Design Guide for Residential Recycling
|
|
|
- Daniella Wright
- 10 years ago
- Views:
Transcription
1 Design Guide for Residential Recycling 15 May 2013
2 Contents 1 Introduction Purpose of Guidelines How to Use this Guide Strategic Context State Government City of Adelaide Relevant Legislation Operational Environment Residential Waste Service Providers Operational Constraints Waste Management System Selection Guide to System Selection Waste System Type and Development Characteristics Design Guidelines All Development Objective 1 - Environmental Sustainability Objective 2 - Effective Waste Resource Management Objective 3 - Clean and Healthy Living Environments System Specific Design Guidelines Type A Low Density Systems Type B and C Medium and High Density Systems Type C High Density (High Rise) Appendix 1: Glossary of Terms Appendix 2: Waste Resource Generation Rates Appendix 3: Type A - Low Density Checklist Appendix 4: Type B and C - Waste Management Plan Appendix 5: References Page 2
3 1 Introduction 1.1 Purpose of Guidelines This guide provide residents, developers and industry professionals, engaged in the design, construction or operation of new residential developments, with information about waste management systems that will support achievement of the following objectives and design outcomes: Objective 1 - Environmental Sustainability Design Outcomes - Strategic (a) Maximise resource recovery and minimise waste going to landfill (b) Meet occupant service requirements and statutory obligations of predicted waste generation Objective 2 - Effective Waste Resource Management Design Outcomes - Operational (a) Functional for residents and building managers (including universal access) (b) Minimise trip generation and pedestrian travel distances (c) System capacity affords flexibility (change of land use, population and/or generation rates) (d) Provide storage areas convenient to primary pedestrian movements (e) Provide collection zones that enable safe and convenient removal from site and the locality. Objective 3 - Clean and Healthy Living Environments Design Outcomes City Living (a) Mitigate negative impacts on amenity (visual, noise, odour, litter and illegal dumping potential) (b) Hygienic and safe Achievement of these objectives and design outcomes will ensure new residential and mixed use developments positively contribute to achievement of resource recovery targets, support effective waste management and enhance the quality of life for the City community. While reasonable effort has been taken to ensure the accuracy of information in this document, the Adelaide City Council makes no representation, express or implied, as to the accuracy, currency, reliability or suitability of the information contained herein. The use of the information contained in this document is at your sole risk. The Adelaide City Council expressly disclaims responsibility for any damages that may be caused by the contents of this document. If you rely on the information in this document, you are responsible for ensuring by independent verification its accuracy, currency or completeness. Copyright of this document is owned by the Adelaide City Council. No licence to publish, communicate, modify, commercialise or alter this document is granted. Permission must be sought from Sustainable City, Adelaide City Council, GPO Box 2252, Adelaide SA
4 1.2 How to Use this Guide This Guide outlines a step-by-step approach to inform waste system selection and design Step 1 Preliminary Design Proposal Step 2 Select Waste Management System (Guide to System Selection - Chapter 4) Step 3 Review Design Guidelines (Chapter 5, Chapter 6 and Appendix 2) Step 4 Design the Waste Management System Step 5 Prepare Supporting Documentation (Appendix 3 and Appendix 4) Step 6 Development Plan Consent Application Using basic information about proposed residential densities, Step 2 broadly aligns proposed developments with waste systems that may be compatible with likely waste generation rates and system constraints. Step 3 provides guidelines which, when applied, contribute to achievement of the targeted design outcomes and objectives. Step 5 provides guidance on the level of documentation which would be appropriate to support applications for Development Plan consent. Figure 1.1 Guideline Flowchart summarises the above process and recommended system documentation to support applications for Development Plan Consent. 4
5 5
6 2 Strategic Context 2.1 State Government The 30-Year Plan for Greater Adelaide Through the 30-Year Plan for Greater Adelaide, the South Australian Government is planning an urban form for Greater Adelaide that focuses new housing and jobs along existing transport corridors. The Plan recognises the importance of the City of Adelaide in implementing this new form and has a target for the City of 15,040 new dwellings by 2040, housing an additional population of 27,300 (DPLG, 2010). Increasing the number of people living in the City will have benefits for all of metropolitan Adelaide by relieving pressure on the urban fringe, increasing the number of people living in vibrant mixed use settings close to facilities, and increasing the use of sustainable commuting options including cycling and walking. Specific policies in the Plan for the City of Adelaide suggest that this additional demand for dwellings could be met by a mix of medium to high density housing South Australia s Waste Strategy Waste management initiatives of Council support achievement of material recovery and recycling targets in South Australia s Waste Strategy (Zero Waste SA, 2011). These targets aim to increase recycling rates for municipal kerbside solid waste (MSW) to 70% by Introduction of the 3 bin system has delivered substantial progress towards Council s target of diverting 50% of kerbside waste from landfill by Recycling rates have increased from less than 25% in 2007/08, to 36% in 2011/12 (42% including commercial cardboard). 2.2 City of Adelaide Creating our Future, the City of Adelaide s Strategic Plan The Strategic Plan outlines the Adelaide City Council s vision for the City of Adelaide and the projects and services it will deliver between 2012 and It provides for the implementation of the urban design, built environs changes and population growth projected in the 30-Year Plan for Adelaide. Outcome 6: Environmentally Sustainable City is one of the six desired Outcomes for the City. Strategies include actions to reduce the City s carbon emissions, water use and waste through projects with businesses, residents and organisations. Key projects and services include waste and recycling service improvements for kerbside collection, public places, events and high density developments Environmental Sustainability Strategy The Environmental Sustainability Strategy , seeks the outcome of achieving a zero waste City. In particular, the Environmental Sustainability Strategy seeks a: A City where waste resource recovery is maximised from residential and higher density developments, hospitality and retail uses and the public realm Waste Management Action Plan The Waste Management Action Plan , sets the following targets for Council s kerbside waste collection service: Recycle 50% of kerbside waste by 2015, on the way to 60% by Increase participation in kerbside green organics service to 25% by
7 2.2.4 Smart Move City of Adelaide s Transport and Movement Strategy The Smart Move strategy is a ten year plan that looks at future needs to make our streets safer and more connected, so our City is easier for people to access and use, creating great streets and places for people. It seeks to achieve eight Smart Move outcomes, particularly Outcome 5 which includes the following relevant strategies: 5.1 Ensure space is available for servicing the City i.e. for pickups, deliveries and waste collection 5.2 Strengthen partnerships between Council, those servicing the City, and service providers Work with local precinct and resident groups to develop management plans for servicing key locations 5.3 Minimise the impact of City services on other City users Provide efficient waste pick up points at all redesign opportunities Introduce methods for minimising th unsightly effects of waste storage Develop behaviour change programs to improve waste disposal practices by residents and businesses 2.3 Relevant Legislation The following legislation is considered most relevant to the design and operation of waste and resource recovery systems for residential developments in the City of Adelaide. Local Government Act 1999 Public and Environmental Health Act 1987 o Public and Environmental Health (General) Regulations 2006 Environment Protection Act 1993 o Environmental Protection (Waste to Resources) Policy 2010 Development Act 1993 o o Adelaide (City) Development Plan Building Code of Australia Disability Discrimination Act 1992 Adelaide City Council By-Law No 5 Waste Management System designers should refer to the Environment Protection (Waste to Resources) Policy 2010 for direction on resource recovery obligations and prohibited landfill waste. 7
8 3 Operational Environment 3.1 Residential Waste Service Providers In the City of Adelaide waste management services are provided by Council and private contractors. The Council provides the majority of waste collection services for residential housing through a standard kerbside service which is delivered by the Council s waste contractor. Private contractors typically provide waste collection services to higher density and more complex residential developments for which Council s standard kerbside service is not suitable. The waste collection services offered by Council or private contractors often utilise different type of bins, equipment and vehicles. Whilst this provides for a diversity of service offerings, there are generic constraints that apply to waste resource collection from residential developments irrespective of what type of service is selected. 3.2 Operational Constraints Many constraints are not dictated by the waste collection service but by the type and design of the residential development itself and the public roads and public realm areas around the development that are required for access or use in providing the waste collection service. Common service constraints are summarised below. Development density Higher density developments generally mean less space on properties for storage of waste resource bins and less street frontage per dwelling for bin collection. Mixed use development Residential developments with retail outlets or commercial offices may restrict street frontage for bin collection and require separate waste systems and services for these other uses. Street design and operation Adjacent roads or streets to the development must be wide enough and designed to allow for access and safely carry waste collection vehicles to street frontages or a property where bins are being collected, which may also require traffic and parking controls. Public realm collection Where Council permits waste bin collection from street verges or other public areas, these need to be designed so they don t interfere with pedestrian traffic or other shared uses and won t cause damage to adjacent private property, e.g. parked cars, fences, etc. or other public infrastructure, e.g. street furniture, power services, trees, etc. On-property collection Requires properly sized access areas, adequate vertical clearances and pavement design to safely carry waste collection vehicles and allow them to turn and manoeuvre so they can enter and exit the property and load bins. Public amenity Delivery of collection services may require controls on hours of service to avoid adverse impacts on public access to streets or properties or urban noise levels that inconvenience residents and the public. 8
9 4 Waste Management System Selection Operation of a waste management system should be a simple and convenient task from the event of waste being generated to the removal of recovered resources and residual waste from the site. To achieve this, systems should cater for the separation of resources and waste within the dwelling and support the movement, consolidation and storage of these materials as they advance to the point of collection. Effective waste management systems will be responsive to the following determining factors: 1. The projected volume of waste; 2. The likely composition of the waste stream i.e. paper, food, plastic etc; 3. Targeted resource recovery rate for each waste resource stream; 4. Availability of storage, presentation and collection spaces; 5. Availability of supporting infrastructure and collection service providers; 6. Statutory obligations and Standards; and 7. User preference and behaviour. Highly effective systems will have a clear chain of custody and responsibility for moving waste within a site that is supported with knowledge and infrastructure that: 1. Enhances the ability of residents and tenants to pass recovered resources and residual waste from private property to public or common areas. 2. Assists building managers to consolidate recovered materials in larger storage bins and present them correctly for collection. 3. Enables collection service providers to safely and effectively remove each waste resource stream. Through integrated design, effective systems should incorporate the following design elements: 1. System with supporting infrastructure 2. Transfer pathways 3. Storage areas 4. Collection Zones 4.1 Guide to System Selection Using the residential density of a development, this Section provides a quick reference guide to align developments with systems that could meet the operational requirements of projected waste volumes Density Guide to Waste System Selection The 30-Year Plan for Greater Adelaide provides three categories of net residential site density to be used in planning policy to guide individual developments (low, medium and high). 1. Low density = less than 35 dwellings per hectare 2. Medium density = dwellings per hectare 3. High density = more than 75 dwellings per hectare These categories broadly correlate with system design parameters and operational constraints that emerge as waste generation volumes increase and the space available per dwelling for storage, presentation and collection decreases. 9
10 To identify applicable guidelines for different residential developments, Table 4.1 below aligns net dwelling densities with potential waste systems. Table 4.1 Guide to waste system selection Net Residential Density Description Waste System <35 dwellings per hectare Low Density Type A dwellings per hectare Medium/High Density (Low Rise) Type B >75 dwellings per hectare High Density (High Rise) Type C This categorisation of waste systems is indicative in nature and intended to support preliminary planning for new developments. A Waste Management Plan and performance based assessment should be undertaken to more accurately determine system compatibility. 4.2 Waste System Type and Development Characteristics The characteristics of these developments and waste systems are further explained below Type A Low Density System This system is used by Adelaide City Council as its standard waste and recycling service for low density dwellings. This service is typically suitable for development which displays the following characteristics: 1. Net Dwelling Density of up to 35 dwellings per hectare (greater than 300 square metres per dwelling) 2. Building Code of Australia: Typically Class 1 buildings 3. Torrens titled residential development with commercial activities limited to home activities, as defined by Schedule 1 of the Development Regulations Each dwelling able to present bins for collection in the public realm without significant disruption to parking or pedestrians. 5. Car parking is contained within the site boundary. Figure 4.1 Low density dwellings in the City of Adelaide set on allotments greater than 300m 2. Bin storage at side or rear of dwelling Direct street frontage On street collection zone 10
11 This system typically has the following design features: 1. Provides every dwelling with three bins: o General Waste Residual Waste to Landfill Red Lid L MGB Weekly collection o Co-mingled Recycling Yellow Lid - 240L mobile garbage bin (MGB) Fortnightly o Organics (including food organics) Lime Green Lid - 240L MGB Fortnightly 2. The presented bins are picked-up and emptied on the same day by side-loading council waste collection vehicles. 3. Bin presentation occurs on a kerbside or in a designated bin collection zone unless otherwise agreed in writing with Council s contracted service provider. Figure 4.2 and 4.3 Low density dwelling in the City of Adelaide and example of 240L bins with colour coded lids Source: Zero Waste SA Type B Medium/High Density (Low Rise) System This system is compatible with medium and high density residential or mixed use residential development with not more than 5 building levels. This system is typically suitable for development which displays the following characteristics: 1. Net dwelling density of >35 to 75 dwellings per hectare (less than 300 square metres per dwelling.) 2. Building Code of Australia: Typically Class 2 buildings 3. Typically Community Titled developments located within the Mixed Use Zone where higher dwelling densities and building heights greater than 2 storeys are envisaged. 4. Low scale dwellings have very small front setbacks but may also have court yard or roof top gardens. 5. Most have off-street parking, but it is often accessed by a rear laneway or a communal driveway. Visitor parking tends to be on the street. 6. The higher medium density examples rely on balconies or small courtyard gardens for private open space. 7. Shared amenity and landscaping areas to supplement comparatively small private open space. 11
12 Figure 4.4 Aerial photograph - High density (low rise) residential development Halifax Street, Adelaide 3 storey townhouses Limited on-site and street access for presentation bins and collection by trucks This system will typically have the following design features: 1. Shared bin system using common bin storage areas 2. Bins Combination of 240, 660 and/or 1100 litre bins 3. Manual handling systems without significant infrastructure 4. Bin presentation for collection within a designated compound on the development site unless otherwise agreed in writing with Council s contracted service provider. 5. Bins pulled to the road at the time of collection or to a previously designated collection zone. 6. A more rigorous waste system design process may be required to demonstrate waste resource recovery outcomes. This may involve preparation of a Waste Management Plan. Further guidance on information requirements of Waste Management Plans is provided in Appendix 4. Figures 4.5 and 4.6 High density (low rise) residential development Adjacent Halifax Street, Adelaide 12
13 4.2.3 Type C High Density (High Rise) System This system is typically required for developments which display the following density and built form characteristics: 1. Greater than 75 dwellings per hectare and typically 5 or more storeys. 2. Typically located within the Central Business Zone or Mixed Use Zone where maximum building heights are greatest. 3. Building Code of Australia: Typically Class 2 and 3 buildings 4. Community Titled 5. Comparatively small site areas for individual dwellings (under 150 square metres). 6. The location and site area dedicated to car parking is a major contributor for high density developments to be achievable. 7. Private open space is often restricted to roof gardens, balconies or small courtyards. Figure 4.7 Aerial photograph High density (high rise) development - East Terrace, Adelaide Multi-storey apartment buildings Narrow internal road 3 storey townhouses Figures 4.8 and 4.9 High density (high rise) mixed use development Wakefield and Grenfell Street, Adelaide. 13
14 This system typically has the following design requirements: 1. Highly site-specific design which may include high volume manual and automated handling systems: (c) Waste chutes for residents to dispose of waste and recyclables to the waste storage bins; (d) Compaction equipment to reduce waste volume and decrease storage area size and/or collection frequency. (e) Provision for additional and separate storage areas for storage and collection of hard waste and/or e- waste items. 2. Bin presentation for collection within a designated compound on the development site unless otherwise agreed in writing with Council. 3. Bins are serviced on the development site; pulled to the road at the time of collection; or to a previously designated on-street collection zone. 4. Larger capacity four wheel bins or skips (660L, 1100L, 1.5m 3 or 3m 3 ) that may require different types of waste collection equipment, e.g. front-lift trucks, bin lifting equipment and/or trolleys. 5. A more rigorous waste system design process may be required to demonstrate waste resource recovery outcomes. This may involve preparation of a Waste Management Plan. Further guidance on information requirements of Waste Management Plans is provided in Appendix 4. Figure 4.10 Example of 660L mobile garbage bin specification Mastec 14
15 5 Design Guidelines All Development 5.1 Objective 1 - Environmental Sustainability Achievement of the following Strategic Design Outcomes will support achievement of Objective 1: Design Outcomes - Strategic To be compatible with the long term sustainability of the environment development should: (a) Maximise resource recovery and minimise waste going to landfill; and (b) Meet occupant service requirements and statutory obligations of predicted waste streams. The following guidelines will support achievement of these design outcomes Guidelines - System Performance Development should be provided with regular collection services for the following waste streams: (a) Waste to landfill; (b) Co-mingled recycling for reuse; and (c) Organics for composting (including food organics) Provision should be made for the storage and periodic collection of hard waste, e-waste and prohibited landfill (hazardous) waste Systems should support occupants to achieve the following target rates of resource diversion from landfill; (a) Low density 70% (b) Medium and high density (low rise) greater than 55% (c) High density (high rise) greater than 55% Figure 5.1 High density (high rise) mixed use development - Hindmarsh Square, Adelaide 15
16 5.2 Objective 2 - Effective Waste Resource Management Achievement of the following Operational Design Outcomes will support achievement of Objective 2: Design Outcomes Operational Effective waste resource management systems should: (a) Be functional for residents and building managers (including universal access); (b) Minimise trip generation and pedestrian travel distances; (c) Ensure system capacity affords flexibility (change of land use, population and/or generation rates); (d) Provide storage areas convenient to primary pedestrian movements; and (e) Provide collection zones that enable safe and convenient removal from site and the locality. The following guidelines will support achievement of these design outcomes Guidelines - Systems with Supporting Infrastructure The design of waste systems should be compatible with residential waste management practices and commercial recycling infrastructure in South Australia. To achieve this, systems should incorporate the following system features: Systems should support source separation of recyclable materials typically found in the waste stream of residential and where applicable mixed use developments Systems and supporting infrastructure should: (a) Be designed to safely, efficiently and conveniently store and handle projected waste generation rates of future building occupants; (b) Be positioned so that access points or openings are conveniently located in entry halls, lift foyers, or a separate room; (c) Be designed for ease-of-cleaning and minimal maintenance; and (d) Minimise potential for blockages and noise disturbances to residents during use The sizing and selection of bins should use estimates for waste and recycling volumes that are based on peak weekly values: (a) Using average per capita waste and recycling generation rates (expressed in Appendix 2); (b) Taking into account design or expected occupancy per dwelling; and (c) Incorporating an additional 25% buffer to allow for seasonal peaks throughout the year, or by providing additional scheduled or at-call services in peak periods Waste and recycling generation rates for various residential and commercial land uses are listed in Appendix 2 Waste Resource Generation Rates. Prior agreement of the nominated service provider should be secured before additional or at call services in peak periods are incorporated into the waste system design. 16
17 The following colour designations should be used for all supporting infrastructure including bin lids, chute openings and labelling; (a) Red Waste to Landfill (b) Yellow Recycling for Reuse (c) Lime Green Organics for Composting (including food organics) All dwellings should make adequate provision for a kitchen (waste and recycling) bin station that provides the following storage capacities: (a) General waste bin at least 20L (b) Co-mingled recycling bin - at least 30L (c) Food organics at least 10L Figure 5.2 (a) and (b) - Elements of a kitchen waste bin station (a) Under-counter waste bin (b) Organics basket with compostable liner and recycling crate A resident handbook should be prepared that outlines the roles and responsibilities of individuals, households, the property manager, and collection contractors to effectively and safely manage the waste and resource recovery system By-laws filed for community/strata title developments should set out management responsibilities for the waste and recycling system on a property The ongoing management of the waste and recycling services should be detailed as part of the initial system design Guidelines - Transfer Pathways Development should facilitate the linear movement of separated materials from private areas into and through common property areas as they advance to the final point of collection Provision should be made for safe and convenient bin transfer to the collection zone/s. This may require provision of vertical lifting equipment, a power trolley or other transport equipment To minimise risks to persons and property, bin storage areas should be located at ground level Transfer routes from the designated ground floor access point of a dwelling to the common bin storage area should ensure dignified access and use of the bin storage area for people with a disability and elderly/frail aged. 17
18 Common bin storage areas should be located in a position that is convenient for both users and waste collection staff, and: (a) Avoid travel distances of greater than 50m from front door of dwelling to bin storage area (excluding access lift travel distance, but not more than 10 metres from the access lift to the bin storage area); (b) Minimise carting of bins to the collection point; (c) Ensure that bins are equitably located and accessible to all residents; and (d) Transfer routes should be appropriately paved and graded for water run-off to avoid water pooling from rain or irrigation Transfer routes from the bin storage area to the collection point should be free of obstructions and designed to allow residents, including the aged or persons with limited mobility impairment, to easily and safely cart the bins and should: (a) Be at least 1.25m wide; (b) Have a grade no more than 1:10 and with no steps; and (c) Not pass through the interior living areas of a dwelling Guidelines - Storage Areas Effective waste systems should be provided to ensure that storage areas are appropriately sized, designed and located to support the consolidation of waste resources from dwellings or tenancies into larger storage bins prior to presentation for collection Storage areas and access to bins should be convenient for all persons (i.e consideration should be given to lifting lids, door opening mechanisms to enable access/egress for people using a wheelchair, and/or provision of low drop off points) Storage and handling infrastructure should be designed to facilitate safe operation and storage of accumulated waste and resources for scheduled periodic collections Waste and recycling storage containers should be stored in accordance with Council s Waste and Resource Recovery By-law 5 Waste Management (i.e. within the property boundary unless formally approved by Council.) Sufficient space should be provided for equipment to handle or manage all waste and recycling likely to be generated on the premises between collections. Figure Example of 1100L mobile garbage bin specification from Mastec (Source: Mastec website 9 July 2010) 18
19 Storage area should be provided on the property in a location that balances the needs of residents with aesthetic and functional requirements of the waste management service provider The designated bin storage area should be located external to living areas as follows: (a) assigned to a dwelling/s and located within the property boundaries; (b) Otherwise, bin-sets should be co-located in designated part(s) of the Common Property Steps should be taken to ensure waste cannot spread beyond the designated storage areas Storage area/s should be of sufficient size and dimensions to store, in separate containers, the volume of waste and recycling likely to be generated during the period between collections. For example - Type A System - Minimum size per bin-set = 2m wide 1m deep (refer Figure 5.4). Figure 5.4 (a), (b) and (c) - Examples of potential arrangements and dimensions for bin storage areas. Bin storage zone Screening Bin storage access zone Bin access/ transfer route Grade < 1: 10 No steps Bin storage access zone Bin access/transfer route 1.20 Screening (a) Single dwelling property 140L and 240L bins (b) Two dwellings with common bin storage area Screening 660L 660L Bin access/transfer route Bin storage access zone 660L 660L (c) 660L bins for putrescible waste/comingled recycling and 240L for organics. (d) Guidelines - Collection Zones Collection Zones may occur within the site of the development or external to the site from the kerbside or roadway. They are a critical interface between the internal site infrastructure (with procedures maintained by the building or facilities manager), and the collection vehicle infrastructure operated by the collection service provider. 19
20 The following design guidelines will facilitate the transfer of waste and resources to the collection service provider: On-street collection zone should, in consultation with Council, balance the needs of collection with the aesthetic and functional requirements of the public realm by: (a) Giving consideration to existing and potential traffic controls that could facilitate access; (b) Minimising disruptions to local pedestrian and vehicle movements; (c) Minimising impact upon noise sensitive adjacent land uses; (d) Ensuring carting distance from storage area to collection zone (where a rear-lifting truck would pick-up the bin) does not exceed 15m; and (e) Confirming adequate street access for waste collection vehicle Where the collection zone is on the property, development should: (a) Provide access for trucks to enter and exit the property in a forward gear; (b) Minimise the need for reversing; (c) Minimise interference with pedestrian or vehicular movements; (d) Provide a roadway designed for fully loaded weight and turning loads of collection vehicles; (e) Provide adequate clearance and lifting heights for bin servicing and manoeuvring; and (f) Be positioned and have designated collection times to minimise loss of amenity to residents, neighbours and the public arising from noise or odour associated with bin collection. For initial guidance, typical vehicle specifications and access requirements for rear-lifting waste collection vehicles are included in NSW Better Practice Guide for Waste Management in Multi-unit dwellings (DEC, 2008). 5.3 Objective 3 - Clean and Healthy Living Environments Achievement of the following City Living Design Outcomes will support achievement of Objective 3: Design Outcomes City Living Development should protect and enhance the quality of life for the City community, by: (a) Minimising litter and illegal dumping potential; (b) Mitigating negative impacts including visual, noise and odour; and (c) Being hygienic and safe. The following guidelines will support achievement of these design outcomes Guidelines - Safety and Amenity Effective waste management systems should be provided to protect and enhance the quality of life for the City community Storage areas should consider: (a) The prevention and mitigation of fire risks; (b) The prevention of waste spreading beyond the defined location causing obstructions, amenity and hygiene impacts; 20
21 (c) Minimising the visual impact reducing the negative impact upon aesthetics; (d) Monitoring to ensure residents are adhering to conditions of storage and that no risk to safety or access are caused by depositing of waste dangerously; (e) Cleansing of the defined area to minimise odour, pests and nuisances preserve the visual amenity of the area; and (f) Providing suitably designated areas to store liquid and hazardous waste to prevent spillage Bin sets which are located indoors, adjacent windows or below balconies, should give careful consideration to; (e) Ventilation; (f) Mitigating odour and noise nuisances; and (g) Visual impacts Bin storage areas should be designed and located to minimise visual prominence from the public realm and adjoining residential premises Storage areas should: (a) Be secured, well illuminated, visually permeable, have passive surveillance and be designed to prevent entrapment of residents; (b) Minimise potential for odour and noise nuisances and preserve visual amenity for residents, neighbours and the public; and (c) Utilise washable surfacing and drainage systems that support periodic maintenance cleaning Periodic risk assessments should be undertaken by the Property Manager to ensure safe storage and handling of waste resources Storage areas should have regard to the following design matters: (a) Ongoing compliance with the Building Code of Australia and all relevant Australian Standards; (b) Safe handling for transporting waste; (c) The prevention of entrapments areas for residents, staff and visitors; (d) The prevention and mitigation of fire risks; (e) Adequate provision for the secure storage and periodic collection of hazardous waste. (batteries, smoke detectors, compact fluorescent light globes etc); (f) Structural design requirements for floor; (g) Adequate signage and illumination (also information for visually impaired) to indicate to the user the nature of the waste and recyclable material. Signage to align with the Australian Standards for Mobile waste containers - colours, markings, and designation; (h) Adequate ventilation; (i) Suitable flooring and wall finishes to minimise staining and benefit for easier cleaning and maintenance; (j) Adequate floor grading and drainage (to sewer) to prevent spillages entering stormwater; (k) Secure gated compounds to prevent interference with bins and equipment; (l) Access by residents (where required) or building staff for maintenance purposes; and 21
22 (m) Where storage areas are on higher levels, a separate service lift should be considered and adequately sized and designed to carry filled bins. Figure 5.5 Example of Instructional Signage in a Bin Enclosure 22
23 6 System Specific Design Guidelines 6.1 Type A Low Density Systems The following design guidelines are specific to low density developments using Council s three bin kerbside collection service Guidelines - Collection Zones A bin presentation area should, in consultation with Council, balance the needs of collection with the aesthetics and functional requirements of the public realm. Consideration should be given to the following criteria: o o The kerbside area in front of a development should be able to accommodate the bins that are presented and allow the bins to be safely accessed and picked up by the collection vehicle. The frontage of a development should meet the following requirements. (i) Retain a 1.2m wide pedestrian path in front of property whilst providing a kerbside verge area that can accommodate a bin presentation zone for each dwelling = 1.6m wide 1.0m in depth; (ii) Ensure that the above bin presentation zone is satisfactorily offset from trees, street furniture, tree canopies, etc.; and (iii) Ensure that on-street parking arrangements do not restrict access of collection vehicle to kerbside on collection days. An example illustrating these requirements is shown in Figure 6.1. Figure Example of presentation zone at front of property for collection of 140/240L bins by council side-loading waste collection trucks. PROPERTY PEDESTRIAN PATH (1.2 m wide min.) Access Road (to Property) Bin presentation zone 23
24 6.2 Type B and C Medium and High Density Systems Guidelines - Systems and Supporting Infrastructure When locating storage areas and disposal points, priority should be given to the convenient disposal of recycled materials. This may involve the location of recycling stations and temporary kitchen bin repositories in or adjoining entry foyers or pedestrian entry points to car parks Where a rear-lifting waste collection vehicle is to be used, the vehicle specifications and access requirements to the bin collection point should be confirmed with Adelaide City Council. For initial guidance, typical vehicle specifications and access requirements for rear-lifting waste collection vehicles are included in NSW Better Practice Guide for Waste Management in Multi-unit dwellings (DEC, 2008) Guidelines - Storage Areas Shared bin storage areas should respond to the different storage and access requirements of: (a) Larger capacity 4 wheel bins, including positioning, set-back, access, noise suppression and screening; (b) Static infrastructure such as carousels, compactors and chutes; and (c) Residential and commercial occupants Where the bin storage area and collection point are separated by a change in building, floor or ground levels, systems should: (a) Provide for manual carting or, if required, mechanical assisted carting; (b) Restrict the size and weight of bins to ensure safe operation and handling; (c) Ensure the egress route is clearly marked and free of obstructions; (d) Avoid kerbs or provide ramps of an adequate width, non-slip surface and gradient ( 1:10). (e) Ensure service-lifts or mechanised lifting platforms are of an adequate size and load capacity. (f) Where using mechanically assisted carting, the same requirements as for manual carting should apply except that in addition: (i) The lifting equipment or trolley to pick-up bins must be appropriately sized and designed to manoeuvre within the access areas available and lift the bins; (ii) A secure storage area for lifting equipment or trolley should be provided to prevent theft or damage by third parties Guidelines - Safety and Amenity Common bin storage areas should be monitored to ensure residents are adhering to building fire safety requirements For building fire safety and accessibility reasons, designated storage areas should be kept tidy and must not obstruct passages and fire exits. 24
25 6.3 Type C High Density (High Rise) Guidelines - Systems and Supporting Infrastructure Development should utilise economies of scale to realise economic benefits for residents, throughout the life of a development, of source separation infrastructure Development should utilise economies of scale to leverage adoption of mechanical and automated infrastructure solutions, such as chutes, compactors, carousels to: (a) Minimise system footprint; (b) Increase ease of participation and maintenance; (c) Improve service frequency; (d) Improve aesthetics and amenity; and (e) Enhance safety Mixed use development should respond to the different waste resource generation rates of commercial and residential occupants (Appendix 2) Waste resource recovery systems, including designated storage areas, should afford maximum flexibility to the likely future mix of commercial and residential land uses to support change of land use, future adaptation and reuse of buildings Direct collection from an on-site bin storage area will require: (a) Provision of adequate vertical clearance for a truck to traverse the site to and from the bin storage area; (b) Ability for the collection vehicle to adequately manoeuvre into position to lift bins with limited need to reverse or potential risk to damage the building or other property in the basement; and (c) Ability for the collection vehicle to exit the basement in a forward gear. Consideration should be given to the following criteria; o o o Minimum vertical clearance - 4m at any point where the collection truck will need to traverse site including collection zone, manoeuvring areas and the entry and exit ramps. The grades of entry and exit ramps should not exceed capabilities of the waste collection vehicle. The floor of the basement must be suitably designed to carry the load of the collection vehicle. 25
26 Appendix 1: Glossary of Terms Commercial and Industrial Waste (General) has the same meaning as in the Environment Protection Authority Waste Guidelines; Commercial Cardboard means non-contaminated cardboard generated by commercial premises but excludes Recyclables, contaminants such as wax boxes, milk cartons, boxes soiled by food, paints or oils, plastic or polystyrene; Collection Zone The location where the physical transfer of waste and resources to the collection vehicles occurs prior to removal from the site and locality. Subject to relevant approvals, it may occur on either private or public land. Domestic Waste means any kind of domestic waste including putrescibles generated from residences, but excludes liquids, metals (other than food containers), building materials, stones, bricks, soil, lead acid batteries, any dangerous or toxic waste, Commercial and industrial Waste (General), Listed Waste, Hazardous Waste or Radioactive Waste; Domestic Waste Container means a container provided or designated by the Council for the reception of Domestic Waste (maximum weight 60kg); Footpath Area means: 1. that part of the Road between the boundary of the Road and the edge of the carriageway of the Road on the same side as that boundary; or 2. a footway, laneway or other place made or constructed for the use of pedestrians and not for the use of Vehicles; Green Organics means any clean organic matter consisting of lawn clippings, plants, vegetables, food scraps, leaves, prunings or other materials for which permission has been given by the Council but excludes any item larger than 15cm in diameter, Domestic Waste, Commercial and Industrial Waste (General), Listed Waste, Hazardous Waste or Radioactive Waste; Green Organics Container means a container provided or designated by the Council for the reception of Green Organics (maximum weight 70kg); Hard Waste means solid waste arising from domestic premises which is not suitable for collection using a kerbside bin system and includes any internal and external household items such as fridges, television sets, mattresses, but excludes any Domestic Waste, Commercial and Industrial Waste (General), Listed Waste, Hazardous Waste, Radioactive Waste or waste that is not deemed suitable for collection by the Council; Hazardous Waste has the same meaning as in the Environment Protection Authority Waste Guidelines; Listed Waste has the same meaning as in the Environment Protection Authority Waste Guidelines; Radioactive Waste has the same meaning as in the Environment Protection Authority Waste Guidelines; Recyclables means newspapers, magazines, clean paper and cardboard, clean plastic containers of a type specified by the Council, clean tins and cans, clean glass and clean milk and juice containers and other materials for which permission has been given by the Council; Recyclables Container means a container provided or designated by the Council for the reception of Recyclables (maximum weight 60kg); Road has the same meaning as in the Local Government Act
27 Universal Design Universal Design is a framework for the design of places, things, information, communication and policy to be usable by the widest range of people operating in the widest range of situations without special or separate design. Most simply, Universal Design is human-centered design of everything with everyone in mind (Institute of Human Centered Design, as adopted by the Adelaide City Council Access & Inclusion Strategy 2012 ) 27
28 Appendix 2: Waste Resource Generation Rates Table A2.1: Generation rates for sizing bins, number of bins and required bin storage areas. LAND USE WASTE excluding food CO-MINGLED RECYCLING GREEN ORGANICS including food Low Density Dwelling Medium or High Density Dwelling Including student accommodation Serviced Apartment, Backpacker or Boarding Houses Hotel or Motel 35 litres/bedroom/week Hard and Electronic Waste 0.77m 3 /household/year 30 litres/bedroom/week Hard and Electronic Waste 0.77m 3 /household/year 30 litres/bedroom/week Hard and Electronic Waste 0.77m 3 /household/year 25 litres/bedroom/week 40 litres/bedroom/week 25 litres/bedroom/week 10 litres/bedroom/week 20 litres/bedroom/week 20 litres/bedroom/week Accommodation 5 litres/bedroom/day 1 litres/bedroom/day 1 litres/bedroom/day Bar Areas 5 litres/10m 2 bar area/day 5 litres/10m 2 bar 0.25 litres/10m 2 bar area/day area/day Dining Areas 25 litres/10m 2 dining area/day 5 litres/10m 2 dining 40 litres/10m 2 dining area/day area/day Combined Bar and Dining Areas 30 litres/10m 2 combined bar and dining area/day 10 litres/10m 2 combined bar and 40 litres/10m 2 combined bar and dining area/day dining area/day Licensed Entertainment Premises or Community Club (Litres per trading day) 5 litres/10m 2 bar floor area/day 30 litres/10m 2 combined bar and dining floor area/day 5 litres/10m 2 bar floor area/day 10 litres/10m 2 combined bar and dining floor area/day 0.25 litres/10m 2 bar floor area/ day 40 litres/10m 2 combined bar and dining floor area/day Offices or Consulting Rooms 5 litres/10m 2 /week 7.5 litres/10m 2 /week 1.25 litres/10m 2 /week Showrooms 4 litres/10m 2 /day 1 litres/10m 2 /day 0.25 litres/10m 2 /day
29 LAND USE WASTE excluding food CO-MINGLED RECYCLING GREEN ORGANICS including food Shop (Litres per trading day) Food Premises: Butcher 3.5 litres/10m 2 /day 2 litres/10m 2 /day 3.5 litres/10m 2 /day Delicatessen 3.5 litres/10m 2 /day 3 litres/10m 2 /day 2.5 litres/10m 2 /day Seafood Retailer 3.5 litres/10m 2 /day 2 litres/10m 2 /day 3.5 litres/10m 2 /day Fruit & Vegetable 10 litres/10m 2 /day 12 litres/10m 2 /day 16 litres/10m 2 /day Hairdresser 3.5 litres/10m 2 /day 3 litres/10m 2 /day 1 litre/10m 2 /day Café/Restaurants 27 litres /10m 2 /day 13 litres/10m 2 /day 40 litres/10m 2 /day Supermarket 18 litres/10m 2 /day 20 litres/10m 2 /day 18 litres/10m 2 /day Takeaway 3 litres/10m 2 /day 3 litres/10m 2 /day 3.5 litres/10m 2 /day Retail Less than 100m 2 floor 5 litres/10m 2 /day 2.5 litres/10m 2 /day 0.25 litres/10m 2 /day space Greater than 100m 2 floor space 5 litres/10m 2 /day 5 litres/10m 2 /day 0.25 litres/10m 2 /day Notes: 1. The rates for low, medium and high density are based on: Bin and hard waste audits undertaken in metropolitan areas; and Assumed best-practice levels of participation and separation in recycling by residents. Diversion rates achieved by City apartment buildings during studies undertaken by Council. 2. All other generation rates are based upon the City of Sydney - Policy for Waste Minimisation in New Developments (2005). 3. Best-practice recycling may not occur until several years after a waste collection service commences this may affect the required mixture of bins and collection frequency per service initially used. While reasonable effort has been taken to ensure the accuracy of information in this document, the Adelaide City Council makes no representation, express or implied, as to the accuracy, currency, reliability or suitability of the information contained herein. The use of the information contained in this document is at your sole risk. The Adelaide City Council expressly disclaims responsibility for any damages that may be caused by the contents of this document. If you rely on the information in this document, you are responsible for ensuring by independent verification its accuracy, currency or completeness. Copyright of this document is owned by the Adelaide City Council. No licence to publish, communicate, modify, commercialise or alter this document is granted. Permission must be sought from Sustainable City, Adelaide City Council, GPO Box 2252, Adelaide SA 5001.
30 Appendix 3: Type A - Low Density Checklist Applicant: Contact details: Applicant s representative: Contact details: Development Application Number: Address: Authorised Signature: Print Name: Date: Item Check Comments 1. The development makes provision for each dwelling to have a Council service bin set? Green Organics 240L Mobile Garbage Bin (MGB) General Waste 140L or 240L MGB Co-mingled Recycling 240L MGB Yes No 2. Kitchen waste station contains recommended number and size of bins? Yes No General Waste at least 20L capacity Co-mingled Recycling at least 30L capacity Food Organics at least 10L capacity 3. Transfer routes support convenient movement of waste from within the dwelling to temporary storage areas and transfer of bins to the on street collection zone. Yes No Does not require transfer of 240L or 140L MGB through living areas of a dwelling. Surfacing supports convenient bin movement. Universal design principles applied 4. Street access for council service confirmed with Adelaide City Council? Yes No 5. Bin storage area: Designed and positioned to minimise nuisances and maximise amenity. Adequately sized & surfacing Convenient access for residents Universal design principles applied Appropriate transfer route to collection zone 6. Collection zone: Surfacing and access appropriate Collection zone agreed by Council Yes No Yes No Yes No Yes No Yes No Yes No Yes No
31 Appendix 4: Type B and C - Waste Management Plan The following guidance is provided on the format and content that should be included in a Waste Management Plan (WMP) for a Type B or C medium or high density system. Section 1. Development details 2. Type of Waste System 3. Waste System Sizing 4. Bin storage location 5. Transfer Pathways 6. Presentation & collection points 7. Specialised Facilities & Equipment Expected content Location; contact details; name of developer; description of development including buildings, commercial premises and land use; dwellings and occupancy data (including number of bedrooms). Waste service provider (Council or Private); individual bin sets or shared/communal bins; location of bin storage area and collection point; and rationale for selection and design of waste system. Number and type of waste and recycling bins with capacity per dwelling and total for development; Method for system sizing, including per dwelling generation rates, peaking factors and design factors assumed; Calculation worksheet for waste generation estimates appended. For mixed use developments waste generation rates and details of proposed waste services for the commercial premises should be included. Description of design methodology, addressing key issues of: sizing, positioning; resident access (including universal design); bin removal for collection; bin labelling and signage; and noise, odour and amenity. Calculation worksheet for number of bins and sizing of storage area. Description of transfer pathways, addressing key issues of: safe and convenient bin transfer; universal design from access/egress point of a dwelling to the common bin storage locations; minimising risks to persons and property; convenience to both users and waste collection staff. Summary of design methodology, addressing key issues of: sizing; positioning; universal design; collection frequency and timing; collection vehicle access; and public safety. Details of waste service provider appended including correspondence confirming suitability of proposed collection arrangements. Where specialised facilities and equipment, such as waste chutes, compactors, lifting equipment, etc., are proposed, provide brief description of design and technical rationale for why and how they were selected and sized, and how they are incorporated into and function as part of the residential waste system. 8. Management Description of waste system management responsibilities and operations for when development complete, including details of any property management contracts including mixed use sites with commercial premises. 9. Resident communication Methods to inform residents about waste and recycling systems and use. Append copies of proposed tenancy agreements or residents manuals explaining the use of the waste system. If you require assistance in the development of a Waste Management Plan, please contact the Waste Management Association of Australia (SA Branch) on phone (61) or [email protected]
32 Appendix 5: References Australian Building Codes Board (ABCB) (2010); Building Code of Australia (BCA) ; ABCB, Canberra, ACT Crown (2010); Rider Pallet Trucks Specifications, GPC 3000 Series; Accessed 02/07/10. Department of Environment and Conservation (DECC), NSW Government (2008); Better Practice Guide for Waste Management in Multi-unit dwellings Mastec (2010); Mastec Our Products: 140L, 240L, 660L, 1100L bins; Accessed 09/07/2010 SITA Environmental Solutions (2010); Rear Lift Collection System; Accessed 05/06/10 Standards Australia (SA) (2008); AS : Mobile waste containers Colours, markings and designation requirements Waste Tech Engineering (2010a); Catalogue Products & Solutions for the Recycling & Waste Industries: Smooth Tubes Garbage & Linen Chutes; Waste Tech Engineering, Hallam, Victoria Waste Tech Engineering (2010b); Catalogue Products & Solutions for the Recycling & Waste Industries: Eco-Pack Waste Chute Compactor Tech Engineering, Hallam, Victoria Other References Commonwealth Environment Protection Agency (1992); National Waste Minimisation and Recycling Strategy, Australia Council of Australian Governments (1992); National Strategy for Ecologically Sustainable Development Department of Environment & Climate Change (2010); Accessed from 29 March 2010 Department of Environment and Conservation, NSW Government (2008); Model Waste Not" Development Control Plan (DCP) Chapter 2008 Department of Planning and Local Government (DPLG), South Australian Government (2010); 30-yr plan for Greater Adelaide Department of Urban Services (1999), ACT Government; Development Control Code for Best Practice Waste Management in the ACT Environment Heritage & Protection Council (2009); National Waste Policy: Less Waste, More Resources Resource Smart, Sustainability Victoria, Victorian Government (2009); Draft Best Practice Guide for Waste Management in Multi-unit Developments South Australian Government (2007); South Australia s Strategic Plan Standards Australia (SA) (1998); AS/NZS 3831:1998: Waste management - Glossary of terms Sydney City Council (SCC) (2005); Policy for Waste Minimisation in New Developments Zero Waste SA (2005); South Australia s Waste Strategy
1 Table of Contents. 1 Table of Contents...2. 2 Acknowledgements...3. 3 Purpose of this guideline...4. 4 Waste Service Type...5
1 1 Table of Contents 1 Table of Contents...2 2 Acknowledgements...3 3 Purpose of this guideline...4 4 Waste Service Type...5 Classification Overview...5 Important tes...6 5 Service Type A Standard Council
GUIDELINES FOR PREPARING A WASTE MANAGEMENT PLAN - 2014
GUIDELINES FOR PREPARING A WASTE MANAGEMENT PLAN - 2014 These guidelines are for developers and planning permit applicants in the City of Melbourne. The guidelines will help you prepare a plan to manage
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
GD 04. Waste Storage and Collection Guidance for New Developments. Version: 2.00
GD 04 Waste Storage and Collection Guidance for New Developments Version: 2.00 Citywide Support Environmental Protection September 2014 SCOPE AND PURPOSE: Scope of this Guidance: This guidance contains
Waste Management Action Plan 2011-2015
Waste Management Action Plan 2011-2015 Approved on: 7 June 2011 Owner: Program Manager, 8203 7723 Trim Reference: ACC2011/77875 Next Review Date: June 2014 Executive Summary This Waste Management Action
Version Decision Number Adoption Date History 1 20\2501 23/02/10 Adopted 2 3 4
Title: Waste Management Policy No: 054 Adopted By: Council Next Review Date: 23/02/2014 Responsibility: General Manager Infrastructure Document Number: 2118629 Version Decision Number Adoption Date History
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS
WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6
Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.
Waste & Recycling Planning Guidance on Waste & Recycling Storage and Collection October 2011 Development & Enterprise FOR INTERNAL USE ONLY Contents 01 Introduction 3 02 General guidelines 3 03 Individual
CITY of richmond design ConsIderaTIons for CommerCIal ProPerTIes: recycling and garbage
CITY of richmond design considerations for Commercial Properties: Recycling and Garbage 1 design considerations: Recycling and Garbage 1 Introduction Goals, Responsibilities 3 KEY STRATEGIES 4 STORAGE
Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra
Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents
part 9 waste management
part 9 waste management 30m Hammerhead T-form 22m 21m Hammerhead Y-form 30m 18m Forward Side-Turn 25m 15m Reverse Side-Turn 30m Above: Recommended turning circles for waste collection vehicles 9 WASTE
Policy document on the provision of waste & recycling collection and storage facilities. Includes both domestic and commercial premises
Policy document on the provision of waste & recycling collection and storage facilities Includes both domestic and commercial premises Introduction This document is intended to help relevant parties who
This document aims to inform developers and architects of Waste and Recycling Service requirements in the London Borough of Hounslow.
GUIDANCE FOR PLANNING APPLICATIONS: RECYCLING & NON RECYCLING PROVISION FOR NEW DEVELOPMENTS WITHIN THE LONDON BOROUGH OF HOUNSLOW FOR RESIDENTIAL & COMMERCIAL SITES This document aims to inform developers
Provision of Household Waste & Recycling Service
Information for developers and architects Provision of Household Waste & Recycling Service Barnet Council as a waste collection authority has a duty to arrange for the collection of household waste, and
Appendix 6 Storage and Collection of Waste and Recycling
Appendix 6 Storage and Collection of Waste and Recycling Appendix 6 Storage and Collection of Waste and Recycling September 2008 (Version 2) 1 Appendix 6 Appendix 6 Design and Sustainability SPD Storage
Refuse and Recycling Advice note For Developers. September 2015
Refuse and Recycling Advice note For Developers Contents: September 2015 1.0 Refuse and recycling Background Information 1.1 Introduction 2.0 Planning and design 2.1 Good Practice 2.2 Internal storage
LONDON BOROUGH OF BRENT. Waste and Recycling Storage and Collection Guidance for Residential Properties
LONDON BOROUGH OF BRENT Waste and Recycling Storage and Collection Guidance for Residential Properties Version no 2-2013 1. Introduction... 3 1.1. Code for Sustainable Homes... 3 1.2. Developer requirements...
Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities
NEWCASTLE CITY COUNCIL Developer Guidance Note: Provision of Waste and Recycling Collection and Storage Facilities This document addresses: 1. Refuse and recycling storage for residential developments
Waste Storage and Collection Guidance for new Developments
Waste Storage and Collection Guidance for new Developments Waste and Outdoor Services Mid Sussex District Council Revision Schedule Revision Date Details Prepared by Approved by V. 1 22/05/2015 First Published
Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)
Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of
Recycling and Waste: Advice note for developers 2015
Recycling and Waste: Advice note for developers 2015 April 2015 Contents 1.0 Recycling & Waste planning guidance background... 3 1.1 Introduction... 3 2.0 Planning and design... 3 2.1 Good practice...
WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING
WAVERLEY BOROUGH COUNCIL ENVIRONMENTAL SERVICES DEPARTMENT WASTE AND RECYCLING Requirements for Refuse and Recycling Provision on New Developments Guidance Notes for Applicants and Agents 1. Waste policy
Supplementary Planning Guidance WASTE COLLECTION AND STORAGE FACILITIES
WASTE COLLECTION AND STORAGE FACILITIES Approved March 2007 Waste Collection and Storage Facilities (Approved by Council 22 nd March 2007) Contents Page 1 Introduction 2 - Waste Management Contact Details
Design requirements for residential properties recycling and waste management
recycling and waste management Guidance for provision of suitable storage and access for waste and recycling collections in Somerset and requirements for successful planning proposals. Contents Page 1
REFUSE AND RECYCLING STORAGE REQUIREMENTS
London Borough of Richmond upon Thames Local Plan REFUSE AND RECYCLING STORAGE REQUIREMENTS SUPPLEMENTARY PLANNING DOCUMENT Adopted April 2015 Table of Contents 1. Residential Developments... 3 2. Commercial
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Planning Technical Advice Note: Waste bin storage and access requirements for new and change of use developments
City Development Planning Technical Advice Note: Waste bin storage and access requirements for new and change of use developments November 2014 1. Introduction There are a number of issues associated with
Smarter Resources Smarter Business Recycling
Smarter Resources Smarter Business Recycling Best Practice Waste and Recycling Contracts for Business February 2014 Best Practice Waste and Recycling Contracts for Business A three step process There is
Waste and Recycling Storage and Collection Guidance for Houses, Flats, Houses of Multiple Occupancy, New Builds, and Conversions.
Waste and Recycling Storage and Collection Guidance for Houses, Flats, Houses of Multiple Occupancy, New Builds, and Conversions. January 2015 Page 1 of 9 Contents Page Number 1. Introduction 3 2. Standard
Forest of Dean District Council. Requirements for refuse and recycling provision at new developments
Forest of Dean District Council Requirements for refuse and recycling provision at new developments Introduction The guidance in this document aims to help developers of new properties or existing dwellings,
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
1 Introduction... 3. 2 Better Practice Waste Management Systems... 4. 2.1 What is better practice?... 4
Multiple Dwelling Development Waste Management Plan Guidelines A resource for Western Australian Local Government and Developers Contents 1 Introduction... 3 2 Better Practice Waste Management Systems...
Waste and recycling requirements for new residential developments in Medway
- 1 - Waste and recycling requirements for new residential developments in Medway Version: 2.8 Medway Council 01634 333333 www.medway.gov.uk [email protected] - 2 - Contents: General information
Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins
Best Practice Guide for Managing Litter and Illegal Dumping at Clothing Bins 2013 Acknowledgements: The research for this guide was completed by Equilibrium OMG Pty Ltd (trading as Equilibrium) for Sustainability
Issue ID Description No. of Credits Available. Mandatory Elements Storage of Non-recyclable Waste and Recyclable Household Waste
150 Code for Sustainable Homes Category 5: te Issue ID Description No. of Credits Available Mandatory Elements 1 Storage of Non-recyclable te and Recyclable Household te 4 Yes Aim To provide adequate internal
Undercover storage requirements for waste/recycling depots
Waste Information Sheet Undercover storage requirements for waste/recycling depots Update September 2010 EPA 845/10: This information sheet has been prepared for waste management and resource recovery
Waste management guidance notes for residential developments
Waste management guidance notes for residential developments February 2014 www.southwark.gov.uk This document provides guidance on the waste storage and collection requirements that should be considered
Development Layout Design
Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose
Construction Traffic Management Plan
Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.
VEHICLE CROSSOVER INFORMATION PACK
VEHICLE CROSSOVER INFORMATION PACK CONTENTS Introduction Section A Section B Section C Section D Section E Criteria for approving a vehicle crossover application (Diagrams to demonstrate measurement criteria)
Construction Management Plan Template
Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name
Refuse and recycling storage guidance
and recycling storage guidance A guide for planners and architects submitting planning applications to Hackney Council 1 2 Contents 1. Summary 1.1 Introduction 1.2 Submitting a planning application 1.3
GUIDANCE FOR FUTURE PLANNING PROPOSALS AND THEIR IMPACT ON WASTE VEHICLES SOUTH AND VALE
GUIDANCE FOR FUTURE PLANNING PROPOSALS AND THEIR IMPACT ON WASTE VEHICLES SOUTH AND VALE Policy DC7 New developments must make adequate provision for the sorting, storage and collection of waste arising
CITY OF TORONTO REQUIREMENTS FOR GARBAGE, RECYCLING AND ORGANICS COLLECTION SERVICES FOR NEW DEVELOPMENTS AND REDEVELOPMENTS
CITY OF TORONTO REQUIREMENTS FOR GARBAGE, RECYCLING AND ORGANICS COLLECTION SERVICES FOR NEW DEVELOPMENTS AND REDEVELOPMENTS LAST REVISED: MAY 2012 TABLE OF CONTENTS PART I - INTRODUCTION GENERAL INFORMATION
SCHEDULE 16 TO THE SPECIAL USE ZONE. Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT. Purpose
SCHEDULE 16 TO THE SPECIAL USE ZONE Shown on the planning scheme map as SUZ16. BALLARAT RAILWAY STATION PRECINCT Purpose To facilitate the revitalisation of the Ballarat Station Precinct in accordance
Sort it! Bag it! Tote it! Recycle it!
Sort it! Bag it! Tote it! Recycle it! CA RD BOA RD / BOXBOARD Recycling guidelines for property owners, managers, and superintendents for multi-residential properties DURHAM REGION WORKS DEPARTMENT WASTE
Legislation Local Government Act 1999 Relevant Delegations:
Waste - Kerbside Waste & Recycling Collection Service Policy Type: Reference Number: Responsible Department: Responsible Officer: Council COU54 Assets & Infrastructure General Manager Legislation Local
Kings Road, Beith. Development Brief. Part 1: Site Specific Information
Kings Road, Beith Development Brief Part : Site Specific Information Introduction Kings Road is a greenfield site on the north west edge of Beith and is currently let for grazing. The site is roughly rectangular
DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners
Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: [email protected] www.redwoodpartnership.co.uk REDWOOD
WASTE AND RECYCLING COLLECTION POLICY
WASTE AND RECYCLING COLLECTION POLICY for Hambleton September 2015 Contents Introduction...1 Assisted Collections...2 Extra Waste...3 Putting Out Receptacles for Emptying...4 Containers (refuse, recycling
WASTE STORAGE AND COLLECTION
BASSETLAW DISTRICT COUNCIL ENVIRONMENT SERVICES GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION IN BASSETLAW 26 October 2011 PURPOSE OF THIS DOCUMENT This guidance document is intended to aid
SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING
SPACE ALLOCATION AND ENCLOSURE DESIGN GUIDELINES FOR TRASH AND RECYCLING For Residential and New Commercial Construction and Remodel Dated July 1, 2010 If you have any questions regarding the Design Guidelines
Gosport Borough Council Waste and Recycling Collection Policy
Gosport Borough Council Waste and Recycling Collection Policy WASTE AND RECYCLING COLLECTION POLICY The Council is under a duty to arrange the collection of household waste from properties in its area.
CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13
Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if
Design Essentials. Stockland Residential Communities 1 st January 2014
Design Essentials Stockland Residential Communities 1 st January 2014 WELCOME TO THE DESIGN ESSENTIALS The Design Essentials form part of your Contract of Sale and assist when designing your home and landscape.
Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS
Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro
BURNIE WASTE MANAGEMENT STRATEGY 2013-2017
BURNIE WASTE MANAGEMENT STRATEGY 2013-2017 October 2013 COUNCIL STRATEGY Burnie Waste Management Strategy 2013-2017 Approved By: Council Document Code: CD-WS-W-001 Doc Controller: Director Works and Services
How To Manage Waste In The Borough Of Newham
Waste Management Guidelines for Architects and Property Developers Waste Management Guidelines for Architects and Property Developers Contents Introduction 1.1 Purpose of Document 1.2 Policy Context European
Planning Advice Note. Waste and Recycling Provisions in New and Refurbished Residential Developments
Planning Advice Note Waste and Recycling Provisions in New and Refurbished Residential Developments For consultation and advice on any scheme, please contact: Housing and Environment London Borough of
Better Recycling - Less Waste Your Sustainable Campus Initiative
Better Recycling - Less Waste Your Sustainable Campus Initiative Frequently Asked Questions (FAQs): Why change the way we manage waste? Why have individual desk bins been removed? What if I don t have
Recycling Infrastructure Guidelines for UBC Buildings
Recycling Infrastructure Guidelines for UBC Buildings Updated March 2, 2015 Contents 1. Background... 2 2. Overview of Requirements... 2 2.1. New Buildings Serviced by UBC Building Operations... 2 2.2.
Refuse & Recycling Storage Design Guide
Refuse & Recycling Storage Design Guide July 2013 Good design and effective management are key to delivering successful refuse storage. Contents Section Page Introduction 2 1. Wheelie Bins 3 2. External
Engineering Standard
Public Transport Services Engineering Standard Stations - Bicycle Facilities PART 129013 AR-PW-PM-SPE-00129013 (D073) Document Control Document Status Document Amendment Record Revision Change Description
Development Management Report
Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: [email protected] Tel: 01743 252665 Fax:
5.1 Parking Policy 1. INTRODUCTION
5.1 Parking Policy 1. INTRODUCTION This policy consolidates the City s parking requirements and outlines its approach to the provision of off-street parking facilities for non-residential and residential
House Code. House Code
1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the
Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure
Department of State Development, Infrastructure and Planning State Planning Policy state interest guideline State transport infrastructure July 2014 Great state. Great opportunity. Preface Using this state
Dwelling house guide
Dwelling house guide Contents 1.0 Introduction... 1 2.0 What is a dwelling house?... 1 3.0 What building assessment provisions apply to dwelling houses?... 1 4.0 What level of assessment applies to a dwelling
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines
DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the
28.0 Development Permit Area #2 (Neighbourhood District)
28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character
This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.
UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract
HOUSEHOLD WASTE AND RECYCLING POLICY 2012
HOUSEHOLD WASTE AND RECYCLING POLICY 2012 1 Objectives...2 2 Introduction...2 3 Frequency of collection for all receptacles...2 4 Black Bins Household waste...3 5 Green Bins Organic waste for composting...4
RESOURCE USE & THE SUPPLY CHAIN
RESOURCE USE & THE SUPPLY CHAIN as part of the Energy Efficiency Information Grants Program Energy efficiency is one aspect of broader resource efficiency, which is the efficient use and re-use of all
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY
DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends
CHAPTER 24: ENVIRONMENTAL MANAGEMENT
Central Eyre Iron Project Environmental Impact Statement CHAPTER 24: ENVIRONMENTAL MANAGEMENT CHAPTER 24 ENVIRONMENTAL MANAGEMENT COPYRIGHT Copyright Iron Road Limited, 2015 All rights reserved This document
Advice can also be sought from specific specialist officers in the Council.
Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information
Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) The application shall be accompanied by
Format for scrutinising the Hill Station Building Applications ( Current File No. 24911/2001-HSBA) 1 2 3 4 5 I. Tamil Nadu Districts Municipalities (Hill Stations) Building Rules 1993. Rules Required Available
ACCESS AUDIT OF WESTPORT HOUSE
ACCESS AUDIT OF WESTPORT HOUSE Large sign on the highway to indicate the entrance to Purbeck District Council Large and wide entrance Entrance showing sign for opening times Entrance sign Main entrance
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT
GOOD LANDLORD CODE OF PRACTICE FOR PRIVATE RENTED SECTOR MANAGEMENT GUIDANCE DOCUMENT Each section contains general information on why the standard was set (Yellow text boxes). In many cases, the standards
KERBSIDE WASTE & RECYCLING COLLECTION POLICY
KERBSIDE WASTE & RECYCLING COLLECTION POLICY Rev 02 (9 th September 2014) 1 of 9 1. PURPOSE OF THE POLICY To define the level of service provision and entitlements for kerbside waste and recycling services
18-1. 18.2.1 Retail or Wholesale In conformity with the provisions of sub-section 18.3. 18.2.2 Art Gallery, Museum or Library In conformity with the
18-1 SECTION 18 - ZONE C-3: SETTLEMENT COMMERCIAL 18.1 Within a Zone C-3, no land shall be used and no building or structure shall be erected or used except for one or more of the listed in Column 1 below.
Arts Revitalisation Projects and the Planning System. January 2010 Guideline
Arts Revitalisation Projects and the Planning System January 2010 Guideline Photography credits: courtesy http://www.flickr.com/groups/renewnewcastle/ Arts Revitalisation Projects and the Planning System
APPENDIX C. PERFORMANCE INDICATORS FOR SOLID WASTE SERVICES
APPENDIX C. PERFORMANCE INDICATORS FOR SOLID WASTE SERVICES A. Generation A1. DEMOGRAPHIC information administrative or political area (area bounded by the administrative boundaries of the municipality
What day will my recycling be collected? Collection will continue to be on your regular pick up day the same day as your garbage pick up.
Recycling FAQs General Program Information What is the new recycling program? The Village of Addison has answered residents requests for a larger recycling container. Residents told us they wanted a larger
WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.
WELCOME WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE. The purpose of the exhibition is to provide the community with the opportunity to view our initial ideas
2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan
2.50 Retirement villages - section 32 evaluation for the Proposed Auckland Unitary Plan 1 OVERVIEW AND PURPOSE...2 1.1 Subject Matter of this Section...2 1.2 Resource Management Issue to be Addressed...2
SECTION 6 COMMERCIAL ZONES
Click here to access definitions SECTION 6 COMMERCIAL ZONES 6.1 CONVENIENCE COMMERCIAL (C.1) ZONE 18116 6.1.1 PERMITTED USES The following are permitted Uses within the C.1 Zone: Artisan Studio Convenience
Construction Site Set Up Requirements
Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment
Planning for Bushfire Risk Mitigation General Code
Planning for Bushfire Risk Mitigation General Code March 2008 Contents 0H1. Introduction 14H1 1H1.1 Purpose... 2H1.2 Aim... 3H2. Principles 17H2 4H2.1 Shared Responsibility... 5H2.2 Prevention, Preparedness,
Section 13 Urban Residential Zones
Section 13 Urban Residential Zones 13.1 RU1 Large Lot Housing RU1c Large Lot Housing with Carriage House RU1h Large Lot Housing (Hillside Area) RU1hc Large Lot Housing (Hillside Area) with Carriage House
Waste Management Guideline
TABLE OF CONTENTS: 1 INTRODUCTION...5 1.1 MINIMISING WASTE...5 1.2 GOVERNMENT RESPONSE...5 1.3 USEFUL WASTE MINIMISATION RESOURCES...6 1.4 PURPOSE AND FEATURES OF THE GUIDELINES...6 1.5 AIMS AND OBJECTIVES...6
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
Ministry of the Environment Decree. on housing design
G1 THE NATIONAL BUILDING CODE OF FINLAND Housing Design Regulations and Guidelines 2005 Ministry of the Environment Decree on housing design adopted in Helsinki on the 1 st of October 2004 In accordance
Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.
15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places