Quality Assurance Assessment



Similar documents
CAR DAILY VEHICLE PRE CHECKS INFORMATION. Page 1 of 6

National Heavy Vehicle Accreditation Scheme: Standards and Business Rules - Maintenance Management standards

A Guide to the Use of Maintenance Software and Computer Storage of Maintenance Records

Floods and flash floods happen in all 50 states. Flash floods often bring walls of water 10 to 20 feet high. A car can easily be carried away by just

Light Vehicle Approved Inspection Station Procedures Manual

THE FORD EXPRESS NEW VEHICLE WARRANTY

HALIFAX REGIONAL MUNICIPALITY (HRM) Seven (7) Current Model Year 4 Door Compact Front Wheel Drive Cars TENDER T15-122

Dangerous Goods Safety Guidance Note. Road transport of dangerous goods in receptacles of more than 500 L or kg

Assessment of Elevator and Escalator Maintenance & Repair Program Final Elevator Audit Submission Bethesda Station - Escalator A09X04 (Station)

Minibus Driving - Code of Practice

JOINT CBA AND SIA GUIDANCE FOR THE STORAGE OF FLAMMABLE LIQUIDS IN SEALED PACKAGES IN SPECIFIED EXTERNAL STORAGE AREAS

CIS Asset Identification and Labelling Standard

PRE-OWNED MOBILE / MANUFACTURED HOME PRE-INSPECTION

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

AUTOMOBILE MECHANIC STUDENT INTERNSHIP SKILLS LIST Provo School District

Vehicle Maintenance Program & Fatigue Management Program Development Package. Overview & Instructions to be retained by customer

INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

WATERJET VISUAL TECHNICAL INSPECTION REPORT

In safe hands. Ifor Williams Trailers. Since 1958, people have put their trust in our trailers, just ask an owner - they re

Buying a car. a buyer s checklist

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

External Visual Inspection Form

TRAILER APPROVAL IVA & RECORDS OF SUPPLY

System Saver 318 Air Compressor for Mack E-Tech and ASET Engines

Permit Application for Mobile Food Truck

Using the PDCA cycle in the real world

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

FRAME DOOR OPENING, DOOR AND SIDE PANEL OUTER

EXTENDED 10 YEAR LIMITED LIFETIME WARRANTY LIMITED LIFETIME WARRANTY

Trade Measurement (Weighbridges) Regulations

REHABILITATION OF MOBILE HOMES R

Retreat Leisure Home Warranty Cover

The Vehicle Commissioning Report and the Vehicle Equipment Registration are designed to ensure vehicles and equipment are:

SELF-STEERING AXLE TABLE OF CONTENTS

Swift Motorhomes web site:

Depending on your facility and the equipment contained within, all or part of the checklists/logs can be printed for use.

Unit LT01 Carry Out Routine Lift Truck Maintenance

Maintenance Report MEDIUM VOLTAGE POWER STATION 500SC / 630SC / 800SC / 900SC / SC / SC / 1250SC / 1600SC / 1800SC / 2000SC

MANDATORY SERVICE BULLETIN

STOLEN VEHICLE DECLARATION

AUGUST 2013 INFORMATION BULLETIN. Livestock transport

The Heavy Vehicle Collision Repair Specialists

In order to avoid misinterpretation, the definitions of various installation terms are listed below as follows:

Ministerial Declaration (Loaded Silage Trailer) Order 2013

Autobody/Collision and Repair Technology/Technician CIP Task Grid

National Heavy Vehicle Accreditation Scheme: Business Rules and Standards

Kia 7 Year Warranty. Terms and Exclusions

10 TON HYDRAULIC PRESS

National Certificate in Motor Industry (Motorcycle Engineering)

AIR-SUSPENSION. Art. nr.: L.L C.M. Auxiliary Air Suspension. Designed for: Mitsubishi L200. From: 2007& UP RDW 71/

ZX AUTO S.A. Warranty

Installation instructions of the MIDI-Heki roof light with operating bar, with crank or electrical version

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

Inspection Location Standards

Suzuki Service Record and Warranty Booklet for Automobile TERMS AND CONDITIONS

SECTION WINDOW WASHING SYSTEMS

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1

Stolen vehicles and/or vehicles being used to commit insurance fraud often have their vehicle

Trade Measurement (Weighbridges) Regulations 1997

Western Plant Health Association DOT MC 330 & 331 NH3 Cargo Tank Inspection Checklist Form

SECTION 807 PUMP STATION REHABILITATION

CARING FOR YOUR BMW. QUICK REFERENCE GUIDE.

WNTI Best Practice for Checking Shipping Containers Prior to Loading Drums of UOC and Before Dispatch GOOD PRACTICE GUIDE

PPG SUPPLIER DEVELOPMENT ASSESSMENT

Operation of the overrun braking system.

Fresh Water Plumbing Maintenance Guide

BUILDING PERMIT RESIDENTIAL BASEMENT FINISH

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Your essential guide to CE Marking

Food Safety and Quality Management System

2015 Senior Emergency Safety Grant

Guidelines on how you can register kit cars and rebuilt or radically altered vehicles

ISO Food Safety Management System

Maintaining the Beauty and Performance of Your Boxster

Miami Beach Building Department

BUYERS GUIDE. IMPORTANT: Spoken promises are difficult to enforce. Ask the dealer to put all promises in writing. Keep this form.

Safety and utilisation advice

Monthly Warehouse Inspection Checklist

Inspecting to a higher standard.

Self-Audit Checklist

PRE-PURCHASE INSPECTION REPORT

Renovation instructions

APEC Private Sector. Supply Chain Security Guidelines

TYPE APPROVAL CERTIFICATION SCHEME MASS PRODUCED DIESEL ENGINES

Shop around for the best deal in insurance cover. You do not have to use the insurance company the car dealer recommends.

Unit: mm(in) Item Standard value Service limit Axle shaft run out - 0.2(0.008)

HOMEOWNER MAINTENANCE MANUAL

TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes

C. Conform to requirements of Americans with Disabilities Act (ADA).

RURAL DEVELOPMENT - MANUFACTURED HOUSING FACT SHEET

Vehicle Maintenance Policies and Procedures

Transcription:

Quality Assurance Assessment Caravans & Camper-Trailers This audit is not a comprehensive evaluation of all aspects of the operation of the business, but is intended to provide potential customers, of a caravan or camper-trailer from the business, a reasonable degree of assurance that the vehicle has been assessed as having been designed and built in a professional manner, employing recognised engineering and quality practices. Business: Part 1: Name Manufacturer / Importer:. Address: Manager:.. Tel.: Quality Manager:. Can over-ride Production Manager?: YES / NO Quality Program: Part 2: Is there a Quality Program in operation: YES / NO If NO, the audit is stopped. Is there an up-to-date Quality Manual: YES / NO. Is there a Register to show latest version of quality documents: YES / NO. Are there Quality posters, policies, certificates and incentives displayed: YES / NO. Are employees well aware of the Quality Program requirements: YES / NO.. Is there a proper training and supervision program for new employees: YES / NO Are employees trained to be able to fill in for other operations, in case of absence: YES / NO.. Is there proper engineering documentation on the design of vehicles: YES / NO.. Is there proper engineering documentation on the testing of vehicles: YES / NO.. Are all documents relating to ADR components marked accordingly: YES / NO Is there a copy of the latest version of VSB-1 on hand: YES / NO Is a qualified experienced engineer engaged to ensure compliance of all models: YES / NO Are there suitable technical drawings for all processes on hand: YES / NO.. Are there suitable work instructions for all processes on hand: YES / NO.. Are there suitable inspection check-lists for all processes on hand: YES / NO.. Do all relevant personnel understand the definitions of Masses & Ratings: YES / NO.

Is there a detailed final check-list for finished vehicles: YES / NO Are internal audits conducted on a regular basis, and non-conformances rectified: YES / NO.. Is the Manager informed of all quality issues and corrective-actions taken: YES / NO Are all Dealers provided with mandatory pre-delivery audit check-lists: YES / NO Is there a satisfactory system for Dealers to report any compliance and quality issues: YES / NO Are all Dealers aware of the need to advise any increase in the Tare Mass: YES / NO.. Premises: Part 3: Does the exterior of the premises give the impression of a professional Business: YES / NO Does the interior of the premises give the impression of a professional Business: YES / NO Does the manufacturing area give the impression of a professional Business: YES / NO Does the manufacturing area give the impression of meeting OH&S requirements: YES / NO Does the manufacturing area give the impression of good clean house-keeping: YES / NO Does the manufacturing area give the impression of efficient and organized processes: YES / NO Is the Receiving area organized, with inspection check-lists utilized and retained: YES / NO Are there specific procedures for checking ADR-related components: YES / NO Is the Despatch area organized, with final-inspection reports utilized and retained: YES / NO Is the Final Inspection Check-list signed by the foreman: YES / NO Is there a segregated area for non-compliant goods: YES / NO Is there a certified weigh-bridge (or proof of a certified public weigh-bridge): YES / NO.. Is there a water-spray facility for testing completed vehicles for leaks: YES / NO. Is there a facility for pressure-testing the water plumbing system before cladding is fitted: YES / NO Manufacturing: Part 4: Is there a clear and detailed Job Sheet provided for each vehicle: YES / NO Are procedures in place to best prevent wrong parts being used: YES / NO Are the manufacturing and assembly operations set up in a safe and logical manner: YES / NO Are only the latest version of technical drawings and manufacturing instructions used: YES / NO Are these documents durable (laminated or such) and free of hand-written notes: YES / NO

Are suitable stage test and inspection check-lists used: YES / NO Are components (such as windows) from suppliers inspected for damage before fitment: YES / NO Are all assembly jigs accurate and in good order: YES / NO Are correct welding procedures on hand: YES / NO Is a senior person responsible for ensuring OH&S compliance and safe equipment: YES / NO Is suitable lighting provided for each operation: YES / NO Is eye-protection and ear-protection provided: YES / NO Are adequate fire-protection and safety instructions apparent: YES / NO Are suitable exits and passage ways apparent: YES / NO Is suitable safety equipment used when working at heights: YES / NO Are tape-measures, set-squares and other assembly aids in good condition: YES / NO Is there a procedure for reporting defects, and a separate area their rectification: YES / NO Are there procedures for ensuring effective sealing, so as to prevent water and dirt leaks: YES / NO Are torque-wrenches and factory compressed-air pressures regularly calibrated: YES / NO Is there an incentive scheme for employees to suggest improvements: YES / NO Random Vehicle: Part 5: Type of RV: Brand:... Model Serial No: Date of Manufacture VIN:. Aggregate Trailer Mass Rating (kg).. Compliance Plate Fitted: YES / NO Information Complete & Correct: YES / NO. Is the information neatly stamped or engraved: YES / NO Weigh-bridge Certificate: Gas Certificate: Electrical Certificate:.. ADR 62 / VSB-1 Certificate:..

Gas Cylinder(s) & Regulator Approved: YES / NO.. Residual Leakage Detector Operating: YES / NO Lighting OK: YES / NO Brakes OK: YES / NO Coupling/Chains OK: YES / NO Tyres & Wheels OK: YES / NO As per Compliance Plate: YES / NO. Wheel Size & Rating: Tyre Size & Ratings: Axle Rating: kg Wheel Nuts Torque Correct: Coupling Nuts Torque Correct: Suspension Rating: kg YES / NO.. Nm.. YES / NO.. Nm.. Recommended Tyre Pressures: Unladen:.. kpa Unladen:.. kpa Final signed-off Check-list provided: YES / NO Handbook provided: YES / NO Sufficient and clear information provided in the Handbook: YES / NO Manuals for all equipment & appliances provided: YES / NO All safety notices provided: YES / NO All notices and labels securely and neatly affixed: YES / NO Vehicle as per Brochure & Web-site: YES / NO Visual external appearance:.. Chassis: Alignment of axle(s) with coupling:.. Underside: Wiring & piping: Ease of opening/closing compartment doors: Ease of opening/closing windows & hatches: Paintwork & surface finish: Any defects scratches, rust, discolouration, bulges, etc.: YES / NO Evenness of gaps around panels: Visual internal appearance:.. Ease of opening/closing compartment doors: Any defects scratches, rust, discolouration, bulges, etc.: YES / NO. Fitment of appliances and accessories:..

Evenness of gaps around panels & appliances: Camper-Trailer Items: Ease of raising roof: Ease of lowering roof: Safety of winding mechanism:. Quality & Standard of Canvas:. Leak and draft areas:. Other items:. Rating of Facility: (1 = Bad; 10 = Good) Rating of Vehicle: (1 = Bad; 10 = Good) Follow-up Action Required:. Audit Address:. Audit Date:.. Name & Signature of Auditor:.. Name & Signature of Manager: