Systems Engineering Challenges A Perspective from the B-2 Bomber. Debbie Bailey Chief Engineer, B-2 Systems Group Wright-Patterson AFB, OH

Similar documents
Recognizing and Mitigating Risk in Acquisition Programs

Position Descriptions. Aerospace

AEROSPACE 2050 The Future of Aviation & Space

C-130 Recapitalization, Lockheed Martin Fleet Support Services

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 7 R-1 Line #261

F-35 JOINT STRIKE FIGHTER. Problems Completing Software Testing May Hinder Delivery of Expected Warfighting Capabilities

Defense Acquisition Review Journal

CAT VIII WORKING DRAFT

APP Aircraft Performance Program Demo Notes Using Cessna 172 as an Example

JOINT STRIKE FIGHTER PHM VISION

JSF Many Programs in One

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

Developing Work Breakdown Structures

F-35 Lightning II Program Status and Fast Facts 4Q 2015

Applying ICT and IoT to Multifamily Buildings. U.S. Department of Energy Buildings Interoperability Vision Meeting March 12, 2015 Jeff Hendler, ETS

Operation IMPACT (Injured Military Pursuing Assisted Career Transition)

Selected Acquisition Report (SAR)

Holloman Air Force Base Mission and Flying Operations

The Boeing Company Strategic Missile & Defense Systems

STATEMENT OF WORK AND/OR SPECIFICATIONS STATEMENT OF WORK

GUIDANCE FOR ASSESSING THE LIKELIHOOD THAT A SYSTEM WILL DEMONSTRATE ITS RELIABILITY REQUIREMENT DURING INITIAL OPERATIONAL TEST.

ROOT CAUSE ANALYSIS OF VTUAV FIRE SCOUT S NUNN-MCCURDY BREACH Patricia Fazio Bronson and Christopher Martin

Risk Management: Pro-active Principles for Project Success. Liz Markewicz Don Restiano

AeroVironment, Inc. Unmanned Aircraft Systems Overview Background

Exhibit R-2, RDT&E Budget Item Justification

Best Practices for the Acquisition of COTS-Based Software Systems (CBSS): Experiences from the Space Systems Domain

WORKFORCE COMPOSITION CPR. Verification and Validation Summit 2010

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE STRATEGIC FORCES SUBCOMMITTEE UNITED STATES SENATE

Module J Trade Study Process

PM UAS Fleet Management (Depot Maintenance) OCT 19, 2011

How To Improve The Defense Communications System

THE WORK BREAKDOWN STRUCTURE IN AN ACQUISITION REFORM ENVIRONMENT. Prepared For: COST SCHEDULE PERFORMANCE MANAGEMENT CONFERENCE

Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems

ITEM FOR FINANCE COMMITTEE

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES PROJECTION FORCES SUBCOMMITTEE

PEO MS OVERVIEW Tactical Missile Conference 2009

Mr. Patrick Carley. Ground Combatant Systems Lethality, Visual Augmentation, Weapons, Ammunition UNCLASSIFIED

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE TACTICAL AIR AND LAND FORCES SUBCOMMITTEE COMMITTEE ON ARMED SERVICES

ARINC 653. An Avionics Standard for Safe, Partitioned Systems

Integrated Performance & Risk Management -

THE UNDER SECRETARY OF DEFENSE 3010 DEFENSE PENTAGON WASHINGTON, DC

CUSTOMER KEYNOTE Hal Buddenbohm

Open Source Solution for IVI: Tizen IVI. Brett Branch Tizen IVI Product Marketing

HISTORY. Aircraft Information

Risk Management in DoD Programs

Chapter 2. Basic Airplane Anatomy Delmar, Cengage Learning

Purchase of Replacement Force Helicopter

OPERATING AND SUPPORT COST-ESTIMATING GUIDE

UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 9 R-1 Line #131

BEST PRACTICES IN CYBER SUPPLY CHAIN RISK MANAGEMENT

ODIG-AUD (ATTN: Audit Suggestions) Department of Defense Inspector General 400 Army Navy Drive (Room 801) Arlington, VA

The Air Force Materiel Command

DoD Software Assurance (SwA) Overview

The Need for a Systems Engineering Approach For Measuring and Predicting the Degradation of Aging Systems And How It Can Be Achieved

Taipei Economic and Cultural Representative Office in the United States PATRIOT Advanced Capability-3 Guided Missiles

Writing a Systems Engineering Plan, or a Systems Engineering Management Plan? Think About Models and Simulations

Using Parametric Software Estimates During Program Support Reviews

Software Safety Strategy for US Navy Gun System Acquisition Programs

WATCHKEEPER X UNMANNED AIRCRAFT SYSTEM (UAS)

Selected Acquisition Report (SAR)

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

COMBATSS-21 Scalable combat management system for the world s navies

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

SpaceLoft XL Sub-Orbital Launch Vehicle

Project Management Planning

Entered into Service: November 2013 Serial Number: 4291 Total Time Since New: 998 Hours Cycles: 398 Hours

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #200

STRATEGIC BUSINESS PLAN QUARTERLY KPI REPORT FOR: FISCAL YEAR 2015, QUARTER 2 (JULY THROUGH DECEMBER 2014)

Introduction to the CMMI Acquisition Module (CMMI-AM)

Nasams. Air Defence System.

AIRCRAFT WORK BREAKDOWN STRUCTURE (WBS) LEVELS (FROM MILITARY SPECIFICATION 881)

DEPARTMENT OF DEFENSE HANDBOOK PARTS MANAGEMENT. This handbook is for guidance only. Do not cite this document as a requirement.

RISK MANAGEMENT GUIDE FOR DOD ACQUISITION

Project Manager Training. Devices (PM TRADE) COL Vince Malone PEO STRI Project Manager Training. Devices (PM TRADE) 18 June 2015

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY. Section A Camouflage, Concealment, and Deception (CCD) Program

Climatography of the United States No

AF Life Cycle Management Center

Total Ownership Cost (TOC) and Cost as an Independent Variable (CAIV)

Network Rail Infrastructure Projects Joint Relationship Management Plan

Using Spiral Development To Reduce Acquisition Cycle Times

PROBLEM STATEMENT: Will reducing the ASD for Kadena AB F-15 C/Ds increase the CPFH for this Mission Design Series (MDS)?

System (of Systems) Acquisition Maturity Models and Management Tools

GTA Board of Directors September 4, 2014

Aircraft performance monitoring

WBS Development: Rules, Aberrations, and MIL-STD-881C Implementation Challenges

Department of Veteran Affairs. Fred Catoe Office of Cyber and Information Security AAIP Project Manager March 2004

RISK MANAGEMENT GUIDE FOR DOD ACQUISITION

L-3 Army Fleet Support is an Equal Opportunity Employer We encourage minorities, women, protected veterans, and disabled individuals to apply.

Climatography of the United States No

DEPARTMENT OF DEFENSE STANDARD PRACTICE

Rapid Prototyping: Leapfrogging into Military Utility

Transcription:

Systems Engineering Challenges A Perspective from the B-2 Bomber Debbie Bailey Chief Engineer, B-2 Systems Group Wright-Patterson AFB, OH 1

Overview B-2 System Description Benefits of Stealth Systems Engineering Perspectives Results of Stealth

B-2 System Description High Subsonic Speed More Than 40,000 Lb Payload Altitudes to 50,000 Ft Four F-118-GE-100 Engines Greater Than 6000 NM Range Two Person Crew 172 Ft

Role of the B-2 CONUS DEPLOYED DEPLOYED Covers Global Land Mass with One Refueling 4

B-2 Weapons (Current and Future) 5

Overview B-2 System Description Benefits of Stealth Systems Engineering Perspectives Results of Stealth 6

Stealth Features SMOOTH SHAPE LOW PROFILE SPECIAL COATINGS BURIED ENGINES ATTENTION TO DETAIL STEALTH INCLUDED IN EVERY ASPECT OF B-2 DESIGN

Why Stealth Conventional Bomber B-2 (Notional Detection Zones) B-2 Stealth Technology Shrinks Defense Engagement Effectiveness

Aircrew at Risk The Value of Range, Payload, Precision, and Stealth Standard Package Precision Weapons Precision and Stealth Precision, Stealth, Global Range and Large Payload Bomb Droppers Air Escort Air Defense Suppression Tankers Total Aircrew At Risk 132 116 40 6

Overview B-2 System Description Benefits of Stealth Systems Engineering Perspectives Results of Stealth 10

SE Challenges with Initial Design SPECIAL COATINGS Adequate air flow to the engine? SMOOTH SHAPE LOW PROFILE Exhaust temperatures? BURIED ENGINES ATTENTION TO DETAIL Routing the exhaust air? 11

SE Challenges with Initial Design SMOOTH SHAPE LOW PROFILE Withstanding exhaust temperatures? SPECIAL COATINGS ATTENTION TO DETAIL Locating air data system probes? Opening BURIED ENGINES weapons bay doors? 12

B-2 Modernization Initiatives Weapons JASSM JSOW EGBU-28 SBRA/Mk-82 JDAM Integrated Operations Radar Upgrade Interoperability Comm Upgrades EHF/SHF FM Immunity PRC-117 GATM Mission Management Center Instrument Display In-Flight Replanner Supportability Arrowhead Panels Improved Tiles CLOVerS/LOVE Deployable Shelters DEC SFIIU OGADS Windshields Aft Deck FMCP 13

Upgrade Program SE Challenges Built-in design constraints of current design Electrical power Cooling Processing capacity Weight/center of gravity Functional integration with existing systems New weapons with existing launchers & stores management processor Comm/nav systems with cockpit instruments 14

Weapon System Resource Management Technical Analysis IPT Approval Engineering Approval Enterprise Approval Weapons System Capacity New Allocations Existing Allocations Remaining Budget 15

System Budget Request Cooling System Was Is Air Loop Location P5 Baseline Remaining Budget (k-watts) EHF Additions (k-watts) Left Forward Rack Left Radar Bay X X Right Forward Rack Wingbox Rack Aft Rack Right Radar Bay and Crew Station X X Center Carry Thru Box and Left Crew Station X X Aft Equip Bay (Aft of Weapons Bay) X X Total X X Margin Available 5% Approaching Spec < 5% Surpassed Spec 16

Unique SE Challenges of Stealth Maintaining signature of current configuration Primarily a maintainability issue Ensuring upgrade programs do not degrade baseline signature performance Improving signature performance to survive future threats 17

LO Impact on B-2 Maintenance MMH/FH FY05 Wpns Fuels Air Cond Engines Flt Ctrl Ldg Gear Suppt Gen Airframe Major driver on MMH/FH and NMC rates Primarily driven by signature performance Re-LO after other maintenance also drives maintenance action LO 18

Tackling LO Maintainability Cure Time Reductions Goal: Reduce cure times of materials to allow quicker turn of aircraft Increase Shelf Life Goal: Increase shelf life to allow greater combat capability Storage Conditions Goal: Ambient storage conditions CAUTION: No such thing as just a material substitution!

Keys to SE Success Well-defined & documented SE process Join forces with the prime contractor Common processes & metrics Incentivize the prime contractor Award fee plans Contractual language Measure the effectiveness of SE Metrics & leading indicators Technical performance measures Maintain visibility into the health of SE process Include in program management reviews (PMR) 20

SE Leading Indicators Proposed Systems Engineering Leading Indicators and Metrics Requirements Design & Integration Verification Validation Production Integrated Logistic Support System Performance Maturity Volatility Traceability TPMs, PROCAS, H/W & S/W Compatibility V & V Plan Compliance: % H/W & S/W Test Compl. V & V Plan Compliance Life Cycle - Risk Management Profile and TPMs Product & Process Quality Measures R & M: Spec. vs Actual Reserved 21

Risk Management Over Time Risk Management Profile 120 Qty of Active Risks 100 80 60 40 20 0 MS B High Moderate Low Jan '03 Mar '03 May '03 Jul '03 Sep '03 Nov '03 Jan '04 Mar '04 May '04 22

SE Visibility: PMR Format Operational Requirements agreed with ACC/DRA2; NG concurrence; PCCB if applicable SORAD signed by B2SG/CC and ACC/DRA2 Acquisition Requirements (SSRD) agreed with NG; DRA2 concurrence; PCCB completed SSRD coordinated with NG, ACC and PCCB completed. SSRD under formal configuration control. Operational & Acquisition Trade Space identified and current; Trade studies on track Required system modifications coordinated with ACC and incorporated into NG proposal. Sensor Concepts, Inc. completing non-recurring effort to modify system configuration. External / Internal interfaces established and under configuration control No formal interface control (SCI-2k to RF Diagnostics). Interface to RF data management system is part of Tier II RF S/W Integration ETA (ETA E3073X). Requirements are traceable at all levels with no widows or orphans Requirements entered in SLATE & traceability issues with Procurement Spec. resolved by NG. ILS Requirements documented in operational requirements documentation and SSRD Key ILS requirements still need to be documented in SSRD -- Plan is to resolve by 10-12 May TIM Program risks identified, prioritized, and handling plans in place Risk assessment completed by NG in Jun 2005 -- production effort assessed as low risk. Need to reaccomplish risk assessment for sustainment elements. AoA Plan in place (CR efforts) / Technology Development Strategy in place (TD efforts) B B B G B B G N/A 23

SE Visibility: PMR Format (cont d) Production Readiness Plan on track / current; Production Readiness Reviews in IMP & IMS This requirement addressed in the production contract Producibility This requirement will be addressed in the production contract ILS Plan on track / current; System Supportability Demo in IMP & IMS G G G Program Integration in the B-2 Enterprise Management Baseline up to date Procurement of the SCI-2k radar system has no effect on the EMB ACC/DRA2 expectations current SORAD signed by ACC/DRA2 in June 2005. Collaborations with DT and OT ongoing; considerations addressed in program & design reviews DT & OT requirements being addressed within Phase 1 & 2 RF Diagnostics test program at WAFB Planning for next program phase on track using the B-2 Enterprise Management System Support Equipment program that has no EMB impact. Plan for SPO / NG participation in Pre & Post FDE validation reviews on track SPO, NG, test range and 509th part of integrated team conducting Phase 2 RF Diagnostics Government-Furnished Property on Track Production contract requires that 509th provide the 2 prototypes to NGC & Sensor Concepts, Inc. so that they can be upgraded after the first 2 units are delivered. No issues at this time. For all suppliers, acceptable performance established & maintained; specs under document control Acceptance criteria (Procurement Spec) for SCI-2k production units finalized -- awaiting NG TPRB approval. N/A G G N/A G G G 24

New SE Initiative: Opportunity Management Risk (per CERP & B-2 SEMP) An aspect of a project/program that could result in the inability to achieve one or more program objectives within defined cost, schedule, and/or performance constraints. Opportunity An aspect of a project/program that could result in the ability to exceed one or more program objectives by reducing defined cost, completing tasks ahead of schedule, and/or exceeding performance thresholds. 25

Opportunity Management 5 x 5 Matrix Maximum Significant Moderate Minor Negligible Negligible Minor Moderate Serious Critical Maximum Significant Moderate Minor Minimum Level 5 90-100% Level 5 90% - 100% Level 4 61-89% Level 3 40-60% Y Axis = Probability Level 4 61% - 89% Level 3 40% - 60% Level 2 11% - 39% Level 1 1% - 10% Level 2 11-39% Level 1 1-10% Maximum Moderate Minimum Low Moderate High X Axis = Benefit Maximum Moderate = Minimum Note: The x-axis, y-axis, and color allocation shown is Mirrored From the Risk 5 x 5 Matrix 26

Opportunity Analysis Criteria Benefit Scale Criteria - 1-2 - 3-4 - 5 Cost (Can Vary) Less Than 5% Decrease 5-10% Decrease 10-15% Decrease 15-20% Decrease Greater Than 20% Decrease Schedule Task(s) Less Than 1 Week Early 1 to 2 Weeks Early 2 to 4 Weeks Early 4 to 6 Weeks Early Greater Than 6 Weeks Early Performance Negligible or No Improvement Minor Improvement Moderate Improvement with One or More Performance Requirements Improved Probability Scale Significant Improvement with One or More Key Performance Requirements Improved Significant Improvement with Two or More Key Performance Requirements Improved Criteria -1-2 - 3-4 - 5 0-10% Not Likely 11-39% Low Likelihood 40-60% Just as Likely as Unlikely 61-89% Highly Likely 90-100% Near Certainty 27

Overview B-2 System Description Benefits of Stealth Systems Engineering Perspectives Results of Stealth 28

B-2 Combat Operations Operation ALLIED FORCE 6 aircraft used 48 combat sorties over 35 days Flew less than 1% of total sorties, destroyed 11% of targets Delivered 656 near precision weapons 2,000 lb Joint Direct Attack Munitions (JDAMs) 5,000 lb GBU-37 Bunker Busters 1,324,000 lbs of weapons delivered Missions approximately 33 hours long Flown round trip out of Whiteman AFB 29

Precision

B-2 Combat Operations Operation ENDURING FREEDOM Flew 6 sorties from Whiteman AFB Crews struck targets in Afghanistan Flew to Forward Operating Location, landed after about 44 hours Performed engine running crew change Second crew flew 29 hour flight back to Whiteman AFB Aircraft operating for over 3 days! 32

B-2 Combat Operations Operation IRAQI FREEDOM Flew combat sorties from Forward Operating Location for first time! 4 aircraft forward deployed, flew 20 sorties from FOL 9 aircraft at Whiteman AFB also flew 27 sorties Delivered 676 weapons 1,271,000 pounds of weapons Delivered JDAMS, GBU-37, and 500 lb Mk-82 unguided weapons 33

Closing Thoughts High valued asset, performing to expectations Worth the LO price tag! Systems Engineering important throughout the weapon system life cycle Applies to modification programs & sustainment efforts Systems Engineering requires continued emphasis & visibility 34

Questions Questions? 35