Corrective Action Plans. Metrorail Category 7: Performance of Information Management Technology (4 Findings and 8 Required Actions)
|
|
|
- April Dickerson
- 10 years ago
- Views:
Transcription
1 Corrective Action Plans Metrorail Category 7: Performance of Information Management Technology (4 Findings and 8 Required Actions) 468
2 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a Federal Transit Administration (FTA) Safety Management Inspection (SMI) MAR 16 APR Washington Metropolitan Area Transit Authority (WMATA) R-7-39-a 1 9/11/15 WMATA FTA 1 of
3 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a Table of Contents 1 BACKGROUND PURPOSE FTA FINDING FTA REQUIRED ACTION ANALYSIS AND RECOMMENDATION ANALYSIS RECOMMENDATION ACTION PLAN DESCRIPTION APPROACH SCHEDULE BUDGET / COST ESTIMATE INTERNAL STAKEHOLDERS CAP COMPLETION DOCUMENTATION PERFORMANCE MEASURES VERIFICATION CAP APPROVAL /11/15 WMATA FTA 2 of
4 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a 1 Background The Federal Transit Administration (FTA) completed a Safety Management Inspection (SMI) of the Washington Metropolitan Area Transit Authority (WMATA) rail and bus systems. FTA issued Safety Directive 15-1 identifying 54 safety findings and 91 required actions to improve safety. 2 Purpose This Corrective Action Plan has been developed to address Safety Finding No. R-39 and its Required Action R-7-39-a. 2.1 FTA Finding Difficulties with WMATA s Enterprise Learning Management (ELM) have forced departments to use work- arounds resulting in poor documentation of initial and refresher training, certifications, professional licenses and re- certifications. 2.1 FTA Required Action WMATA must evaluate the existing ELM recordkeeping system and take corrective action, as necessary, to ensure accurate training, re-certification, and professional certification records are created, maintained, and readily accessible to appropriate managers and employees. 3 Analysis and Recommendation 3.1 Analysis ELM functionality is constrained by the lack of an authoritative source record for employees and contractors in PeopleSoft Human Capital Management (HCM). It was always the intention to create the necessary business processes to support this activity once the migration to HCM 9.1 was completed. The General Manager (GM) will be approving the work elements and deliverables recorded in this document thereby authorizing and enabling the IT Department to proceed with this project. 3.2 Recommendation Now that the HCM 9.1 upgrade has been successfully deployed to production, Metro is now in a position to establish processes to facilitate role based provisioning including establishing 1 9/11/15 WMATA FTA 3 of
5 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a functional requirements, and building/documenting the processes, training and audit functions such that accurate records are maintained. If ELM is incapable of supporting this goal, alternatives paths will also be considered. 4 Action Plan Description An ELM business policy will be developed to provide guidance on how ELM training records should be documented and maintained. The policy will also identify the roles and responsibilities necessary to ensure that accurate training data is captured and maintained within ELM. The Future of Workforce Initiatives are being used as a guideline in the re-configuration of HCM and ELM to ensure accurate recordkeeping. These four initiatives are as follows: (1) Personnel Data Standardization and Governance: This initiative aims to streamline the flow of personnel data across different systems and functions across the authority through a phased standardization effort (2) Personnel Data Transaction Management: This initiative aims to identify, categorize, analyze and improve key processes utilizing personnel data in their transactions (3) Employee Training Profile Enhancement: This initiative aims to codify the training, license, and certification requirements for different positions across the authority to ensure that only qualified employees are filling. (4) TimeKeeping Enhancement: This initiative aims to standardize and automate the tools and processes related to timekeeping in order to improve the accuracy and auditability of labor payment. The Employee Training Profile Enhancement initiative will build upon the foundation set by initiatives one (1) and two (2) to aid HCM in becoming the authoritative source record for personnel information. This first two initiatives have a direct impact on the quality of data that ELM receives from HCM. Once these initiatives have been achieved the data pushed from HCM to ELM will be more accurate and useful among the ELM user community as we move towards improving ELM s functionality. The steps to complete the Employee Training Profile Enhancement also known as initiative three (3) are as follows: 1 9/11/15 WMATA FTA 4 of
6 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a (1) Define Inventory of Employee Roles (2) Codify Qualification Requirements into ELM (3) Conduct Gap Analysis of Qualification Requirements (4) Maintain/Update Training Requirements Other minor business processes (Training Audit, Supplemental Learning, and Certification Management) will be developed to aid the ELM user community in fully utilizing the tool to capture training, certifications and professional licenses as required. 4.1 Approach Deliverable 1) ELM Policy Description This policy will enforce the use of ELM across Metro as the authoritative source of record for training. It will also identify the roles and responsibilities associated with ELM. Responsible Party Matthew Peters Due Date 10/16/16 2) Formal evaluation of ELM s capabilities 3) 4) Employee Roles Report* Qualification Requirements Report* 5) Training Audit Process* To support addressing this action item, including a proposal of alternatives if it is deemed incapable Path 1 Cataloging the different types of employee roles across the authority and determining the required experience, trainings, licenses, certifications, etc. for each Configuring the ELM tool to build lists of requirement trainings, certifications, and licenses with corresponding ongoing training needs for each of the roles identified in the previous phase This process will define the catalogue of trainings that should be maintained in ELM. The process will also define how a training record audit should be documented and managed to include corrective actions. Tiffany Grey 6/1/2017 Matthew Peters Mark Weaver Mark Weaver, Tamela Gilkes 9/22/2017 3/09/2018 6/15/2018 6) Final Implementation Of enhanced ELM or alternative training tracking system Tiffany Grey 7/27/ /11/15 WMATA FTA 5 of
7 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a Deliverable Description Responsible Party Due Date 7) Development of user training materials and a schedule For training delivery to appropriate departments. Matthew Peters 9/1/2018 8) Quality Audit Report* The Office of Information Technology Quality Assurance (ITQA) performs scope verification and inspection of CAP deliverables to ensure that all are completed as planned and expected. Shikha Khan 9/15/2018 Path 2 9) Implementation of New Learning Management System Implementation a new learning management system that meets the learning and tracking needs of WMATA Tiffany Grey 6/30/ ) Development ofuser training materials and a schedule For training delivery to appropriate departments. Matt Peters 8/1/ ) Quality Audit Report The Office of Information Technology Quality Assurance (ITQA) performs scope verification and inspection of CAP deliverables to ensure that all are completed as planned and expected. Shikha Khan 9/1/ /11/15 WMATA FTA 6 of
8 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a 4.2 Schedule Tasks Estimated Start Estimated Finish Kick Off Meeting 07/01/16 07/01/16 Define Requirements for ELM Policy 07/05/16 07/15/16 Develop ELM Policy 07/18/16 08/21/16 Review and Edit Policy 08/24/16 09/11/16 ELM Policy Approval 09/14/16 10/16/16 Formal evaluation of ELM s capabilities 1/3/2017 6/30/2017 Path 1 Define Inventory of Employee Roles* 7/3/2017 9/22/2017 Codify Qualification Requirements into ELM* 12/18/2017 3/09/2018 Develop Training Audit Process* 3/12/2018 6/15/2018 Enhanced System Rollout 6/18/2018 7/27/2018 Path 2 Implementation of new learning management system 1/3/2018 6/30/ Budget / Cost Estimate This action will be funded in the capital budget in FY2016. Additional capital funds will be required in future fiscal years to complete this action. Segment Code Cost Estimate CIP 49 TOTAL $1.5M $1.5M 1 9/11/15 WMATA FTA 7 of
9 FTA SMI (MAR 16- APR ) Finding R-39 f----1 Required Action R-7-39-a 4.4 Internal Stakeholders ) The following internal stakeholders are committed to work on the action plan: Give To/ Estimated Required Participant Needed From Item Needed Coordinate Completion Initials With Date Participation in Human Resources meetings and Lydia 07/01/16- Talent Management Matthew Peters development Oghogho 07/01/17 (HRTM) of processes 1/ Participation in Bus Maintenance ( meetings and Lydia 07/01/16- (BMNT) Phillip Wallace development Oghogho 07/01/17 of processes ( I Participation in Bus Transportation meetings and Lydia 07/01/16- (BTRA) Robert Potts,qJ I development Oghogho 07/01/17 of processes Deputy General Manager of Operations Robert Troup Participation in (DGMO) -e..-r meetings and Lydia 07/01/16- Operations development Oghogho 07/01/17 Management Services Linda Stoffregen ( of processes (OPMS) 1 ) Rail Transportation p-z.. rr.:o-r Participation in Hercules Ballard (RTRA).,..p.,J;t, k ROOT Department of Safety & Environ mental Management (SAFE) Dr. Lauren Semper -Scott Lou Brown $ fiv meetings and Lydia 07/01/16- development Oghogho 07/01/17 of processes Participation in meetings and Lydia 07/01/16- development Oghogho 07/01/17 of processes Transit Infrastructure and Engineering Andrew Off Participation in Systems (TIES) meetings and Lydia 07/01/16- development Oghogho 07/01/17 Vehicle Program Joseph _L- of processes Services (CENV) Reynolds ",u;v, 'r-c #fl.an _A P CAP deliverables Lydia 9/15/18 or verified and Oghogho 9/1/19 ; JttJ'f' reviewed ITQA Shikha Khan./ \) 1 09/11/15 WMATA FTA 8 of
10 FTA SMI (MAR 16 APR ) Finding R-39 Required Action R-7-39-a 5 CAP Completion Documentation After Metro s collective review, a memorandum with enclosed CAP deliverables (refer to 4.1) will be provided to FTA to support the closure of this required action. 6 Performance Measures 100% of WMATA employees are added to updated unified tracking system within 3 months of completion 100% of WMATA departments have received training within 12 months of completion 7 Verification Review of formal ELM evaluation document and alternatives. On-site demonstration of updated training tracking system. Monthly review of employee training completion percentage. 1 09/11/15 WMATA FTA 9 of
11 478
12 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a Federal Transit Administration (FTA) Safety Management Inspection (SMI) MAR 16 APR Washington Metropolitan Area Transit Authority (WMATA) R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a 1 09/11/15 WMATA FTA 1 of
13 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a Table of Contents 1 BACKGROUND PURPOSE FTA FINDING FTA REQUIRED ACTION ANALYSIS AND RECOMMENDATION ANALYSIS RECOMMENDATION ACTION PLAN DESCRIPTION APPROACH SCHEDULE BUDGET / COST ESTIMATE INTERNAL STAKEHOLDERS CAP COMPLETION DOCUMENTATION PERFORMANCE MEASURES VERIFICATION CAP APPROVAL /11/15 WMATA FTA 2 of
14 1 Background FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a The Federal Transit Administration (FTA) completed a Safety Management Inspection (SMI) of the Washington Metropolitan Area Transit Authority (WMATA) rail and bus systems. FTA issued Safety Directive 15-1 identifying 54 safety findings and 91 required actions to improve safety. 2 Purpose This Corrective Action Plan has been developed to address Safety Finding No. R-40 and R-41 and their Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a. 2.1 FTA Finding WMATA s MMIS, in its current configuration, is cumbersome and challenging to use for many WMATA maintenance employees. WMATA s IT Department lacks necessary authority to ensure that all WMATA departments use IT applications in the same manner to ensure data sharing, coordination of training, and conduct of audits in a consistent manner. 2.2 FTA Required Action WMATA must develop a training strategy for improving the capabilities of employees to enter, analyze and assess information into the agency s Maintenance Management Information System. WMATA must establish a data reliability working group focused on maintenance information. The Information Technology Department must coordinate with the Technical Training Department to ensure the availability of additional training on the use of WMATA s Maintenance Management Information System for WMATA s maintenance departments. WMATA must assess data accessibility and coordination needed to support safety functions throughout the agency including the operations and maintenance departments. 1 09/11/15 WMATA FTA 3 of
15 3 Analysis and Recommendation 3.1 Analysis FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a Each of these findings speaks to a concern with either the functionality, data quality, or reporting capabilities of Maximo. Many of these concerns exist because Maximo has developed organically over the past decade. Many of its functions have been narrowly tailored for specific user groups, which leads to poor data quality and cumbersome navigation. Functionality is best addressed by: Simplifying the existing Work Order processes, reducing the number of same from sixteen to five or fewer; Automatically linking appropriate job instructions to work orders; Automatically linking appropriate parts and shop supplies to work orders; Implementing the latest version of Maximo to ease navigation issues; Implementing an agency wide training program to train users in the revised work order processes and screen navigation. Data quality is best addressed by: Developing an enterprise-wide data dictionary so that each data element is used for the same purpose by all users Constraining edit rights to the appropriate system of record and the actual data owners To the extent feasible, apply data validation techniques to each data field To the extent feasible, eliminate or limit the use of free-text fields Implement working groups to review the current data and validate it 3.2 Recommendation This work is part of the Maximo 7.6 upgrade project, a component project of the Asset Management Systems Program, which was instituted in April, The 7.6 upgrade has just commenced. Using the forthcoming upgrade of its MMIS, Maximo, to version 7.6, which has improved screen navigation capabilities to reduce the cumbersome nature of the system. This project will include the following phases: a) conduct, in coordination with the Transit Asset Management Office (TAMO), a full business process reengineering to revise and standardize its work order processes and business 1 09/11/15 WMATA FTA 4 of
16 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a processes for maintenance transactions. The BPR will also seek to simplify the business processes and simplify the system navigation; b) use the results of the BPR to size the work required to reduce customizations and standardize data usage and format (this analysis will inform the scope, timing, and deliverables for FY17); c) increase the number of defined fields (as opposed to free-text); d) remove customizations that inhibit use of Maximo's automated processes; e) establish a working group for maintenance data, including representatives from relevant maintenance operating groups. Metro will reassess the data elements required to report and analyze safety issues and support safety functions with three goals: (1) simplifying access to the data; (2) reducing the number of systems used to store and manage the data; and (3) implementing data governance to assure use of a common data dictionary. f) design and delivery of appropriate training for the upgraded system. IT Trainers will coordinate with training group to develop revised training materials and will assist the Maximo Subject Matter Experts in the delivery of those materials. 4 Action Plan Description The work described in this plan is part of the work assigned to the Asset Management Program. This plan reprioritizes and accelerates a portion of that scope. Year one will consist of a series of requirements definition exercises to define how the new processes will work and be implemented. Year two will see implementation of those plans, including data governance controls, system navigation improvements, reporting improvements, and a full training plan. The requirements definition performed in year one will better inform the year two plan, leading to changes in scope, schedule, and budget. The Office of Applications within the Department of Information Technology helps Metro meet its mission objectives by providing information processing support to all levels in the Authority. It develops, deploys and maintains software applications that: Help senior management with strategic planning Help departmental managers with budgetary planning and control Help operational supervisors manage daily operations more efficiently 1 09/11/15 WMATA FTA 5 of
17 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a Help staff and workers provide better services to their customers Help to aid customers in using the Washington Metropolitan Area Transit system This responsibility extends to all enterprise systems and includes the duties of guiding departments through business process reengineering exercises, setting standards for data governance and quality control, and setting standards for data integration and modelling. The signature of the General Manager and CEO on a project initiation document (such as this Corrective Action Plan) instructs his subordinates to provide the required assistance and participation for the success of the project. 4.1 Approach Deliverable Description Responsible Party Estimated Completion Date 1) Project Management Plan 2) Reengineering Plan 3) Business Requirements 4) Technical Requirements Detailed plan for the first year of the project. Required Actions affected by this action: R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a. Detailed plan for integrating the various requirements exercise into a new business process. Required Actions affected by this action: R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a. Requirements from each of the stakeholder groups listed below to meet both the four required actions and the other improvements envisioned for this program. Required Actions affected by this action: R a, R-7-40-b, R-7-40-c, and R-7-41-a. Conversion of business requirements into technical requirements that define how each technical component of the system will be implemented. Required Actions affected by this action: R-7-40-a and R-7-41-a. Architectural and data flow documents that document how the various system 5) System Design Documents* components will interoperate. R-7-40-a and R-7-41-a. 6) Program Manager Approval Memorandum to Transfer Code to Testing System* All software development on all systems is complete and ready for testing. R-7-40-a and R-7-41-a. Robert Dunham 09/30/15 Neka Ross 11/30/15 Neka Ross and Kim Keene 04/30/16 Furkan Tari 06/30/16 Rick Lanier FA + 90 Furkan Tari and Neka Ross FA /11/15 WMATA FTA 6 of
18 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a 7) 8) Deliverable User Acceptance Testing Signature Document* Training Schedule With Names of Trained Users* 9) Quality Audit Report* Description All software systems have passed through unit, integration, and user acceptance testing. All noted issues are corrected. R a and R-7-41-a. All end users have received training on the new system. R-7-40-a, R-7-40-b, R c, and R-7-41-a. The Office of Information Technology Quality Assurance (ITQA) performs scope verification and inspection of CAP deliverables to ensure that all are completed as planned and expected. R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a. Responsible Party Neka Ross and Kim Keene Estimated Completion Date FA Neka Ross FA Shikha Khan FA *The second half of the project is dependent upon receiving an additional $2,990,000 in funding. The deliverables dependent upon that funding are shown with estimated delivery dates in the form FA + X, where FA is the date funds are made available and X is the number of days after funding availability that the item is due. 4.2 Schedule Tasks Estimated Start Estimated Finish Develop and obtain approval for PMP 08/01/15 09/30/15 Develop BPR Plan 09/01/15 11/30/15 Develop Business Requirements 09/01/15 04/30/16 Develop Technical Requirements 02/01/16 06/30/16 Develop System Design Documents* FA + 0 FA + 90 Develop all software components* FA + 31 FA Develop testing plan* FA + 90 FA Performing testing and revision* FA FA Develop training strategy and materials* FA FA Conduct end user training* FA FA *The second half of the project is dependent upon receiving an additional $2,990,000 in funding. The tasks dependent upon that funding are shown with estimated start and end dates in the form FA + X, where FA is the date funds are made available and X is the number of days after funding availability that work will start or end. 1 09/11/15 WMATA FTA 7 of
19 4.3 Budget / Cost Estimate FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a Segment Code Cost Estimate Develop and obtain approval for PMP $10,000 Develop BPR Plan $200,000 Develop Business Requirements $1,300,000 Develop Technical Requirements $500,000 Develop System Design Documents $450,000 Develop all software components $1,850,000 Develop testing plan $100,000 Performing testing and revision $425,000 Develop training strategy and materials $150,000 Conduct end user training $500,000 TOTAL $5,485, Action requires funding in FY2016 and in the out years. This action will be funded in the capital budget in FY2016 and FY2017. Additional capital funds will be required in future fiscal years to complete this action.this schedule shows the entire budget for the project. Of the entire budget, $2,495,000 are available in FY16 and FY17. The balance $2,990,00 is the budget impact. Of this amount, $500,000 is required in FY16, with the balance of $2,490,000 needed for FY /11/15 WMATA FTA 8 of
20 487
21 488
22 FTA SMI (MAR 16 APR ) Finding R-40 and R-41 Required Actions R-7-40-a, R-7-40-b, R-7-40-c, and R-7-41-a An on-site demonstration of new system capabilities, including ease of data access, and applicability across all disciplines. Monthly review of employee training completion percentage. 1 09/11/15 WMATA FTA 11 of
23 490
24 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b Federal Transit Administration (FTA) Safety Management Inspection (SMI) MAR 16 APR Washington Metropolitan Area Transit Authority (WMATA) R-7-41-b 1 09/11/15 WMATA FTA 1 of 8 491
25 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b Table of Contents 1 BACKGROUND PURPOSE FTA FINDING FTA REQUIRED ACTION ANALYSIS AND RECOMMENDATION ANALYSIS RECOMMENDATION ACTION PLAN DESCRIPTION APPROACH SCHEDULE BUDGET / COST ESTIMATE INTERNAL STAKEHOLDERS CAP COMPLETION DOCUMENTATION PERFORMANCE MEASURES VERIFICATION CAP APPROVAL /11/15 WMATA FTA 2 of 8 492
26 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b 1 Background The Federal Transit Administration (FTA) completed a Safety Management Inspection (SMI) of the Washington Metropolitan Area Transit Authority (WMATA) rail and bus systems. FTA issued Safety Directive 15-1 identifying 54 safety findings and 91 required actions to improve safety. 2 Purpose This Corrective Action Plan has been developed to address Safety Finding No. R-41 and its Required Action R-7-41-b. 2.1 FTA Finding WMATA s Information Technology (IT) Department lacks necessary authority to ensure that all WMATA departments use IT applications in the same manner to ensure data sharing, coordination of training, and conduct of audits in a consistent manner. 2.1 FTA Required Action The IT Department must coordinate with Rail Operations Quality Training (ROQT) to ensure the availability of additional training for the Rail Operations Control Center (ROCC) staff on the Advanced Information Management system. 3 Analysis and Recommendation 3.1 Analysis This finding speaks to a concern with the IT Department coordinating the training to the ROCC staff on the Advanced Information Management (AIM) system. 3.2 Recommendation This work is part of the Overall Training project, which began in June This training will be delivered both in ROCC controller initial training, as well as during required ROCC controller refresher training. This project includes the following phases: (a) Requirements: this phase entails working with the ROCC and IT stakeholders in gathering requirements for the development of the AIM training materials. It includes holding Joint 1 09/11/15 WMATA FTA 3 of 8 493
27 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b Application Design (JAD) sessions with the stakeholders to ensure all operations scenarios are clearly documented in the requirements. (b) Develop training materials: this phase entails the development of the following training courses: Database Generation and Maintenance course Displays Generation and Maintenance course Hardware and Systems Diagnostics course Software Administration Operator Instructor Training (Simulator) Overview and Alarm Training for Passenger Operations (POS) and Assistant Superintendents All AIM User Functions and Supervisory Functions Training for Assistant Superintendents All AIM User Functions Training for Train Dispatchers All AIM User Functions and Supervisory Functions Training for OCC Trainers (c) Deliver training to IT stakeholders: this phase entails the delivery of training to the IT stakeholders. The IT training courses will include: Database Generation and Maintenance course Displays Generation and Maintenance course Hardware and Systems Diagnostic course Software Administrations (d) Deliver training to ROCC stakeholders: this phase entails the delivery of training to the ROCC stakeholders. The ROCC training courses will include: Operator Instructor Training (Simulator) Overview and Alarm Training for POS and Assistant Superintendents All AIM User Functions and Supervisory Functions Training for Assistant Superintendents All AIM User Functions Training for Train Dispatchers All AIM User Functions and Supervisory Functions Training for OCC Trainers 1 09/11/15 WMATA FTA 4 of 8 494
28 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b 4 Action Plan Description The work described in this plan is part of the work previously assigned to the IT Applications group. This plan reprioritizes and accelerates a portion of that scope. The requirements phase was completed in The development of the training material is scheduled to be completed in October of The delivery of the training will be complete in March of Approach AIM training developed in this CAP revision will be incorporated into the ROCC initial and refresher training materials. Deliverable Description Responsible Party Estimated Completion Date 1) 2) Project Management Plan Business Requirements Plan Detailed plan for the project. Albert Fehrens 02/28/15 Requirements from each of the stakeholder groups listed below to meet both the four required actions and the other improvements envisioned for this program. Rockwell Collins (Vendor) 04/30/15 3) Training Materials Development of the training materials. Rockwell Collins 09/30/15 4) IT Training Deliver training to IT stakeholders Rockwell Collins 10/31/15 5) ROCC Training 6) Quality Audit Report Deliver training to Rail Operations Control Rockwell Collins 03/30/16 Center stakeholders The Office of Information Technology Quality Assurance (ITQA) performs scope verification and inspection of CAP Shikha Khan 07/07/16 deliverables to ensure that all are completed as planned and expected. 1 09/11/15 WMATA FTA 5 of 8 495
29 FTA SMI (MAR 16 APR ) Finding R-41 Required Actions R-7-41-b 4.2 Schedule Tasks Estimated Start Estimated Finish Develop Business Requirements 10/31/14 02/28/15 Develop Training Material 02/28/15 09/30/15 Deliver training to IT stakeholders 10/31/15 10/31/15 Deliver training to Rail Operations Control Center 10/31/15 03/30/16 stakeholders Revise ROCC initial training materials 04/01/16 06/30/16 Revise ROCC refresher training materials 04/01/16 06/30/ Budget / Cost Estimate Segment Code Cost Estimate Develop Business Requirements 25,000 Develop Training Material 50,000 Deliver Training to IT 110,000 stakeholders Deliver training to Rail Operations 120,000 Control Center stakeholders TOTAL $305,000 This schedule shows the entire budget for the project. No capital funds are required to support this action in FY2016. Additional capital funds will be required in future fiscal years complete this action 1 09/11/15 WMATA FTA 6 of 8 496
30 497
31 498
32 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a Federal Transit Administration (FTA) Safety Management Inspection (SMI) MAR 16 APR Washington Metropolitan Area Transit Authority (WMATA) R-7-42-a 1 09/11/15 WMATA FTA 1 of
33 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a Table of Contents 1 BACKGROUND PURPOSE FTA FINDING FTA REQUIRED ACTION ANALYSIS AND RECOMMENDATION ANALYSIS RECOMMENDATION ACTION PLAN DESCRIPTION APPROACH SCHEDULE BUDGET / COST ESTIMATE INTERNAL STAKEHOLDERS CAP COMPLETION DOCUMENTATION PERFORMANCE MEASURES VERIFICATION CAP APPROVAL /11/15 WMATA FTA 2 of
34 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a 1 Background The Federal Transit Administration (FTA) completed a Safety Management Inspection (SMI) of the Washington Metropolitan Area Transit Authority (WMATA) rail and bus systems. FTA issued Safety Directive 15-1 identifying 54 safety findings and 91 required actions to improve safety. 2 Purpose This Corrective Action Plan has been developed to address Safety Finding No. R-42 and its Required Action R-7-42-a. 2.1 FTA Finding Proactive safety analysis of information provided by Operating and Maintenance departments is not routinely conducted. This negatively impacts ability of WMATA to provide more support for proficiency testing, conduct more in- depth safety studies, reviews and accident/incident investigations. 2.2 FTA Required Action WMATA operating and maintenance departments must work together to develop a strategy to more actively analyze, review, and assess rail operations and maintenance data from a safety perspective. 3 Analysis and Recommendation 3.1 Analysis Required action R-7-42-a directs that WMATA operating and maintenance departments must work together to develop a strategy to more actively analyze, review, and assess rail operations and maintenance data from a safety perspective. Any such strategy assumes that current systems (e.g. Maximo) contain accurate data, that data outside of current systems, (e.g. VMS) is readily available to support the analysis, that appropriate analytical tools (e.g. failure mode analysis and business intelligence) are configured to support the analysis, and that users can both participate in the design of and be trained on the resulting systems. The data quality issue is being addressed as part of required actions R-7-40-a, -b, and c. This project will address the other assumptions and develop a strategy to integrate and use the various data sources 1 09/11/15 WMATA FTA 3 of
35 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a so that WMATA will be able to more actively analyze, review and assess data from a safety perspective. This work will build on the Asset Management System for the Office of Elevator and Escalators (ELES) pilot project, a component project of the Asset Management Systems program, which was instituted in April, The ELES Pilot Project addresses many of these issues for a single asset class. 3.2 Recommendation Metro will design and test a strategy that: (a) improves collection of safety related data using various data telemetry sources; (b) relates the telemetry and other data sources to each asset; (c) utilizes existing software packages to produce analytical data for review and assessment by rail operations and maintenance personnel; (d) supports the conversion of safety issues to corrective action plans, engineering test plans or work orders, as appropriate. At the completion of the pilot project Metro will produce: (e) A lessons learned document that describes issues to be avoided or managed, and opportunities to be exploited in an Enterprise roll-out of the system. (f) A plan for an Enterprise roll-out of the system 4 Action Plan Description The work envisioned by plan is included in the scope of the Asset Management Systems program, which was initiated in April This work was originally envisioned for later years. Implementation of this plan will accelerate and expand this work into FY17. This project will utilize requirements documentation developed for Required Actions R-7-40-a, -b, and c. Building on the data and reporting for that project, this project will integrate asset telemetry, work order data, and asset configuration data to produce safety data based on both near-term historical information and current telemetry. It will then present that data using existing business analysis tools. It will also pilot the concept of automatic generation of work orders based on telemetric data. 1 09/11/15 WMATA FTA 4 of
36 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a 4.1 Approach Deliverable Description Responsible Party Estimated Completion Date 1) Project Management Plan* Detailed plan for the full year project. Robert Dunham FA ) Data Architecture Schema* 3) Technical Requirements* 4) 5) User Acceptance Testing Signature Document* Training Schedule With Names of Trained Users* 6) Lessons Learned Report* 7) Enterprise Roll Out Plan 8) Quality Audit Report* An IT architecture document that de tails how all the relevant data elements are to be connected and rationalizes the duplicative data elements within them. Neka Ross FA + 60 Conversion of reporting requirements and the data schema into technical Kim Keene requirements that define how reporting FA + 90 requirement will be implemented. All software systems have passed through unit, integration, and user acceptance testing. All noted issues Kim Keene FA are corrected. All end users have received training on the new system. Describes issues to be avoided or managed, and opportunities to be exploited in an Enterprise roll-out of the system. Plan that lays out how the pilot solution can be implemented throughout the authority, including how users will review and act upon the dat. The Office of Information Technology Quality Assurance (ITQA) performs scope verification and inspection of CAP deliverables to ensure that all are completed as planned and expected. Neka Ross FA Robert Dunham FA Robert Dunham FA Shikha Khan FA *The project is dependent upon receiving an additional $2,300,000 in funding. All deliverables are dependent upon that funding. Thus, all deliverables are shown with estimated delivery dates in the form FA + X, where FA is the date funds are made available and X is the number of days after funding availability that the item is due. 1 09/11/15 WMATA FTA 5 of
37 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a 4.2 Schedule Tasks Estimated Start Estimated Finish Develop and obtain approval for PMP (1) FA 60 FA 30 Procure and install additional storage (1) FA + 0 FA Develop Data Schema (1) FA + 0 FA + 60 Develop Technical Requirements (1) FA + 30 FA + 90 Develop testing plan (1) FA FA Performing testing and revision (1) FA FA Develop training strategy and materials (1) FA FA Conduct end user training (1) FA FA Operate the system with ELES and analyze FA FA effectiveness of the system.(1) Produce Lessons Learned Report (1) FA FA Produce Enterprise Roll Out Plan (1) FA FA *The project is dependent upon receiving an additional $2,300,000 in funding. The tasks dependent upon that funding are shown with estimated start and end dates in the form FA + X, where FA is the date funds are made available and X is the number of days after funding availability that work will start or end. 1 09/11/15 WMATA FTA 6 of
38 FTA SMI (MAR 16 APR ) Finding: R-42 Required Action: R-7-42-a 4.3 Budget / Cost Estimate Segment Code Cost Estimate Develop and obtain approval for PMP 0 Procure and install additional storage 50,000 Develop Data Schema 200,000 Develop Reporting Requirements 350,000 Develop Technical Requirements 150,000 Develop System Design Documents 100,000 Develop all software components 500,000 Develop testing plan 50,000 Performing testing and revision 200,000 Develop training strategy and materials 200,000 Conduct Test with ELES 300,000 Prepare Lessons Learned Report 100,000 Prepare Rollout Plan 100,000 TOTAL $2,300, No capital funds are required to support this action in FY2016. Additional capital funds will be required in future fiscal years to complete this action. Assuming work is to begin on 07/01/16, $1,800,000 will be required in FY17 and $500,000 in FY /11/15 WMATA FTA 7 of
39 506
40 FTA SMI (MAR 16 -APR ) Finding: R l Required Action: R-7-42-a Participant PLNT ITQAIT Needed From Paul Kram Shikha Khan Required Initials Item Needed Full participation in requirements gathering, testing, and trainin. Full participation in uirements at ering, testing, nd trainin Give To/ Estimated Coordinate Completion With Date Robert FA+ 0 to Dunham FA+ 330 Robert FA+ 0 to Dunham FA CAP Completion Documentati After Metro's collective review, a memorandum with enclosed CAP deliverables (refer to 4.1) will be provided to FTA to support the closure of this required action. 6 Performance Measures A. One hundred percent (100 %) of affected users in ELES have received training on the new system with 60 days of system acceptance. 8. ELES has developed its processes to review and act upon the data provided by IT. 7 Verification The FT A will verify project progress and completion of project deliverables by: A. Review of final training materials developed 8. Review of lessons learned document following ELES test strategy. C. Review of ELES strategies to use data provided by IT department, such as monthly review meeting notes. 1 09/11/15 WMATA FTA 9of10 507
41 508
42 FTA SMI (MAR 16 APR ) Finding R-42 Required Action R-7-42-b Federal Transit Administration (FTA) Safety Management Inspection (SMI) MAR 16 APR Washington Metropolitan Area Transit Authority (WMATA) R-7-42-b 1 09/11/15 WMATA FTA 1 of 6 509
43 FTA SMI (MAR 16 APR ) Finding R-42 Required Action R-7-42-b Table of Contents 1 BACKGROUND PURPOSE FTA FINDING FTA REQUIRED ACTION ANALYSIS AND RECOMMENDATION ANALYSIS RECOMMENDATION ACTION PLAN DESCRIPTION APPROACH SCHEDULE BUDGET / COST ESTIMATE INTERNAL STAKEHOLDERS CAP COMPLETION DOCUMENTATION PERFORMANCE MEASURES VERIFICATION CAP APPROVAL /11/15 WMATA FTA 2 of 6 510
44 FTA SMI (MAR 16 APR ) Finding R-42 Required Action R-7-42-b 1 Background The Federal Transit Administration (FTA) completed a Safety Management Inspection (SMI) of the Washington Metropolitan Area Transit Authority (WMATA) rail and bus systems. FTA issued Safety Directive 15-1 identifying 54 safety findings and 91 required actions to improve safety. 2 Purpose This Corrective Action Plan has been developed to address Safety Finding No. R-42 and its Required Action R-7-42-b. 2.1 FTA Finding Proactive safety analysis of information provided by Operating and Maintenance departments is not routinely conducted. This negatively impacts ability of WMATA to provide more support for proficiency testing, conduct more in- depth safety studies, reviews and accident/incident investigations. 2.2 FTA Required Action WMATA must work with the Tri-State Oversight Committee and FTA to establish and pilot an enhanced investigation process for rail transit accidents, incidents and safety studies that identify systemic root causes and deficiencies. 3 Analysis and Recommendation 3.1 Analysis WMATA conducts investigations into rail accidents and incidents that have occurred within the system. WMATA has established accident investigation procedures and they are utilized. (WMATA Policy Instruction 10.4/0, Incident and Accident Investigation, 11/04/2011). WMATA currently meets with TOC representatives on a monthly basis to review all open accidents, incidents, and safety studies. However, FTA has identified a gap in some investigations indicating that additional analysis is necessary to ensure the causal factors have been appropriately recognized and evaluated. 1 09/11/15 WMATA FTA 3 of 6 511
45 FTA SMI (MAR 16 APR ) Finding R-42 Required Action R-7-42-b 3.2 Recommendation WMATA will work with the Tri-State Oversight Committee and the FTA to expand its pursuit of root cause analysis of accidents and incidents beyond those that reach a Level 1 rating to further assess risk and identify proactive risk mitigation strategies. 4 Action Plan Description 1) 2) 3) 4.1 Approach Deliverable Provide Initial Hazard Rating for all open Accidents/ Incidents in SMS Provide revised draft of Policy/Instruction 10.4/0 Develop top ten list of highest priority accident/ incident investigations and report monthly to Executive Safety Committee 4) Quality Audit Report Description SAFE will provide an initial hazard rating for all accidents/incidents to provide a priority ranking for identifying systemic root causes and deficiencies using SMS. Prepare revised draft of Policy/Instruction 10.4/0 in for WMATA coordination and TOC approval. SAFE, in coordination with TOC, will develop a top ten list of the highest priority accident/ incident investigations on a monthly basis using the Hazard Management Procedure ( SAFE, 7/01/2011) and report to the Executive Safety Committee, TOC and the FTA. Responsible Party Lou Brown, Manael Kennerly Lou Brown, Manael Kennerly Lou Brown, Manael Kennerly The Office of Quality Assurance & Warranty (QAAW) performs scope verification and inspection of CAP Michael deliverables to ensure that all are DiNatale completed as planned and expected. Estimated Completion Date 10/15/15 12/30/15 01/15/16 01/31/ Schedule Refer to 4.1 for scheduled dates. 4.3 Budget / Cost Estimate N/I (No Impact). 1 09/11/15 WMATA FTA 4 of 6 512
46 FTA SMI (MAR 16 -APR ) Finding R-42 Required Action R-7-42-b 4.4 Internal Stakeholders The following internal stakeholders are committed to work on the action plan: Give To/ Estimated Required Participant Needed From Item Needed Coordinate Completion Initials With Date Manael SAFE Lou Brown Deliverables 10/15/15 Kennerly ITQA Shika Khan CAP deliverables Manael verified and 01/31/16 Kennerly reviewed 5 CAP Completion Documentation After Metro's collective review, a memorandum with enclosed CAP deliverables (refer to 4.1) will be provided to FTA to support the closure of required action. 6 Performance Measures 100% of open accidents and incidents are rated by 10/15/ % of open accidents and incidents are reviewed in accordance with revised policy 90 days following implementation. Monthly updates on top ten list of high priority investigations. 100% of accidents requiring infrastructure or vehicle repairs have been entered into Maximo 30 days following open accident and incident review. 7 Verification Review of enhanced investigation policy instruction. Review of open accident or incident updated to meet new policy. Review of new accident or incident that follows updated policy. Revision Issue Date Prepared By Approved By Page 1 09/11/15 WMATA FTA 5 of 6 513
47 514
MAP-21 National Public Transportation Safety and Transit Asset Management Requirements
MAP-21 National Public Transportation Safety and Transit Asset Management Requirements Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2013 APTA ANNUAL MEETING Chicago, IL October 1, 2013
Power Point Presentation
Good Morning Chairman Evans and members of the Committee on Finance and Revenue. I am Jack Requa, Interim General Manager and CEO of the Washington Metropolitan Area Transit Authority (WMATA), commonly
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 12-001 BACKGROUND
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 12-001 SUBJECT: Review of Contract CQ 7068 Safety Management Assessment and Enhancement Program DATE: February 14, 2012 FROM: OIG Helen Lew
STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840
MARYLAND STATE BOARD OF ELECTIONS P.O. BOX 6486, ANNAPOLIS, MD 21401-0486 PHONE (410) 269-2840 Bobbie S. Mack, Chairman David J. McManus, Jr., Vice Chairman Rachel T. McGuckian Patrick H. Murray Charles
Financial Systems Integration
Finance & Administration Committee Action Item III-A May 13, 2010 Financial Systems Integration Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
Internal Audit Report. Toll Operations Contract Management TxDOT Office of Internal Audit
Internal Audit Report Toll Operations Contract Management TxDOT Office of Internal Audit Objective To determine whether the Toll Operations Division (TOD) contract management structure is designed and
CTAA - SAFETY AND SECURITY OFFICER PROGRAM (CSSO)
CTAA - SAFETY AND SECURITY OFFICER PROGRAM (CSSO) 1 Training Agenda: Morning Session-Day 1: Introduction Leadership and Administration Transit Operations Afternoon Session-Day 1: Maintenance and Technology
VA Office of Inspector General
VA Office of Inspector General OFFICE OF AUDITS AND EVALUATIONS Department of Veterans Affairs Audit of Office of Information Technology s Strategic Human Capital Management October 29, 2012 11-00324-20
SAFETY AND SECURITY: Opportunities to Improve Controls Over Police Department Workforce Planning
SAFETY AND SECURITY: Opportunities to Improve Controls Over Police Department Audit Report OIG-A-2015-006 February 12, 2015 2 OPPORTUNITIES EXIST TO IMPROVE WORKFORCE PLANNING PRACTICES AND RELATED SAFETY
Project Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
PUB (MPI) 1-62 Reference: Gartner Scorecard
Information Requests Round 1 PUB (MPI) 1-62 Reference: Gartner Scorecard PUB/MPI 2-23 2013 GRA a) Please file an update to the response to Gartner s recommendations provided at PUB/MPI 2-23 from last year
MEMORANDUM. Date: October 28, 2013. Federally Regulated Financial Institutions. Subject: Cyber Security Self-Assessment Guidance
MEMORANDUM Date: October 28, 2013 To: Federally Regulated Financial Institutions Subject: Guidance The increasing frequency and sophistication of recent cyber-attacks has resulted in an elevated risk profile
IT Service Provider and Consumer Support Engineer Position Description
Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Transit Asset Management MBTA Initiatives
Transit Asset Management MBTA Initiatives Standing Committee on Audit and Finance March 3, 2015 1 Agenda TAM overview MAP 21 requirements MBTA TAM initiatives: Asset Management Plan Decision Support Tool
1. Talecom from BT. Talecom from BT. Service Definition
1. BT is working with Talecom to provide a field force automation solution comprising of a number of core components which are combined to deliver specific mobile solutions across the organisation. These
Achieve greater efficiency in asset management by managing all your asset types on a single platform.
Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company
SENTINEL AUDIT V: STATUS OF
SENTINEL AUDIT V: STATUS OF THE FEDERAL BUREAU OF INVESTIGATION S CASE MANAGEMENT SYSTEM U.S. Department of Justice Office of the Inspector General Audit Division Audit Report 10-03 November 2009 Redacted
Achieve greater efficiency in asset management by managing all your asset types on a single platform.
Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. When you use Maximo Asset Management to help maximize the
Managing Open Source Code Best Practices
Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate
How To Manage Records At The Exceeda Agency
Table of Contents Table of Contents... i I. Introduction and Background... 1 A. Challenges... 1 B. Vision and Goals... 1 II. Approach and Response... 2 A. Set up a Governance Structure... 2 B. Established
A Sensible Approach to Asset Management
Introduction Most IT managers would agree, an effective asset management program is the key to successfully managing the IT enterprise. Whether it is measuring total cost of ownership or creating an enterprise-wide
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report
Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report Enterprise Projects Fiscal Year 2011/2012 Third Quarter Report The Enterprise Program Investment Council (EPIC) is responsible for governance
Achieve greater efficiency in asset management by managing all your asset types on a single platform.
Asset solutions To support your business objectives Achieve greater efficiency in asset by managing all your asset types on a single platform. Obtain an entirely new level of asset awareness Every company
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 08-005
FINAL AUDIT REPORT WITH RECOMMENDATIONS Internal Operations No. 08-005 SUBJECT: Review of Trapeze, the Bus Rail DATE: March 25, 2008 Scheduling and Dispatch System FROM: TO: IG/OIG Helen Lew /s/ GMGR John
Program Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
KAREN E. RUSHING. Clerk of the Circuit Court and County Comptroller. Audit Services. Karen E. Rushing
KAREN E. RUSHING Clerk of the Circuit Court and County Comptroller AUDIT OF Sarasota County s Computerized Maintenance Management System (Maximo) Audit Services Karen E. Rushing Clerk of the Circuit Court
FREQUENTLY ASKED QUESTIONS
FREQUENTLY ASKED QUESTIONS Continuous Monitoring 1. What is continuous monitoring? Continuous monitoring is one of six steps in the Risk Management Framework (RMF) described in NIST Special Publication
Human Capital Update
Finance & Administration Committee Information Item IV-A July 10, 2014 Human Capital Update Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number:
Integrating Project Management and Service Management
Integrating Project and Integrating Project and By Reg Lo with contributions from Michael Robinson. 1 Introduction Project has become a well recognized management discipline within IT. is also becoming
How to use the National Cybersecurity Workforce Framework. Your Implementation Guide
How to use the National Cybersecurity Workforce Framework Your Implementation Guide A NATIONAL PROBLEM The Nation needs greater cybersecurity awareness. The US workforce lacks cybersecurity experts. Many
Business Logistics Specialist Position Description
Specialist Position Description March 23, 2015 MIT Specialist Position Description March 23, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level
Validating Enterprise Systems: A Practical Guide
Table of Contents Validating Enterprise Systems: A Practical Guide Foreword 1 Introduction The Need for Guidance on Compliant Enterprise Systems What is an Enterprise System The Need to Validate Enterprise
OCCUPATIONAL GROUP: Information Technology. CLASS FAMILY: Security CLASS FAMILY DESCRIPTION:
OCCUPATIONAL GROUP: Information Technology CLASS FAMILY: Security CLASS FAMILY DESCRIPTION: This family of positions provides security and monitoring for the transmission of information in voice, data,
ID Task Name Time Pred
0 UC Modernization Project Plan 1115 d 1 1 Phase I - Business Case Development and Competitive Procurement 205 d 2 1.1 Complete Initial Feasibility Study 55 d 3 1.2 Prepare and Issue LBR 30 d 2 4 1.3 Competitive
FINAL AUDIT REPORT WITH RECOMENDATIONS Internal Operations No. 10-002
FINAL AUDIT REPORT WITH RECOMENDATIONS Internal Operations No. 10-002 SUBJECT: Review of Controls Over DATE: March 24, 2010 Storeroom Operations FROM: TO: IG/OIG Helen Lew /s/ DGMA/CFO Carol Kissal This
Camber Quality Assurance (QA) Approach
Camber Quality Assurance (QA) Approach Camber s QA approach brings a tested, systematic methodology, ensuring that our customers receive the highest quality products and services, delivered via efficient
ORACLE PROJECT MANAGEMENT
ORACLE PROJECT MANAGEMENT KEY FEATURES Oracle Project Management provides project managers the WORK MANAGEMENT Define the workplan and associated resources; publish and maintain versions View your schedule,
Windows 7 Upgrade Risk Mitigation Planning: Ensuring Windows 7 Upgrade Success
November 2010 Windows 7 Upgrade Risk Mitigation Planning: Ensuring Windows 7 Upgrade Success By: Robert Schaper, Laplink Software Enterprise Solutions Contents Introduction 2 Risk and Cost 2 Upgrade Strategies
Service Transition and Support: A CA Service Management Process Map
TECHNOLOGY BRIEF: SERVICE TRANSITION AND SUPPORT Service Transition and Support: A CA Service Process Map JUNE 2009 Malcolm Ryder ARCHITECT CA SERVICES Table of Contents Executive Summary 1 SECTION 1:
Release and Deployment Management: A CA Service Management Process Map
TECHNOLOGY BRIEF: RELEASE AND DEPLOYMENT MANAGEMENT Release and Deployment : A CA Service Process Map JULY 2009 Malcolm Ryder ARCHITECT CA SERVICES Table of Contents Executive Summary 1 SECTION 1: CHALLENGE
Case Study SharePoint Implementation
Case Study SharePoint Implementation This proposal includes data that shall not be disclosed outside of the client and shall not be duplicated, used or disclosed in whole or in part for any purpose other
Accenture Federal Services. Federal Solutions for Asset Lifecycle Management
Accenture Federal Services Federal Solutions for Asset Lifecycle Management Assessing Internal Controls 32 Material Weaknesses: identified in FY12 with deficiencies noted in the management of nearly 75%
CARLETON UNIVERSITY POSITION DESCRIPTION. Position Title: Manager, HR Systems Position No.: 298879. Approved by:
CARLETON UNIVERSITY POSITION DESCRIPTION Position Title: Manager, HR Systems Position No.: 298879 Reports to: Department: Assistant Director HR, Talent Programs Human Resources Approved by: (Incumbent/Date)
Colorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
Security Control Standard
Department of the Interior Security Control Standard Security Assessment and Authorization January 2012 Version: 1.2 Signature Approval Page Designated Official Bernard J. Mazer, Department of the Interior,
Review of Toronto Transit Commission Bus Maintenance and Shops Department, Phase Two Audit Progress on Implementation of Audit Recommendations
AUDITOR GENERAL S REPORT ACTION REQUIRED Review of Toronto Transit Commission Bus Maintenance and Shops Department, Phase Two Audit Progress on Implementation of Audit Date: June 11, 2015 To: From: Wards:
Mitel Professional Services UK Catalogue for Unified Communications and Collaboration
Mitel Professional Services UK Catalogue for Unified Communications and Collaboration JUNE 2015 DOCUMENT RELEASE# 1.0 CATALOGUE SERVICES OVERVIEW... 3 TECHNICAL CONSULTING & DESIGN... 5 NETWORK ASSESSMENT...
Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview
Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1 Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program
PHASE 9: OPERATIONS AND MAINTENANCE PHASE
PHASE 9: OPERATIONS AND MAINTENANCE PHASE During the Operations and Maintenance Phase, the information system s availability and performance in executing the work for which it was designed is maintained.
Office of the Assistant Secretary for Administration and Management Washington, D.C. 20210. ELLIOT P. LEWIS Assistant Inspector General for Audit
U.S. Department of Labor Office of the Assistant Secretary for Administration and Management Washington, D.C. 20210 AUG 1 4 2015 MEMORANDUM FOR: FROM: SUBJECT: ELLIOT P. LEWIS Assistant Inspector General
U.S. Nuclear Regulatory Commission. Plan of Action Strategic Workforce Planning
U.S. Nuclear Regulatory Commission Plan of Action Strategic Workforce Planning January 19, 2001 Strategic Workforce Planning Plan of Action January 19, 2001 Content Overview This plan of action outlines
Streamline your staffing process with a vendor management system that fits your business
Peopleclick VMS Streamline your staffing process with a vendor management system that fits your business Peopleclick VMS is web-based, enterprise-wide vendor management software that automates, tracks
Problem Management: A CA Service Management Process Map
TECHNOLOGY BRIEF: PROBLEM MANAGEMENT Problem : A CA Service Process Map MARCH 2009 Randal Locke DIRECTOR, TECHNICAL SALES ITIL SERVICE MANAGER Table of Contents Executive Summary 1 SECTION 1: CHALLENGE
Improving Service Asset and Configuration Management with CA Process Maps
TECHNOLOGY BRIEF: SERVICE ASSET AND CONFIGURATION MANAGEMENT MAPS Improving Service Asset and Configuration with CA Process Maps Peter Doherty CA TECHNICAL SALES Table of Contents Executive Summary SECTION
Field Service and Repair Center Software
Field Service and Repair Center Software Mobile Field Service Scheduling Service Management Field Service Management Software Optimize field service and repair operations with integrated, proven Service
Owner s Procurement Forum
Washington Metropolitan Area Transit Authority Construction Management Association of America National Capitol Chapter Owner s Committee Owner s Procurement Forum February 24, 2015 OVERVIEW of WMATA INFRASTRUCTURE:
Notice of Public Hearing Washington Metropolitan Area Transit Authority Docket B13-01
Notice of Public Hearing Docket B13-01 PROGRAM OF PROJECTS FOR FEDERAL FISCAL YEAR 2013 FUNDS AUTHORIZED UNDER THE MOVING AHEAD FOR PROGRESS IN THE 21 ST CENTURY ACT (MAP-21) AND THE PASSENGER RAIL INVESTMENT
Guidance for the Quality Assurance of Fire Protection Systems
Guidance for the Quality Assurance of Fire Protection Systems Prepared for: Office of Energy Research Office of Environment, Safety and Health Technical Support Prepared by: Roy F. Weston, Inc. October
Mainframe Legacy Application
ATTACHMENT I Mainframe Legacy Application Data Migration Archival Retrieval & Reporting Contents Statement of Work... 3 SECTION 1 Project Overview... 3 1.1 Project Scope... 3 1.2 Background... 3 1.3 Purpose
Department of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
Business Continuity Position Description
Position Description February 9, 2015 Position Description February 9, 2015 Page i Table of Contents General Characteristics... 2 Career Path... 3 Explanation of Proficiency Level Definitions... 8 Summary
Draft Document STATE OF MICHIGAN. SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing
STATE OF MICHIGAN SACWIS Planning Department of Human Services Strategic Implementation Plan: Project Staffing Executive Summary The State of Michigan has dedicated integrated team of resources for the
DESIGNED FOR YOUR INDUSTRY. SCALED TO YOUR BUSINESS. READY FOR YOUR FUTURE. SAP INDUSTRY BRIEFING FOR ELEVATOR, ESCALATOR AND MOVING SIDEWALK
Photo courtesy of Schumacher Elevator Company DESIGNED FOR YOUR INDUSTRY. SCALED TO YOUR BUSINESS. READY FOR YOUR FUTURE. SAP INDUSTRY BRIEFING FOR ELEVATOR, ESCALATOR AND MOVING SIDEWALK MANUFACTURERS
LDAP Authentication Configuration Appendix
1 Overview LDAP Authentication Configuration Appendix Blackboard s authentication technology is considered a focal point in the company s ability to provide true enterprise software. Natively, the Blackboard
How to Use the MAG ITS Architecture and Website
MAG Regional ITS Architecture How to Use the MAG ITS Architecture and Website Prepared by: June, 2013 Copyright 2013, Kimley-Horn and Associates, Inc. 1. HOW TO USE THE MAG ITS ARCHITECTURE AND WEBSITE
PHASE 6: DEVELOPMENT PHASE
PHASE 6: DEVELOPMENT PHASE The Phase features a key step in the project: system construction. The previous phases lay the foundation for system development; the following phases ensure that the product
Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0
Mitel Professional Services Catalog for Contact Center JULY 2015 SWEDEN, DENMARK, FINLAND AND BALTICS RELEASE 1.0 Contents MITEL PROFESSIONAL SERVICES DELIVERY METHODOLOGY... 2 CUSTOMER NEEDS... 2 ENGAGING
Memorandum. ACTION: Report on Computer Security Controls of Financial Management System, FTA FE-2000-098. May 23, 2000.
U.S. Department of Transportation Office of the Secretary of Transportation Office of Inspector General Memorandum ACTION: Report on Computer Security Controls of Financial Management System, FTA FE-2000-098
Asset Integrity - Process Safety Management
Asset Integrity - Process Safety Management Commit to Process Safety Understand Hazards & Risks Manage Risk Learn from experience Process safety culture Compliance with standards Process safety competency
Request for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
Accelerate your mission with GTSI Integration Services
Accelerate your mission with GTSI Integration Services GTSI delivers deep technical expertise and integrates advanced computer and networking technologies. Organizations requiring technology integration
Asset and Plant Lifecycle Management
IBM Software Enterprise Content Management April 2010 Asset and Plant Lifecycle Management 2 Asset and Plant Lifecycle Management Executive summary The IBM Asset and Plant Lifecycle Management (APLM) solution
PHASE 3: PLANNING PHASE
PHASE 3: PLANNING PHASE The ning Phase focuses principally on required project planning work. Proper comprehensive project planning is essential to a successful IT project, and incomplete project planning
44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
The City of Scottsdale. Business Intelligence Strategic Plan
The City of Scottsdale Business Intelligence Strategic Plan Created June 2014 This page intentionally left blank EXECUTIVE SUMMARY 1 SERVICES PROVIDED 3 DATABASE SERVICES 3 BUSINESS INTELLIGENCE SERVICES
EVALUATION REPORT. Weaknesses Identified During the FY 2014 Federal Information Security Management Act Review. March 13, 2015 REPORT NUMBER 15-07
EVALUATION REPORT Weaknesses Identified During the FY 2014 Federal Information Security Management Act Review March 13, 2015 REPORT NUMBER 15-07 EXECUTIVE SUMMARY Weaknesses Identified During the FY 2014
Army Regulation 702 11. Product Assurance. Army Quality Program. Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED
Army Regulation 702 11 Product Assurance Army Quality Program Headquarters Department of the Army Washington, DC 25 February 2014 UNCLASSIFIED SUMMARY of CHANGE AR 702 11 Army Quality Program This major
MAP-21 NATIONAL PUBLIC TRANSPORTATION SAFETY AND TRANSIT ASSET MANAGEMENT REQUIREMENTS
MAP-21 NATIONAL PUBLIC TRANSPORTATION SAFETY AND TRANSIT ASSET MANAGEMENT REQUIREMENTS Allison I. Fultz Kaplan Kirsch & Rockwell LLP Washington, DC 2013 APTA MAP-21 Webinar Session 4 Certification and