Seattle Public Utilities Green Stormwater Infrastructure: O&M Program
|
|
|
- Jessica Perkins
- 10 years ago
- Views:
Transcription
1 Seattle Public Utilities Green Stormwater Infrastructure: O&M Program
2 O&M Maintenance Package O&M Maintenance Package 1. Landscape Maintenance Manual 2. NDS/LID Maintenance Manual for ROW 3. Identifiable and detailed levels of service 4. Porous Pavement 5. O&M Facility Checklists 6. Key Performance Indicators 7. O&M Estimating Database Tool Life Cycle Costs Risks
3 Homeowners Landscape Manual Encourage and educate residence Landscape Maintenance Manual Maintenance personnel Homeowners living adjacent to systems
4 NDS Manual Sections Inspection/Checklist and Recommended Maintenance Activities 1. Vegetation and Landscaping 2. System Functionality 3. Hardscape and Infra-Structure 4. Infiltration Failure Swale Ponding 5. Recommended Maintenance for Other Elements 6. Safety, Mobility, and Accessibility
5 Maintenance Manual Summary Routine maintenance activities Non-routine maintenance activities Inspection/checklist Scheduling and performing maintenance activities in the ROW Images and descriptions
6 Levels of Service (LOS) LOS A Excellent effort LOS B Good effort LOS C Moderate effort LOS D Poor effort
7 Layout and How To Select the desired Service Level for maintenance
8 1-Vegetation and Landscape Maintenance Inspection/checklist Vegetation is mostly healthy Good appearance Small quantities of weeds Edges are loosely defined Grass encroaching on the swale (or vice versa) Insert photo Levels of Service B - Good
9 Noxious and Nuisance Weeds Special considerations need to be identified Provide link to jurisdiction s s web site Photos Identification key Reporting requirements if applicable Spotted Knapweed
10 Level of Service D - Poor effort Inspection/checklist Sediment is significant Infrastructure is mostly inaccessible Trash is present Significant competition between roots and any pipes Viewlands Cascade
11 All Levels of Service Stormwater sedimentation structures are less than ½ full or in accordance with NPDES requirements
12 4-Infiltration Failure Evidence of a cell holding water for more than 24 hours needs to be reported One Call Center for Seattle Operations and Maintenance Asset Manager Monitor swale for ponding water Retrofit swale
13 5-Recommended Maintenance for Other Elements Pest control Spill prevention and response Safety Mobility Accessibility Permeable pavements Irrigation systems
14 Manual is a Working Document Work, work, and continue to work with field crews Update photos to continue refining document Document lessons learned Include BMP s
15 Porous Pavement Cleaning Evaluation Sidewalk and street cleaned and tested Single and combination treatments Pressure washing breaks up top layer and allows for material to be remove Monitoring every six months
16 January 2009 Before Infiltration rate 0 in/hr After Infiltration rate 208 in/hr
17
18
19 Restoration Infiltration Rates Leaf blower - 0 in/hr Industrial pressure 3000psi 4.5 in/hr to 21 in/hr Regenerative air sweeper truck - 0 in/hr Walk behind leaf vacuum 0 in/hr Combination treatment 0.75 in/hr to 209 in/hr
20 Testing Results Combinations Treatments Leaf Blower/Pressure Washer/Street Sweeper Leaf Blower/Pressure Washer Pressure Washer/Vacuum SPU Vactor Truck Pressure Washer/SDOT Pressure Washer Pre Cleaning Infiltration Rate (in/hr) Post Cleaning Infiltratio n Rate (in/hr) Improved Infiltratio n %
21 Porous Pavement Seattle porous pavement spec. Inspector and installer checklists BMP s Levels of services Frequency/schedule Standardized infiltration testing Recommended maintenance activities
22 Checklists Condensed version of manual Developed for each section of the manual Reduce maintenance activities to a summary Eliminate photos Identify key performance indicators monitoring and reporting
23 Checklist Form - Example photo
24 Key Performance Indicators (KPI s) Determine LOS achieved for swales Provides an overall reporting score for high level management Indicators help identify successes areas of improvement failures for each system
25 Key Performance Indicators (KPI s) Data includes Project location Drainage area Maintenance target Reporting of maintenance LOS achieved Provides Accountability Reporting method Excellent asset management tool for management
26 O&M Estimating Database Tool- Vegetation Inputs: Level of Service Square footage Discount rate Establishment time Life of project Replacement frequency
27 O&M Estimating Database Tool- Vegetation Summary of Line Item Cost Output Mowing for grass lined swales Plant maintenance inspection including litter and minor weed removal Inspection Watering Mulching above ordinary high water mark Replacement cost (15yr)
28 Vegetation Estimated O&M Costs LOS B 47,290 SQ FT Initial 3 year Landscape Establishment Total Present Value Annual Value assuming 0% community participation $177,614 $65,221 Established (starting year 4) 0% community participation $562,228 $28,615 25% community participation $421,671 $21,461 50% community participation $281,114 $14,308 75% community participation $140,557 $7,154 90% community participation $56,223 $2,862 Soil Replacement (every 15yrs) $466,952 $23,527
29 Life Cycle Costs - Pinehurst Present value of O&M + construction costs LCC for Pinehurst (47,290 ft 2 ) $1.2M+ $5.2M = $6.4M Initial estimates $4.8 million construction cost Comparable project to retrofit $8.9 million Total project cost 453K for 660 ft blk Includes all design, project management, const. cost Present value of O&M costs compared to traditional systems is significantly less
30 Lessons Learn and Risks
31
32
33
34
35
36
37
38
39 Questions?
Operations and Maintenance
Seattle Public Utilities Green Stormwater Infrastructure: O&M Program Operations and Maintenance O&M Maintenance Took Kit 1. Landscape Maintenance Manual 2. GSI/LID Maintenance Manual for ROW 3. Identifiable
Seattle Public Utilities. Natural Drainage Systems (NDS) Maintenance Manual
Seattle Public Utilities Natural Drainage Systems (NDS) Maintenance Manual 1 Revision Date: December 2007 2 Table of Contents I. Overview... 4 II. How to Use This Manual... 4 III. NDS Contacts... 4 List
PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS
BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,
Operation & Maintenance Document Templates
Appendix G Operation & Maintenance Document Templates The following templates are provided to assist project applicants in preparing stormwater treatment measure maintenance plans, which municipalities
Stanford Graduate School of Business Knight Management Center Campus
Stanford Graduate School of Business Knight Management Center Campus Mathew Bamm, P.E. LEED AP courtesy: boora architects Overview Introductions Design Team and Project Overview Regulatory Framework and
PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
Residential Turf Removal Program Application Package
Instructions Residential Turf Removal Program Application Package 1. PROJECTS THAT HAVE BEEN STARTED OR ALREADY COMPLETED PRIOR TO REBATE RESERVATION APPROVAL ARE NOT ELIGIBLE. 2. Read the program terms
Low Impact Development Permeable Paving
Low Impact Development Permeable Paving An education initiative funded by the Department of Ecology June 11, 2013 How to Participate in a Webinar chat send to host Polling box will appear at first poll
GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT
SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT GREEN ROOFS A green roof is a system consisting of waterproofing material, growing medium, and vegetation, and is used
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng. Source: CH2M Hill The Presenter Robert Bowers, P.Eng., LEED GA [email protected] Director
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
Residential Turf Removal Program Application Package
Instructions Residential Turf Removal Program Application Package 1. PROJECTS THAT HAVE BEEN STARTED OR ALREADY COMPLETED PRIOR TO REBATE RESERVATION APPROVAL ARE NOT ELIGIBLE. 2. Read the program terms
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org [email protected] Chagrin River Watershed Partners Formed
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE
GENESEE COUNTY DRAIN COMMISSIONER S OFFICE DIVISION OF SURFACE WATER MANAGEMENT G-4608 BEECHER ROAD, FLINT, MI 48532 PHONE (810) 732-1590 FAX (810) 732-1474 JEFFREY WRIGHT COMMISSIONER October 1, 2012
Landscape Maintenance
Photo Credit: Geoff Brosseau Description This category includes businesses that provide landscaping and landscape maintenance/gardening services. Pollutant Sources The following are sources of pollutants:
Pervious Concrete Pavement Maintenance and Operations Guide
Pervious Concrete Pavement Maintenance and Operations Guide NRMCA Pervious Concrete Pavement Maintenance and Operations Guide Pervious concrete pavement is a Portland cement-based, rigid permeable pavement
Landscape Maintenance
Landscape Maintenance SC-73 Objectives Contain Educate Reduce/Minimize Product Substitution Description Landscape maintenance activities include vegetation removal; herbicide and insecticide application;
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs. Tom Schueler Chesapeake Stormwater Network
Lessons Learned from the Expert BMP Panel Process That May Apply to MTDs Tom Schueler Chesapeake Stormwater Network Recent Expert Panels 1. Stormwater Retrofit Practices 2. New State Performance Standards
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement David R. Smith, Technical Director Interlocking Concrete Pavement InsCtute, Herndon, Virginia USA William F. Hunt,
4.3 Cisterns and Rain Barrels
4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may
Green Infrastructure for Single Family Residences
Green Infrastructure for Single Family Residences CITY OF ATLANTA STORMWATER GUIDELINES Prepared for CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT NOVEMBER 2012 Prepared by AMEC Environment
Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects
Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology
Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007
Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal
City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions
City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager [email protected] Stormwater
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation. Presenters:
Post-Construction Storm Water Management Program: Planning, Design, Construction, and Operation Presenters: Environment, Health & Safety (EH&S) Kimberly O Connell, UC San Diego April 2014 (draft) Charlotte
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
GUIDANCE DOCUMENT. Prepared for Washington State Department of Ecology Water Quality Program
GUIDANCE DOCUMENT WESTERN WASHINGTON LOW IMPACT DEVELOPMENT (LID) OPERATION AND MAINTENANCE (O&M) Prepared for Washington State Department of Ecology Water Quality Program Prepared by Herrera Environmental
BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
Pervious Pavement. An Infiltration BMP A LID Technique. Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association
Pervious Pavement An Infiltration BMP A LID Technique Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association Portland, Oregon 503-292-7729 [email protected] www.nrmca.org
WSUD maintenance guidelines. A guide for asset managers
WSUD maintenance guidelines A guide for asset managers Table of contents Introduction 2 How to use the guidelines 3 1 Asset management framework 5 1.1 Types of maintenance 6 1.1.1 Proactive maintenance
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
RainWise Frequently Asked Questions
RainWise Frequently Asked Questions RAINWISE PROGRAM: HOW TO GET STARTED AND WHAT TO EXPECT What is the RainWise Rebate Program? RainWise is a program offered by Seattle Public Utilities and King County
GROUNDS MAINTENANCE-WATER USE DFC Environmental Management System
1.0 Purpose To reduce the amount of water applied to the DFC Grounds in order to conserve water. 2.0 Activity/Department The On-site Landscape Contractor GSA Team 6 3.0 Forms Used Contractor s Daily Quality
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
APWA Green Pavement Alternatives
Civil Engineering Landscape Architecture Environmental Restoration Planning APWA Green Pavement Alternatives Kathryn Gwilym, PE, LEED AP June 24, 2010 www.svrdesign.com Topics to Cover Introduction to
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System Jason Wimberly, EI, MCE Director of Technical Services Carolinas Ready Mixed Concrete Association Disclaimer This presentation
MODULE 2 RULES RELATING RULES RELA
MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS 1 RULES RELATING TO STORM DRAINAGE STANDARDS Sections that underwent revision 1-11 PURPOSE 1-2 MODIFICATIONS
GreenPlanIT LID Site Suitability Tool. Patty Frontiera, [email protected] Pete Kauhanen, [email protected] Marshall Kunze, marshallk@sfei.
GreenPlanIT LID Site Suitability Tool Patty Frontiera, [email protected] Pete Kauhanen, [email protected] Marshall Kunze, [email protected] GreenPlanIT TAC Meeting, 06/17/2014 LID Site Suitability Tool Talk
Writing a Successful Exterior Landscape Maintenance RFP
Writing a Successful Exterior Landscape Maintenance RFP 1 The 11 Essential Things to Include 1. Pre bid letter with meeting time, place and date 2. Specific instructions on what to bring to the Pre bid
Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach
October 5 2011 Estimating Stormwater System Annual Maintenance and Repair Costs - A GIS Approach 2011 SESWA Annual Conference 2011 Southeast Stormwater Associated Annual Conference Presentation Overview
Post Construction and Redevelopment Inspection Manual
City of Myrtle Beach Post Construction and Redevelopment Inspection Manual In April 2003, the United States Environmental Protection Agency (USEPA) issued a National Pollutant Discharge Elimination System
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
Pervious Pavers: Where is the Perviousness?
Pervious Pavers: Where is the Perviousness? Elizabeth (Betsy) Pappas Research Hydraulic Engineer Chi-hua Huang Soil Scientist United States Department of Agriculture Agricultural Research Service National
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Clarendon CISD. Integrated Pest Management Program (IPM) Manual Updated & Board Acknowledgement 11/10/11
Clarendon CISD Integrated Pest Management Program (IPM) Manual Updated & Board Acknowledgement 11/10/11 See Official Board Policy Code CLB (LEGAL) & (LOCAL) 1 TABLE OF CONTENTS Policy Statement... 3 IPM
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT
ELMER AVENUE Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT STAGG STREET ELMER AVENUE KESWICK STREET PASEO NOTE: Photo taken before retrofit WHAT IS THE NEIGHBORHOOD RETROFIT PROJECT?
Stormwater Management Facilities. Operation and Maintenance for Private Property Owners
Stormwater Management Facilities Operation and Maintenance for Private Property Owners Stormwater Management Facilities Operation and Maintenance for Private Property Owners Contents Page INTRODUCTION:
Sustainable Site Pavement Systems
Sustainable Site Pavement Systems Permeable Interlocking Concrete Pavement Training for Design Professionals ICPI Presentation #003 Presented by: Brent Davis - Design Consultant Belgard Engineered Solutions
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
How to Build a Rain Garden at Your Home
How to Build a Rain Garden at Your Home Virginia gets an average of 45.22 inches of rain a year. Rain that runs off your roof or patio can flow into a sewer pipe, stream or groundwater. Why not put it
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Follow the Drop. Activity Overview Students observe and collect information about water runoff on their school property. Objective Students will:
Follow the Drop Activity Overview Students observe and collect information about water runoff on their school property. Objective Students will: Practice observation and investigative skills Survey and
Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012
Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND
Operations and Maintenance Plan
Douglas County, Washington Stormwater Pollution Prevention Operations and Maintenance Plan Douglas County Transportation 140 19 th Street NW, Suite A East Wenatchee, WA 98802 Last Update: April 2011 Acknowledgements
Stormwater Credit Open House Q&A
Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or
SCOPE OF WORK Specifications for Landscaping, Lawn Maintenance & Pest Control
January 10, 2013 Request for Proposal for WINDRUSH BAY CONDOMINIUM ASSOCIATION, INC 700 Windrush Bay Drive, Tarpon Springs, FL 34689 www.windrushbay.org SCOPE OF WORK Specifications for Landscaping, Lawn
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation 702 E. Johnson Street, Madison, Wisconsin 53703 (608) 441-2677 Fax (608) 441-2676 [email protected]
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3