Jeffery Peyton Office of Contracts Ohio Department of Transportation

Size: px
Start display at page:

Download "Jeffery Peyton Office of Contracts Ohio Department of Transportation"

Transcription

1 Jeffery Peyton Office of Contracts Ohio Department of Transportation

2 The USDOT OIG has identified DBE fraud as one of their top priorities. Increased oversight of the DBE Program by numerous Federal agencies to reduce fraud and ensure the DBE Program benefits truly disadvantaged businesses.

3 DBE participation towards the established project goal is counted only if the DBE is performing a Commercially Useful Function. The DBE must carry out its contract responsibilities by actually performing, managing, and supervising the work they have been hired to perform.

4 Management Equipment Workforce Materials Performance

5 Scheduling work operations Receive quotes and ordering of all materials Preparing and submitting certified payrolls Hiring and firing employees Make all operational and managerial decisions Supervision of daily operations

6 DBE employees supervised by another contractor DBE provides little or no supervision of work DBE s superintendent is not a regular employee DBE firm's owner is not aware of the status of the work or the performance of the business

7 Equipment lease agreements are required to be long term (1 year +) and at competitive rates A DBE firm may lease specialized equipment on an ad hoc basis from another contractor, excluding the prime contractor or subsidiary Operation of the equipment must be subject to the full control of the DBE, and they are expected to provide the operator for that equipment (unless specialized)

8 Trucks and/or equipment used by DBE firm belong to the prime contractor Equipment used by the DBE belongs to a another contractor with no formal lease agreement Equipment signs and markings cover another owner's identity, usually through the use of magnetic signs

9

10

11

12 DBE firms must keep a regular workforce DBE contractors cannot "share" employees with non-dbe contractors, especially the prime contractor or a subsidiary of the prime DBE firm must be responsible for all payroll and labor compliance requirements for all employees within the control of the company

13 Movement of employees between contractors Employee paid by both DBE and prime Employee working for prime in morning and DBE in afternoon

14 The DBE must be responsible for: The ordering of all materials and negotiating cost Arranging delivery and taking possession of, and Paying for all materials and supplies provided Materials may not be drop shipped to the project by the manufacturer unless it is standard industry practice, and written prior approval is given to do so.

15 Materials for the DBE are ordered and/or paid for, by the prime contractor Materials for the DBE are delivered to, billed to, or paid for by another contractor. Standard materials are drop shipped to the project by the manufacturer. DBE never takes possession of the materials.

16 The DBE must be responsible for the performance, management and supervision of all work identified in their subcontract agreement (C92)

17 Work being done jointly by DBE firm and another contractor. The work to be performed outside of the DBE's known experience or capability DBE works for only one prime contractor or a large portion of the firm s contracts are with one contractor

18 Immediate suspension of work; Withholding of project payments from the prime; Investigation by the U.S. DOT Office of the Inspector General and/or the U.S. Attorney; Revoke DBE certification; and/or prequalification Pursue debarment of the DBE firm, prime contractor and/or subcontractor.

19

20 Jeffery Peyton Office of Contracts Ohio Department of Transportation

21 Who needs to be paid prevailing wages? Site of Work Trucking Review of the Certified Payrolls Project Site Visits Reporting Requirements

22 Construction work over $2000 on Federal contracts over $78,258 (new construction) and $23,447 (reconstruction, alteration and repair) on projects that are 100% State funded. Construction includes: new construction, reconstruction, alteration, and repair of a public improvement over the established dollar threshold.

23 Prevailing Wage laws apply to all laborers and mechanics performing work on the Site of Work Must be paid not less often than weekly Correct wage determination must be posted at the job site, and readily accessible

24 Are defined as: Workers whose duties are manual or physical in nature - Includes apprentices Does not include: Executive, administrative, and professional employees (i.e. timekeepers, inspectors, architects, engineers) Non-working foremen

25 2 Key Points. Must be registered in a bona fide apprenticeship program registered with DOL or a DOL approved State apprenticeship agency Must not exceed the allowable ratio of apprentices to journeymen specified in the Wage Determination or approved plan

26 Two prong test to determine the Site of Work Proximity Must be located adjacent or virtually adjacent to the project limits This has been established to be 1 mile as the crow flies Exclusive Must be dedicated exclusively to or nearly so, to the performance of the contract or project.

27 Site of Work does not include a contractor s or subcontractor s.. permanent home office commercial batch plants & quarries other facilities not specifically established for the project at hand.

28 Employee Truck drivers are covered by Davis- Bacon for time: Spent moving material directly on the project Hauling material on or off the project from a dedicated source or location considered to be within the Site of Work Time spent loading or unloading materials or supplies on the site of the work, if such time is equal to or greater than 20% of the drivers total work week

29 Again, Site of Work must meet the 2 prong test.. Proximity Must be located adjacent or virtually adjacent to the project limits (1 mile) and Exclusive Must be dedicated exclusively to the performance of the contract or project.

30

31 Must demonstrate a significant and real financial commitment Lease must be long term (1 year +) Can not be subject to cancellation at any time. Must maintain full control over the use and operation of the truck. Must assume responsibility for all aspects of operating that truck. Fuel Repair costs Vehicle insurance / Permits Fees

32

33

34 Must be submitted weekly Rates of pay must meet or exceed the rate listed in the wage determination Project owner / LPA must perform a review of not less than 30% of the payrolls received.

35

36

37 The total prevailing wage rate (TPWR) is composed of 2 parts: The basic hourly rate (BHR) and The fringe benefit package

38 BHR $20.00 FB $10.00 Total prevailing wage $30.00 The contractor may comply by paying.. $30.00 in cash wages $20.00 in cash wages plus $10.00 for FB $19.00 in cash wages plus $11.00 for FB

39 Life Insurance Health Insurance Pension Vacation Holiday Sick Leave

40 Regular project site visits should be conducted to interview employees to ensure Prevailing Wage compliance. Project Bulletin Board must also be reviewed to ensure that all of the required posters are in place

41 Monthly Wage / EEO report must be completed by the LPA for each active project and returned to the ODOT district office by the 7th of every month

42

43 Federally Funded Projects Davis-Bacon and Related Acts 29 CFR Parts 1, 3, 5, 6, and 7 100% State Funded Projects ORC 4115, Wages and Hours on Public Works

44 USDOL Ohio Department of Commerce, Wage and Hour Division

45

46

47 Contract Administration and Construction Inspection by Federal Highway Administration

48 The Federal-aid Process

49 Got Federal-aid? Then you must include all the required contract provisions for all of the work on the project

50 Federally Required Contract Clauses and Conditions Form FHWA 1273 (Required Contract Provisions) Failure to include the FHWA-1273 could result in the loss of federal-aid funding Local Hiring Preferences [23 CFR (b)] Restriction of competition [23 CFR ] Standardized Changed Conditions Contract Clauses [23 CFR ] False Statements Concerning Highway Projects [23 CFR 633 and ] Clean Air Act and Federal Water Pollution Control Act [23 CFR ]

51 Federally Required Contract Clauses and Conditions DBE Goal [49 CFR Part 26] DBE goals are assigned to projects with estimates of $500,000 or more. Davis-Bacon Prevailing Wage Requirements Prime Contractor must perform at least 30% of the work [23 CFR ] Incorporated into the construction contract as part of the Bid Document template, Provision VII in the FHWA-1273 Must track all subcontracts to assure this requirement is met

52 LPA s Contract Administration Role and Responsibilities Pre-construction meeting - invite ODOT and FHWA (if an oversight project) Equal Employment Opportunity (EEO) Prevailing Wages DBE Contract Compliance Project Inspection and Documentation

53 EEO/Prevailing Wage LPA s Prevailing Wage Coordinator must perform EEO/Prevailing Wage Interviews Job Site Bulletin Boards must be visible and have current posters and wage rates programadmin/contracts/ poster.cfm

54 Emergency Phone Numbers Actual Project Wage Rates Contractor s EEO Policy Statement Letter appointing Contractor s EEO Officer Water Quality Related Info (NOI)

55 Suggestions for Posting Job Site Bulletin Boards on Mobile Operations Posted on an A-Frame in the Back of the Truck Posted in a magnetic box on the outside of the Truck Posted at Equipment Trailer Posted where the employees meet in the mornings before heading to the project site Posters need to be more accessible than inside the foreman s truck The foreman can have the information in a binder in the truck, but that cannot be the only place that the posters are available for viewing by the employees on the project

56 Waivers DBE Contract Compliance - LPA must send request to ODOT to evaluate - Examine the contractor s good faith efforts Commercially Useful Function (CUF) - Count DBE expenditures toward the DBE goal only if the DBE is performing a commercially useful function. - What constitutes commercially useful function? - The DBE must carry out its contract responsibilities by actually performing, managing, and supervising the work involved.

57 Buy America 23 CFR All Federal-aid construction projects Enforcement of Buy America is State/LPA responsibility All permanent steel or iron items incorporated in the project must meet Buy America Requirements IRON & STEEL only all manufacturing processes must take place domestically includes coatings on these materials Minimal use = 0.1% (contract value) or $2500 (whichever is greater) Discuss all use of foreign iron or steel with ODOT! Covers all contract items including 100% locally funded Waivers have to be given by Secretary of Transportation

58 Made in America? The language in ODOT C&MS fully implements Buy America - if using local specifications, must include this ODOT specification in contract (This is now incorporated in the LPA Bid Template)

59 Project Supervision and Staffing 23 USC USC CFR All Federal-aid highway construction projects

60 Project Supervision and Staffing Locally administered projects ODOT may arrange for local public agency having jurisdiction to perform work with its own forces or by contract provided that all of following is met: All Federal requirements including 23 CFR 635 Subpart A shall be met on contract awarded by local agency Local agency is adequately staffed & suitably equipped to undertake & satisfactorily complete the work Local agency shall provide a full-time employee of agency to be in responsible charge of each Fed-aid project, including those with consultant services It does not relieve ODOT of overall responsibility for the project

61 Project Supervision and Staffing Supervision of construction engineering consultants person in responsible charge means: Aware of day-to-day operations on the project Aware of and involved in decisions about changed conditions that require change orders Aware of qualifications, assignments, performance of consultant staff at all stages of the project Visiting the project on a frequency that is commensurate with the magnitude & complexity of the project

62 Inspection and Documentation Procedures for inspection & documentation Construction Manual & other guidelines Electronic record keeping Regular review of records Major areas of documentation Daily diaries or Inspector s daily reports Method of Measurement & Basis of Payment Materials submittals (certificates of compliance, test reports, etc) Shop drawings NPDES/environmental compliance Work Zone safety & traffic control Change Orders, Extensions of Time Claims

63 Seven Identifiers for Documentation Date Project Number Item Number Reference Number Subject Location Signature or Initials

64 Complete, concise, accurate Factual (no hearsay) Signed & dated WHY??? Disputes, claims, FOIA Major items to include: Items of work Weather Contractors & Equipment Traffic control MOT NPDES Testing Compliance issues Measurements Pay quantities Decisions made on-site Force account work Project Diaries

65 Measurement of Pay Quantities Appropriate quantities of completed work Measured in units per contract Material delivered and incorporated into work Based on weight/mass or volume Adequate assurance that quantities of completed work are accurate Initial source documents pertaining to pay quantities must be retained & made a matter of record Auditors need to be able to make the link between what was paid and what was installed/delivered

66 Work Zone Traffic Control - Implementation Make sure you document the condition of the project and note the context of your photographs

67 Substantiation Definition: To support with proof or evidence Documentation Inspection and control records Computations Specific Forms and Test Methods

68 Documentation Good Practices State facts, not opinions (include digital photos) Maintain supporting documents Job Progress Meeting Minutes Utility Meeting Minutes Referenced Memos or Reports by Others Referenced Specifications Materials Inspection Reports Inspector s reports

69 Sampling, Testing & Acceptance of Materials Determine frequency, type of tests, and who is testing at the beginning of the project LPA needs to provide Quality Assurance The contractor cannot hire the testing company The LPA must hire the testing company with a Quality Based Selection

70 Quality Assurance vs. Quality Control Quality Assurance Making sure the quality of a product is what it should be. LPA responsibility Includes QC Quality Control Making the quality of a product what it should be. Contractor/ producer responsibility Part of QA Doing the right things Motivates good QC practices Doing things right Motivated by QA & acceptance procedures

71 Quality Assurance: Type/Frequency Read Specifications If the LPA wants to modify the testing criteria that is in an ODOT specification, this needs to be approved by ODOT LPA Manual Appendix J (Local Let Material Procedures, Guidelines, and Documents)

72 Bar Chart Progress Schedule

73 Liquidated Damages The purpose is to recover agency costs for administering the contract after the completion date has passed The amounts in Table are determined by an analysis of ODOT CE costs every 2 years Any amount in excess of this table is considered a disincentive for purposes of federal participation

74 Liquidated Damages 3 different scenarios for reimbursement of LD s 1. If there is federal participation in the CE the project is credited at the prorata share 2. If the locals are funding CE they do not have to credit FHWA for LD s unless #3 applies 3. If the LD daily amount exceeds C&MS Table FHWA is credited for the amount above regardless of the CE funding source

75 Components of a Change Order and/or Claim Documentation Entitlement Description of change Document the changed condition Reference applicable specification section Impact Description of the impact Cost $$ or Time Documentation

76 Construction Quality

77 RESOURCES ODOT Locally Administered Transportation Projects Manual of Procedures Other ODOT References FHWA Contract Administration Core Curriculum Participant s Manual & Reference Guide m FHWA Construction Program Management and Inspection Guide

78 Contact Information Sara Lowry, PE Transportation Engineer Federal Highway Administration (FHWA)

79 Randy Lane Local Projects Section

80 (Millions) ODOT Local-let Program History Dollars & Number of Projects $600 $500 $ $400 $ $300 $200 $100 $0 $8 11 $ $ $ $ $ $ $ $ $ $ $ $ $

81 Possible Delegated Activities Environmental Studies Selection of Consultant Services Design Right of Way Acquisition Preparation of Plans, Specifications and Estimate Preparation of Bid Proposal Advertisement and Award Construction Contract Administration and Inspection

82 Non-Delegated Activities NEPA Review and Approval Design Exception Approval Right of Way Certification DBE Goals and Waivers Final Inspection and Acceptance Sole Source and Proprietary Justification Approval Labor Compliance Enforcement Concurrence in Rejection of Bids

83 Process Controls ODOT Stewardship and Oversight Agreement for locally administered projects. Dedicated Staffing FHWA Ohio Division Local Programs Engineer, ODOT Office of Local Projects, and District LPA Coordinator and Construction Monitors Locally Administered Transportation Projects Manual of Procedures (LATP Manual) Qualification Program for Local Agencies LPA Participation Requirements Chapter of LATP Manual ODOT Contractor and Consultant Prequalification

84 ODOT Process Requirements LPA Federal Project Agreement Roles and Responsibilities in adherence to Federal and State requirements Locally Administered Transportation Projects Manual of Procedures ODOT and LPA Project Responsibilities Inception through Project Closeout FHWA Ohio Division Involved in Development and Revision ODOT 2010 LPA Bid Proposal Template Incorporated into LPA Bid Proposal and Contracts Developed with FHWA to ensure incorporation of Federal requirements.

85 ODOT Process Requirements ODOT Oversight in the Procurement of Consultant Services Advertisement of available contracts ODOT Prequalified Consultant Fee Analysis and Negotiation Preparation of LPA / Consultant agreement ODOT Review and Concurrence / Approval Plans, Specs and Estimates Package Award to Lowest and Best Bidder DBE concurrence / waivers Rejection of Bids Change Orders Invoice Reimbursement Final Acceptance

86 Why - Increased Federal oversight of the LPA Program LPA Contracts Quality Improvement review performed by FHWA - Compliance with required clauses and conditions - Consistency for LPA / ODOT benefit Where - Word document 2010 LPA Bid Document Template (Local-let Procedures and Documents)

87 Properly incorporated In most cases it has been just attached. Designed to work with LPA proposal documents. - Incorporated by reference in Proposal - The required contract provisions for federal-aid construction contracts (contained in ODOT s 2005 LPA template) are hereby incorporated by reference. - Incorporated into Contract - By signing the specified contract proposal, of which the ODOT LPA Template has been incorporated, the bidder agrees to all of the below provisions Template set up for use with C&MS - Table includes excluded 100 specs exclusive to ODOT.

88 LPA Template Item 1 - Specifications Local Specifications Acknowledge LPA specifications with LPA Participation Requirements and LPA Scope of Services document. Modify the first note from the template Must still incorporate the following from C&MS: Cancellation of Award prior to signature of all parties without liability (B) Adjustment due to Differing Site Conditions then that in the contract documents (C) Adjustment due to Suspension of Work caused by conditions not faulting Contractor (D) Adjustment due to Significant Changes in work in accordance with table Can replace with language from 23 CFR.109(a)(3)

89 LPA Template Item 1 - Specifications Must incorporate the following (Continued): State and Federal domestic Steel and Iron policies Laws to Be Observed Required laws affecting contract, including EEO, OSHA Regulations 23 CFR , etc Federal-aid Provisions Work subject to FHWA inspection, without making Federal Government a party to the contract CGL Insurance and workers compensation. Local must get a copy from the contractor before award EPA Waterway Permits, etc.

90 LPA Template Item 1 - Specifications Must incorporate the following (Continued Civil Rights Comply with Antidiscrimination, Affirmative Action, and DBE requirements set forth Prompt Payment Payroll Records Refer to color-coded C&MS document on Local Projects website Required (green) Strongly encouraged (blue) Optional (yellow)

91 ODOT C&MS Contains both (a.) 23 CFR & (b.) ORC CFR All steel and iron products incorporated permanently into the Work - all manufacturing processes must take place domestically - includes coatings on these materials - Minimal use = 0.1% (contract value) or $2500 (whichever is greater) - Covers all contract items including 100% locally funded - Waivers have to be given by FHWA Headquarters

92 LPA Template Item 3 Debarment and Suspension FHWA 1273 (XI) 49 CFR 29 By signing the contract, the bidder certifies that they, or any described party, are not under suspension, debarment, voluntary exclusion or determination of ineligibility by any Federal agency; have not been within past 3 years; or currently pending proposed debarment.

93 LPA Template Item 4 Prequalification Only ODOT Prequalified contractors eligible to submit for bids Prequalification must be in force at time of bidding, at the time of Award, and throughout the life of the contract Prime Contractor must perform no less than 30% of the total contract price (FHWA CFR 635) Encourage incorporating prequalification for specific ODOT work types

94 LPA Template Item 6 EEO Certification Executive Orders 10925, 11114, and 41 CFR (b) Bidder must certify compliance by circling appropriate has or has not Requirement also contained within ODOT PN017 FEDERALLY REQUIRED EEO CERTIFICATION FORM The bidder hereby certifies that he has..., has not..., participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that he has..., has not..., filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. The Bidder must circle the appropriate has or has not above.

95 LPA Template Item 8 NonSegregated Facilities ODOT PN 026 FHWA 1273 (III.) 23 CFR 633A Applicable to all Federal-aid construction contracts and to all related subcontracts of $10,000 or more.) By signing proposal Contractor agrees to provisions of the Certification of Nonsegregated Facilities, providing that the bidder does not maintain or provide for employees facilities which are segregated on a basis of race, creed, color, or national origin. Defines places under term segregated facilities Provides Notice to Perspective Subcontractors and Material Suppliers of Requirement for Certification of Nonsegregated Facilities.

96 LPA Template Item 9 EEO Special Provisions (Nondiscrimination) ODOT PN 035 FHWA Form 1273 (II), 1-9 Requires designation of EEO Officer and EEO Dissemination of Policy requirements EEO responsibilities associated with Recruitment Personnel Actions Training and Promotion Unions Selection of Subcontractors, Materials and Equipment Leasing. Requires retention of records and reports to support number of minority and non-minority in each work classification, progress and efforts in securing, training and promoting minority and female employees and DBE contractors.

97 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity. - Incorporates provisions of the American Disabilities Act of 1990 by reference - In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a) The contractor will work with the State DOT and the Federal Government in carrying out EEO obligations and in their review of his/her activities under the contract. b) Acceptance of EEO operating policy defined in FHWA 1273

98 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 2. EEO Officer: The contractor will designate and make known to the SHA contracting officers an EEO Officer who will have the responsibility for administering and promoting an active contractor program of EEO and who must be assigned adequate authority and responsibility to do so.

99 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 3. Dissemination of Policy: Authorized contractor s staff will disseminate and implement EEO policy and contractual responsibilities. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a) Periodic meetings b) All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer within 30 days c) EEO Officer will instruct recruitment personnel in the contractor's procedures for locating and hiring minority group employees. d) Notices and posters setting forth the contractor's EEO policy in areas accessible to employees, applicants and potential employees. e) Inform employees of contractor's EEO policy & procedures by means of meetings, employee handbooks, or appropriate means.

100 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 4. Recruitment: Advertisement for employees will include"an Equal Opportunity Employer." Advertisements will be placed in publications having a large circulation among minority groups. a) The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment of minority employees. b) In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, he is expected to observe the provisions of that agreement to the extent that the system permits the contractor's compliance with EEO contract provisions. c) Contractor will encourage employees to refer minority group applicants for employment..

101 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions shall be taken without discrimination. Contractor shall follow these procedures: a) Periodic inspections of project sites to insure that working conditions & employee facilities are not discriminatory. b) Periodically evaluate wages paid within each classification to determine any evidence of discriminatory wage practices. c) Periodically review selected personnel actions in depth to determine whether there is evidence of discrimination and if found follow prompt corrective action. d) Promptly investigate all complaints of alleged discrimination and will take appropriate corrective action.

102 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 6. Training and Promotion: Contractor will: a) Assist in locating, qualifying, and increasing the skills of minority group and women employees and applicants. b) Consistent with the work force requirements and Federal & State regulations, make full use of training programs, i.e., apprenticeship, and on-the-job training programs. c) Advise employees and applicants for employment of available programs & entrance requirements. d) Periodically review the training and promotion potential of minority group and women employees and will encourage application for such training and promotion.

103 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 7. Unions: Contractor will use best efforts to obtain the cooperation of such unions to increase opportunities for minority groups and women within the unions. Actions by the contractor will include: a) Efforts to develop, with union cooperation, joint training programs aimed toward qualifying minority members & women for membership and increasing skills for advancement. b) Efforts to incorporate an EEO clause into each union agreement c) Obtain information as to the referral practices and policies of the labor union d) If union is unable to provide a reasonable flow of minority and women referrals within the time limit in CBA, contractor will, through independent recruitment, fill vacancies w/o discrimination.

104 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 8. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate in the selection & retention of subs, procurement of materials & leases of equipment. a) The contractor shall notify all potential subcontractors and suppliers of his/her EEO obligations under this contract. b) DBEs shall have equal opportunity to compete for and perform subcontracts pursuant to the contract. c) The contractor will use his best efforts to ensure subcontractor compliance with their EEO obligations.

105 LPA Template Item 9 EEO Provisions FHWA 1273 (II.) 9. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements and for inspection by SHA and the FHWA. a) The records kept by the contractor shall document the following: 1) The number of minority and non-minority group members and women employed in each work classification on the project; 2) The progress and efforts being made in cooperation with unions, to increase minotity & women employment 3) The progress and efforts being made recruitment, qualifying, and upgrading minority & female employees 4) The progress and efforts being made in securing the services of DBE subcontractors b) Submit Form FHWA-1391 Annual report to the LPA each July for the duration of the project. Collect and report On-the-job Training.

106 LPA Template Item 10 Title VI Nondiscrimination ODOT PN 003 Title VI of Civil Rights Act of 1964, and related statutes. Nondiscrimination In Federally Assisted Programs No person shall, on grounds of race, color, national origin, sex, disability or age be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity.

107 LPA Template Item 11 Affirmative Action ODOT PN 020 Sufficient for the sale of projects through ODOT to meet FHWA / ODOT EEO requirements Obligated under 23 CFR Part 230, 41 CFR Part 60, EO 11246, and VEVRAA (Vietnam Vet Assistance) of 1974 Provides for minority and female utilization obligations by craft. Census driven Defines New Hire

108 LPA Template Item 13 Wage Determination Appeals Process ODOT PN CFR Part 1.8 and 29 CFR Part 7 Describes stepped process for appeals of Federal wage determinations

109 LPA Template Item 14 Wage Scale on All Federal-aid Projects ODOT PN 061 US DOL, Title 29, Subtitle A, Part 5 & FHWA 1273 Contractor shall use only the classifications and wage rates set forth in US DOL Davis Bacon wage decisions. Latest decision at time of advertisement. Rates locked in for life of construction contract. Requires certifies payrolls to be submitted on Form WH-347 Refer to FHWA Form 1273 and LATP Manual of Procedures, Construction Contract Administration Chapter, for monitoring responsibilities.

110 LPA Template Item 17 Non-Collusion ODOT PN USC 112 and ORC 1331, and Contractor has not entered either directly or indirectly into any agreement, participated in any collusion, or otherwise taken action in the restraint of free competitive bidding in connection with the proposal. Requires signature of Non-Collusion Affidavit as permitted by 28 USC No separate form needed with proper inclusion of LPA Bid Document Template. Bid Rigging hotline information

111 LPA Template Item 18 Drug-Free Workplace ODOT PN USC 112 and ORC 1331, and Contractor agrees to all applicable state and federal laws regarding drug-free workplace Required to make a good faith effort to ensure that employees will not purchase, transfer, use or possess illegal drugs or alcohol or abuse prescription drugs in any way. Require this obligation to be placed on all subcontractors and material contracts and their lower tier contracts. Register for Drug-Free Workplace actdescriptions.asp

112 LPA Template Item 19 Drug-Free Workplace Discount Program ODOT PN 034 Drug-Free Workplace Program During the life of the project, the Contractor and all Subcontractors that provide labor must be enrolled and in good standing in the OBWC Drug-Free Safety Program or a comparable program approved by OPWC. LPA will declare a bid non-responsive and ineligible for award if the Contractor is not enrolled within 8 days of the bid opening. Contractor is responsible for and shall insert in each of its subcontracts a clause requiring all subcontractors to comply.

113 LPA Template Item 20 Ohio Workers Compensation Coverage ODOT PN 034 Contractor must secure and maintain valid Ohio workers compensation coverage until the project has been finally accepted by the LPA/ ODOT A certificate of coverage evidencing valid workers compensation coverage must be submitted to the LPA before the contract will be executed by the LPA. Contractor must immediately notify the LPA, in writing, if it or any subcontractor fails or refuses to renew their workers compensation coverage. Failure to maintain valid workers compensation coverage shall be considered a breach of contract leading to withholding of pay estimates and/or termination of the contract.

114 LPA Template Item 21 Unresolved Finding for Recovery ODOT PN 038 OAC 9.24 Contractor represents to LPA that it is not subject to a finding for recovery under OAC If this representation is deemed false, the contract shall be void and any funds paid by the state hereunder shall be repaid to the LPA.

115 LPA Template Item 24, 25 & 26 Asphalt Binder, Steel and Fuel Price Adjustments ODOT PNs for price adjustments for Asphalt Binder, Steel and Fuel. Encouraged not required. Steel Price Adjustment ODOT PN 525 Fuel Price Adjustment ODOT PN 520 Asphalt Binder Price Adjustment PN 530 Single year projects PN 535 Multiple year projects

116 LPA DBE Requirements ODOT PN CFR Part 26 ODOT assigned DBE Goal obtained for all projects > $500K Based on availability of DBE firms to perform associated work types. LPA place goal on cover of the Bid Proposal Document and identified within instructions to bidders Establishes Contractor responsibilities associated with Disadvantaged Business Enterprises Outlines waiver process of full or partial DBE goal Sanctions to be issued by the LPA if goal not met and waiver not presented

117 LPA DBE Requirements Request to sublet form (ODOT C-92) and all executed subcontractor / P.O. agreements submitted to the ODOT District EEO Coordinator for review and approval - Verify that the firm is certified as a DBE (ww.ohioucp.org) Verify proper NAICS code assigned for the work detailed in subcontractor For material suppliers, compare type of material being supplied to NAICS code assigned Information on proposed drop shipped items No drop shipment can occur without prior approval from ODOT If DBE is a regular dealer only 60% of expenditures may be counted toward goal, providing CUF Entire expenditure may be counted if DBE supplier is a manufacturer that produces the goods from raw materials or substantially alters them before resale

118 LPA DBE Requirements ALL DBE material suppliers should be asked to provide the following information by the LPA documented through I am in the process of approving the C-92 s for the referenced project I have the some questions that I am hoping you can answer. Please refer to the attached P.O./C-92 and provide the following for each item listed: Please identify those items that will be coming directly from your yard and any items that are intended to be drop shipped From which of your locations will the material be shipped? How will the item get to the project site? Please indicate the quantities that will be delivered throughout the life of the project Will it all be shipped at once? Or, Will shipments be made throughout the life of the project? Identify the name of the manufacturer that will be drop shipping (if applicable) Forward to the District EEOCC for review and approval of C-92 Must be approved by the District EEOCC prior to execution of the contract with the Prime.

119 LPA DBE Requirements Waiver Process In the event the Contractor is unable to meet the DBE Goal placed on this project, a request for waiver of all or part of the goal may be made to the Ohio Department of Transportation through the LPA. - The Contractor must document the progress and efforts being made in securing the services of DBE subcontractors. - The written request must indicate a good faith effort was made to meet the goal and be sent to the LPA contracting authority. - The LPA forwards the request with recommended action to the ODOT District. - The ODOT District then makes recommendation and forwards the request to ODOT Office of Contracts for determination of action. - If an item of work subcontracted to a DBE firm is non-performed by LPA or the subject of an approved VECP, the Contractor may request a waiver for the portion of work excluded.

120 DBE Monitoring Requirements - DBE Quarterly Payments Form - January 10, April 10, July 10, and October 10 Signed by LPA EEO Coordinator - Sent to District EEOCC

121 LPA Template Item 29 Affidavit of Subcontractor Payment (if DBE) ODOT PN CFR Part Verifies that work committed to the DBE at Award is actually performed by the DBE. Verifies actual payments made to DBE. Affidavit must be signed by the Contractor within 15 days of completion and mailed to ODOT Office of Contracts Forms on Contracts website and LATP Manual, Construction Chapter Appendices

122 LPA Template Item 31 DMA / Nonassistance to Terrorist Organizations ORC Serves as a declaration of the provision of material assistance to a terrorist organization or organization that supports terrorism as identified by the U.S. Department of State Terrorist Exclusion List. Must be completed and returned prior to entering into a contract with any political subdivision of the state of Ohio Failure to submit this form prior to entering into contract will result in the bid being deemed non-responsive and ineligible for award. Form located on Ohio Homeland Security website at or linked on Local Projects Website under Bid Preparation section.

123 Form FHWA 1273 (Required Contract Provisions) Failure to include the FHWA-1273 could result in the loss of federal-aid funding Standardized Changed Conditions Contract Clauses 23 CFR ODOT C&MS Establishes pay factors for significant changes in character of the work

124 23 CFR (b) Prohibits ODOT and local governments from enacting preferences Examples Local encourage or mandate the use of local employment Local considers location of contractor in award process Hometown plans (Cincinnati & Toledo) All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio Products, materials, services, and labor in the implementation of their project. Anti-apartheid ordinances are anti-competitive» Northern Ireland clause (MacBride Principles)

125 Local mandates Local presence Local business license Local workforce requirement Restrictive Best Bid Criteria

126 Prime Contractor must perform at least 30% of the work 23 CFR Incorporated into the construction contract as part of the Bid Document template, Provision VII in the FHWA-1273 Must track all subcontracts to assure this requirement is met

127 In accordance with ORC Need note naming ODOT as an additional insured or obligee per LPA agreement

128 Other requirements: Dispute process Termination process (Compliance with LPA Agreement) Best bid criteria (non-restrictive) Bid rejection process ODOT and FHWA must concur in the rejection of bids Confliction between specified provisions and specifications (Public Works or HUD language)

129 Two acceptable methods - Additive Bidding (takes advantage of project s available funding) - Proprietary Local funds the price differential between standard item and betterment. Both methods must be coordinated and approved by ODOT District

130 If not done through alternate bidding: Two acceptable methods: - Public Interest Finding (ODOT & FHWA approval) FHWA Can participate in item % Local Funded Both methods must be coordinated and approved by ODOT District

131 ODOT Local Projects Website Locally Administered Transportation Projects Manual of Procedures Bid Doc Template Bid Doc Preparation Guidance and Checklist Color-coded ODOT C&MS - FHWA Contract Administration Core Curriculum Manual

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES

CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES CHAPTER 15 EQUAL EMPLOYMENT OPPORTUNITY, ON-THE-JOB TRAINING AND PREVAILING WAGES 15.1 OVERVIEW To effectively assure Equal Employment Opportunity (EEO), the Federal Highway Administration (FHWA) requires

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONTRACT COMPLIANCE PROGRAM MANUAL DECEMBER 2013 EQUAL EMPLOYMENT OPPORTUNITY PROGRAM CONTRACT COMPLIANCE PROGRAM LOUISIANA DEPARTMENT OF TRANSPORTATION

More information

CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division

CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division CONTRACT COMPLIANCE REVIEW CHECKLIST Nevada Department of Transportation, Contract Compliance Division Contractor: Complete this checklist. Attach all required documentation and send to the NDOT Contract

More information

External Equal Opportunity (EO) Contract Compliance Requirements for Contractors

External Equal Opportunity (EO) Contract Compliance Requirements for Contractors External Equal Opportunity (EO) Contract Compliance Requirements for Contractors 2015 Tammie Y. Greene External EO and OJT Program Coordinator Office of Business Development & Special Programs South Carolina

More information

DISADVANTAGED BUSINESS ENTEPRISE PROGRAM CONTRACT COMPLIANCE MONITORING

DISADVANTAGED BUSINESS ENTEPRISE PROGRAM CONTRACT COMPLIANCE MONITORING DBE PROGRAM OVERVIEW DISADVANTAGED BUSINESS ENTEPRISE PROGRAM CONTRACT COMPLIANCE MONITORING It is the policy of the Columbus Regional Airport Authority (CRAA), in compliance with federal law (49 CFR 26),

More information

ADVERTISING, SALE & AWARD

ADVERTISING, SALE & AWARD ADVERTISING, SALE & AWARD PRIMARY ROLES & RESPONSIBILITIES PRIMARY TASK ODOT LPA DEVELOP BID PROPOSAL If project estimate exceeds $500,000, submit engineer estimate to LPA Coordinator to obtain DBE goal.

More information

CONTRACTOR COMPLIANCE

CONTRACTOR COMPLIANCE CONTRACTOR COMPLIANCE The Arkansas State Highway and Transportation Department is committed to equal employment opportunity. This commitment includes working cooperatively with highway construction contractors

More information

Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.)

Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.) Chapter IV - Labor Compliance (LC) Program Oversight and Procedures (FHWA-1273 IV.,V.) 1. Labor Compliance Program Objectives The NMDOT Labor Compliance (LC) Program is established under the guidance and

More information

CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual

CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY. Field Procedures Manual New Mexico Department of Transportation Office of Equal Opportunity Programs CIVIL RIGHTS EQUAL EMPLOYMENT OPPORTUNITY Field Procedures Manual Americans with Disabilities Act (ADA) Program Disadvantaged

More information

INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT

INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT Table of Contents 1.1 Definitions. 1 1.2 Policy Statement.... 1 1.3 Nondiscrimination in Programs and Activities

More information

FACT SHEET Broadband Technology Opportunities Program Davis-Bacon Act Requirements Overview

FACT SHEET Broadband Technology Opportunities Program Davis-Bacon Act Requirements Overview FACT SHEET Broadband Technology Opportunities Program Davis-Bacon Act Requirements Overview Section 1606 of the American Recovery and Reinvestment Act (ARRA) of 2009, Pub. L. No. 111-5, 123 Stat. 115 (Feb.

More information

DIVERSITY & ECONOMIC OPPORTUNITY DEPARTMENT CONTRACT COMPLIANCE MANUAL (RC FTA)

DIVERSITY & ECONOMIC OPPORTUNITY DEPARTMENT CONTRACT COMPLIANCE MANUAL (RC FTA) DIVERSITY & ECONOMIC OPPORTUNITY DEPARTMENT CONTRACT COMPLIANCE MANUAL (RC FTA) SECTION 100 DISADVANTAGED BUSINESS ENTERPRISE PROGRAM 100 FEDERAL OBLIGATION: This contract is subject to the requirements

More information

EQUAL EMPLOYMENT OPPORTUNITY (EEO) SPECIAL PROVISIONS

EQUAL EMPLOYMENT OPPORTUNITY (EEO) SPECIAL PROVISIONS Office of Civil Rights Revised 07/12 EQUAL EMPLOYMENT OPPORTUNITY (EEO) SPECIAL PROVISIONS This section of Special Provisions contains the Equal Employment Opportunity (EEO) rules and regulations for highway

More information

To Whom It May Concern:

To Whom It May Concern: To Whom It May Concern: The Ohio Treasurer of State ( Treasurer ) may be eligible for an initial allocation of 100,000 student loan accounts to become a Not-For-Profit Direct Loan Servicer, as permitted

More information

PITTSBURG UNIFIED SCHOOL DISTRICT

PITTSBURG UNIFIED SCHOOL DISTRICT PITTSBURG UNIFIED SCHOOL DISTRICT New Construction and Modernization Projects PRE-QUALIFICATION PROGRAM QUESTIONNAIRE FOR PROJECTS $20 MILLION AND OVER TABLE OF CONTENTS PAGE NO. GENERAL INFORMATION.......i

More information

FEDERAL CONSTRUCTION CONTRACT PROVISIONS

FEDERAL CONSTRUCTION CONTRACT PROVISIONS FEDERAL CONSTRUCTION CONTRACT PROVISIONS COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Office of Community and Rural Affairs One North Capitol, Suite 600 Indianapolis, Indiana 46204-2288 Revised April 2009

More information

Delaware Department of Transportation. Contractor Compliance Manual

Delaware Department of Transportation. Contractor Compliance Manual Delaware Department of Transportation Contractor Compliance Manual Table of Contents TABLE OF CONTENTS CHAPTER 1 GENERAL INFORMATION I. OVERVIEW A. Background B. Goals C. Authority D. FHWA Responsibilities

More information

THE HUDSON COUNTY IMPROVEMENT AUTHORITY AFFIRMATIVE ACTION COMPLIANCE/MANDATORY EEO LANGUAGE N.J.S.A.

THE HUDSON COUNTY IMPROVEMENT AUTHORITY AFFIRMATIVE ACTION COMPLIANCE/MANDATORY EEO LANGUAGE N.J.S.A. APPENDIX E-13 THE HUDSON COUNTY IMPROVEMENT AUTHORITY AFFIRMATIVE ACTION COMPLIANCE/MANDATORY EEO LANGUAGE N.J.S.A. 10:5-31 et seq. (P.L. 1975, C. 127) N.J.A.C. 17:27 CONSTRUCTION CONTRACTS This form is

More information

City of Round Rock. Request for Statement of Interest and Proposals. Transit Master Plan

City of Round Rock. Request for Statement of Interest and Proposals. Transit Master Plan City of Round Rock Request for Statement of Interest and Proposals Transit Master Plan General The City of Round Rock seeks qualified planning firms to submit Statements of Interest and Proposals (SIP)

More information

GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS

GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS GUIDELINES FOR SMALL BUSINESS CONSTRUCTION CONTRACTS HARRISBURG, PENNSYLVANIA MAY 2014 EDITION Guidelines for the DGS Small Business Reserve Program For Construction Contracts 1 General a.) Pursuant to

More information

Four County Transit Server Voice Broadcast Bid Request

Four County Transit Server Voice Broadcast Bid Request Four County Transit Server Voice Broadcast Bid Request AASC/Four County Transit is accepting bids for voice broadcast auto dialer software. Price should include all shipping and handling charges, as applicable.

More information

Request for Proposals

Request for Proposals City of Sonora Request for Proposals City of Sonora Microenterprise Technical Assistance Program Lead Technical Assistance Consultant City of Sonora Community Development Department 94 N. Washington Street

More information

RELOCATION ASSISTANCE SERVICES SPECIFICATIONS (LUMP SUM)

RELOCATION ASSISTANCE SERVICES SPECIFICATIONS (LUMP SUM) RELOCATION ASSISTANCE SERVICES SPECIFICATIONS (LUMP SUM) A. PROJECT DESCRIPTION The Local Public Agency (LPA) will receive proposals for Relocation Assistance Services for: Project: CN: Location: The work

More information

1. The New Jersey Economic Development Authority Affirmative Action Addendum to Construction Contract,

1. The New Jersey Economic Development Authority Affirmative Action Addendum to Construction Contract, New Jersey Economic Development Authority Affirmative Action Addendum to Construction Contract MANDATORY EQUAL EMPLOYMENT OPPORTUNITY LANGUAGE Pursuant to N.J.A.C. 19:30 SUBCHAPTER 3. AFFIRMATIVE ACTION

More information

OHIO DEPARTMENT OF TRANSPORTATION

OHIO DEPARTMENT OF TRANSPORTATION STATE OF OHIO OHIO DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE PROGRAM PLAN 2007 THE OHIO DEPARTMENT OF TRANSPORTATION DBE PROGRAM Section 26.1, 26.23 Objectives/Policy Statement The

More information

Navigating Contractor Compliance. Kathy Terrio Contractor Compliance Specialist 406.444.9270 kterrio@mt.gov

Navigating Contractor Compliance. Kathy Terrio Contractor Compliance Specialist 406.444.9270 kterrio@mt.gov Navigating Contractor Compliance Kathy Terrio Contractor Compliance Specialist 406.444.9270 kterrio@mt.gov Contractor Compliance Ensures that contractors and subcontractors performing work on Federally

More information

University Of New Hampshire Transportation Services. Disadvantaged Business Enterprises

University Of New Hampshire Transportation Services. Disadvantaged Business Enterprises University Of New Hampshire Transportation Services Disadvantaged Business Enterprises Table of Contents Program Objectives/Procedures Statement..3 Non Discrimination Clause.4 Record Keeping Requirements...4

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing SECTION 8 PROJECT-BASED VOUCHER PROGRAM

U.S. Department of Housing and Urban Development Office of Public and Indian Housing SECTION 8 PROJECT-BASED VOUCHER PROGRAM U.S. Department of Housing and Urban Development Office of Public and Indian Housing SECTION 8 PROJECT-BASED VOUCHER PROGRAM PBV AGREEMENT TO ENTER INTO HOUSING ASSISTANCE PAYMENTS CONTRACT NEW CONSTRUCTION

More information

OHIO DEPARTMENT OF TRANSPORTATION

OHIO DEPARTMENT OF TRANSPORTATION OHIO DEPARTMENT OF TRANSPORTATION CENTRAL OFFICE, 1980 WEST BROAD STREET, COLUMBUS, OHIO 43223 JOHN KASICH, GOVERNOR JERRY WRAY, DIRECTOR May 26, 2016 AMERICON INDUSTRIAL SERVICES LLC 3651 LEHARPS RD AUSTINTOWN,

More information

EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION EEO/AA POLICY AND PLAN

EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION EEO/AA POLICY AND PLAN EEO/AA POLICY & PLAN PAGE 1 OF 6 hereafter referred to as the Company or this Company has adopted this policy and plan Date: By: EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION EEO/AA POLICY AND PLAN

More information

MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT SMALL PROCUREMENT CONTRACT (FOR CONTRACTS OF $25,000 OR LESS) [Insert Contract Name and No.

MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT SMALL PROCUREMENT CONTRACT (FOR CONTRACTS OF $25,000 OR LESS) [Insert Contract Name and No. MARYLAND DEPARTMENT OF HOUSING AND COMMUNITY DEVELOPMENT SMALL PROCUREMENT CONTRACT (FOR CONTRACTS OF $25,000 OR LESS) [Insert Contract Name and No.] THIS CONTRACT (the Contract ) is made as of the day

More information

Puget Sound Regional Council

Puget Sound Regional Council PSRC Request for Qualifications for On-Call Services for Communication and Public Involvement Consultant Services Solicited by the Released: September 15, 2009 Submissions Due: 4:00pm, October 6, 2009

More information

Construction Management/ General Contractor Alternative Contracting Process

Construction Management/ General Contractor Alternative Contracting Process Clean Water State Revolving Fund Loan Program Construction Management/ General Contractor Alternative July 2011 Last Updated: 08/03/2011 By: Larry McAllister DEQ 11-WQ-027 Prepared by: Clean Water State

More information

Consultant Administration Services Procedure Manual

Consultant Administration Services Procedure Manual Consultant Administration Services Procedure Manual July 15, 2015 Prepared by NORTH DAKOTA DEPARTMENT OF TRANSPORTATION Bismarck, North Dakota www.dot.nd.gov DIRECTOR Grant Levi, P.E. OFFICE OF PROJECT

More information

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School

Carmel Unified School District. Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School Carmel Unified School District Prequalification Application For Bleacher and Pressbox Replacement Project at Carmel High School January 4, 2016 1 NOTICE REGARDING PREQUALIFICATION FOR BLEACHER AND PRESSBOX

More information

FORM OF RETENTION. PERIOD OF RETENTION a. Six months from date record made or personnel action taken, whichever is later.

FORM OF RETENTION. PERIOD OF RETENTION a. Six months from date record made or personnel action taken, whichever is later. Federal EEO Record-Keeping Requirements Federal enforcement agencies must be able to review employment records in order to determine whether an employer has discriminated in employment on the basis of

More information

Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT 2013-2014

Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT 2013-2014 Ceres Unified School District INDEPENDENT CONTRACTOR AGREEMENT 2013-2014 THIS CONTRACT is hereby entered into by the Ceres Unified School District, hereinafter referred to as DISTRICT, and CONTRACTOR MAILING

More information

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874

FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 2 1109 S. Marion Avenue, Mail Station 2015 Lake City, Florida 32025-5874 ADVERTISEMENT FOR LETTERS OF INTEREST FOR A DESIGN BUILD PROJECT (PROCUREMENT METHOD SHORTLISTING OF PROPOSERS WITH TECHNICAL AND PRICE EVALUATION BY ADJUSTED SCORE) PROCUREMENT NUMBER: E2N44 Financial

More information

HADDONFIELD PUBLIC SCHOOLS ONE LINCOLN AVENUE HADDONFIELD, NJ 08033 Phone: 856-429-4130, X 215 Fax: 856-429-6015

HADDONFIELD PUBLIC SCHOOLS ONE LINCOLN AVENUE HADDONFIELD, NJ 08033 Phone: 856-429-4130, X 215 Fax: 856-429-6015 HADDONFIELD PUBLIC SCHOOLS ONE LINCOLN AVENUE HADDONFIELD, NJ 08033 Phone: 856-429-4130, X 215 Fax: 856-429-6015 REQUEST FOR PROPOSALS FOR SCHOOL DISTRICT HEALTH INSURANCE BROKER SERVICES Notice is hereby

More information

(Local Public Agency) TITLE VI PLAN

(Local Public Agency) TITLE VI PLAN NEBRASKA DEPARTMENT OF ROADS Title VI Plan for Agencies SAMPLE PLAN Over 100,000 Population (Local Public Agency) TITLE VI PLAN Department Commissioners Department Administrator Prepared by: Job Title

More information

How To Get Paid At A Public Work Project

How To Get Paid At A Public Work Project I. PUBLIC WORK A. What is Public Work? In determining whether a construction project is public work, two conditions must be fulfilled in order for the provisions of Article 8 to apply to the project: 1.

More information

ATTACHMENT B GENERAL TERMS AND CONDITIONS FOR NEIGHBORHOOD STABILIZATION PROGRAM CONSTRUCTION PROJECTS

ATTACHMENT B GENERAL TERMS AND CONDITIONS FOR NEIGHBORHOOD STABILIZATION PROGRAM CONSTRUCTION PROJECTS ATTACHMENT B GENERAL TERMS AND CONDITIONS FOR NEIGHBORHOOD STABILIZATION PROGRAM CONSTRUCTION PROJECTS The work to be performed under this bid/contract is financed by a Federal grant and the following

More information

Puget Sound Regional Council

Puget Sound Regional Council Puget Sound Regional Council PSRC Request for Qualifications for Legal Services Consultant Services Solicited by the Puget Sound Regional Council Released: November 12, 2009 Submissions Due: 4:30pm, November

More information

The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects

The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects The University of North Carolina Plan to Increase Utilization of Historically Underutilized Businesses in Construction Projects May 2002 1 of 15 The University of North Carolina Office of The President

More information

During the performance of this contract, the contractor, for itself, its assignees and successors in interest agrees as follows:

During the performance of this contract, the contractor, for itself, its assignees and successors in interest agrees as follows: CONTRACT FORM CONTRACT # This Contract, made and entered into this day of, 20, by and between the State of Nevada Department of Transportation, hereinafter called the Department, and (Contractor Name and

More information

Massachusetts Clean Energy Internship Program Participating Host Employer Application Form 2014 Spring Session

Massachusetts Clean Energy Internship Program Participating Host Employer Application Form 2014 Spring Session Massachusetts Clean Energy Internship Program Participating Host Employer Application Form 2014 Spring Session The Massachusetts Clean Energy Internship Program (the Program ) is a workforce development

More information

Attachment II FLOW-DOWN CLAUSES APPLICABLE TO PURCHASE ORDERS INVOLVING FUNDS FROM A FEDERAL GOVERNMENT CONTRACT OR GRANT

Attachment II FLOW-DOWN CLAUSES APPLICABLE TO PURCHASE ORDERS INVOLVING FUNDS FROM A FEDERAL GOVERNMENT CONTRACT OR GRANT Attachment II FLOW-DOWN CLAUSES APPLICABLE TO PURCHASE ORDERS INVOLVING FUNDS FROM A FEDERAL GOVERNMENT CONTRACT OR GRANT If the Order involves funds from a Federal government contract or funds from a

More information

Section 4: Affirmative Action Responsibilities

Section 4: Affirmative Action Responsibilities Section 4: Affirmative Action Responsibilities Affirmative Action Responsibilities The Ohio Department of Transportation (ODOT) has internal and external civil rights programs. The Division of Chief Legal

More information

An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance.

An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance. An ordinance amending Chapter 82 of the Saint Paul Administrative Code revising the City s prevailing wage ordinance. THE COUNCIL OF THE CITY OF SAINT PAUL DOES ORDAIN: Section 1 Chapter 82 of the Saint

More information

AC Transit Policy No. 327 BOARD POLICY

AC Transit Policy No. 327 BOARD POLICY AC Transit Policy No. 327 BOARD POLICY Category: Financial Matters I. PURPOSE BUS RAPID TRANSIT CONSTRUCTION CAREERS POLICY The Alameda-Contra Costa Transit District ( AC Transit ) operates a bus system

More information

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISON OF PROFESSIONAL REGULATIONS RULES AND REGULATIONS RELATING TO PREVAILING WAGES

STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISON OF PROFESSIONAL REGULATIONS RULES AND REGULATIONS RELATING TO PREVAILING WAGES STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DIVISON OF PROFESSIONAL REGULATIONS RULES AND REGULATIONS RELATING TO PREVAILING WAGES As Amended: November 2012 March 2012 1) Any contractor who has been

More information

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD

DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD DESERT WILDLIFE UNLIMITED POB 1388 Brawley, CA 92227 760 275 3953 NOTICE TO BIDDERS ALAMO RIVER TREATMENT WETLANDS AT SHANK ROAD The contactor shall possess a California contractor s license, Class A,

More information

REQUEST FOR PROPOSAL BID #045-15 ELECTRONIC CHECK PROCESSING SOFTWARE AND RELATED EQUIPMENT. August 10, 2015

REQUEST FOR PROPOSAL BID #045-15 ELECTRONIC CHECK PROCESSING SOFTWARE AND RELATED EQUIPMENT. August 10, 2015 REQUEST FOR PROPOSAL BID #045-15 ELECTRONIC CHECK PROCESSING SOFTWARE AND RELATED EQUIPMENT August 10, 2015 The City of Rome, Georgia is requesting proposals from qualified firms to provide Check Processing

More information

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST The following checklist has been developed to ensure that all required aspects of a project approved for Federal funding have been addressed and a responsible

More information

10/30/2015. Procurement Under the New Requirements. Why This Session Is Needed. Lesson Overview & Module Objectives. Changes to conflict of interest

10/30/2015. Procurement Under the New Requirements. Why This Session Is Needed. Lesson Overview & Module Objectives. Changes to conflict of interest Requirements Procurement under the New Requirements 1 1 Why This Session Is Needed New provisions in Uniform Guidance Changes to conflict of interest requirements in Uniform Guidance Distinctions between

More information

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION INTERSTATE TRANSPORTATION OF GOODS (FREIGHT) SERVICES PUBLICATION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION INTERSTATE TRANSPORTATION OF GOODS (FREIGHT) SERVICES PUBLICATION TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION SPECIFICATION NO. TxDOT 9628622 INTERSTATE TRANSPORTATION OF GOODS (FREIGHT) SERVICES PUBLICATION This specification is a product of the Texas

More information

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office

STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office STATE OF MINNESOTA MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State University, Mankato/System Office SERVICES CONTRACT/P. O. # Title: THIS CONTRACT, and amendments and supplements thereto, is

More information

Request For Quotes. 928 South Ninth Street Springfield, IL 62703-2497 REQUEST FOR QUOTES PAYROLL PROCESSING SERVICES RFQ-2015-09

Request For Quotes. 928 South Ninth Street Springfield, IL 62703-2497 REQUEST FOR QUOTES PAYROLL PROCESSING SERVICES RFQ-2015-09 928 South Ninth Street Springfield, IL 62703-2497 REQUEST FOR QUOTES PAYROLL PROCESSING SERVICES RFQ-2015-09 RESPONSES DUE: OCTOBER 16, 2015 Page 1 of 10 TABLE OF CONTENTS TABLE OF CONTENTS 2 PART I: SPRINGFIELD

More information

Lawrence University Procurement Policy for Federally Sponsored Projects

Lawrence University Procurement Policy for Federally Sponsored Projects Lawrence University Procurement Policy for Federally Sponsored Projects PURPOSE Federal grants are taxpayer dollars entrusted to Lawrence University for the advancement of public good. It is incumbent

More information

FEDERAL REQUIREMENTS FOR CONSTRUCTION CONTRACTS

FEDERAL REQUIREMENTS FOR CONSTRUCTION CONTRACTS FEDERAL REQUIREMENTS FOR CONSTRUCTION CONTRACTS Arundel Community Development Services, Inc. 2666 Riva Road, Suite 210 Annapolis, Maryland 21401 (410) 222-7600 FAX: (410) 222-7619 FEDERAL REQUIREMENTS

More information

DEKALB COUNTY GOVERNMENT

DEKALB COUNTY GOVERNMENT DEKALB COUNTY GOVERNMENT PROJECT MANUAL FOR CO-LOCATION SERVICES FOR DATA PROJECT JUNE 15, 2011 TABLE OF CONTENTS Advertisement for Bids 3 General Requirements 4 Request for Proposal 5 Bidder s Proposal

More information

Ocoee, FL July 01, 2016 Advertisement No. 1

Ocoee, FL July 01, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL July 01, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

U.S. Department of Labor Code of Federal Regulations Equal Employment Opportunity In Apprenticeship and Training. Title 29 - Part 30

U.S. Department of Labor Code of Federal Regulations Equal Employment Opportunity In Apprenticeship and Training. Title 29 - Part 30 U.S. Department of Labor Code of Federal Regulations Equal Employment Opportunity In Apprenticeship and Training Title 29 - Part 30 APPRENTICESHIP SECTION SPECIALITY COMPLIANCE SERVICES DIVISION DEPARTMENT

More information

State of Washington Department of Transportation Notice to Consultants Evaluate Risk-Based Asset Management Systems for WSDOT

State of Washington Department of Transportation Notice to Consultants Evaluate Risk-Based Asset Management Systems for WSDOT State of Washington Department of Transportation Notice to Consultants Evaluate Risk-Based Asset Management Systems for WSDOT The Washington State Department of Transportation (WSDOT) solicits interest

More information

Request for Proposal (RFP) for Contract Management

Request for Proposal (RFP) for Contract Management Request for Proposal (RFP) for Contract Management The City of Belton seeks a qualified management consulting firm to assist in the administration of the HOME Program to be awarded through the Texas Department

More information

Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer

Welcome to the City of Chicago. Department of Procurement Services. Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer Welcome to the Bid & Bond Room Rahm Emanuel, Mayor Jamie Rhee, Chief Procurement Officer The remains committed to the growth and development of small, minority and women-owned business enterprises and

More information

Mission Support Alliance Provision

Mission Support Alliance Provision SPECIAL PROVISIONS SOFTWARE Rev. 0 December 9, 2014 1.0 GENERAL... 2 2.0 DEFINITIONS... 2 3.0 GRATUITIES... 2 4.0 ANTI-KICKBACK... 3 5.0 COVENANT AGAINST CONTINGENT FEES... 5 6.0 RESTRICTIONS ON SUBCONTRACTOR

More information

3/5/2014. Section 3 Handbook Presque Isle County Home Improvement Program

3/5/2014. Section 3 Handbook Presque Isle County Home Improvement Program 3/5/2014 Section 3 Handbook Presque Isle County Home Improvement Program Section 3 Handbook Presque Isle County Home Improvement Program Introduction Section 3 is the legislative directive from the U.S.

More information

Case 7:15-cv-08630 Document 1 Filed 11/03/15 Page 1 of 11

Case 7:15-cv-08630 Document 1 Filed 11/03/15 Page 1 of 11 Case 7:15-cv-08630 Document 1 Filed 11/03/15 Page 1 of 11 PREET BHARARA United States Attorney Southern District of New York By: ELLEN M. LONDON Assistant United States Attorney 86 Chambers Street, 3 rd

More information

Disadvantaged Business Enterprise Program. Georgia Department of Human Resources

Disadvantaged Business Enterprise Program. Georgia Department of Human Resources Disadvantaged Business Enterprise Program for the Georgia Department of Human Resources Submitted for: Federal Fiscal Year 2008-2009 2 Policy Statement It is the policy of the Georgia Department of Human

More information

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR

FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS. REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR FABENS INDEPENDENT SCHOOL DISTRICT FABENS, TEXAS REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES (CM @ Risk) FOR A New High School Competition Gym RFP No. 052015-036 PROPOSALS ARE DUE 10:00

More information

Federal EEO Record-Keeping Requirements

Federal EEO Record-Keeping Requirements Federal EEO Record-Keeping Requirements Record-keeping requirements are imposed on employers under several federal laws. The following table summarizes the requirements of Title VII, Executive Order 11246,

More information

STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS

STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS STATE UNIVERSITY CONSTRUCTION FUND GUIDELINES FOR AWARD OF PROCUREMENT CONTRACTS Section I. Purpose The purpose of these Guidelines is to describe the methods and procedures governing the use, awarding,

More information

24 CFR PART 85 85.36 Procurement. States. Procurement standards.

24 CFR PART 85 85.36 Procurement. States. Procurement standards. 85.36 Procurement. (a) States. When procuring property and services under a grant, a State will follow the same policies and procedures it uses for procurements from its non-federal funds. The State will

More information

A DESK GUIDE TO THE DAVIS-BACON ACT

A DESK GUIDE TO THE DAVIS-BACON ACT A DESK GUIDE TO THE DAVIS-BACON ACT Prevailing Wage Requirements for Contractors on Federal Contracts and DBA-Covered Federally Financed or Assisted Construction Projects Introduction. The U. S. Department

More information

MINORITY AND WOMEN-OWNED BUSINESS UTILIZATION AGREEMENT

MINORITY AND WOMEN-OWNED BUSINESS UTILIZATION AGREEMENT MINORITY AND WOMEN-OWNED BUSINESS UTILIZATION AGREEMENT This MINORITY AND WOMEN-OWNED BUSINESS UTILIZATION AGREEMENT ( Agreement ) is entered into as of, 20, by and among ( General Contractor ), having

More information

MINNESOTA DEPARTMENT OF HEALTH MASTER GRANT CONTRACT FOR COMMUNITY HEALTH BOARDS

MINNESOTA DEPARTMENT OF HEALTH MASTER GRANT CONTRACT FOR COMMUNITY HEALTH BOARDS MINNESOTA DEPARTMENT OF HEALTH MASTER GRANT CONTRACT FOR COMMUNITY HEALTH BOARDS DRAFT for Discussion Only 8.22.14 THIS MASTER GRANT CONTRACT, and amendments and supplements thereto, is between the State

More information

SHORT FORM For Use by presently certified firms.

SHORT FORM For Use by presently certified firms. Economic Development Department Minority and Women-Owned Business Enterprise Certification Application SHORT FORM For Use by presently certified firms. M/WBE Certification Application, Short Form Rev.

More information

PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM. (Statutory authority: Executive Law, 200, 369-i[5])

PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM. (Statutory authority: Executive Law, 200, 369-i[5]) PART 252 SERVICE-DISABLED VETERAN-OWNED-BUSINESS ENTERPRISE PROGRAM Sec. (Statutory authority: Executive Law, 200, 369-i[5]) 252.1 Definitions. 252.2 State agency responsibilities: purpose, scope and applicability.

More information

Chapter 7: Labor, Payroll, Posting and Equal Employment Opportunity Requirements

Chapter 7: Labor, Payroll, Posting and Equal Employment Opportunity Requirements Chapter 7: Labor, Payroll, Posting and Equal Employment Opportunity Requirements Seattle District, NWS Last updated: 03FEB14 Chapter 7 Labor, Payroll, Posting, and Equal Employment Opportunity Requirements

More information

May 2013. This document is not a public record. Amador Water Agency

May 2013. This document is not a public record. Amador Water Agency Gravity Supply Line Project PRE-QUALIFICATION QUESTIONNAIRE May 2013 Amador Water Agency 12800 Ridge Road Sutter Creek, California 95686 Phone:(209) 257-5222 Fax:(209) 257-5295 INVITATION TO PRE-QUALIFY

More information

CHAPTER 7 PUBLIC WORKS LAW

CHAPTER 7 PUBLIC WORKS LAW 7-1 CHAPTER 7 PUBLIC WORKS LAW GENERAL PROVISIONS The "Public Works Law" [IC 36-1-12] applies to all public work performed or contracted by political subdivisions and their agencies. Any public work performed

More information

16 LC 34 4725 A BILL TO BE ENTITLED AN ACT

16 LC 34 4725 A BILL TO BE ENTITLED AN ACT House Bill 712 By: Representatives Bruce of the 61 st, Smyre of the 135 th, Marin of the 96 th, Dukes of the 154 th, Dawkins-Haigler of the 91 st, and others A BILL TO BE ENTITLED AN ACT 1 2 3 4 5 6 7

More information

ATTACHMENT B FEDERAL CERTIFICATIONS FOOD SERVICE MANAGEMENT COMPANIES AND PUBLIC SCHOOLS

ATTACHMENT B FEDERAL CERTIFICATIONS FOOD SERVICE MANAGEMENT COMPANIES AND PUBLIC SCHOOLS The undersigned states that: ATTACHMENT B FEDERAL CERTIFICATIONS FOOD SERVICE MANAGEMENT COMPANIES AND PUBLIC SCHOOLS 1. He or she is the duly authorized representative of the Vendor named below; 2. He

More information

BENTON COUNTY PERSONAL SERVICES CONTRACT

BENTON COUNTY PERSONAL SERVICES CONTRACT BENTON COUNTY PERSONAL SERVICES CONTRACT This is an agreement by and between BENTON COUNTY, OREGON, a political subdivision of the State of Oregon, hereinafter called COUNTY, and, hereinafter called CONTRACTOR.

More information

GEORGIA UNIFORM CERTIFICATIO PROGRAM Section 1: CERTIFICATION INFORMATION

GEORGIA UNIFORM CERTIFICATIO PROGRAM Section 1: CERTIFICATION INFORMATION GEORGIA UNIFORM CERTIFICATIO PROGRAM Section 1: CERTIFICATION INFORMATION A. Prior/Other Certifications Is your firm currently certified for DBE any of the following programs? (If Yes, check appropriate

More information

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM DISADVANTAGED BUSINESS ENTERPRISE PROGRAM RED ROSE TRANSIT AUTHORITY LANCASTER, PA February 2012 Updated October 2012 TABLE OF CONTENTS INTRODUCTION A. POLICY STATEMENT...1 B. FEDERAL FINANCIAL ASSISTANCE

More information

... 10 ... 2 ... 4 ... 8 ... 9 ... 11

... 10 ... 2 ... 4 ... 8 ... 9 ... 11 ... 1... 2... 4... 8... 9... 10... 11... 11 SHA Solicitation No. 811326 Page 1 of 14 SHA Solicitation No. 811326 Page 2 of 14 SHA Solicitation No. 811326 Page 3 of 14 SHA Solicitation No. 811326 Page 4

More information

Q&As Regarding Workers Who Perform Work Activities Involved in Surveying

Q&As Regarding Workers Who Perform Work Activities Involved in Surveying Q&As Regarding Workers Who Perform Work Activities Involved in Surveying 1. What determines whether or not federal Davis-Bacon prevailing wage requirements apply to a construction project? Prevailing wage

More information

AUSTIN COMMUNITY COLLEGE DISTRICT (ACC) SMALL BUSINESS DEVELOPMENT PROGRAM SBDP FORM A - SLBE PARTICIPATION COMMITMENT. Name of Offeror/Proposer:

AUSTIN COMMUNITY COLLEGE DISTRICT (ACC) SMALL BUSINESS DEVELOPMENT PROGRAM SBDP FORM A - SLBE PARTICIPATION COMMITMENT. Name of Offeror/Proposer: AUSTIN COMMUNITY COLLEGE DISTRICT (ACC) SMALL BUSINESS DEVELOPMENT PROGRAM SBDP FORM A - SLBE PARTICIPATION COMMITMENT Name of Offeror/Proposer: Address: Contracting Agency/Owner: Contract (Project) Title

More information

Facilitating Local Hiring on Transportation Projects: A Recommendation for the Surface Transportation Authorization. Overview

Facilitating Local Hiring on Transportation Projects: A Recommendation for the Surface Transportation Authorization. Overview Facilitating Local Hiring on Transportation Projects: A Recommendation for the Surface Transportation Authorization Prepared by: Center for Community Change, Gamaliel Foundation, Green for All, Partnership

More information

1. Provide advice and opinions regarding workers compensation issues, as needed;

1. Provide advice and opinions regarding workers compensation issues, as needed; Town of West New York Requests Proposals ( RFP ) From Law Firms Interested in Serving as Workers Compensation Counsel for the Town of West New York For the Period January 1, 2016 through December 31, 2016

More information

Ocoee, FL May 13, 2016 Advertisement No. 1

Ocoee, FL May 13, 2016 Advertisement No. 1 BID SOLICITATION NOTICE Turnpike FLORIDA DEPARTMENT OF TRANSPORTATION CONSTRUCTION AND MAINTENANCE PROGRAMS Ocoee, FL May 13, 2016 Advertisement No. 1 All bids must be completed using Expedite Bid software

More information

BOROUGH OF ELMWOOD PARK REQUEST FOR PROPOSAL PAYROLL SERVICES

BOROUGH OF ELMWOOD PARK REQUEST FOR PROPOSAL PAYROLL SERVICES BOROUGH OF ELMWOOD PARK REQUEST FOR PROPOSAL PAYROLL SERVICES Date Issued: May 15, 2015 Return Date & Time: Return To: May 26, 2015, no later than noon Keith Kazmark, RMC/CMC/MMC Borough of Elmwood Park

More information

Marion County Public Works

Marion County Public Works Marion County Public Works Federally Funded Transportation Program Title VI Annual Accomplishment Report Fiscal Year 2014/15 Marion County Public Works Department Introduction The Marion County Department

More information

Application of EEO Record-Keeping and Affirmative Action Requirements to Temporary Employees

Application of EEO Record-Keeping and Affirmative Action Requirements to Temporary Employees June 17, 2013 By Stephen C. Dwyer General Counsel 703-253-2037 sdwyer@americanstaffing.net Valerie J. Hoffman Partner, Seyfarth Shaw LLP 312-460-5870 vhoffman@seyfarth.com Application of EEO Affirmative

More information

WASHINGTON COUNTY, BOARD OF COUNTY COMMISSIONERS

WASHINGTON COUNTY, BOARD OF COUNTY COMMISSIONERS WASHINGTON COUNTY, BOARD OF COUNTY COMMISSIONERS REQUEST FOR PROPOSALS FOR EMERGENCY PLANNING, DISASTER RECOVERY AND HAZARD MITIGATION GRANT PROGRAM CONSULTING SERVICES NOTICE IS HEREBY GIVEN that the

More information

Construction Management Standards of Practice

Construction Management Standards of Practice Construction Management Standards of Practice 2010 Edition Advancing Professional Construction/ Program Management Worldwide. 7926 Jones Branch Drive, Suite 800 McLean, VA 22102-3303 USA 703.356.2622 703.356.6388

More information

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP)

CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Michigan Department Of Transportation 5100B (05/13) CHECKLIST TO DESIGNATE AREAS OF EVALUATION FOR REQUESTS FOR PROPOSAL (RFP) Page 1 of 2 REQUISITION NUMBER DUE DATE TIME DUE MDOT PROJECT MANAGER JOB

More information

Small Public Work Contract

Small Public Work Contract City of Bellevue 450 110 th Ave. NE Bellevue, WA 98004 Small Public Work Contract City of Bellevue Contract Identification Information: Contract Title: This CONTRACT is entered into the date

More information