Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)



Similar documents
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

BUSINESS USE PERMIT APPLICATION

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

9770 CULVER BOULEVARD CULVER CITY, CA Incidental improvements: improvements that do not qualify as minor or

Building Permits Permit Counter

TOWN OF JUNO BEACH 340 Ocean Drive Juno Beach, FL Phone: (561) Fax: (561)

PLAN SUBMITTAL INFORMATION

Development Services Department City of San Antonio. Permits & Licenses. Development Services Manager. Deputy Historic Preservation Officer

The City of Basehor, Kansas

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

City of La Vernia 102 E. Chihuahua Street, La Vernia, Texas Phone: (830) Fax: (830)

A Guide for the Homeowner/Builder

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

BUILDING PERMITS. Santa Rosa County Building Inspection

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Development Services Guidelines

City of Douglas Commercial Building Permit Site Application

Building Code Inspections and Fees

City of Hill Country Village Residential Construction/Development Packet

Development Services Guidelines

Schedule B to By-law

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

APPLICATION FOR NEW CONSTRUCTION

HOMEOWNER S PERMIT GUIDE

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

How To Get A Building Permit In Florida

A Homeowner s Guide to Building Permits

October 5, 2015 Dear Client,

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

BEFORE YOU BUILD GUIDE

PREPARED DATE: SIGNATURE AND SEAL INSPECTION REPORT PREPARED BY: PRINT NAME: REGISTRATION NUMBER: MAILING ADDRESS:

Estimating Database Checklist

Single Family Residential Building Permit Questions & Answers

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

CHARLOTTE COUNTY Community Development Department

Residential Building Permits Information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

LOUISVILLE FIRE PROTECTION DISTRICT 895 West Via Appia, Louisville, Colorado

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Top Valu Marketplace. Produced for: Commerce Realty

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

City of Oviedo Commercial Shell Building Permit Application Guidelines

RESIDENTIAL/COMMERCIAL

BUILDING PERMIT SPECIFICATIONS

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

2. What building projects are exempted? (permit not required)

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

NAHB PRODUCT DEFINITION

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

PERMIT APPLICATION FORM SELECT ALL THAT APPLY: BUILDING DRIVEWAY ELECTRICAL PLUMBING HEATING DEMOLITION SIGN MOBILE HOME

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

Schedule B to By-law Part A Fees Payable for Permits

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

REQUIREMENTS FOR OBTAINING A THORNBURY TOWNSHIP, DELAWARE COUNTY PERMIT

SITE IMPROVEMENT PLANS CHECKLIST

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Guide To Customer Care

Bureau Veritas Contact Information

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Lot Number. City. Architect Name SUBCONTRACTORS - COMPLETE AND ATTACH LIST ON PAGE 4

Notice to Property Owners

RESIDENTIAL CODES 101 FOR REALTORS

School Construction Authority Architecture & Engineering

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

ARTICLE 22: FEE SCHEDULE

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

2016 BUILDING PERMIT FEES*

Exhibit C: Scope of Work and Schedule of Deliverables

CITY OF HILSHIRE VILLAGE NEW HOUSE AND HOUSE ADDITION PLAN SUBMITTAL CHECK LIST ADDRESS: DATE:

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

BGE Service Application Guidelines Commercial & Industrial Projects

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Requirements for Building Application Submission

Building Information Packet

Project Close Out Summary

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Transcription:

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010

Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions (Main Menu)...3 Performing a task on a Permit...3 Get the status of your permit...3 Look up an inspection...3 Details for all inspections on this permit...5 Request a new inspection on this permit...5 Get the comments for this permit...6 Look up related permits... 6 IVR Instruction Manual 2

IVR Instructions Initial Entry Instructions Dial 678 518 6277 to access the IVR System Welcome to the Gwinnett County Automated IVR System Permit Access Instructions (Main Menu) Enter permit number and then press # Example for BLD2009 00100, enter 253200900100 BLD = 253 CDP = 237 FPL = 375 LDP = 537 MDP = 637 SDP = 737 Performing a task on a Permit Get the status of your permit Press 1 to hear the status of this permit Press 1 to perform another task on this permit OR Press 2 to return to the main menu OR Press 3 to exit Look up an inspection Press 2 to look up an inspection IVR Instruction Manual 3

Please choose from one of the following list of inspections scheduled for this case, press the star (*) key to return to the permit menu After selecting inspection: Press 1 to reschedule this inspection Press 1 to choose one of the available inspection dates Enter the corresponding (#) of the available dates given Press 1 to choose AM as the inspection time Press 2 to choose PM as the inspection time Press 3 to ignore the inspection time Do you want to enter an inspection phone number? (Phone Number) Press 1 for Yes If yes, enter phone number Press 2 for No Confirm inspection, scheduled date and time Press 1 if correct Press 2 to cancel Press 3 to cancel and try again Confirmation number given Press 1 to go on Press 2 to listen again Press 2 to enter exact date for the inspection Enter the date on when you would like to schedule this inspection (MMDD) Press 2 to update the status of this inspection Enter the date on which you would like to update this inspection (MMDD) Press 3 to research inspection Press 1 to perform another task on this inspection Press 2 to perform another task on this permit Press 3 to return to the main menu IVR Instruction Manual 4

Press 4 to exit Press 4 to cancel this inspection Press 1 if correct Press 2 to abort cancellation Press 5 to hear the comments of this inspection Details for all inspections on this permit Press 3 to hear the details for all inspections on this permit Press 1 to play the inspection comment Choose from the following inspections, press the star (*) key to replay all inspections press 0 to skip to the next inspection reading Press 2 to hear the details of the inspections Press 3 to go back to the permit menu Request a new inspection on this permit Press 4 to request a new inspection on this permit Enter the inspection type code OR Press the * key to select an inspection type from the menu Choose from the inspection types (###) Response You have selected inspection type Press 1 to create the inspection OR Press 2 to go back to the main menu OR Press 3 to redo the selection Press 1 to choose one of the available inspection dates Enter the corresponding (#) of the available dates given Press 1 to choose AM as the inspection time Press 2 to choose PM as the inspection time Press 3 to ignore the inspection time IVR Instruction Manual 5

Do you want to enter an inspection phone number? (Phone Number) Press 1 for Yes If yes, enter phone number Press 2 for No Do you want to leave an inspection comment? Press 1 to leave a comment Press 2 to skip Confirm inspection, scheduled date and time Press 1 if correct Press 2 to cancel Press 3 to cancel and try again Confirmation number given Press 1 to go on Press 2 to listen again Press 2 to enter exact date for the inspection Enter the date on when you would like to schedule this inspection (MMDD or YYYYMMDD) Get the comments for this permit Press 5 to get the comments for this permit Look up related permits Press 6 to look up related permits IVR Instruction Manual 6

INTERACTIVE VOICE RESPONSE INSPECTION REQUEST SYSTEM (IVR) To Begin: Dial 678.518.6277 Enter permit number then press #: Example for BLD2010-00100, enter 253201000100 # BLD = 253 CDP = 237 SDP = 737 LDP = 537 MDP = 637 FPL =375 Then press 1 to schedule an inspection Then press the inspection number listed below To use the short cut code put a 1 in front of the inspection code TYPE OF INSPECTION IVR ID TYPE OF INSPECTION IVR ID COMMERCIAL TYPE OF INSPECTION IVR ID COMMERCIAL TYPE OF INSPECTION IVR ID STRUCTURAL 100-150 PLUMBING 400-450 PRECONSTRUCTION CONFERENCE 100 PLUMBING CONFERENCE 400 COMMERCIAL CONFERENCE 101 PLUMBING PARTIAL SLAB 401 COMMERCIAL PARTIAL FOOTING 103 PLUMBING COMPLETE SLAB 402 COMMERCIAL COMPLETE FOOTING 104 PLUMBING EXTERIOR FIRE MAIN 403 COMMERCIAL PARTIAL MONOLITHIC SLAB 105 PLUMBING SEPTIC TANK HOOKUP 410 COMMERCIAL COMPLETE MONOLITHIC SLAB 106 PLUMBING SEWER LATERAL 411 COMMERCIAL PARTIAL SLAB 107 PLUMBING WATER SERVICE 412 COMMERCIAL COMPLETE SLAB 108 PLUMBING PARTIAL ROUGH 413 COMMERCIAL PARTIAL ELEVATED SLAB 109 PLUMBING COMPLETE ROUGH 414 COMMERCIAL COMPLETE ELEVATED SLAB 110 PLUMBING GREASE TRAP 420 COMMERCIAL PARTIAL POURED WALL 111 PLUMBING STORM DRAIN 430 COMMERCIAL COMPLETE POURED WALL 112 PLUMBING IRRIGATION 439 COMMERCIAL PARTIAL FRAMING 120 PLUMBING TEMPORARY FINAL 449 COMMERCIAL COMPLETE FRAMING 121 PLUMBING FINAL 450 COMMERCIAL EXTERIOR SHEATHING 122 EROSION CONTROL 500 COMMERCIAL TILT PANEL 123 EROSION CONTROL 500 COMMERCIAL PARTIAL ROOFING 130 RESIDENTIAL TYPE OF INSPECTION IVR ID COMMERCIAL COMPLETE ROOFING 131 STRUCTURAL 160-190 COMMERCIAL PARTIAL CEILING 140 RESIDENTIAL CONFERENCE 160 COMMERCIAL COMPLETE CEILING 141 RESIDENTIAL SETBACK 161 FOOTING BASKET 142 RESIDENTIAL PARTIAL FOOTING 170 SIGN SETBACK 143 RESIDENTIAL COMPLETE FOOTING 171 COMMERCIAL TEMPORARY FINAL 149 RESIDENTIAL SLAB 172 COMMERCIAL FINAL 150 RESIDENTIAL MONOLITHIC SLAB 173 ELECTRICAL 200-253 RESIDENTIAL FRAMING 175 ELECTRICAL CONFERENCE 200 RESIDENTIAL PARTIAL WALL 176 ELECTRICAL TEMPORARY POLE 210 RESIDENTIAL COMPLETE WALL 177 ELECTRICAL PARTIAL SLAB 211 SIGN SETBACK 180 ELECTRICAL COMPLETE SLAB 212 FOOTING BASKET 181 ELECTRICAL UNDERGROUND 213 RESIDENTIAL FINAL 190 ELECTRICAL SERVICE ROUGH 214 ELECTRICAL 210-290 ELECTRICAL PARTIAL WALL ROUGH 215 ELECTRICAL TEMPORARY POLE 210 ELECTRICAL COMPLETE WALL ROUGH 216 ELECTRICAL CONFERENCE 260 ELECTRICAL PARTIAL CEILING ROUGH 217 ELECTRICAL UNDERGROUND 261 ELECTRICAL COMPLETE CEILING ROUGH 218 ELECTRICAL ROUGH 262 LOW VOLTAGE ROUGH 220 ELECTRICAL TEMPORARY POWER RELEASE 263 LOW VOLTAGE PARTIAL WALL ROUGH 221 SWIMMING POOL AIR TEST 270 LOW VOLTAGE COMPLETE WALL ROUGH 222 ELECTRICAL BONDING/LIGHT 280 LOW VOLTAGE PARTIAL CEILING ROUGH 223 ELECTRICAL FINAL 290 LOW VOLTAGE COMPLETE CEILING ROUGH 224 HVAC 360-390 LOW VOLTAGE FINAL 225 HVAC CONFERENCE 360 ELECTRICAL ROUGH 230 HVAC GAS LINE UNDERGROUND 361 ELECTRICAL TEMPORARY POWER RELEASE 231 HVAC SLAB 362 SWIMMING POOL AIR TEST 235 HVAC COMPLETE ROUGH 370 ELECTRICAL TEMPORARY FINAL 248 HVAC GAS LINE CONCEALED 371 ELECTRICAL BONDING/LIGHT 249 HVAC FINAL 390 ELECTRICAL FINAL 250 PLUMBING 460-490 SWIMMING POOL FINAL 251 PLUMBING CONFERENCE 460 COMMERCIAL PARTIAL ELEVATION 252 PLUMBING COMPLETE SLAB 461 COMMERCIAL COMPLETE ELEVATION 253 PLUMBING EXTERIOR FIRE MAIN 465 HVAC 300-350 PLUMBING SEPTIC TANK HOOKUP 470 HVAC CONFERENCE 300 PLUMBING COMPLETE ROUGH 475 HVAC GAS LINE UNDERGROUND 301 PLUMBING GREASE TRAP 481 HVAC SLAB 302 PLUMBING STORM DRAIN 482 HVAC PARTIAL ROUGH 303 PLUMBING IRRIGATION 483 HVAC COMPLETE ROUGH 304 PLUMBING FINAL 490 HVAC GAS LINE CONCEALED 310 EROSION CONTROL 501 1

HVAC TEMPORARY GAS RELEASE 311 EROSION CONTROL 501 HVAC HEATING TEMPORARY FINAL 320 HVAC REFRIGERATION SYSTEM 330 HVAC GREASE HOOD 340 HVAC FINAL 350 CE RESPONSE INSPECTION REQUEST SYSTEM (IVR) To Begin: Dial 678.518.6277 Enter permit number then press #: Example for BLD2010-00100, enter 253201000100 # BLD = 253 CDP = 237 SDP = 737 LDP = 537 MDP = 637 FPL = 375 Then press 4 to schedule an inspection Then press the inspection number listed below To use the short cut code put a 1 in front of the inspection code TYPE OF INSPECTION IVR ID TYPE OF INSPECTION IVR ID DEVELOPMENT INSPECTIONS 600-699 FIRE - BUILDING 900-950 ARBORIST 1ST SITE VISIT 601 FIRE 50% SPEC SPACE 900 ARBORIST 2ND SITE VISIT 602 FIRE 80% SPEC SPACE 901 BUFFER 605 FIRE 100% SPEC SPACE 902 CLEARING 608 FIRE 50% CONSTRUCTION 910 CO (CONSTRUCTION ENTRANCE/ EXIT) 610 FIRE 80% CONSTRUCTION 911 CURB 612 FIRE 100% CONSTRUCTION 912 DECEL LANE/ BASE 614 FIRE SPRINKLER 920 DECEL LANE/ PAVEMENT 616 FIRE ALARM 921 DECEL LANE/ STRIPING/ SIGNAGE 618 FIRE COMMERCIAL HOOD 922 DECEL LANE SUBGRADE 620 FIRE SUPPRESSION SYSTEM 923 DETENTION POND 623 FIRE TENANT FINAL CO ONLY 930 DUMPSTER SCREEN 626 FIRE TENANT TRANSFER CO 931 EROSION CONTROL 629 FIRE RACKING SYSTEM 932 FENCE INSPECTION 632 FIRE TEMPORARY FINAL 933 FINAL INSPECTION 635 FIRE CONSULTATION 940 GRADING 638 FIRE PUMP 941 GRUBBING 641 FIRE COMPLIANCE INSPECTION 950 HANDICAP RAMPS 644 FIRE - SITE 960-990 LANDSCAPE INSPECTION 647 FIRE BURN PIT 960 LANDSCAPE WARRANTY INSPECTION 650 FIRE BONFIRE 961 NPDES IINSPECTION 653 FIREWORKS 962 PARKING LOT STRIPING 656 FIRE SITE FINAL 963 PORTABLE TOILET 659 FIRE TENT 964 PRE-CONSTRUCTION MEETING 662 FIRE KNOX INSPECTION 965 SIDEWALK 665 SPECIMEN TREE FOLLOW-UP VISIT 668 STORM DRAIN 671 STREAM BUFFER 674 STREET PAVING/ BASE 677 STREET PAVING/ PAVEMENT 680 STREET PAVING/ STRIPING 683 STREET PAVING/ SUBGRADE 686 TREE PROTECTION FENCE 689 TREE SAVE BUFFER INSPECTION 692 ZONING BUFFER 695 STORMWATER 700-799 BUFFER VARIANCE INSPECTION 700 SWM EROSION CONTROL 710 SWM BMP 720 SWM BMP FINAL 730 WATER & SEWER 800-899 FORCE MAINS 800 PUMP STATIONS 810 SEWER AIR TEST 820 SEWER AS-BUILT 823 SEWER INSTALL 826 SEWER TV 829 WATER AS-BUILT 830 WATER CHLORINATION TEST 833 WATER INSTALL 836 WATER PRESSURE TEST 839 2