Organizational Change Management for Sustainability Insights from the Harvard Green Campus Initiative Case Study
|
|
|
- Aileen Gordon
- 10 years ago
- Views:
Transcription
1 Organizational Change Management for Sustainability Insights from the Harvard Green Campus Initiative Case Study Leith Sharp, Harvard University Visiting Scholar, Harvard School of Public Health Faculty, Harvard Extension School Independent Consultant, Strategic Campus Sustainability Photo by Ben Ponte
2 About Harvard o600+ Buildings, over 23 million square feet, new campus in development olarge Population: 2500 faculty, 12,000 staff, 20,000 degree & 15,000 non-degree students ohighly Decentralized ocomplex infrastructure and organizational systems ocomplex stakeholder environment omixture of out-sourcing and in-house campus operations opolitically charged oghg emissions have grown by over 60% in the last 15 years a
3 Harvard s Green Campus Initiative (recently renamed Office for Sustainability) Start Up Story Harvard Green Campus Initiative: Organizational Chart 2000 Co-Chair Faculty, Harvard School of Public Health Prof. Jack Spengler Director, Leith Sharp Co-Chair Assoc. VP, Facilities & Environmental Services Tom Vautin a
4 Harvard receives the highest national green campus ratings from: The Sustainable Endowments Institute The Princeton Review Sierra Club Grist
5 Guiding Principle: Systems Based Problem and Solution Infrastructural Systems Organizational Systems Earth Systems Earth Impacts Energy supply and distribution Material supply and disposal Food supply Water supply and disposal Building design and construction Mission Leadership Style Organizational Culture Information Systems Procurement systems Decision Making Processes Ecosystems Climate systems Atmospheric systems Oceanic systems Geological systems Species extinction, increases in infectious vectors from insects Climate disturbance Ozone depletion, air pollution Rising sea levels, deep ocean current changes, fisheries depletion Building Mechanical Systems Ventilation Temperature control Transportation Non-vehicular Circulation Landscaping Finance & Accounting Structures Human resources Position Requirements Incentives Training Capital Developments Building operations and maintenance Water systems Nutrient systems Desertification, land pollution, mineral and resource depletion Water pollution, scarcity and unreliable rain fall Depletion of soil quality, build-up of toxins in soils Campus planning Copyright Leith Sharp 009
6 Guiding Principle: The Sustainability Enabled Organization The global environmental imperative requires us to change the way in which we do almost everything. The end goal, environmental sustainability, is a moving target. Therefore any organization or individual that is serious about addressing the environmental imperative needs to expand their capacities for engaging in the process of change itself. The sustainability enabled organization has a greater capacity for change and the related processes of continuous innovation and organizational transformation. Copyright Leith Sharp 2009
7 Guiding Principle: Stable Change Most believe that people are innately averse to change. A more useful assessment is that people have an aversion to instability and are actually invigorated by change when it occurs with adequate stability. Therefore, the sustainability enabled organization is able to foster ongoing and significant change while maintaining the stability of the organization, entity or process. Copyright Leith Sharp 2009
8 Common Causes of Instability Time and Money Attention Technology and Design Skills and Capacities Politics and Power Organizational Limitations Cognitive Limitations Lack of integration and optimization across disciplines, departments, operational components etc
9 Common Causes of Instability Requires a multifaceted response to remove risk of instability (perceived or real) Time and Money Attention Technology and Design Skills and Capacities Politics and Power Organizational Limitations Cognitive Limitations Lack of integration and optimization across disciplines, departments, operational components etc = = = = = = = = Business Development, Finance and Accounting Advocacy Expertise in Green Building, Energy, Transportation etc Education and Training Governance, Strategy, Alliance Building and Influence Leadership and Organizational Culture Social Marketing Techniques, Emotional Intelligence Systems Thinking
10 Guiding Principle: Trust Based Relationships Sustained innovation depends upon the ability of people to trust one another in the face of uncertainty and risk, to believe that they will be supported in the process of learning and discovery and to be willing to invest in mutual understanding and transparency. Therefore, the sustainability enables organization invests significant effort in fostering and maintaining a web of mutually respectful relationships across the institution. Copyright Leith Sharp 2009
11 Relationships provide a Powerful Stabilizing Force for Change If the average person can change the thinking of 3 people they have a relationship with over a period of 6 months and each of these people go on to do the same Months 9 1 Year Months 81 2 Years Months Years 2, Months 6,561 4 Years 19, Months 59,049 5 Years
12 Guiding Principle: The Leverage Principle: Be the Rudder on the Rudder Even the biggest ships can be turned by a small force if it is directed at the point of maximum leverage.
13 Harvard s Green Campus Initiative A Business Model Change to Fund Management Green Collar Team Jobs
14 Harvard s Green Campus Initiative A Business Model Change to Fund Management Green Collar Team Jobs Green Building Operations Co-Chair Faculty, Harvard School of Public Health Prof. Jack Spengler Director, Leith Sharp Co-Chair Assoc. VP, Facilities & Environmental Services Tom Vautin 23+ Full-time Staff 30 Part-time students Green Building Design Campus Occupant Engagement Programs Environmental Procurement Residential Green Living Programs Renewable Energy HGCI Base Program Staff HGCI Courses at Harvard Extension School Sustainability The Challenge of Changing Our Institutions Green Building Design, Construction and Operations FY08 Operating Cost = $2.2million Annual Savings = $7+ million 20% Office of President and Provost & central administration sources. 80% from fee for service partnerships funded on the basis of extensive savings
15 Harvard s Green Campus Initiative A Business A Business Model Model to Fund for Green Collar Jobs Base Program Funding Total Full Time Staff FY01 $ 80,000 1 FY02 $264,000 4 $400,000 FY03 $648,000 8 $700,000 FY04 $890, $1.5 million Annual University Savings FY05 $857, $3 million FY06 $1,155, $5 million FY07 $1,700, $6+million FY08-FY09 $2,200, $7+million
16 Harvard s Green Campus Initiative A Business Model Empowering to Fund Green Others Collar to Jobs Lead There is no problem because.the planet is an infinite source of resources with an infinite capacity to absorb our pollution There is a problem but it s not mine because..what I do has little impact on the planet, I just don t count, my influence is too small There is a problem, I am involved, I probably could do something except it s so hard I can t get the funds, I don t know how, I don t have the time, I keep forgetting, my manager doesn t seem to want it, there s no reliable alternative, it s too risky, I don t get evaluated on it etc There is a problem and I am fully engaged in working on my part of the solution in every way possible!
17 Harvard s Green Campus Initiative Transcend A Business Finance, Accounting Model to Fund & Budgeting Green Collar Barriers Jobs Finance and accounting systems currently incentivize and institutionalize inefficiency, silos and component optimization at the expense of larger systems optimization and best business practices. Annual budgeting processes also exclude ongoing investments in innovation and continuous improvement. Therefore, the sustainability enables organization has reformed its finance and accounting structures to drive efficiency and optimization at the systems level while purposely stimulating innovation and continuous improvement.
18 Harvard s Green Campus Initiative A Business Model Transcend to Fund Green Financial Collar Barriers Jobs Green Campus Loan Fund: $12 million interest-free capital for conservation projects Existing Buildings New Construction Full capital cost covered 5 year payback maximum Simple payback used Cost delta funded 10 year payback maximum Lifecycle costing used $8.5+ million lent since projects 30+% average return on investment
19 Harvard s Green Campus Initiative Transcend Financial Barriers Sample of Simple Payback and Return on Investment by Project Type.
20 Green Campus Loan Fund Resource Conservation Incentive Program (RCIP) Green Campus Loan Fund for Existing Buildings Green Campus Loan Fund DOUBLED and EXPANDED to include New Construction Green Campus Loan Fund DOUBLED again January 2002 July 2005 April 2006 $1.5 mil Revolving Fund 5 year maximum simple payback period $2.6 mil in loans over 5 years 34% Return on Investment Unused after 2 years due to lack of service support $3 mil Revolving Fund 5 year maximum simple payback period $6 mil Revolving Fund 5 year maximum simple payback period for existing buildings 10 year maximum payback period for new construction to fund cost difference only $12 mil Revolving Fund
21 Life Cycle Costing A method of project evaluation in which all costs arising from owning, operating, maintaining and ultimately disposing of a project over an agreed period are accounted for and converted into today s dollars. In short, life cycle costing allows for the consideration of medium and long term cost implications of today s decisions. When can it be used? New Construction Major Renovations Capital Projects Routine Replacements or Upgrades Day to day purchases that incur any ongoing costs
22 How Should LCC Be Used in the Decision Making Process?
23 How Should LCC Be Used in the Decision Making Process? 1. To compare different options (e.g. ground source heat pumps versus natural gas furnace) 2. To determine financially optimal efficiency level (e.g. amount of insulation) 3. To identify medium and long term savings for potential reinvestment or immediate justification of integrated design solutions
24 Weld Hill Research Center Seeking LEED Gold Closed loop geothermal system for heating and cooling, ventilation rates for lab space designed to 6 air changes per hour with night time set-back Department: Arnold Arboretum Building Type: Labs and Offices Size: 45,000 square feet
25 Lab Integrated Design and LCC Case Study: Weld Hill Ventilation Rates 1 Cubic Foot per Minute (CFM) of outside air cost about $2.20 in energy over the year at Weld Hill. Switching from 10 Air Changes per Hour(CH) to 6 ACH saves about 10,000 CFM. Results in energy savings of approximately $22,000 per year. Air Handling Units (AHU) can also be downsized. AHUs cost about $5/cfm. AHU savings is $50,000. Since peak loads are reduced, we save in well field and Heat Pump sizing. Reducing the air flow by 10,000 CFM saves us 18 tons of cooling. Saves about 4 wells and 1 HP, which nets a savings of $80,000. Switch from 10 to 6 ACH saves $130,000 first cost, $22,000 annually.
26
27 A Business Model for Cost Neutral, Climate Neutral Buildings Adopting 20 years net present value accounting framework for evaluating carbon neutrality investment and return options for each building. Track and reinvest savings from energy demand reductions to fund onsite renewable energy, fuel switching, additional efficiency efforts and carbon offsets.
28 Costing Case Study Building Name Department Description Age Size Occupancy Demographics Lease format Building systems and utilities Leverett Towers F & G Faculty of Arts and Sciences Complex of 2 11-story towers Built 1959; renovations every 4 years 121,697 square feet 2006 GHG emissions 1537 MTCDE 158 suites, 20 tutor apartments; 300 residents Undergraduates, graduate tutors Academic year appointments; temporary summer housing Heat/ventilation: Steam to forced air and radiant heat; Hot water: steam Air conditioning: window units Electricity: tutor kitchenette appliances Natural gas: dryers ( only) 28
29 Cost Neutral Climate Neutral Building Case Study Leverett Towers Investment Summary Component % of Portfolio Investment Period MTCDE/yr Energy Conservation Measures 17% Renewable Energy Technology (onsite) 3% Fuel Switch 22% Offsets 58% Behavior Program ((2%)) ((33))
30 Cost Neutral Climate Neutral Building Case Study Leverett Towers Investment Summary Component (Further information can be provided by Debra Shepard % of Portfolio Investment Period MTCDE/yr Energy Conservation Measures 17% Renewable Energy Technology (onsite) 3% Fuel Switch 22% Offsets 58% Behavior Program ((2%)) ((33)) Leverette Towers Financial Summary for Climate Neutrality Financial Category Net present value through 2020 Investments (ECM, RET, Fuel Switch, Behavior) ($1,068,958) Savings (ECM, RET, and Behavior) $1,142,947 Carbon Offset Purchases ($68,268) TOTAL PROGRAM Net Present Value $5,721 30
31 Harvard s Green Campus Initiative A Business Model to Fund Build Green New Collar Capacities Jobs
32 Harvard s Green Campus Initiative A Business Model to Fund Build Green New Collar Capacities Jobs There is much research to support the idea that learning is best served when motivation is intrinsic that is to say when the individual is self-motivated rather than externally motivated. Experience that has no emotional engagement are not likely to be effective in generating new mental representations. Gardener, H. (1999) The Disciplined Mind: What All Students Should Understand. New York: Simon & Schuster.
33 Peer to Peer Learning Harvard s Green Campus Initiative A Business Model to Fund Peer Green to Peer Collar Programs Jobs Residential Green Living Programs: Harvard residents. 13+% electricity reduction, 30+% recycling increase. Over $300,000 p.a savings Lab User Engagement: Fume hood competitions have generated over $400,000 in annual energy savings Peer to Peer Training Programs: Staff training each other to save energy through better building management Green Skillet Competition: 500 staff. The winning kitchen reduced electricity use by 23%
34 Peer to Peer Learning Harvard s Green Campus Initiative A Business Cultural Model to Change Fund Green The Collar New Norm Jobs Occupant impacts on building operations & environmental impacts According to the EPA Individuals can affect 32% of personal ghg emissions through electricity use, waste, and transportation choices!
35 Peer to Peer Learning Harvard s Green Campus Initiative A Business Cultural Model to Change Fund Green The Collar New Norm Jobs Staff Green Teams: Building Energy Competitions Social Marketing: Fostering energy conserving and recycling habits across Harvard Sustainability Pledge: 8,000+ Harvard members made their online pledge in 2007
36 Peer to Peer Learning Harvard s Green Campus Initiative A Business Model Manage to Stakeholder Fund Green Collar Complexity Jobs
37 Peer to Peer Learning Harvard s Green Campus Initiative A Business Model Manage to Stakeholder Fund Green Collar Complexity Jobs Simple Lighting Retrofit Project Location: student residence (~300 students) Proposed savings: Annual savings >$20,000 Payback <3 yrs Process
38 Unknown Complexity in Decision Making Simple Lighting Retrofit Project School HGCI Loan Fund 1 Change Agent 2 Fin Mgr (capital budget) Fin Mgr (operating budget) Facility Director Building Manager (Superintendent) House Master Vendor Sales Rep Technician Univ. Ops Maintenanc e crew House occupants (students) REP coordinator (student)
39 Unknown Complexity in Decision Making Simple Lighting Retrofit Project School HGCI Loan Fund 1 Change Agent 2 4 Fin Mgr (capital budget) Fin Mgr (operating budget) Facility Director Building Manager (Superintendent) House Master Vendor Sales Rep Technician 3 Univ. Ops Maintenanc e crew House occupants (students) REP coordinator (student)
40 Unknown Complexity in Decision Making Simple Lighting Retrofit Project School HGCI Loan Fund 1 Change Agent Fin Mgr (capital budget) Fin Mgr (operating budget) Facility Director 5 Building Manager (Superintendent) House Master Vendor Sales Rep Technician 3 Univ. Ops Maintenanc e crew House occupants (students) REP coordinator (student)
41 Peer to Peer Learning Harvard s Green Campus Initiative A Business Model Manage to Stakeholder Fund Green Collar Complexity Jobs Simple Lighting Retrofit Project Full Process = 3 months of constant facilitation by Green Campus Staff School HGCI Loan Fund Vendor Sales Rep Technician Change Agent Univ. Ops Maintenanc e crew Fin Mgr (capital budget) Fin Mgr (operating budget) Facility Director 5 Building Manager (Superintendent) House Master 8 12 House occupants (students) REP coordinator (student)
42 Harvard s Green Campus Initiative Stabilize Change Via Ongoing Piloting & Expansion
43 Harvard s Green Campus Initiative Stabilize Change Via Ongoing Piloting & Expansion Biodiesel in University Shuttles Occupancy sensor driven temperature Setbacks Ground Source Heat Pumps Photovoltaic Building Mounted Wind Solar Thermal Collecting oil for Harvard Recycling truck Green Cleaning
44 Harvard s Green Campus Initiative Stabilize Change Via Ongoing Piloting & Expansion 2001: HGCI initiates first 3 pilot LEED projects LEED Projects 2 Certified 5 Registered 16 LEED Projects 4 Certified 12 Registered 21 LEED Projects 5 Certified 16 Registered 26 LEED Projects 7 Certified 19 Registered 50+ LEED Projec 13 Certified 37 Registere
45 Harvard s Green Campus Initiative Green Building Services Building Name LEED Rating Building Name LEED Rating Aldrich Hall HBS Byerly Radcliffe Hamilton Hall HBS Wyss Hall HBS 5 Cowperthwaite St. HRES 10 Akron St. HRES Allston Science Center ADG Gallatin Hall HBS Attempting CERTIFIED Attempting SILVER GOLD Attempting GOLD Attempting GOLD Attempting GOLD Attempting GOLD Attempting GOLD Gallatin Hall HBS McCollum Hall HBS Northwest Corner HLS Rockefeller Hall Divinity Weld Hill Arnold Arboretum 2 Grant Street HRES Attempting GOLD Attempting GOLD (LEED-CI) Attempting GOLD Attempting GOLD Attempting GOLD Attempting PLATINUM (LEED-H) The HGCI Provided LEED project management for all Harvard LEED Projects: Fostering New Capacities Inhouse
46 Aldrich Hall LEED Silver Campus Lighting Master Plan, Preferred Parking for Fuel Efficient Vehicles, Green Cleaning Program, high performance ventilation 13 Filters, 80% C&D Waste Diversion Harvard Business School
47 Hamilton Hall, Harvard Business School LEED Gold Occupancy Sensor Controlled Thermostats, $370,000 of Plyboo Furnishings, Tested Low- Flow Shower Heads Before Selecting Symmons 2.0, HGCI Performed Daylight and Views Calcs. Photo by: Nathan Gauthier Photo by: Nathan Gauthier Photo by: Nathan Gauthier Photo by: Nathan Gauthier Harvard Business School
48 Weld Hill Research Center Seeking LEED Gold Closed loop geothermal system for heating and cooling, ventilation rates for lab space designed to 6 air changes per hour with night time set-back
49 46 Blackstone LEED Platinum Certified Highest modelled energy performance of any Harvard LEED building, bioswale, energy efficient elevator, ground source heat pumps, extensive use of environmentally preferred materials LEED Platinum at no added cost. The result of early commitment, good process management and an integrated design approach. University Operations Services
50 Harvard s Green Campus Initiative A Business Model Proving to Fund Cost Green Effectiveness Collar Jobs
51 Harvard s Green Campus Initiative A Business Model Proving to Fund Cost Green Effectiveness Collar Jobs What is the cost of Green Building (LEED Gold or better)?
52 PROJECT 1 Additional Green Costs Total Soft Costs = $2,358,275 Total Project Cost = $18,509,114 Additional Green Soft Costs = $69,724 Additional Green Hard Costs = $115,122 Green Soft Costs as % of Total = 0.38% Green Hard Costs as % of Total = 0.062%
53 PROJECT 1 Additional Green Soft Costs Enhanced Commissioning $4,832 Energy Modeling $13,200 Green Building Consultant $15,460 C&D Waste Consultant $34,032 LEED Certification Costs $2,200 MEP design review, recommissioning manual & verification of operator training Promotes integrated design and identifies energy savings from ECMs Guides team through sustainable design process & manages LEED effort Salvage significant quantities of materials for donation & targeting > 95% waste diversion rates Hold team member accountable & 3 rd party verification of sustainability
54 PROJECT 1 Additional Green Hard Costs: Energy Conservation Measures that Resulted from Soft Cost Investment Improved Building Envelope $20,971 Variable Frequency Drives $29,000 Lighting Optimization $25,000 Lighting Controls $5,625 CO2 Sensors in Cafeteria $4,000 Hot water temperature difference $2,450 Melink System $12,500 Pressure Independent Control Valves $5,576 Energy Recovery Wheel $10,000 Fan Coil Unit Fan Cycling $ Total capital cost $115,122 = %0.062 of total project cost
55 PROJECT 1 Energy Conservation Measures (ECM) Total ECM Cost = $115,122 Total First Year Energy Savings = $16,000 Internal Rate of Return = 17.8% ECMs pay for themselves in < 8 years Total Green Cost Premium = 1% of the total project cost
56 PROJECT 2 Hamilton Hall cost estimates $320K Estimated Material Cost of LEED ~ 2.5% of total project cost Estimated Energy Savings ($35,000) Annually Estimated < 10 year payback
57 PROJECT 3 Harvard School of Public Health LANDMARK CENTER Carbon Dioxide (CO2) Monitoring Ventilation Efficiency Low-Emitting Materials: Adhesives & Sealants Paints Carpet Furniture and Furnishings Thermal Comfort Daylight 75% of Spaces
58 PROJECT 3 Harvard School of Public Health Item Additional "Green" Costs Project Expenses 1 Architectural Soft Costs $ 16,000 2 LEED Certification Filing $ 22,000 3 Green Power Certificate (2 Yrs) $ 8,332 4 Commissioning $ 31,000 Additional Green Costs Total: $ 77,332 Simple Payback (Years): 0.94 Item Estimated Savings Annual 10 Year Savings Lease 1 Employee Productivity 1% (Kats) $ 52,000 $ 520,000 2 DALI Lighting vs T8 Mid-Range $ 16,274 $ 162,740 3 Displacement Ventilation System $ 14,000 $ 140,000 Potential Savings Total (14%): $ 82,274 $ 822,740
59 Harvard s Green Campus Initiative Continuous A Improvement: Business Model Knowledge, to Fund Green Process Collar & Jobs Infrastructure Knowledge Infrastructure Decision-Making Process
60 Harvard s Green Campus Initiative A Business Continuous Model Improvement to Fund Green in Infrastructure Collar Jobs Trial Recommend Trial Recommendations Trial Recommend Trial Recommendations Evaluation Design Process Evaluation Design Process Evaluation Design Process Evaluation Design Process Building Project Building Project Building Project Building Project
61 Harvard s Green Campus Initiative A Business Model to Fund Knowledge Green Collar Sharing Jobs Lessons Learned and Continual Improvement
62 Harvard s Green Campus Initiative A Business Decision-Making Model to Fund Process Green Improvement Collar Jobs Ten commandments of Cost effective Green Building Design 1. Commitment 2. Leadership 3. Accountability 4. Process Management 5. Integrated Design 6. Energy Modeling 7. Enhanced Commissioning 8. Specifications 9. Life Cycle Costing 10. Continuous Improvement
63 TRADITION Decision-making PROCESS A typical process involves a linear progression from the upper management levels down to the middle management and finally the grass roots. A formal hierarchy of communication is enforced by the organization. Leaders Managers Doers
64 Integrated Design Architects Engineers Contractors
65 Optimizing Individuals and Relationships Conventional Approach to Engagement Involves team members only when essential Integrated Process of Engagement Inclusive from the outset Less time, energy, and collaboration exhibited in early stages More decisions made by fewer people Linear process Systems often considered in isolation Limited to constrained optimization Front-loaded time and energy invested early Decisions influenced by broad team Iterative process Whole-systems thinking Allows for full optimization Diminished opportunity for synergies Emphasis on up-front costs Seeks synergies Life-cycle costing Typically finished when construction is complete Source: Roadmap for the Integrated Design Process. Prepared Busby Perkins+Will, Stantec Consulting Process continues through post-occupancy
66 Harvard s Green Campus Initiative A Business Model to Greening Fund Green Harvard s Collar Jobs Labs Labs: Square footage and energy use
67 Lab-specific Opportunities Building Operations & Design Life cycle costing Updating building plans when upgrades occur Right-sizing Modeling exhaust dispersion Ventilation requirements (air changes per hour) Occupancy schedules Engineering & controls monitoring Energy recovery for ventilation air Fume hood technology Water efficiency Low pressure drop HVAC design Day lighting Decreasing reheat energy use Lighting systems and upgrades Sensors Occupants Life cycle costing Efficiency of lab equipment Hazardous materials disposal Sharing lab equipment to reduce costs and energy consumption Lab equipment inventories Fume hood and chemical management Occupant safety & best practices training Stakeholder involvement in lab design decisions Communication between all those involved in lab design and operations
68 Lab-specific Opportunities Building Operations & Design Life cycle costing Updating building plans when upgrades occur Right-sizing Modeling exhaust dispersion Ventilation requirements (air changes per hour) Occupancy schedules Engineering & controls monitoring Energy recovery for ventilation air Fume hood technology Water efficiency Low pressure drop HVAC design Day lighting Decreasing reheat energy use Lighting systems and upgrades Sensors Occupants Life cycle costing Efficiency of lab equipment Hazardous materials disposal Sharing lab equipment to reduce costs and energy consumption Lab equipment inventories Fume hood and chemical management Occupant safety & best practices training Stakeholder involvement in lab design decisions Communication between all those involved in lab design and operations
69 Factors Affecting Air Change Rates in Lab Buildings Maximize User Intensity Lab Modulization and Control Bending Fume Hoods Set-backs Consider sash height, plug in modular hoods, diversity, and FH interconnectedness, decommissioning, recommissioning Chemical Use in Animal Labs Enhanced and Continuous Commissioning Spill Purging Controls Consider possibilities for unoccupied mode EH&S Management Protocols and Training Operations Protocols and Training Safety Cabinets Consider Aircuity connection, alarming only Air Quality Monitoring FH-driven, ACH-driven, or Thermal Loaddriven Ventilation Decouple Ventilation from HVAC Positive/Negative Pressure Office/Garden to Lab Cascading Occupant Engagement and Education Chemical Storage Strategy (snorkels, cabinets) Area-based vs Volumebased Ventilation Chemical Inventory and Control Plan Consider people and information systems
70 Lab-specific Opportunities Building Operations & Design Life cycle costing Updating building plans when upgrades occur Right-sizing Modeling exhaust dispersion Ventilation requirements (air changes per hour) Occupancy schedules Engineering & controls monitoring Energy recovery for ventilation air Fume hood technology Water efficiency Low pressure drop HVAC design Day lighting Decreasing reheat energy use Lighting systems and upgrades Sensors Occupants Life cycle costing Efficiency of lab equipment Hazardous materials disposal Sharing lab equipment to reduce costs and energy consumption Lab equipment inventories Fume hood and chemical management Occupant safety & best practices training Stakeholder involvement in lab design decisions Communication between all those involved in lab design and operations
71 The Challenge - Labs Energy Use in Harvard Buildings All Other Buildings 61% of energy, 84% of sq ft Lab Buildings 39% of energy, 16% of sq ft Building Occupant Behavior significantly influences energy use: Equipment use Purchasing decisions Hours of operation
72 The Opportunity Fume Hoods Fume Hoods at Harvard cost $1,800-$3,000 each per year in energy costs. ~400 hoods are VAV and thousands of $ energy is wasted because the hoods are left open when not in use. **Example of connection between occupant behavior & building operations**
73 The Shut the Sash Campaign Our Goal: Encourage researchers to close the fume hood sash to reduce energy waste. Medical School: Pre-campaign: Post-campaign: 12 inches 2.4 inches Chem. Dept: 27% reduction in CFM (DDC controls data) Total: Saving $188,000 per year energy costs
74 How Do You Change Behavior? Social Sciences research shows that INFORMATION alone is not always enough to influence BEHAVIOR. Community Based Social Marketing Based on behavioral psychology research Excellent resource: Fostering Sustainable Behavior by Doug McKenzie-Mohr & William Smith
75 How Do You Change Behavior? Our Campaign Plan 1. Identify Barriers 2. Design Campaign: Use Social Marketing a. Prompts b. Incentives c. Communication techniques 3. Monitor results 4. Continuous Improvement
76 1. Identify Barriers I thought we were not supposed to close the sash below the line on the inspection sticker We hardly ever use our fume hood, how can it be using so much energy? I guess I just forgot to close it
77 2. Use Social Marketing Prompts: Put magnets on each hood, clear instructions close to point of contact
78 2. Use Social Marketing Incentives: Held a contest with Wine & Cheese Party prize competitive spirit at Harvard catch busy lab occupant attention Events are outreach opportunity
79 2. Use Social Marketing Communicate in understandable terms In 2004 the CO2 emissions from energy use in the WAB building was equivalent to the emissions of 1,900 cars driven an average amount in a year. Many fume hoods use the same amount of energy as 3½ houses!!
80 2. Use Social Marketing Provide Feedback & Use Personal Contact
81 Hood exhaust (ft3/min) 3. Monitoring With Exhaust Data Trend data downloadable from Siemens Total CFM for Park Lab, added to Shut the Sash in January December 08 March /11/08 2/21/08 2/31/08 1/10/09 1/20/09 1/30/09 2/9/09 2/19/09 3/1/09
82 3. Monitoring Without Exhaust Data: Walk-through visual audits Inches open = sash height
83 4. Follow-up Continuous Improvement Continue monitoring & ensure behavior continues after contest. THIS HOOD SASH WAS LEFT OPEN OVERNIGHT. Closing it would save $1,500 a year (enough to heat an average home) and 10,600 pounds of CO 2 emissions. A closed hood is also safer for you and others in the lab. Please remember to shut the sash. Thank you! Building Manager Date
84 Harvard s Green Campus Initiative Forums for Engagement and Leadership
85 Harvard s Green Campus Initiative Forums for Engagement and Leadership Lab Sustainability Assessments Vision Share best practices Optimize resource conservation without compromising research Who s Involved Lab Sustainability Reps Lab Manager/contact Green Labs Coordinator (full time, to ensure follow up) Approach Obtain Approval Have the lab assess its own practices Conduct a visit and interview Follow-up to help the lab set goals and address them
86 Lab Sustainability Reps Role: the experts on the ground on sustainable lab practices at Harvard, acting as a resource for labs that wish to make their practices more sustainable Attributes Background as lab researchers Paid & volunteer interns Variety of academic backgrounds Actively enrolled students and lab professionals Benefits Credibility, understanding Accountability, follow-up Cross fertilization of ideas between departments, knowledge of specific lab settings Have developed relationships with many professors, providing a foot in the door
87 Lab Sustainability Opportunities Opportunities Pringle Pearson Langmuir Betley Abzhanov Whitesides Further evaluation of local exhaust x x Shut the Sash x x x Fixing drafts/ window issues x x Temperature setpoint issues x Pipet tip box recycling x x x x Defrosting/ organizing freezers x x x x Appliances to put on power strip or timer x x x x PCR Machine Energy Saving Default x x Buy from stockroom freezer (shipped in bulk) x x
88 Harvard Green Labs Certification (in development) Coupled with follow-up from our assessment process Lab members will sign a pledge to affirm their commitment Check-ins for continuous improvement
89 Lab Sustainability Kits 2 Lab equipment stickers 3 Lab recycling signs 4 Shut the fume hood sash reminder magnets 1 Handout on resource efficient lab equipment and supplies
90 Harvard s Green Campus Initiative Leveraging A Business Leadership Model to (Conducting Fund Green Collar the Voices) Jobs
91 Harvard s Green Campus Initiative Leveraging A Business Leadership Model to (Conducting Fund Green Collar the Voices) Jobs Grass Roots Students, building Managers, facilities staff, project managers, custodial, transport & procurement staff CONFIDENCE & CAPACITY Evidence Confidence Business base for green campus organization Top Level Leadership President, Provost, Deans, VP s Upper Middle Management 2 nd Level Deans, Associate VP s, CFOs, COO - Planning AUTHORITY Legitimacy Priority Mood/culture Goals SYSTEMS INTEGRATION Capital Approvals Systems Finance & Accounting University Contracts
92 Harvard-Wide Green Building Guidelines: Development Process : LEED piloted and numerous projects underway 2004: President Summers: Approves Sustainability Principles including commitment to integrate sustainability into capital approvals process : LEED project experience expanded across University 2007 Feb: University Construction Managers Council requests draft guidelines 2007 March Oct: Guidelines developed by HGCI and interfaculty committee over 11 meetings
93 Harvard-Wide Green Building Guidelines: Development Process 2007 Oct-Dec Financial Deans: Approval Capital Projects Review Committee: Approval University Construction Managers Council: Approval Administrative Deans: Approval University Construction Managers Council : Approve final draft President Faust: Notified of completion and adoption
94 Governance Processes Need to Allow more Bottomup and Horizontal Leadership in Decision-making Collaborative Governance Models Dynamic Governance Models
95 Harvard s Green Campus Initiative A Business Fostering Model to Institutional Fund Green Commitment Collar Jobs
96 Harvard s Green Campus Initiative A Business Fostering Model to Institutional Fund Green Commitment Collar Jobs Only 5% of what we do is consciously driven and the rest is driven by habit and automatic response. Our minds are constantly working to convert conscious efforts into unconscious habits ASAP. It s possible that our organizations reflect our own cognitive tendencies and that what we are working to transform is largely unconscious of itself, requiring a strategic effort to locate the conscious capacities needed to transform new practices into habit. The sustainability enabled organization has mastered effective strategies for diagnosing the deeper institutional drivers at play and institutionalizing new commitments and practices as soon as they are proven effective, minimizing dependence upon human memory or conscious attention. 5% Conscious Behavior
97 Harvard s Green Campus Initiative A Business Fostering Model to Institutional Fund Green Commitment Collar Jobs HARVARD Green Building Guidelines Capital projects exceeding $5 million will seek minimum LEED Silver certification. Harvard University requires a number of LEED credits to be treated as pre-requisites An Integrated Design approach is to be adopted. Life Cycle Costing assessment is to be conducted throughout the project Energy modeling is required Adopt an ongoing commissioning approach for the life of the building.
98 Harvard s Green Campus Initiative A Business Fostering Model to Institutional Fund Green Commitment Collar Jobs Sustainable Design Guidelines for Allston Development ALLSTON SUSTAINABILITY GOALS LEED Gold for All Buildings % Reduction in Building Energy Use % Less GHG per Heating, Cooling and Power related MMBTU than 2006 % of Renewable Energy % Reduction in Potable Water Use Treat / Use % of Stormwater On-site % of Parking Underground Bus and Shuttle Stops w/in 1 Minute of All Buildings Diesel Emissions Controls on All Construction Vehicles % of Landscaping w/native Species
99 Harvard s Green Campus Initiative A Business Fostering Model to Institutional Fund Green Commitment Collar Jobs President Faust Approved Harvard s GHG Reduction Goals in July Initial goal of 30% below 2006 levels by 2016 (including campus growth which takes the total reduction in 2016 to over 50%) Every Four years additional goals to be developed Strive towards climate neutrality as soon as possible
100 Harvard s Green Campus Initiative A Business Model A to Systems Fund Green Thinking Collar Future Jobs A systems thinking approach is essential for achieving the cost effective and large scale organizational reform necessary to achieve and maintain environmental sustainability. The sustainability enabled organization has integrated systems thinking and systems leadership into its overall organizational life. Copyright Leith Sharp 2009
101 In a Systems Thinking World Organizational systems will be responsive to the boundaries provided by the Earth s living systems.
102 In a Systems Thinking World We will design with systems and synergies at the forefront
103 Dockside Green Victoria, Canada
104
105
106 Interactions Between All Systems System Synergies
107 In a Systems Thinking World The very way in which decisions are made in organizations will be profoundly transformed.
108 Systems Thinking Produces a Process Focus Organizational systems, like living systems develop and evolve. Therefore, understanding them requires understanding renewal, change, and transformation. In practice, this shift can result in shifting emphasis to how we solve problems rather than on whether we get the "right" answer. In communities, it can mean that the process for making decisions is often as important as the decisions themselves. Source: The Center for Ecoliteracy
109 Systems Thinking Addresses Relationships According to Fritjof Capra, systems thinking requires thinking in terms of relationships, connectedness, and context. An ecosystem is not just a collection of species, but is a community. Communities, whether ecosystems or human systems, are made up of sets, or networks, of relationships. In the systems view, the "objects" of study are networks of relationships. Source: The Center for Ecoliteracy
110 In a Systems Thinking World Components of the financial system (front cost, operating costs, disposal costs, staff costs) will be optimized overall rather than set in competition with one another.
111 In a Systems Thinking World Leadership contributions (influence and authority), like components of a leadership system, will be optimized through leverage, synergies, feedback and overall connectivity.
112 In a Systems Thinking World Governance structures will allow more interdisciplinary, bottom-up and horizontal engagement in decision-making
113 In a Systems Thinking World We will ensure stability during change and the journey from the pilot phase to wide-scale implementation will be deliberately guided rather than left to chance.
114 In a Systems Thinking World The power of human relationships to foster transformation will be thoroughly utilized
115 In a Systems Thinking World The relationships between people will be optimized to produce the best contributions from both individuals and the collaborations between the individuals
116 Systems Thinking and Change Agency In The Necessary Revolution: Senge et al There is nothing magic about seeing larger systems in order to encourage strategic choices; the magic come from people actually doing it, and truly learning how to think together in the process. In a world shaped by organizations and networks of organizations, individual systems thinkers are, ultimately, of little significance.the systems intelligence needed to deal with the challenges we face as the Industrial age comes to an end is collective and must be built through working together at many levels, within and beyond organizations, in teams and networks that span industries, communities and global supply chains. But collaborations often fail not enough time invested, not enough trust, too much conflict avoidance, not enough shared vision. Building the capacity to collaborate is hard work and needs to be valued and seen as such.
117 In a Systems Thinking World People are reflective, secure and open to learning. They encourage interactions for the purpose of shared discovery. They feel valued for what they co-create, facilitate and support as much as they are for what they do themselves.
118 Can the future of Industrial Ecology be to revolutionize production, consumption AND decision-making process?
119 Integrating Sustainability Into The Campus Insights from the Harvard Green Campus Initiative Case Study Leith Sharp, Harvard University Visiting Scholar, Harvard School of Public Health Faculty, Harvard Extension School Independent Consultant, Strategic Campus Sustainability Photo by Ben Ponte
Green Buildings Guidelines for Harvard
Green Buildings Guidelines for Harvard Presentation to the Administrative Deans. October 26th 2007 Leith Sharp, Director, Harvard Green Campus Initiative What is a Green Building? Average Savings of Green
34% 81% 84% 19% GOLD PROJECT HIGHLIGHTS. LEED Facts. Stubbs Laboratory
HARVARD UNIVERSITY FACULTY OF ARTS AND SCIENCES LEED-CI V3.0 STUBBS LABORATORY GORDON MCKAY LABS BUILDING Gordon McKay Building, 9 Oxford Street, Cambridge, MA 02138 GOLD The Stubbs Laboratory is a 2,035
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...
125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008
125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction,
Rules of Thumb Energy Efficiency in Buildings
Energy Efficiency in Buildings Energy Savings Cost Savings Increased Productivity Economic Development Other Standard lighting retrofits: $0.90-$1.20 per square foot. High-efficiency packaged and split
Metrics That Matter: Pam Greenley MIT EHS Associate Director [email protected]. Steve Lanou MIT Deputy Director, Sustainability slanou@mit.
Metrics That Matter: Energy Efficiency in Laboratories Pam Greenley MIT EHS Associate Director [email protected] Steve Lanou MIT Deputy Director, Sustainability [email protected] Today Measuring progress of
EarthCents (DSM) Program Summary
EarthCents (DSM) Program Summary Renewable Energy EarthCents Programs Solar Water Heating This program is available to residential customers for the installation of a qualifying solar thermal water heater.
Deep Energy Savings in Existing Buildings
Case Study Deep Energy Savings in Existing Buildings Overview Site Details Owner: Alliance for Sustainable Colorado Location: Denver, CO Building Type: Office Project Description: Major Renovation Size
BOMA BESt Assessment Overview
BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of
Columbus State Community College. Climate Action Plan
Columbus State Community College Climate Action Plan September 2009 Contents Introduction... 3 Commitment... 3 Community Education... 4 Carbon Footprint... 4 Accounting for Student and Employee Commuting...
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING PURPOSE: With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the
University of Central Florida Greenhouse Gas Emissions Report
2009 University of Central Florida Greenhouse Gas Emissions Report Sustainability & Energy Management University of Central Florida in Orlando, Florida Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION...
The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
Green Guide for Businesses Strategy: Energy
Green Guide for Businesses Strategy: Energy Reduce Energy Use in New and Existing Businesses - In the United States buildings account for: o 72% of electricity consumption, o 39% of energy use, o 38% of
Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings
Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)
Harvard University. Green Loan Fund. Robert Foley Senior Research Fellow Sustainable Endowments Institute
Green Revolving Funds in Action: Case Study Series Harvard University Green Loan Fund Robert Foley Senior Research Fellow Sustainable Endowments Institute Summary Location: Cambridge, Massachusetts Full-time
Sustainable Smart Laboratories
Sustainable Smart Laboratories Presented by Cristian Monsalves (Moderator) Program Manager, Energy Efficiency Services, NSTAR Panelists Alison Farmer, Project Manager, Andelman and Lelek Engineering John
Emissions Inventory, Fiscal Year 2013. Siemens Building Technologies Division, U.S. usa.siemens.com/buildingtechnologies
usa.siemens.com/buildingtechnologies Emissions Inventory, Fiscal Year 2013 Siemens Building Technologies Division, U.S. Answers for infrastructure and cities. Executive Summary The Building Technologies
Clean State Energy Actions 2011 Update. north carolina. Energy efficiency included in North Carolina s REPS
Energy Efficiency Building Energy Codes Utility Demand-Side-Management Utility Rate Realignment Energy Savings Targets/Energy Efficiency Resource Standards 2009 North Carolina Energy Conservation Code
Using Performance Contracting and Incentives to Accelerate Energy Efficiency Projects
White Paper Using Performance Contracting and Incentives to Accelerate Energy Efficiency Projects Andre E. Davis Director of Structured Finance, Global Energy Solutions, Americas Johnson Controls, Inc.
Ground Source Heat Pumps The Fundamentals. Southington, Connecticut 860 628 4622 John F. Sima III P.E.
Ground Source Heat Pumps The Fundamentals Southington, Connecticut 860 628 4622 John F. Sima III P.E. Winter/Spring 2010 Ground Source Heat Pumps The Fundamentals TOPICS: Heat Pump Terminology Basic Physics
Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.
3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed
LEED PRESENTATION OUTLINE
16902 BOLSA CHICA STREET, SUITE 101 HUNTINGTON BEACH, CA 92649 TELEPHONE (714) 840-8230 FACSIMILE (714) 840-2490 LEED PRESENTATION OUTLINE I. Overview of Green Building and Risks Involved with Sustainability
Sea Water Heat Pump Project
Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum
How school facilities managers and business officials are reducing operating costs and saving money
Energy-Smart Building Choices How school facilities managers and business officials are reducing operating costs and saving money Smart Energy Choices Free Up Dollars for Capital Improvements Operating
Radford University. Indoor Air Quality Management Plan
Radford University Indoor Air Quality Management Plan Spring 2015 Introduction Concerns with Indoor Air Quality (IAQ) have increased since energy conservation measures were instituted in office buildings
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Continuous Energy Management at UC San Diego. Anna Levitt, P.E. Assistant Energy Manager June 13, 2013
Continuous Energy Management at UC San Diego Anna Levitt, P.E. Assistant Energy Manager June 13, 2013 UC San Diego: A 42 megawatt Microgrid With a daily population of over 45,000, UC San Diego is the size
How To Calculate Cost Of An Eco-Friendly Building
THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER BY LEONARDO ACADEMY INC. Revised February 2, 2009 APRIL 21, 2008 THIS WHITE PAPER SPONSORED BY JOHNSON CONTROLS
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
Steps Toward Sustainability at Johnson County Community College. Jay Antle Rick Monk Marilyn Rhinehart Deborah Williams
Steps Toward Sustainability at Johnson County Community College Jay Antle Rick Monk Marilyn Rhinehart Deborah Williams College Stakeholders Interested in Sustainability at JCCC Students Faculty Staff Private
Context and Items for Discussion
ENGS 44 SUSTAINABLE DESIGN Context and Items for Discussion Benoit Cushman-Roisin 28 March 2016 We have come to realize that our ways of life are Therefore, If we want things to stay as they are, things
Smart Ideas for Your Business. Energy Saving Opportunities for Hospitals
Smart Ideas for Your Business Energy Saving Opportunities for Hospitals Where Are Your Energy Dollars Going? 21% of hospitals do not measure/monitor energy performance Only 23% have a designated energy
Our Triple Bottom Line...
Our Triple Bottom Line... A Better Approach We embrace what we consider to be our responsibility as developers to balance profits with environmental and social dividends. We believe that our long-term
Organizational Change Management for Sustainability Pearson Inc www.pearson.com
Organizational Change Management for Sustainability Pearson Inc www.pearson.com Kate McCarthy [email protected] Project Lead Green Teams Pearson North America Sustainability Specialist 1 About
BOMA BESt AND LEED EBOM COMPARISON
BOMA BESt AND LEED EBOM COMPARISON INTERNATIONAL FACILITY MANAGEMENT ASSOCIATION James Furlong, CET, LEED AP - Senior Associate, Stantec Consulting Ltd. BOMA BESt BOMA - Building Owners and Managers Association
Middle Class Task Force: Green Jobs Update
Middle Class Task Force: Green Jobs Update Introduction It was no accident that the first Middle Class Task Force was on green jobs. Our focus on clean energy and energy efficiency jobs for the middle
Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response
Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response
Heating, Ventilation and Air Conditioning Rebate Catalog Saving energy for a brighter future
Pacific Gas and Electric Company Energy-Efficiency s for Your Business Heating, Ventilation and Air Conditioning Catalog Saving energy for a brighter future Customers may be eligible to participate in
Home Energy Efficiency and Conservation: Call to Action. July 23, 2015 Dave Blake and David Wood REEP Green Solutions
Home Energy Efficiency and Conservation: Call to Action July 23, 2015 Dave Blake and David Wood REEP Green Solutions Today s Agenda Background Understanding where you are: Energy Usage EnerGuide Home Energy
Energy Audit Data Collection Form
SAVING ENERGY IN COMMERCIAL BUILDINGS Energy Audit Data Collection Form Site Data Building Name Address Building Square Footage (ft 2 ) Age of Building (years) Date of Last Major Renovation Purpose of
Sika Sarnafil World Class Roofing and Waterproofing
The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.
HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons
Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined
Commercial Building Energy Initiative Tenant Business Case
Commercial Building Energy Initiative Tenant Business Case April 2010 An initiative of the Greater Toronto CivicAction Alliance The business case for GTA tenants Why to invest in energy efficiency programs
Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Pros:
P a g e 1 Generating Current Electricity: Complete the following summary table for each way that electrical energy is generated. Generating Electrical Energy Using Moving Water: Hydro-Electric Generation
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
Energy Performance Benchmarking Report For:
Energy Performance Benchmarking Report For: Example NJ Office Building 100 Efficient Way Secaucus, New Jersey 07094 Prepared by: TRC Energy Services, NJCEP C&I Marketing Manager Report Generated May 20,
100% 50% 92% 99% LEED Facts PROJECT HIGHLIGHTS. Multi-occupant spaces have adjustable thermostats and lighting. Reduced water usage for landscaping
UNIVERSITY OF RICHMOND CAROLE WEINSTEIN INTERNATIONAL CENTER 28 Westhampton Way, Richmond VA 23173 LEED NC v2.2 GOLD 2015 Completed in 2010, the Carole Weinstein International Center showcases the University
Aldrich Hall. LEED Facts. Silver 34* Case Study. Harvard Business School. Aldrich Hall Boston, MA
Harvard Business School Aldrich Hall LEED Facts Harvard Business School Aldrich Hall Boston, MA LEED for New Construction - Version 2.2 Certification Pending Silver 34* Sustainable Sites 9/14 Water Efficiency
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
How To Improve A Building
SUSTAINABILITY TRIFECTA Three Approaches to Campus Sustainability Mike Reca Associate VP Facilities & Auxiliary Services Rider University Frank Sherman Director of Sustainability Spiezle Architectural
Energy Efficiency Improvements in New & Existing Homes
Energy Efficiency Improvements in New & Existing Homes Matthew Phillips Residential Energy Efficiency Program [email protected] Austin Energy awarded: & Sustained Excellence Award 2007-2009
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING
FEDERAL LEADERSHIP IN HIGH PERFORMANCE and SUSTAINABLE BUILDINGS MEMORANDUM OF UNDERSTANDING PURPOSE: With this Memorandum of Understanding (MOU), signatory agencies commit to federal leadership in the
University of Vermont 2010 Climate Action Plan
University of Vermont 2010 Climate Action Plan Prepared by the UVM Office of Sustainability Gioia Thompson, Director Anna Mika, Graduate Fellow December 2010 1 Presidents Climate Commitment Images courtesy
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Energy Efficiency Operations & Maintenance Plan August 25, 2010
Energy Efficiency Operations & Maintenance Plan August 25, 2010 Table of Contents Introduction... 3 Repair, Maintain and Operate Existing Equipment Efficiently... 3 Citywide Requirements Contract... 4
Multiple sources of energy will be available, giving the consumer choices. A Higher Percentage of Energy will come from renewable energy sources
Editor s comments: Numbers in parentheses indicate the number of duplicate or extremely similar comments made. The headings are editor s best attempt to draft vision statements reflecting the participants
Sample - Existing Building Commissioning Plan
Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of
Tim Facius Baltimore Aircoil
Presented By: Tim Facius Baltimore Aircoil Slide No.: 1 CTI Mission Statement To advocate and promote the use of environmentally responsible Evaporative Heat Transfer Systems (EHTS) for the benefit of
San Antonio College. Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY SYSTEM
CLIMATE ACTION PLAN 2011 For: San Antonio College 1300 San Pedro Ave., San Antonio, TX 78212. (210) 486-0000 Prepared by: Energy Systems Laboratory TEXAS ENGINEERING EXPERIMENT STATION TEXAS A&M UNIVERSITY
ENERGY EFFICIENCY ENERGY EFFICIENCY: Saving Dollars While Clearing the Air
: Saving Dollars While Clearing the Air After labor and food, energy is the largest controllable cost in a restaurant s operation. And energy is a great place to start in becoming a green restaurant because
Example Retrocommissioning Measure: Opening Throttled Discharge Valves
Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large
Energy Analysis and Design
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Energy Analysis and Design Donald Prowler, FAIA Architects who can offer combined expertise in energy-related design factors
The Integrated Design Process
The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000
ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT
Court Services and Offender Supervision Agency for the District of Columbia POLICY STATEMENT ENVIRONMENTAL, ENERGY AND TRANSPORTATION MANAGEMENT I. COVERAGE This Policy Statement and its appended procedures
HVAC Costs. Reducing Building. Building owners are caught between two powerful forces the need to lower energy costs. By Stephen J.
Reducing Building HVAC Costs of site rec By Stephen J. Pargeter Building owners are caught between two powerful forces the need to lower energy costs and the need to meet or exceed outdoor air ventilation
Energy Benchmarking Report for Lakeside Middle School. Millville, NJ
Energy Benchmarking Report for Lakeside Middle School Millville, NJ (for the period: June 1, 2008 through May 31, 2009) Prepared by: Background & Findings: The New Jersey Clean Energy Program (NJCEP) developed
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%
1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs
EKU Sustainability Strategic Plan 12/3/2015
What is Sustainability? Sustainability implies a cross-generational commitment to environmental stewardship and its economic, political and social dimensions. It is a practical approach toward making decisions
Building Energy Efficiency Opportunity Report
Building Energy Efficiency Opportunity Report September 2013 Building Energy Efficiency Opportunity Report TABLE OF CONTENTS Introduction 3 Building Efficiency Opportunities 4 #1: High Potential Buildings
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?
Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green
SAM HOUSTON STATE UNIVERSITY
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
Greening Your Business
ENVIRONMENTAL ASSISTANCE OFFICE NEWSLETTER In this Issue How to make your business green Greening Your Business September, 2011 Recycling Office Space upgrades Fleet management Employee Involvement Previous
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)
Operating Sustainable Facilities
Operating Sustainable Facilities Introduction... 1 Chapter 1: Energy Topic 1: Energy and Sustainable Facilities... 8 Topic 2: Energy Metrics... 11 Topic 3: Sustainable Facility Energy Initiatives... 20
Data Center & IT Infrastructure Optimization. Trends & Best Practices. Mickey Iqbal - IBM Distinguished Engineer. IBM Global Technology Services
Data Center & IT Infrastructure Optimization Trends & Best Practices Mickey Iqbal - IBM Distinguished Engineer IBM Global Technology Services IT Organizations are Challenged by a Set of Operational Issues
