1 Broadband Project Frequently Asked Questions What is the history of the Nelson County broadband project? Nelson County completed its research and planning for this project, with the assistance of the Virginia Department of Housing and Community Development s (DHCD s) Community Broadband Study. The project was part of the Virginia Rural Broadband Planning Initiative. The County received a total of $115,000 in grant funds and hired ICON Broadband Technologies, Inc. to assist the County in three phases of planning that culminated in the County s Broadband Technology Opportunities Program (BTOP) middle mile project grant application. The County accepted the NTIA/BTOP grant award on April 6, 2010 and subsequently began implementation of its middle mile network project. Middle mile project is defined as follows: o Middle Mile Project: a broadband infrastructure project that does not predominantly provide broadband service to end users or to end user devices, and may include interoffice transport, backhaul, Internet connectivity, or special access. How and for what purpose did Nelson County obtain funding for the project? Through a highly competitive grant process, Nelson County obtained $1,826,646 for the Broadband Project from the National Telecommunications and Information Administration s (NTIA s) Broadband Technology Opportunities Program (BTOP). The purpose of this funding is to enhance and expand broadband Internet services in unserved and underserved areas of Nelson County by deploying approximately 31 miles of new fiber and four new wireless tower sites, and directly connecting 13 Community Anchor Institutions (CAIs). The CAIs that received direct connections to the new network are five county government facilities, three K-12 schools, the Blue Ridge Medical Center, Afton Family Medicine, Nelson Rescue, Nelson County Service Authority, and the Nelson Memorial library. The project plans to provide speeds from 10 Mbps up to 1 Gbps and spur more affordable broadband Internet service for as many as 1,500 households, 250 businesses, and an additional 30 CAIs, by enabling Internet service providers to connect to the project s open access network. The Nelson County Virginia Broadband Project will also: Enable the Blue Ridge Medical Center to deploy telemedicine capabilities and enhance collaboration with health care specialists at the University of Virginia. Enhance public safety by allowing emergency services personnel to communicate and transmit vital patient data en route to a hospital. Provide residents, students, and teachers greater access to multimedia educational information and distance learning opportunities. How much money was spent on the project? A total of $3,173,205 was spent on the project. Funding is broken down as follows: $1,826,646 in federal grant funds, $456,662 in required local match, $200,000 in state grant funds, and $689,897 in other local funds were spent on the project.
2 What were the requirements of the grant? At least 75 percent of the proposed funded service area to be funded had to be within rural areas that were unserved or underserved as defined as follows: o Proposed funded service area: the area (either in all or part of an existing service area or a new service area) where the applicant is requesting BIP or BTOP funds to provide broadband service pursuant to the July 2009 NOFA. o Rural area: any area, as confirmed by the latest decennial census of the Bureau of the Census, which is not located within: (i) a city, town, or incorporated area that has a population of greater than 20,000 inhabitants; or (ii) an urbanized area contiguous and adjacent to a city or town that has a population of greater than 50,000 inhabitants. For purposes of the definition of rural area, an urbanized area means a densely populated territory as defined in the latest decennial census of the U.S. Census Bureau. o Unserved: At least 90 % of households in the proposed funded service area lack access to facilities based, terrestrial broadband service, either fixed or mobile, at the minimum broadband transmission speed. A household has access to broadband service if the household can readily subscribe to that service upon request; or o Underserved: No more than 50 % of the households in the proposed funded service area have access to facilities based, terrestrial broadband service at greater than the minimum broadband transmission speed; No fixed or mobile broadband service provider advertises broadband transmission speeds of at least 3 mbps downstream in the proposed funded service area; or The rate of broadband subscribership for the proposed funded service area is 40 % of households or less A proposed funded service area may qualify as underserved for middle mile projects if one interconnection point terminates in a proposed funded service area that qualifies as unserved or underserved for Last Mile projects. Note: An unserved/underserved area may include individual Census block groups or tracts that on their own would not be considered underserved and the availability of or subscribership rates for satellite broadband service is not considered for the purpose of determining whether an area is unserved and or underserved. For broadband infrastructure projects seeking more than $1 million in funding, a certification, from a Professional Engineer was required, that attested that: a) the system would deliver the stated performance; and b) the proposed project would be substantially complete within two years, and fully complete within three years. Two way data transmission with advertised speeds of at least 768 kbps downstream and 200 kbps upstream must be provided.
3 Applicant agreed to comply with the nondiscrimination and interconnection obligations outlined in the Notice of Funding Availability (NOFA) as follows: o Nondiscrimination and interconnection obligations: adherence to the FCC s Internet Policy Statement adopted on August 5, 2005 as follows: (1) consumers are entitled to access the lawful Internet content of their choice; (2) consumers are entitled to run applications and services of their choice, subject to the needs of law enforcement; (3) consumers are entitled to connect their choice of legal devices that do not harm the network; (4) consumers are entitled to competition among network providers, application and service providers, and content providers not favor some lawful applications and content over others; describe and display any network management policies; connect to the public Internet and not be an entirely private closed network; and offer interconnection, including the ability to connect to the public Internet and physical interconnection for the exchange of traffic. The project had to advance at least one of the following statutory purposes for BTOP, Nelson County s project advanced all three at the time of its application: o Provide access to broadband service to consumers residing in unserved areas of the United States o Provide improved access to broadband service to consumers residing in underserved areas of the United States o Provide broadband education, awareness, training, access, equipment, and support to Community Anchor Institutions (CAIs) as defined as follows: Community Anchor Institutions: Schools, libraries, medical and healthcare providers, community colleges and other institutions of higher education, and other community support organizations by or through these organizations Organizations and agencies that provide outreach, access, equipment, and support services to facilitate greater use of broadband service by low income, unemployed, aged, and otherwise vulnerable populations Job creating strategic facilities located within a State designated economic zone, Economic Development District designated by the Department of Commerce, Renewal Community or Empowerment Zone designated by the Department of Housing and Urban Development, or Enterprise Community designated by the Department of Agriculture o Improve access to, and use of, broadband service by public safety agencies o Stimulate the demand for broadband, economic growth, and job creation
4 Applicant had to provide matching funds of at least 20 percent towards the total eligible project costs. The County was required to provide a match of $456, $200,000 in State grant funds were used to offset this cost. Applicant had to document that the project would not have been implemented during the grant period without federal grant assistance. Has the grant project been completed? As of March 2013, the grant project is in the final stages of completion with all but the connection to the Massie s Mill tower site being completed. The project final completion deadline is June 30, What is the network comprised of? The NCBA Broadband Network is comprised of approximately 31 miles of fiber backbone extending from Afton to Colleen along routes 151, 6 and 29 within the County. The network also includes four communications towers with connectivity to the network to be used by wireless internet service providers in delivering services. These towers are located in Afton at the Rockfish Valley Fire Department, in Avon at Martin s Store, in Massies Mill near the Solid Waste Collection Site, and at Colleen in the Colleen Business Park. Will there be grant funding to connect individual homes and businesses? Not at this time. The BTOP grant that provided funding for the project, only required that the thirteen identified Community Anchor Institutions (CAIs) be directly served by the project. The grant funding did not provide for any additional connections beyond these. Who owns the network? Nelson County owns all network infrastructure and leases the network to the Nelson County Broadband Authority (NCBA) for its operation. It is the intent of Nelson County to own and NCBA to lease and operate all fiber infrastructure all the way to the customer premise, in order to promote a competitive environment for service provision. Who monitors and maintains the network? Nelson County Broadband Authority (NCBA) has contracted with Blue Ridge Internetworks (BRI), a Charlottesville based technology firm, to monitor and maintain the network. BRI brings a wealth of technical expertise and personnel who provide 24 x 7 x 365 network monitoring and support to keep the network up and running. What is the role of service providers? Service providers lease connections on the NCBA network to reach and serve customers. Each service provider develops their own service offerings and associated pricing. Customers are to contact service providers directly for information regarding these services and their costs.
5 Who can be a service provider? Any internet service provider wishing to offer services utilizing the network can do so provided they can meet the contractual obligations established by NCBA. Who are the current service providers and how do I contact them? As of March 2013, NCBA is under contract with or has contracts pending for service provision with the following providers - please contact these service providers directly: o Blue Ridge Internetworks (BRI), Charlottesville VA, Wired Internet Services, (434) , o Stewart Computer Services (SCS), Arrington VA, Wireless & Satellite Internet Services Contract Pending (434) , What services does NCBA anticipate will be offered over the network? To date service providers have indicated that they intend to utilize the network to deliver three different types of services: wireless, fiber to the home or business, and hybrid fiber/copper (DSL) to the home or business. When will services be available? The deployment of services to the customer is driven by the service provider. NCBA does not provide services to individual customers. The time required before services will be available to you will depend upon the effort required for deployment and installation by the provider. The schedule for deployment can be impacted by the complexity of the installation, contract negotiations, weather and customer demand. What is the future of the network? NCBA will continue to plan strategically for expansion of the network based on customer demand, the viability of the existing network, and available capital funding. For more information regarding the Nelson County NTIA grant see the following website:
NTIA/RUS BROADBAND GRANT AND LOAN PROGRAMS: PROCEDURES AND REQUIREMENTS
NTIA/RUS BROADBAND GRANT AND LOAN PROGRAMS: PROCEDURES AND REQUIREMENTS The National Telecommunications and Information Administration (NTIA) and the Rural Utilities Service (RUS) have released the first
The Broadband Landscape in the State of Texas:
The Broadband Landscape in the State of Texas: Assessment at a State, Regional & Local Level, and Recommendations for Broadband Expansion A Working Report by Connected Texas March 2011 Table of Contents
Mapping Broadband Availability in New Hampshire
Mapping Broadband Availability in New Hampshire Fay Rubin, NHBMPP Project Director NEURISA Lightning Talks Hanover, NH April 16, 2013 This presentation is funded under grant # 33-50-M09048 from the U.S.
APPLICATION GUIDE CONNECTING BRITISH COLUMBIA PROGRAM
APPLICATION GUIDE CONNECTING BRITISH COLUMBIA PROGRAM About the Province-wide Program Introduction The Connecting British Columbia Program is a province-wide program administered by Northern Development
Public Notice Submissions
Broadband USA Applications Database Applicant Name: California Valley Broadband, LLC Public Notice Submissions -----Service Area: CVB Project 1 Submitter: Interwest Management Services Inc. dba Fire2Wire
Broadband Definitions and Acronyms
The New Mexico Broadband Program Broadband Definitions and Acronyms Version 1, April 2013 Prepared for: The New Mexico Broadband Program NM Department of Information Technology http://www.doit.state.nm.us/broadband/
Best Practices from BTOP & Key Implications for Bidding & Sustainability New NY Broadband Program: Bidders/Stakeholders Forum
Best Practices from BTOP & Key Implications for Bidding & Sustainability New NY Broadband Program: Bidders/Stakeholders Forum Liverpool, NY February 9, 2016 Objectives Discuss key lessons learned and best
Speed Matters: High Speed Internet for All
Speed Matters: High Speed Internet for All Communications Workers of America www.speedmatters.org The emergence of a new communications system one based on high speed interactive networks designed for
What Is Broadband? How Does Broadband Work?
What Is Broadband? High-speed Internet access or broadband allows users to access the Internet and Internet-related services at significantly higher speeds than those available through dialup Internet
Broadband Infrastructure, Adoption, and Technology Usage in Michigan. First in a Series of Working Reports on the State of Broadband in Michigan
Broadband Infrastructure, Adoption, and Technology Usage in Michigan First in a Series of Working Reports on the State of Broadband in Michigan June 2011 Table of Contents Executive Summary... 3 Overview
Community Forum Agenda October 2012
Community Forum Agenda October 2012 Topic Welcome CEKC/WSUE LTPT Project Scope Forums Survey Data Results LTPT Next Steps Broadband 101/Map Q&A Websites Mapping Survey Complete Survey Close/Next Steps
Testimony of. Mr. Douglas Kinkoph Associate Administrator
Testimony of Mr. Douglas Kinkoph Associate Administrator Office of Telecommunications and Information Applications National Telecommunications and Information Administration United States Department of
Getting Broadband. FCC Consumer Facts. What Is Broadband?
Getting Broadband FCC Consumer Facts What Is Broadband? Broadband or high-speed Internet access allows users to access the Internet and Internetrelated services at significantly higher speeds than those
Iowa Broadband. Current Market Analysis & Initial Recommendations For Acceleration of Iowa s Broadband Market
Iowa Broadband Current Market Analysis & Initial Recommendations For Acceleration of Iowa s Broadband Market The First in a Series of Reports by Connect Iowa August 2010 connectiowa.org Table of Contents
The Benefits of Wireless Broadband For Rural Deployments
The Benefits of Wireless Broadband For Rural Deployments Coleman Bazelon The Brattle Group March 16, 2010 This paper was sponsored by Qualcomm. I would like to thank Charles Jackson, Abhinab Basnyat, and
Please find attached the comments of ITI in the Broadband Opportunity Council Notice and Request for Comment.
From: To: Subject: Date: Attachments: Jesaitis, Vince BOCrfc2015 Broadband Opportunity Council Wednesday, June 10, 2015 4:11:49 PM NTIA_RUS_BBCouncil_10June2015.pdf Please find attached the comments of
The Florida Senate. Interim Project Report 2002-146 October 2001 UNIVERSAL PROVISION OF DSL SERVICES IN FLORIDA
The Florida Senate Interim Project Report 2002-146 October 2001 Committee on Regulated Industries Senator Walter "Skip" Campbell, Jr., Chairman UNIVERSAL PROVISION OF DSL SERVICES IN FLORIDA SUMMARY Staff
Broadband in the Upper Peninsula of Michigan
Broadband in the Upper Peninsula of Michigan A high-speed Internet connection is a modern lifeline to quality jobs, information, and vital services ranging from interactive telemedicine to higher education.
Broadband in New York State. David Salway, Director NYS Broadband Program Office
Broadband in New York State David Salway, Director NYS Broadband Program Office NYS Broadband Program Office Single Point of Contact for NYS Broadband Supports Broadband Initiatives for 10 REDCS Recommends
Broadband What is it?
What is it? FCC Definition 200 kbps is defined as Internet Access 200 kbps in at least one direction is defined as Hi Speed Access (1) 200 kbps in both directions is defined as Advanced Services (1) A
Projects and Policies Related to Deploying Broadband in Unserved and Underserved Areas
United States Government Accountability Office Report to Congressional Requesters April 2014 TELECOMMUNICATIONS Projects and Policies Related to Deploying Broadband in Unserved and Underserved Areas GAO-14-409
APPLICANT: LCB Communications LLC. Page 2
Page 1 APPLICANT: LCB Communications LLC Page 2 CONTACT PERSON: Elise Brentnall, Cofounder PROJECT TITLE: Light Saber PROPOSED PROJECT LOCATION: Unincorporated South Santa Clara County PROJECT TYPE: Last
Southern Coastal Cable
Southern Coastal Cable To: From: FCC Next Generation Networks Rural Broadband Experiments DC 10-90 Southern Coastal Cable, LLC Kendall Buckner Comptroller Date: March 6, 2014 Re: Expression of Interest
High-Speed Services for Internet Access: Status as of December 31, 2008
High-Speed Services for Internet Access: Status as of December 31, 2008 Industry Analysis and Technology Division Wireline Competition Bureau February 2010 This report is available for reference in the
Broadband in Garrett County: A Strategy for Expansion and Adoption
Broadband in Garrett County: A Strategy for Expansion and Adoption Prepared for: Garrett County, Maryland This study was financed in part by a grant from the Appalachian Regional Commission as administered
Connecting Northumberland Rural Broadband Expansion Project Frequently Asked Questions (FAQ s)
Connecting Northumberland Rural Broadband Expansion Project Frequently Asked Questions (FAQ s) PROJECT BACKGROUND 1) What is the objective of the project? In March 2008, the Government of Ontario announced
Network Neutrality Statement
Network Neutrality Statement CTC continues to comply with all applicable FCC requirements while providing the best possible customer experience for its Internet users. As such, CTC commits to the open
AT&T Rural Broadband Coverage in North Carolina
AT&T Rural Broadband Coverage in North Carolina AT&T Services, Inc. April 07, 2008 2007 AT&T Intellectual Property. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Intellectual Property.
Kelly Cameron +1(301) 768-7263 [email protected] +216 95 320 650. 26 janvier 2015
TUNISIA BUSINESS REFORM AND COMPETITIVENESS PROJECT Workshop sur le Service Universel L Expérience Américaine Kelly Cameron +1(301) 768-7263 [email protected] +216 95 320 650 26 janvier 2015
USDA is an equal opportunity provider, lender, and employer.
All Rural Development Contacts and Funding Notices can be found on the website at: www.rurdev.usda.gov Select: Notice of Funds Availability on the right hand side of the screen. Select: Contact Us at the
Minnesota Broadband Availability and Adoption Statistics
Minnesota Broadband Availability and Adoption Statistics An Initial Working Report on the Current State of Minnesota s Broadband Landscape Connect Minnesota January 2011 connectmn.org Table of Contents
Section 2: Overview of Wireless Broadband Networks
Section 2: Overview of Wireless Broadband Networks 2.1 Introduction to Broadband Network Elements Over the past decade, technological innovation and a motivation to deploy broadband in new, efficient ways
FCC Healthcare Connect Fund
FCC Healthcare Connect Fund Network Plan Brazos Valley Council of Governments Created April 29, 2015 1. Network Plan Narrative The CoGnet consortium consists of health care delivery entities that operate
Remarks As Prepared for Delivery by Jonathan Adelstein NARUC Annual Meeting Atlanta, GA
Remarks As Prepared for Delivery by Jonathan Adelstein NARUC Annual Meeting Atlanta, GA Good morning. And thanks, President Coen, for that introduction! It is great to back with all of you at NARUC s Annual
Broadband Study October 21, 2013
FREDERICK COUNTY & CITY OF WINCHESTER, VIRGINIA Broadband Study October 21, 2013 Copyright 2013 Center for Innovative Technology All rights Reserved Disclaimer Technology and telecommunications are changing
Public Survey for Phase I
Rockfish Valley Area Plan: Public Survey for Phase I For Nelson County Residents & Property Owners Name: OPTIONAL: Location of residence or property: o Address: o Voting District: North Central West South
Rural Development Program Guide Building Rural Communities from the Ground Up. www.rd.usda.gov/me
Rural Development Program Guide Building Rural Communities from the Ground Up www.rd.usda.gov/me Housing Programs Program Objective Applicant Uses Population / Direct s Direct Repair s and s Guaranteed
REGIONAL DISTRICT OF NORTH OKANAGAN
REGIONAL DISTRICT OF NORTH OKANAGAN REQUEST FOR PROPOSALS - RFP-2015-C02 Electoral Area D Internet Service Provider INSTRUCTIONS TO PROPOSERS The Regional District of North Okanagan (RDNO) is requesting
Fiber Optics: Vision for the I-69 Thumb Region. April 17, 2015
Fiber Optics: Vision for the I-69 Thumb Region April 17, 2015 Table of Contents Fiber in Region 6.. 2 Why Fiber?.... 3 Target Industries 4 Maps....5 Stakeholder Input...... 8 Tools & Resources. 9 Genesee
AT&T Billing Glossary
# A B C D E F G H I J K L M N O P Q R S T U V W X Y Z # 411 An information/directory Assistance service provided by operators who assist customers in obtaining the telephone number(s) they wish to call.
A Guide To USDA Rural Development Programs and Services
A Guide To USDA Rural Development Programs and Services Vermont/New Hampshire www.rurdev.usda.gov/nh-vthome.html Follow Us on Twitter: http://twitter.com/rd_vtandnh Rural Housing and Community Facilities
Space Applications for International Development: Commercial Satellite Applications Yesterday, today and tomorrow
Space Applications for International Development: Commercial Satellite Applications Yesterday, today and tomorrow Kalpak S. Gude Vice President & Assistant General Counsel, Regulatory 18 November 2009
WiMAX technology. An opportunity that can lead African Countries to the NET Economy. Annamaria Raviola SVP - Marketing and Business Development
WiMAX technology An opportunity that can lead African Countries to the NET Economy Annamaria Raviola SVP - Marketing and Business Development Agenda Telecommunications in Africa: the present picture Wi-MAX:
Current access technologies overview
White Paper Current access technologies overview In this paper, we explore six basic technology choices for deploying broadband services to the end customer xdsl, DOCSIS, G.fast, satellite, wireless and
LIVINGSTON COUNTY TECHNOLOGY ACTION PLAN PREPARED BY CONNECT MICHIGAN LIVINGSTON COUNTY BROADBAND COMMITTEE AND THE
LIVINGSTON COUNTY TECHNOLOGY ACTION PLAN PREPARED BY CONNECT MICHIGAN AND THE LIVINGSTON COUNTY BROADBAND COMMITTEE SEPTEMBER 2013 TABLE OF CONTENTS INTRODUCTION... 3 BACKGROUND... 3 METHODOLOGY... 5 CONNECTED
Community Connect Awards Virginia
2015 Grant Awards: Community Connect Awards Virginia Scott County Telephone Cooperative Community: Edwards Ridge and surrounding area in Dickenson County, Virginia. Grant Amount: $2,135,158 Contact: Mr.
Chapter 1 Instructor Version
Name Date Objectives: Instructor Version Explain how multiple networks are used in everyday life. Explain the topologies and devices used in a small to medium-sized business network. Explain the basic
Enhancing Broadband Capabilities in the New Native America
Enhancing Broadband Capabilities in the New Native America Prepared for By: 8a\SBD Certified Turtle Island Communications, Inc. April 2013 About Us: TICOM is an American Indian Owned Telecommunication
Proposed Wireless Broadband Project: Connected OC Low-Cost Internet Access Network Business Case
EXECUTIVE SUMMARY Business Case Drivers Socioeconomic profiles of Orange County s Red Zone populations are statistically shown to accompany low-rates of broadband adoption. In 2005: Only 24% of low-income
Statement of Objectives. Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN)
Special Notice D15PS00295 Nationwide Public Safety Broadband Network (NPSBN) 4/27/2015 C Statement of Objectives First Responder Network Authority (FirstNet) Nationwide Public Safety Broadband Network
ConnectED: President Obama s Plan for Connecting All Schools to the Digital Age
THE WHITE HOUSE ConnectED: President Obama s Plan for Connecting All Schools to the Digital Age Driven by new digital technologies, the future of learning is increasingly interactive, individualized, and