI spec can be 'completely rephrased' benefiting from PCP lessons learnt Use conditions that encourage job creation 'in Europe' Because PCP falls outside WTO rules Prevent foreclosing of competition & crowding out of private investment in R&D Companies that are not financing their R&D via procurement/pcp (e.g. via grants, own company resources) can still bid for deployment contracts/ppis Facilitates access to procurement market for SMEs Gradually increasing contract sizes, tasks, required manpower Stringent financial guarantee/qualification requirements:'no' in PCP,'ltd' in PPI above not the case if R&D is procured as part of/inside large deployment contract

Status of PCP implementation across Europe January 2014 Awareness Raising Exploring possibilities Working on framework Framework identified and/or Pilots in preparation Pilots started Malta Romania Cyprus Bulgaria Luxembourg Slovakia Switzerland Estonia Latvia Denmark Lithuania Finland Spain Sweden Ireland Iceland Poland Netherlands UK Norway Czech Republic Greece France Belgium Italy Hungary Germany Slovenia Portugal Austria Examples of PCPs done by procurers in Member States without EU support: in Norway, Austria, Italy, Spain, UK, Netherlands etc ->More Info about national PCP initiatives in Member States: http://cordis.europa.eu/fp7/ict/pcp/msinitiatives_en.html Examples of on-going EC funded PCP projects doing joint cross-border PCP procurements: SILVER (Robotics solutions for elderly care), CHARM (Traffic management), V-CON (Virtual Construction / Modelling of Roads), SMART@FIRE (Smart Personal Protective Equipment for Fire Fighter), DECIPHER (applications based on Distributed EC Individual Personal Health Records), PRACE 3IP (energy efficient high performance computing), C4E (Cloud computing), ENIGMA (lighting solutions for cities), IMAILE (e-learning), THALEA (telemedecine for ICU patients at increased risk), UNWIRED-HEALTH (mobile care for vaccination & heart failure), PREFORMA (Digital Preservation), NYMPHA-MD (mental care for bipolar disorders) ->More info about EU funded cross border PCP projects: http://cordis.europa.eu/fp7/ict/pcp/projects_en.html

Examples from PCPs in member States done without EU support Carbon capture Norway Large project Statoil/Gassanova attracting large firms Regulatory requirement to seriously reduce CO2 emissions by 2016 without negative effects on health/environment, beyond what market is able to offer PCP started mid 2011, finished end 2012 (time to market shortened) compared solution approaches of 5 vendors Follow-up procurement for deployment in preparation for 2014 (open to whole market) More info on this case on: http://cordis.europa.eu/fp7/ict/pcp/docs/statoil-pcp-case-v2.pdf

Examples in Healthcare Larger project, but demanding Small projects attracting mainly SMEs innovation requirements, rements, interests both SMEs+larger vendors Potential 19m p.a. saving Potential 30m p.a. saving 4,000 per HCAI avoided Potential 160m p.a. saving Potential Value PCP-like projects to NHS in UK: Improve the quality of the patient experience and generate significant cost savings ( 236m). Value to the economy: A number of innovators/smes have attracted significant extra investment ( 290m). PCP Niguarda Hospital Lombardy region 10 Easy-to-use automated universal system for moving hospital beds, with anticollision and safety systems, not needing guide lines or tracks even on non rectilinear routes

Examples EU cofunded PPI (piloted in CIP) Low carbon healthcare PPI started 2006 Introducing more energy efficient LEDs in network of over 20 hospitals in 8 EU countries (cross border PPI cooperation funded by EC/DG ENTR) 30% energy consumption saving 88% maintenance savings Total cost savings enable take-in of +10% patients For more info: http://lowcarbon-healthcare.eu/ National brand names for PPI: Forward Commitment Procurement (FCP) in UK, Technology procurement in Nordic countries (e.g. Sweden NUTEK cases), etc www.ecoquip.eu PPI procurement for more efficient and sustainable healthcare solutions Procurers: Bologna univ. hospital Authority (IT), Erasmus Univ Medical Centre (NL), Nothingham univ hospital & Rotherham NHS trusts (UK), Such Deskidzka hospital (PL) www.happi-project.eu PPI procurement for healthy ageing solutions Partners from 12 different EU countries incl. procurers: NHS commercial Solutions (UK), Centrale de Marches Mercure (BE), FHL (Lux), Resah-Idf (FR), FPA (AT), SCR Piemonte (IT)

Part 2 slide set Horizon 2020 Funding Instruments in support of PCP-PPI

Forms of support Coordination and Support Actions (100% funding rate): Support only coordination activities e.g. for preparation of a PCP or PPI by a group of procurers (identifying common challenges among procurers, conducting open market consultations before initiating a concrete PCP or PPI procurement etc) CSAs do not provide EU cofunding for an actual PCP or PPI procurement) PCP cofund Actions (70% funding rate): Provides EU cofunding for an actual PCP procurement (one joint PCP procurement per action) + for related coordination and networking activities (e.g. to prepare, manage and follow-up the PCP call for tender) PPI cofund Actions (20% funding rate): Provides EU cofunding for an actual PPI procurement (one joint PPI procurement per action) + for related coordination and networking activities (e.g. to prepare, manage and follow-up the PPI call for tender)

Coordination and support actions Who: procurers (+ others that assist procurers, if participation well justified and adds value to the action) What: EU wide networks of procurers identifying together shared procurement needs in short term (PPIs) and longer term (PCPs) Engage in open dialogue with all stakeholders (industry, research community, other procurers, end-users) Investigate feasibility of and prepare concretely 1 joint PCP or PPI Other relevant coordination and networking activities (no cofunding for undertaking an actual procurement) Funding: typically +/- 1 Mio CSA type grant (100% direct costs + 25% indirect costs) Finding Partners: EU procurement forum, Linkedin group, Krakow PCP-PPI event (14-15 Nov 2013) Previous Projects: PCP/PPI projects in ICT domain

PCP and PPI cofund actions conditions for participation Minimum of 3 independent legal entities from 3 different Member States or associated countries, minimum 2 of which are public procurers from 2 different Member States or associated countries Public procurers are contracting authorities or contracting entities as defined in the EU public procurement directives Sole participant possible, if minimum participation requirements met They can be complemented by other types of procurers that are providing services of public interest and share the same need to procure R&D or innovative solutions E.g. NGOs or private procurers Other entities may participate as direct beneficiaries on condition that they add value to the action, are not potential suppliers of solutions sought for by the PCP/PPI and have no other type of conflict of interest Assisting the procurers in the preparation, implementation and follow-up

PCP and PPI cofund actions - Role of different actors Beneficiaries and third parties Action involves beneficiaries that undertake together the PCP or PPI procurement, i.e. the buyers group & the lead procurer Action can include third parties that can make in-kind contributions (make available resources / equipment to the beneficiaries to carry out the PCP or PPI) Buyers group Procurers that provide the financial commitments to undertake the PCP or PPI. Min 2 public procurers from 2 different Member States or associated countries Shall represent the demand side for the innovations, a critical mass of procurers that can trigger wide implementation of the innovations, shall aim for ambitious quality/efficiency improvements in area of public interest. Lead procurer Procurer in project appointed by buyers group to lead and coordinate the PCP or PPI. Subcontractors Successful tenderers, selected by the buyers group & lead procurer as result of the PCP or PPI call for tender, to provide the R&D services (PCP) or innovative solutions (PPI). They do 'NOT' enter the grant agreement with the EC.

PCP and PPI cofund actions - Eligible activities In the proposal, consortium shall already identify a specific challenge in the innovation plans of the procurers that requires innovation + KPIs (targeted quality/efficiency improvements) for the PCP/PPI. Eligible activities: Preparation stage Preparation of one joint PCP or PPI procurement per action Open market consultation /verification of market readiness to meet procurement need If relevant to the action, other coordination or networking activities Outcome Agreed common tender specifications + Joint procurement agreement Confirmation of commitment on availability of financial commitments to start PCP/PPI Execution stage Joint procurement of the R&D services (PCP) or innovative solutions (PPI) For PCP: Validation/comparison of the performance of the competing PCP solutions against jointly defined criteria in real-life operational conditions For PPI: Evaluation of results of deploying and operating the procured solutions in real-live operating conditions Dissemination/exploitation of results If relevant to the action, other coordination or networking activities (e.g. preparation of follow-up PPI, contribution to standardisation / regulation / certification)

PCP and PPI cofund actions EU contribution Reimbursement rate direct costs: Max 70% of eligible costs for PCP cofund actions, Max 20% of eligible costs for PPI cofund actions Eligible direct costs to carry out eligible activities defined in WP include: - Price of the R&D services (PCP) or innovative solutions (PPI) procured (if procurement conducted in compliance with requirements in Annex E WP) - Eligible coordination and networking activities - May include in-kind contributions (e.g. third parties putting resources at disposal of beneficiaries e.g. for testing of solutions) - VAT is an eligible cost unless for beneficiaries that can deduct it Flexibility: Consortium may choose to use part of the Union contribution to increase the support to coordination and networking activities/budget for call for tender as long as the Union contribution does not exceed 70% (PCP)/20% (PPI) of the sum of those costs and the price of the call for tender. Or other way around. Requested reimbursement for coordination and networking can comprise max 30% (for PCP) / max 50% (for PPI) of total requested grant Plus 25% for indirect costs. But, no indirect costs on the price of the PCP/PPI procurement or on 3 rd party resources not used at the beneficiaries premises Pre-financing: Yes, 1 st pre-financing at start project for costs for preparation stage, 2 nd pre-financing before execution stage for costs for rest (incl. call for tender)

One joint PCP coordinated by the lead procurer In their proposal, consortium shall have already identified one concrete procurement need as proposed focus for the PCP that is identified as a common challenge in the innovation plans of the buyers group and requires R&D! One joint call for tender published EU wide One joint evaluation of offers One lead procurer awarding all contracts in the name and on behalf of all procurers in buyers group Each winning tenderer gets: 1 framework agreement to participate in the PCP + one specific contract per PCP phase (solution design, prototyping, testing) One joint total budget (grouping financial commitments of all procurers in buyers group) from which all R&D providers are paid But, actual payments can be carried out centralised or distributed Either all R&D providers paid by the lead procurer Or each R&D provider paid pro rata by each procurer in the buyers group according to the share of each procurer's contribution to the common pot Also supervising suppliers and testing of solutions can be centralised or distributed Choice between testing all solutions of all R&D providers in 1 procurers site or on several sites procurers sites etc

Specific requirements PCP procedure (Annex E WP) Procedure: Compliance with applicable national procurement rules + compliance with additional specific requirements Definition PCP (Horizon 2020 RfP and PCP communication) EU-wide published open market dialogue and call for tender PCP call for tender open for at least 60 days Same objective evaluation criteria Functional / performance based specifications Best value for money award criteria Majority of R&D activities performed in MS/AS IPR arrangements for PCP R&D providers generating results in PCP shall own attached IPRs Procurers shall enjoy royalty-free access rights to use the R&D results for their own use Procurers shall also enjoy the right to grant or to require participating R&D providers to grant non-exclusive licenses to third parties to exploit the results under fair and reasonable market conditions without any right to sublicense

Example PCP cofund action Example: 5 M PCP cofund grant EU contribution: e.g. 0,7 M for coordination + 4,3 M for PCP (procurement of 6,1 M) EU contribution: Max 1,5 M for coordination + 3,5 M for PCP (procurement of 5 M) Example: 3 M PCP cofund grant EU contribution: e.g. 0,7 M for coordination + 2,3 M for PCP (procurement of 3,3 M) EU contribution: Max 0,9 M for coordination + 2,1 M for PCP (procurement of 3 M) P5 P4 P1 Preparation Joint PCP P3 P2 Consortia of public procurers P1->P5 (min 3) One Joint PCP call for tender + Joint evaluation offers (common tender specs) Phase 1: Solution design ~10-15% PCP budget ~100-250K/supplier ~4-10 suppliers Supplier A Supplier B Supplier C Supplier D Supplier E Example of 5-7 Mio PCP Phase 2: Prototyping ~30-40% PCP budget ~500-750K/supplier ~3-6 suppliers Supplier B Supplier C Supplier D Supplier E Phase 3: Original development operational testing ~50-60% PCP budget ~800K-2,3M/supplier ~2-4 suppliers Supplier B Supplier D Supplier E

One joint PPI coordinated by the lead procurer In their proposal, consortium shall have already identified one concrete procurement need as proposed focus for the PCP that is identified as a common challenge in the innovation plans of the buyers group and requires R&D! One joint call for tender published EU wide (unless PPI procures limited set of prototypes / test products developed during PCP, then negotiated procedure without publication foreseen in public procurement directives possible) One joint evaluation of offers But contract award can be centralised or distributed Either one lead procurer awarding all contracts to all suppliers on behalf of all procurers in the buyers group Or one lead procurer only awarding a framework contract with lots (lots per procurer) to each supplier, and each individual procurer awarding (a) specific contract(s) for his lot(s) to the supplier(s) delivering the solution(s) he buys» This means same core functionality and performance characteristics for solutions procured by all procurers, but possible additional local functionality for each procurer Also supervising suppliers and payments can be centralised or distributed

Specific requirements PPI procedure (Annex E WP) Procedure: Compliance with applicable national procurement rules + compliance with additional specific requirements Unless PPI limited to prototypes, test-products developed during pre-ceding PCP Cofund action Definition PPI (Horizon 2020 RfP). Choice between procurement procedures covered by procurement directives that do not include procurement of R&D EU wide publication of open market consultation, early announcement of target date for launching the PPI and call for tender PPI call for tender open for at least 60 days PPI call for tender open to tenderers from EU Member States and Horizon 2020 associated countries + (if applicable) additional countries that ratified WTO GPA Possibility of conformance testing before contract award Same objective evaluation criteria Functional / performance based specifications Best value for money award criteria IPR arrangements for PPI IPRs attached to results generated during PPI shall be owned by the party generated the results, unless duly justified cases (e.g. party the generating results is not able to exploit IPRs)

Example PPI cofund action Example: 5 M PPI co-fund grant EU contribution: e.g. 0,2 M for coordination + 4,8 M for PPI (procurement of 24 M) EU contribution: Max 2,5 M for coordination + 2,5 M for PPI (procurement of 12,5 M) Example: 2,5 M PPI co-fund grant EU contribution: e.g. 0,2 M for coordination + 2,3 M for PPI (procurement of 11,5 M) EU contribution: Max 1,25 M for coordination+ 1,25 M for PPI (procurement of 6,25 M) P1 One Joint PPI call for tender + joint evaluation offers (based on common tender specs) Public Procurement of Innovative Solutions (PPI) Deployment of commercial end-products Early adoption of new to the market products / services P10 P4 Preparation Joint PPI P3 P2 Buyers group of procurers e.g. P1->P10 (min 3) Lot 1 Lot 2 Lot 3 Lot 4 Lot 10 Procurer 1 buying e.g. 2 Mio solutions from supplier A Procurer 2 buying e.g. 1,5 Mio solutions from supplier B Procurer 3 buying e.g. 5 Mio solutions from supplier D Procurer 4 buying e.g. 2 Mio solutions from supplier A Procurer 10 buying e.g. 2 Mio solutions from supplier X

Differences PCP/PPI piloting vs Horizon 2020 Lessont Learnt New 2014 public procurement directives will provide now clear legal basis for joint cross-border procurement in all EU countries Flexible implementation of payment of suppliers possible H2020 enables to better leverage out differences in VAT across EU countries H2020 provides model PCP/PPI tender documents (will be in Annex to MGA) MGA drafted so that coordination/networking costs will not be reduced proportionally automatically, if procurers can buy innovative solutions cheaper than budgeted or if procurement cannot take place for unforeseen reason (coordination/networking costs max 30% / 50% of maximum grant amount not actual spent grant amount - for PCP / PPI cofund actions) Sole participants also possible in H2020 in PCP/PPI cofund actions Flexibility to shift budget from networking/coordination to call for tender part of the grant or other way around Especially for PPIs also: Longer deadlines to prepare proposals (all PPI cofund actions in WP2015) + large scale testing is optional i.s.o. mandatory (was considered by some as tough requirement in CIP ehealth PPI pilot call). Note: PPIs are in H2020 also done as 'joint' procurement, but with flexibility to use 'lots' for different procurers/different subcomponents to be procured

Background info CNECT website on PCP and PPI: Info on upcoming events and EU funding for PCP and PPI, ongoing EU funded projects, PCP/PPI initiatives in countries around Europe, background docs and FAQs, Keep informed: subscribe yourself to the CNECT PCP-PPI newsletter http://cordis.europa.eu/fp7/ict/pcp/home_en.html Official Horizon 2020 docs setting funding conditions for PCP and PPI cofund actions: http://ec.europa.eu/research/participants/portal/desktop/en/funding/referen ce_docs.html#h2020-work-programmes-2014-15-annexes (Annex D&E) Finding partners: EU procurement forum, PCP-PPI Linkedin group Info on ongoing PCP/PPI projects http://cordis.europa.eu/fp7/ict/pcp/projects_en.html http://cordis.europa.eu/fp7/ict/pcp/msinitiatives_en.html Info about upcoming events, info days http://cordis.europa.eu/fp7/ict/pcp/events_en.html