1 Associated with PA Consulting Group Technical, Management, and Economic Counsel Technical Audit Study of Jamshoro, Guddu and Muzaffargarh Thermal Power Stations in Pakistan Final Report HBP REF.: R1V02TAG April 27, 2011 Advanced Engineering Associates International Islamabad

2 Executive Summary An energy audit of the thermal power stations (TPSs) of the following three state owned power plants, collectively referred to as GENCOs was carried out: TPS Jamshoro, or the Jamshoro Power Company Ltd., commonly referred to as GENCO I, TPS Guddu, which is a part of Central Power Generation Company Ltd. commonly referred to as GENCO II), and, TPS Muzaffargarh, which is a part of Northern Power Generation Company commonly referred to as GENCO III.D The main objective of the study was to carry out a baseline evaluation or a benchmarking for determining efficiency gains and operational improvements to be achieved through the implementation of the USAID Fixed Amount Reimbursement Agreements (FARA) Repair and Maintenance Plan currently under implementation at these GENCOs. The key terms of reference of the study were: Assess performance parameters such as effective output capability, heat rate and efficiency and power plant availability of each unit Identify reasons for drop of plant performance from the design parameters Carry out a spot fuel oil analysis to determine the heat contents and quality of the fuel oil being supplied to the power stations Carry out a brief technical review to assess the potential for using high-viscosity fuel oil to reduce the plants generation costs The standard methodologies used by the industry to determine the baseline performance evaluation of steam and combined cycle power plants are ANSI/ASME PTC-6 and ANSI/ASME PTC-46 respectively. However, these methodologies could not be followed for a number of limitations for GENCOs. These limitations include: Lack of availability of accurate and calibrated instrumentation in the power station for online or off-line evaluation of efficiency Lack of trained staff and manpower to carry out detailed measurement procedures under controlled testing conditions Software tools to carry out the component-wise heat balance analysis of the plant Extensive data that includes ambient conditions, design data, correction curves and operating conditions for the main heat path components such as boilers, turbines, condensers, and cooling towers. A specific testing protocol was devised for each unit on the basis of its fuel supply systems, instrumentation status, and other operating conditions. A number of units were not available for testing due to different operational reasons. Exhibit I provides a R1V02TAG: 04/27/11 Executive Summary ii

3 summary of units that were tested and those not tested along with the reasons for their unavailability. Exhibit I: Unit-wise Testing Status of GENCOs Power Station Units Tested Units Not Tested Reasons for Not Testing the Units TPS Jamshoro Units 1-4 TPS Guddu Steam Block Units 1-2 Energy input could not be measured due to absence of gas flow meters TPS Guddu CCP Block Block 2-A (GT 7, GT8, ST 5) Block 1 (GT 11, GT12, ST 13) Unit 3 Unit 4 Block 2-B (GT 9, GT10, ST6) Energy input could not be measured accurately due to due to errors in gas and RFO flow meters On prolonged shutdown from December 2010 to March 2011 due to break down of air preheater Energy input could not be measured accurately due to lackof functional and calibrated gas flow meters TPS Muzaffargarh Units 2-6 Unit 1 On prolonged shutdown from November 2010 to mid- April 2011 due to delay in replacement of super heater tubes The heat rates and efficiency parameters for the power stations have been calculated only for the purpose of baseline evaluation or a benchmark for determining efficiency gains and operational improvements to be achieved after the implementation of the USAID FARA Repair and Maintenance Plan currently under implementation at these GENCOs. It should be noted that heat rates in this study were determined under steady loading and specific ambient and operating conditions of the units during the winter season. Average annual heat rates for the power stations are likely to be higher due to variations in ambient conditions and loading levels, inclusive of startups and shutdowns. Findings and Results All the steam units of TPS Jamshoro and TPS Muzaffargarh are dual fuel plants having gas and residual fuel oil (RFO) firing facilities except for Unit 1 of Jamshoro that has only fuel oil firing capability. However, these plants were only operating on RFO firing due to shortage of natural gas. TPS Guddu uses medium calorific raw gas from Mari and Kandhkot. Steam Unit 3 and 4 at Guddu can also operate on mixed firing with RFO as secondary fuel. Due to poor maintenance of the power stations, GENCOs have lost nearly one third of their capacity and nearly 17% of their thermal efficiency due to plant degradation. The Exhibit II shows the unit-wise results of performance evaluation tests for the power stations. R1V02TAG: 04/27/11 Executive Summary iii

4 Exhibit II: Results of Output Capability, Heat Rate and Availability of GENCOs Installed Capacity MW Present Gross Capability MW Present Net Capability MW Capacity Degradation Design Heat Rate Design Net Efficiency Gross Heat Rate Gross Efficiency Net Heat Rate Net Efficiency Average Availability in FY2010 Average Availability in FY2011 TPS Jamshoro Unit % 9, % 9, % 10, % 73% 80% Unit % 10, % 11, % 12, % 88% 69% Unit % 10, % 11, % 13, % 85% 58% Unit % 10, % 10, % 11, % 91% 79% Total Jamshoro % 84% 72% TPS Guddu CCP Block Block 2-A GT % 10, % 12, % 12, % 78% 96% GT % 10, % 13, % 13, % 98% 92% ST % % 97% Total Block 2-A % 9, % 9, % 98% 95% Block 1 GT % 10, % 12, % 12, % 99% 100% GT % 10, % 12, % 12, % 99% 100% ST % 97% 86% Total Block % 8, % 8, % 98% 95% Total Guddu CCP % 95% 95% R1V02TAG: 04/27/11 Executive Summary iv

5 Installed Capacity MW Present Gross Capability MW Present Net Capability MW Capacity Degradation Design Heat Rate Design Net Efficiency Gross Heat Rate Gross Efficiency Net Heat Rate Net Efficiency Average Availability in FY2010 Average Availability in FY2011 TPS Muzaffargarh Unit % 9, % 10, % 10, % 88% 83% Unit % 9, % 9, % 10, % 81% 96% Unit % 9, % 10, % 11, % 97% 60% Unit % 10, % 11, % 13, % 47% 72% Unit % 10, % 12, % 14, % 77% 78% Total Muzaffargarh 1, % 80% 62% R1V02TAG: 04/27/11 Executive Summary v

6 The key results of the performance evaluation tests are described below. TPS Jamshoro The average capacity degradation was found to be 32% compared to the installed capacity with a maximum degradation of 40% for Unit 2 and a minimum degradation of 23% for Unit 1. The average drop in the net efficiency is about 20% from the design efficiency of the power station. Unit 1 is most efficient with 32% net efficiency against the design efficiency of 36.6%. The net efficiencies of Units 2-4 ranged between 25.7% to 28.6% against the design efficiency of 34%. The average availability of the power station was 84% in FY2010 and 72% in FY2011 (till November 2010). However, if this availability is corrected for lost output of the plant due to degradation, the availability factor would drop by about 35%, indicating poor performance of the plant. TPS Guddu CCP Block 1 has shown 40% degradation in its capacity from the installed capacity whereas CCP Block 2-A appears to be in better condition with only 17% capacity degradation. The gas turbines (GTs 7 and 8) in Block 2-A showed net efficiencies of 27.8% each against the design efficiency of 31.7%. The GT 11 and GT 12 in Block 1 showed the net efficiencies of 26.5% and 25.3% respectively against the design efficiency of 32.1%. The net efficiency of the Block 2-A and Block 1 were calculated to be 35.3% and 41.5% respectively. The average availability of the units tested under the study at power station was in excess of 95% but if this availability is corrected for lost output of the plant owing to degradation, the availability factor would drop by about 30%, quite low from industry standards. TPS Muzaffargarh The power station is operating with an overall capacity degradation of around 40%. Capacity degradation for the units varied between 20% for Unit 2 to 63% for Unit 6. The power station is facing an overall degradation of around 18% in its net efficiency. Units 2 and 3 are in better condition with 31% net efficiency compared with their design efficiency of 36.8%. Unit 4 has a net efficiency of 30% against 36.7% design efficiency. Units 5 and 6 have efficiencies of 26% and 24% respectively against the design efficiency of 31.7% for both units. The average availability of the power station was in 80% and 62% in FY2010 and FY2011. The availability of TPS Muzaffargarh would also drop by 40% if corrected for lost output of the plant. The auxiliary consumption and energy sent out on many units could not be measured with accuracy due to indiscrete or absent metering. Therefore gross output capability and heat rates should be used for the benchmarking purpose in this study. Conclusions Based on the observations of the audit team, interviews with the power stations management and operational staff and review of historic records of the plants, and capacity and heat rate tests conducted at the operational units, a number of reasons were identified behind the overall decline in the performance of the power stations studied. R1V02TAG: 04/27/11 Executive Summary vi

7 Quality of RFO None of the samples complied with Pakistan Standard and Quality Control Authority (PSQCA) specifications for RFO. High specific gravity values were obtained due to higher water contents. Only one sample met the standard calorific value of 18,200 Btu/lb. Moreover, the low calorific value up to 8.5% below the minimum permissible limit was observed due to high specific gravity, water and ash contents. Measurement Accuracy of Energy Input and Output The discrete measurement of fuel supplied and energy generated and sent out for each unit of the plant was found to be inadequate. No credible measurement system exists for RFO received from the supplier as well as fed to the installed units from the storage facilities of the plant. The same applies to natural gas supplied and consumed at Guddu power station. At Guddu, the gas supplied to residential colony is not measured. Measurement instruments are either not calibrated, non-functional, or absent. No uniform standards are followed for measurement of energy output. Auxiliary supply is not discrete or fully measured for each unit resulting in inappropriate accounting of auxiliary consumption. Testing quality and procedures adopted by plants internal laboratories are also highly questionable as they lack transparency and quality control. None of the RFO samples complied with Pakistan Standard and Quality Control Authority (PSQCA) specifications in one or more tests. Water and ash contents were found to be higher than the maximum limits prescribed by the PSQCA Lack of Preventive Maintenance A number of maintenance activities are long overdue and have already resulted in loss of output capability, increasing heat rates and lower availability. GENCO managements are forced to delay the overhauling of the plants and are not able to carry out regular preventive maintenance to avoid break-down of the plants for the following reasons: Refusal of shut-down time by the system operator (NTDC) due to shortages in power supply in the country, Delay in payments to GENCOs against power sales, and Delay in procurements of parts and services for plants major overhauling. Poor Housekeeping GENCO managements are paying little attention to simple housekeeping activities which do not require large expenditures. Examples include: Frequent steam leakages in boiler and other steam usages increase heat loss at the plant as well as raise water purification cost due to excessive use of chemicals. A number of critical plant components are not operating at their optimal conditions, causing frequent tripping and breakdowns of the units. R1V02TAG: 04/27/11 Executive Summary vii

8 Plant management is generally oblivious to environmental conservation and protection. Massive oil spills and un-optimal combustion results in higher rate of toxic emissions and effluent discharges causing environmental threats to adjacent population, flora and fauna. Lack of Performance Evaluation, Monitoring, and Reporting No attention is given to the performance evaluation of the plants and as such no standards are observed to assess the performance of the plants. The present monitoring and reporting system covers a few technical parameters and is not capable to provide a detailed assessment of the plants. Plants are running in manual mode in the absence of modern monitoring and control systems. The absence of performance evaluation standards and an on-line integrated management information system (MIS) severely limits the ability of the management to take prompt decisions and initiate actions and remedial measures for efficient operation of the plants. Limited Financial and Administrative Autonomy Managements of GENCO plants have limited financial autonomy to take independent decisions. Payments to GENCOs are not made on time which results in deferment of maintenance routines which is a major reason behind plant output and efficiency degradation. Approval process for procurement of spare parts and services through international tendering is cumbersome and time consuming. Management is not empowered to initiate a performance-based human resource management system to promote efficiency and competition. The plants are suffering from overstaffing with majority of staff working without specialized industrial training to perform their duties Occupational health, safety, and environmental management system and relevant trainings are not observed at the plants increasing the potential of a safety hazard at the plant Recommendations In order to improve the performance of the GENCOs, the following recommendations are made: A standard measurement and testing protocol needs to be devised for GENCOs for all measurement to avoid errors in financial transactions. GENCOs should carry out a detailed exercise to devise a robust measurement mechanism for RFO receipts at the plants to reduce oil pilferages and acceptance of substandard oil. A third party RFO testing mechanism should be established on regular basis to ensure the quality of fuel received from supplier. The contracts with the fuel R1V02TAG: 04/27/11 Executive Summary viii

9 supplier should include penalties or correction in price for supply of substandard oil. A detailed management study is required to prescribe key performance indicators pertaining to financial, human and environmental performance of the plant and the procedures to evaluate them on sustainable basis. The Inspection, Testing and Records (ITR) and Maintenance Management System (MMS) sections may be merged to form a Performance Monitoring Section (PMS) at each power station to provide a wider range of performance evaluation and monitoring services. On-line analyzers and instruments with communication channels to a central performance modeling system should be installed to assess the performance and efficiency of the plant on a continuous basis. The PMS should operate this system and advise the operations and maintenance staff on corrective and preventive actions to be taken to meet the performance targets. Special training and workshops should be arranged to educate and train the management and staff about best industrial practices to operate and maintain the power stations. The capacity of in-house repair and maintenance workshops should be enhanced with modern machines, tools and training of staff to provide maintenance services of critical parts locally to reduce down-time There is a need to establish an R&D or a Technical Services section to carryout research on technical and management problems of the power stations and devise solutions Switching to heavier grade RFO will require capital investment in the infrastructure for storage, handling, transportation, and utilization of RFO. A detailed feasibility study including the infrastructure analysis of PSO and required modifications at the steam turbine and diesel engine based power plants and assessment of the resulting cost savings is recommended to ascertain the economics of burning heavier grade fuel oils. The government is currently implementing a Generation and Transmission Improvement Plan (GTIP) for the GENCOs. The resolution of management and operational issues identified in this study require a complete change in the management approach and operational environment of the GENCOs. The government could consider bringing in independent management under a performance based O&M contract based on a structure of incentives and penalties against the performance of the power stations. The terms and conditions of the O&M contract could be designed in a manner to make the contractor responsible for injecting investment for rehabilitation of the units and bringing in highly trained and experienced senior managers. The O&M contractor may be given extended authority to reward and motivate employees and to take disciplinary action and adjust the size of the work force. This approach will help in establishing and expanding the O&M industry and in improving the efficiency of the power sector in the country. R1V02TAG: 04/27/11 Executive Summary ix

10 Contents 1. Introduction Objectives and Scope of Work Study Team Acknowledgement Organization of the Report Methodology Limitations of Standard Methodologies and Approach Adopted for the Study Measurements and Collection of Data on Plant Performance Testing of Fuel Quality Testing Arangements and Schedule Description of GENCO Plants Fuel Supply Arrangements TPS Jamshoro TPS Guddu TPS Muzaffargarh Maximum Present Capability General Approach and Overall Limitations TPS Jamshoro TPS Guddu TPS Muzaffargarh Heat Rate Analysis Definitions Limitations in Assessment of Heat Rates Testing Schedule Measurement of Fuel Flow Metering of Electrical Output Application of Heat Rate Assessment TPS Jamshoro Testing Procedures and Data Analysis Results TPS Guddu Testing Procedures and Data Analysis Results TPS Muzaffargarh Results R1V02TAG: 04/27/11 Contents x

11 6. Power Plant Availability Definitions and Limitations Data and Results TPS Jamshoro TPS Guddu TPS Muzaffargarh Major Reasons for Degradation of Performance Technical Issues Measurement Accuracy of Fuel Received Fuel Oil Quality Lack of Preventive Maintenance Poor Housekeeping Management Issues and Recommenadations Lack of Performance Evaluation Limited Financial and Administrative Autonomy Absence of Plant Automation and Management Information System Other Management Issues Detailed Technical Assessment of GENCOs TPS Jamshoro TPS Guddu TPS Muzaffargarh Usage of High Viscosity Fuel Oil in GENCO Power Plants Fuel Oil Standards Potential for use in Power Generation in Paksitan Modifications Required in Fuel Oil Handling at the Power Plants Modification and Adjustments Required in the Boilers Fuel Oil Procurement and Supply APPENDICES Appendix A: Fuel Oil Analysis Results Appendix B: Data and Results of the GENCOs Capacity Test Appendix C: Testing Procedures for Measurment of GENCOs Gross and Net Heat Rates Appendix D: Calculation of GENCOs Gross and Net Heat Rates Appendix E: Power Plant Availability R1V02TAG: 04/27/11 Contents xi

12 Exhibits Exhibit 1.1: Locations of Power Stations Studied Exhibit 1.2: Formation of the Consulting Team Exhibit 3.1: Natural Gas Supply Arrangements at the Power Stations Exhibit 3.2: GENCO wise Installed and Derated Capacities, Plant and Fuel Types, and Efficiencies from PEPCO Statistics Exhibit 3.3: 200 MW Steam Unit No. 2 at TPS Jamshoro Exhibit 3.4: Oil Storage Tanks at TPS Jamshoro Exhibit 3.5: 200 MW Steam Unit No. 3 at TPS Guddu Exhibit 3.6: RFO Storage Capacity at the Power Stations-TPS Guddu Exhibit 3.7: 200 MW Steam Unit No. 6 at TPS Muzaffargarh Exhibit 3.8: Oil Decanting from Railway Wagons and Tank Lorries attps Muzaffargarh Exhibit 3.9: RFO Storage Capacity at the Power Stations-TPS Muzaffargarh Exhibit 3.10: Oil Storage Tanks at TPS Muzaffargarh Exhibit 4.1: Exhibit 4.2: Exhibit 4.3: Unit-wise Installed Capacity and Present Capability TPS Jamshoro Unit-wise Installed Capacity and Present Capability of Units Tested Under the Study TPS Guddu Unit-wise Installed Capacity and Present Capability of Units Tested Under the Study TPS Muzaffargarh Exhibit 5.1: Exhibit 5.2: Exhibit 5.3: Unit-wise Gross and Net Heat Rate and Efficiency TPS Jamshoro Unit-wise Gross and Net Heat Rate and Efficiency TPS Guddu Unit-wise Gross and Net Heat Rate and Efficiency TPS Muzaffargarh Exhibit 6.1: Unit-wise Availability TPS Jamshoro Exhibit 6.2: Unit-wise Availability TPS Guddu Exhibit 6.3: Unit-wise Availability TPS Muzaffargarh R1V02TAG: 04/27/11 Exhibits xii

13 Exhibit 7.1: Average Degradation in Performance of GENCOs Exhibit 7.2: Summary of Results of Fuel Oil Testing Exhibit 7.3: Poor Maintenance of Insulation at TPS Jamshoro Exhibit 7.4: Steam Leakages at TPS Muzaffargarh Exhibit 7.5: View of a Nonfunctional Soot Blower at TPS Jamshoro Exhibit 7.6: Oil Spillage at Storage Facility at Muzaffargarh Exhibit 7.7: View of the Joint Control Room of Units 3 and 4 at TPS Jamshoro Exhibit 7.8: Smoke Showing Poor Combustion at Unit No. 6 at TPS Muzaffargarh Exhibit 7.9: River Water Quality Supplied at TPS Jamshoro in January Exhibit 7.10: Reasons for Drop in Performance of the Plant TPS Jamshoro Exhibit 7.11: Damaged Air Pre-heater due to Fire of Unit No. 4 at TPS Guddu Exhibit 7.12: Poor Cooling of Turbine Section of Unit No. 3 at TPS Guddu Exhibit 7.13: Reasons for Drop in Performance of the Steam Units TPS Guddu Exhibit 7.14: View of Under Repair Induced Draft Fan of Unit No. 1 at TPS Muzaffargarh Exhibit 7.15: Unit-wise Reasons for Drop in Performance of the Steam Units TPS Muzaffargarh Exhibit 8.1: RFO Specifications ISO 8217: R1V02TAG: 04/27/11 Exhibits xiii

14 1. Introduction Advanced Engineering Associates International (AEAI) engaged to carry out an energy audit of the thermal power stations (TPSs) of the following three state owned power plants: 1. TPS Jamshoro, or the Jamshoro Power Company Ltd., commonly referred to as GENCO I, 2. TPS Guddu, which is a part of Central Power Generation Company Ltd. commonly referred to as GENCO II), and, 3. TPS Muzaffargarh which is a part of Northern Power Generation Company commonly referred to as GENCO III. These thermal power stations are collectively referred to as GENCOs in this report. The locations of these thermal power stations in the country are shown in Exhibit Objectives and Scope of Work The main objective of the study was to carry out a baseline evaluation or a benchmarking for determining efficiency gains and operational improvements to be achieved through the implementation of the USAID Fixed Amount Reimbursement Agreements (FARA) Repair and Maintenance Plan currently under implementation at these GENCOs. The main features of the scope of work of the study were: Visual inspection of all units of three GENCO power stations, review of the station logbooks and other available records to establish main reasons for the poor performance of the plants and the present generation capacity. Interviews and discussions with the plant managers/operators and determine the reasons for poor performance. Drawing of performance profile of each unit including operating parameters, such as effective output capability, power plant availability, heat rate and efficiency of each unit. Determination of specific fuel consumption and monitor on line calorific value of fuel being injected into each machine. Carrying out a spot fuel oil analysis to determine the heat contents and quality of the fuel oil being supplied to the power stations. Determination of heat rate and efficiency of each unit. Carrying out a brief technical review to assess the potential for using highviscosity fuel oil to reduce the plants generation costs. Preparation and submission of Energy Audit Report for each of the GENCOs. Three teams of power generation experts were formed to carry out the site visits and conduct tests to assess the capacity and heat rates of the operational units of the plants. Introduction R1V02TAG: 04/27/11 1-1

15 Exhibit 1.1: Locations of Power Stations Studied Introduction R1V02TAG: 04/27/11 1-2

16 1.2 Study Team The study team consisted of experienced engineers who have been extensively involved in the construction and operation of the power stations studied, and have retired from senior positions at the GENCOs. The names and specific assignment of the consultants involved in the study are listed in Exhibit 1.2. Name of Consultant Exhibit 1.2: Formation of the Consulting Team 1 Manzar Naeem Qureshi Team Leader 2 Muhammad Qasim Shaikh TPS Jamshoro Responsibility 3 Abdul Waris Khan TPS Guddu Combined Cycle Power Station Block 4 Abdul Aziz Chandio TPS Guddu Steam Power Station Block 5 Abdul Karim Leghari TPS Muzaffargarh Additional staff was engaged at each power station to assist the Consultants in taking concurrent meter readings of input and output energy measurements at the power stations. 1.3 Acknowledgement The management of the GENCOs extended their generous cooperation in facilitating the audit teams, and allowed unhindered and unlimited access to power station equipment, instruments, data records and personnel for interviews. HBP management would like to extend their profound gratitude to the management of the GENCOs for their support in completing the assignment. 1.4 Organization of the Report Section 2 of the report describes the methodology used to carry out the capability and efficiency tests for the GENCOs. Section 3 provides an overview of the power stations in terms of configuration and fuel supply arrangements. Section 4 presents the results of the unit-wise maximum capability tests for each power station. Section 5 provides detailed procedures employed for carrying out the heat rate tests and presents the results of heat rate and efficiency for each unit of the power stations. Section 6 shows the unitwise annual availability in terms of load factor, utilization factor and availability. Section 7 provides a detailed account of the main technical and management reasons causing the drop in performance of these power stations. Section 8 sums up the conclusions and recommendations of the study. Introduction R1V02TAG: 04/27/11 1-3

17 2. Methodology 2.1 Limitations of Standard Methodologies and Approach Adopted for the Study The standard methodologies used by the industry to determine the baseline performance evaluation of steam and combined cycle power plants are ANSI/ASME PTC-6 and ANSI/ASME PTC-46 respectively. Application of these methodologies helps in accurate determination of performance of the power stations and generation of analysis and information for optimization of their performance. These standard methodologies have the following requirements: Availability of accurate and calibrated instrumentation in the power station for online or off-line evaluation of efficiency Trained staff and manpower to carry out detailed measurement procedures under controlled testing conditions Software tools to carry out the component-wise heat balance analysis of the plant Extensive design data and correction curves for the main heat path components such as boilers, turbines, condensers, and cooling towers. Ambient conditions including temperature and humidity, and Data on operating conditions at the inlet and outlet of the main heat path components, such as temperatures, flow rates, and stream composition. None of the GENCOs studied fulfill the requirements listed above. Preparing the GENCOs to fulfill these requirements would require extensive capacity building and installation of necessary instrumentation, which was beyond the scope and schedule of this study. It was therefore not possible to conduct a comprehensive audit of the performance of the GENCOs using the standard industry methodologies given the prevailing conditions and the operating environment in the GENCOs and the time constraints for the study. In view of these limitations, the standard industry methodologies were modified and applied in a simplified manner to measure the capacity and input and output energy of the plants to calculate the heat rate and efficiency, and to work out the plant availability on monthly and annual basis. Industry experience indicates that heat rate test conducted by using formal ASTM-6 procedure has an accuracy of about 3%. Given the poor condition of instrumentation that were not properly calibrated, unusual operating conditions for testing, and improvised test protocols, the accuracy of the heat rate tests under this study could range between 5-10% as per expert judgment. This aspect should be kept in view while comparing the results of benchmarking conducted under this study with the follow-up tests to be conducted after completion of FARA program. Methodology R1V02TAG: 04/27/11 2-1

18 2.2 Measurements and Collection of Data on Plant Performance Special teams, comprising of instrumentation experts, were formed to carry out tests at each unit. A specific testing protocol was devised for each unit on the basis of its fuel supply systems, instrumentation status, and other operating conditions. The measurement points were marked beforehand and measurement procedures were established keeping in view the operating constraints of the unit. Special proformas were designed to prescribe the measurement specifications and to maintain testing records. Standard conversions and definitions were used to calculate the output and heat rates of the units. The measurement procedures were documented and are presented in Section 5 of this report. Residual fuel oil (RFO) consumption was calculated by using dip-tape, calibration charts of the feeding tanks, and specific gravity of RFO at observed temperatures. Natural gas consumption at TPS Guddu was measured through the meters installed at the units in the power station. Electrical outputs at gross and sent-out meters, and auxiliary consumption were recorded at the metering locations of the units studied. All the readings were taken concurrently and coordination was managed through mobile phones and hand held radio phones. The Consultants did not engage any serving person from the GENCOs for the purpose of assisting the teams in reading of instruments or recording the observations. No unit logsheet entries and event registers were used or consulted for extracting the information and data for the purpose of calculation of heat rates. The Consultants ensured uninterrupted operation of the plants throughout the testing period. The testing schedule was designed to avoid interference with operations and management of the power station. The Consultants relied to the extent possible on the installed measurement instruments, and used their own equipment such as dip-tapes to carry out the assignment where required. 2.3 Testing of Fuel Quality RFO RFO samples were drawn from the main storage tanks of these power stations in accordance with the ASTM methodology; Standard Practice for Manual Sampling of Petroleum and Petroleum Products: D (Reapproved 2000). The parameters studied to assess the quality of RFO included specific gravity, flash point, pour point, water contents, sulfur, ash content and calorific value. A composite sample was drawn from each of the storage tanks consisting of a blend created from the upper, middle, and lower samples from a single tank. The sample was obtained with the help of a specially designed sampling tube also called special thief. The bottom sample was taken from the height of 1.5 to 2.0 meters from bottom of the tank as the outflow of the tank was drawn from the height of 1.0 meters. The samples were packed in aluminum bottles and dispatched to an independent laboratory for testing. In all, eighteen samples were drawn; 4 from TPS Jamshoro; 5 from TPS Guddu; and 9 from TPS Muzaffargarh. Samples were collected during the period of December 29, 2010 to January 5, 2011 and analysis was carried out by Quality Control Laboratory of Attock Refinery Limited, Morgah Rawalpindi. Methodology R1V02TAG: 04/27/11 2-2

19 2.4 Testing Arangements and Schedule The detailed procedures developed for performance testing of each unit are described in Section 5 of this report. TPS Jamshoro Prior to conducting the performance tests, inspections of all the units at the power plant were carried out in the presence of the representatives of the power station management. The operational conditions of the units were observed and necessary information and details were gathered. Although all the units were in operating condition, the plant management could run only one unit at a time due to shortage of demineralized water. Further, the units could not operate at optimum load on continuous basis for longer periods on RFO firing due to choking of rotary air pre-heaters. Therefore, the Consultant s team faced considerable difficulty in finding an appropriate window of time to carry out heat rate and capacity tests for continuous three days without interruption at optimum operating conditions. Heat rate and capacity tests at the plants were performed in the following sequence: TPS Guddu Unit 1: January 19-21, 2011 for heat rate tests and January 21-23, 2011 for capacity tests Unit 2: January 21-23, 2011 for both heat rate and capacity tests Unit 3 & 4: February 17-19, 2011 for both heat rate and capacity tests Meetings were held with the concerned management of each unit before the beginning of testing. Block 2 B comprising of Units 6, 9 and 10 did not have functional gas flow meters and therefore could not be tested. Similarly, Unit 4 was on long shut down due to break down of air pre-heater. Units 1 & 2 also do not have gas flow meters and therefore were not tested. The testing of these units was deferred until gas flow meters are made operational on all of these units and repair/replacement of air pre-heater of Unit 4. Capacity and Heat Rate Tests at the plants were performed in the following sequence: Unit 3: December 30, 2010 to January 1, 2011 Block 2 A (Unit 5, 7& 8): December 30, 2010 to January 2, 2011 Block 1 (Unit 13, 11& 12): January 3-6, 2011 TPS Muzaffargarh Before undertaking the performance tests, inspection of all the units installed in different phases (1 & 2) was carried out in the presence of representatives of the power station management. The operational conditions of the units were observed and necessary information and details were gathered. Unit 1 was placed under a long shutdown since November 11, 2010 for repair/replacement of super heater tubes. However, the repair/replacement of ends of super-heater tubes was delayed due to arrival of Russian experts of the Original Methodology R1V02TAG: 04/27/11 2-3

20 Equipment Manufacturer (OEM). The unit could not be restarted until the middle of April 2011 and therefore the performance testing of this unit could not be conducted. Heat Rate Tests & Capacity Tests at the plants were performed in the following sequence: Unit 2 & 3: January 9-11, 2011 Unit 4: January 5-7, 2011 Unit 5 & 6: January 2-4, 2011 Methodology R1V02TAG: 04/27/11 2-4

21 3. Description of GENCO Plants Total installed capacity of the three power plants studied is 3,855 1 MW out of which 2,840 MW consists of dual fuel steam turbines, and 1,015 MW of gas fired gas turbine combined cycle (CCGT) power plants installed at Guddu. The dual fuel plants operate on pipeline quality natural gas and residual fuel oil (RFO), whereas CCGT units installed at Guddu use medium calorific value (MCV) gas ( Btu/scft). Nearly 90% of the installed capacity of GENCOs is over 15 years old, and is generally in poor condition. Due to the weak financial conditions prevailing amongst power sector entities, the Water and Power Development Authority (WAPDA) which owned the units until 1998 and the Pakistan Electric Power Company Ltd. (PEPCO) which owns them now, have not been able to allocate adequate funds to meet the operational and maintenance expenditures of these plants. These factors have contributed to a gradual loss of effective capacity, efficiency, and dispatch availability of these plants. Consequently, the GENCOs are currently operating their plants at a derated capacity that is 25% below their respective nameplate capacities. The combined cycle units at Guddu, however, are an exception and can operate on full capacity if natural gas injection pressures are restored to the design levels. The average forced outage rate for the GENCOs has been about 12%, compared with 6% for thermal IPPs in the country. Nearly all of the GENCO power plants studied are operating at a much lower efficiency levels than the industry-wide standards for plants of similar age and configuration. Exhibit 3.2 provides a snapshot of the current status, age, and origin of these plants. 3.1 Fuel Supply Arrangements Most of the steam units at the power stations have the provision of dual fuel combustion on natural gas and RFO. Unit 1 at TPS Jamshoro can only operate on RFO. The Steam Units 1-2, and combined cycle units at TPS Guddu operate on MCV gas supplied from Mari, Kandhkot, and Zamzama gas fields. The power station-wise details of the fuel supplies are given below. Natural Gas All the power stations have connections with the utilities for supply of natural gas. However, gas utilities used these plants as swing customers and curtailed the gas supplies during winter to meet the heating demand of the residential and commercial consumers. TPS Jamshoro and TPS Muzaffargarh do not have firm supply contracts with their respective gas supply utilities and therefore receive natural gas only when there is surplus in the national gas network. The county is presently facing a shortfall in the natural gas supplies due to rising gas demand and the gas utilities have been unable to maintain supply of pipeline quality gas to these power stations even during the summer period. 1 Power System Statistics, 34th Edition, 2009 Description of GENCO Plants R1V02TAG: 04/27/11 3-1

22 Exhibit 3.1 contains the sources and fuel supply arrangements for natural gas for the GENCO plants. Exhibit 3.1: Natural Gas Supply Arrangements at the Power Stations Power Station Gas Supply Source Contract Status TPS Jamshoro Sui Southern Gas Company No firm contract as and when available TPS Guddu Mari Gas Mari Gas Company* 60 MMscfd Kandhkot gas Pakistan Petroleum Limited Zamzama Gas through SNGPL and SSGC networks ( ) MMscfd No firm contract Not supplied since 2005 TPS Muzaffargarh Sui Northern Gas Pipelines No firm contract as and when available * Gas supplies to Guddu from Mari have been reduced to 60 MMscfd from 110 MMscfd after diversion of 50 MMscfd to Fatima Fertilizer from November 27, Residual Fuel Oil (RFO) RFO is supplied to all GENCOs by Pakistan State Oil (PSO). However, only TPS Muzaffargarh has a fuel supply agreement with PSO, whereas the government has advised TPS Jamshoro and TPS Guddu to purchase RFO from PSO exclusively. PSO mainly supplies the RFO from Karachi through railway tank wagons and tank lorries. GENCO plants are designed to operate on fuel oil having kinematic viscosity of 180 centistokes (cst) during summer and 120 cst during winter. RFO Measurement The GENCOs follow a uniform procedure for measurement of the quantity of RFO received from PSO. The initial volumetric measurement is taken by using dip-sticks for both railway tank wagons and tank lorries and fuel oil volumes are converted to weight for the calculation of payments by using specific calibration charts for the lorries/wagons after applying corrections for temperature and specific gravity of RFO. For tank lorries, the weighbridges are also present at all the power stations. The weight of RFO calculated using dip-sticks is verified at the weighbridges by taking measurements of the tank lorries before and after the oil decanting. Several checks are applied to ensure complete decanting of RFO from tank lorries and railway wagons. The weighbridge measurement is not used for making payments to fuel supplier. All tank lorries and railway wagons are tested for temperature and specific gravity of the fuel oil and about 20-25% are randomly selected for detailed analysis of RFO specifications in the local laboratory of the concerned power station. A small proportion of the samples are also tested through independent laboratories to verify the result of the internal laboratory. RFO that does not meet specifications is rejected for procurement. The results of the third party analysis of the RFO samples collected from GENCO power stations are presented in Appendix-A. Oil Storage All the power stations have their own RFO storage facilities at their premises for storage of day requirement of RFO. Description of GENCO Plants R1V02TAG: 04/27/11 3-2

23 Plant TPS Jamshoro Exhibit 3.2: GENCO wise Installed and Derated Capacities, Plant and Fuel Types, and Efficiencies from PEPCO Statistics Installed Capacity Year of Commissioning Fuel Country of Origin Thermal Efficiency (Design) Unit January 1990 RFO Japan 36.6% Unit December 1990 Natural Gas/RFO China 33.9% Unit June 1990 Natural Gas/RFO China 33.9% Unit January 1991 Natural Gas/RFO China 33.9% TPS Guddu Steam Unit Natural Gas Czech Slovakia 28.0% Unit Natural Gas Czech Slovakia 28.0% Unit Natural Gas/RFO USSR 30.0% Unit Natural Gas/RFO China 30.0% CCGT Block 2-A GT December 1985 Natural Gas USA 31.7% GT March 1986 Natural Gas 31.7% ST December 1987 N/A CCGT Block 2-B GT April 1986 Natural Gas USA 31.7% GT April 1986 Natural Gas 31.7% ST March 1988 N/A Description of GENCO Plants R1V02TAG: 04/27/11 3-3

24 Plant CCGT Block 1 Installed Capacity Year of Commissioning Fuel Country of Origin Thermal Efficiency (Design) GT September 1992 Natural Gas Germany 32.1% GT December 1992 Natural Gas 32.1% ST May 1994 N/A TPS Muzaffargarh Unit September 1993 Natural Gas/ RFO Russia 36.8% Unit March 1994 Natural Gas/ RFO Russia 36.8% Unit February 1995 Natural Gas/ RFO Russia 36.8% Unit December 1997 Natural Gas/ RFO China 36.7% Unit February 1995 Natural Gas/ RFO China 31.7% Unit August 1995 Natural Gas/ RFO China 31.7% Source: Power System, Statistics, 34 th Edition, Description of GENCO Plants R1V02TAG: 04/27/11 3-4

25 3.2 TPS Jamshoro TPS Jamshoro is one of the major generation installation connected to the National Grid System in the south of Pakistan. The present installed capacity of TPS Jamshoro is 850 MW consisting of four steam power units. Exhibit 3.3 shows 200 MW Steam Turbine Unit No. 2 at TPS Jamshoro. Exhibit 3.3: 200 MW Steam Unit No. 2 at TPS Jamshoro The staff strength at the power station is 1,550. About 50% of the staff is residing in the residential colony with their families built adjacent to the power house. The residential colonies provide all the basic and civil amenities like school, hospital, recreational centers, playgrounds, mosques, and shopping centers to cater for the needs of the employees. Water supply for cooling and drinking is taken from the Indus River through a pipeline and pumping station network. For drinking purpose, the river water is only clarified whereas for supply to the power plant it is treated further to produce demineralized water for boilers. RFO decanting: TPS Jamshoro has decantation arrangements for both railway tank wagons and road tankers. However, the power station receives RFO only through tank lorries from Karachi as delivery through railway was discontinued in The station has two arrangements for decanting of RFO from tank lorries and railway wagons; an open channel and an oil receiving header. The channel is normally used during dry weather whereas the oil header was initially constructed to decant oil during rainy periods but it is used round the year due to increasing number of incoming tank lorries. Oil is lifted by transfer pumps from the channel and header into storage tanks. In recent times, Description of GENCO Plants R1V02TAG: 04/27/11 3-5

26 RFO Storage: TPS Jamshoro has common RFO storage facilities for all units. It has 4 main storage tanks of 26,500 tonnes each having a total storage of 106,000 tonnes at the plant. These tanks are interconnected and used as common storage for all units. Exhibit 3.4 shows the oil storage facilities at TPS Jamshoro. Exhibit 3.4: Oil Storage Tanks at TPS Jamshoro 3.3 TPS Guddu TPS Guddu has both steam and combined cycle units that operate on medium calorific value (MCV) gas from Mari, Kandhkot and Chachar. Exhibit 3.5 shows a view of the turbine hall of 200 MW Steam Unit No. 3 at TPS Guddu. Exhibit 3.5: 200 MW Steam Unit No. 3 at TPS Guddu Description of GENCO Plants R1V02TAG: 04/27/11 3-6

27 The plant has a staff of about 1,950 persons living with their families at the residential colony built adjacent to the powerhouse. Civil amenities like schools, hospitals, recreational centers, playgrounds, mosques, and shopping centers have been provided at the cost of the company to cater for the needs of the employees. Water supply for cooling and for boiler feed water is taken from the Indus River through a pipeline and pumping station network at the nearby Begari Feeder, Sindh. For drinking purposes, the water taken from the canal is clarified and supplied through overhead tanks. Water is treated to produce demineralized water for boiler feed and other usage at the plant. TPS Guddu is the major generation installation connected to the national grid system in Pakistan in the middle of the country. The other important feature of this plant is that it generates electricity on MCV gas to provide electricity at a comparatively lower cost to national grid. Oil Decanting: The power station has decantation arrangement for road tankers. Oil is decanted into a channel and lifted by transfer pumps into storage tanks. Oil Storage: TPS Guddu has common storage facilities for the steam units 3 & 4. The plant has 9 storage tanks with total capacity of 56,400 tonnes of RFO. Exhibit 3.6 shows the RFO storage facilities at the power stations. Exhibit 3.6: RFO Storage Capacity at the Power Stations-TPS Guddu Power Station Unit No. No. of FO Tanks Capacity of each Tank (Tonnes) Total Storage Capacity (Tonnes) TPS Guddu 2 12,000 24, TPS Muzaffargarh 4 5,000-5,500 21, ,800 11,400 Total 9 56,400 TPS Muzaffargarh is connected to the National Grid System in the mid-country near major load centers. The present installed capacity of TPS Muzaffargarh is 1,350 MW consisting of six steam power units. The Exhibit 3.7 shows the 200 MW Steam Turbine of Unit No. 6 at TPS Muzaffargarh. Description of GENCO Plants R1V02TAG: 04/27/11 3-7

28 Exhibit 3.7: 200 MW Steam Unit No. 6 at TPS Muzaffargarh The plant has staff strength of around 1,500 personnel most of which live with their families in the residential colony built adjacent to the powerhouse. Like other GENCO plants, the staff residential colony provides the civil amenities like school, hospital, recreational centers, playgrounds, mosques, and shopping centers. Water for cooling and drinking purpose is supplied through 35 Tube-wells, which are installed along the banks of Taliri canal flowing 8Km away in the east. Muzaffargarh Thermal Power Plant is the major generation installation connected to the National Grid System in Pakistan in the middle of the country. Oil Decanting: The power station has decantation arrangements for both railway tank wagons as well as tank lorries. Similar to TPS Jamshoro, the oil is decanted into a deep channel and lifted by transfer pumps into storage tanks. The decantation of RFO at Unit 4 as well as Unit 5 & 6 is carried out through oil receiving headers. Presently, only the header for Unit 4 is operational. Exhibit 3.8 shows the RFO decanting station with both railway wagons and tank lorries off-loading oil. Description of GENCO Plants R1V02TAG: 04/27/11 3-8

29 Exhibit 3.8: Oil Decanting from Railway Wagons and Tank Lorries at TPS Muzaffargarh Oil Storage: Each phase of TPS Muzaffargarh has its own dedicated storage facilities that have now been interconnected and can supply fuel to all the operating units. The power station has 11 storage tanks with a maximum capacity of around 241,000 tonnes. Exhibit 3.9 shows the phase-wise installed RFO storage capacity at the power stations. Exhibit 3.10 shows the Oil Storage Facilities at TPS Muzaffargarh. Exhibit 3.9: RFO Storage Capacity at the Power Stations-TPS Muzaffargarh Power Station Unit No. No. of FO Tanks Capacity of each Tank (Tonnes) TPS Muzaffargarh Total Storage Capacity (Tonnes) 1, 2 & ,000 18, ,000 to 111, ,000 ~ 18,500 40,000 37,000 5 & ,000 ~ 25,000 81,000 75,000 Total , ,000 Description of GENCO Plants R1V02TAG: 04/27/11 3-9

30 Exhibit 3.10: Oil Storage Tanks at TPS Muzaffargarh Description of GENCO Plants R1V02TAG: 04/27/

31 4. Maximum Present Capability 4.1 General Approach and Overall Limitations The capacity tests were carried out under certain limitations and restrictions specific to each unit of the power plants. Most of the units could not be operated, even for a shorter duration of time, under full opening of the turbine steam control valve, as recommended under ASME PTC-6, to assess their maximum output capability. Based on their experience, the management had apprehended risk of damage to heater tubes in the boilers and other risks if the boilers were operated above certain loads. Owing to these reasons and the prevailing shortage of power generation capacity in the country, it was agreed with the power station managements that the units will be operated in safe mode for testing purposes to avoid any disruption in operations. The capacity tests were carried out for continuous operation of each unit for 3-4 hours at a time with gross and net output capacity observed and recorded at an interval of one hour. The test was carried out for three days at a unit. The gross and net capability of the unit was calculated on the basis of average readings over the testing period. Detailed data on capacity measurements for each unit of the Jamshoro, Guddu and Muzaffargarh power stations is provided in Appendix B as Exhibit B.1, B.2 and B.3 respectively. 4.2 TPS Jamshoro Limitations of Test: The speed governors of Units 2-4 were not functioning on auto control. The load was therefore adjusted manually to maintain output at a certain level. In case of Unit 1, the output of the unit was temporarily reduced to 187 MW from 200 MW because of overheating of turbine bearing. Results: The results of the capacity tests for TPS Jamshoro are presented in Exhibit 4.1. The capacity tests indicated a maximum degradation of around 40% for Unit 2 from its design capacity and a minimum degradation of around 23% for Unit 1. The overall power station capability has dropped by 32% in the present operating conditions. Unit No. Exhibit 4.1: Unit-wise Installed Capacity and Present Capability TPS Jamshoro Installed Capacity Present Gross Capability Auxiliary Load Present Net Capability MW MW MW MW Capacity Degradation Unit % Unit % Unit % Unit % Total % Maximum Present Capability R1V02TAG: 04/27/11 4-1

32 4.3 TPS Guddu Limitations of Test: The gas flow meters of steam Unit 1 and Unit 2 and CCP Block 2B were not functional and therefore tests could not be carried out for these units. Steam Unit 4 was on extended shut down from December 11, 2010 to March 15, 2011 due to damaged air preheater and therefore could not be tested in the timeframe of this study. Gas flow meters for CCP Block 1 and Block 2-A were functional and capacity tests were therefore carried out at these two units only. Results: CCP Block 1 has shown 40% degradation in its capacity from the installed capacity whereas CCP Block 2-A appears to be in better condition with only 17% capacity degradation, most of which was contributed by the steam turbine Unit 5 which has lost about 29% of its capacity. Exhibit 4.2 provides the unit-wise installed capacity and present capability of the units assessed under the testing procedures. Exhibit 4.2: Unit-wise Installed Capacity and Present Capability of Units Tested Under the Study TPS Guddu CCP Block 1 Installed Capacity Present Gross Capability Auxiliary Load Present Net Capability MW MW MW MW Capacity Degradation GT % GT % ST % Total Block % CCP Block 2-A GT % GT % ST % Total Block 2-A % Total % 4.4 TPS Muzaffargarh Limitations of Test: Unit 1 was on extended shut down from November 2010 to end of March 2011 due to delay in arrival of experts from the Russian manufacturer of equipment to supervise the replacement work. Units 2-6 were tested. Results: Results of capacity tests for Units 2-6 are presented in Exhibit 4.3. Significant degradation was observed on all units when compared with their respective design capacities. Unit 2 was in the best operating condition with 20% degradation in capacity whereas Unit 6 was the worst with 63% degradation in capacity. Maximum Present Capability R1V02TAG: 04/27/11 4-2

33 Unit No. Exhibit 4.3: Unit-wise Installed Capacity and Present Capability of Units Tested Under the Study TPS Muzaffargarh Installed Capacity Present Gross Capabilit Auxiliary Load Present Net Capability MW MW MW MW Capacity Degradation Unit % Unit % Unit % Unit % Unit % Total 1, % Maximum Present Capability R1V02TAG: 04/27/11 4-3

34 5. Heat Rate Analysis 5.1 Definitions The following definitions were followed in the analysis of heat rates: Heat Rate: Heat rate of a plant is the amount of thermal energy required to generate one unit of electrical energy and is generally expressed as K calories/kwh or Btu/kWh. In this report, Btu/kWh has been adopted as the standard units for heat rate. Thermal Efficiency: Thermal efficiency of the power plant also simply referred to as the efficiency of the plant is the ratio of the output energy to the input energy of the plant. It is usually calculated as 3,412/ (heat rate of the plant) expressed in Btu units. Gross and Net Efficiency: Both the heat rate and efficiency could be gross or net depending on the point of measurement of the output of the plant. The gross efficiency is the ratio of the total energy generated from the plant to the total energy input whereas the net efficiency is calculated as the ratio of total energy sent-out from the plant to the total energy input of the plant. The energy sent-out is calculated by subtracting auxiliary consumption of the plant and losses of plant s cable and step-up transformer from the gross generation of the plant. In certain cases, a discrete sent-out meter is installed at the plant that can provide a direct measure of the energy sent out from the plant. 5.2 Limitations in Assessment of Heat Rates A number of limitations were encountered in carrying out the heat rate tests and efficiency in nearly all the cases. These are summarized in the following sections Testing Schedule The GENCO power stations do not have functional flow meters to measure the fuel oil supplied to each unit in continuous manner over a specified period. Oil measurements were taken by using dip-tapes from the service tank or main storage tank depending on the specific arrangement for each unit. Service tanks are smaller in size and provide storage of 3-4 hours of unit s consumption and need to be refilled every 4 hours. The refilling process takes about 1-2 hours. The testing team was working in single shift and therefore could only record observations during daytime working hours. Owing to these reasons, heat rate tests were carried out for continuous operation of each unit for 2-3 hours at a time with input and output energy observed and recorded. The test was carried out once in the morning and once in the afternoon and continued for three days to capture variations in the heat rates under different operating conditions of the unit. The present gross and net heat rates and resulting efficiency of the plant were calculated on the basis of average of the observed readings over the testing period Measurement of Fuel Flow The steam units at the power stations studied have the provision of dual fuel combustion on natural gas and RFO with the exception of Unit 1 at TPS Jamshoro that can only operate on RFO and the Units 1-2 and combined cycle units at TPS Guddu that operate Heat Rate Analysis R1V02TAG: 04/27/11 5-1

35 on medium calorific value (MCV) gas. However, as gas was not being supplied to the plants during the study period, the heat rates of all the dual fuel steam units were tested on RFO. It was observed that the GENCOs have not followed a standard fuel supply arrangement. No credible measurement system was in place for the RFO received from supplier at the power plants. Similarly, no credible measurements were being taken for the RFO fed to each unit from plant s main storage. Most of the measurement instruments were either not calibrated, non-functional, or simply missing. At TPS Muzaffargarh and TPS Guddu, many units have common fuel supply pipelines without adequate measurement instruments at each unit. Similarly, a number of units do not have RFO service tanks to monitor their fuel flow. The same is the case at Guddu where gas flow meters are mostly missing and gas is supplied through common pipelines to the steam and CCGT units. It was therefore quite a challenge to discretely measure the fuel input at most of the units. RFO consumption was calculated by using dip-tape, calibration charts of the feeding tanks (the specific day storage or service tank or the main storage tank, where a day tank is not present), and specific gravity of RFO at observed temperatures. The input valves of the respective feeding tanks of the concerned units were closed before the beginning of the tests and sealed with locks to stop inflow of RFO and recirculation of RFO and condensate. Electrical outputs at gross and sent-out meters, and auxiliary consumption were recorded at the respective meter locations. All the readings at a specific time were taken concurrently and coordination was managed through use of devices such as mobile phones and RF radio equipment. Special teams, comprising of instrumentation experts, were formed to concurrently read the measurement instruments to carry out tests at each unit. At TPS Guddu, the residential colony is also supplied gas from the header meant for steam Units 1 and 2 with no gas measurement for the residential colony. The residential gas consumers have individual gas meters at their premises but due to severe leakages in the gas distribution network, the consumers are charged a flat rate with respect to size of their houses Metering of Electrical Output The same applied to the output side of the plants as no uniform standards are followed for measurement of energy output. Auxiliary supply is not discrete for certain units resulting in inappropriate accounting of auxiliary consumption. In many instances, auxiliary consumption is not even fully measured. The units at TPS Muzaffargarh do not have discrete sent-out meters at each unit to record net output. In case of TPS Jamshoro, the measurement scale of the sent-out meter was in GWh at the NTDC grid station, giving little resolution to measure the difference in kwh. The cable and step-up losses could not be calculated at any instance due to absence of appropriate metering protocol and therefore were not included in the calculation of net heat rate and efficiency. It was therefore recommended to use the gross heat rates and efficiency as the baseline or benchmark for the purpose of this study instead of net heat rate and efficiency. Heat Rate Analysis R1V02TAG: 04/27/11 5-2

36 5.2.4 Application of Heat Rate Assessment The heat rates and efficiency parameters for the power stations have been calculated only for the purpose of baseline evaluation or a benchmark for determining efficiency gains and operational improvements to be achieved after the implementation of the USAID FARA Repair and Maintenance Plan currently under implementation at these GENCOs. It should be noted that heat rates in this study were determined under steady loading and specific ambient and operating conditions of the units during the winter season. Average heat rates for the power stations are likely to be higher due to variations in ambient conditions and loading levels, inclusive of startups and shutdowns. 5.3 TPS Jamshoro Testing Procedures and Data Analysis TPS Jamshoro has four dual fuel steam units that were operating on RFO only during the testing period. Heat rate tests were carried out for all the units of the power station. The specific procedure for calculation of heat rates for TPS Jamshoro is illustrated in Appendix C. The unit-wise detailed data compiled on heat rate measurements for TPS Jamshoro is presented in Appendix D as Exhibit D Results The gross and net heat rate and efficiency for the generation units at TPS Jamshoro are presented in Exhibit 5.1. Unit 1 is most efficient with 32% net efficiency against the design efficiency of 36.6%. The net efficiencies of Units 2-4 ranged between 25.7% to 28.6% against the design efficiency of 34%, corresponding to an overall drop in the efficiency of the power station of about 20% compared to the design. Heat Rate Analysis R1V02TAG: 04/27/11 5-3

37 Unit No. Gross Energy Generation (kwh) Exhibit 5.1: Unit-wise Gross and Net Heat Rate and Efficiency TPS Jamshoro Fuel Consumption (Mmbtu) Gross Heat Rate (Btu/kWh) Gross Efficiency* Auxiliary Consumption (kwh) Net Sent-out Energy (kwh) Net Heat Rate (Btu/kWh) Net Efficiency (%) Unit 1 2,786,946 27,392 9, % 231,862 2,555,084 10, % Unit 2 1,361,912 15,971 11, % 83,370 1,278,542 12, % Unit 3 1,242,596 14,761 11, % 129,597 1,112,999 13, % Unit 4 1,422,838 15,521 10, % 122,336 1,300,502 11, % * Gross heat rates and efficiency is recommended to be used for benchmarking purpose. Heat Rate Analysis R1V02TAG: 04/27/11 5-4

38 5.4 TPS Guddu TPS Guddu has two main set of power generation units, a steam block and a Combined Cycle Power Station (CCP) block. In the steam block complex, the plant has four (4) steam units out of which Units 1 and 2 can operate only on natural gas. Units 3 and 4 are dual fuel on natural gas and RFO. In the CCP block, the plant has three combined cycle sub-blocks of (2 GT+1 ST) gas fired CCGT. The plant receives MCV gas from Mari, Kandhkot and Chachar. Measurement of Fuel Supply TPS Guddu has major shortcomings with respect to fuel measurement both on supply side as well as for the consumption in the power plant. No gas sales meters are installed by the gas suppliers at the premises of the plant and gas is billed from the meters installed at the supplier end of the pipelines. Gas from various supply sources is mixed at a gas mixing station on the plant s premises. The mixing station has separate headers for steam and CCP blocks from where it is branched through separate pipelines to each unit. The gas is supplied at a pressure for of 11 bar to steam units and at 23 bar to CCP. No measurements are taken for the outflow of gas from mixing headers. Units 3 and 4 have functional gas flow meters whereas Units 1 and 2 are operating without the gas flow meters. Units 1 and 2, therefore, have no gas inflow measurements to establish the input energy for the purpose of calculation of heat rate and efficiency. The heat rate and capacity testing of Units 1 and 2 was postponed until installation of appropriate gas metering system on supply of gas to each unit. Fuel oil is also supplied to Units 3 and 4 through a common line with no service tanks but the two units have separate RFO flow meters to measure their respective RFO consumption. The testing of Unit 4 could not be carried out due long shut down caused by damage of air pre-heater. Testing was limited to Unit 3 for these reasons. The pipelines supplying gas to CCP block also do not have a gas meter at the gas mixing header. Out of three CCP sub-blocks, the Block 2-B does not have functional gas flow meters to measure gas consumed in the gas turbines (Unit 9 and 10). Gas consumption of Block 2 B could therefore not be ascertained for calculation of the heat rate and efficiency of this block. Attempts were made to establish fuel input of the steam Units 1 and 2 and that of CCGT Block 2-B by using secondary data from the plant operations. Due to absence of credible data, gas consumption of these units could not be segregated. It was therefore decided to postpone the heat rate and capacity testing of these units until installation of appropriate gas metering system. Measurement of Energy Output On the output side, all units at TPS Guddu have their individual gross energy generation meters. However, the steam units do not have adequate metering on their auxiliary supply as well as that of sent-out energy. Unit wise auxiliary load for steam units was calculated on the basis of connected auxiliary load at a fixed rate of 8% of gross generation. The sent-out energy was calculated by subtracting the estimated auxiliary consumption from gross generation. All the CCP blocks have appropriate meters for Heat Rate Analysis R1V02TAG: 04/27/11 5-5

39 gross generation, auxiliary consumption and energy sent-out. Therefore, it is again recommended to use gross heat rates and efficiency for the benchmarking of steam units Testing Procedures and Data Analysis Specific procedures were developed to carry out energy measurements for steam and CCP blocks of the power station which have been illustrated in Appendix C. The unitwise detailed data compiled on heat rate measurements for TPS Guddu is presented in Appendix D as Exhibit D Results The summary of results of heat rate tests for TPS Guddu is presented in Exhibit 5.2. The heat rate test of the Guddu Steam Unit 3 showed inaccurate results in terms of its efficiency higher than the design efficiency of the unit. It appears the measurement of the existing gas flow meter is not reliable and it was showing lower consumption of gas than the actual. The heat rate test of Unit 3 therefore was rejected. The gas turbines (GTs 7 and 8) in Block 2-A showed the net efficiencies of 27.8% each against the design efficiency of 31.7%. The GT 11 and GT 12 in Block 1 showed the net efficiencies of 26.5% and 25.3% respectively against the design efficiency of 32.1%. The net efficiency of the Block a-a and Block 1 were calculated to be 35.3% and 41.5%. The design efficiencies of these clocks under combined cycle operations were not provided by the management. Heat Rate Analysis R1V02TAG: 04/27/11 5-6

40 CCP Block 1 Gross Energy Generation (kwh) Exhibit 5.2: Unit-wise Gross and Net Heat Rate and Efficiency TPS Guddu Fuel Consumption (MMBtu) Gross Heat Rate* (Btu/kWh) Gross Efficiency* (%) Auxiliary Consumption (kwh) Net Sent-out Energy (kwh) Net Heat Rate (Btu/kWh) Net Efficiency (%) GT 11 7,192,000 92,347 12, % 31,360 7,160,640 12, % GT 12 6,633,000 88,962 13, % 26,880 6,606,120 13, % ST 13 5,116, ,000 5,006, % Total Block 1 18,941, ,309 9, % 168,240 18,772,760 9, % CCP Block 2-A GT 7 6,346,000 77,396 12, % 33,685 6,312,315 12, % GT 8 6,320,000 77,331 12, % 18,701 6,301,299 12, % ST 5 6,482, ,000 6,215, % Total Block 2-A 19,148, ,727 8, % 319,386 18,828,614 8, % * Gross heat rates and efficiency is recommended to be used for benchmarking purpose. Heat Rate Analysis R1V02TAG: 04/27/11 5-7

41 5.5 TPS Muzaffargarh TPS Muzaffargarh has six steam units installed in two phases. Phase 1 consists of Units 1-3, and Phase 2 units 5-6. Unit 4 at TPS Muzaffargarh is managed separately by a Resident Engineer. Unit 1 of phase 1 was on extended shut down during the testing period so heat rate tests could not be carried out. TPS Muzaffargarh does not have individual net output meters at each unit as each unit directly feeds to common busbars at the switchyards. Unit wise net output, therefore, was calculated by subtracting auxiliary consumption from gross generation. The detailed procedure for calculation of heat rate for each unit is given here under. The specific procedures for calculation of heat rates for TPS Muzaffargarh at each phase of the power station are illustrated in Appendix C. The unit-wise detailed data compiled on heat rate measurements for TPS Muzaffargarh is presented in Appendix D as Exhibit D Results The unit wise gross and net heat rate and efficiency of TPS Muzaffargarh are presented in Exhibit 5.3. Units 2 and 3 are in better condition with 31% net efficiency compared with their design efficiency of 36.8%. Unit 4 has a net efficiency of 30% against 36.7% design efficiency. Units 5 and 6 have efficiencies of 26% and 24% respectively against the design efficiency of 31.7% for both units. The power station is facing an overall degradation of around 18% in its net efficiency. Heat Rate Analysis R1V02TAG: 04/27/11 5-8

42 Unit No. Gross Energy Generation (kwh) Exhibit 5.3: Unit-wise Gross and Net Heat Rate and Efficiency TPS Muzaffargarh Fuel Consumption (MMBtu) Gross Heat Rate* (Btu/kWh) Gross Efficiency* (%) Auxiliary Consumption (kwh) Net Sent-out Energy (kwh) Net Heat Rate (Btu/kWh) Net Efficiency (%) Unit 1 Unit 2 3,665,000 36,870 10, % 246,074 3,418,926 10, % Unit 3 3,083,000 30,655 9, % 237,521 2,845,479 10, % Unit 4 4,982,400 50,468 10, % 521,000 4,461,400 11, % Unit 5 1,757,700 20,010 11, % 221,585 1,536,115 13, % Unit 6 1,409,940 17,455 12, % 197,128 1,212,812 14, % * Gross heat rates and efficiency is recommended to be used for benchmarking purpose. Heat Rate Analysis R1V02TAG: 04/27/11 5-9

43 6. Power Plant Availability 6.1 Definitions and Limitations The availability of the plant is best represented by the Plant Availability Factor which is calculated as: Plant Availability = (Running Hours / Total Hours over the period x 100) Equation 6.1 This expression is further expanded to include the capacity lost due to constrained low load operations over certain duration and is modified as: Plant Availability = (Σ Running Hours x load served during low load operations+ Running Hours x Rated Capacity of the plant) x 100/ (Total Hours over the period x Rated Capacity of the plant) Equation 6.2 As power plants are subject to planned and unforeseen shutdowns, it is normal practice to calculate plant availability over a longer duration such as on monthly or annual basis. In view of the short visits to the plants during this study, no tests were carried out to calculate the plant availability. Instead, plant availability was assessed on the basis of the data compiled and reported by the power station management under the monthly E-forms 2 for the period of July 2009-November GENCOs also do not follow any standards for plant availability. In Pakistan, the Independent Power Producers (IPPs) set up under the 1994 Power Policy were allowed a minimum of 85.7% plant availability that include allowances of 8.3% and 6% for planned and forced outages respectively. The partial outages are also counted for the IPPs in their availability calculations. Further IPPs outages during high demand months are given higher weightage than those during low demand months. In later power policies, government has further tightened the standards for IPPs by raising the plant availability top 89%. Plant availability factor for GENCOs should be worked out using Equation 6.2 by including the impact of both the outages and the low load operations (partial outages). However, GENCOs report availability factor in E-forms on the basis of full outages only, by using the simplified Equation 6.1. However, the impact of low load operations (partial outages) can be captured by taking the other performance indicators in to consideration such as Plant Utilization Factor 3 and Plant Load Factor 4 for the same E-forms is a standard reporting template used by GENCOs to assess and report the performance of individual units and power station on monthly basis. At the completion of a fiscal year, an annual E-form is generated at the pattern of monthly E-form. Major parameters indicated in the E-form are units generated, units sent out, auxiliary consumption, fuel consumption, heat rates, maximum load, minimum load, load factor, utilization factor, capacity factor, forced and planned shut-down hours, and plant availability. Plant Utilization Factor is the ratio of Units generated in KWh and the product of the de-rated Load in KW and hours of the period over which the calculations are made. Plant Load Factor is the ratio of Units generated in KWh and the product of the maximum Load in KW and hours of the period over which the calculations are made Power Plant Availability R1V02TAG: 04/27/11 6-1

44 period. These indicators give a good indication of the generation capability of the plant over that period. It must be noted that GENCOs report Plant Utilization Factor on the basis of derated capability of the units that shows higher plant utilization. In order to provide the true perspective of the plant availability, it is recommended that all power plant performance indicators, such as load factor, utilization factor, capacity factor and availability factor, should be worked out on the basis of the installed capacity so as to reflect the true picture of the plant. 6.2 Data and Results The consultants requested the management of GENCOs to provide hourly loading profile and outage record in electronic form for all units for the period of July 2009 to November 2010 to assess the plant availability parameters. The management claimed that they do not prepare the hourly loading and outage profile in electronic form due to shortages of trained staff. Instead they provided unit-wise tripping data and monthly E-form for the specified period that contained summary of the availability parameters. Despite the definitions and quality issues, the availability data was taken from the E-forms of the power stations after carrying out spot checks on the accuracy of data TPS Jamshoro Unit wise data compiled on power plant availability on monthly basis for TPS Jamshoro is presented in Appendix E as Exhibit E.1. Unit wise performance parameters representing power plant availability on annual basis for TPS Jamshoro are summarized in Exhibit 6.1. Units 2-3 have shown good availability ranging between 84% to 90% during FY2010 as the units were operated in safe (derated) mode by the management. However, if the Plant Availability Factor was corrected for derated output of the units, the availability of the units would have dropped further by 20-25%, well below the standards maintained by the IPPs. Lower availability of the Units 2-4 ranging between 58% tom 78% during FY2011 is mainly due to shortage of demineralized water for boiler operations. The large difference in the load factor and utilization factor based on installed capacity is a good indicator that plant was not able to operate on its rated output for most of the time TPS Guddu Unit wise data compiled on power plant availability on monthly basis for TPS Guddu is presented in Appendix E as Exhibit E.2. Unit wise performance parameters representing power plant availability on annual basis for TPS Guddu are shown in Exhibit 6.2. The availability of CCP Block 2-A and Block 1 was mostly above 90% due to operation on natural gas. CCP Block 2-B was low during FY2010 due to extended shut downs from November 2009 to May 2010 needing major overhaul that has been delayed due to procurement of spare parts and availability experts from the supplier. The availability of this block improved in FY2011 due to improvement in gas turbine operations. Steam Unit 6 was not available till November 2010 due to a major overhaul. The availability of steam Unit 1 has been low at 60% during FY2011. The availability of steam block otherwise has generally been shown good ranging between 82% to 93% but Power Plant Availability R1V02TAG: 04/27/11 6-2

45 like TPS Jamshoro, it should be interpreted with caution due to operation on derated output. 6.3 TPS Muzaffargarh The unit wise data compiled on power station availability on monthly basis for TPS Muzaffargarh is presented in Appendix E as Exhibit E.3. Unit wise performance parameters representing power plant availability on annual basis for TPS Muzaffargarh are shown in Exhibit 6.3. The output capability of all units of Muzaffargarh has declined over the past two years with average degradation recorded over 40%. It appears that management is gradually reducing the output capability of these units to improve the availability of the units. Unit 5 was operated at a maximum of 120 MW in FY2010 compared with 200 MW of installed capacity and performed poorly with 47% availability but it improved 74% at lower load. The availability of Unit 4 dropped from 97% in FY2010 to 60% in the FY2011 along with a reduction in the maximum output of the unit of about 20% from the previous year. Units 1 and 2 have shown consistent availability of over 80% but have shown a decline of 31% and 45% in their respective output capabilities from the previous year. The availability of Unit 6 has been steady at around 75% but this unit too was operating at only 135 MW during FY2010 and further decreasing to 95 MW during FY2011 compared with 200 Mw of installed capacity. These performance indicators clearly indicate low reliability levels in GENCOs that are mainly due to lack of preventive maintenance and curtailing the operational and maintenance expenditures. Power Plant Availability R1V02TAG: 04/27/11 6-3

46 Unit No. Period Installed Capacity (IC) Derated Capacity (DC) Exhibit 6.1: Unit-wise Availability TPS Jamshoro Maximum Load Minimum Load Load Factor Utilization Factor Scheduled Outage Forced Outage Availability Availability Factor (Time-base) MW MW MW MW (%) (%) (Hrs.) (Hrs.) (Hrs.) (%) Unit 1 FY % 50% 1, ,431 73% FY2011 YTD % 53% ,946 80% Unit 2 FY % 75% ,731 88% FY2011 YTD % 49% ,549 69% Unit 3 FY % 69% ,417 85% FY2011 YTD % 49% ,134 58% Unit 4 FY % 79% ,931 91% FY2011 YTD % 52% ,886 79% Note: Data available till November 2010 for FY2011 Power Plant Availability R1V02TAG: 04/27/11 6-4

47 Unit No. Period Installed Capacity (IC) Derated Capacity (DC) Exhibit 6.2: Unit-wise Availability TPS Guddu Maximum Load Minimum Load Load Factor Utilization Factor Scheduled Outage Forced Outage Availability Availability Factor (Time-base) MW MW MW MW (%) (%) (Hrs.) (Hrs.) (Hrs.) (%) Unit 1 FY % 45% ,622 87% FY2011 YTD % 33% 1, ,229 61% Unit 2 FY % 52% 850 7,910 90% FY2011 YTD % 45% 251 3,421 93% Unit 3 FY % 70% 558 1,057 7,145 82% FY2011 YTD % 51% ,151 86% Unit 4 FY % 59% 1,786 6,974 80% CCP Block 2-A FY2011 YTD % 18% 394 3,278 89% Unit 7 FY % 85% ,530 78% FY2011 YTD % 87% 133 3,539 96% Unit 8 FY % 79% 142 8,618 98% FY2011 YTD % 74% ,382 92% Unit 5 FY % 62% 144 8,616 98% FY2011 YTD % 46% 102 3,570 97% Block 2-A FY % 76% ,588 98% FY2011 YTD % 69% ,497 95% Power Plant Availability R1V02TAG: 04/27/11 6-5

48 CCP Block 2-B Unit 9 FY % 24% 6, ,323 27% FY2011 YTD % 63% 913 1,237 1,521 41% Unit 10 FY % 32% 5, ,875 33% FY2011 YTD % 78% ,023 82% Unit 6 FY % 18% 6, ,167 25% FY2011 YTD 0% 0% 3,672 0% Block 2-B FY % 24% 6, ,455 28% FY2011 YTD % 47% 1, ,515 41% CCP Block 1 Unit 11 FY % 60% 126 8,634 99% FY2011 YTD % 60% 1 3, % Unit 12 FY % 60% 96 8,664 99% FY2011 YTD % 58% 7 3, % Unit 13 FY % 55% 269 8,491 97% FY2011 YTD % 36% 507 3,165 86% Block 1 FY % 58% 165 8,595 98% FY2011 YTD % 51% 177 3,495 95% Note: Data available till November 2010 Power Plant Availability R1V02TAG: 04/27/11 6-6

49 Unit No. Period Installed Capacity (IC) Derated Capacity (DC) Exhibit 6.3: Unit-wise Availability TPS Muzaffargarh Maximum Load Minimum Load Load Factor Utilization Factor Scheduled Outage Forced Outage Availability Availability Factor (Time-base) MW MW MW MW (%) (%) (Hrs.) (Hrs.) (Hrs.) (%) Unit 1 FY % 61% 852 7,908 90% FY2011 YTD % 31% 515 3,157 86% Unit 2 FY % 76% ,671 88% FY2011 YTD % 64% ,046 83% Unit 3 FY % 47% 899 7,117 81% FY2011 YTD % 53% 163 3,509 96% Unit 4 FY % 88% 240 8,520 97% FY2011 YTD % 41% 1, ,205 60% Unit 5 FY % 25% 3,426 1,712 4,121 47% FY2011 YTD % 31% ,643 72% Unit 6 FY % 46% 624 1,568 6,729 77% FY2011 YTD % 35% 807 2,865 78% Note: Data available till November 2010 for FY2011 Power Plant Availability R1V02TAG: 04/27/11 6-7

50 7. Major Reasons for Degradation of Performance The analysis presented in Section 4 to Section 6 of this report indicates significant degradation in the performance of the GENCOs from their design parameters. The degradation in the output, efficiency, and availability for the power stations studies is summarized in Exhibit 7.1. Based on the observations of the audit team, interviews with the plants management and operational staff and review of historic records of the plants, a number of reasons were identified behind the overall decline in the performance of the power stations studied. These reasons were categorized as technical and management to facilitate the identification of remedial measures. Exhibit 7.1: Average Degradation in Performance of GENCOs Installed Capacity Present Gross Capability Present Net Capability MW MW MW Capacity Degradation Average Design Net Efficiency Average Net Efficiency Average Availability in FY2011 Jamshoro % 34.7% 28.6% 72% Guddu % N/A* 38.9% 80% Muzaffargarh 1, % 35.2% 28.9% 78% * The design heat rate of CCP Guddu was not available. 7.1 Technical Issues The power stations are suffering from a number of chronic technical problems that are severely affecting the operational and financial performance of the plants Measurement Accuracy of Fuel Received GENCOs purchase million tonnes of RFO annually amounting to Pak Rs billion at the present price of Rs 50,000/tonne. RFO measurement system through dip-stick or dip-tapes is generally considered to be reasonably accurate if carried out by a trained person and in stable tank conditions, and volumes converted to weight by using accurate calibration charts and temperature corrections. This method is applied in most of the RFO transactions in the country. Application of this measurement procedure, however, requires strict adherence to specified procedures, documentation of measurements, and skilled and experienced operators and monitoring supervisors. The procedures being practiced by the GENCOs for measurement of fuel oil are lacking in most of these elements. There is excessive human intervention at every stage of transactions and the system is highly prone to errors and malpractices. Following observations were made during the inspection of GENCOs. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-1

51 No fuel flow measurements are taken for natural gas and for the RFO supplied from storage tanks in the units where flow meters are not present. On units where flow meters are available for RFO or natural gas, the meters are either non-functional or not calibrated on regular basis. Fuel consumption at the units is not measured in real time on regular basis and instead the power station management relies on estimated consumption rates worked out through accounting exercise derived from invoices of the fuel purchased, inventory levels, and energy generated over an operating period. Such calculations have serious limitations in determining accurate heat rates and efficiency as they ignore critical parameters such as quality of fuel received in each batch, and allocation of fuel to individual units for a multi-unit power station from common storage facilities. The validity of such accounting exercises is highly questionable for setting up the heat rate and efficiency benchmark for the plants or individual units Fuel Oil Quality Procedures for sampling and analysis of RFO are described in Section 2 of this report. None of the samples complied with Pakistan Standard and Quality Control Authority (PSQCA) specifications for RFO in one or more tests. High specific gravity values were obtained due to higher water contents. Moreover, the low calorific value was observed due to high specific gravity, water and ash contents. Results of fuel oil testing are summarized in Exhibit 7.2. The detailed testing results of the analysis are provided in Appendix A. Exhibit 7.2: Summary of Results of Fuel Oil Testing Test PSQCA Specifications TPS Jamshoro TPS Guddu TPS Muzaffargarh Min Max Min Max Min Max Specific 15.6 C Max Water Contents Vol. % 0.5% Max 1.2% 1.8% 8.0% 4.2% 1.4% 2.8% Sulfur, Total, % mass 3.5% Max 2.8% 3.2% 2.5% 2.9% 2.7% 3.0% Ash Content, % Wt. 0.1% Max 0.3% 1.4% 0.0% 0.5% 0.0% 4.2% Clorific Value, Gross, BTU/Ib 18,200 Min 17,844 18,202 16,660 17,438 17,076 18,089 All the power stations have their own laboratories to analyze fuel oil on a daily basis. However, it was observed that the laboratory staff assigned for collection of samples was not adequately trained, and the testing procedures prescribed under the standards are not likely being fully complied with. This is evident from the results of the analysis of RFO tested from an independent reputed laboratory as part of this assignment and summarized in Exhibit 7.2. All of the 18 samples taken from three plants did not meet the Pakistan Standards for Quality Control Authority (PSQCA) specifications on specific gravity, water contents, ash content, and calorific value. Substandard RFO coupled with Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-2

52 inaccurate measurements impacts plant performance and results in financial losses to GENCOs due to high fuel costs. A third party RFO testing mechanism should be established on regular basis to ensure the quality of fuel received from supplier. The contracts with fuel supplier should include penalties or correction in price for supply of substandard oil. Moreover, GENCOs should carry out a detailed exercise to devise a robust measurement mechanism for RFO receipts at the plants to reduce oil pilferages and acceptance of substandard oil Lack of Preventive Maintenance A number of maintenance activities are long overdue and have already resulted in loss of output capability, increasing heat rates and lower availability. GENCO managements are forced to delay the overhauling of the plants and are not able to carry out regular preventive maintenance to avoid break-down of the plants for the following reasons: Refusal of shut-down time by the system operator (NTDC) due to shortages in power supply in the country, Delay in payments to GENCOs against power sales, and Delay in procurements of parts and services for plants major overhauling, GENCO plants were designed to run on dual fuel with natural gas as primary fuel. RFO is only used as backup fuel supply during infrequent gas outages. However, TPS Muzaffargarh and Jamshoro have not received gas from the gas utilities on a regular basis since 2005 and have run on RFO on continuous basis. The RFO supplied to GENCOs contain up to 3.5% sulfur and other undesired impurities such as vanadium. Continuous operation of steam units on RFO has increased the breakdown frequency and lost time due to excessive corrosion caused by formation of sulfuric acid in the flue gas circulation path and depositions of vanadium oxide and ash on heat exchanging metal surfaces of boiler, reducing their performance. Poor quality of RFO supplied to GENCOs has only exacerbated this problem. Most of the GENCO units urgently need detailed inspections for the hot gas/steam path components to plug leakages and heat losses. Key plant components such as soot blowers, a significant proportion of boiler tubes, high pressure (HP) feed water heaters, and auxiliary equipment are not functioning. These have a direct impact in the form of reduction in output and efficiency of the units Exhibit 7.3 show examples of poor maintenance at TPS Jamshoro resulting in damaged insulation and flue gas ducts. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-3

53 Exhibit 7.3: Poor Maintenance of Insulation at TPS Jamshoro Poor Maintenance of Flue Gas Duct at TPS Jamshoro The capacity of in-house workshops should be enhanced with modern machines, tools, and training of staff to provide maintenance services for critical parts locally to reduce down-time. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-4

54 7.1.4 Poor Housekeeping GENCO managements are paying little attention to simple housekeeping activities which do not require large expenditures. Examples include: Frequent steam leakages in boiler and other steam usages increase heat loss at the plant as well as raise water purification cost due to excessive use of chemicals. Exhibit 7.4 shows steam leakages at RFO heating system at Muzaffargarh. Such leakages on continuous basis cause significant drop in efficiency. A large number of soot blowers have become non-operational due to their metallurgy or poor design. This increases the rate of clogging of heater elements. A non-functional soot blower at Unit 3 of TPS Jamshoro is shown in Exhibit 7.5. Plant management is generally oblivious to environmental conservation and protection. Massive oil spills and un-optimal combustion results in higher rate of toxic emissions and effluent discharges causing environmental threats to adjacent population, flora and fauna. Exhibit 7.6 shows significant oil spillage at Muzaffargarh RFO decanting and storage facility. There is a need to establish a Research and Development (R&D) or a Technical Services section to carryout research on such problems and devise solutions. Exhibit 7.4: Steam Leakages at TPS Muzaffargarh Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-5

55 Exhibit 7.5: View of a Nonfunctional Soot Blower at TPS Jamshoro Exhibit 7.6: Oil Spillage at Storage Facility at Muzaffargarh Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-6

56 7.2 Management Issues and Recommenadations Management of the power station is responsible to carry out safe, economic, and reliable operation of the plants. Deficiencies highlighted below were common to all the plants Lack of Performance Evaluation No attention is given to the performance evaluation of the plants and as such no standards are observed to assess the performance of the plants. Each power station has an Inspection, Testing and Record (ITR) section but their role is limited to monitoring of a few technical parameters. The power stations also have a Maintenance Management System (MMS) which evaluates and compiles the performance parameters of the power station and generates E-forms on monthly and annual basis. A detailed management study is required to prescribe key performance indicators pertaining to financial, human and environmental performance of the plant and the procedures to evaluate them on sustainable basis. The ITR and MMS sections may be merged to form a Performance Monitoring Section (PMS) at each power station to provide a wider range of performance evaluation and monitoring services. In addition to the activities carried out by ITR and MMS, the PMS should develop a 24-hour capability for continuous analysis of trends in performance and losses. With this capability the PMS will be in a position to provide definitive advice on discrepancies on fuel receipts, inventories, and heat rates. By adding analyses and instruments over time, the trend analysis can help identify emerging problems and form the basis for management decisions for improvement of plant performance Limited Financial and Administrative Autonomy Managements of GENCO plants have limited financial autonomy to take independent decisions. Payments to GENCOs are not made on time which results in deferment of maintenance routines which is a major reason behind plant output and efficiency degradation. Approval process for procurement of spare parts and services through international tendering is cumbersome and time consuming. It takes on the average 18 months from initiating the tendering process to procure spare parts and services from international sources due to time consumed in preparation of tender documents, advertisement notices and evaluation of tenders, tender awards and inspections, and manufacturing and transportation of goods. In addition, it takes significantly long time before the tendering process can be initiated to get internal approvals for procurement. Best industry practices are not observed for financial management of the power plants and important financial instruments such as a maintenance reserve fund to cater for the financial needs of plants maintenance cycles are not available. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-7

57 7.2.3 Absence of Plant Automation and Management Information System Exhibit 7.7 shows the control room of Units 3 & 4 at the Jamshoro power plant mainly consisting of manual and analogue instrumentation. General observations are summarized below. Plants are running in manual mode in the absence of modern monitoring and control systems. Most of the instrumentation is analogue in nature and readings are recorded manually in the log sheets. Limited data is organized in electronic form and therefore it is difficult to carry out meaning full analyses on plant performance and identify problem areas. Vital on-line analyzers necessary for optimization and control of plant operation are missing. The absence of performance evaluation standards and an on-line integrated management information system (MIS) severely limits the ability of the management to take prompt decisions and initiate actions and remedial measures for efficient operation of the plants. Exhibit 7.7: View of the Joint Control Room of Units 3 and 4 at TPS Jamshoro The impact of absence of such on-line facilities and controls could be observed frequently at the plants where air-fuel mixing ratio is not monitored due to absence of on-line analyzers that allows escape of un-burnt fuel through plant s exhaust which is visible as black smoke (Exhibit 7.8). This not only contributes heavily towards degradation of air quality in the surroundings of the plant but also increases the fuel consumption of the plant raising the heat rate and cost of fuel. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-8

58 Exhibit 7.8: Smoke Showing Poor Combustion at Unit No. 6 at TPS Muzaffargarh All the units of GENCOs should be upgraded with installation of on-line analyzers and instruments with communication channels to a central thermal model should be provided to assess the performance of the plant on continuous basis Other Management Issues The plants are suffering from overstaffing with majority of staff working without specialized industrial training to perform their duties. No occupational health, safety, and environmental management system and relevant trainings were observed at the plants increasing the potential of a safety hazard at the plant. Inventory control system is primitive and in certain instances not operational that result in un-optimal inventory levels at the plant, causing a direct financial burden in the form of working capital. GENCOs, like other power sector entities, lack any performance based human resource management systems to promote efficiency and competition. Simple housekeeping and safety measures such as firefighting facilities are inadequate and completely missing in certain cases. Major Reasons for Degradation of Performance R1V02TAG: 04/27/11 7-9

59 The government is currently implementing a Generation and Transmission Improvement Plan (GTIP) for the GENCOs. Under this Action Plan, the Board of Directors of GENCOs will be reconstituted by induction of directors from private sector to bring in improvements in the GENCOs performance. In the absence of financial stakes, the effectiveness of the new management at a higher level may be doubtful. Furthermore, the resolution of a number of management and operational issues identified in the study need a complete change in the management approach and operational environment of the GENCOs which could prove to be a major challenge for the new management. Under these circumstances, government could consider bringing in independent management under a performance based O&M contract based on a structure of incentives and penalties against the performance of the power stations. The terms and conditions of the O&M contract could be designed in a manner to make the contractor responsible for injecting investment for rehabilitation of the units and bringing in highly trained and experienced senior managers capable of using state-of-the-art management tools and industry standard O&M procedures. The O&M contractor may be given extended authority to reward and motivate employees and to take disciplinary action and adjust the size of the work force. This approach will help in establishing and expanding the O&M industry and in improving the efficiency of the power sector in the country. 7.3 Detailed Technical Assessment of GENCOs TPS Jamshoro Reasons for the degradation of performance of each unit at TPS Jamshoro are listed in Exhibit Significant among these are summarized below: All the units have too many leaking points and need nearly 8-10% make up water per day for generation of steam in the boiler. Such high leakages not only increase the operating cost of the plant but also result in heat losses in the form of leaking steam and injection of cold make up water. The water treatment facilities and other chemical plants are in poor condition and require complete rehabilitation. The situation becomes critical if the treatment facilities come under stress. An example of this is the significant increase in the level of total dissolved solids (TDS) in the fresh water supply of the plant from the Indus River following the floods in July The comparison of the recommended quality and the actual water received during the month of January 2011 are shown below in Exhibit 7.9 below. This severely affected the availability of plant during the period of October 2010 to January 2011 period. High levels of TDS in water significantly reduced the purification capacity of demineralization plant and substantially increased the consumption of chemicals adding to the O&M cost of the plant. The demineralization plant could not produce enough water to operate even two out of four installed power generation units simultaneously. Major Reasons for Degradation of Performance R1V02TAG: 04/27/

60 Exhibit 7.9: River Water Quality Supplied at TPS Jamshoro in January 2011 ph T.H (ppm) Chloride (ppm) Conductivity (µs/cm) Total Desolved Solvents (TDS) (ppm) ,260 2,445 A common reverse osmosis (RO) plant needs to be installed to meet the requirements of demineralized water. The Units 2-4 show a general pattern of decline in output and efficiency while running on RFO due to deposit of soot on heat exchange metal surfaces of heaters and gradual chocking of air pre-heater. Most of the soot blowers are not operational and cleaning of soot cannot be carried out. This results in eventual shut down of unit for cleaning when output reaches the minimum loading limits of the units. The use of chemical additives (magnesium) should be allowed at all units to covert vanadium to magnesium vanadium pentoxide to avoid vanadium deposits on tube and element surfaces. So far, the budget for chemicals additives of only one unit has been included in FARA. The funds for other three units should be provided for reliable and continuous operation of these units on RFO The High Pressure (HP) heaters have become non-functional since long and need replacement after thorough review of design and metallurgy of the tubes. Major Reasons for Degradation of Performance R1V02TAG: 04/27/

61 Boiler Exhibit 7.10: Reasons for Drop in Performance of the Plant TPS Jamshoro Unit 1 Unit 2 Unit 3 Unit 4 Detailed Inspection of boiler needs to be carried out. Last carried out in 2000 Total of 38 soot blowers are installed, but mostly inoperative and need replacement Final super heater coils are damaged and need immediate replacement Detailed Inspection of boiler needs to be carried out. Last carried out in Total of 36 soot blowers are installed, but mostly inoperative and need replacement Final super heater coils are damaged and need immediate replacement (Included in FARA) 3-way burner valves are damaged and need replacement Furnace Safety Supervisory System (FSSS) along with furnace flame monitoring are damaged and need replacement (Included in FARA) Actuators of boiler feed pumps are damaged and need replacement (Included in FARA) Detailed Inspection of boiler needs to be carried out. Last carried out in Total of 36 soot blowers are installed, but mostly inoperative and need replacement Inal super heater coils are damaged and need immediate replacement (Included in FARA) 3-way burner valves are damaged and need replacement (Included in FARA) FSSS along with furnace flame monitoring are damaged and need replacement (Included in FARA) Actuators of boiler feed pumps are damaged and need replacement (Included in FARA) Spares are required for overhauling of steam turbine Detailed Inspection of boiler needs to be carried out. Last carried out in Total of 36 soot blowers are installed, but mostly inoperative and need replacement Final super heater coils are damaged and need immediate replacement (Included in FARA) 3-way burner valves are damaged and need replacement FSSS along with furnace flame monitoring are damaged and need replacement (Included in FARA) Actuators of boiler feed pumps are damaged and need replacement (Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

62 Turbines Unit 1 Unit 2 Unit 3 Unit 4 Spares reqquired for overhauling of turbine (Included in FARA) High pressure feed water (HP) are bypassed due to severe leakages in heater tubes. Needs tube replacements Unit does not have electronic hydraulic governor (EHG) are missing aand turbine is presently manually operated. EHG along with data acquisition system need to installed to automated unit output controls (Included in FARA) Digital recorder/event recorder system needs to be installed Data loggers and data plotter on turbine need to be installed HP are bypassed due to severe leakages in heater tubes. Needs tube replacements Unit does not have EHG and is presently manually operated. EHG along with data acquisition system need to installed to automated unit output controls (Included in FARA) Digital recorder/event recorder system needs to be installed Auto control on turbine needs to be installed Temperature scanners on turbine need to be installed Data loggers and data plotter on turbine need to be installed HP are bypassed due to severe leakages in heater tubes. Needs tube replacements Unit does not have EHG and is presently manually operated. EHG along with data acquisition system need to installed to automated unit output controls (Included in FARA) Digital recorder/event recorder system needs to be installed Auto control on turbine needs to be installed Temperature scanners on turbine need to be installed Data loggers and data plotter on turbine need to be installed HP are bypassed due to severe leakages in heater tubes. Needs tube replacements Unit does not have EHG and is presently manually operated. EHG along with data acquisition system need to installed to automated unit output controls (Included in FARA) Digital recorder/event recorder system needs to be installed Auto control on turbine needs to be installed Temperature scanners on turbine need to be installed Data loggers and data plotter on turbine need to be installed Major Reasons for Degradation of Performance R1V02TAG: 04/27/

63 Air Handling System Unit 1 Unit 2 Unit 3 Unit 4 Flue gas duct & air-preheater bottom hoppers needs repair & maintenance (Included in FARA) Air pre-heater elements and seals are damaged and need replacement (Included in FARA) Cooling System Air pre-heater elements and seals are damaged and need replacement Induced draft (ID) fans dampers are damaged Air pre-heater elements and seals are damaged and need replacement Induced draft (ID) fans dampers are damaged ID fan Impellers are damaged ID fan Impellers are damaged (Included in FARA) Cooling tower fans need redundance and require additionla bank All 12 cooling tower fans need overhauling (Included in FARA) Drive shafts of cooling tower fans need replacement (Included in FARA) Gear stystem for cooling tower fans needs to be added All 12 cooling tower fans need overhauling (Included in FARA) Drive shafts of cooling tower fans need replacement (Included in FARA) Gear stystem for cooling tower fans needs to be added Air pre-heater elements and seals are damaged and need replacement Induced draft (ID) fans dampers are damaged ID fan Impellers are damaged (Included in FARA) All 12 cooling tower fans need overhauling (Included in FARA) Drive shafts of cooling tower fans need replacement (Included in FARA) Gear stystem for cooling tower fans needs to be added Major Reasons for Degradation of Performance R1V02TAG: 04/27/

64 Miscellaneuos Unit 1 Unit 2 Unit 3 Unit 4 Last major overhauling was carried out in Y1999 and is long overdue since Supervisory experts needed for overhaul ($2-3 million) Drain valve (high pressure & high temperature), safety, by-pass spray control valves need replacement. Off-line efficiency monitoring system and training need to be provided (Included in FARA) Steam convertor needs repair and maintenance Demineralization/ deionization plan needs complete rehabilitation. Drain valve (high pressure & high temperature), safety, by-pass spray control valves need replacement. Clorination plant for treatment of water for boiler use is not functional and needs complete rehabilitation. Instrumentation and auto operating system of Demineralization plant is not functional and needs rehabilitation Demineralization/ deionization plan needs complete rehabilitation. Instrumentation and auto operating system of Demi neralization plant is not functional and needs rehabilitation Off-line efficiency monitoring system and training need to be provided (Included in FARA) Drain valve (high pressure & high temperature), safety, by-pass spray control valves need replacement. Off-line efficiency monitoring system and training need to be provided (Included in FARA) Drain valve (high pressure & high temperature), safety, by-pass spray control valves need replacement. A common steam convertor unit with condensate recirculation needs to be installed for Units 2-4 Clorination plant for treatment of water for boiler use is not functional and needs complete rehabilitation Demineralization/ deionization plan needs complete rehabilitation. Instrumentation and auto operating system of Demineralization plant is not functional and needs rehabilitation Clorination plant for treatment of water for boiler use is not functional and needs complete rehabilitation Demineralization/ deionization plan needs complete rehabilitation. Instrumentation and auto operating system of Demineralization plant is not functional and needs rehabilitation Major Reasons for Degradation of Performance R1V02TAG: 04/27/

65 7.3.2 TPS Guddu Reasons for the degradation of performance at TPS Guddu are given in Exhibit Like other GENCOs, poor maintenance of the plant has resulted in damage to key plant components. Significant problems are summarized below: The CCP Block 1 is facing significant load reduction as it requires major over hauling. The units are run in safe mode as inspection of hot gas path components has not been carried out since The management apprehends break down of hot gas path components if run on full load. On CCP Block 2, the auxiliary supply is not secured in case of total plant shut down (black out). This can cause damage to plant and excessive outage in case of black out. Black start capability for auxiliaries needs to be ensured through installation of a diesel generator and connection with grid. Silting of intake water structure at Begari Sindh Feeder Canal reduces the supply of condenser cooling water for all units that results in drop in plant output and efficiency. Problem can be solved with dredger or remodeling of intake water channel. The Kandhkot and Mari gas pipeline need to be re coated as its coating has deteriorated at places and the pipeline is exposed to corrosion. Gas leakage from rupture in the pipeline can result in extended outage at the plant. Exhibit 7.11 shows pictures of the damaged air preheater of Unit 4 due to fire resulting in an outage of nearly three months for the unit. Exhibit 7.12 shows inadequate cooling of the turbine section of Unit 3 Exhibit 7.11: Damaged Air Pre-heater due to Fire of Unit No. 4 at TPS Guddu Major Reasons for Degradation of Performance R1V02TAG: 04/27/

66 Damaged Air Pre-heater Elements due to Fire of Unit No. 4 at TPS Guddu Melted Air Pre-heater due to Fire of Unit No. 4 at TPS Guddu Major Reasons for Degradation of Performance R1V02TAG: 04/27/

67 Exhibit 7.12: Poor Cooling of Turbine Section of Unit No. 3 at TPS Guddu Poor Cooling of Unit No. 3 at TPS Guddu Major Reasons for Degradation of Performance R1V02TAG: 04/27/

68 Boiler Exhibit 7.13: Reasons for Drop in Performance of the Steam Units TPS Guddu Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 All of the boiler tubes are week and cannot sustain full temperatures and pressures. All boiler tubes should be replaced. Boiler feed pumps performance reliability has significantly dropped and therefore need replacement for the safe and continuous operation of the boiler. High pressure (HP) heaters are out of service since long and require replacement after modified metallurgy of tubes. If replaced, it can significantly reduce the fuel consumption The performance of operation feed water pump has dropped significantly due to impellor damage and need repair/replacement The performance of operation condensate pump has dropped significantly due to damaged impellor and inter-stage seals and need repair/replacement. Their respective regulating valves are also not functioning properly and need repair/replacement. Inlet/outlet motorized valves of feed water and condensate lines are not functioning properly and need repair/replacement. Boiler insulation is very poor and damaged Super heater and reheater temperature control injection regulators are not working resulting in temperature variations at the inlet of turbine. Safety valves of boiler drum, super heaters and reheater have leakage and need repair/replacement. HRSG by-pass and Isolation damper have leakages, need to be replaced (Only Block 2A Included in FARA) Feed water controllers not functioning and need to be replaced (Only Block 2A Included in FARA) HRSG drum insulation has deteriorated and need to replaced (Only Block 2A Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

69 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 Refractory of boiler is badly damaged causing heat loss and need rebuilding. Hydraulic seal of boiler is damaged since long resulting in heat loss and needs to be reinstalled. HP heaters are out of service since long and require replacement after modified metallurgy of tubes. If replaced, it can significantly reduce the fuel cost. Soot blowing system is not effective both in furnace and air pre-heaters need rehabilitation. No analyzers for exhaust gases are present resulting in ineffective control on combustion. HP heaters are out of service since long and require replacement after modified metallurgy of tubes. If replaced, it can significantly reduce the fuel cost. No analyzers for exhaust gases are present resulting in ineffective control on combustion. Drum s level transmitter malfunction and causing tripping, and need to be replaced. (Only Block 2A Included in FARA) Flue gas leakages due to damage in Heeat recovery staem generator (HRSG) bypass dampers and isolation damper controllers, damage control system, need to be replaced. (Only Block 2A Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

70 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 No analyzers for exhaust gases are present resulting in ineffective control on combustion. Turbine Super heater tubes are week and cannot sustain full temperatures and pressures. The tubes need to be replaced. Boiler safety valves are leaking and needs repair. Periodic blow-down valves of the boiler are leaking and needs replacement. Boilers burners are chocked and need replacement. No analyzers for exhaust gases are present resulting in ineffective control on combustion. Control cable deterioration because of overheating from flue gases (Only Block 2A Included in FARA) SSS clutch vibration on gas turbines, need rebalancing The present instruments and controls system is obsolete and spare parts are no more available. The complete system need to be replaced. Major Reasons for Degradation of Performance R1V02TAG: 04/27/

71 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 Air Handling System GRC fans are out of order and need replacement to reduce fuel consumption. Cooling System Circulating cooling water pumps are not delivering water at the full output resulting into low vacuum and hence lower turbine output Flue gas ducts on both sides is leaking and needs repair. 20% condenser tubes have been plugged due to leakages and need replacement to improve the condenser vacuum to increase output and efficiency of turbine Both regulators of flue gas recirculation fan (GRC) fans are not working thereby affecting the performance of boiler and need replacement Steam inlet air-heater (calorifier) are not working resulting in entry of cold air in the boiler and need replacement. The filer screens at the inlet of CW pumps are damaged due to which the debris flows into the condenser and causes tube chocking resulting in load reduction and stoppage of unit. The screens need replacement. GT lift oil pumps don t build required pressure. Need to be replaced Evaporator cooler not functioning, filling material needs to be replaced (Only Block 2A Included in FARA) Silting of intake water structure at Begari Sindh Feeder results in reduction in the quantity of condenser cooling water. Problem can be solved with dredger or remodelling of intake water channel Major Reasons for Degradation of Performance R1V02TAG: 04/27/

72 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 Reverse flow valves of condenser cooling are not functioning therefore backwashing of the condenser ids not carried out. These valves require replacement. Impellers of cooling water (CW) pumps have been eroded and need replacement. The reliability of 6 kv Motors of CW pumps, condensate pumps, ID/FD fans, feed pumps, cooling tower pumps has significantly dropped due to local rewinding and need replacement of an appropriate rewinding solution. At Unit 1, a number of condenser tubes need replacement due to leakage. Cooling Water (CW)pumps are not providing sufficient water for the condenser cooling. Also the fine screens installed ion the inlet of CW pumps are damaged. One bay of cooling towers need to be added for Unit 5 & 6 to improve condenser vacuum The RCC structure of cooling towers has developed cracks, Need to be reinforced Major Reasons for Degradation of Performance R1V02TAG: 04/27/

73 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 Cooling tower structure is completely damaged and result in closure of the plant during canal closure and floods. Generator Generators are not able to take maximum load due drop in hydrogen supply from Hydrogen generation plant. Hydrogen generation plant needs transformer replacement to get to its full capacity. Miscillenous AUX Standby auxiliary transformer (6/0.4 kv) T7 requires replacement to ensure standby arrangements. Leakage of acidic water from demi-water plant seeped into cable trenches and damaged control cables resulting in excessive nuisance tripping Reduction in amp-hour of station battery bank due to aging, needs replacement The air filters get clogged in fog resulting in reduction of load or shut down of the gas turbines. A solution such as use of protective cover at KAPCO power plant may be able to solve the problem. Major Reasons for Degradation of Performance R1V02TAG: 04/27/

74 Unit 1-2 Unit 3 Unit 4 CCP Block 2-A and 2-B CCP Block 1 Overhead crane bus bar deforms in hot weather. Needs to be replaced The governing system of Diesel generator for black is not functioning therefore DG set is no more in service. Need repair/replacement Work is under progress at Unit No. 9 and stat of the art controlling and monitoring system is being installed by G.E. The unit is not being completed due to trouble in its exciter. Performance to be evaluated after the completion of work. Major Reasons for Degradation of Performance R1V02TAG: 04/27/

75 7.3.3 TPS Muzaffargarh Major reasons for the degradation of performance at TPS Muzaffargarh are listed in Exhibit Significant problems are summarized below: Soot blowers of Unit 5 and 6 are not functional and cause significant degradation in plants output and efficiency with continuous operation. The use of chemical additives (magnesium) should be allowed to avoid vanadium deposits on tube and element surfaces. The budget for chemicals additives has been included in FARA. Nearly 50% of the cooling tower fans of Units 2, 3 and 6 are not functioning thereby significantly affecting the condenser operations of these units due to lower vacuum. The immediate replacement/repair of the damaged fans of all the units is needed as lower efficacy of cooling tower results in drop of output and efficiency of the turbine to back pressure at the condenser end. Cooling water treatment needs to be improved with modifications in the treatment systems to avoid damage to cooling water system components from scaling. The up-gradation has been included in FARA for all units of TPS Muzaffargarh. The calorifiers of Units 2, 3, 5 and 6 are not fully operational due to damage to headers resulting in loss in efficiency for these units. Unit 1 requires major overhaul and has been out of service since November 2011due to non-availability of experts from the manufacturer of the equipment (OEM). The unit is expected to be back in service around end March Exhibit 7.14 show the under repair induced draft (ID) fan of Unit 1. Exhibit 7.14: View of Under Repair Induced Draft Fan of Unit No. 1 at TPS Muzaffargarh Major Reasons for Degradation of Performance R1V02TAG: 04/27/

76 Under Repair Induced Draft Fan of Unit No. 1 at TPS Muzaffargarh Major Reasons for Degradation of Performance R1V02TAG: 04/27/

77 Boiler Exhibit 7.15: Unit-wise Reasons for Drop in Performance of the Steam Units TPS Muzaffargarh Unit 1-3 Unit 4 Unit 5 & 6 Frequent leakages in boiler super-heater tubes, causing load restriction and also forced shut downs. The ends of super-heater tubes need to be replaced (Included in FARA) Soot-blowing system is defective. Rehabilitation of soot-blowers installed at superheaters, reheaters and regenerative airheaters is required urgently Formation of scale on heat transfer surfaces including superheaters and reheaters is a common phenomenon. Fuel additive system is required to be launched (Included in FARA) Formation of scale deposits on heating surfaces is a frequent phenomenon. Fuel additive system for the fuel oil is required to be launched Performance of boiler feed water pumps is not upto the mark. Major overhauling of feed water pumps is required to be carried out FSSS system is not functioning effectively and needs to be up-graded. (Included in FARA) Soot blowing system is non-functional. Rehabilitation of furnace soot blowers and regenerative air preheater is essentially required Steam coil air heaters are deteriorated. The air heaters are required to be repaired/replaced FSSS system is not functioning effectively and needs to be up-graded. (Included in FARA) Frequent economizer tubes leakages occur causing load restriction beyond 100 MW. The rehabilitation of economizer tubes is required (Included in FARA) Formation of scale on heating surfaces is too frequent. Fuel additive system is required to be introduced Major Reasons for Degradation of Performance R1V02TAG: 04/27/

78 Turbine Unit 1-3 Unit 4 Unit 5 & 6 Low Pressure turbine rotor blades of last stage were removed after damages. The blades need to be reinstalled with new ones and balancing of turbine is essentially required (Included in FARA) Turbine Supervisory Instrumenttaion (TSI) needs upgradation (Included in FARA) DEH system needs to be replaced. (Included in FARA) Feed water pumps hydraulic coupling problem is experienced. The hydraulic coupling problem is required to be set right (Included in FARA) HP Heaters tubes are damaged. Damaged tubes are required to be replaced/repaired Intermidiate Pressure (IP) and Low Pressure (LP) turbine rotors are badly deteriorated. The replacement of rotors is needed urgently (Included in FARA) Gland seals of HP/IP turbines are deteriorated. Replacement is required The performance of turbines DEH-III and data acquisition systems DAS-100 is not funtioning in a satisfatory manner. Installation of a complete distribution control system (DCS), including sensors, transmitters, and actuators ffor Turbiner governing system DEH-III and boiler tuurbine auto regulation system needs to be installed. (Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

79 Air Handling System Unit 1-3 Unit 4 Unit 5 & 6 Flue gas ducts are worn-out & damaged at several points. The affected areas of flue gas ducts should be repaired/replaced GRC motor is defective. The Motor needs replacement. (Included in FARA) Regeneraytive airheater (RAH) elements are badly deteriorated. Cold & hot elements are required to be replaced (Included in FARA) ID fans (both sides A & B) are badly damaged. The major components of ID fans need to be replaced Cooling System Condenser Vacuum system is faulty. The condenser Vacuum system and allied cooling water system need to be rectified Air preheater elements are deteroated. Elements of pre-heater need to be replaced with new ones (Included in FARA) Flue gas duct is worn out and damaged. The flue duct is in bad shape hence its rehabilitation is essentially required Working of gooling tower is not satisfactory. Special cooling water treatment system should be introduced ID fans impellers, its casing and inlet dampers are badly deteriorated. The deteriorated components of ID fans require replacement. (Included in FARA) GRC fans impellers are defective. The defective components GRS fans require replacement. (1 set Included in FARA) Air flue duct is damaged and leaking at several points. Rehabilitation of flue gas duct, air plennum and expansion joints is required (Included in FARA) Air pre-heater hot and cold elements are damaged. The calorifiers have also deteriorated. Replacement of air preheater with the new one is required, Calorifiers aso need to be repaired/replaced (Included in FARA) Gear boxes of cooling water fans & blades are worn out. Replacement of damaged parts is required (Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

80 Unit 1-3 Unit 4 Unit 5 & 6 Cooling tower fans are defective. Existing fans of cooling towers need to be replaced with new ones and chemical treatment system is to be managed on regular basis (Cost of Electric motor is included in FARA) Generator Performance of excitation system is not satisfactory. Modification of excitation system need to be carried out. (Included in FARA) Miscillenous AVR system is not functioning properly. Its modification is required (Included in FARA) Uninterupted power supply (UPS) for control systems system is not working properly. Existing UPS system need to be replaced (Included in FARA) Water showering louvers and their fittings are deteriorated. Rehabilitation of these components is needed Generator Hydrogen coolers of unit no. 6 are defective. Replacement of hydrogen coolers is required to be done urgently The Bearings of TURBO genmerator are damaged and need replavcement. (Included in FARA)` The generator excitation system needs modifications. Protection relays of genertor also need to be replaced. (Included in FARA) Boiler ingnition system needs to be converted from natural gas to HSD/furnace oil ddue to absence of gas (Included in FARA) 6.6 kv motors of cooling water pumps, CP, ID fans, FD Fans and Boiler Feed pumps are damagaed and ned replacement (Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

81 Unit 1-3 Unit 4 Unit 5 & 6 Technical problems on turbine and generators are being faced. Major overhauling and balancing of turbines is essentially required 0.4 kv motors of cooling towers are damaged and need to be replaced. (Included in FARA) Major Reasons for Degradation of Performance R1V02TAG: 04/27/

82 8. Usage of High Viscosity Fuel Oil in GENCO Power Plants RFO is used in dual fuel power stations when natural gas is not available. RFO is available in several grades with kinematic viscosity ranging from 30 centistoke (cst) to 700 cst. In Pakistan, power plants use RFO with kinematic viscosity of 180 cst during summer and 120 cst during winter. Generally the price of RFO decreases as its viscosity increases. A suggestion was made to assess the potential of using RFO having the viscosity of 380 cst and above in GENCO power stations as a cost saving measure. Higher viscosity fuel oils tend to have a higher ash and metals content compared to those with lower viscosity. Oils with higher viscosity also require additional heating to make them pump-able and transportable through the piping systems in cold weather. The ToRs for the study required an investigation of the technical feasibility of using fuel oils with kinematic viscosity of 380 cst (referred to as heavier RFO in this section) in the GENCO power stations to reduce the cost of fuel for power generation in the country. This section discusses the major factors that need to be considered for switching to fuel oils with higher viscosity. 8.1 Fuel Oil Standards In Pakistan power stations and industrial plants are designed to operate on 180 cst during summer and 120 cst during winter. The country as such does not have any experience of using more viscous fuel oil to date. Pakistan Standards for Quality Control Authority (PSQCA) therefore does not have any reference to the more viscous fuel oil grades. Internationally, residual fuel oil is also referred to as marine fuel and its specifications are guided by ISO 8217: 2010 Classification of marine fuels. Exhibit 8.1 shows the specifications of various grades of Marine Residual Fuel Oil. The specifications indicate an increasing trend of vanadium, metals, and ash contents with increasing viscosities. Increasing concentrations of these parameters lead to a decline in performance of steam plants and increase in operations and maintenance (O&M) cost. 8.2 Potential for use in Power Generation in Paksitan Heavier fuel oils of 380 cst and above are used in power generation in many countries including India and Brazil. The following is a summary of factors that could limit their usage in the power plants in Pakistan. Steam Plants Heavier residual fuel oils can be used with greater flexibility in steam power plants than in diesel sets due to the external combustion mode of firing and minimal retrofits of oil burners to burn fuels of varying viscosities. Steam power plants can therefore be designed to use heavier grades of fuel oil. However, in existing steam power stations, use of heavier fuel oils can affect the output and operational efficiency due to the limitations of the installed oil handling system. Usage of High Viscosity Fuel Oil in GENCO Power Plants R1V02TAG: 04/27/11 8-1

83 Diesel Engines In addition to modification of the oil storage and handling system, the fuel injection systems of the power plants using diesel engine technology would require replacement. In addition, presence of higher concentration of vanadium will cause hot corrosion at the exhaust valves thereby increasing the operational and maintenance cost of the plant. The use of heavier RFO in existing diesel engine plants therefore should be considered only after careful assessment of the economics of operations on such RFO grades. Gas Turbines The experience of use of RFO being marketed in Pakistan in gas turbines in Pakistan at the KAPCO and Rousch CCGT power stations show a significant 10-15% degradation of power output and loss of thermal efficiency of the plant and about 8-10% additional shut down time required for periodic washing of turbine blade due to deposition of vanadium. Due to these problems, Rousch power plant switched to gas firing for reliable operation of the plant. The use of even heavier grades of RFO in gas turbines with substantially higher vanadium content (higher by a factor of three) and 50% higher ash content will not be feasible. The above discussion indicates that the steam power stations are the only units where use of RFO of higher viscosity of the order of 380 cst could be considered. 8.3 Modifications Required in Fuel Oil Handling at the Power Plants Significant modifications can be required at the oil handling system of steam power stations right from decanting from railway or road tankers to final consumption at the boiler. Decanting time: Due to higher viscosity, decanting will take much longer time especially during winter as the oil will have to be heated to its pour point to permit pumping. Up-gradation of decanting facilities: The capacity of the decanting facility may have to be enhanced to accommodate larger number of tankers at a time to decant desired amount of oil in a day. Modification in oil heating system: The heating system would need modification to provide higher amount of heat to raise the temperature of the oil. Besides additional heat input, heat losses in the oil storage and handling system would also increase, which will have a negative impact on the overall thermal efficiency of the plant. Pumping requirements: In order to flow more viscous oil, the capacity of fuel oil filling pumps from decanting stations to storage tanks and oil feed pumps from storage tanks to boilers will need replacement or revamping. 8.4 Modification and Adjustments Required in the Boilers Heavier oils have different physical properties that may require modifications in the boiler components to attain optimal efficiencies for the plants. Burner design: Burner design may need modifications to allow for adequate fuel atomization and combustion in the furnace. Usage of High Viscosity Fuel Oil in GENCO Power Plants R1V02TAG: 04/27/11 8-2

84 Soot blowing frequency: With nearly 50% higher ash contents in the oil, the frequency of the soot blower operations is likely to increase. The GENCO power plants have manually operated soot blowers and majority of them are not even operational. In such conditions, the plants may need more frequent shut downs for washing of heater elements and tubes in the boiler. Oil additives/chemical usage: The higher concentration of vanadium in heavier fuel oil will increase the rate of depositions on heat exchanging surfaces of boiler needing frequent washing causing frequent shutdowns. These depositions can be reduced through use of fuel additives that will add to the existing O&M costs. Emissions: Due to higher concentration of micro carbon residue in the oil, the overall emissions from the plant may increase. All of the above factors would require capital investment at the plant to modify the oil handling system and plant O&M procedures to accommodate the usage of high viscous oil and will cost additional O&M expenses on recurring basis. 8.5 Fuel Oil Procurement and Supply RFO of 120 cst and 180 cst kinematic viscosity is produced by local refineries which meets nearly 50% of the country demand. GENCOs power stations contribute nearly 25-30% in the total demand of RFO in the country. Pakistan State Oil Company (PSO) manages the fuel oil supply in the country through oil imports from the Middle East on a regular basis to meet the domestic deficit. Since the specifications of local and imported oil are similar, PSO maintains a uniform infrastructure for storage, handling, and transport of RFO for the market in the country. Fuel oil availability: PSO will need to develop special tendering mechanism for import of heavier grade of RFO. In the absence of firm quantity contracts with GENCOs, it will always be a challenge for PSO to estimate the order size and frequency of supply to minimize its market risks. Modification of port handling facilities: Modification of decanting facilities from ships to port storage and onward handling of oil to depots will be required on the lines similar to that of fuel oil handling systems at the power plants. Dedicated storage: PSO will have to maintain dedicated storage for heavier RFO and will have to modify oil handling systems at their depots. PSO may not be willing to serve the market of heavy heavier grade RFO within the prevailing pricing mechanisms and may look for premiums to cover the risks. Such premiums will add to the delivered price of the heavier grade RFO, which may eliminate the advantage offered by the lower international market price. Use of Heavier Grade Fuel Oil in GENCOs Switching to heavier grade RFO will require capital investment in the infrastructure for storage, handling, transportation, and utilization of RFO. A detailed feasibility study including the infrastructure analysis of PSO and required modifications at the steam turbine and diesel engine based power plants and the assessment of resulting cost savings is recommended to ascertain the economics of burning heavier grade fuel oils. Usage of High Viscosity Fuel Oil in GENCO Power Plants R1V02TAG: 04/27/11 8-3

85 Exhibit 8.1: RFO Specifications ISO 8217: 2010 Paramenter Unit Limit RMA RMB RMD RME RMG RMK Viscosity at 50 C mm 2 /s Max Density at 15 C kg/m 3 Max Micro Carbon Residue % mm Max Aluminium + silicon mg/kg Max Sodium mg/kg Max Ash % mm Max Vanadium mg/kg Max CCAI Max Water % V/V Max Pour point (Upper) a Summer Pour Point (Upper) b Winter C Max 6 30 C Max 0 30 Flash Point C Min 60 Sulphur c % m/m Max Statutory requirements Total Sediment, aged % m/m Max 0.10 Acid Number* mgkoh/g Max 2.5 Used Lubricating Oils (ULO) 1 Calcium and Zinc 1 or Calcium and Phosphorus mg/kg Max The fuel shall be free from ULO, and shall be considered to contain ULO when either one of the following conditions is met: Calcium >30 and Zinc >15 or Calcium >30 and phosphorus >15 Usage of High Viscosity Fuel Oil in GENCO Power Plants R1V02TAG: 04/27/11 8-4

86 Appendix A: Fuel Oil Analysis Results See following pages. Appendix A R1V02TAG: 04/27/11 A-1

87 ATTOCK REFINERY LIMITED QUALITY CONTROL LABORATORY FURNACE FUEL OIL TEST REPORT Sample Report #: C-HBP-2 Sample Source: Date Received: Time Received: 1600 Hrs Date Reported: Time Reported: 1200 Hrs No. Test Method PSQCA 5 Specifications JT-1 6 (1-E02962) JT-2 (2-E02963) JT-3 (3-E02964) Results JT-4 (4-E02965) GT-1 7 (6-E02966) GT-3 (7-E02967) 1. Specific 15.6 C ASTM D Max Flash Point, PMCC, C ASTM D93 66 Min Pour Point, C ASTM D97 24 Max Water Contents Vol. % ASTM D Max Sulfur, Total, % mass ASTM D Max Ash Content, % Wt. ASTM D Max Clorific Value, Gross, BTU/Ib ASTM D240 18,200 Min 18,208 17,844 17,981 17,929 16,813 17, PSQCA=Pakistan Standards for Quality Control Authority JT=Jamshoro Storage Tanks GT= Guddu Storage Tanks ASTM=American Society for Testing And Materials Appendix A R1V02TAG: 04/27/11 A-2

88 Sample Report #: C-HBP-2 Sample Source: Date Received: Time Received: 1600 Hrs Date Reported: Time Reported: 1200 Hrs No. Test Method PSQCA Specifications GT-5 (7-E02968) GT-8 (8-E02969) GT-9 (9-E02970) Results MT 9-2 (10-E02971) MT-3 (6-E02972) MT-A (Unit-4) (7-E02973) 1. Specific 15.6 C ASTM D Max Flash Point, PMCC, C ASTM D93 66 Min Pour Point, C ASTM D97 24 Max Water Contents Vol. % ASTM D Max Sulfur, Total, % mass ASTM D Max Ash Content, % Wt. ASTM D Max Clorific Value, Gross, BTU/Ib ASTM D240 18,200 Min 16,860 17,364 17,428 17,678 17,229 17,123 9 MT= Muzaffargarh Storage Tanks Appendix A R1V02TAG: 04/27/11 A-3

89 Sample Report #: C-HBP-2 Sample Source: Date Received: Time Received: 1600 Hrs Date Reported: Time Reported: 1200 Hrs No. Test Method PSQCA Specification s MT-B (Unit-4) (13-E02974) MT-1 (14-E02975) Results MT-2 (15-E02976) MT-4 (16-E02977) MT-5 (17-E02978) MT-6 (18-E02979) 1. Specific 15.6 C ASTM D Max Flash Point, PMCC, C ASTM D93 66 Min Pour Point, C ASTM D97 24 Max Water Contents Vol. % ASTM D Max Sulfur, Total, % mass ASTM D Max Ash Content, % Wt. ASTM D Max Clorific Value, Gross, BTU/Ib ASTM D240 18,200 Min 17,076 17,350 18,014 18,089 17,803 17,826 Remarks: All eighteen samples does not comply Pakistan Standard and Quality Control Authority (PSQCA) specifications for Furnace Fuel Oil (FFO) in one or more tests. High specific gravity values are obtained due to higher water contents. Moreover, the low calorific value is obtained due to high specific gravity, water and ash contents. This report shall not be produced/made part of any investigation/inquiry/ or used for any litigation purpose. Samples were collected by M/s Hagler Bailly Pakistan (HBP) and received at room temperature. Appendix A R1V02TAG: 04/27/11 A-4

90 Appendix B: Data and Results of the GENCOs Capacity Test Unit 1 Exhibit B.1: Results of the Capacity Test of TPS Jamshoro Date Time Gross Output Auxiliary Load Net Output 21/01/ : : : : /01/ : : : : /01/ : : : : Average Unit 2 Date Time Gross Output Auxiliary Load Net Output 21/01/ : : : : /01/ : : : : /01/ : : : : Average Appendix B R1V02TAG: 04/27/11 B-1

91 Unit 3 Date Time Gross Output Auxiliary Load Net Output 17/02/ : : : : /02/ : : : : /02/ : : : : Average Unit 4 Date Time Gross Output Auxiliary Load Net Output 17/02/ : : : : /02/ : : : : /02/ : : : : Average Appendix B R1V02TAG: 04/27/11 B-2

92 CCP Block 2-A (GT7, GT8, ST5) Exhibit B.2: Results of the Capacity Test of TPS Guddu Date Time Gross Output GT 7 GT 8 ST5 CCP Block 2-A Auxiliary Load Net Output Gross Output Auxiliary Load Net Output Gross Output Auxiliary Load Net Output 30/12/ Gross Output Auxiliary Load /12/ /01/ /01/ Average Net Output Appendix B R1V02TAG: 04/27/11 B-3

93 CCP Block 1 (GT11, GT12, ST13) Date Time Gross Output GT 11 GT 12 ST 13 CCP Block 1 Auxiliary Load Net Output Gross Output Auxiliary Load Net Output Gross Output Auxiliary Load Net Output 03/01/ Gross Output Auxiliary Load /01/ /01/ /01/ Average Net Output Appendix B R1V02TAG: 04/27/11 B-4

94 Exhibit B.3: Results of the Capacity Test of TPS Muzaffargarh Unit 2 Date Time Gross Output Auxiliary Load Net Output 09/01/ : : : : /01/ : : : : /01/ : : : : Average Unit 3 Date Time Gross Output Auxiliary Load Net Output 09/01/ : : : : /01/ : : : : /1/ : : : : Average Appendix B R1V02TAG: 04/27/11 B-5

95 Unit 4 Date Time Gross Output Auxiliary Load Net Output 05/01/ : : : : /01/ : : :! : /01/2011 9: : : : Average Unit 5 Date Time Gross Output Auxiliary Load Net Output 02/01/ : : : : /01/ : : : : /01/2011 9: : : : Average Appendix B R1V02TAG: 04/27/11 B-6

96 Unit 6 Date Time Gross Output Auxiliary Load Net Output 02/01/ : : : : /01/ : : : : /01/ : : : : Average Appendix B R1V02TAG: 04/27/11 B-7

97 Appendix C: Testing Procedures for Measurment of GENCOs Gross and Net Heat Rates C.1 TPS Jamshoro All of the four units at TPS Jamshoro have similar instrumentation arrangement for measurement of fuel input and electrical output. Exhibit C.1 shows the energy measurement system at TPS Jamshoro. The diagram indicates the ideal location of the measuring instruments for appropriate measurement input and output energy of the plant along with the actual instrumentation on ground at each unit. As can be seen from the diagram, RFO received from the tank lorry is measured with dipstick because of the absence of RFO flow meters at the oil receiving terminal. The separate RFO pipelines feed each unit through a dedicated service tank (day tank) through a flow meter. The calibration status of the flow meter however was not available and therefore the readings of flow meters were not considered for the testing purpose. The power station has arrangements to measure gross generation and auxiliary consumption at each unit but have no meter at the sent-out of each unit within the power station premises. The sent-out electrical energy meters for each unit are located at the adjoining NTDC 500 kv grid station. Appendix C R1V02TAG: 04/27/11 C-1

98 Exhibit C.1: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output TPS Jamshoro Unit 1-4 Appendix C R1V02TAG: 04/27/11 C-2

99 C.1.1 Power Testing Procedure and Data Collected TPS Jamshoro has net sent-out meters at each unit located at the incoming busbar of the NTDC switchyard. These meters are at the premises of the nearby NTDC grid station and record energy sent-out at the scale of GWh. It is therefore, recommended that gross heat rates and efficiency should be used for the benchmarking purpose in future. The detailed procedure for calculation of heat rate for each unit is given below. The input and output measurement arrangement is same for all the four units of this power station. 1. Heat rate tests were conducted in two (2) sessions (in morning and in evening) for a duration of 3½ hours. 2. These units have their individual service tanks where the RFO consumption was measured using dip-tape during the test period. Flow meters were present on all the units but calibration records of the flow meters were not available. The readings from flow meters were noted for record purposes but not used in the heat rate analysis. 3. The fuel feeding tank was isolated by closing respective valves of supply and recirculation. 4. Each unit has gross energy generation meter and a unit auxiliary meter. Some of the auxiliaries were fed from other sources such as starting transformer through a separate meter. All units have independent net sent-out energy meters for energy delivered at the busbar of the NTDC switchyard. However, the measurement scale of the sent-out meter at the busbar of the NTDC switchyard was in GWh and therefore it was not possible to accurately capture the variations in KWh. Therefore, net generation was calculated at the unit output point by subtracting total auxiliary consumption from gross generation. The step-up transformer and cable losses for the units from generator terminal up to NTDC switchyard could not be calculated. 5. The readings of all the input and output measurement points were taken concurrently in the presence of station staff: a. Unit fuel input: The RFO consumption volume (in kilo or 000 liters) was measured at the service tank of the unit by using dip-tape and calibration charts for the service tanks. Temperature at the service tank was also recorded simultaneously. RFO consumption in metric tonnes was calculated after applying corrections for temperature and specific gravity of RFO. b. Unit energy output: Readings from gross energy meters, station auxiliary meters and other meters of auxiliary consumption through starting transformers were taken to measure the gross and net output of the plant after applying appropriate multiplying factors for respective meters. The detailed procedures for calculation of heat rates for TPS Jamshoro Units 1-4 are presented in Appendix D.2. Appendix C R1V02TAG: 04/27/11 C-3

100 C.2 TPS Guddu All the units at TPS Guddu have similar instrumentation arrangement for measurement of fuel input and electrical output for its steam and CCP blocks. Only Steam Unit 3 of the steam block could be tested. Steam unit 3 and 4 are dual fired units capable of both natural gas and RFO firing. RFO received from the tank lorry is measured with dipstick because of the absence of RFO flow meters at the oil-receiving terminal. The RFO is fed to Unit 3 and 4 through a common pipeline directly from main storage tanks. Both units have separate flow meters, however, the calibration status of the flow meter was not available and therefore the readings of flow meters were not considered for the testing purpose. Guddu receives medium calorific value raw gas from Kandhkot, Mari and Chachar. Gas meters are not present to measure the gas received at the power station. Since the pipelines are owned by Guddu power station, gas suppliers bill the power station from the meters installed at gas fields nearly kilometers away from the power station. No gas flow meters are present at Steam Units 1 and 2. The gas flow meters at Steam unit 3 and Block 2B were either not functional or not calibrated. The power station has arrangements to measure gross generation and auxiliary consumption at each unit but have no meter at the sent-out of each unit within the power station premises. The sent-out electrical energy meters for each unit are located at the adjoining NTDC 500 kv grid station. Exhibit C.2 shows the energy measurement system at the steam block Units 3 and 4 whereas Exhibit C.3 shows the energy measurement system at the CCP block of TPS Guddu. Appendix C R1V02TAG: 04/27/11 C-4

101 Exhibit C.2: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output Steam Block Unit 3-4 Appendix C R1V02TAG: 04/27/11 C-5

102 Steam Unit 1-2 and Steam Unit 4 Steam Units 1 and 2 were not tested due to absence of gas flow meters. Unit 4 could not be tested due to long shutdown due to breakdown of air pre-heater. Steam Unit 3 The detailed procedure for calculation of heat rate for Unit 3 is given here under: 1. The unit was running on mixed firing. The unit has operational gas and RFO flow meters. The consumption of gas was noted from gas flow meters at the specified time intervals. 2. These units do not have their individual service tanks and RFO is directly fed from main storage tanks through a common line for Units 3 & 4. RFO Flowmeters were present on both the units but calibration status of the flow meters was not available. Since Unit 4 was on prolonged shutdown, RFO was measured directly at the feeding (main storage) tank using the dip-tape. 3. Since feeding tank did not require frequent refills, heat rate tests were conducted in one session in the morning for duration of 6 hours. 4. The feeding tank was isolated by closing respective valves of supply and recirculation. 5. The Unit has gross energy generation and sent-out meters with no discrete measurement of auxiliary consumption. 6. The readings of all the input and output measurement points were taken concurrently in the presence of station staff: a. Unit fuel input: The readings of flow-meters installed in respective units were noted down concurrently with the dip measurement at the feeding tank. Temperatures at storage tanks were also recorded simultaneously. b. Unit energy output: The measurements were taken from gross energy and sent out meters. The auxiliary consumption and losses in step-up transformer and cables/lines up to sent-out busbar of the power station were calculated by subtracting the sent-out energy from the gross energy generation. Appendix C R1V02TAG: 04/27/11 C-6

103 Exhibit C.3: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output TPS CCP Block 2-A and CCP Block 1 Appendix C R1V02TAG: 04/27/11 C-7

104 CCP Blocks The detailed procedure for calculation of heat rate for Block 1 and Block 2-A is given here under: 1. Due to availability of functional flow meters for gas measurement, heat rate tests were conducted in single session over the day for the duration of 8 hours. 2. The gas consumption was measured at the gas flow meters installed at the inlet of each gas turbine. 3. The unit has meters for gross energy generation, auxiliary consumption and energy sent-out at all units. 4. The readings of all the input and output measurement points were taken concurrently in the presence of station staff: a. Unit fuel input: The reading of flow-meters installed in respective control rooms were noted down. b. Unit energy output: The measurements were taken from gross energy, auxiliary supply, and sent out meters. The detailed procedures for calculation of heat rates for TPS Guddu CCP Block are presented in Appendix D.2. C.3 TPS Muzaffargarh TPS Muzaffargarh was constructed in three phases and each phase has its own arrangements for input and output of energy. Phase 1 consists of Units 1-3, Phase 2consists of Units 5 and 6 whereas Unit 4 is managed as separate entity in the power station. Exhibit C.4, C.5 and C.6 present energy measurement system at Phase 1, Phase 2 and Phase 3 of TPS Muzaffargarh. The diagram indicates the ideal location of the measuring instruments for appropriate measurement input and output energy of the plant along with the actual instrumentation on ground at each unit. Similar to arrangements at other GENCO power stations, RFO received from the tank lorry is measured with dipstick because of the absence of RFO flow meters at the oil receiving terminal. Although power station has dedicated storage facilities for each phase, these facilities were interconnected and are now used as common storage facilities for units. Units 1-4 do not have service tanks are instead fed directly from main storage tanks. Units 5-6 have dedicated service tanks. RFO flow meters are present on all units but these were either not functional or their calibration status was not known and therefore the readings of flow meters were not considered for the testing purpose. The power station has arrangements to measure gross generation and auxiliary consumption at each unit but have no meter at the sent-out of each unit within the power station premises. A number of units did not have discrete sources for their auxiliary consumption and were sharing the sources with other units. The sent out electrical energy meters for the power station are located at the adjoining NTDC grid stations. Appendix C R1V02TAG: 04/27/11 C-8

105 Exhibit C.4: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output TPS Muzaffargarh Unit 2-3 Appendix C R1V02TAG: 04/27/11 C-9

106 C.3.1 Unit 1 Testing Procedures and Data Analysis This unit was not available for testing due to an extended shut down. Units 2 and 3 1. Heat rate tests were conducted in two (2) sessions (in morning and in evening) for duration of 3½ hours. 2. These units do not have their individual service tanks and RFO is directly fed from main storage tanks through a common line for Units 1-3. Flow-meters were present on both the units but calibration records for the meters were not available. Prior to running main heat rate tests on the units, the flow meters were manually adjusted to bring their readings in close proximity to the oil consumption measured through the dip method from the main storage tank feeding oil to these units. 3. The feeding tank was isolated by closing respective valves of supply and recirculation 4. This unit has gross energy generation meter and station auxiliary meters. Some of the auxiliary requirement was fed from other sources such as starting transformers through a separate meter. This unit does not have an independent net output energy meter so net output was calculated by subtracting total auxiliary consumption from the gross generation. The losses in step-up transformer and cables/lines up to sent-out busbar of the power station could not be calculated due to absence of sent-out meter at the unit. 5. The readings of all the input and output measurement points were taken concurrently in the presence of station staff: a. Unit fuel input: The reading of flow-meters installed in respective control rooms were noted down concurrently with the dip measurement at the feeding tank. Temperatures at storage tanks and flow meters were also recorded simultaneously. b. Unit energy output: Readings from gross energy meters, station auxiliary meters and other meters of auxiliary consumption through starting transformers were taken to measure the gross and net output of the plant after applying appropriate multiplying factors for respective meters. The detailed procedures for calculation of heat rates for Units 2-3 TPS Muzaffargarh are presented in Appendix D.3. Appendix C R1V02TAG: 04/27/11 C-10

107 Exhibit C.5: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output TPS Muzaffargarh Unit 4 Appendix C R1V02TAG: 04/27/11 C-11

108 Unit 4 1. Heat rate tests were conducted in two (2) sessions (in morning and in evening) for duration of 3½ hours. 2. Unit 4 does not have its individual service tanks and RFO is directly fed from a dedicated main storage tanks. Flow-meter was present but calibration status of the meter was not available. The actual RFO consumption was directly measured through dip method from the main storage tank feeding to the unit. 3. The feeding tank was isolated by closing respective valves of supply, recirculation and condensate etc. 4. The Unit has gross energy generation meter and station auxiliary meters. The Unit does not have an independent net output energy meter so net output was calculated by subtracting total auxiliary consumption from the gross generation. The losses in step-up transformer and cables/lines up to sent-out busbar of the power station could not be calculated due to absence of sent out meter at the Unit. 5. The readings of all the input and output measurement points were taking concurrently in the presence of station staff: a. Unit fuel input: The RFO consumption was measured at the feeding tank with the dip-tape. Temperature at storage tank was also recorded simultaneously. b. Unit energy output: Readings from gross energy meters and station auxiliary meters were taken to measure the gross and net output of the plant after applying appropriate multiplying factors for respective meters. The detailed procedures for calculation of heat rates for Unit 4 TPS Muzaffargarh are presented in Appendix D.3. Appendix C R1V02TAG: 04/27/11 C-12

109 Exhibit C.6: Schematic Diagram Show Status of Measurement of Fuel Input and Electrical Output TPS Muzaffargarh Unit 5-6 Appendix C R1V02TAG: 04/27/11 C-13

110 Units 5 and 6 1. Heat rate tests were conducted in two (2) sessions (in morning and in evening) for duration of 3½ hours. 2. The Units have their individual service tanks. Flow-meters were present but were not functional at these units so the actual RFO consumption was directly measured through dip method from the service tank feeding to the unit. 3. The feeding tank was isolated by closing respective valves of supply, recirculation and condensate etc. 4. The Unit has gross energy generation meter and station auxiliary meters. The Unit does not have an independent net output energy meter so net output was calculated by subtracting total auxiliary consumption from the gross generation. The losses in step-up transformer and cables/lines up to sent-out busbar of the power station could not be calculated due to absence of sent out meter at the Unit. 5. The readings of all the input and output measurement points were taking concurrently in the presence of station staff: a. Unit fuel input: The RFO consumption was measured at the feeding tank with the dip-tape. Temperature at storage tank was also recorded simultaneously. b. Unit energy output: Readings from gross energy meters and station auxiliary meters were taken to measure the gross and net output of the plant after applying appropriate multiplying factors for respective meters. The detailed procedures for calculation of heat rates for Units 2-3 TPS Muzaffargarh are presented in Appendix D.3. Appendix C R1V02TAG: 04/27/11 C-14

111 Appendix D: Calculation of GENCOs Gross and Net Heat Rates See following pages. Appendix D R1V02TAG: 04/27/11 D-1

112 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Specific 0.55% 1 Water Contents RFO Weight in Tank 2 RFO Consumption RFO Average Heating Value 3 Total Heat Input Gross Generation Meter Readings Gross Generation Auxiliary Consumption Meter Readings Aux. Consumption Aux. through start-up transformer meter Readings Aux. Feed through Startup Tr. Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Exhibit D.1: Calculation of Gross and Net Heat Rate and Efficiency TPS Jamshoro Calculations of Gross and Net Heat Rates and Efficiency Unit 1 TPS Jamshoro Date Time Meter s C o Tonne s Tonnes MBtu/ Tonne MMBtu 000' kwh 000' kwh 000' kwh 000' kwh 000' kwh , ,644 22, ' kwh 000' kwh ,881 3,816 32, , , , ,936 22, ,881 4,902 36, , , , ,017 22, ,881 3,837 37, , , , ,313 22, ,881 3,910 40, , , , ,383 22, ,881 3,709 41, , , , ,684 22, ,881 3,614 45, , , , ,759 22, ,881 3,604 46, , , Total ,392 2, Appendix D R1V02TAG: 04/27/11 D-2

113 1 Total Fuel Input 27,392 MMBtu 2 Gross Generation 2, kwh 3 Gross Heat Rate 9,829 Btu/kWh 4 Gross Efficiency 34.7% 5 Auxiliary Consumption kwh 6 Sent Out Energy 2, kwh 7 Net Heat Rate 10,720 Btu/kWh 8 Net Efficiency 31.8% 1. Standard RFO specific gravity was adjusted for water contents in RFO. The RFO present at the TPS Jamshoro had average water contents of 1.1% at the main storage tanks. It was assessed to reduce by 50% at temperature range of Co at the service tank. A water content of 0.55% was therefore assessed for be present at service tank stage. In future, however, a sample for RFO analysis should be taken from service tank instead of storage tank to calculate the exact concentration of water contents. 2. RFO volume converted to weight by using calibration charts of the service tanks. 3. The RFO present at the TPS Jamshoro had average heating value of 40,103 MMBtu/Tonne at water contents of 1.1% at the main storage tanks. The heating value was also corrected for the water contents of 0.55% at service tank stage which worked out to be 38,881 MMBtu/Tonne. Appendix D R1V02TAG: 04/23/11 D-3

114 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Specific 0.55% 1 Water Contents RFO Weight in Tank 2 RFO Consumption RFO Average Heating Value 3 Total Heat Input Gross Generation Meter Readings Gross Generation Auxiliary Consumption Meter Readings Aux. Consumption Aux. through start-up transformer meter Readings Aux. Feed through Start-up Tr. Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 2 TPS Jamshoro Date Time Meters C o Tonnes Tonnes MBtu/ Tonne ,286 82,265 7,227 MMBtu ,881 2, , , , ,795 82,294 7, ,881 2, , , , ,016 82,421 7, ,881 2, , , , ,517 82,450 7, ,881 2, , , , ,700 82,574 7, ,881 2, , , , ,157 82,601 7, ,881 2, , , , Total ,971 1, ' kwh 000' kwh 000' kwh 000' kwh 000' kwh 000' kwh 000' kwh Appendix D R1V02TAG: 04/23/11 D-4

115 1 Total Fuel Input 15,971 MMBtu 2 Gross Generation 1, kwh 3 Gross Heat Rate 11,727 Btu/kWh 4 Gross Efficiency 29.1% 5 Auxiliary Consumption kwh 6 Sent Out Energy 1, kwh 7 Net Heat Rate 12,492 Btu/kWh 8 Net Efficiency 27.3% 1. Standard RFO specific gravity was adjusted for water contents in RFO. The RFO present at the TPS Jamshoro had average water contents of 1.1% at the main storage tanks. It was assessed to reduce by 50% at temperature range of C at the service tank. A water content of 0.55% was therefore assessed for be present at service tank stage. In future, however, a sample for RFO analysis should be taken from service tank instead of storage tank to calculate the exact concentration of water contents. 2. RFO volume converted to weight by using calibration charts of the service tanks. 3. The RFO present at the TPS Jamshoro had average heating value of 40,103 MMBtu/Tonne at water contents of 1.1% at the main storage tanks. The heating value was also corrected for the water contents of 0.55% at service tank stage which worked out to be 38,881 MMBtu/Tonne. Appendix D R1V02TAG: 04/23/11 D-5

116 Date Time Dip-Tape Readings Tank Tempe-rature RFO Specific Gravity RFO Specific 0.55% 1 Water Contents RFO Weight in Tank 2 RFO Consumption RFO Average Heating Value 3 Total Heat Input Gross Generation Meter Readings Gross Generation Auxiliary Consumption Meter Readings Aux. Consump-tion Aux. through startup transformer meter Readings Aux. Feed through Start-up Tr. Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 3 TPS Jamshoro Meter s C Tonne s Tonne s MBtu/ Tonne MMBtu , ,906 35, ,881 2, , , , , , ,170 35, ,881 2, , , , , ,210 35, ,881 2, , , , , ,170 35, ,881 2, , , , , ,499 35, ,881 2, , , , Total ,761 1, ' kwh 000' kwh 000' kwh 000' kwh 000' kwh 000' kwh 000' kwh Appendix D R1V02TAG: 04/23/11 D-6

117 1 Total Fuel Input 14,761 MMBtu 2 Gross Generation 1, kwh 3 Gross Heat Rate 11,879 Btu/kWh 4 Gross Efficiency 28.7% 5 Auxiliary Consumption kwh 6 Sent Out Energy 1, kwh 7 Net Heat Rate 13,262 Btu/kWh 8 Net Efficiency 25.7% 1. Standard RFO specific gravity was adjusted for water contents in RFO. The RFO present at the TPS Jamshoro had average water contents of 1.1% at the main storage tanks. It was assessed to reduce by 50% at temperature range of C at the service tank. A water content of 0.55% was therefore assessed for be present at service tank stage. In future, however, a sample for RFO analysis should be taken from service tank instead of storage tank to calculate the exact concentration of water contents. 2. RFO volume converted to weight by using calibration charts of the service tanks. 3. The RFO present at the TPS Jamshoro had average heating value of 40,103 MMBtu/Tonne at water contents of 1.1% at the main storage tanks. The heating value was also corrected for the water contents of 0.55% at service tank stage which worked out to be 38,881 MMBtu/Tonne. Appendix D R1V02TAG: 04/23/11 D-7

118 Time Dip-Tape Readings Tank Tempe-rature RFO Specific Gravity RFO Specific 0.55% 1 Water Contents RFO Weight in Tank 2 RFO Consumption RFO Average Heating Value 3 Total Heat Input Gross Generation Meter Readings Gross Generation Auxiliary Consumption Meter Readings Aux. Consump-tion Aux. through startup transformer meter Readings Aux. Feed through Start-up Tr. Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 4 TPS Jamshoro Date Meters C Tonnes Tonnes MBtu/ Tonne MMBtu 000' kwh 000' kwh 000' kwh , , ,881 3, , , , , , ,881 3, , , , , ,881 3, , , , , ,881 3, , , , , ,881 2, , , Total ,521 1, ' kwh 000' kwh 000' kwh 000' kwh Appendix D R1V02TAG: 04/23/11 D-8

119 1 Total Fuel Input 15,521 MMBtu 2 Gross Generation 1, kwh 3 Gross Heat Rate 10,909 Btu/kWh 4 Gross Efficiency 31.3% 5 Auxiliary Consumption kwh 6 Sent Out Energy 1, kwh 7 Net Heat Rate 11,935 Btu/kWh 8 Net Efficiency 28.6% 1. Standard RFO specific gravity was adjusted for water contents in RFO. The RFO present at the TPS Jamshoro had average water contents of 1.1% at the main storage tanks. It was assessed to reduce by 50% at temperature range of C at the service tank. A water content of 0.55% was therefore assessed for be present at service tank stage. In future, however, a sample for RFO analysis should be taken from service tank instead of storage tank to calculate the exact concentration of water contents. 2. RFO volume converted to weight by using calibration charts of the service tanks. 3. The RFO present at the TPS Jamshoro had average heating value of 40,103 MMBtu/Tonne at water contents of 1.1% at the main storage tanks. The heating value was also corrected for the water contents of 0.55% at service tank stage which worked out to be 38,881 MMBtu/Tonne. Appendix D R1V02TAG: 04/23/11 D-9

120 Exhibit D.2: Calculation of Gross and Net Heat Rate and Efficiency TPS Guddu CCP Block 2-A: GT 7 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading ,690 83,904 5, ,240 84,000 5, ,290 84,189 5, ,210 84,370 5, ,840 84,530 5, ,350 85,935 5, ,360 86,122 5, ,750 86,583 5, ,110 86,670 5, ,830 88,162 5, ,800 88,350 5, ,850 88,542 5, ,430 88,822 5, ,150 90,435 5, ,170 90,623 5, ,220 90,811 5, ,820 91,096 5, Initial Gas Meters Reading 801,690 MCF 2. Final Gas Reading 916,820 MCF 3. Difference 115,130 MCF 4. Gas Calorific Value Btu/Scf 5. Total Fuel Input 92,347 MMBtu 6. Intial Gross Generation Reading 83,904 MWh 7. Final Gross Generation Reading 91,096 MWh 8. Difference 7,192 MWh 9. Gross Generation 7,192,000 kwh 10. Gross Heat Rate 12,840 Btu/kWh 11. Gross Efficiency 27% 12. Intial Auxiliary Consumprion Reading 5, Final Auxiliary Consumprion Reading 5, Difference Mutliplying Factor Auxiliary Consumption 31,360 kwh 17. Sent Out Energy 7,160,640 kwh 18. Net Heat Rate 12,896 Btu/kWh 19. Net Efficiency 26% Appendix D R1V02TAG: 04/23/11 D-10

121 CCP Block 2-A: GT 8 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading ,530 41,323 6, ,980 41,408 6, ,890 41,581 6, ,780 41,751 6, ,580 41,922 6, ,220 43,286 6, ,120 43,460 6, ,270 43,887 6, ,630 43,973 6, ,290 45,334 6, ,070 45,502 6, ,960 45,672 6, ,300 45,928 6, ,330 47,358 6, ,220 47,529 6, ,090 47,699 6, ,002,440 47,956 6, Initial Gas Meters Reading 891,530 MCF 2. Final Gas Reading 1,002,440 MCF 3. Difference 110,910 MCF 4. Gas Calorific Value Btu/Scf 5. Total Fuel Input 88,962 MMBtu 6. Intial Gross Generation Reading 41,323 MWh 7. Final Gross Generation Reading 47,956 MWh 8. Difference 6,633 MWh 9. Gross Generation 6,633,000 kwh 10. Gross Heat Rate 13,412 Btu/kWh 11. Gross Efficiency 25% 12. Intial Auxiliary Consumprion Reading 6, Final Auxiliary Consumprion Reading 6, Difference Mutliplying Factor Auxiliary Consumption 26,880 kwh 17. Sent Out Energy 6,606,120 kwh 18. Net Heat Rate 13,467 Btu/kWh 19. Net Efficiency 25% Appendix D R1V02TAG: 04/23/11 D-11

122 CCP Block 2-A: ST5 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading ,623 4, ,694 4, ,828 4, ,975 4, ,104 4, ,109 4, ,243 4, ,578 4, ,650 4, ,690 4, ,821 4, ,955 4, ,159 4, ,276 4, ,400 4, ,533 4, ,739 4, Initial Gas Meters Reading MCF 2. Final Gas Reading MCF 3. Difference MCF 4. Gas Calorific Value Btu/Scf 5. Total Fuel Input - MMBtu 6. Intial Gross Generation Reading 15,623 MWh 7. Final Gross Generation Reading 20,739 MWh 8. Difference 5,116 MWh 9. Gross Generation 5,116,000 kwh 10. Gross Heat Rate Btu/kWh 11. Gross Efficiency 12. Intial Auxiliary Consumprion Reading 4, Final Auxiliary Consumprion Reading 4, Difference Mutliplying Factor 10, Auxiliary Consumption 110,000 kwh 17. Sent Out Energy 5,006,000 kwh 18. Net Heat Rate Btu/kWh 19. Net Efficiency Appendix D R1V02TAG: 04/23/11 D-12

123 CCP Block 2-A 1. Total Fuel Input 181,309 MMBtu 2. Gross Generation 18,941,000 kwh 3. Gross Heat Rate 9,572 Btu/kWh 4. Gross Efficiency 36% 5. Auxiliary Consumption 168,240 kwh 6. Sent Out Energy 18,772,760 kwh 7. Net Heat Rate 9,658 Btu/kWh 8. Net Efficiency 35% Appendix D R1V02TAG: 04/23/11 D-13

124 CCP Block 2-A: GT 11 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Initial Gas Meters Reading 256,005 HCM 2. Final Gas Reading 283,328 HCM 3. Difference 27,323 HCM 4. Unit conversion 3.53 HCM to MCF 5. Gas Consumption 96,490 MCF 6. Gas Calorific Value Btu/Scf 7. Total Fuel Input 77,396 MMBtu 8. Intial Gross Generation Reading 952,690 MWH 9. Final Gross Generation Reading 959,036 MWH 10. Difference 6,346 MWH 11. Gross Generation 6,346,000 kwh 12. Gross Heat Rate 12,196 Btu/kWh 13. Gross Efficiency 28% 14. Intial Auxiliary Consumprion Reading 729, Final Auxiliary Consumprion Reading 763, Auxiliary Consumption 33,685 kwh 17. Sent Out Energy 6,312,315 kwh 18. Net Heat Rate 12,261 Btu/kWh 19. Net Efficiency 28% Appendix D R1V02TAG: 04/23/11 D-14

125 CCP Block 2-A: GT 12 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Initial Gas Meters Reading 873,114 HCM 2. Final Gas Reading 900,414 HCM 3. Difference 27, HCM 4. Unit conversion 3.53 HCM to MCF 5. Gas Consumption 96,409 MCF 6. Gas Calorific Value Btu/Scf 7. Total Fuel Input 77,331 MMBtu 8. Intial Gross Generation Reading 476,780 MWH 9. Final Gross Generation Reading 483,100 MWH 10. Difference 6,320 MWH 11. Gross Generation 6,320,000 kwh 12. Gross Heat Rate 12,236 Btu/kWh 13. Gross Efficiency 28% 14. Intial Auxiliary Consumprion Reading 326, Final Auxiliary Consumprion Reading 344, Auxiliary Consumption 18,701 kwh 17. Sent Out Energy 6,301,299 kwh 18. Net Heat Rate 12,272 Btu/kWh 19. Net Efficiency 28% Appendix D R1V02TAG: 04/23/11 D-15

126 CCP Block 2-A: ST13 Date Time Gas Flow Gross Generation Auxiliary Consumption MCF MWh Reading , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , Initial Gas Meters Reading - MCF 2. Final Gas Reading - MCF 3. Difference - MCF 4. Gas Calorific Value - Btu/Scf 5. Total Fuel Input - MMBtu 6. Intial Gross Generation Reading 675,538 MWH 7. Final Gross Generation Reading 682,020 MWH 8. Difference 6,482 MWH 9. Gross Generation 6,482,000 kwh 10. Gross Heat Rate - Btu/kWh 11. Gross Efficiency 0% 12. Intial Auxiliary Consumprion Reading 344,914 MWh 13. Final Auxiliary Consumprion Reading 345,181 MWh 14. Difference 267 MWh 15. Mutliplying Factor 1, Auxiliary Consumption 267,000 kwh 17. Sent Out Energy 6,215,000 kwh 18. Net Heat Rate - Btu/kWh 19. Net Efficiency 0% Appendix D R1V02TAG: 04/23/11 D-16

127 CCP Block 1 1. Total Fuel Input 154,727 MMBtu 2. Gross Generation 19,148,000 kwh 3. Gross Heat Rate 8,081 Btu/kWh 4. Gross Efficiency 42% 5. Auxiliary Consumption 319,386 kwh 6. Sent Out Energy 18,828,614 kwh 7. Net Heat Rate 8,218 Btu/kWh 8. Net Efficiency 42% Appendix D R1V02TAG: 04/23/11 D-17

128 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Weight in Tank 1 Total RFO Consump-tion for Unit 2 and 3 Proportion of RFO attributed to Unit 2 2 Total RFO Consump-tion for Unit 2 RFO Average Heating Value 3 Total Heat Input for Unit 2 Gross Generation Meter Readings Gross Generation Total Auxiliary Consumption from Table B Technical Audit Study of GENCO Power Plants Exhibit D.3: Calculation of Gross and Net Heat Rate and Efficiency TPS Muzaffargarh Calculations of Gross and Net Heat Rates and Efficiency Unit 2 TPS Muzaffargarh Table A Date Time Meters Co Tonnes Tonnes Tonnes MBtu/ Tonne MMBtu 000' kwh kwh kwh ,794 5,277, , % ,278 6,740 5,278, ,000 41, ,374 5,278, , % ,278 3,634 5,278, ,000 21, ,876 5,281, , % ,278 6,534 5,282, ,000 42, ,475 5,282, , % ,278 6,779 5,283, ,000 42, ,906 5,286, , % ,278 6,460 5,286, ,000 47, ,583 5,286, , % ,278 6,724 5,287, ,000 50,160 Total 1, ,870 3,665, ,074 Appendix D R1V02TAG: 04/23/11 D-18

129 Auxiliary Consumption Meter A Readings Aux. ConsumptionSide A Aux. Consumption Side A4 Auxiliary Consumption Meter B Readings Aux. Consumption Side B4 Aux. Consumption Side B Aux. through start-up transformer meter Readings Difference Aux. Feed through Start-up Tr. Aux. Feed through Start-up Tr. For Unit 2 Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Table B Date Time kwh kwh kwh kwh kwh ,993 6,565 3, , ,704 6, ,952 3, ,640 1,320 41, ,994 6,566 3, , ,088 6, ,240 3, ,904 1,452 21, ,998 6,569 3, , ,440 6, ,480 3, ,640 1,320 42, ,999 6,570 3, , ,938 6, ,744 3, ,904 1,452 42, ,003 6,574 5, , ,648 6, ,800 5, ,672 6,336 47, ,004 6,574 5, , ,384 6, ,120 5, ,312 7,656 50,160 Total 246,074 Appendix D R1V02TAG: 04/23/11 D-19

130 1 Total Fuel Input 36,870 MMBtu 2 Gross Generation 3,665,000 kwh 3 Gross Heat Rate 10,060 Btu/kWh 4 Gross Efficiency 33.9% 5 Auxiliary Consumption 246,074 kwh 6 Sent Out Energy 3,418,926 kwh 7 Net Heat Rate 10,784 Btu/kWh 8 Net Efficiency 31.6% 1. RFO volume converted to weight by using calibration charts of the storage tanks using the conversion of 1,250 Tonnes/meter. 2. Unit 1-3 are supplied RFO from a common storage tank. The total supply from the storage tank was divided on the basis of proportion of the consumption recorded by RFO flow meters installed at each of these units. Unit 1 was not operational so total consumption was divided between Unit 2 and 3 accordingly 3. The RFO present at the TPS Muzaffargarh had average heating value of 39,278 MBtu/Tonne at the main storage tank feeding Unit 2 and Auxiliary consumption of Sides A and B and start-up Transformer converted to kwh by using the multiplying factor of 26,400 for Auxiliary Meters. The start-up transformer was shared between Unit 2 and 3 so its total supply was divided equally between Units 2 and 3. Appendix D R1V02TAG: 04/23/11 D-20

131 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Weight in Tank 2 Total RFO Consump-tion for Unit 2 and 3 Proportion of RFO attributed to Unit 2 3 Total RFO Consump-tion for Unit 2 RFO Average Heating Value 4 Total Heat Input for Unit 2 Gross Generation Meter Readings Gross Generation Total Auxiliary Consumption from Table B Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 3 TPS Muzaffargarh Table A Date Time Meters Co Tonnes Tonnes Tonnes MBtu/ Tonne MMBtu 000' kwh kwh kwh ,794 6,055, , % ,278 5,532 6,055, ,000 41, ,374 6,056, , % ,278 2,953 6,056, ,000 21, ,876 6,058, , % ,278 5,334 6,059, ,000 40, ,475 6,059, , % ,278 5,422 6,060, ,000 40, ,906 6,062, , % ,278 5,415 6,062, ,000 46, ,583 6,062, , % ,278 5,999 6,063, ,000 45,936 Total 1, ,655 3,083, ,521 Appendix D R1V02TAG: 04/23/11 D-21

132 Auxiliary Consumption Meter A Readings Aux. Consumption Side A Aux. Consumption Side A5 Auxiliary Consumption Meter B Readings Aux. Consumption Side B4 Aux. Consumption Side B Aux. through start-up transformer meter Readings Difference Aux. Feed through Start-up Tr. Aux. Feed through Start-up Tr. For Unit 2 Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Table B Date Time kwh kwh kwh kwh kwh ,815 9,576 3, , ,800 9, ,592 3, ,640 1,320 41, ,816 9,577 3, , ,164 9, ,032 3, ,904 1,452 21, ,819 9,581 3, , ,536 9, ,800 3, ,640 1,320 40, ,820 9,582 3, , ,325 9, ,064 3, ,904 1,452 40, ,824 9,586 5, , ,272 9, ,120 5, ,672 6,336 46, ,825 9,587 5, , ,272 9, ,008 5, ,312 7,656 45,936 Total 237,521 Appendix D R1V02TAG: 04/23/11 D-22

133 1 Total Fuel Input 30,655 MMBtu 2 Gross Generation 3,083,000 kwh 3 Gross Heat Rate 9,943 Btu/kWh 4 Gross Efficiency 34.3% 5 Auxiliary Consumption 237,521 kwh 6 Sent Out Energy 2,845,479 kwh 7 Net Heat Rate 10,773 Btu/kWh 8 Net Efficiency 31.7% 1. RFO volume converted to weight by using calibration charts of the storage tanks using the conversion of 1,250 Tonnes/meter. 2. Unit 1-3 are supplied RFO from common storage tank. The total supply from storage tank was divided on the basis of proportion of the consumption recorded by RFO flow meters installed at each of these units. Unit 1 was not operational so total consumption was divided between Unit 2 and 3 accordingly 3. The RFO present at the TPS Muzaffargarh had average heating value of 39,278 MBtu/Tonne at the main storage tank feeding Unit 2 and Auxiliary consumption of Sides A and B and start-up Transformer converted to kwh by using the multiplying factor of 26,400 for Auxiliary Meters. The start-up transformer was shared between Unit 2 and 3 so its total supply was divided equally between Units 2 and 3. Appendix D R1V02TAG: 04/23/11 D-23

134 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Specific 0.55% 1 Water Contents RFO Weight in Tank 2 RFO Consumption RFO Average Heating Value 3 Total Heat Input Gross Generation Meter Readings Gross Generation Gross Generation Auxiliary Consumption Meter Readings Aux. Consumption Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 4 TPS Muzaffargarh Date Time Meters Co Tonnes Tonnes MBtu/ Tonne MMBtu kwh kwh , ,933 51, ,749 39, ,079 51, , ,087 51, , ,278 14, , ,444,800 51, , , ,696 51, ,801 39, ,843 51, , ,853 51, , ,278 15, , ,564,800 51, , , ,707 52, ,515 39, ,877 52, , ,968 52, , ,278 19, , ,972,800 52, ,000 Total 1, ,468 4,982, ,000 Appendix D R1V02TAG: 04/23/11 D-24

135 1 Total Fuel Input 50,468 MMBtu 2 Gross Generation 4,982,400 kwh 3 Gross Heat Rate 10,129 Btu/kWh 4 Gross Efficiency 33.7% 5 Auxiliary Consumption 521,000 kwh 6 Sent Out Energy 4,461,400 kwh 7 Net Heat Rate 11,312 Btu/kWh 8 Net Efficiency 30.2% 1. RFO volume converted to weight by using calibration charts of the storage tanks using the conversion of 1, Tonnes/meter. 2. The RFO present at the TPS Muzaffargarh had average heating value of 39,278 MBtu/Tonne at the main storage tank feeding Unit Auxiliary consumption converted to kwh by using the multiplying factor of 1,000 for Auxiliary Meters. Appendix D R1V02TAG: 04/23/11 D-25

136 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Specific 1.08% Water Contents RFO Weight in Tank 2 Total RFO Consump-tion for Unit 2 RFO Average Heating Value 4 Total Heat Input for Unit 2 Gross Generation Meter Readings Difference Gross Generation Total Aux. Consump-tion from Table B Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 5 TPS Muzaffargarh Table A Date Time Meters Co Tonnes Tonnes MBtu/ Tonne MMBtu kwh kwh , ,707 3,361 5, ,280 35, , ,707 2,969 5, ,940 35, , ,707 2,933 5, ,700 30, , ,707 3,577 5, ,520 41, , ,707 3,647 5, ,520 39, , ,707 3,523 5, ,740 40,065 Total ,010 1,757, ,585 Appendix D R1V02TAG: 04/23/11 D-26

137 Auxiliary Consumption Meter Readings Aux. Consumption Aux. Consumption 5 Aux. through start-up transformer meter Readings Difference Aux. Feed through Start-up Tr. Aux. Feed through Start-up Tr. For Unit 5 Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants Table B kwh kwh kwh kwh 19,929 1,314 19, ,020 1, ,263 1,131 35,151 19,930 1,314 19, ,020 1, ,263 1,131 35,151 19,934 1,314 19, ,295 1, ,640 1,320 30,615 19,335 1,314 19, ,690 1, ,640 1,320 41,010 19,940 1,314 19, ,273 1, ,640 1,320 39,593 19,941 1,314 19, ,745 1, ,640 1,320 40,065 Total 221,585 1 Total Fuel Input 20,010 MMBtu 2 Gross Generation 1,757,700 kwh 3 Gross Heat Rate 11,384 Btu/kWh 4 Gross Efficiency 30.0% 5 Auxiliary Consumption 221,585 kwh 6 Sent Out Energy 1,536,115 kwh 7 Net Heat Rate 13,026 Btu/kWh 8 Net Efficiency 26.2% 1. RFO volume converted to weight by using calibration charts of the service tanks using the conversion of 39 Tonnes/meter. 2. The RFO present at the TPS Muzaffargarh had an average heating value of 39,278 MBtu/Tonne at the main storage tank feeding Unit 2 and Auxiliary consumption was converted to kwh by using multiplying factor of 47,250 for Auxiliary Meters. In addition, reading of start-up Transformer was converted to kwh by using the multiplying factor of 264,000 for transformer Meters. The start-up transformer was shared between Unit 5 and 6 so its total supply was divided equally between Units 5 and 6. Appendix D R1V02TAG: 04/23/11 D-27

138 Dip-Tape Readings Tank Temperature RFO Specific Gravity RFO Specific 1.08% Water Contents RFO Weight in Tank 2 Total RFO Consump-tion for Unit 2 RFO Average Heating Value 4 Total Heat Input for Unit 2 Gross Generation Meter Readings Difference Gross Generation Total Aux. Consump-tion Table B Technical Audit Study of GENCO Power Plants Calculations of Gross and Net Heat Rates and Efficiency Unit 6 TPS Muzaffargarh Table A Date Time Meters Co Tonnes Tonnes MBtu/ Tonne MMBtu kwh kwh , ,707 2,892 3, ,800 33, , ,707 2,565 3, ,120 28, , ,707 2,912 3, ,140 32, , ,707 3,046 3, ,260 34, , ,707 2,995 3, ,920 33, , ,707 3,045 3, ,700 34,395 Total ,455 1,409, ,128 Appendix D R1V02TAG: 04/23/11 D-28

139 Auxiliary Consumption Meter Readings Aux. Consumption Aux. Consumption 5 Aux. through start-up transformer meter Readings Difference Aux. Feed through Start-up Tr. Aux. Feed through Start-up Tr. For Unit 5 Total Aux. Consump-tion Technical Audit Study of GENCO Power Plants kwh kwh kwh kwh 17,297 1,314 17, ,130 1, ,640 1,320 33,450 17,298 1,314 17, ,405 1, ,112 1,056 28,461 17,302 1,314 17, ,185 1, ,640 1,320 32,505 17,303 1,314 17, ,075 1, ,640 1,320 34,395 17,306 1,314 17, ,602 1, ,640 1,320 33,922 17,307 1,314 17, ,075 1, ,640 1,320 34,395 Total 197,128 1 Total Fuel Input 17,455 MMBtu 2 Gross Generation 1,409,940 kwh 3 Gross Heat Rate 12,380 Btu/kWh 4 Gross Efficiency 27.6% 5 Auxiliary Consumption 197,128 kwh 6 Sent Out Energy 1,212,812 kwh 7 Net Heat Rate 14,392 Btu/kWh 8 Net Efficiency 23.7% 1. RFO volume converted to weight by using calibration charts of the service tanks using the conversion of 39 Tonnes/meter. 2. The RFO present at the TPS Muzaffargarh had average heating value of 39,278 MBtu/Tonne at the main storage tank feeding Unit 2 and Auxiliary consumption was converted to kwh by using multiplying factor of 47,250 for Auxiliary Meters. In addition reading of start-up Transformer was converted to kwh by using the multiplying factor of 264,000 for transformer Meters. The start-up transformer was shared between Unit 5 and 6 so its total supply was divided equally between Units 5 and 6. Appendix D R1V02TAG: 04/23/11 D-29

140 Appendix E: Power Plant Availability See following pages. Appendix E R1V02TAG: 04/23/11 E-1

141 Steam Unit 1 Installed Capacity Derated Capacity Month 250 MW 187 MW Max. Load Min. Load Exhibit E.1: Power Plant Availability-TPS Jamshoro Load Factor (%) Utilization DC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY , ,431 8,760 73% Total FY2011 YTD* ,946 3,672 80% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-2

142 Steam Unit 2 Installed Capacity Derated Capacity Month 200 MW 160 MW Max. Load Min. Load Load Factor (%) Utilization Factor (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,731 8,760 88% Total FY2011 YTD* ,549 3,672 69% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-3

143 Steam Unit 3 Installed Capacity Derated Capacity Month 200 MW 160 MW Max. Load Min. Load Load Factor (%) Utilization Factor (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,417 8,760 85% Total FY2011 YTD* ,134 3,672 58% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-4

144 Steam Unit 4 Installed Capacity Derated Capacity Month 200 MW 160 MW Max. Load Min. Load Load Factor (%) Utilization Factor (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,931 8,760 91% Total FY2011 YTD* ,886 3,672 79% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-5

145 Steam Unit 1 Installed Capacity Derated Capacity Month 100 MW 60 MW Max. Load Min. Load Exhibit E.2: Power Plant Availability-TPS Guddu Load Factor (%) Utilization DC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % 44% % Aug, % 43% % Sep, % 43% % Oct, % 44% % Nov, % 46% % Dec, % 48% % Jan, % 48% % Feb, % 49% % Mar, % 48% % Apr, % 41% % May, % 43% % Jun, % 40% % Jul, % 34% % Aug, % 42% % Sep, % 43% % Oct, % 47% % Nov, Total FY % 45% ,622 8,760 87% Total FY2011 YTD* % 33% 1, ,229 3,672 61% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-6

146 Steam Unit 2 Installed Capacity Derated Capacity Month 100 MW 60 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % 44% % Aug, % 43% % Sep, % 43% % Oct, % 49% % Nov, % 56% % Dec, % 60% % Jan, % 62% % Feb, % 62% % Mar, % 59% % Apr, % 51% % May, % 53% % Jun, % 45% % Jul, % 42% % Aug, % 43% % Sep, % 38% % Oct, % 46% % Nov, % 56% % Total FY % 52% 850 7,910 8,760 90% Total FY2011 YTD* % 45% 251 3,421 3,672 93% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-7

147 Steam Unit 3 Installed Capacity Derated Capacity Month 210 MW 170 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Total Hours of Month Availability Factor (Time-base) Jul, % 67% % Aug, % 65% % Sep, % 66% % Oct, % 69% % Nov, % 73% % Dec, % 76% % Jan, % 75% % Feb, % 75% % Mar, % 73% % Apr, % 69% % May, % 68% % Jun, % 60% % Jul, % 45% % Aug, % 45% % Sep, % 43% % Oct, % 61% % Nov, % 61% % Total FY % 70% 558 1,057 7,145 8,760 82% Total FY2011 YTD* % 51% ,151 3,672 86% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-8

148 Steam Unit 4 Installed Capacity Derated Capacity Month 200 MW 150 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % 43% % Aug, % 45% % Sep, % 36% % Oct, % 63% % Nov, % 66% % Dec, % 71% % Jan, % 69% % Feb, % 65% % Mar, % 68% % Apr, % 57% % May, % 66% % Jun, % 56% % Jul, % 39% % Aug, % 51% % Sep, 10 0% 0% % Oct, 10 0% 0% % Nov, % 0% % Total FY % 59% 1,786 6,974 8,760 80% Total FY2011 YTD* % 18% 394 3,278 3,672 89% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-9

149 Block 2-A: GT Unit 7 Installed Capacity Derated Capacity Month 100 MW 90 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,530 8,760 97% Total FY2011 YTD* ,539 3,672 96% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-10

150 Block 2-A: GT Unit 8 Installed Capacity Derated Capacity Month 100 MW 90 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,618 8,760 98% Total FY2011 YTD* ,382 3,672 92% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-11

151 Block 2-A: Steam Unit 5 Installed Capacity Derated Capacity Month 100 MW 82 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,616 8,760 98% Total FY2011 YTD* ,570 3,672 97% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-12

152 CCP Block 2-A (GT7, GT8, ST5) Installed Capacity Derated Capacity Month 300 MW 262 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,588 8,760 98% Total FY2011 YTD* ,497 3,672 95% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-13

153 Block 2-B: GT Unit 9 Installed Capacity Derated Capacity Month 100 MW 90 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, Dec, Jan, Feb, Mar, Apr, May, Jun, Jul, Aug, % Sep, % Oct, % Nov, % Total FY , ,323 8,760 27% Total FY2011 YTD* ,237 1,521 3,672 41% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-14

154 Block 2-B: GT Unit 10 Installed Capacity Derated Capacity Month 100 MW 90 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, Dec, Jan, Feb, Mar, Apr, May, Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY , ,875 8,760 33% Total FY2011 YTD* ,023 3,672 82% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-15

155 Block 2-B: Steam Unit 6 Installed Capacity Derated Capacity Month 100 MW 82 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, Dec, Jan, Feb, Mar, Apr, May, Jun, Jul, Aug, Sep, Oct, Nov, Total FY , ,167 8,760 25% Total FY2011 YTD* 3,672 3,672 0% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-16

156 CCP Block 2-B (GT9, GT10, ST6) Installed Capacity Derated Capacity Month 300 MW 262 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, Dec, Jan, Feb, Mar, Apr, May, Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY , ,455 8,760 28% Total FY2011 YTD* , ,515 3,672 41% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-17

157 Block 1: GT Unit 11 Installed Capacity Derated Capacity Month 136 MW 90 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,634 8,760 99% Total FY2011 YTD* ,671 3, % * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-18

158 Block 1: GT Unit 12 Installed Capacity Derated Capacity Month 136 MW 80 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,664 8,760 99% Total FY2011 YTD* ,665 3, % * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-19

159 Block 1: Steam Unit 13 Installed Capacity Derated Capacity Month 143 MW 98 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,491 8,760 97% Total FY2011 YTD* ,165 3,672 86% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-20

160 CCP Block 1 (GT11, GT12, ST13) Installed Capacity Derated Capacity Month 415 MW 268 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Schdld. Outage Hours Forced Outage Hours Available Hours Total Hours of Month Availability Factor (Time Base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,595 8,760 98% Total FY2011 YTD* ,495 3,672 95% * Data available till November 2010 Appendix E R1V02TAG: 04/23/11 E-21

161 Steam Unit 1 Installed Capacity Derated Capacity Month 210 MW 160 MW Max. Load Min. Load Exhibit E.1: Power Plant Availability-TPS Muzaffargarh Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,908 90% Total FY2011 YTD ,157 86% Appendix E R1V02TAG: 04/23/11 E-22

162 Steam Unit 2 Installed Capacity Derated Capacity Month 210 MW 200 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,671 88% Total FY2011 YTD ,046 83% Appendix E R1V02TAG: 04/23/11 E-23

163 Steam Unit 3 Installed Capacity Derated Capacity Month 210 MW 160 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,117 81% Total FY2011 YTD ,509 96% Appendix E R1V02TAG: 04/23/11 E-24

164 Steam Unit 4 Installed Capacity Derated Capacity Month 320 MW 250 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,520 97% Total FY2011 YTD , ,205 60% Appendix E R1V02TAG: 04/23/11 E-25

165 Steam Unit 5 Installed Capacity Derated Capacity Month 200 MW 120 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,426 1,712 4,121 47% Total FY2011 YTD ,643 72% Appendix E R1V02TAG: 04/23/11 E-26

166 Steam Unit 6 Installed Capacity Derated Capacity Month 200 MW 135 MW Max. Load Min. Load Load Factor (%) Utilization DC (%) Utilization IC (%) Schedld. Outage (Hrs.) Forced Outage (Hrs.) Availablity (Hrs.) Availability Factor (Time-base) Jul, % Aug, % Sep, % Oct, % Nov, % Dec, % Jan, % Feb, % Mar, % Apr, % May, % Jun, % Jul, % Aug, % Sep, % Oct, % Nov, % Total FY ,568 6,729 77% Total FY2011 YTD ,865 78% Appendix E R1V02TAG: 04/23/11 E-27

Best Practice Guide BPGCS007

Best Practice Guide BPGCS007 Best Practice Guide BPGCS007 ENERGY MANAGEMENT Introduction: With rising fuel costs, opening of electricity and gas markets to alternate suppliers and climate change, the requirement to monitor and reduce

More information

The function of a power station is to deliver

The function of a power station is to deliver CHAPTER CHAPTER 3 Variable Load on Power Stations 3.1 Structure of Electric Power System 3.2 Variable Load on Power Station 3.3 Load Curves 3.4 Important Terms and Factors 3.5 Units Generated per Annum

More information

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN

DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN DESIGN CHALLENGES AND OPERATIONAL EXPERIENCE OF A MEGA MED SEAWATER DESALINATION PLANT IN TIANJIN Authors: Presenter: T. Efrat, Yu Haimiao Tomer Efrat Deputy Manager, Thermal Process Dept. IDE Technologies

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN

UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 1 of 27 UTILITIES DEPARTMENT NORTH CAMPUS DISASTER RECOVERY PLAN Page 2 of 27 Table of Contents 1. OBJECTIVE... 4 2. SCOPE... 4 3. COMMUNICATION... 4 4. LOSS OF NATURAL GAS SUPPLY... 5 5. LOSS OF

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria International Journal of Electronic and Electrical Engineering. ISSN 0974-2174 Volume 4, Number 3 (2011), pp. 281-289 International Research Publication House http://www.irphouse.com Performance Analysis

More information

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS

GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS GEOTHERMAL POWER GENERATION A PRIMER ON LOW-TEMPERATURE, SMALL-SCALE APPLICATIONS by Kevin Rafferty Geo-Heat Center January 2000 REALITY CHECK Owners of low-temperature geothermal resources are often interested

More information

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power

A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT. Keywords : Power Plant, Boiler Capacity, Electrical Power A CASE STUDY: PERFORMANCE AND ACCEPTANCE TEST OF A POWER AND DESALINATION PLANT Atef M Al Baghdadi Water and Electricity Authority Abu Dhabi, U.A.E Keywords : Power Plant, Boiler Capacity, Electrical Power

More information

Proposal for Improve the Electrical Power Supply in Port Sudan Town

Proposal for Improve the Electrical Power Supply in Port Sudan Town Proposal for Improve the Electrical Power Supply in Port Sudan Town Naeim Farouk Department of Mechanical Engineering, Faculty of Engineering, Red Sea University, Port Sudan Sudan [email protected], [email protected]

More information

Optimization of Natural Gas Processing Plants Including Business Aspects

Optimization of Natural Gas Processing Plants Including Business Aspects Page 1 of 12 Optimization of Natural Gas Processing Plants Including Business Aspects KEITH A. BULLIN, Bryan Research & Engineering, Inc., Bryan, Texas KENNETH R. HALL, Texas A&M University, College Station,

More information

Methodology for Merit Order Dispatch. Version 1.0

Methodology for Merit Order Dispatch. Version 1.0 Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...

More information

ALCOA OF AUSTRALIA POSITION DESCRIPTION. Principal Electrical Engineer WAO Powerhouse Operations & Power Distribution

ALCOA OF AUSTRALIA POSITION DESCRIPTION. Principal Electrical Engineer WAO Powerhouse Operations & Power Distribution ALCOA OF AUSTRALIA POSITION DESCRIPTION Position: Manager: Principal Electrical Engineer WAO Powerhouse Operations & Power Distribution WAO Powerhouse Operations Manager Accountability Objective Accountability

More information

Chapter 1.3 Energy management & audit

Chapter 1.3 Energy management & audit Chapter 1.3 Energy management & audit Part I: Objective type questions and answers 1. The judicious and effective use of energy to maximise profits and enhance competitive positions. This can be the definition

More information

Backup Fuel Oil System Decommissioning & Restoration Plan

Backup Fuel Oil System Decommissioning & Restoration Plan Backup Fuel Oil System Page 1 of 19 Overview of Physical Fuel Oil System and Decommissioning Steps The fuel oil system at Milford Power consists of a number of subsystems. These include the following:

More information

ASME B31.3 Process Piping. Scope of B31.3 Course

ASME B31.3 Process Piping. Scope of B31.3 Course ASME B31.3 Process Piping Charles Becht IV, PhD, PE Don Frikken, PE Instructors BECHT ENGINEERING COMPANY, INC. Introduction -1 Scope of B31.3 Course This course covers piping as typically used in process

More information

Recover Heat from Boiler Blowdown Water

Recover Heat from Boiler Blowdown Water Prepared for California Energy Commission (CEC) Prepared By: Southern California Gas Company (A Sempra Energy Utility) E3M Inc. May 2012 i Disclaimer The CEC and its contractor, Southern California Gas

More information

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle INL/CON-05-00740 PREPRINT Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle Geothermal Resources Council Annual Meeting Greg Mines October 2005 This is a preprint of a paper intended for publication

More information

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II

GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II GENCO HOLDING COMPANY LIMITED (GHCL) PROFORMA PC-II HIRING OF CONSULTANTS FOR EIAs, PC-1 & BIDDING DOCUMENTS FOR COAL FIRED POWER PLANT 2X660 MW (Gross) AT LAKHRA, AND FEASIBILITY OF 1x660 MW (Gross) AT

More information

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013 USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency

More information

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1 Nuclear Power in Pakistan Nuclear Power Plants Capacity (MWe) Year of Commissioning In

More information

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management

More information

System Assessment Capabilities for Fossil Fuel Power Stations

System Assessment Capabilities for Fossil Fuel Power Stations System Assessment Capabilities for Fossil Fuel Power Stations Technical Services LifeCycle Advantage Educational Services Consulting Technology Advantage The mission of Flowserve Technical Services is

More information

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division

David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products Division Caterpillar Inc. Cat Marine Power Diesel fuel feature story 187-P-2-004-98 Special to Seaway Review HEADLINE: BYLINE: Fuel for Thought David O. Ahrens, Commercial Marine Manager Caterpillar Engine Products

More information

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy

Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy Explosion of a gasoline vapour cloud formed in a hydrocarbon loaded effluents storage tank 10 December 1999 Arquata Scrivia Italy UVCE Storage tank Hydrocarbons Steam coil Corrosion Steam Instrumentation

More information

ASME QRO Certification Program

ASME QRO Certification Program ASME QRO Certification Program ASME QRO Certification For Operators of Resource Recovery Facilities Applicant Information Table of Contents Table of Contents Page QRO Certification Overview...1 Types of

More information

10 Nuclear Power Reactors Figure 10.1

10 Nuclear Power Reactors Figure 10.1 10 Nuclear Power Reactors Figure 10.1 89 10.1 What is a Nuclear Power Station? The purpose of a power station is to generate electricity safely reliably and economically. Figure 10.1 is the schematic of

More information

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours: Current state of plant Functioning as a peak and emergency centre Statistics Accumulated operating hours: D1-2-3-6-7: 43000 to 48000 hrs D4-5: 53000 to 57000 hrs D8: 33000 hrs Layout of the plant Index:

More information

Top Technology for Industry, Agriculture, Business and Communities

Top Technology for Industry, Agriculture, Business and Communities Top Technology for Industry, Agriculture, Business and Communities CHP The Technology with a Potential for Saving Energy Combined Heat and Power (CHP) is a highly efficient technology for the conversion

More information

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS

THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS THE PRODUCTION OF ELECTRICITY FROM WOOD AND OTHER SOLID BIOMASS RTP TM /ADVANCED CYCLE VS. COMBUSTION STEAM CYCLES OR WHY NOT SIMPLY COMBUST? For decades, the only commercial option available for the production

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

Natural Gas Conversions of Existing Coal-Fired Boilers

Natural Gas Conversions of Existing Coal-Fired Boilers White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,

More information

FLUID CIRCULATION PUMP PRESSURE

FLUID CIRCULATION PUMP PRESSURE www.babcock-wanson.co.uk STEAM PRESSURE CURVE The Practical Application of Thermal Fluid Heating THERMAL FLUID CIRCULATION PUMP PRESSURE BS EN ISO 9001:2000 FM 29856 PED97/23 CDX tank cut away Combined

More information

Wind Power and District Heating

Wind Power and District Heating 1 Wind Power and District Heating New business opportunity for CHP systems: sale of balancing services Executive summary - Both wind power and Combined Heat and Power (CHP) can reduce the consumption of

More information

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF

GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents

Federal Wage System Job Grading Standards for Electric Power Controlling, 5407. Table of Contents Federal Wage System Job Grading Standards for Electric Power Controlling, 5407 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 SPECIAL ADDITIONAL RESPONSIBILITIES...

More information

GAS HEATING IN COMMERCIAL PREMISES

GAS HEATING IN COMMERCIAL PREMISES ENERGY EFFICIENCY OFFICES GAS HEATING IN COMMERCIAL PREMISES www.energia.ie www.energia.ie Typically, energy reductions of 10% or more can be made easily through maintenance and low cost improvements.

More information

gasnetworks.ie Methodology for forecasting gas demand

gasnetworks.ie Methodology for forecasting gas demand gasnetworks.ie Methodology for forecasting gas demand 1 Contents 1 Introduction 2 1.1 Scope of the report 3 1.2 Use and publication of the forecasts 4 1.3 Structure of the document 5 2 Conceptual background

More information

PLP - TERMS AND CONDITIONS

PLP - TERMS AND CONDITIONS PLP - TERMS AND CONDITIONS 2014-2015 Philadelphia Gas Works Residential Parts & Labor Plan Contract This Residential Parts & Labor Plan Contract (this Plan ) is available to customers of the Philadelphia

More information

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF

More information

Routine and Emergency Boiler Operation

Routine and Emergency Boiler Operation Routine and Emergency Boiler Operation Learning Outcome When you complete this module you will be able to: Describe the routine safe and efficient operation of a packaged boiler. Learning Objectives Here

More information

Nuclear Power Plant Electrical Power Supply System Requirements

Nuclear Power Plant Electrical Power Supply System Requirements 1 Nuclear Power Plant Electrical Power Supply System Requirements Željko Jurković, Krško NPP, [email protected] Abstract Various regulations and standards require from electrical power system of the

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

INTEC Engineering GmbH Heating Solutions for the Marine Industry

INTEC Engineering GmbH Heating Solutions for the Marine Industry INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a

More information

HomeServices Terms and Conditions

HomeServices Terms and Conditions HomeServices Terms and Conditions Contents Definitions 03 The Contract 04 Start date 04 General Exclusions 11 Payment 12 Cancellation 13 Appointments 16 Product Renewal 16 Changes to contract 16 Safety

More information

THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS

THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS THE DASH FOR GAS WHY UK BUSINESS CONSUMERS OF HEAVY FUEL OIL NEED TO CONSIDER CONVERTING TO NATURAL GAS CONTENTS 3 Executive summary 4 Introduction 5 Key points to consider when converting from heavy fuel

More information

Columbia University Master Planning & Optimization

Columbia University Master Planning & Optimization Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District

More information

University of Iowa Power Plant

University of Iowa Power Plant University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...

More information

SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013

SHAIYO TRIPLE A GROUP. Hochiminh City, 16 September 2013 Integrated Biomass Power Generation in Thailand: Lesson Learnt and Transfer to Vietnam SHAIYO TRIPLE A GROUP Hochiminh City, 16 September 2013 Shaiyo Triple A is a world class agricultural based organization

More information

RESIDUAL FUEL OIL AS A SU.PPLEMENTARY FUEL

RESIDUAL FUEL OIL AS A SU.PPLEMENTARY FUEL Proceedings of The South African Sugar Technologists' Association-March 1966 135 RESIDUAL FUEL OIL AS A SU.PPLEMENTARY FUEL By J. GUDMANZ Abstract The need for supplementary fuel in local sugar mill steam

More information

ENERGY EFFICIENCY AUDITING

ENERGY EFFICIENCY AUDITING GUIDANCE NOTE ON ENERGY EFFICIENCY AUDITING July 2003 ENVIRONMENTAL PROTECTION AGENCY An Ghníomhaireacht um Chaomhnú Comhshaoil PO Box 3000, Johnstown Castle, Co.Wexford, Ireland Telephone: +353-53-60600

More information

Energy Audits. Good energy management begins with an energy audit

Energy Audits. Good energy management begins with an energy audit Energy Audits Good energy management begins with an energy audit Effective management of energy-consuming systems can lead to significant cost and energy savings as well as increased comfort, lower maintenance

More information

PRE-QUALIFICATION ANNOUNCEMENT

PRE-QUALIFICATION ANNOUNCEMENT Warsaw March 9, 2011 PRE-QUALIFICATION ANNOUNCEMENT The contracting authority 00-526 Warsaw, ul. Krucza 24/26, Poland Website: www.elektrowniapolnoc.pl Contact person: Mr. Marek Obuchowicz E-mail: [email protected]

More information

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY

More information

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Content Introduction...5 Standard ambient matched engine...5 Operating at high seawater with standard matched engine...6 Non-standard

More information

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]

State of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR] State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

ON-LINE MONITORING OF POWER PLANTS

ON-LINE MONITORING OF POWER PLANTS ON-LINE MONITORING OF POWER PLANTS Dr. Hans-Gerd Brummel Siemens Power Generation (PG), Huttenstrasse 12-16, 10553 Berlin, Germany Phone: +49 30 3464 4158, E-mail: [email protected] Table of

More information

Job Grading Appeal Decision Under Section 5346 of Title 5, United States Code

Job Grading Appeal Decision Under Section 5346 of Title 5, United States Code U.S. Office of Personnel Management Office of Merit Systems Oversight and Effectiveness Classification Appeals and FLSA Programs Dallas Oversight Division 1100 Commerce Street, Room 4C22 Dallas, TX 75242

More information

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure

Table of Contents. Real-Time Reliability Must Run Unit Commitment and Dispatch (Formerly G-203) Operating Procedure No. 2310 Table of Contents Purpose... 2 1. Responsibilities... 2 2. Scope/Applicability... 2 2.1 Background... 2 2.2 Scope / Applicability... 2 3. Detail... 3 3.1 Energy Dispatching... 3 3.1.2 Real-Time

More information

OIL CONDITION MONITORING: AUTOMOTIVE ANALYSIS

OIL CONDITION MONITORING: AUTOMOTIVE ANALYSIS OIL CONDITION MONITORING: AUTOMOTIVE ANALYSIS Why Analyse Lubricants? With increasing costs and tighter deadlines, the need for effective maintenance strategies is greater than ever before. So why not

More information

REQUEST FOR QUOTATIONS

REQUEST FOR QUOTATIONS Metropolitan Washington Airports Authority Materials Management, MA-133 Terminal A, Room 278 Washington, DC 20001-4901 REQUEST FOR QUOTATIONS 1. FOR INFORMATION CONTACT NAME: Regina Leigh 2. REQUEST FOR

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

01 2015 CIMAC Guideline

01 2015 CIMAC Guideline 01 2015 CIMAC Guideline Cold flow properties of marine fuel oils By CIMAC WG7 Fuels This publication is for guidance and gives an overview regarding the assessment of risks associated with operating on

More information

COLOCATION SERVICE SCHEDULE

COLOCATION SERVICE SCHEDULE COLOCATION SERVICE SCHEDULE 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Standard Terms and Conditions:

More information

Combined Cycle Control Overview

Combined Cycle Control Overview Combined Cycle Control Overview Introduction The Combined Cycle (CC) solution provides for the control and monitoring of a typical CC power plant in a cost effective, preengineered package. Basic Architecture

More information

Data Center Infrastructure & Managed Services Outline

Data Center Infrastructure & Managed Services Outline Data Center Infrastructure & Managed Services Outline The 360 Technology Center Solutions Data Center is located in Lombard, IL, USA. We are 20 minutes outside of downtown Chicago. The 360TCS staff consists

More information

Implementation of Emergency Repair Work for Steam Turbine at Himeji No. 2 Power Station, Kansai Electric Power Co., Inc.

Implementation of Emergency Repair Work for Steam Turbine at Himeji No. 2 Power Station, Kansai Electric Power Co., Inc. June 10, 2015 The Kansai Electric Power Co., Inc. Implementation of Emergency Repair Work for Steam Turbine at Himeji No. 2 Power Station, Kansai Electric Power Co., Inc. The Kansai Electric Power Co.,

More information

HAZARD RISK ASSESSMENT

HAZARD RISK ASSESSMENT HAZARD RISK ASSESSMENT Mt Grace Batchelor Magnesium Project A hazard risk assessment was undertaken to identify and assess the consequences of unplanned incidents that may pose safety, environmental risks,

More information

Rauhalahti Biomass CHP Plant

Rauhalahti Biomass CHP Plant Rauhalahti Biomass CHP Plant Jyväskylän Energiantuotanto Oy, a heat production company owned by Fortum Heat and Power (%) and the City of Jyväskylä (40%), owns in all 29 boilers. Two of these are power

More information

Draft consolidated baseline and monitoring methodology ACM00XX

Draft consolidated baseline and monitoring methodology ACM00XX Draft consolidated baseline and monitoring methodology ACM00XX Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology

More information

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further

More information

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry

GreEnergy. Power Plants. ELECTRICAL POWER from CEMENT PLANT WASTE HEAT. for the Cement Industry ELECTRICAL POWER from CEMENT PLANT WASTE HEAT for the Cement Industry GreEnergy Power Plants Power Solutions from ORMAT to Increase the Eco-Efficiency of the Cement Industry Courtesy of Heidelberger Zement

More information

Session 2: Hot Water Supply

Session 2: Hot Water Supply MEBS6000 Utility Services http://www.hku.hk/mech/msc-courses/mebs6000/index.html Session 2: Hot Water Supply Dr. Benjamin P.L. Ho Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application.

Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. Subject: Technology Collaboration for Gas Turbine and its auxiliaries of a 1.5 MW (ISO) rating, suitable for marine (defence) application. 1) Introduction This Expression of Interest (EoI) seeks response

More information

ENERGY POLICY PROGRAM

ENERGY POLICY PROGRAM ENERGY POLICY PROGRAM PARTICIPANT TRAINING PROGRAM POST-TRAINING EVALUATION BEST PRACTICES IN THERMAL OPERATIONS AND MAINTENANCE April 2014 This document is made possible by the support of the American

More information

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi

Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Tutkimuksen merkitys menestyvässä liiketoiminnassa- Innovaatiosta tuotteeksi Matti Rautanen Manager, External Networks, Power-wide R&D Tutkimuksella tulevaisuuteen- seminaari Kaukolämpöpäivät, Kuopio 29.8.2013

More information

2. Performance Test Schedule and Certificates. 2.1 Definitions

2. Performance Test Schedule and Certificates. 2.1 Definitions 2. Performance Test Schedule and Certificates 2.1 Definitions 2.1.1 Unit shall mean the complete Power Station Assembly/Unit as defined in the Agreement (which consists of equipment provided by Contractor

More information

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG) BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT

More information

Residential Heating Oil Prices: What Consumers Should know

Residential Heating Oil Prices: What Consumers Should know Residential Heating Oil Prices: What Consumers Should know Introduction Heating oil is a petroleum product used by many Americans to heat their homes. Historically, heating oil prices have fluctuated from

More information

21.1 Functions, Basic Configuration, and Interfaces

21.1 Functions, Basic Configuration, and Interfaces 21 (6.2.M) Site Services Building 21.1 Functions, Basic Configuration, and Interfaces 21.1.1 Functions The primary functions performed by the site services building are to house, support, provide a suitable

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

COLOCATION SERVICE SCHEDULE

COLOCATION SERVICE SCHEDULE COLOCATION SERVICE SCHEDULE 1. DEFINITIONS AND INTERPRETATION 1.1 Definitions Capitalised terms in this Service Schedule not otherwise defined here have the meaning given in the Master Services Agreement:

More information

Post Graduate Diploma Program

Post Graduate Diploma Program Post Graduate Diploma Program in ENERGY MANAGEMENT and AUDIT JADAVPUR UNIVERSITY KOLKATA INDIA Table of Contents Aim and Scope of the Program Course Structure Course Content Faculties & Facilities Admission

More information

English version. Manual for Determination of Combined Heat and Power (CHP)

English version. Manual for Determination of Combined Heat and Power (CHP) CEN/CENELEC WORKSHOP CWA 45547 September 2004 AGREEMENT ICS 27.100 English version Manual for Determination of Combined Heat and Power (CHP) This CEN/CENELEC Workshop Agreement has been drafted and approved

More information

Classification and Qualification STANDARDS

Classification and Qualification STANDARDS Classification and Qualification STANDARDS HVAC Series Classification Title Class Code Date Established Date Revised Operating Engineer Building Service Engineer Air Conditioning/Refrigeration Mechanic

More information

Jefferson Parish Department of Water Emergency Plan

Jefferson Parish Department of Water Emergency Plan 1. Overview Jefferson Parish Department of Water Emergency Plan 1.1. Purpose The purpose of this document is to establish procedures for the Department of Water during natural disasters or terrorist acts.

More information

AE BIO SOLAR AE BIO SOLAR HYBRID PLANT SOLAR/BIOMASS ADESSO ENERGIA SRL HYBRID PLANT SOLAR/BIOMASS THE BEGINNING OF A NEW ENERGY PRESENTATION

AE BIO SOLAR AE BIO SOLAR HYBRID PLANT SOLAR/BIOMASS ADESSO ENERGIA SRL HYBRID PLANT SOLAR/BIOMASS THE BEGINNING OF A NEW ENERGY PRESENTATION ADESSO ENERGIA SRL AE BIO SOLAR THE BEGINNING OF A NEW ENERGY PRESENTATION Tel.0918887364 14.05.2014 fax 0917480735 Pagina 1 INTRODUCTION Adesso Energia is an innovative startup based in Palermo created

More information

Well Positioned for the Future

Well Positioned for the Future Dominion Generation Virginia City Hybrid Energy Center Well Positioned for the Future The Coal Institute July 13, 2015 Rick Boyd Manager of Fuel Origination & Operations 1 Dominion Profile Operating Segments

More information

Electric Power 2005 in Chicago. Dr. Aiham Alsammarae Minister Of Electricity Iraq

Electric Power 2005 in Chicago. Dr. Aiham Alsammarae Minister Of Electricity Iraq Electric Power 2005 in Chicago Dr. Aiham Alsammarae Minister Of Electricity Iraq IRAQ s ELECTRICAL SYSTEM (STATUS & FUTURE PLAN) April. 2005 IRAQ s ELECTRICAL SYSTEM A QUICK HISTORICAL REVIEW Electricity

More information

Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995)

Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995) Abstract Process Economics Program Report 136A PLANT UTILITIES COSTS (January 1995) This report updates the utilities costs previously developed in PEP Report 136, also titled Plant Utilities Costs (September

More information