Assessment of Building Performance Measurement Tanzania
|
|
|
- Shannon Darren Dean
- 10 years ago
- Views:
Transcription
1 Department of Real Estate and Construction Management Thesis no. 115 Name of programme: Real estate and Construction Management Master of Science, 30 credits Name of track: Real Estate Management Assessment of Building Performance Measurement Tanzania Author: Supervisor: Johari Hussein Stockholm 2011 Henry Muyingo
2 Master of Science thesis Title Assessment of Building Performance Measurement In Tanzania Authors Johari Hussein Department Architecture and Built Environment Division of Real Estate Management Master Thesis number 115 Supervisor Henry Muyingo Keywords Performance measurement, building performance, facility management, ABSTRACT Purpose: Methodology: Findings: Provision of an understanding of the complexes and implications associated with building performance measurement in relation to supporting the organizational objectives by Tanzania facility managers. The study involved the use of questionnaire sent to both public and private organization and literature reviews in Tanzania with the aim of developing the process associated with the assessment of building performance and the way to improve its operational processes. The study observed that BPM practices are affected by managers control over the buildings facilities because there are no specific procedures that guide the formation of BPM process due to lack of Government attention to this growing industry. The other major finding of the study is that managers concentrate mostly on the financial performance instead of the operational performance of the building, which was contrary to the expectation of this study. 2
3 ACKNOWLEDGEMENT This thesis is dedicated to the people who helped me a lot from the start to the completion of my research and my Master degree. May the Almighty Allah bless you for your support My supervisor Henry Muyingo, My Mother Ashura Kingi and My father Hussein Nassor, My siblings, Kassam, Fatma, Zakia, Nassor and Amina To all my friends 3
4 Table of Contents ABSTRACT... 2 ACKNOWLEDGEMENT... 3 LIST OF TABLES... 6 LIST OF CHARTS... 6 LIST OF FIGURE... 6 LIST OF ATTACHMENT INTRODUCTION Background Tanzania construction and real estate industry Research objectives Research question Scope of the study Disposition RESEARCH METHOD Theoretical basis Qualitative study Data collection method Data analysing and presentation PERFORMANCE IN BUILDINGS AND FACILITY MANAGEMENT Performance measurement Factors used in Building performance measurement Planning what to measure: Choosing what to measure: Determining how to measure: Data utilization Implementation of BPM information: Building performance measurement (BPM) Facility Management (FM) Summary RESULTS OF THE SURVEY Respondents background information Functional and operational building performance Assessment of building performance measurement General knowledge about BPM Processing BPM framework Presenting and reporting BPM data
5 5: SUMMARY OF FINDING, CONCLUSION AND RECOMMENDATION Discussion of major findings Conclusion remarks Recommendations for further studies REFERENCES AND ATTACHMENTS
6 LIST OF TABLES Table 1: Summary of results Table 2: Respondents characteristic LIST OF CHARTS Charts 1: Satisfaction on building features Chart 2: Manager's control over the building Chart 3: Experience with BPM Chart 4: Buildings that BPM was conducted Chart 5: Schedule for BPM Chart 6: Awareness on organizational BPM objectives and Goals Chart 7: Parameters for BPM Chart 8: Factors linked to BPM Chart 9: Indicators for high building performance Chart 10: Measures for enhancing building performance Chart 11: Readers of BPM report Chart 12: Uses of BPM reports Chart 13: Challenges facing organization in setting up BPM LIST OF FIGURE Figur 1: BPM data and information storage LIST OF ATTACHMENTS Attachment 1: Interview questions Attachment 2: Questionnaire
7 1. INTRODUCTION The concept of building performance that is applied on building problems and solutions arose during the period of industrial evolution where buildings were designed to reflect people s everyday life, changing society, use of environment and increase technology. On the other hand, Building owners wanted to ensure their building remain competitive in the market by ensuring that building facilities are cost effective and support organizations to achieve business objectives. These reasons led to adoption of different approaches and techniques for measuring building performances depending on the building being evaluated. 1.1 Background The working environment is related to building facilities that contribute to achieving the intended use of the business future functions (Williams, 1993). Designing and planning working environment has become a crucial issue to organizations because they are value imbued and therefore represent the largest part of organization assets (Elmualim et al, 2010). Organizations have become more aware that when facilities are not well managed they tend to generate cost associated with economic, environmental and social impacts to existing business (Sha and Chen, 2001). Explosion of new economies and technological energy in the nineteenth century lead to innovations in business creation, planning and designing of physical working environment that are significant to business success (Duffy, 2000). In the current business world, organizations give more attention to the working environment, by trying to reduce costs and improve design flexibility that supports in both organizational long- and short-term core businesses (Amaratungs and Baldry, 1998; Alexander, 2003). Williams (1993) provided for development of approaches that evaluate and assess building performance to effectively achieve long-term use of organizational building. Amaratungs and Baldry (1998) stated that, application of building performance approaches help to optimize life-cycle costs and management of people and process related space, asset, and efficient supply of resources. Facility management industry is comprised with increasing numbers of professionals who follow ethical standards, however many conflicts arise due to uncertainty and conflicting practices making it difficult to know if they are able to bring benefits by reducing costs, improve flexibility that supports the effective building performance as argue by Alexander, 7
8 (2003). As shown on the study of Davis (2006), the design and orientation of built environment is anchored to reflect people s everyday life as a result different regions and nations have different types of building. Evaluation of such buildings with different settings requires establishment of performance indicators with appropriate techniques depending on building being evaluated (Preiser and Schramm, 2002). 1.2 Tanzania construction and real estate industry Tanzania is located in the Eastern Africa covering total area of about 947,300km2. The country is dependent on the agricultural sector which accounts for more that 40% of the GDP as provided in the World s Fact Book. The construction and real estate industry is among other industries that are evolving and are in their stage of growth as shown by recent developments in transportation, housing and mining sectors. Tanzania Construction Sector Report of 2008 presented the growth rate rose from 10.8% to 11.9% from 2004/05 to 2005/06 and contributed about 5.6% to the total GDP in 2005/6. This caught the government s attention and lead to the formation of construction policies that were aimed to ensure efficient and cost-effective performance in the construction industry. It has been difficult for professionals in industry to cope with both the set policies and procedures and the rate of changing technology in the global world. Hence the country now depend mostly on foreign companies to design, construct, develop and manage large scale building projects in order to solve the problem of due to inadequate number of professionals and low technology that the country experience. Since the demand for buildings is very high, investors are just developing building without considering the set quality standards causing Tanzania to continuously face an increasing number of poor maintained and disrepair building resulting buildings collapsing and death as commented in Maery, (2011). Despite the growing of real estate industry, building performance measurement is still not routinely applied to mainstream building performance because its methods are costly to implement and hard to manages. Komu (2008) argued that, lack of knowledge and policies neglecting on provision of quality building in the industry has led to this problem. Moreover the understanding of the concept of building performance measurement in Tanzania is still limited as people confuse it with facility management. 8
9 1.3 Research objectives The main objective of this study was to investigate the current practice and attitudes towards building performance measurement in Tanzania since its practice involve the adoption of practical thinking in terms of goal rather than means. The following are subsequent objectives that are covered in this study with the aim of finding out how facility managers ensure that their building stocks support organizational objectives. To analyses the process and procedures that are taken into account by organizations in order to ensure high building performance. To identify the challenges and provide solution on for the problems encountered by facility managers during the assessment. To suggest areas for further studies relating to the covered in this study. 1.4 Research question Though the building industry is comprised of professional property and facility managers, many conflicts still arise due to poor measurement and uncertainty brought by building performance. This study attempt to answer the question below What are the procedures involved in the stages of building performance measurement in Tanzania and what are the challenges associated with the assessment process? 1.5 Scope of the study As in Kironde (2002), Dar es Salaam was selected to be a study area for this research as it is considered to be an area with rich information, whatever happens in the city of Dar es salaam has an impact on the whole direction of country. Given the exploratory nature of this study, the data was obtained from various facility managers from top ten real estate firms, and three large governmental institutions i.e. National Housing Corporation (NHC), Parastatal Pension Fund (PPF) and Tanzania Building Agency (TBA) in Dar es Salaam who have large share of properties in the building market. In the course of carrying out data collection, fifty questionnaires were sent to government institutions and twenty questionnaires to private real estate firms making a total of seventy respondents who were used as a study sample. 1.6 Disposition This chapter has presented the background and the objective of this study concerning to building performance measurement in Tanzania. Chapter two includes methods adopted in the 9
10 study while Chapter three presents literature explaining the concepts related to building performance for the purpose of establishing the basis of the study. Data analysis and presentation are discussed in Chapter four. Chapter five provide major finding, conclusion and recommendations of this study. 10
11 2. RESEARCH METHOD 2.1 Theoretical basis The concept of building performance arose during the period of industrial evolution where buildings were designed to reflect people s everyday life, changing society, use of environment and increase technology. Consequently as provided by Hartkoft (et al, 1986), these factors have influenced building industry to adopt new strategies to facilitate building performance support their business objectives. The theoretical basis for this paper is performance measurement, building performance measurement as well as facility management. 2.2 Qualitative study This is basically a qualitative research that employed various techniques of data collection, analysis and presentation for the purpose of clearly depicting what approaches facility managers adopt and how these approaches affect the measurement of organizational property performance in Tanzania. In the paper written by Robert Eccles (1991) stated, Within the next five years, every company will have to redesign how it measures its business performance. This statement shows that, building performance measurement are affected by the pre-existing situation of the time it is carried and the qualitative approach was chosen to present the reality socially constructed, behavior complex, and process of change associated in the building industry. This research method was used so as to gather first hand data from respondents on how facilities managers in Tanzania manage the built environment in order to achieve their longterm objectives. 2.3 Data collection method The research focuses on public and private institutions in Dar es Salaam and the chosen respondents were required to be working with the operational aspect of the building. The aim was to gather relevant data and information regarding the topic from broad range of professionals who interact with buildings in various ways. Apart from selection respondents and conducting literature review, government and institutional reports were reviewed to gain 11
12 the overview of the theory and concept about the topic in order to support the argument behind the researcher's study thesis. The data were collected through the online survey questionnaires which were formulated into guiding respondents to provide specific and relevant data regarding the topic of the study. An interview was also conducted to one personnel who directly participate in building industry. The purpose was to gain further information on the field and the information was also used to structure the survey questionnaire which was the main method of data collection. 2.4 Data analysing and presentation The data obtained from the study was compiled and analyzed using Microsoft Excel. The data are presented in descriptive and analytical form. 12
13 3 PERFORMANCE IN BUILDINGS AND FACILITY MANAGEMENT 3.1 Performance measurement Performance measurement involves the process of quantifying the efficiency and effectiveness of building actions (Neely, 1998). The concept of performance measurement existed in early 1880s to 1980s where organization used traditional performance measurement to measure their performance (Banks and Wheelwright, 1979). This type of measure made organization to only focus on using financial costs and accounting systems to determine productivity and profits derived (Ghalayini and Noble, 1996) but they failed to provide ways on planning and controlling cycles that can cause organization to remain competitive in the market cycles as evidenced by Barnard (1962) and Chandler (1977). Due to changes in market demand and supply factors in the industry after 1980s, managers and practitioners in the industry started to evaluate the limitations of their traditional measurement and the extent of how developed performance will affect the organizational business (Douglas, 1996; Ghalayini and Noble, 1996). More emphasis is now put in evaluation factors that are related to strategic, tactical, operational and informational aspects of the business that affect the organization. Organization need to follow certain stages that will enable them come up with a reasonable performance measurement framework. 3.2 Factors used in Building performance measurement Planning what to measure: It involves first determining what are the organizational goals and objectives towards the present and future performance of their building. Goals and objectives are then linked with strategies where facilities managers need focus on measuring critical factors in all categories of PM i.e. processes, financial and operational PM. Lack of clear focus and information may lead to measurement of facilities that do not need immediate attention and hence this may lead to poor performance of the building. Hence without a strategic plan, clear goals and objective, the measurement process won t provide result that benefits the development of organizational building performance Choosing what to measure: After determining the organizational objectives towards their building, facility managers then need to move in the state of determine how do building elements affect the management and 13
14 utilization of facilities towards the achievement of set objectives. This is done through measuring facilities progress by first checking if there are frequent problems associated with the building and whether they achieve additional added value during its operation. Carrying out this stage enables facility managers to identify what elements in the building need attention and time needed to execute the problem issue Determining how to measure: In order for a building to accomplish it desired purpose, managers should identify critical success factors that are to be applied during measurement processes to determine whether buildings are performing as planned. The relevant measures are determined by the listed organizational objectives and strategic plan that were made in the first and second stage of this process. Facility managers can aim to focus on measuring building performance by process or output. Process measures involves the application of output into building elements in order to determine if operation and activities are used and executed as planned to see whether the building meets its objective. Output measure will capture whether building elements achieve the desired organizational short-term, intermediate and long-term goals, it involves seeing whether the operational changes that were applied to building bring affect as speculated Data utilization Once the measures in the previous steps are completed and data are collected and analyzed, the following step is to present and interprets the results about the previous and current performance of the building. Here facility managers want to observe whether building performance is consistent with the set goals and objective. The finding should be stored formally e.g. data-base, excel files, loose reports so there is a record by which any employee in the organization can use to measure progress in the subsequent assessment. Additionally, reporting of data supports the consistent ongoing effort directed to properties and therefore reinforces the organization, safeguarding, and support behaviors necessary for a successful building performance Implementation of BPM information: After the data are collected, usually facility managers compile the data into different set of reports and distribute them to real estate audiences depending on the requested type of 14
15 information that is related to a certain field, example architect, engineers, service provides, investors so on. Reports are also used as a way of providing feedback to team members who were involved in the measuring processing. The report result may influence members to increase their efforts in ensuring that the building performs according to standard and remain competitive in the market. If there are variations in the measured data then the manager can suggest a different way to execute problems or different way of measure that will improve the performance and bring added value to organization. 3.3 Building performance measurement (BPM) In order for the organization to effectively achieve long-term use of organizational building in the competitive market, managers were argued to apply highly skilled measures in assessing building performance to effectively achieve long-term use of organizational building (Williams, 1993; Nutt, 1999). According to Wong and Jan (2003), Building performance is a framework, through the comprehensive use of both objective and subjective field evaluations in all performance areas simultaneously, serve to understand the critical balance needed to simultaneously ensure all building performance mandates. The mandate refer to building performance approaches that help to optimize building lifecycle, management of people and process related space, asset, and efficient supply of resources (Amaratungs and Baldry, 1998; Preiser, 2005). As indicated by Kian (et al. 2001), taking into account the mandate during the process of building performance evaluation helps managers to ensure that at the end of the measurement process building does not bring any negative effect users. To come up with a building performance framework one must first identify different strategies and techniques that will be used in measuring building. The aim of identifying these strategies is to help managers to avoid forgetting crucial building components that may result into poorly functioning building with high maintenance cost. Identified strategies and techniques are then to be linked with structural and non-structural building facilities in order to come up with a reliable building performance measurement decision. 15
16 The main structural and non-structural building performance as presented by Hackman and Scott (2008); Lavy (et. al, 2010) included the following Physical performance Physical performance addresses the tangible aspects of real property that ensure a sustainable asset base throughout its life cycle in support of program delivery. These physical aspects include the quality and durability of the land base, the buildings and infrastructure as provided by Canada guide to management of real estate property of Lavy (et. al, 2010), highlighted the physical aspect of the building to include; availability of building space to supports the desired function, quality of space (spatial, environmental and amenities), accessibility (site, location, and building design), and resource consumption (energy efficient, water, and material). The condition of mentioned building elements is affected by on the extent of continuous operation, maintenance and repairs that will help managers estimate the remaining physical life of facilities at which they will able to support organizational function. Most people spend more of their time in the offices, homes, schools and health institution. The service and environment aspects of the building tend to affect the physical activities of users by either creating a comfortable living and working environment or de-motivate people in using them. Zimring (et. al, 2005) mentioned that relationship between building physical aspect and users behavior vary depending on the types of building, hence managers should ensure there is a strong integration of all building components and users needs. This integration results to occupants satisfaction that is brought by healthier working environment and potential for enhanced worker productivity. Functional performance This category involves measuring building functional aspects that are linked to spatial needs and requirements, system performance as well as durability and efficient maintenance of building physical elements throughout anticipated life (Kyle, 2001). Managers should ensure that building operate at satisfactory standard that enhances occupants with physical and psychological comfort through efficient provision of building elements such as air distribution, lighting, heating, cooling, workspaces, systems, and technology. Incase the building operates below goal, its cost of management can be extremely high because of the 16
17 failures in determining the needs requirements of systems, materials and technology that are used to running the building. The significance of carrying out functional performance is to evaluate how the building supports organizational activities and whether the building dilapidating causing it not to meet specific performance standards of building operations. When root causes of the building problem are identified, managers are able to measure appropriate option before any alterations, maintenances or design development (Hendriks and Hens, 2000). The reason for rational measurement is to avoid making rush decision that will result to destructing or damaging other building element during the process making the building sustainable design diluted. Therefore functional performance improves building durability, flexibility and enhances the surroundings aesthetically by meeting its performance objectives. Financial performance Lavy (et. al, 2010) related this type of building performance to costs and expenditures of the facility related to buildings systems and components. Real estate owners regard building as investment as they provide returns and benefits through cash flows that are paid by users. On the other hand, users usually react to changes in the organizational needs causing changes in the operation and design characteristic of the buildings that eventually affect the functional returns and benefits derived from the usage of building (Varcoe, 1992; Leaman, 1993). These changes are therefore forcing facility and property manager to manage operational property strategically by integrating the core business activities into the management of the building competency. With the development of technological and service market in real estate industry, managers are required to establish adequate appraisal metrics for assessing building performance (Canada guide to management of real estate property of 2009). The financial metrics should be able to measure the actual and estimated life-cycle costs that are related to productivity and risks associated physical building components and facilities. The importance of carrying out financial performance is to help managers to identify building problems associated with depreciation; space utilization and productivity in order achieve long term organizational goals (Lavy, et. al, 2010). 17
18 Survey-based performance Measurement of building performance is done through collecting users response on environmental and psychological satisfaction that is brought by the quality of services necessary for the operations of building facilities and assets as provided by Lavy (et. al, 2010). Supported by Preiser and Vischer (2005), measuring this type of performance will help managers to see whether the non-financial impact related to building facilities on users do support the core business objectives and user s expectations. The concept behind this performance is to identify on one hand if the building meet the requirement of users, on the hand is how the building will have to perform in order to meet the requirement of the users. In the study of Ang (et. al, 2005), there is a need to use solution concept to set up technical materialization that satisfies and fulfill the needs and objectives of the users. This can be done by asking users some questions related to building facilities operations that are linked to their organizational needs (Lavy, et. al, 2010). This process will help to translate users needs and intended building use into required performance (Spekkink 2005) Building performance aspects are common to all the mentioned literature; however it is difficult to entail which measurable metrics are to be used to indicate and show the performance of buildings. This study is concentrating on measuring the physical (operational) aspects of the building performance as the metrics are easy to identify and to avoid complexity resulted by limited resources and time constraints. 3.4 Facility Management (FM) The history of facility management evolved during the explosion of office administration over the last twenty years due to high technological and economic innovation in the building industry (Amaratungs and Baldry, 1998; Weller, 1995). During its evolution facility management was done in a traditional way involving supervision and direction of built environment to ensure they produce optimum return (Thorncroft, 1965). Changing of workplace and resources use that affect buildings influenced different disciplines in building industry such as engineering, architecture and other to come up with FM concept that will better manage organizational facilities and building infrastructures (Lucian, 2007). 18
19 According to Barrett and Baldry (2003), facility management (FM) refer to An integrating approach to maintain, improving and adapting the buildings of an organization in order to create an environment that strongly supports the primary objectives of that organization. Moreover, Lai and Yik (2010) argue for highly qualified facilities managers to successfully manage facilities and building infrastructures for organization to stay competitive. Many researchers have written different concept that explain the FM practice, which is influenced by the following factors as presented in the studies of Barrett (1995); Williams (1993); Krumm et al (1998) respectively Organization structure to support core business objectives Skilled approaches adopted due to stake holders cultures and market contextual issues Location, size and scope of organization facilities and how they influence stakeholders Consideration of the above three factors then determines whether the organisation use inhouse or out-sourced services depending on the added value that is brought by the cost-value relationship that existing between facility management requirements. The services provided in the facility management sector include property management, financial management, change management, human resources management, healthy and safety, building maintenance, domestic services and utilities supplies depending as provided by Atkins and Brooks (2009). Hence, organisations procure certain facility management services depending on their requirements that support the core business of the organisation. 3.5 Summary Building performance has gained much attention in the FM field because buildings represent a substantial amount of investments and at the same time achieving a range of objectives for organisation with greater efficiency and effectiveness than that of their competitors (Atkins and Brooks, 2009). For this case, facility management helps to relate buildings and their settings to users by monitoring progress, evaluate action plans of the actual and expected performance basing on the post-occupancy evaluation process model as was provided in the study of Preiser and Vischer (2005). 19
20 4. RESULTS OF THE SURVEY In order to determine the issues associated with the stages of building performance measurement in Tanzania and the challenges associated with the assessment process, a total of 70 respondents from both public and private organization in the building industry were asked to participate in the survey. The criteria for their selection was that they should be employees of their corresponding real estate organizations for the purpose of assuring that participants understand the concept of building management as this would make the survey to easy achieve its objective. The questionnaire was used as a main source of data collection method for this study (See Appendix 1). Table 1: Summary of results Questionnaire Number Percentage (%) Returned questionnaire % Not returned questionnaire % Sent questionnaire % Out of 70 questionnaires that were distributed 43questionnaires representing a rate of 61% presented in the above Table 1 were returned between April 2011 and July The questionnaire was divided into three sections and below is the presentation based on the 43 responses that were received: 4.1 Respondents background information This section contained questions that identify the background information of the respondents in terms of gender, age, and education level, the description of their form of job employment as well as their assigned job tittles. The objective of gathering this type of data was to observe whether background information have impact on building performance measurement practice. The other parts of the questionnaire cover the functional and operational part of building performance together with how organizations conduct assessment of their building performance measurement. An interview made to a facility manager in one of the public institution stated that, the practice is different between age group as it affected by the experience, education level and attitude towards organizational changes involved industry. People who have long term 20
21 experience are usually reluctant to the changes that are made towards building performance standards associated with new building technologies because they want to secure tenure of their jobs. On the other hand people who have higher level of education tend to engage and develop activities that tend to enhance building performance because of their willingness to accept changes in the industry. The results from the interview were utilized in formulating the factors presented in Table 2 below: Table 2: Respondents characteristic total Returned questionnaires ,0% Variables Number Distribution (%) Gender Men % Female % Total % Age group below 26 years % years % years % years % years % over 65 years % Total % Educational Level No formal education % Secondary Education % Bachelor s degree % Master s degree % Higher degree % Total % Form of employment Private sector % Government sector % Total % Job title Managing director % Property Manager % Facility manager % Building caretaker % Total % 21
22 Number of females is less than that of men by approximately 2 times less as indicated by the responses received from the study sample. The largest age-group of the respondents is that of 26-35years which consisted of 48.8% of survey response whilst 2.3% was for age group of 46-55years and above 65years respectively 69.8% of respondents have achieved the bachelor degree, followed by master degree and secondary education at 13.9% respectively, and 1 person with higher education. The survey showed that, 69.8% of respondents are employed with the government sector where the remaining 30.2% works in private sector with different forms of employments including employment with consulting firm, property company and selfemployed. The majority of respondents are property managers represented by 48.8%, followed by building caretakers at 34.9%, and facility managers at 13.9%. On average, the above information shows that half of the respondents have acquired their real estate knowledge at the bachelor degree level, indicating that the respondents qualify for our sample and have necessary experience in management of property and facilities in the built environment. This information is used in the discussion section to help analyze if experience and education level affect managers in the assessment and evaluation roles of building performance to enable organizational achieve long-term objective 4.2 Functional and operational building performance The questions in this section were set in a way that the responses are connected to how building facilities are related to the actual building performance. Out of 43 responses received, one respondent skipped answering the questions in this section, which may be caused by either lack of interest or the respondent, is not directly involved with the functional and operational part of the building. Therefore, the analysis in this section is reduced to answers provided by 42 respondents. The survey presented that 33 respondents are working in the organization that manages more than two buildings and 8 respondents work with organization that manages less than 2 buildings. Moreover the survey indicated that, 21 respondents have worked with buildings for 2-3 years, 13 respondents have worked more than 3years while the remaining 8 respondents 22
23 have less than one year in the real estate industry. The results of the first question in this section suggested that, respondents have necessary knowledge and skills needed in the building management as they are involved with large number of building. However their practice and experience in the field is limited as they have short time experience in working with buildings in the industry. 34 managers revealed that they spend more than five hours of their working time in the building while the remaining manager spend less than two hours in the buildings that they manage. Poor or ineffective building facilities tend to bring harm to users and hence a manager is required to spend more time in the building to identify, assess, and find solution to serious problems that are brought by poor building systems and vice versa. On the other hand, time spent on the building can be affected by control managers have on different building factors that include physical layout, design, services, security, safety and utilities that exist in the building. This study covered managers position in controlling most important building features including building layout, services and safety in the building management processes, which are presented and analyzed as follows; 23
24 Charts 1: Satisfaction on building features In response to the question regarding satisfaction on building layout, about 15 managers are satisfied with design and layout of the buildings they manage while oppositely 17 respondents consisted of managers who are of no opinion and completely not satisfied with the building layout as shown in Chart1. However the managers are happy with the way their building are designed and meet the intended requirement, they are not certain on their safety. As shown on Chart1, the bar graph on fully agree dropped because respondents are not happy and are lacking faith with the safety feature of their buildings. Again Chart1 shows that, at least 16 managers are happy with how building elements and systems support users objectives and activities I fully disagree I partly disagree No opinion I partly agree I fully agree Building layout meeting intended uses building safety Chart1: Satisfaction on building features The reason for those who are not satisfied with building layout may either be due to limited experience in the industry or they are not familiar with the way the building are design as presented earlier in this section. Additionally, the reason managers who are happy with the building layout are explained by how buildings facilities meet users needs. Buildings meet their objectives when their individual facilities and systems work together to perform a building function such as office, residential or commercial purposes. This situation may be resulted by how much control managers have over different building facilities and elements. Facilities and property managers are usually expected to have full management control over the building facilities as this enhances the building quality through overseeing maintenance issues arise within the buildings and by making sure that the problems are taken care off so 24
25 they don t arise in the future. If managers lack control over building facilities they tend to lose motivation of retaining the building to its optimum level. If managers are not in control of the building they tend to lose faith as revealed on Chart1, this is due to the fact that they don t want to be responsible for the impacts associated with the building failure and uncertainties. The last question in this section on how much control does managers have on the building physical aspect is captured in the Chart2. Chart 2: Manager's control over the building Fully disagree Partly disagree No opinion Partly agree Fully agree Chart2 shows that, more than 21 of 42 respondents have control over artificial light, cleanliness, waste disposal, daylight and sanitation. Energy use is viewed to be the most expense of building, as it covers about 70% of all building services linked to electricity e.g. artificial lighting, day lighting, heating and ventilation as presented in the chart. Apart from that at least 8 respondents are not happy with their control water consumption and noise. 25
26 The choice of their answers may be influenced by the satisfaction derived by the design and the layouts of the building they manage, as seen from the Chart2 that only 4 respondents have control over the building design. Poor design result to building sick syndrome diseases cause by in adequate ventilation and hence affecting level of comfort, sense of security and the potential workers performance. For this case, owners now require architect and engineers to design buildings that take full advantage of natural ventilation and day light as this provide comfortable environment for users and also save the cost of energy consumption. Recently studies have identified that building user, manager and owners look for different ways to reduce and manage cost related to energy consumption, contrary this survey has confirmed otherwise by indicating that managers have little control over energy consumption, heating and ventilation. 4.3 Assessment of building performance measurement The questions on this part of questionnaire were aimed to explore if there is a general acceptable understanding about BPM and its assessment in the Tanzania real estate industry. Since practitioners in the industry consider this concept to be very knew but of increasing interest, the questions were set to provide respondents with variety of options with the intension of evaluating the stages taken when conducting building performance assessment. Moreover the questions were divided to capture three general things: general knowledge about BPM, processing BPM framework, presenting and reporting BPM. The following is the result analysis from the 42 out 43 respondents because 1 respondent still opted out in this section of the questionnaire General knowledge about BPM Question 13 wanted to depict respondents definition of BPM required respondents to select the meaning of BPM; out of 42 respondents 20 chose BPM refer to monitoring building by providing safe, healthy and productive environment for occupant. Respectively, the remaining 10 and 12 respondents chose integrating functional, efficient and workflow performance and managing building facilities to perform at lowest operational cost respectively. The choice of the remaining 10 respondent captures all the building elements. 26
27 Their choice is influenced by the control a manager has over the building elements as seen in result shown on Chart2. Taking an example of the respondents who believes that BPM is about managing the building areas to provide good work flow space for users has control over building design and layout, while the ones who chose performing at lowest operational cost their concern is only about energy efficiency. All in all, at least all respondents idea about BPM is linked to the definition provided in Chapter 4, which is referred to optimizing building life-cycles, management of people and process related to space, assets and efficient supply of resources. However they are limited by the control they have on the building they manage. Chart 3: Experience with BPM About 17 respondents have been working with BPM for less than year while the remaining respondents are divided into the category of 1-3years and more than 3years experience respectively Less than 1 year 1-3 years More than 3 years Response Count Chart 3: Experience with BPM The study observed that, the scope of BPM tend to be affected by the practical experience that is derived from building performance assessing. This observation compliments with the point mentioned by the interviewed facility manager in public institution that people who have long-term experience are usually reluctant to changes because they want to secure job tenure and so they tend to be very thorough in checking all details related to BPM. In order to master the assessment of BPM, a person must first advance his practice in terms of familiarity with building facilities and in selecting parameters and factors associated with BPM which is 27
28 gained after years of practical experience. The 10 respondents working experience may influence their choice of the meaning of BPM that captured the entire building experience as shown on Chart 3 above. Chart 4: Buildings that BPM was conducted Chart4 below presents that; BMP is carried once a year mostly on housing blocks and office buildings as provided by 23 and 18 respondents respectively where between about 30 respondents have never carried out performance measurements for special purpose and the number decreases for respondents in industrial blocks and of the remaining respondents were of mixed opinion regarding office buildings and housing as shown on Chart4 Chart4: Buildings that BPM was conducted The type of building people work with is another way that differentiates the scope of BPM among respondents. Different type buildings have different requirements, as users require different set of services that support their organizational needs. 28
29 Chart 5: Frequency of Conducting BPM Chart5 present answers for question 20 that wanted respondents to provide how often BPM is conducted in their organization complements with the information that conclude by stating that building types affect the managers knowledge and practice of BPM The chart5 present that, 2 respondents conduct BPM quarterly, followed by 7 respondents who conduct BPM after every 6months. The chart also present that BPM is done annually by 20 respondents who are almost half of the total number of respondents whilst the remaining respondents fall under the categories in which BPM is conducted by more than 2years and never Responses Chart5: Frequency of conducting BPM 29
30 4.3.2 Processing BPM framework In the process of setting up and carrying BPM, managers are usually required to first determine the organizational goals and objectives towards the present and future performance of their building. Chart6 below shows that, 26 respondents are often and always know the reason for their organization when they schedule for performance measurement for the building they manage, however 6 respondents rarely and never understand the goals that are linked to BPM. Chart 6: Awareness on organizational BPM objectives and Goals Never Rarely Sometimes Often Always Respondents This can be explained by the extent they have on the management of building and also the time they spend on building as explained before. When managers know the exactly goals and objectives that the organization wants to achieve, it becomes easily for them to select parameters depending on the building type the assessment is going to be performed on. 30
31 Chart 7: Parameters for BPM Chart7 presents the data on the parameters that facility managers usually focus on. At least 21 respondents pay more attention on the financial, business and informational part of the building and the average of 9 respondents rated other parameter to be somehow important to be considered in the performance measure Fully agree Partly agree No opinion Partly disagree Fully disagree Chart6: Parameters for BPM Financial parameters has high votes because it is believed that financial budgeting control building efficiency and accommodate a range of all identified parameters in Chart7 that have an impact on organizational goals and objectives except for statistical parameter, which is mainly used by contractors and engineers. For this case, it is easy for managers to select performance parameters when they know exactly goals and objective the organization is aiming to achieve during the assessment of BPM. Contrarily, the study expected the functional and operational parameters to be the most important parameters to focused on because they enhance comfortability and productivity of users and in case the building function below standard they increase cost of operations and reduce returns. 31
32 After identifying the objectives and choosing the parameters that facility managers have to focus on, they then have to identify different factors that performance measurement will be referred to during assessment. Chart8 present the important factors managers look into when conducting BPM Chart 8: Factors linked to BPM Very important Moderately important Neutral Slightly important Low importance Chart8 present four important factors that are above the average as provided by the survey results, the factors are recommended to be looked at when conducting BPM and include: building meeting its intended uses and company requirement, added value and customers satisfaction. Less important factors are linked to building impacts on the general performances of the design options and building flexibility. The choices of these four factors are connected with the managers control over the building elements as presented on Chart1. Generally the survey data suggest that, the higher the control over the building the better choices and practice of BPM. Never the less during the BPM process managers are supposed to link these important factors and the organizational objectives to evaluate whether the desired goals have been achieved. 32
33 Managers usually monitor the success of BPM through examination of how well building indicators are supporting organizational business as presented in Chart9 Chart 9: Indicators for high building performance Every time Almost every time Occasionally Rarely Never There are three main indicators that are used every time by at least 15 respondents when measuring the successfulness of how building performance affect organisational business which are; repairs on cost savings, number of services to be executed and historical performance of the buildings. These indictors show managers how successful the buildings perform individually and not compared to the market after the measurement has been completed because benchmarking is rarely used as seen from Chart9. Surprisingly, factors related to monitoring improvements and building failures are occasionally used where these factors that determined the level of building performance are ignored. However the BPM result shows that buildings are poorly performing, different measures are then applied periodically to ensure that buildings achieve the required standards, operate at optimum and hence derive the expected added value in the future. 33
34 Chart 10: Measures for enhancing building performance The quickest measure that is always used to remedy building facilities that perform under the required standard is minor repairs as provided by 27 respondents while 15 respondents tend to apply frequent schedule maintenance that is carried periodically. Other measures like renovation, major repairs and replacement are sometimes applied by at least 14 respondents whilst 20 respondents never use expansion and this may be due to high cost and long period of time involved in such activities Always Frequently Sometimes Infrequently Never Chart10: Measures for enhancing BP Presenting and reporting BPM data The BPM data and information that is captured during the process is usually stored into formats that are easy to analyze and understood by the users. However there is increase in new computerized data storage systems that improve services and efficiency even if the government is slow in implementing the use of the systems unlike the private sectors that has switched to automatic data storages. Figure 1 shows the results of the question whereby the respondents were asked to choose a data storage system in which they store more that 75% of their BPM data and information regardless of incorporate other type of data storage systems. 34
35 Figur 1: BPM data and information storage 29 Out of 42 respondents record their data and information on manual storage system while the remaining 13 respondents record their data and information in automatic systems as shown in Figure1. Data and information storage system 42 respondents Manual storage 29 respondents Automatic Storage 13 respondents Reports forms/cards Notebooks spreadsheets Database 22 respondents 4 respondents 3 respondents 9 respondents 3 respondents Figur1: BPM data and information storage Figure1 indicates that, manual data storage involves recording data into three categories, which include reports, forms/cards, and notebooks as provided by 29 respondents. While the data maintained automatically is recorded into spreadsheets and database as presented in the same figure. After BPM data and information is recorded and complied into a report, managers usually submit or distribute them to the intended recipient who are interested to know how building portfolio perform. Their reason may include; if users are satisfied with building services, are operation costs low, does the building add value and etc. Therefore the reporting of BPM is dependant on the important factors listed on Chart8 and the organizational goals towards present and future performance of the building. 35
36 Chart 11: Readers of BPM report Managers and building investors are the main readers of the BPM reports as provided by 28 and 19 respondents respectively as presented on Chart11. Their main interest is to analyze whether the building works as intended, additional value added by the building operations and benchmarking it to the market as shown on Chart12. Occupiers, Architects and Service providers are the groups that were rated high on never read by more than 16 respondents each. The choice for engineers was mostly rated mostly on rarely and occasional report reading Building Investor Managemnt Occupiers Architects Engineers Service providers Always Often Ocassionally Rarely Never Chart11: Readers of BPM reports 36
37 Chart 12: Uses of BPM reports The engineer s rare interest on the BPM report is related to evaluation of risk associated with building facilities (refer Chart8) with the intention of evaluating buildings capability in providing additional value to the portfolio as rated by 20 and 17 respondents in each case as presented on Chart EBO SIC BWI RFBPM RAB AVAC BBIM Frequently use Almost every time Sometimes Almost never Never use Chart12: Uses of BPM reports Chart 13: Challenges facing organization in setting up BPM As explained in the previous chapters that BPM is new concepts in Tanzania and different facility managers have different way of conducting it because of their limited ability in controlling building facilities. For this case there are different challenges that face facility managers in this field, Chart13 present the challenges that are encountered by respondents when setting the BPM process for their organization. 37
38 I fully agree I partly agree No opinion I partly disagree I fully disagree Chart13: challenges facing organization in setting up BPM The four most challenging factors facing respondents when setting up BPM for their organization include; inadequate energy supply, insufficient funds set for building maintenance, in ability to procure sustainable building facilities and most managers lack relevant training on facilities. All these factors were rated by at least 18 respondents respectively. Power breakouts are severe in Tanzania resulting to high operational costs and destroying facilities like air conditioning, generators and other electrical facilities in the building. High operational cost tends to overlap the budget set for maintenance services. All this is cause by the failure of the government to provide or insisting on sustainable building with less complex and obsolete systems as rated by 17 respondents. 38
39 5: SUMMARY OF FINDING, CONCLUSION AND RECOMMENDATION The main objective of this study was to provide an understanding on the complexes and implication associated with stages adopted when carrying BPM by Tanzania facility managers to support organizational objectives. Previous chapter 5 concentrated on survey data analysis and presentation from the Tanzanian real estate industry that was obtained from the online distributed questionnaires. Firstly this section summarises the research findings from both the literature review and the survey results and then makes conclusion based on the findings. Lastly, it provides recommendations that will serve as guidelines to assist facility managers to prepare a BPM framework for their organisation in Tanzania. 5.1 Discussion of major findings This study attempted to answer the question of: What are the procedures associated with the stages of building performance measurement in Tanzania and what are the challenges associated with the assessment process? The following summary of findings answers the research questions basing on the observation that were made from both the collected literature review and survey results. BPM theory Vs. practice It is important that facilities managers follow each stage of BPM procedures because these stages have profound impact on the organizational building portfolio. The literature review on the theory of BPM has provided that each stage has resourceful inputs that help facility managers to achieve high level outcomes necessary to support strategy and continuous organizational improvement of their buildings. A good BPM framework involves five key stages, which are; planning objectives; choosing what to measure; identify measurement metrics; reporting BPM outcomes; and outcome implementation. Results from the survey show that there is a lack of correlation between the BPM theory and its application in Tanzania construction industry. There are no clear set procedures in Tanzania construction industry that guide the facility manager in developing organizational BPM actions. The study observed that, the ability of facilities managers to set up BPM is compromised by unclear organizational objectives and insufficient control buildings facilities. Most of the buildings in Tanzania are either dilapidated their systems are obsolete and some of them collapse due to lack of performance follow-ups. In addition, these factors have led to failure in attaining high performance buildings which provide effective, comfortable and productive environment. 39
40 Therefore, there is a need for more knowledge and training about benefits of BPM in order to create a momentum that will change the current Tanzania practice of building processes by putting more emphasis in recognizing the importance of quality in the built environment which people occupy. Limited knowledge and training on BPM In order for an organization to succeed it needs to have qualified employees with professional skills and capabilities related to their job position. This study has observed that real estate professional confuses between the roles of facility managers and that of property managers which are differentiate with skills, capacities and judgment during their performance. Out of 9respondents who answered survey questionnaire, 6respondents were property managers indicating that property managers take over the duties of FM without knowing that their segment is just a fraction of FM and hence they end up making short term decisions to the building facilities instead of considering the present and future needs for facilities performance. This finding compliments the literature review that showed that FM and BPM are new concept in Tanzania real estate industry leading to misunderstand of the contextual framework between the two concepts. Therefore, the construction industry should introduce educational programs and trainings that provide necessary skills and ability to differentiate the fundamental and the theories BPM and FM concepts. Lack of formal procedures/policies for setting up BPM framework. There are no formal procedures that allow facility managers to setup BPM framework for their building portfolios. The study had reveled that; respondents only set up the BPM in relation to the control over the building and to the organization goals and objectives. BPM require first setting up goals that aim at improving the building performance over its entire life cycles. Therefore the settings should go through all the stages listed in chapter three, and the most important of all is to start checking the design of the building facilities which determines energy usage, operations and maintenance that are required by the building. However this is not the case for the Tanzania real estate as 35 respondents think the design stage is of slight importance and hence they conducting BPM from when the building is running. Failure to take design stage into account lead to failure or collapse of building facilities, this is evidence with reports and news on collapsing building in Tanzania resulted by poor design of building facilities. 40
41 Inadequate use of technology: This study observed that, BPM data and information is mostly stored manual systems and the information stored automatically is mainly on excel and spreadsheet and few in database. The manual system tend to decrease staff productivity as employees spend more time going through the pile of files, spending more time going through each building facility hence increasing work load, increasing chance of leaving out important details and finally leading to high management cost. Deployment of computer-aided facilities management will help facilities management companies to easily transform data into information that will improve facilities performance at lower costs. This is achieved through integrating building performance data related to among other things building designs, performance objective, optimize resources, energy savings and solutions for potential facility problems. This study concludes that, the real estate industry does not efficiently utilize computer-aided facilities to enhance efficient decision-making regarding sustainable building performance. Emphasis is on short-term and not long-term goals The main objective of conducting BPM is to ensure that managers are able to optimize building through out its life cycle as seen the literature review. However this seem not to be the practice in Tanzanian real estate industry as practitioners seems to concentrate on solving problems at the time the problem has occurred without considering the performance in the future. Managers find themselves always performing minor repairs instead of major repairs, replacement or renovation, which could be a best solution for building facilities. If the building is neglected in the long run they end up being dilapidated, obsolete and old as seen on most of Tanzanian buildings. Low allocation of budget for maintenances is argued to be the main reasons for managers to concentrate on short term goals because most of the budget goes to paying for energy and hence the cost overlap the budget. Hence the best solution is to provide more training on how managers can link long-term goals into the organizational BPM framework Lack of government recognition and follow-ups Results from the survey indicate that, the government is not putting much emphasis in provision of quality building. This finding confirms with Komu (2008) argument that practitioner s neglect following policies of quality building because the government does not make follow-ups on building operations and performance of facilities. It s the duty of the government to ensure that buildings are constructed to fulfill the current and future needs of 41
42 the users; hence this can be done through provision of favorable conditions that enables the real estate industry to procure sustainable buildings that are not to complex and energy saving as argued by managers. Since the industry is still growing and most of their concepts are knew, it is easy for the government to now introduce and incorporate sustainable building rating systems into the industry. The rating tools will benefit the real estate industry and the country at large by enhancing efficient planning and management of buildings facilities. 5.2 Conclusion remarks This study observed that BPM is an efficient instrument used to ensure that different facilities in the building perform at optimum at cost effective. There are five stages that managers need to identify strategies and techniques that are linked with structural and non-structural building facilities in order to come up with a reliable BPM framework and decision. In contrast to the literature review this study has found out that, Tanzanian real estate industry does not have specific procedures that they follow when conducting BPM for organization. Moreover, control over building facilities is a major determinant that influences managers to measure the extent of their building performance with major emphasis on informational and financial aspects. Concentration is more done on informational and financial aspects of the building and not the building operational aspects because of difficulties in identifying metrics or benchmarking tools for measuring which was the main objective of this study. Hence more buildings become obsolete and too complex to manage. The real estate industry is in its stage of growth, it is now the best time for the government to intervene by developing policies that guide practitioners into better practice. Through provision of significant BPM policies and procedure the government will able to shape the industry into developing and constructing sustainable buildings that will benefit the country tremendously. On the otherhand organization should provide training and education to its employees regarding BPM, how to link the framework with organizational objectives with the aim of achieving both their long-term and short-term goals. These transformation strategies will the discipline go forward. Therefore, the above mentioned strategies can easily achieve in eliminating complexes and implication associated with measuring building performance in Tanzania when organization integrate computer-aided facilities management systems. These technological systems will help facility management easily customize building performance problems as these systems 42
43 integrate people, process and spaces over the management time and hence increase employees productivity and reducing cost for setting up BPM. The tasks for effectively bringing BPM practice are very challenging but are nevertheless possible to accomplish if practitioners and governments make rigorous efforts to coordinate in order to achieve high performing building in the industry. The study collected its survey data through the online-questionnaire sent to private and public sectors and after more than four months constant reminders and personal follow-ups the study was able to received 61.4% response from both sectors. The reason for this response rate is due to bureaucratic systems that are involved in the sectors and also technological constraints i.e. most of the respondents have s but they have don t frequent access to the internet because of high power outage that are facing the country now. Nevertheless, the data received from the respondents can be generalised to the population because the researcher has not spotted any changes in the construction industry or the country general that would have made the non-respondents to have answered differently from the respondents. 5.3 Recommendations for further studies To the best of the author knowledge, further studies are needed to be done on building performance measurement in Tanzania by first improving this study by taking considerable large number of data which was the main problem faced by researcher due to time constraints. It would be more interesting to review and analyze the study with large context of data to see whether the current situation and findings of BPM practice can be improved and finding more solution for the problems and concerns that have been raised by this study. Moreover researches can be done to examine the effects of integrating computer-aided facilities management systems into Tanzania facility management practice. Computer-aided facilities management systems are seen to have benefit in developed countries as has been explored by numerous researchers however there are no previous researches that have been on this subject connected to the practice in Tanzania. Hence a survey into effects of computeraided facilities management on BPM implementation may be a good opportunity for researching. Lastly, a comparative study on BPM can be either made between different types of buildings or between public and private sector practices. As noted earlier in the study that different organization and users have different expectations and requirements for the buildings they use. It would be beneficial for additional research to be conducted in such set of groups. 43
44 6. REFERENCES AND ATTACHMENTS BOOKS Atkins, B., & Brooks, A. (2009). Total facilities management, 3 rd Edition. Wiley Blackwell Publishers Amaratungs, D., & Baldry, D. (1998). Appraising the total performance of higher educational buildings: a participatory approach towards a knowledge-base system. Facilities management: Research directions. RICS Books Atkins, B. & Brooks, A. (2000). Total facilities management. Blackwell Science, Oxford. Barnard, C.I. (1962). The Functions of the Executive. Harvard University Press. Cambridge, MA Barrett, P. & Baldry, D. (2003). Facility management: towards practice. 2 nd Edn. Blackwell Publishing. UK Barrett, P. (1995). Facilities management: towards best practice. Blackwell, Oxford. Chandler, A.D. (1977). The visible hand managerial revolution in American business. Harvard University Press, Boston, MA. Davis, H.(2006). The culture of building. Oxford University Press, USA Hartkoft, V.H., Loftness, V.E., & Mill, P.A.D. (1986). The concept of total building performance and building diagnosis. Building performance: Function, preservation and rehabilitation, ASTM STP 901. G. Davis, Ed., American Society for testing and Materials, Philadelphia, 5-22 Luciani, P.J. (2007). An investigation into cycle and prediction of organization facility management procurement. Thesis submitted for the degree of doctor of FM. University technology Sidney. Australia Neely, A.D. (1998), Measuring Business Performance: Why, Why and How, Economist Books, London Preiser, W.F.E., & Vischer, J.C. (2005). Assessing building performance. Elsevier Butterworth-Heinemann, Oxford, UK ARTICLES Alexander, K. (2003). A strategy for facilities management. Facilities. 21(11/12), Ang, G.K.I, Groosman, M., and Scholten, N.P.M. (2005). Dutch performance-based approach to building regulations and public procurement. Building Research & Information, Vol. 33 (2). March-April. Banks, R.L. and Wheelwright, S.C. (1979), Operations versus strategy trading tomorrow for today, Harvard Business Review, May/June, pp Bottom, C. W., McGreal, W. S. and Heaney, G. (1999). Appraising the functional performance characteristics of office buildings. Journal of Property Research, 16(4), Douglas, J. (1996). Building performance and its relevance to facilities management. Facilities, 14 (3/4),
45 Duffy, F. (2000). Design and facilities management in a time of change. Facilities, 18, Elmualim, A., Shockley, D., Valle, R., Ludlow, G., & Shah, S. (2010). Barriers and commitment of facilities management profession to the sustainability agenda. Building and Environment, 45(1), Ghalayini, A.M., & Noble, J.S. 1996). The changing basis of performance measurement. International Journal of Operations & Production Management, 16(8),63 80 Hackman, H.Y.L., & Scott.D. (2008). Development of a conceptual framework for the study of building maintenance operation processes in the context of facility management. Surveying and Built Environment, 19(1), Kian, P.S., Feriadi, H., Sulistio, W., & Seng, K.C. (2001). a case study on total building performance evaluation of an intelligent office building in Singapore. Dimensi Teknik Sipil, 3(1), 9-15 Kironde, L. J. M. (2002). Local Democracy and Decentralization in Tanzania, in UN- HABITAT, Local Democracy and Decentralization in East and Southern Africa. Experiences from Uganda, Kenya, Botswana, Tanzania and Ethiopia. Krumm, P., Devulf, G., DeJonge, H. (1998). Managing key resources and capabilities: pinpointing the added value of corporate real estate management. Facilities, 16(12/13), Lai, J.H.K., & Yik, F.W.H. (2010). An analytical method to evaluate facility management services for residential buildings. Building and Environment, 46 (2011), Lavy, S., Garcia, J.A., & Dixit, M.K. (2010). Establishment of KPIs for facility performance measurement: review of literature. Facilities, 28 (9/10), Neely, A.D. (1999). The performance measurement revolution: why now and what next?. International Journal of Operations & Production Management, 19(2), Nutt, B. (1999). Linking FM practice and research. Facilities, 17(1/2), Preiser, W.F.E., & Schramm, U. (2002). Intelligent office building performance evaluation. Facilities, 20(7/8), Sha, D.Y., & Chen, CW. (2001). A new approach to the multiple objective facility layout problems. Integrated Manufacturing Systems, 12(1), Thorncroft, M. (1965). Principles of Estate Management London: The Estates Gazette. Varcoe, B.J. (1993). Facilities performance: achieving value for money through performance measurement and benchmarking. Property Management, 11(4), Weller, L.D. (1995), ``School restructuring and downsizing: using TQM to promote costeffectiveness'', The TQM Magazine, 7( 6), Williams, B. (1993). What a Performance. Property management. 11(3), Zimring, C., Joseph, A., Nicoll, G.L., & Tsepas, S. (2005). Influences of building design and site design on physical activity: Research and Intervention Opportunities. American Journal of Preventive Medicine, 28(2S2),
46 REPORTS Hendriks, L. & Hens, H. (2000). Building Envelopes in a Holistic Perspective - Methodology, Technical report, Laboratorium Bouwfysica, K.U. Leuven, Leu- ven, Belgium. Kyle, B.R. (2001). Toward effective decision making for building management. APWA International Public Works Congress, Philadelphia. NRCC/CPWA/IPWEA Seminar Series Innovations in Urban Infrastructure Leaman, A. (1993) Measuring people and performance, Proceedings of the Measuring, Valuing and Benchmarking Building Performance Seminar, BWA, in collaboration with Oxford Brookes University and BRE, London, unpublished report. Spekkink, D. (2005). Keynote for PeBBu day at 11th joint CIB International Symposium. Helsinki, Finland. INTERNET Guide to the management of real property, (2009). Canada. Retrieved from on 6 may Maery, M. (u.d.). The collapse of buildings., Retrieved from on 27 June 2007 CIA world fact book. (2011). Retrieved from on 5 July 2011 Tanzania Construction Sector Report. (2008). Retrieved from on 05 July
47 Attachment 1: Interview questions Before the questionnaire was formulated an interview was carried out with a facility manager in one of the government institutions in order to gain information that was useful in structuring the survey which was the main method of data collection. Questions 1. What is Building performance measurement? 2. What would you say are the major technical skills needed for BPM? 4. What are the building facilities that you pay more attention to and which performance indicators do you use to monitor successfulness of building performance? 5. How often does your organization change, improve or modify BPM framework? 6. Who are the user of BPM data and reports? 7. What are the challenges organization faces when setting up BPM framework? 47
48 Attachment 2: Questionnaire The purpose of this questionnaire is to get information about Building Performance Measurement and how it is done in Tanzania. The aim is to collect data for a Masters thesis being conducted by Johari Hussein, MBS student at The Royal Institute of Technology in Sweden. The focus is on what facility managers do and how company policies are affected by the BPM report. The questionnaire is estimated to take minutes of your time to answer and we are grateful for your participation. All answers will be treated confidentially and no single answer will be identified to you. BACKGROUND INFORMATION 1. Please fill in your sex o Male o Female 2. Please choose your age group o Below 26 years o years o years o years o years o Over 65 years 3. Please indicate the highest education level you have achieved of the ones below o No formal education o Secondary School o Bachelors Degree o Masters Degree o Higher Degree 4. Please indicate your form of employment. (You can choose more than 1 box for example if you have a regular paid employment and are also self-employed) o I am self employed with my own company o I am employed by the property company I work for o I am employed by a consultancy firm o I work with a governmental institution o Other, PLEASE specify in the space below. 5. Please indicate your job title o Managing director o Property manager o Facility manager o Building caretaker 48
49 BUILDING PROCESS, FUNCTIONAL AND OPERATIONAL PERFORMANCE The answers in this section will be of help in analyzing factors like how building facilities are related to the actual building performance. 6. How many buildings does the company you work for manage? o Building o 2 buildings o More than 2 buildings 7. How long have you worked with the building? o Less than 1 year o 1 year o 2 3 years o More than 3 years 8. How long do you spend in the building during the day? o Less than 1 hour o About 2 hours o About 5 hours o About 8 hours o More than 8 hours 9. The building's layout is satisfactory to me o I fully disagree o I partly disagree o No opinion o I partly agree o I fully agree 10. Overall the building meets its intended needs o I fully disagree o I partly disagree o No opinion o I partly agree o I fully agree 11. I feel safe in this building o I fully disagree o I partly disagree o No opinion o I partly agree o I fully disagree 49
50 12. I have good control in this building over: Fully disagree Partly disagree No opinion Partly agree Fully agree Heating Ventilation Daylight Artificial light Noise Energy consumption Water consumption Cleanliness Waste disposal Sanitation Building design ABOUT ASSESSMENT OF BUILDING PERFORMANCE STAGES 13. Building Performance Measurement refer to o Integrating functional, efficient and workflow performance o Monitor building to provide safe, healthy and productive environment for occupant o Managing building facilities to perform at lowest operational cost o Other (please specify) 14. How long have you worked with Building Performance Measurement? o Less than 1 year o 1 3 years o More than 3 years 15. The building(s) in which I have carried out Building Performance Measurement was Never Once a year Every 3month Once a month Everyday Heating Ventilation Daylight Artificial light Noise 50
51 16. I am aware of our organization goals and objectives towards the present and future performance of our buildings o Never o Rarely o Sometimes o Often o Always 17. When forming building performance measurement the parameters I focus most highly on are: Fully Partly No Fully Partly agree disagree disagree opinion agree Strategic Statistical Operational Tactical Informational Functional Financial Technical Business 18. We have formal procedures for defining ways on how to measure building performance o I fully disagree o I partly disagree o No opinion o I partly agree o I fully agree 19. What are the important factors you would look when conducting building performance measurement? * Low Slightly Moderately Very Neutral Importance Important Important Important Meeting company requirement Building meet its intended use Buildings added value Customer s view of quality & value Design option Building Impacts on performance 51
52 20. Building performance measurement is usually done o Quarterly o Every six-month o Yearly o Two to three years o More than 3yearss o Never 21. Within a portfolio of buildings, the following are key indicators of how well a building is performing for your business Almost Everytime Never Rarely Occasionally never Description of building failures Track and reports on cost savings Benchmarking the building to market Monitoring design improvements Client evaluation of services Historical performance records 22. In order to ensure performance measurement add value to organization we conduct the following duties Never Infrequent Sometimes Frequently Always Schedule maintenance Major repair Minor repair Replacement Renovation Expansion 23. After the BPM information is captured and analyzed, we usually store them as followed o Manually o Automatically If manual go to Qn.24, and if Automatic go to QN The data and information collected, stored & maintained manually, is recorded using o Forms and cards o Reports o Notebooks o Journals 52
53 25. The data and information collected, stored & maintained automatically, is recorded using o Spread sheet o Database 26. The main reader of BPM report in my organization is Never Rarely Occasionally Often Always Investors Managers Architects Engineers Service providers 27. The building performance report is used to Evaluation of likely and actual building outcome Strategic implication and consequences Never Almost never Sometimes Almost every time Frequent use The building work as intended Recommendations for future BPM Risk associated with building Benchmarking the building to other in the market Additional value added capability 53
54 28. Challenges facing the organization on setting up BPM are Fully Party disagree disagree Poor recognition and support from government No opinion Party agree Fully agree Insufficient Energy supply Procuring and building sustainable facilities Measuring performance tools are unclear Lack of relevant training on facilities management Insufficient budget/funding for maintenance Building too old and systems have become obsolete Building and systems complexity 54
MANAGEMENT COURSES Student Learning Outcomes 1
MANAGEMENT COURSES Student Learning Outcomes 1 MGT 202: Business Professions 1. Describe and use the elements of effective decision making research, assessment and consequence. 2. Apply elements of effective
BUSINESS ADMINISTRATION (Non-EMBA) COURSES Student Learning Outcomes 1
BUSINESS ADMINISTRATION (Non-EMBA) COURSES Student Learning Outcomes 1 BA 100: Exploration of Business 1. Explain the culture of higher education. 2. Undertake critical examination and self-reflection
JOB DESCRIPTION. Contract Management and Business Intelligence
JOB DESCRIPTION DIRECTORATE: DEPARTMENT: JOB TITLE: Contract Management and Business Intelligence Business Intelligence Business Insight Manager BAND: 7 BASE: REPORTS TO: Various Business Intelligence
Facility Management. Robin Ellerthorpe, FAIA. Summary CLIENT NEEDS. 1 Supplemental Architectural Services 2000 AIA FACILITY MANAGEMENT SERVICES
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Facility Management Robin Ellerthorpe, FAIA As more clients recognize the benefits of integrating facility planning with
University College London Staff survey 2013: results presentation
University College London Staff survey 2013: results presentation Classification: Private Agenda Headline results Employee engagement Key drivers of engagement within UCL Other key themes Summary and next
Contents. viii. 4 Service Design processes 57. List of figures. List of tables. OGC s foreword. Chief Architect s foreword. Preface.
iii Contents List of figures List of tables OGC s foreword Chief Architect s foreword Preface Acknowledgements v vii viii 1 Introduction 1 1.1 Overview 4 1.2 Context 4 1.3 Purpose 8 1.4 Usage 8 2 Management
UNIVERSITY INDUSTRY COLLABORATION: SAFETY ENGINEERING EDUCATION AT KU LEUVEN
UNIVERSITY INDUSTRY COLLABORATION: SAFETY ENGINEERING EDUCATION AT KU LEUVEN Jan Degrève 1, Jan Berghmans* 1, Geert Boogaerts 2 1 Katholieke Universiteit Leuven, Department of Chemical Engineering, Belgium
'Swampy Territory' The role of the palliative care social worker in safeguarding children of adults who are receiving specialist palliative care
'Swampy Territory' The role of the palliative care social worker in safeguarding children of adults who are receiving specialist palliative care This qualitative study explores the role of the palliative
Occupier perspective Workplace strategies Focus on people March 2014
Occupier perspective Workplace strategies Focus on people March 2014 Creating a workplace strategy is one of the first and most important elements of portfolio / real estate strategy, which allows organisations
16- Master s Degree in Public Health and Public Health Sciences (Majoring Health Management, Planning and Policy)
16- Master s Degree in Public Health and Public Health Sciences (Majoring Health Management, Planning and Policy) Students should fulfill a total of 38 credit hours: 1- Basic requirements: 10 credit hours.
Analysis of Building Performance Evaluation and Value Management as Tools in Building Facilities Management
Analysis of Building Performance Evaluation and Value Management as Tools in Building Facilities Management Kevin Chuks Okolie 1* and Charles Yemi Adedeji 2 1. Faculty of Environmental Sciences, Nnamdi
Briefing Paper. How to Compete on Customer Experience: Six Strategic Steps. www.syn gro.c om SynGro SynGro 2013 2013 Tel: +44 (0 ) 15 06 5 92 2 24
Briefing Paper How to Compete on Customer Experience: Six Strategic Steps How to Compete on Customer Experience: Six Strategic Steps Voice of the Customer as a term has come to reflect the growing understanding
ACM Courses. Management and Organization Department. Ramon V. del Rosario College of Business. De La Salle University.
ACM Courses Management and Organization Department Ramon V. del Rosario College of Business De La Salle University 2011 ACM-P003-4 Page 0 1.0 COURSE OVERVIEW 1.1 Human Resources Management. The heart of
Outline feasibility study for ORET application in the health care sector
Outline feasibility study for ORET application in the health care sector In this section we outline the information needed for a proper assessment of your application for financing under the ORET program.
University of Cambridge: Programme Specifications MASTER OF STUDIES IN INTERDISCIPLINARY DESIGN FOR THE BUILT ENVIRONMENT
University of Cambridge: Programme Specifications Every effort has been made to ensure the accuracy of the information in this programme specification. Programme specifications are produced and then reviewed
Zurich Universities of Applied Sciences and Arts. Master of Science in Facility Management
Zurich Universities of Applied Sciences and Arts Master of Science in Facility Management The Master of Science in Facility Management is modular, and each semester has a specific focus. In the first semester,
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA. Those modules are:
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA. Those modules are: Management and Organizational Change (P.4) Leading Strategic Decision
TDWI strives to provide course books that are content-rich and that serve as useful reference documents after a class has ended.
Previews of TDWI course books are provided as an opportunity to see the quality of our material and help you to select the courses that best fit your needs. The previews can not be printed. TDWI strives
IFMA Facility Management Learning System - Table of Contents
Competency: Communication Chapter 1: Communication Fundamentals o Topic 1: The Nature of Communication o Topic 2: Effective and Efficient Communication o Topic 3: Cross-Cultural Communication o Topic 4:
ASSOCIATE PROJECT MANAGER
ASSOCIATE PROJECT MANAGER Duties and Responsibilities This class of positions encompasses project management and coordination work of varying degrees of difficulty and responsibility. All personnel may
Role Activity Grade 5 PAS Professional Officer
Role Activity Grade 5 PAS Generic Post Job Title: Market Insight Officer Title: Reporting to: Head of Market Insight School/ External & Community Relations Department: Job Family: Professional and Administrative
HIGHER DIPLOMA BUSINESS FINANCE
BENCHMARK STATEMENTS for HIGHER DIPLOMA in BUSINESS FINANCE SRI LANKA QUALIFICATIONS FRAMEWORK AND QUALITY ASSURANCE UNIT HIGHER EDUCATION FOR TWENTY FIRST CENTURY (HETC) PROJECT Ministry of Higher Education
How are companies currently changing their facilities management delivery model...?
Interserve and Sheffield Hallam University market research 2012 Page 2 www.commercial.interserve.com How are companies currently changing their facilities management delivery model...? we have a strategy
Project Management for Business Process Improvement
Project Management Approach for Business Process Improvement Overview Gina Abudi Business process improvement initiatives are frequently key projects within an organization regardless of the size of the
Table 1: Number of students enrolled in the program in Fall, 2011 (approximate numbers)
Program: Department: MBA Human Resource Management CBA Table 1: Number of students enrolled in the program in Fall, 2011 (approximate numbers) MBA Concentration (Program) # students Human Resource Management
NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS
NATIONAL COMPETENCY STANDARDS FOR QUANTITY SURVEYORS - CONSTRUCTION ECONOMISTS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS THE AUSTRALIAN INSTITUTE OF QUANTITY SURVEYORS NATIONAL COMPETENCY STANDARDS
Administrative Analysis Grade Evaluation Guide
Administrative Analysis Grade Evaluation Guide TABLE OF CONTENTS COVERAGE... 2 EXCLUSIONS... 2 BACKGROUND INFORMATION... 3 HOW TO USE THIS GUIDE... 3 GRADE CONVERSION TABLE... 4 FACTOR LEVEL RELATIONSHIPS...
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA.
All available Global Online MBA routes have a set of core modules required to be completed in order to achieve an MBA. Those modules are: Building High Performance Organisations Management and Organisational
IMPACT FACTOR OF HUMAN RESOURCE MANAGEMENT AT PRIVATE SECTOR IN TAMILNADU
IMPACT FACTOR OF HUMAN RESOURCE MANAGEMENT AT PRIVATE SECTOR IN TAMILNADU R.Murugesan Assistant Professor, Dept. of Management Studies, P.S.V.College of Eng. &Tech, Krishnagiri, Tamilnadu, India. Abstract
A Strategic Approach to Housing Asset Management
Housing A Strategic Approach to Housing Asset Management www.milton-keynes.gov.uk/housing-mkc 0 A Strategic Approach to Housing Asset Management Contents Page 1. Introduction 1 2. Developing a New Set
This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.
Red River College Course Learning Outcome Alignment with BABOK Version 2 This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed
Commentary: What Do Budget Deficits Do?
Commentary: What Do Budget Deficits Do? Allan H. Meltzer The title of Ball and Mankiw s paper asks: What Do Budget Deficits Do? One answer to that question is a restatement on the pure theory of debt-financed
Performance Detailed Report. Date. Last saved: 12/10/2007 13:18:00. Property asset management. Bristol City Council. Audit 2006/07
Performance Detailed Report Date Last saved: 12/10/2007 13:18:00 Property asset management Audit 2006/07 - Audit Commission descriptor to be inserted by Publishing- Document Control Author Filename Bob
Cover Page. The handle http://hdl.handle.net/1887/33081 holds various files of this Leiden University dissertation.
Cover Page The handle http://hdl.handle.net/1887/33081 holds various files of this Leiden University dissertation. Author: Stettina, Christoph Johann Title: Governance of innovation project management
National Education Technology Standards
National Education Technology Standards Objectives Satisfied by Each Deliverable in the Program 1 Basic operations and concept Students demonstrate a sound understanding of the nature and operation of
A9. What is the total number of employees worldwide including Denmark by headcount?
SURVEY OF EMPLOYMENT PRACTICES OF MULTINATIONAL COMPANIES OPERATING IN DENMARK Home-based English version Please select a language: SECTION A: INTRODUCTION English... 1 Danish... 2 First page: EMPLOYMENT
January 2016. Communications Manager: Information for Candidates
January 2016 Communications Manager: Information for Candidates Thank you for expressing interest in the role of Communications Manager. We have compiled this information pack to tell you more about The
Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness
General Information Company: Northwestern Michigan College Supervisor: Employee: Department: Office of Research, Planning and Effectiveness Employee No: Detail Job Title: Coordinator of Data Reporting
Master of Arts in Leadership in TVET and Workforce Development. TVET / Workforce Development Core Courses
Master of Arts in Leadership in TVET and Workforce Development COURSE DESCRIPTIONS TVET / Workforce Development Core Courses EDTV6000 EDEA6309 EDTV6002 EDTV6003 EDTV6004 EDTV6005 Philosophical Foundations
Bachelor's Degree in Business Administration and Master's Degree course description
Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration Department s Compulsory Requirements Course Description (402102) Principles
THE EVOLUTION of Talent Management Consulting
Talent management consulting is the giving of professional, expert advice to executives who are put in charge of handling, directing, or managing those who have a capacity for achievement or success. THE
PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes
PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes Release: 3 PSPSOHS602A Develop OHS information and data analysis and reporting and recording processes Modification
Requirements Engineering: Elicitation Techniques
2008:PR003 Requirements Engineering: Elicitation Techniques Sai Ganesh. Gunda Source:http://www.marcocioffi.com/archives/2005/04/requirements-engineering/ MASTER S THESIS Software Engineering, 2008 Department
Message from the Chief Executive of the RCM
Message from the Chief Executive of the RCM The Midwifery Leadership Competency Framework has been derived from both the NHS Leadership Qualities Framework and the Clinical Leadership Competency Framework.
ITGovA: Proposition of an IT governance Approach
Position Papers of the Federated Conference on Computer Science and Information Systems pp. 211 216 DOI: 10.15439/2015F21 ACSIS, Vol. 6 ITGovA: Proposition of an IT governance Approach Adam CHEKLI Hassan
Assessing Employee Satisfaction at the Zimbabwe Open University
Assessing Employee Satisfaction at the Zimbabwe Open University Daniel Ndudzo Zimbabwe Open University, Harare, Zimbabwe ABSTRACT This study assesses employee satisfaction at the Zimbabwe Open University.
Summary of the Master Thesis. Implementation of Business Ethics in International Construction Projects
Summary of the Master Thesis Master s Degree International Project Management (Building, Real Estate and Infrastructure) Implementation of Business Ethics in International Construction Projects The Perception
GENERAL SERVICES ADMINISTRATION Federal Acquisition Service Mission Oriented Business Integrated Services (MOBIS) SCHEDULE PRICE LIST
GENERAL SERVICES ADMINISTRATION Federal Acquisition Service Mission Oriented Business Integrated Services (MOBIS) SCHEDULE PRICE LIST SIN 874-7 Interior Systems, Inc., dba ISI Professional Services 1201
Baldrige Core Values and Concepts Customer-Driven Excellence Visionary Leadership
Baldrige Core Values and Concepts These beliefs and behaviors are embedded in high-performing organizations. They are the foundation for integrating key performance and operational requirements within
Quick Guide: Meeting ISO 55001 Requirements for Asset Management
Supplement to the IIMM 2011 Quick Guide: Meeting ISO 55001 Requirements for Asset Management Using the International Infrastructure Management Manual (IIMM) ISO 55001: What is required IIMM: How to get
Full Time Master of Science in Management program. Core concepts and disciplinary foundations of the courses. Marketing Management Specialization
Full Time Master of Science in program Core concepts and disciplinary foundations of the courses Specialization Courses during the adaptation phase (Pre-Master) Deep Dive Business Strategy Managerial Economics
Journal of Asian Business Strategy. Interior Design and its Impact on of Employees' Productivity in Telecom Sector, Pakistan
. Journal of Asian Business Strategy journal homepage: http://aessweb.com/journal-detail.php?id=5006 Interior Design and its Impact on of Employees' Productivity in Telecom Sector, Pakistan Naeem Akhtar
Civil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
Computer Support Specialists and Systems Administrators
http://www.bls.gov/oco/ocos268.htm Computer Support Specialists and Systems Administrators * Nature of the Work * Training, Other Qualifications, and Advancement * Employment * Job Outlook * Projections
MSc in Construction Management (Cycle 2, level 4)
(Cycle 2, level 4) is a 2 year full-time graduate study program of 120 ECTS credits (4 semesters, 30 ECTS each semester). Students generally take 90 ECTS in specialized courses and a 30 ECTS thesis. In
Self Study and Training for Members and Staff of Agricultural Cooperatives A Guidance Manual for Advisers and Trainers
Self Study and Training for Members and Staff of Agricultural Cooperatives A Guidance Manual for Advisers and Trainers This manual offers guidance to field workers involved in advising and providing training
SAQA LOGO: QUALIFICATION TITLE Bachelors Degree in Quantity Surveying (NQF level 7) based on Unit Standards. LEVEL: NQF level 7 CREDITS: 360 FIELD:
QUALIFICATION TITLE Bachelors Degree in Quantity Surveying (NQF level ) based on Unit Standards SAQA LOGO: LEVEL: NQF level CREDITS: 360 FIELD: NSB 12: Physical Planning and Construction SUB-FIELD: Physical
2016 COMMUNITY SERVICES GRANTS
SOCIAL POLICY DIVISION, SOCIAL DEVELOPMENT DEPARTMENT 2016 COMMUNITY SERVICES GRANTS 2016 COMMUNITY SERVICES GRANTS INFORMATION SHEET FOR SUSTAINABLE FOOD SYSTEMS GRANTS STANDARD APPLICATION APPLICATION
How to achieve a successful 360-Degree Appraisal
How to achieve a successful 360-Degree Appraisal Valerie Heritage Specialists in Employee Engagement Solutions incorporating 360 degree feedback http://www.communicationchallenge.co.uk How to achieve a
Business Logistics Specialist Position Description
Specialist Position Description March 23, 2015 MIT Specialist Position Description March 23, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
ABSTRACT. assesses the perception of billing of consumers via computerized system. The project is aimed
ABSTRACT Bills are documents that services as an evidence of sales of goods and services. This work assesses the perception of billing of consumers via computerized system. The project is aimed at developing
The Asset Management Landscape
The Asset Management Landscape ISBN 978-0-9871799-1-3 Issued November 2011 www.gfmam.org The Asset Management Landscape www.gfmam.org ISBN 978-0-9871799-1-3 Published November 2011 This version replaces
Development, Acquisition, Implementation, and Maintenance of Application Systems
Development, Acquisition, Implementation, and Maintenance of Application Systems Part of a series of notes to help Centers review their own Center internal management processes from the point of view of
Business & Technology Applications Analyst
NC 12234 OSP 6/2004 Business & Technology Applications Analyst DESCRIPTION OF WORK: This is technical and analytical work in developing, designing, and/or supporting applications for the business, research,
KEY GUIDE. The key stages of financial planning
KEY GUIDE The key stages of financial planning Financial planning has witnessed significant change, so it is not surprising that most people are unclear about what financial planners actually do. The aim
Revised Body of Knowledge And Required Professional Capabilities (RPCs)
Revised Body of Knowledge And Required Professional Capabilities (RPCs) PROFESSIONAL PRACTICE Strategic contribution to organizational success RPC:1 Contributes to the development of the organization s
Overview of Water Utility Benchmarking Methodologies: From Indicators to Incentives
Overview of Water Utility Benchmarking Methodologies: From Indicators to Incentives Sanford Berg and Julie C Padowski [email protected] Public Utility Research Center (www.purc.ufl.edu) University
Occupational Profile and Curriculum Summary
Occupational Profile and Curriculum Summary Presented for Comment OFO code 143905 Related Occupation Contact Centre Manager Table of Content Occupational Profile and Curriculum Summary... 1 Presented for
CORPORATE PERFORMANCE MANAGEMENT GUIDELINE
-001 CORPORATE PERFORMANCE MANAGEMENT GUIDELINE -001 TABLE OF CONTENTS 1 Introduction... 3 1.1 Scope... 3 1.2 Purpose... 3 2 Performance Management Framework Overview... 4 3 Performance Management Framework...
POST DISTRIBUTION MONITORING: - Guidelines to Monitor processes, outputs and outcomes
POST DISTRIBUTION MONITORING: - Guidelines to Monitor processes, outputs and outcomes A guide for the Afghanistan Cash & Voucher Working Group George Bete: - August 2013 Funded by European Community Humanitarian
University of Cambridge: Programme Specifications MASTER OF PHILOSOPHY IN ENGINEERING FOR SUSTAINABLE DEVELOPMENT: PROGRAMME SPECIFICATION
Page 1 of 8 University of Cambridge: Programme Specifications Every effort has been made to ensure the accuracy of the information in this programme specification. Programme specifications are produced
Statement #4/Managerial Cost Accounting Concepts and Standards for the Federal Government
Statement #4/Managerial Cost Accounting Concepts and Standards for the Federal Government Executive Office of the President Office of Management and Budget "Managerial Cost Accounting Concepts and Standards
CHAPTER 12.1 INTRODUCTION
CHAPTER 12 Management Accounting Introduction Divisions of Accounting Financial Accounting Concept of Management Accounting Management Accounting-Definition Importance and Need of Management Accounting
CAREER OPPORTUNITIES IN FINANCE Department of Finance, Real Estate, and Insurance
CAREER OPPORTUNITIES IN FINANCE Department of Finance, Real Estate, and Insurance PURPOSE OF THE ACADEMIC MAJORS The Bachelor of Science in Business Administration at CSUN offers options in Finance, Real
Elements of an Occupational Health and Safety Program
Occupational Health and Safety Division Elements of an Occupational Health and Safety Program Table of Contents Introduction 3 What workplaces must have a program? 5 What criteria must the program meet?
Administrator Position Description. About the Drug Foundation
Administrator Position Description Approved by Executive Director, April 2013 Next review at annual staff appraisal About the Drug Foundation New Zealanders use drugs. That use can cause harms and add
Project Manager (Renewable Energy) Terms of Reference
I. Position Information Project Manager (Renewable Energy) Terms of Reference Organization: Office of the Quartet (OQ) Title: Project Manager (Renewable Energy) Reports to: Energy Adviser Duty Station:
Australian ssociation
Australian ssociation Practice Standards for Social Workers: Achieving Outcomes of Social Workers Australian Association of Social Workers September 2003 Contents Page Introduction... 3 Format of the Standards...
STRATEGIC AND OPERATIONAL PLAN
STRATEGIC AND OPERATIONAL PLAN 2013-2015 2 3 Table of Contents Introduction Corporate Balanced Scorecard Revitalized... 5 Reorganizing Corporate Structure... 8 The Planning Process The Planning Process...
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
Accounting. Management. Environment of Business. Business Law for Accountants. Stats Business & Econ I. Management
Undergraduate Courses: Course # Course Title Course Description BUS201 Financial An introduction to basic accounting principles for measuring and Accounting communicating financial data about a business
SUSTAINABLE DEVELOPMENT OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ACTIVE UPGRADING OF CORPORATE SAFETY CULTURE
, Volume 5, Number 4, p.108-113, 2004 SUSTAINABLE DEVELOPMENT OF OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM ACTIVE UPGRADING OF CORPORATE SAFETY CULTURE Qiang Chen Safety Engineering Department,
INTERNATIONAL ACCOUNTING STANDARDS. CIE Guidance for teachers of. 7110 Principles of Accounts and. 0452 Accounting
www.xtremepapers.com INTERNATIONAL ACCOUNTING STANDARDS CIE Guidance for teachers of 7110 Principles of Accounts and 0452 Accounting 1 CONTENTS Introduction...3 Use of this document... 3 Users of financial
COMPREHENSIVE ASSET MANAGEMENT STRATEGY
COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
MA in Sociology. Assessment Plan*
MA in Sociology Assessment Plan* Submitted by The Graduate Assessment Committee: November, 2008 Sharon K. Araji, Chair Submitted to The Dean of the College of Liberal Arts and Sciences UC Denver * The
COST OF PROVIDING FINANCIAL ADVICE
ABI RESEARCH PAPER NO 22, 2010 COST OF PROVIDING FINANCIAL ADVICE Identifying and quantifying the cost of the key components of a full advice service Report from Charles River Associates By Kyla Malcolm,
UNIVERSITI TEKNOLOGI MARA THE EFFECTIVENESS OF MARKETING MIX STRATEGY CASE STUDY: SETIA ALAM
UNIVERSITI TEKNOLOGI MARA THE EFFECTIVENESS OF MARKETING MIX STRATEGY CASE STUDY: SETIA ALAM HIZMA RAZLIATI BINTI ABDUL RAHIM SEPTEMBER 2011-JANUARI 2012 JABATAN PENGURUSAN HARTANAH FAKULTI SENIBINA PERANCANGAN
Design and Construction policy for sustainable buildings and Campus environments
ESTATES SUPPORT SERVICE Design and Construction policy for sustainable buildings and Campus environments 1.0 INTRODUCTION The Higher Education Funding Council for England, responding to Governmental direction,
Job Information Pack. IT Service Management Officer Tower Hill, London. June 2014 ALZHEIMER S SOCIETY
ALZHEIMER S SOCIET Job Information Pack IT Service Management Officer Tower Hill, London June 2014 Alzheimer s Society, Devon House, 58 St Katharine s Way, London. Telephone +44 (0) 20 7423 3500. Fax 020
HEALTH AND SAFETY EXECUTIVE MANAGEMENT STANDARDS SECTION 3
HEALTH AND SAFETY EXECUTIVE MANAGEMENT STANDARDS SECTION 3 Stress Management Toolkit Section 3 Health and Safety Executive Management Standards 06.03.12 Page 1 of 10 3.1 HEALTH AND SAFETY EXECUTIVE MANAGEMENT