WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGES CLAIMS



Similar documents
NERSA APPROVED TARIFFS

GENERAL OBLIGATION BONDS

Soapstone Sewer Rehabilitation Alternative Concepts Design and Associated Impacts

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Bay Park Sewage Treatment Plant Super Storm Sandy Recovery

Introduction to the Envision Sustainability Rating System

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

Engineering Major Service Actual Budget Projected Request Executive Adopted

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Directorate: Local Government Accounting Ms. Lusanda Ngxonono. Reference: T7/2/7 TREASURY CIRCULAR MUN NO 26/2012

Toronto s Wet Weather Flow Master Plan

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

STAFF REPORT TO COMMITTEE OF THE WHOLE

Asset Management Plan

House Research Department General Fund Appropriations in Flood Relief Bills

Analysis One Code Desc. Transaction Amount. Fiscal Period

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

SFPUC s Vision A Multi-Billion Dollar Investment To Secure The Health and Economic Stability of the City of San Francisco

Standard Operating Procedures Storm Drain System Maintenance

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Examples of Eligible Projects. Project Category Description Examples

Township of Enniskillen. Asset Management Plan

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) Over 2015 $ $ $

Bridges & Culverts Condition by Quantity

ASSET MANAGEMENT PLAN

DAMAGE ASSESSMENT ANNEX E

Moving Ruston Forward. City of Ruston Infrastructure Maintenance and Improvements

City of Auburn Summary of Capital Outlay by Fund and Department

Disaster Recovery Managing and Leveraging Multiple Funding Sources

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

How To Help The Environment

Request for Proposal Campus Master Planning Consultant

Policy Clarifications on the Eligibility of Water and Wastewater Utility Projects for FEMA s Public Assistance and Hazard Mitigation Assistance Grants

Vermont Economic Resiliency Initiative (VERI) Community Forum Barre City & Barre Town

Case 2:08-cv ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Rivers Group. Effect of Canterbury Earthquakes on Waimakariri, Kaiapoi, & Halswell Rivers. Flooding & Drainage Perspectives

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY Small Commercial Service (SCS-1) GSR

Contracts Awarded by Gympie Regional Council worth $200, or more

Repair or Replacement - Band-Aids vs. Surgery

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

Barre City City-wide Policy and Program Options

Glenorchy City Council Asset Management Strategy for Infrastructure Assets

Carlton Fields Memorandum

City of Minot CDBG Disaster Recovery Action Plan Amendment #3

STORM WATER MANAGEMENT PLAN (SWMP)

ASSET MANAGEMENT STRATEGY


Green Spaces to Improve Waterways and Communities

Illinois IKE Disaster Recovery Program Housing Rehabilitation and Reconstruction Program (IKE-HRR) FAQS

City of Pitt Meadows 2015 Utilities Financial Plan December 11, 2014

Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT

Flood Mitigation in the NYC West-of-Hudson Watershed A guide to Programs, Agencies and Funding Sources for Municipalities and Property Owners

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

West London Dyke Flood Control Structure Master Plan Appendix A

Eastern Connecticut Risk & Vulnerability Assessment Workshop

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

The Corporation of the Municipality of Callander. Asset Management Plan

Paving Capitalization Work Categories and Treatments

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

EXPENDITURES SUMMARY INCREASE BUDGET BUDGET (DECREASE) (Restated) Over 2014

April 17, 2015 SUMMARY OF SUBJECT MATTER

Disaster Risk Management: prevention and urgent repair procedures for infrastructure and facilities

Town of Huntsville Municipal Asset Management Plan

HERE COMES THE RAIN AGAIN Stormwater Management in a Changing Climate at the City of Toronto

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

Mouth of the Columbia River Jetties Major Rehabilitation Study

MAJOR FUNDING SOURCES FOR COMMUNITY DEVELOPMENT

Approved Natural Disaster Recovery Round Green Army projects

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

PUBLIC WORKS DEPARTMENT STRATEGIC PLAN

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Transcription:

WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGES CLAIMS Expenditure Balance Summary Total R24,500,000.00 R24,500,000.00 R0.00 Dora R24,500,000.00 R24,500,000.00 R0.00 Under/Over Expenditure R0.00 Approval of Business Plan dated: 22 December 2004 Projects Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale R9,064,816.00 R9,064,816.00 R0.00 Laingsburg Municipality: 1) Repair of main water supply in Bergsig community Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R32,380.00 R32,380.00 R0.00 R4,042,500.00 R4,042,500.00 R0.00 Bitou Municipality: 1) Rehab of roads in Green Valley R650,000.00 R650,000.00 R0.00 Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges R1,368,000.00 R1,368,000.00 R0.00 Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900,080.00 R6,900,080.00 R0.00 Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system R2,122,224.00 R2,122,224.00 R0.00 George Municipality: 1) Repair of damaged roads R320,000.00 R320,000.00 R0.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Summary Prepared by ekotze 2008/04/10 17

Summary Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale R9,064,816.00 R9,064,816.00 Claims to date R9,064,816.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Hessequa Bladsy 2 van 17 2008/04/10

Hessequa Municipality: 1) Rehab of existing tar, concrete storm channel and drifts in Heidelberg 2) Rehab of sewage treatment works in Heidelberg 3) Rehab of roads, storm water culverts and main water outfall in Riversdale February 2006 R9,064,816.00 March 2006 23-Jan Hessequa Flood damages 2006/03/20 R2,275,000.00 23-Jan Hessequa Flood damage 2006/03/20 R3,944,400.00 23-Jan Hessequa Flood damage 2006/03/20 R732,346.86 28-Dec Hessequa Flood damage 2006/12/28 R2,113,069.14 TOTAL 4 R9,064,816.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Hessequa Bladsy 3 van 17 2008/04/10

Laingsburg Municipality: 1) Repair of main water supply in Bergsig community R32,380.00 Summary R32,380.00 Claims to date R32,380.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 3-Feb Laingsburg Repair of main water supply Bergsig 4000846362 dd 12/01/06 2006/02/07 R29,075.48 TOTAL 1 R29,075.48 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Laingsburg Bladsy 4 van 17 2008/04/10

Laingsburg Municipality: 1) Repair of main water supply in Bergsig community R32,380.00 March 2006 13-Mar Laingsburg Herstel hoof watertoevoer na Bergsig In 400577 2006/03/20 R3,304.52 TOTAL 1 R3,304.52 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Laingsburg Bladsy 5 van 17 2008/04/10

Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R4,042,500.00 Summary R4,042,500.00 Claims to date R4,042,500.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Swellendam Bladsy 6 van 17 2008/04/10

Swellendam Municipality: 1) Upgr of existing culvert bridge and pedestrian crossing in Barrydale 2) Repair of bridges crossing over the Koringland river 3) Repair of low water bridge and infrastructure at Swellendam 4) Remedial measures to stabilize bank erosions of the Koringland river 5) Repair of pipelines at Swellendam R4,042,500.00 March 2006 8-Mar-06 Swellendam Repair of Infrastructure 2006/03/20 R379,038.08 29-Sep-06 Swellendam Barrydale: Repair Stormwater culverts 2006/09/29 R300,207.58 20-Mar Swellendam Memorandum of agreement 2006/03/20 R808,500.00 29-Sep Swellendam Repair Stormwater Culverts 2006/09/29 R478,074.49 29-Sep Suurbraak Repair Pipelines 2006/09/29 R860,215.54 28-Dec-06 Swellendam Barrydale: Repair Stormwater culverts 2006/12/28 R1,216,464.31 TOTAL 6 R4,042,500.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Swellendam Bladsy 7 van 17 2008/04/10

Bitou Municipality: 1) Rehab of roads in Green Valley R650,000.00 Summary R650,000.00 Claims to date R650,000.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Bitou Bladsy 8 van 17 2008/04/10

Bitou Municipality: 1) Rehab of roads in Green Valley R650,000.00 March 2006 14-Mar-06 Bitou Floof damage 2006/03/20 650000 TOTAL 1 R650,000.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Bitou Bladsy 9 van 17 2008/04/10

Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges R1,368,000.00 Summary R1,368,000.00 Claims to date R1,368,000.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 03-Feb-06 Breede River Winelands Robertson rehabilitationof roads and Ref: sidewalks 5/15/2/3/1 dd 20/12/05 2006/02/07 R764,277.92 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Breede River Winelands Bladsy 10 van 17 2008/04/10

Breede River/Winelands: 1) Repair of civil services in Robertson include rebuilt, repair and reseal of streets sidewalks, rehabilitation of sidewalks channels and repairs to 2 x low water concrete bridges March 2006 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS R1,368,000.00 TOTAL 1 R764,277.92 17-Mar-06 Breede River Winelands Robertson rehabilitationof roads and sidewalks 2006/03/17 R603,722.08 TOTAL 1 R603,722.08 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Breede River Winelands Bladsy 11 van 17 2008/04/10

Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900,080.00 Summary R6,900,080.00 Claims to date R6,900,080.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Knysna Bladsy 12 van 17 2008/04/10

Knysna Municipality: 1) Repair of damage community facilities (halls, creche) 2) Repair of solid waste handling facility 3) Repair of electrical infrastructure 4) Repair of recreation and sport facilities 4) Repair of water infrastructure 5) Repair of damaged facilities in the nature reserve 6) Repair of damaged sewer infrastructure 7) Repair to damaged roads and stormwater structure 8) Repairs to sidewalks R6,900,080.00 February 2006 13-Mar-06 Memorandum of agreement R1,380,016.00 TOTAL 0 R1,380,016.00 March 2005 15-Mar-06 Knysna Memorandum of understanding 2006/03/20 R500,000.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R250,000.00 15-Mar-06 Knysna Memorandum of Understanding 2006/03/20 R200,000.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R300,000.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R1,380,540.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R101,000.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R342,000.00 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R518,776.12 28-Dec-06 Knysna Memorandum of agreement 2006/12/28 R1,621,207.88 15-Mar-06 Knysna Memorandum of agreement 2006/03/20 R306,540.00 TOTAL 10 R5,520,064.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Knysna Bladsy 13 van 17 2008/04/10

Summary April 2005 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system Claims to date R2,122,224.00 R2,122,224.00 R2,122,224.00 Total R0.00 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Mosselbay Bladsy 14 van 17 2008/04/10

Mosselbay Municipality: 1) Repair to electrical systems and flood light at KwaNonqwaba 2) Repair to streets and storm water systems 3) Repair to sewer system March 2006 WESTERN CAPE: 2005/2006 MONTHLY DISASTER RECOVERY I.E. INFRASTRUCTURE DAMAGE CLAIMS/PAYMENTS R2,122,224.00 14-Mar-06 Mosselbay Flood Damages 2006/03/20 R150,252.00 38790.0 Mosselbay Flood Damages 2006/03/20 R1,618,572.00 22-Mar-06 Mosselbay Flood Damages 17/16/3/1 2006/03/23 R173,873.61 14-Mar-06 Mosselbay Flood Damages 2006/03/20 R179,526.39 TOTAL 4 R2,122,224.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/Mosselbay Bladsy 15 van 17 2008/04/10

George Municipality: 1) Repair of damaged roads R320,000.00 R320,000.00 Claims to date R320,000.00 Total R0.00 April 2005 May 2005 June 2005 July 2005 August 2005 September 2005 October 2005 November 2005 December 2005 January 2006 February 2006 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/George Bladsy 16 van 17 2008/04/10

George Municipality: 1) Repair of damaged roads R320,000.00 March 2006 2006/03/20 R320,000.00 TOTAL 1 R320,000.00 40536/Reports/2005-2006 Monthly Flood Damage claims-payments Jan2007/George Bladsy 17 van 17 2008/04/10