SOUTHERN RURAL WATER POLICY RISK MANAGEMENT POLICY
|
|
|
- Sharon Davis
- 10 years ago
- Views:
Transcription
1 SOUTHERN RURAL WATER POLICY RISK MANAGEMENT POLICY 1. POLICY STATEMENT Having regard to AS/NZS ISO Risk Management, it shall be the Policy of SRW to manage risk to protect public safety, quality and security of supply. This will be achieved through the implementation of SRW s Risk Management System, which is described in Schedule DATE OF BOARD APPROVAL Board Meeting No 148 held on 20 July Board Meeting No 184 held on 9 October Board Meeting No 205 held 5 May Board Meeting No 219 held 2 June REVIEW May EXPLANATORY NOTES This Policy should read in conjunction with the Dam Safety Management Policy, and AS/NZS ISO Risk Management 5. COMMUNICATION This Policy will be made available to the Public on the SRW website Policy prepared by: Chief Financial Officer 20 May 2011
2 SCHEDULE 1 RISK MANAGEMENT SYSTEM 1. INTRODUCTION 1.1 A fundamental task for any organisation is identifying and managing both potential negative impacts and beneficial opportunities to achieve the entity s objectives. SRW s Risk Management System is designed to achieve this, by establishing good Risk Management practice for a business of our size and risk profile. Successful Risk Management requires a combination of sound support systems and a culture that actively seeks to identify and address risks. 1.2 SRW s Statement of Obligations imposes: as a Guiding Principle, in performing its functions and providing its services the Corporation must: manage risk to protect public safety, quality and security of supply; as an Obligation the Corporation must develop and implement plans, systems and processes, having regard to the Australian/New Zealand standard AS/NZS 4360 Risk Management, as revised from time to time, to ensure that risks to the Corporation s assets or services are identified, assessed, prioritised and managed. 1.3 SRW s Risk Management System will ensure compliance with our Statement of Obligations and the principles of good governance. 1.4 The System is designed create a consistent, comprehensive and clear definition of risk within the Corporation, facilitating a common understanding of risk exposure, specifying, recommending and agreeing on tolerable levels of risk and setting improvement priorities and targets. 1.5 The key elements of our Risk Management System are to: Categorise risks in accordance with SRW s risk assessment framework. Utilise appropriate software to record, manage and monitor risk. Define roles and responsibility for Risk Management. Define review and reporting procedures. Determine the process to manage risk for significant projects and for some headworks issues. 2. RATING OF RISKS 2.1 Risks are rated using a combination assessment of likelihood and consequence resulting in the risk rated as either low, moderate, high or extreme.
3 Almost certain Moderate High Extreme Extreme Extreme Likely Moderate Moderate High Extreme Extreme Possible Low Moderate Moderate High Extreme Rare Low Moderate Moderate Moderate High LIKELIHOOD Very rare Low Low Low Moderate Moderate Minimal Minor Significant Major Catastrophic CONSEQUENCE Consequence is rated from minimal to catastrophic, having regard to a range of factors as identified in the attached Table 1. Likelihood is rated from very rare to almost certain, based on the expected probability or frequency of occurrence as shown below: RATING OCCURRENCE DESCRIPTION Almost certain Likely Possible Rare Very rare Expected to occur at least once per year Expected to occur at least once every 10 years Expected to occur at least once every 100 years Expected to occur at least once every 1,000 years Expected to occur less often than once every 1,000 years The event is expected to occur in most circumstances The event will probably occur in most circumstances The event should occur at some time The event could occur at some time The event may occur only in exceptional circumstances
4 3. ROLES AND RESPONSIBILITIES Position Role Board Approve Risk Management policy; Approve risk assessment criteria; and Approve the risk tolerance of the Corporation. Audit & Risk Policy Committee Monitor the adequacy of the Risk Management system; and Assign review responsibility for all identified risks to a Board Committee. Board Committee s Review Risk Management performance for those risks within each Committee s ambit. Managing Implement Risk Management consistent with the approved RMS; and Director Inform the Board of any legislative changes or ministerial directions that impact on management of risk. Executive Risk Committee Monitoring, leadership and ongoing maintenance of the Risk Management System; Ensure consistent application of the Risk Management System; Review accuracy and completeness of the enterprise-wide risk register; and Co-ordinate enterprise-wide training and education initiatives. Within their respective areas: Act as Risk Reviewer and recommend a Tolerance Baseline rating for Board reporting; Ensure Risk Management processes are in place and operating effectively; and Report risk events in accordance with reporting processes. Risk Coordinator Implement Risk Management software, facilitation of supporting workshops and training and provide on-going support; Provide risk reporting to Managing Director, Executive Risk Committee, Audit & Risk Policy Committee and Board; Provide secretarial support to Executive Risk Committee; and Keep abreast of best practice developments and how these apply to the SRW context. Risk Owner For those risks designated as Risk Owner: Prioritise, specify and implement risk control actions; Identify (and report to the Executive Risk Committee) treatments that further mitigate risk; and Ensure the risk register is maintained to accurately record progress for identified actions and to reflect current knowledge of risk assessment. Managers and Supervisors Ensure induction of new employees introduces the Corporation s Risk Management System, and the role that each employee performs to mitigate Corporation risk; Ensure that as Position Description (PD) documents are created or revised, the PD incorporates that member of staff s responsibilities within the Corporation s Risk Management System; Ensure Risk Management processes are in place and operating effectively; Report risk events in accordance with reporting processes; Regular training and reinforcement of Risk Management principles to all staff in their area; and Ensure that performance appraisal for subordinate staff considers adherence to applicable Risk Management requirements for that staff member. All staff All staff across the Corporation are responsible for observing the organisation s policies, procedures, delegations and minimising risks to the organisation, at all Manager Human Resources times. Ensure that the Corporation s Human Resources policies and procedures reinforce the requirements of the Risk Management System.
5 Position Role Finance Manager Ensure that the treatment outcomes from the Corporation s Risk Management System is reflected in corporate plans and budgets Internal Audit As recommended by the Audit & Risk Policy Committee, specialist Internal Audit is periodically engaged to conduct independent examinations and evaluations of risk mitigation plans (policies, procedures, systems) in place to manage risk within acceptable tolerance limits. External Audit Is responsible for independently assessing the Corporation s financial state; and Will use Risk Management information to assist in determining reliance on key systems. 4. USE OF SENTINEL RISK MANAGEMENT SOFTWARE 4.1 During 2004/05, SRW implemented specialist software Sentinel to record, manage and report on our risks and Risk Management strategies. Risks are characterised based on their inherent risk (without controls), baseline risk (with existing controls) and target risk (with proposed controls), and are assigned to designated officers (Risk Owner). The register records proposed controls and actions, and provides progress reporting against those actions. 4.2 Guiding Principles Risk Owner is responsible for the management of the risk and any applicable Treatment, and associated recording within Sentinel Risk Reviewer is responsible for the Acceptance of the Risk. By Accepting the Risk, the Reviewer has notified his: Recommended Tolerance of Baseline risk rating; or Agreement of Target risk and the associated Treatment (from a scope, time and financial context), and recommended Tolerance of Baseline risk rating throughout the Treatment period It is the responsibility of both the Owner and Reviewer to ensure that no Risks are recorded as Not Accepted. 4.3 Risk Procedure Once a risk is identified by the Corporation a Risk Owner is identified by the applicable Executive and Sentinel maps the process of Risk Management in the following manner: Risk Owner Management of risk is recorded and monitored by the Risk Owner within Sentinel as follows: 1. Risk identified Title and description recorded by Sentinel 2. Inherent risk assessment Likelihood and consequence assessment performed in an environment without any controls, result input to Sentinel as Inherent Risk 3. Including an assessment of associated Impact and Effectiveness, existing controls recorded in Sentinel 4. Baseline risk assessment Likelihood and consequence assessment performed in an environment with existing controls, result input to Sentinel as Baseline Risk 5. Treatment (A Treatment refers to a series of Milestone tasks, each Milestone task represents a separate action or project that will enhance the control environment with the objective of mitigating our risk position) a. Treatment proposed
6 Milestone tasks described and input to Sentinel, together with responsible officer, estimated external cost and completion date. Likelihood and consequence assessment performed in an environment with existing and proposed controls, result input to Sentinel as Target Risk b. No Treatment proposed No further Sentinel input required, including assessment of Target risk Risk Reviewer 6. Acceptance Appropriate member of Executive Risk Committee agrees proposed (or no) Treatment and records their Acceptance within Sentinel. At time of Acceptance, a Review risk rating is also input to Sentinel. This rating reflects the current assessment of the risk and will mirror Baseline risk. These steps combine to formalise the Risk Reviewers acknowledgement of the risk, its current status, if applicable, any proposed Treatment and allows reporting of the Risk Reviewers recommended risk tolerance to the respective Board Committee. All Risks identified and input to Sentinel must be Accepted by a member of the Executive Risk Committee within 4 weeks of initial input Risk Owner 7. Where Treatment Accepted - Milestone reporting Monthly update of Sentinel to accurately record progress for each Milestone action. Sentinel includes a % completion field this field must reflect current progress towards completion of the task. 8. New control Once Treatment is complete, the result is input to Sentinel as a control. The Baseline risk is adjusted to reflect the new control environment (target risk remains unchanged) Risk Reviewer 9. Acceptance Once the Treatment is complete and the new control has been input to Sentinel, the Review Risk is updated to reflect the new Baseline risk. 5. REPORTING & REVIEW 5.1 Reporting risk events Irrespective that the Corporation may not have incurred a negative consequence, should an event occur that could have, or has triggered an outcome of minor or above, Corporation management must report the event to the Board. Reporting of risk events is not limited to events described within the Risk Register. 5.2 Consequence Minor and Significant Should a risk eventuate with an actual or potential consequence greater than or equal to Minor, the responsible Executive must include an appropriate description of the event, and the adequacy of our Risk Management System to mitigate the event, as a report within the next available Board agenda. 5.3 Consequence Major and Catastrophic
7 The occurrence of any event with an actual or potential Major or Extreme consequence must be reported immediately to the Board by the Managing Director, and this report must also incorporate an assessment of the adequacy of the Corporation Risk Management System. 5.4 Potential consequence Reporting of risk occurrence for potential consequence captures those events that have occurred, but the outcome was mitigated (either via organisation controls or good fortune). Reporting these near miss events aids the Corporations ongoing evaluation of the Risk Management System. 5.5 Board Committee reporting In order that the Board can monitor Risk Management performance, the Audit & Risk Policy Committee charter determines that the Committee will assign individual risks to a Board Committee. As required, the Chair of each respective committee will schedule Risk Presentations from management. These presentations will follow a consistent format, as approved from time to time by the A&RPC. 5.6 Reporting to the Managing Director Co-ordinated by the Risk Co-ordinator and supervised by the Executive Risk Committee, a Risk Management Exception Report will be provided for those risk events where the Sentinel record has been amended for: Any change to the risk rating of existing risks; Any new risks; Any completed milestones; Any new milestones; or Any new controls. In addition, detailed risk reporting is provided for any risk: Not Accepted ; Where a treatment has been deferred; and Where a treatment is outstanding. For each reported instance, detailed information is provided from Sentinel using the Management summary report. 5.7 Audit & Risk Policy Committee reporting In order that the Audit & Risk Policy Committee can consider the performance of Risk Management within the Corporation, reporting to the Committee consists of: Executive Risk Committee Minutes of all Executive Risk Committee meetings will be tabled at the following A&RP meeting. These minutes will include copy of all detailed risk reporting provided to the Managing Director for those risks not reported to Board Committee s Balanced Scorecard report The most recent Balanced Scorecard report for any risk related objective (at May 2011 recorded as Manage Risks Well ) will be presented to the Committee for consideration. 5.8 Managing Director Risk Attestation At each scheduled meeting of the Board and in respect of key risks only, the Managing Director will advise the Board:
8 a. If a risk has occurred b. If a risk has been re-assessed to a lower (or higher) rating; and c. Of any significant change that has been made to the management / mitigation strategies of a risk. 5.9 Annual Review A key risk is any event with a Catastrophic or Major inherent consequence Annually, on or about 28 February, the Risk Co-ordinator will distribute to all Corporation supervisory and management staff a summary and detail report of all Risks recorded by Sentinel By the April Audit & Risk Policy Committee meeting, the Executive Risk Committee will have considered these summary and detail reports so that an Annual Risk Review can be considered by the Committee, and then the Board, for the year ending 31 March The reports forming the Annual Risk Review will include, but are not limited to : a. The summary schedule of risks recorded by Sentinel; b. New risks recorded since the last Annual Risk Review; c. Changed circumstances, including technological or legislative developments, that may have affected existing risk ratings. All amendments to a Baseline rating since the last Annual Risk Review will be reported by the Review; and d. Occurrence of actual and potential risk events since the last Annual Risk Review. Prior to submission of the report to the Committee, any revisions to Sentinel during the preceding 12 months must by Accepted by the Managing Director, as demonstrated to the Committee by the Managing Directors authorisation of the Annual Review The Annual Risk Review is provided to the Board at the next scheduled Board meeting. 6. SPECIAL ARRANGEMENTS FOR PROJECTS AND HEADWORKS 6.1 Special arrangements for significant projects Several characteristics relating to projects warrant a variation to their Risk Management compared to the on-going risks associated with our businesses. Risk characteristics of projects typically include: an evolving understanding of the risk and control measures as the project progresses; a very wide range of inter-related risks that can directly impact on several businesses; a risk exposure that only exists during the project and the option to completely avoid the risk by abandoning the project or by deferring it to more preferred time. The proposed arrangement for project Risk Management, that accounts for its more dynamic and inter-related nature, is to require the project manager to undertake a risk assessment and to prepare a Risk Management plan at key stages of the project. The plan would require CE approval prior to proceeding to the next stage. Key stages for projects would vary but typically would include the following: project proposal, conceptual design, detailed design and pre-tender. Given the relative short duration of projects and the evolution of risk understanding during its cycle, we will manage these risks as part of the general project management requirements. Consequently these risks would fall outside RMS and have separate reporting arrangements. The RMS would include the controls on managing risks for major projects. 6.2 Special arrangements for headworks Several aspects of Risk Management for headworks stand it apart from our other responsibilities. Very well established, detailed, conservative and prescriptive processes developed by Australian National Committee Of Large Dams (ANCOLD) cover the assessment of dam failures resulting from earthquakes or extreme flood events. There is a clear expectation that dam owners should comply
9 with these guidelines to demonstrate compliance with their duty of care. Consequently, we plan to continue to manage the earthquake and flood event risks in accordance with the ANCOLD guidelines. The RMS would cover all other headworks risks, including the downstream impact of floods and damage (but not destruction) to Headworks structures and ancillary equipment.
10 Table 1 CONSEQUENCE FOR: Proposed People Environment SRW Reputation SRW Reputation Proposed SRW Reputation SRW Finances SRW Finances Customers Proposed Customers Third-party Assets 5 Catastrophic Fatality or multiple fatalities Extensive and long-term impact on the environment Ministerial abolishment of enterprise Breach resulting in a fine > $2.5 M Recurring expenditure > $25M Non recurring losses > $250M Severe & recurring shortfall on announced allocation for major system Widespread and prolonged interruption to service resulting in customer financial failure Expenditure and losses > $25M CONSEQUENCE OF: 4 Major 3 Significant Permanent disability; loss of limb or severe illness Major injury requiring longterm hospitalisation Significant and long-term impact on the environment Noticeable longterm impact on the environment Ministerial Breach resulting in removal of Board a fine > $250,000 Ministerial Breach resulting in removal of Chair a fine > $25,000 Prolonged adverse Nationwide media coverage Adverse statewide media coverage Recurring expenditure > $2.5 M Recurring expenditure > $250,000 Non recurring losses > $25 M Non recurring losses > $2.5 M Substantial shortfall on announced allocation for major system Significant shortfall on announced allocation for major system Substantial interruption to service resulting in significant customers financial loss Significant interruption to service Expenditure and losses > $2.5M Expenditure and losses > $250k 2 Minor Injury resulting in minor hospitalisation Systematic but relative impact on the environment Ministerial reprimand of Board Breach resulting in a fine > $2.5k Adverse regional media coverage Recurring expenditure > $25k Non recurring losses > $250,000 Systematic but relative minor shortfall on announced allocation Systematic but relative minor interruption to service Expenditure and losses > $25k 1 Minimal Injury not resulting in hospitalisation Minor and isolated impact on the environment DES Secretary reprimand of CE Non-judicial sanction Adverse local media coverage Recurrent losses greater than $2.5k Capital losses greater than $25k Minor and isolated shortfall on announced allocation Minor and isolated interruption to service Expenditure and losses > $2.5k
Risk Management: Coordinated activities to direct and control an organisation with regard to risk.
POLICY CG01 RISK MANAGEMENT Document Control Statement This Policy is maintained by the Governance and Organisational Strategy. Any printed copy may not be up to date and you are advised to check the electronic
Compliance Management Framework. Managing Compliance at the University
Compliance Management Framework Managing Compliance at the University Risk and Compliance Office Effective from 07-10-2014 Contents 1 Compliance Management Framework... 2 1.1 Purpose of the Compliance
Risk Management Policy and Framework
Risk Management Policy and Framework December 2014 phone 1300 360 605 08 89589500 email [email protected] location 1Bagot Street Alice Springs NT 0870 post PO Box 2257 Alice Springs NT 0871
RISK MANAGEMENT POLICY
DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Council policy Approved Manager Organisational Development Risk Management Committee Council DATE ADOPTED:
Eclipx Group Limited Risk Management Policy
Eclipx Group Limited Risk Management Policy Date approved: 26 March 2015 Table of Contents 1. Background... 3 1.1 Overview... 3 1.2 Purpose... 3 1.3 Board responsibility... 3 2. Key principles and concepts...
Managing Risk in Procurement Guideline
Guideline DECD 14/10038 Managing Risk in Procurement Guideline Summary The Managing Risk in Procurement Guideline assists in the identification and minimisation of risks involved in the acquisition of
The Lowitja Institute Risk Management Plan
The Lowitja Institute Risk Management Plan 1. PURPOSE This Plan provides instructions to management and staff for the implementation of consistent risk management practices throughout the Lowitja Institute
Title: OHS Risk Management Procedure
Issue Date: July 2011 Review Date: July 2013 Page Number: 1 of 9 1. Purpose: To outline the methodology by which Department of Education and Early Childhood Development (DEECD) identifies, assesses, controls
AFTRS Health and Safety Risk Management Policy
AFTRS Health and Safety Risk Management Policy Responsible Officer Contact Officer Authorisation Director, Corporate and Student Services Head of Human Resources Chief Executive Officer Effective Date
Victorian Government Risk Management Framework. March 2015
Victorian Government Risk Management Framework March 2015 This document reproduces parts of the AS/NZS ISO 31000:2099 Risk Management Principles and Guidelines. Permission has been granted by SAI Global
3 August 2012 Policy updated to reflect name changes and alignment with current Aurora Energy Group Policy standards.
Aurora Energy Risk Management Policy Version History REV NO. DATE REVISION DESCRIPTION APPROVAL 0 19/11/98 Risk Management Policy Prepared by: Manager Internal Audit 1 March 2007 Risk Management Policy
RISK MANAGEMENT FRAMEWORK
RISK MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Manager Organisational Development
Shepway District Council Risk Management Policy
Shepway District Council Risk Management Policy Contents Section 1 Risk Management Policy... 3 1. Updates and amendments... 3 2. Definition... 3 3. Policy statement... 3 4. Objectives... 3 Section 2 Risk
Council Meeting Agenda 27/07/15
3 Risk Management Framework Abstract Council s Risk Management Framework ( the Framework ) was adopted by Council in 2012. The Framework provides structure and guidance to Council s risk management activities
The Risk Management strategy sets out the framework that the Council has established.
Derbyshire County Council Management Policy Statement The Authority adopts a proactive approach to Management to achieve Best Value and continuous improvement and is committed to the effective management
Bedford Group of Drainage Boards
Bedford Group of Drainage Boards Risk Management Strategy Risk Management Policy January 2010 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
ENTERPRISE RISK MANAGEMENT FRAMEWORK
ROCKHAMPTON REGIONAL COUNCIL ENTERPRISE RISK MANAGEMENT FRAMEWORK 2013 Adopted 25 June 2013 Reviewed: October 2015 TABLE OF CONTENTS 1. Introduction... 3 1.1 Council s Mission... 3 1.2 Council s Values...
Core Infrastructure Risk Management Plan
SHIRE OF MOUNT MAGNET Roads and Buildings Core Infrastructure Risk Management Plan Version 1 May 2013 AM4SRRC Document Control Asset Management for Small, Rural or Remote Communities Document ID: 59_280_110211
University of New England Compliance Management Framework and Procedures
University of New England Compliance Management Framework and Procedures Document data: Document type: Administering entity: Framework and Procedures Audit and Risk Directorate Records management system
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY ENTERPRISE RISK MANAGEMENT FRAMEWORK
THE SOUTH AFRICAN HERITAGE RESOURCES AGENCY ENTERPRISE RISK MANAGEMENT FRAMEWORK ACCOUNTABLE SIGNATURE AUTHORISED for implementation SIGNATURE On behalf of Chief Executive Officer SAHRA Council Date Date
POL ENTERPRISE RISK MANAGEMENT SC51. Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT:
POL ENTERPRISE RISK MANAGEMENT SC51 POLICY CODE: SC51 DIRECTORATE: Executive Services Department BUSINESS UNIT: Executive Support Services SERVICE UNIT: Executive Support Services RESPONSIBLE OFFICER:
CONTROLLED DOCUMENT. Number: Version Number: 4. On: 25 July 2013 Review Date: June 2016 Distribution: Essential Reading for: Information for:
CONTROLLED DOCUMENT Risk Management Strategy and Policy CATEGORY: CLASSIFICATION: PURPOSE: Controlled Number: Document Version Number: 4 Controlled Sponsor: Controlled Lead: Approved By: Document Document
Health, Safety and Environment Management System
Health, Safety and Environment Management System For Bridgeport Energy Ltd Level 7, 111 Pacific Highway North Sydney 2011 June, 2010 DOCUMENT CONTROL Title: Document Number: Health, Safety and Environmental
Risk Management Policy Adopted by:
Risk Management Policy Adopted by: Infigen Energy Limited Infigen Energy (Bermuda) Limited Infigen Energy RE Limited in its capacity as Responsible Entity of Infigen Energy Trust Adopted: 17 December 2009
An Introduction to Risk Management. For Event Holders in Western Australia. May 2014
An Introduction to Risk Management For Event Holders in Western Australia May 2014 Tourism Western Australia Level 9, 2 Mill Street PERTH WA 6000 GPO Box X2261 PERTH WA 6847 Tel: +61 8 9262 1700 Fax: +61
Insurance management policy and guidelines. for general government sector, September 2007
Insurance management policy and guidelines for general government sector September 2007 i Contents 1. Introduction... 2 2. Identifying risk is the first step... 2 3. What is risk?... 2 4. Insurance is
Risk Management. Policy
Policy Risk Management Endorsed: 26 February 2014 Brief description The GPC Risk Management Policy and its supporting standards and procedures provide a framework to ensure that risks arising from our
Board of Directors Meeting 12/04/2010. Operational Risk Management Charter
Board of Directors Meeting 12/04/2010 Document approved Operational Risk Management Charter Table of contents A. INTRODUCTION...3 I. Background...3 II. Purpose and Scope...3 III. Definitions...3 B. GOVERNANCE...4
NSW Government Digital Information Security Policy
NSW Government Digital Information Security Policy Version: 1.0 Date: November 2012 CONTENTS PART 1 PRELIMINARY... 3 1.1 Scope... 3 1.2 Application... 3 1.3 Objectives... 3 PART 2 CORE REQUIREMENTS...
KING III CORPORATE GOVERNANCE COMPLIANCE REGISTER
KING III CORPORATE GOVERNANCE REGISTER CHAPTER 1: ETHICAL LEADERSHIP AND CORPORATE CITIZENSHIP NON 1.1. The board should provide effective leadership based on an ethical foundation 1.2. The board should
Integrated Risk Management Policy
Integrated Management Policy Document reference number Document developed by Quality and Patient Safety Directorate Revision number 4 Document approved by Quality and Patient Safety Directorate Approval
SAFETY and HEALTH MANAGEMENT STANDARDS
SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents
Operational Risk Management Policy
Operational Risk Management Policy Operational Risk Definition A bank, including a development bank, is influenced by the developments of the external environment in which it is called to operate, as well
Version: 3.0. Effective From: 19/06/2014
Policy No: RM66 Version: 3.0 Name of Policy: Business Continuity Planning Policy Effective From: 19/06/2014 Date Ratified 05/06/2014 Ratified Business Service Development Committee Review Date 01/06/2016
SAI GLOBAL LIMITED Risk Management Policy
SAI GLOBAL LIMITED Risk Management Policy SAI Global Ltd ABN 67050611642 Last Updated: February 2012 Contents 1. Risk Management... 3 2. Policy... 3 3. Risk Management Philosophy... 3 4. Risk Appetite...
Application of King III Corporate Governance Principles
APPLICATION of KING III CORPORATE GOVERNANCE PRINCIPLES 2013 Application of Corporate Governance Principles This table is a useful reference to each of the principles and how, in broad terms, they have
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1
Work Health & Safety Policy Document Number: WH&S 023 003 Ver 1 Approved by: Senior Leadership Team Page 1 of 7 POLICY OWNER: Human Resources PURPOSE: To ensure, so far as is reasonably practicable, that
Discipline: Technical Services Category: Procedure. Risk Management RM-01 2013. Applicability. ARTC Network Wide. Interstate Network.
Discipline: Technical Services Category: Procedure Risk Management RM-01 2013 Applicability ARTC Network Wide Interstate Network Hunter Valley Document Status Version Prepared by Reviewed by Endorsed Approved
Hazard Identification, Risk Assessment and Control Procedure
Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and
Risk Management Policy
Risk Management Policy Responsible Officer Author Ben Bennett, Business Planning & Resources Director Julian Lewis, Governance Manager Date effective from December 2008 Date last amended December 2012
Application of King III Corporate Governance Principles
Application of Corporate Governance Principles Application of Corporate Governance Principles This table is a useful reference to each of the principles and how, in broad terms, they have been applied
Capital Adequacy: Advanced Measurement Approaches to Operational Risk
Prudential Standard APS 115 Capital Adequacy: Advanced Measurement Approaches to Operational Risk Objective and key requirements of this Prudential Standard This Prudential Standard sets out the requirements
Reserve Bank of Fiji Insurance Supervision Policy Statement No. 8 MINIMUM REQUIREMENTS FOR RISK MANAGEMENT FRAMEWORKS OF LICENSED INSURERS IN FIJI
Reserve Bank of Fiji Insurance Supervision Policy Statement No. 8 NOTICE TO INSURANCE COMPANIES LICENSED UNDER THE INSURANCE ACT 1998 MINIMUM REQUIREMENTS FOR RISK MANAGEMENT FRAMEWORKS OF LICENSED INSURERS
ENTERPRISE RISK M A NAGEMENT POLICY
Tablelands Regional Council ENTERPRISE RISK M A NAGEMENT POLICY Draft Final Policy No: PD 3.3.1 File ref: PD 3.3.1 Policy Section: INSURANCE AND RISK MANAGEMENT Version: 1 Date Adopted: 7 July 2010 Review
ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN
ANSTO Nuclear Medicine Facility Construction Licence Application Document ANM-Mo99-C-LA-D2 rev 0 ANSTO NUCLEAR MEDICINE Mo99 FACILITY CONSTRUCTION LICENCE SAFETY MANAGEMENT PLAN Prepared By Australian
A guide for members APES 325 Risk Management for Firms
A guide for members APES 325 Risk Management for Firms An explanation and introduction to APES 325 Risk Management for Firms Overview of the scope and application of a risk management framework. APES 325
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM
HEALTH SAFETY & ENVIRONMENT MANAGEMENT SYSTEM September 2011 OUR HEALTH, SAFETY AND ENVIRONMENT POLICY OUR PRINCIPLE OF DUE CARE We care about the wellbeing of our people and our impact on the environment.
Risk Management - Enterprise-Wide Risk Management Policy and Framework NSW Health
Policy Directive Ministry of Health, NSW 73 Miller Street North Sydney NSW 2060 Locked Mail Bag 961 North Sydney NSW 2059 Telephone (02) 9391 9000 Fax (02) 9391 9101 http://www.health.nsw.gov.au/policies/
A Guide to Corporate Governance for QFC Authorised Firms
A Guide to Corporate Governance for QFC Authorised Firms January 2012 Disclaimer The goal of the Qatar Financial Centre Regulatory Authority ( Regulatory Authority ) in producing this document is to provide
Financial Management Framework >> Overview Diagram
June 2012 The State of Queensland (Queensland Treasury) June 2012 Except where otherwise noted you are free to copy, communicate and adapt this work, as long as you attribute the authors. This document
Health and Safety Management Standards
Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...
Bridgend County Borough Council. Corporate Risk Management Policy
Bridgend County Borough Council Corporate Risk Management Policy December 2014 Index Section Page No Introduction 3 Definition of risk 3 Aims and objectives 4 Strategy 4 Accountabilities and roles 5 Risk
APPLICATION OF KING III CORPORATE GOVERNANCE PRINCIPLES 2014
WOOLWORTHS HOLDINGS LIMITED CORPORATE GOVERNANCE PRINCIPLES 2014 CORPORATE GOVERNANCE PRINCIPLES 2014 CORPORATE GOVERNANCE PRINCIPLES 2014 This table is a useful reference to each of the King III principles
Release 1. BSBPMG415A Apply project risk-management techniques
Release 1 BSBPMG415A Apply project risk-management techniques BSBPMG415A Apply project risk-management techniques Modification History Release Release 1 Comments This version first released with BSB07
Enterprise Risk Management Framework 2012 2016. Strengthening our commitment to risk management
Enterprise Risk Management Framework 2012 2016 Strengthening our commitment to risk management Contents Director-General s message... 3 Introduction... 4 Purpose... 4 What is risk management?... 4 Benefits
Compliance Review Report Internal Audit and Risk Management Policy for the New South Wales Public Sector
Compliance Review Report Internal Audit and Risk Management Policy for the New South Wales Public Sector Background The Treasury issued TPP 09-05 Internal Audit and Risk Management Policy for the New South
COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES
COMPLIANCE FRAMEWORK AND REPORTING GUIDELINES DRAFT FOR CONSULTATION June 2015 38 Cavenagh Street DARWIN NT 0800 Postal Address GPO Box 915 DARWIN NT 0801 Email: [email protected] Website:
GUIDELINES ON RISK MANAGEMENT AND INTERNAL CONTROLS FOR INSURANCE AND REINSURANCE COMPANIES
20 th February, 2013 To Insurance Companies Reinsurance Companies GUIDELINES ON RISK MANAGEMENT AND INTERNAL CONTROLS FOR INSURANCE AND REINSURANCE COMPANIES These guidelines on Risk Management and Internal
Hazard Identification, Risk Assessment and Control Management
The Paraplegic and Quadriplegic Association of SA Inc Hazard Identification, Risk Assessment and Control Management STATEMENT The Paraplegic and Quadriplegic Association of South Australia Incorporated
RISK MANAGEMENT FOR INFRASTRUCTURE
RISK MANAGEMENT FOR INFRASTRUCTURE CONTENTS 1.0 PURPOSE & SCOPE 2.0 DEFINITIONS 3.0 FLOWCHART 4.0 PROCEDURAL TEXT 5.0 REFERENCES 6.0 ATTACHMENTS This document is the property of Thiess Infraco and all
KUMBA IRON ORE LIMITED (Registration number 2005/015852/06) ( Kumba or the Company )
KUMBA IRON ORE LIMITED (Registration number 2005/015852/06) ( Kumba or the Company ) RISK COMMITTEE ( the committee ) TERMS OF REFERENCE 1. CONSTITUTION 1.1 In line with the recommendations of the King
NZ Transport Agency Page 1 of 23
NZ Transport Agency Page 1 of 23 Risk Management 1 Introduction The Highways and Network Operations (HNO) group supports the NZ Transport Agencies strategic objectives through the delivery of Capital Projects
Pocket Guide to Clinical Risk Management
TOOLKIT FOR MANAGING RISK IN HEALTH CARE TOOLKIT Pocket Guide to Clinical Risk Management ACKNOWLEDGEMENTS The Pocket Guide to Clinical Risk Management is designed to support Area Health Service Executives
PROCEDURES RISK MANAGEMENT FRAMEWORK AND GUIDELINES PURPOSE INTRODUCTION. 1 What is Risk?
PROCEDURES RISK MANAGEMENT FRAMEWORK AND GUIDELINES PURPOSE This Framework and Guidelines have been developed in support of the CQUniversity Risk Management Policy and are intended for use by the CQUniversity
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM
13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM This ESIA has identified impacts (both positive and negative) to the physical, natural and socio-economic environments, as well as to community and worker
Policy. VBA Enterprise Risk Management. Governance Unit
Policy VBA Enterprise Risk Management Governance Unit Keywords: Policy; risk; governance. ID: Version no: Status: VBAPOL-0074 2.0 Final Issue date: Date of effect: Next review date: 14/07/2015 14/07/2015
Risk Management Policy
Risk Management Policy DOCUMENT CONTROL Developed by: Date: Origination: Quality, Systems & Shared s March 2014 Authorised by: Colette Kelleher April 2014 DOCUMENT REVIEW HISTORY Original Circulation date:
Better Practice Guide
Better Practice Guide June 2008 Risk Management COMCOVER Commonwealth of Australia 2008 ISBN 1 921182 78 4 print ISBN 1 921182 79 2 online Department of Finance and Deregulation This work is copyright.
Risk Management Framework
Risk Management Framework Mandate and commitment Design of framework for managing risks Continual improvement of the framework Implementing risk management Monitoring and review of the framework Source:
Safety Management Systems (SMS) guidance for organisations
Safety and Airspace Regulation Group Safety Management Systems (SMS) guidance for organisations CAP 795 Published by the Civil Aviation Authority, 2014 Civil Aviation Authority, CAA House, 45-59 Kingsway,
Safety Management System (SMS) Guidelines
Safety Management System (SMS) Guidelines Pursuant to section 9D (2) (c) of the Passenger Transport Act 1990 For Bus and Coach Operators in NSW Roads and Maritime Services Level 5, 27-31 Argyle Street
RISK MANAGEMENT POLICY
RISK MANAGEMENT POLICY Nuffield College s Risk Management Policy defines the College's approach to risk and how risk management should be embedded into management processes to ensure that the major risks
APPLICATION OF THE KING III REPORT ON CORPORATE GOVERNANCE PRINCIPLES
APPLICATION OF THE KING III REPORT ON CORPORATE GOVERNANCE PRINCIPLES Ethical Leadership and Corporate Citizenship The board should provide effective leadership based on ethical foundation. that the company
Business Resilience and Risk Management
Policy Business Resilience and Risk Management Document Number GOV-POL-37 1.0 Policy Statement Stanwell is committed to delivering a business resilience platform across all levels of the business and its
Avondale College Limited Enterprise Risk Management Framework 2014 2017
Avondale College Limited Enterprise Risk Management Framework 2014 2017 President s message Risk management is part of our daily life, something we do regularly; often without realising we are doing it.
AMP Capital Investors Limited ABN 59 001 777 591 AFSL 232497. AMP Capital Derivatives Risk Statement
AMP Capital Investors Limited ABN 59 001 777 591 AFSL 232497 AMP Capital Derivatives Risk Statement April 2015 Table of Contents 1. Responsible party... 3 2. Objective of the DRS... 3 3. Definition of
Service Risk Assessment. Consultant PQC
Service Risk Assessment Consultant PQC For further information or additional copies of this document contact either: Principal Policy Manager Building Policy Unit Works Division Telephone 07 3224 5482
Board Charter. May 2014
May 2014 Document History and Version Control Document History Document Title: Board Charter Document Type: Charter Owner: Board [Company Secretary] Description of content: Corporate Governance practices
Procurement of Goods, Services and Works Policy
Procurement of Goods, Services and Works Policy Policy CP083 Prepared Reviewed Approved Date Council Minute No. Procurement Unit SMT Council April 2016 2016/0074 Trim File: 18/02/01 To be reviewed: March
Mandatory Provident Fund Schemes Authority COMPLIANCE STANDARDS FOR MPF APPROVED TRUSTEES. First Edition July 2005. Hong Kong
Mandatory Provident Fund Schemes Authority COMPLIANCE STANDARDS FOR MPF APPROVED TRUSTEES First Edition July 2005 Hong Kong Contents Glossary...2 Introduction to Standards...4 Interpretation Section...6
Northern Ireland Blood Transfusion Service
Northern Ireland Blood Transfusion Service Risk Management Strategy Northern Ireland Blood Transfusion Service Lisburn Road Belfast BT9 7TS Telephone No. 028 9032 1414 www.nibts.org Page 1 of 12 CONTENTS
DRAFT May 2012. Objective and key requirements of this Prudential Standard
Prudential Standard GPS 230 Reinsurance Management Objective and key requirements of this Prudential Standard This Prudential Standard requires a general insurer and a Level 2 insurance group to maintain,
Internal Audit Terms of Reference
Internal Audit Terms of Reference Introduction 1. The Internal Audit Terms of Reference (ToR) describes the framework within which the Internal Audit Service is delivered. It is intended to act as a guide
Risk Management Policy
Risk Management Policy Risk Management Policy Record Number D14/79827 Responsible Manager Manager Strategy and Governance Last reviewed 10 March 2015 Adoption reference Council Resolution number 90.5 Previous
Hazard Identification, Risk Assessment And Control Procedure
Hazard Identification, Risk Assessment And Control Procedure 1. Purpose 1.1 To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage hazards
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
. Board Charter - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1. Interpretation 1.1 In this Charter: Act means the Companies
Quality Manual Quality Management System Description
Australian Government Security Vetting Agency Quality Manual Quality Management System Description Commonwealth of Australia 2013 This work is copyright. Apart from any use as permitted under the Copyright
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy
Waveney Lower Yare & Lothingland Internal Drainage Board Risk Management Strategy and Policy Page: 1 Contents 1. Purpose, Aims & Objectives 2. Accountabilities, Roles & Reporting Lines 3. Skills & Expertise
Telstra Corporation Limited ABN 33 051 775 556 Standard Terms and Conditions of Purchase Order
Telstra Corporation Limited ABN 33 051 775 556 Standard Terms and Conditions of Purchase Order APPLICATION These Terms and Conditions apply to the Purchase Order unless the Purchase Order refers to a formal
Risk management systems of responsible entities
Attachment to CP 263: Draft regulatory guide REGULATORY GUIDE 000 Risk management systems of responsible entities July 2016 About this guide This guide is for Australian financial services (AFS) licensees
TRUST SECURITY MANAGEMENT POLICY
TRUST SECURITY MANAGEMENT POLICY EXECUTIVE SUMMARY The Board recognises that security management is an integral part of good, effective and efficient risk management practise and to be effective should
RISK MANAGEMENT STRATEGY 2013-2016
RISK MANAGEMENT STRATEGY 2013-2016 As presented and endorsed by the Mornington Peninsula Shire s Audit Committee at its meeting of 20 February, 2013 and subsequent adoption by Council at its meeting of
How To Manage Safety Risk In Aviation
4 AVIATION RISK MANAGEMENT AN INTRODUCTION Civil AVIATION AuthORITy of New Zealand BOOKLET FOUR PUBLISHED: JUNE 2013 Preface The Civil Aviation Authority (CAA) published Advisory Circular AC00-4 Safety