Damage Prevention Toolbox
|
|
|
- Poppy Malone
- 10 years ago
- Views:
Transcription
1 Damage Prevention Toolbox Geoff Price Chevron Pipe Line Company DOT Pipeline Safety One Call Specialist 1220 L Street, NW Washington, DC
2 Excavation Damage Excavation damage is a leading cause of serious pipeline incidents L Street, NW Washington, DC
3 CGA DIRT - Root Causes One Call Notification Practices Not Sufficient No notification made to the One-Call Center Notification to one-call center made, but not sufficient Wrong information provided to One-Call Center Locating Practices Not Sufficient Facility could not be found or located Facility marking or location not sufficient Facility was not located or marked Incorrect facility records/maps Excavation Practices Not Sufficient Failure to maintain marks Failure to support exposed facilities Failure to use hand tools where required Failure to test-hole (pot-hole) Improper backfilling practices Failure to maintain clearance Other insufficient excavation practices Miscellaneous Root Causes One-Call Center error Abandoned facility Deteriorated facility Previous damage 1220 L Street, NW Washington, DC
4 Shared Learnings & Practices Enbridge Kinder Morgan Magellan Colonial Shell Chevron Sunoco BP DP Toolbox Allegro 1220 L Street, NW Washington, DC
5 DP Toolbox Committee Company BP Pipeline BP Pipeline Chevron Pipe Line Company Colonial Pipeline Enbridge Enterprise Products Operating LLC Kinder Morgan Kinder Morgan Magellan PL Marathon PL Marathon PL Plains All American Shell Pipeline Company LP Sunoco Pipeline L.P. Allegro Energy RCP Inc RCP Inc Member Bobby Roye Larry Stansifer Geoff Price Jessie Husband Warren Loper Devin Hotzel Buzz Fant Jaime Hernandez Dyan Gillean Kevin Sabol Miriam Kuhn Sheryl Nguyen Gweneyette Broussard Kevin E. Docherty Cheryl Trench Bill Byrd Jennifer Cooper 1220 L Street, NW Washington, DC
6 What is the DP Toolbox? Collection of shared learnings and practices for onshore, hazardous liquid transmission pipeline operation. Includes documents and examples from operators: Forms Reports Procedures Correspondences Other relevant materials. Toolbox can be used by an operator as information to be considered when analyzing, reviewing/modifying existing procedures, and/or following an investigation. Not intended to be utilized as a recommended practice or basis for regulation L Street, NW Washington, DC
7 Toolbox Topics One-Call Notification Screening One-Call Notifications Response and Communication Operator One-Call Ticket Management Systems One-Call Quality Assurance Line Locating and Temporary Marking Line Locating Quality Assurance Excavation Monitoring and Observation Pipeline Depth of Cover ROW Patrol & Response ROW Usage by Landowner Crossing & Encroachment Agreements and Correspondence Unauthorized Activities 1220 L Street, NW Washington, DC
8 Important Links Toolbox Website: Toolbox L Street, NW Washington, DC
9 One Call Quality Assurance Overview: Damage Prevention Toolbox Topic 1220 L Street, NW Washington, DC
10 One Call Quality Assurance Process centered approach...designed to identify& eliminate systematic error through frequent review & reporting Mapping Training Reporting 1220 L Street, NW Washington, DC
11 Mapping Map Accuracy Horizontal Attribute Map Review CDC Review Centerline Review 1220 L Street, NW Washington, DC
12 Mapping CONSIDERATIONS: Is there a process for managing all centerline changes that includes the proper change notification to all One Call stakeholders? Are frequent buffer review meetings scheduled with all One Call stakeholders to account for changes in centerline geometry? Does a process exist for updating One Call coverage for newly acquired, divested, or abandoned lines? Is there a process to review, update, and validate current One Call coverage at the State One Call Centers? Do One Call stakeholders know the buffer submission requirements at each state One Call Center? What data format is required? What coordinate system is required? Is a datum transformation necessary? Does the Operator have a competent person in place to oversee buffer management and submissions, one that understands GIS data management and the nuance of coordinates systems and their transformation methods? 1220 L Street, NW Washington, DC
13 Reporting Ticket Screening Appropriate criteria used? Outgoing Communication Good Documentation? Effort Workload balancing opportunities 1220 L Street, NW Washington, DC
14 Reporting CONSIDERATIONS: Count of Tickets per Month, per Quarter, per Year. Tickets Per Mile of Pipe Ratio of tickets per locator Outstanding Tickets/Past Due Tickets Monitor variability in ticket volumes (monthly, seasonal) Number of Positive Responses Average and Median Time for Positive Responses Percentage Marked Percentage Update Tickets (Ticket Extensions) Ticket Type (regular, emergency, update, etc.) Average and Median Time to Respond to Emergencies 1220 L Street, NW Washington, DC
15 Reporting CONSIDERATIONS (continued): Tickets with pictures attached Drove to Field (Y/N) Method of Clearing (Map, Contact, Site Visit) Method of Marking (paint, pin flags, cane poles) Distributed Safe Digging Literature (Y/N) Required Crossing Agreement (Y/N) Daily Audit of Tickets Received by Operator vs. Tickets Sent from One Call center 1220 L Street, NW Washington, DC
16 Training GIS Competency Ticket Management Proprietary Tools 1220 L Street, NW Washington, DC
17 Training CONSIDERATIONS: Are designated personnel adequately trained in the tools and software that supports the management, submission, and review of One Call mapping files? Does the One Call buffer review process require any specialized training that includes editing or confirming coverage using any proprietary One Call Center mapping software? Are designated personnel adequately trained in the tools and software that supports the configuration of reports and metrics identified for One Call Quality Assurance reviews? 1220 L Street, NW Washington, DC
18 Reporting Example 1220 L Street, NW Washington, DC
19 Reporting Example 1220 L Street, NW Washington, DC
20 Buffer Review Process Example 1220 L Street, NW Washington, DC
21 Questions or Comments? Toolbox Website: Toolbox L Street, NW Washington, DC
22 FAQs When will additional topics be added? The toolbox will grow and evolve with your contributions. How can I contribute to the toolbox? [email protected] How often will the toolbox be revised? Review of toolbox materials will be done on a periodic basis. Toolbox Website: Toolbox [email protected] 1220 L Street, NW Washington, DC
23 DP Toolbox Committee Company BP Pipeline BP Pipeline Chevron Pipe Line Company Colonial Pipeline Enbridge Enterprise Products Operating LLC Kinder Morgan Kinder Morgan Magellan PL Marathon PL Marathon PL Plains All American Shell Pipeline Company LP Sunoco Pipeline L.P. Allegro Energy RCP Inc RCP Inc Member Bobby Roye Larry Stansifer Geoff Price Jessie Husband Warren Loper Devin Hotzel Buzz Fant Jaime Hernandez Dyan Gillean Kevin Sabol Miriam Kuhn Sheryl Nguyen Gweneyette Broussard Kevin E. Docherty Cheryl Trench Bill Byrd Jennifer Cooper THANK YOU!! 1220 L Street, NW Washington, DC
One-Call Notification Screening
Purpose Reference The purpose of this document is to share learnings with pipeline operators related to the process of receiving, analyzing, and managing notifications from the State One-call Center to
GPS Excavation Monitoring Solution. Design Session
GPS Excavation Monitoring Solution Design Session Overview Problem Statement Performance Requirements Workflow Excavation Monitoring Hardware Software Platform Analytics Notification and Viewing Problem
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
Damage Information Reporting Tool (DIRT) USER S GUIDE
Damage Information Reporting Tool (DIRT) USER S GUIDE In order to comply with the Reporting & Evaluation best practices, identified in Chapter 9 of the 1999 Common Ground Study of One-Call Systems & Damage
FEDERAL GOVERNMENT OVERSIGHT OF PIPELINE SAFETY
Operational Safety INTRODUCTION The Millennium Pipeline Company (Millennium) is proud of the key role it plays in New York s energy infrastructure. The Millennium Pipeline is a vital link in a system that
MPSC DAMAGE REPORTING
MPSC DAMAGE REPORTING DAMAGE INFORMATION REPORTING TOOL- DIRT The program collects critical information, analyzing the numbers and producing targeted recommendations to damage prevention stakeholders about
Complete Project Inspection. Construction Management and Inspection Services Safety, Environmental and Regulatory Controls
Construction Management and Inspection Services Safety, Environmental and Regulatory Controls MBF Inspection Services, Inc. has been providing competent, quality, business support services since 1992.
Oklahoma One-Call System, Inc.
Oklahoma One-Call System, Inc. Table of Contents I. Who Is Call Okie? II. III. IV. Mission Statement Safety Statement Damage Prevention V. Contact Page Who Is Call Okie? Posted on July 15, 2013 by Susan
Pipelines and Informed Planning Alliance (PIPA): Land-Use Planning for Schools Near Transmission Lines
Pipelines and Informed Planning Alliance (PIPA): Land-Use Planning for Schools Near Transmission Lines Presented at NSBA s Annual Conference April 12 th, 2010 Presented by: Cynthia Munyon, Utility Specialist/Paralegal,
NW Natural & Pipeline Safety
NW Natural & Pipeline Safety We Grew Up Here NW Natural is an Oregon-based utility company founded in 1859. The company purchases natural gas for its core market in western Oregon and southwestern Washington,
Public Awareness Programs for Pipeline Operators API RECOMMENDED PRACTICE 1162 FIRST EDITION, DECEMBER 2003
Public Awareness Programs for Pipeline Operators API RECOMMENDED PRACTICE 1162 FIRST EDITION, DECEMBER 2003 Public Awareness Programs for Pipeline Operators Pipeline Segment API RECOMMENDED PRACTICE 1162
SERVING THE NATIONS LEADING COMPANIES
SERVING THE NATIONS LEADING COMPANIES Amerada Hess BP Chemical BP Refining & Pipeline Citgo Petroleum Corporation Colonial Pipeline Conoco Phillips Pipeline Enbridge Energy Company, Inc. Equistar Chemical
Responding to a pipeline emergency
Responding to a pipeline emergency The following guidelines are designed to ensure the safety of those in the area if a petroleum product or natural gas pipeline leak is suspected or detected: Secure the
Trenching and Excavation Safety
1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking
April 15, 2011 VIA ELECTRONIC TRANSMISSION
Enbridge Pipelines (Lakehead) L.L.C. Shaun G. Kavajecz, Manager 119 N 25 th Street E Pipeline Compliance Superior, WI 54880 Tel 715 394 1445 www.enbridgepartners.com Fax 713 821 9428 [email protected]
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way
A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way 1 Introduction Q uestar Corporation is an integrated natural gas company headquartered in Salt Lake City, Utah. Through subsidiaries
Part of Your Community Important Safety Information. TransCanada - Bison Pipeline
Part of Your Community Important Safety Information TransCanada - Bison Pipeline Public Safety Information Pipeline Safety is Everybody s Business This brochure contains important safety information about
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES
GUIDELINES FOR PARALLEL CONSTRUCTION OF PIPELINES Technical support to The INGAA Foundation, Inc. by: Process Performance Improvement Consultants 1200 Post Oak Road, Suite 2705 Houston, TX 77056 USA F-2008-05
Welcome. Workshop on Public Awareness Programs for Pipeline Operators Day 1, Session 1. Co-Sponsors
Welcome Workshop on Public Awareness Programs for Pipeline Operators Day 1, Session 1 Co-Sponsors Introduction and Welcome Public Awareness Program Workshop Jeff Wiese Denise Hamsher U. S. DOT, RSPA, Enbridge
Client Services Service Level Agreement
RMI Corporation Client Services Service Level Agreement 40 Darling Drive Avon, CT 06001 Phone: 860.677.1005 *Fax: 860.677.2454 RMI Corporation Client Services - Service Level Agreement TABLE OF CONTENTS
By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document
By Authority Of THE UNITED STATES OF AMERICA Legally Binding Document By the Authority Vested By Part 5 of the United States Code 552(a) and Part 1 of the Code of Regulations 51 the attached document has
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
Learning Outcomes for This Session: Who we are What we do Organization Structure How PODS Association operates Current Projects How to get involved
Learning Outcomes for This Session: Who we are What we do Organization Structure How PODS Association operates Current Projects How to get involved Access Midstream Air Liquide Alyeska Pipeline Service
STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES
STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES STV has served the energy industry for more than 25 years, providing services for projects that transport crude oil, refined petroleum products, natural
Honeoye Storage Corporation. Canandaigua New York Public Awareness Plan Part 192.616
Honeoye Storage Corporation Canandaigua New York Public Awareness Plan Part 192.616 June 19, 2006 Revision 2: April 29, 2008 Revision 3: May 16, 2008 Revision 4: September 28, 2012 Revision 5: November
Yale University Incident Management Process Guide
Yale University Management Process Guide Yale University Management Process 1 of 17 Introduction Purpose This document will serve as the official process of Management for Yale University. This document
Guidelines for Rights of Way
Guidelines for Rights of Way Guidelines for Statutory Rights of Way for Engineering and Public Works Infrastructure Rights of Way (Drainage, Sanitary, Water & Electrical Utilities) A Statutory Right of
Colonial Pipeline Company
Colonial Pipeline Company Moving the Energy that Moves America Sam Whitehead Public & Government Affairs Manager February 8, 2012 The Colonial System Pipeline miles 5500 Refinery Connections 29 Customer
Guidelines for Excavations
O c t o b e r 2 0 0 1 Guidelines for Excavations in the vicinity of gas lines Technical Standards & Safety Authority Putting Public Safety First Guidelines for Excavations in the Vicinity of Gas Lines
Appendix B: Uniform Color Code & Marking Guidelines
Appendix B: Uniform Color Code & Marking Guidelines The information contained in Appendix B is intended to be supplemental information for existing practices found within CGA Best Practices Version 2.0.
A Solution to MOP/MAOP Data Management in PODS
2013 Esri International User Conference July 8 12, 2013 San Diego, California A Solution to MOP/MAOP Data Management in PODS Chevron Pipe Line Company Nathan Marx, GIS Project Manager Marsh Wong, IT Systems
Guidance 1 for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics
Guidance 1 for Strengthening Pipeline Safety Through Rigorous Program Evaluation and Meaningful Metrics 1 This document is to provide guidance describing methods to evaluate and measure IM program effectiveness.
How To Preserve Trees
San Diego County Water Authority Vic Bianes, PE - Engineering Manager Tad Brierton, SR/WA - Right of Way Supervisor APWA National Congress 2013 Chicago, IL 2 1 Background - San Diego County Water Authority
Regulation of Natural Gas Pipelines. June 23, 2008
Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),
Frequently Asked Questions About PennEast Pipeline Project
Frequently Asked Questions About PennEast Pipeline Project Who is PennEast Pipeline Company, LLC? AGL Resources, NJR Pipeline Company, South Jersey Industries, PSEG Power LLC and UGI Energy Services (UGIES)
1-800-DIG-RITE or 811. mo1call.com
Excavator Manual 1-800-DIG-RITE or 811 1 mo1call.com This manual is designed to serve as a guide to assist excavators with the process of placing a locate request. It does not take the place of the Missouri
Enbridge Class Location Change Management Plan. 1.1 Additional Information for Identified Changed Class Locations
Information Request No. 1-1.1 Additional Information for Identified Changed Class Locations Reference: i. (A70936) Preamble: ii. Canadian Standards Association (CSA) Z662-15, Oil and Gas Pipeline Systems
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA
DAMAGE PREVENTION LEGISLATION ELEMENTS REQUIRED FOR CANADA Ensuring the Highest Level of Public, Worker and Community Safety with Effective Legislation for Damage Prevention / Protection of Buried Infrastructure
NATURAL GAS PIPELINES CHALLENGES
Paper #2-19 NATURAL GAS PIPELINES CHALLENGES Prepared by the Technology Subgroup of the Operations & Environment Task Group On September 15, 2011, The National Petroleum Council (NPC) in approving its
CHAPTER 8 CIVIL DESIGN
CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical
NSW Licensed Pipeline Performance Reporting Guidelines
NSW Licensed Pipeline Performance Reporting Guidelines NSW Trade & Investment Resources and Energy Division GPO Box 3889 Sydney NSW 2001 Rev Jan 2012 NSW T & I Division of Resources and Energy Contents
ONE CALL CENTER REPORT
ITIC Mobile HTML Version of Excavators Ticket HTML format for proper display on any device Allows for different fonts, colors and embedded links Printed copies use greyscale TicketLINK Enhanced for ETM
Important Safety Message
Important Safety Message for your community* *Please share this with others in your organization. PIPELINE PURPOSE AND RELIABILITY Pipelines are the safest and most effi cient means of transporting natural
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
WHAT IS SOFTWARE PERFORMANCE ENGINEERING? By Michael Foster www.cmgaus.org
WHAT IS SOFTWARE PERFORMANCE ENGINEERING? By Michael Foster www.cmgaus.org DEFINITION Software Engineering is: A systematic and quantitative approach for the cost effective development of software systems
Excavation & Trenching Procedure
Excavation & Trenching 1. Overview The will ensure, as far as is reasonably practicable, that the conduct of work relating to excavation and trenching will not be harmful to the health and safety of employees
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
GENERAL ORDER DISTRICT OF COLUMBIA I. BACKGROUND
GENERAL ORDER DISTRICT OF COLUMBIA Subject CJIS Security Topic Series Number SPT 302 12 Effective Date March 28, 2014 Related to: GO-SPT-302.08 (Metropolitan Police Department (MPD) Wide Area Network)
Application Support Solution
Application Support Solution White Paper This document provides background and administration information on CAI s Legacy Application Support solution. PRO00001-MNGMAINT 080904 Table of Contents 01 INTRODUCTION
BDCOWAIV UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF OCEAN ENERGY MANAGEMENT
PAGE 1 00160 ANR PIPELINE COMPANY ROW for TC Offshore LLC #03262 G01503 G04279 G03923 G04054 G01687 G01687M G01687M G05266 G07584 G11684 G11163 G20597 G21269 G21510 G25389 G28678 G29248 G01687A G01687B
School pipeline safety information WHAT S INSIDE
School pipeline safety information WHAT S INSIDE Emergency Response Plan/Management Guide Call Before You Dig How To Recognize The Location Of A Pipeline Recognizing A Pipeline Leak Pipelines are near
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
ITSM Maturity Model. 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident management process exists
Incident ITSM Maturity Model 1- Ad Hoc 2 - Repeatable 3 - Defined 4 - Managed 5 - Optimizing No standardized incident process exists Incident policies governing incident Incident urgency, impact and priority
Project Management Improving Performance with KPIs Shelia Darby, MBA, PMP Darby Consulting www.darbyconsulting.com
Project Management Improving Performance with KPIs Shelia Darby, MBA, PMP Darby Consulting www.darbyconsulting.com Welcome to the PMI Houston Conference & Expo and Annual Job Fair 2015 Please put your
Pipeline Regulatory and Environmental Permits
Chapter 3 Pipeline Regulatory and Environmental Permits William E. Bauer Chapter Outline Introduction 57 3.1 Regulation of Interstate Pipelines 58 3.1.1 FERC-Regulated Natural Gas Pipelines 58 3.1.2 FERC-Regulated
Pipeline Safety Division Investigation Report
Pipeline Safety Division Investigation Report Investigation regarding: Crosby Excavating Incorporated UPPAC Database Record ID: 4873 Report Date: 9/23/2013 Investigator: Mike Orr Damage Date: 5/29/2013
Introducing and Managing Process Safety Key Performance Indicators (KPIs)
Introducing and Managing Process Safety Key Performance Indicators (KPIs) Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same
Service Portfolio Management PinkVERIFY
-11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to
Managing the integrity of pipeline assets
ROSEN Integrity Solutions Managing the integrity of pipeline assets Pipeline Integrity Services ROSEN: Leading the way in integrity management The safe and efficient operation of major transmission pipe
Permit No. Permit Fee: $295.00. Permit Expires (D+90 days): Business Name: Applicants Name: Telephone Number: E-mail Address:
City of Woodland Park Internet Service Provider (IPS) Permit for Installation of Telecommunication Infrastructure within City Owned Rights-of-Way (up to five locations per single permit) Permit No. Permit
PIPELINE EMERGENCY CONTACT DIRECTORY
Adams Kinder Morgan CIG - Eastern CO and WY (877) 712-2288 (303) 261-4296 Suncor Energy (U.S.A.) Pipeline Company (866) 978-6267 (307) 775-8101 Sinclair Pipeline Company (800) 321-3994 (307) 328-3643 Hazardous
GTI s Asset Lifecycle Tracking Program
GTI s Asset Lifecycle Tracking Program > Northeast Gas Association s Spring Operations Conference April 11, 2013 > Paul Armstrong Bill Gale Gas Technology Institute GTI Overview > Not-for-profit research,
What is a definition of risk?
What is a definition of risk? Definition of Risk Risk is the probability or threat of any negative occurrence caused by internal or external vulnerabilities interfering with achieving objectives that may
Operations and Maintenance Procedures for Natural Gas Systems
Operations and Maintenance Procedures for Natural Gas Systems Contact Information John West Transportation Specialist U.S. Department of Transportation PHMSA Office of Training and Qualifications Office
Safety Management Program
Corrective Action Plan (CAP) Safety Management Program Submitted by TransCanada PipeLines Limited and its National Energy Board Regulated Subsidiaries to address non-compliant findings in the National
Maryland & Washington, D.C. Damage Prevention Guide
Maryland & Washington, D.C. Damage Prevention Guide Two full business days prior to work call 1-800-257-7777 or 811. 1-800-257-7777 or 811 missutility.net. Version #5 Updated February 2015 APWA Uniform
Re: INGAA s Comments to OSHA s Request for Information concerning Process Safety Management
March 28, 2014 OSHA Docket Office Occupational Safety and Health Administration U.S. Department of Labor Room N-2625 200 Constitution Avenue NW Washington, DC 20210 Via electronic submission: www.regulations.gov
California Public Utilities Commission Risk Assessment Unit Hazard Database Project Report on Status and Initial Recommendations
California Public Utilities Commission Risk Assessment Unit Hazard Database Project Report on Status and Initial Recommendations March 14, 2012 I. Introduction The California Public Utilities Commission