1 GAME PLAN: Framework for Flood Risk Reduction in the Galveston Bay Area VERSION 1 December 5, 2014 Working document, draft Main report written and edited by: S.N. (Bas) Jonkman (TU Delft), Mathijs van Ledden (RHDHV & TU Delft) Kasper Lendering (TU Delft), Leslie Mooyaart (RHDHV & TU Delft), Bill Merrell (Texas A&M Galveston), Arno Willems (Iv Infra). With contributions from: Samuel Brody (Texas A&M Galveston), Kayode Atoba (Texas A&M Galveston), Wes Highfield (Texas A&M Galveston), Russell Blessing (Texas A&M Galveston), Jens Figlus (Texas A&M Galveston), Galen Newman (Texas A&M Galveston), Eric Bardenhagen (Texas A&M Galveston), Bruce Ebersole (Jackson State University), Tom Richardson (Jackson State University), Antonia Sebastian (Rice University), Robert Gilmer (Bauer College of Business, Univ. of Houston) and Adam Perdue (Bauer College of Business, Univ. of Houston).

2 GAME PLAN Flood Risk Reduction for the Galveston Bay area Table of contents Table of contents... 2 Section 1 Introduction Background Purpose of the game plan Status of the Ike Dike concept... 5 Section 2 Framework for risk reduction for the Galveston Bay area General Lessons from earlier large-scale coastal interventions National Research Council Report Integrated Risk Reduction framework Application to Galveston Bay area Section 3. Ike Dike Research program Coastal Barrier Solution Natural system Houston-Galveston Society Flood risk Section 4. Outlook and recommendations Short-term focus: Indicative Costs and Benefits Coastal Barrier Plan (March 2015) Mid-term focus: Comprehensive Feasibility Study Coastal Barrier Plan (July/August 2015) Long-term focus: Integrated Risk Reduction Study for the Houston/Galveston area (July/August 2016) List of references This report includes a separate Appendix which contains summaries of research done related to the coastal barrier solution for surge suppression in the Galveston Bay. Figure on front cover: K. Stoeten (2013) 2

3 GAME PLAN Flood Risk Reduction for the Galveston Bay area Section 1 Introduction Background The Galveston Bay Area has a large human population, a thriving economy that is vital to Texas and the United States, and contains the most biologically productive ecosystem in the Gulf of Mexico. The three counties that surround the Bay (Chambers, Galveston, and Harris) have a combined population of over 4.4 million people making Galveston Bay the most heavily populated watershed in the Gulf Region. Major ship channels run through Galveston Bay serving the ports of Galveston, Texas City and, of course, Houston. The Port of Houston is the busiest export port in the nation generating $178 billion of total economic impact annually. Galveston Bay s industrial complex contains the largest petrochemical complex in the United States and is of national strategic importance. A report by the Perryman Group for the Independent Insurance Agents of Texas found that a Katrina-like storm that hit the Port of Houston area would result in the losses of$73 billion of gross product over 800,000 permanent jobs and about $2.5 billion in state revenue. Galveston Bay is also home to a large and productive estuary. The waters, flora and fauna of the Bay drive commercial and recreational activity including commercial and recreational fisheries, ecotourism, bird watching, hunting and boating. The Galveston Bay Estuary Program estimates that over 55,847 hectares (138,000 acres) of coastal wetlands exist around the Bay. These coastal wetlands serve as habitat for the many harvestable species found in the Bay and open Gulf waters. It is in the Federal interest and the State interest to protect both the economic vitality and the valuable ecosystem services provided by the Bay region s built infrastructure and natural resources. Hurricane Ike showed that both are vulnerable to storm surge. Hurricane Ike caused over $30 billion in damages to the Houston/Galveston region. Ike also devastated the natural environment; for example, killing over half the Bay s oyster population and salt poisoning fauna as far as twenty miles inland. Many areas have not yet recovered and, although those of us who lived through Ike think of it as a severe storm, it could have been much worse. The storm tract forecast on the morning of September 12 th would have placed Ike s landfall to the west of Galveston forcing the maximum winds and surge over the Island. Had Ike stayed on this officially forecast track, the storm damages would have been about $100B and thousands would have died instead of the dozens who lost their lives during Ike. 1 This section has been written by dr. Bill Merrell. 3

4 GAME PLAN Flood Risk Reduction for the Galveston Bay area Figure 1: The Maeslant Barrier at the entrance of the Port of Rotterdam, the Netherlands protecting the Rotterdam area from storm surges at the North Sea. Large scale flood protection systems and surge barriers such as those long-used in Europe and now newly constructed in New Orleans provide proven defences against storm surge. A properly designed, constructed and maintained flood protection system will provide protection for the Galveston/Houston region and significantly reduce the risk. 1.2 Purpose of the game plan This document, a working game plan for Ike Dike research, is designed to evolve and serve a number of purposes. In its present early form (Version 1), it consists of brief reports of more or less individual studies which are focused on a specific aspect of the Coastal Barrier (Ike Dike) overall project. As such, it serves as a means of conveying the progress and rough plans of individual researchers to all Ike Dike researchers. A specific use of Version 1 is to provide a starting point for the December 14, 15 and 16 (2014) meeting of all Ike Dike researchers. A secondary mission of this and subsequent versions is to keep stakeholders and funders fully informed about Ike Dike research progress and plans. After the December researchers meeting, the team will prepare Version 2 of the game Plan. Version 2 will consist of the individual reports as modified by discussions and interactions at the December researchers meeting as well as new multi-investigator sections that integrate pertinent individual studies into a combined approach to achieve specific research goals necessary to produce an initial, credible cost/benefit analysis for the Galveston Bay region. Version 2 will also contain descriptions of Ike Dike-related projects that are not strongly connected to the initial cost benefit analysis but important to eventually produce better cost/benefit analyses, understand the Barriers effects on the region s natural resources, 4

5 GAME PLAN Flood Risk Reduction for the Galveston Bay area future growth configurations and communal and social issues. Appendices will be included to provide more detailed descriptions and links to publications, theses, and formal reports produced by Ike Dike research groups. It will also serve as the starting point for subsequent Ike Dike research planning and in particular the next meeting of the research team. 1.3 Status of the Ike Dike concept The Ike Dike research group at Texas A&M University at Galveston has formed strategic partnerships with the Bay Area Houston Economic Partnership (BAHEP) and the Bay Area Coastal Protection Alliance (BACPA). The role of Texas A&M Galveston is to develop and disseminate information regarding the coastal barrier concept in a manner appropriate for a public university. BAHEP has been active in working with local communities and decision makers on the Ike Dike concept and advocating its further development and eventual construction. BACPA is a 501c3 advocating surge protection for the Galveston Bay region and funds coastal barrier public outreach through BAHEP and research to Texas A&M and its research partners. The three entities have agreed on The Ike Dike Concept A Coastal Barrier Protection System as a name for the surge protection strategy. So far 20 cities and 10 economic development organizations in the Galveston Bay region have endorsed the Ike Dike concept as the preferred strategy for surge suppression. A recent development in advancing the Ike Dike concept is interest by the State of Texas. Last session the Texas legislature formed a special joint committee co-chaired by Senator Larry Taylor and Representative Joe Deshotel to examine a coastal barrier system. Senator Taylor and Representative Deshotel have been through in studying the importance of the issue to Texas through hearings and have made trips to the Netherlands and New Orleans to examine the feasibility and appearance of existing barriers. Because the businesses around Galveston Bay are Texas s biggest economic driver and Galveston Bay is its most productive estuary, it is clearly in the State s interest to see them protected. The joint committee will produce its first report soon. Game plan - SSPEED Center statement Another recent development in Galveston Bay surge suppression research is an agreement between the SSPEED Center at Rice University and Texas A&M University at Galveston to work more closely together. So far, the two research groups have agreed to the following statement. The SSPEED Center at Rice University and Texas A&M University at Galveston have been studying strategies for surge suppression for the Galveston Bay Region. SSPEED had been concentrating its efforts on suppressing surge using barriers internal to the Bay system and non-structural alternatives, while Texas A&M Galveston has concentrated on methods to stop the surge at the coast using a continuous coastal barrier the Ike Dike concept. Both Texas A&M Galveston and the SSPEED Center will continue their research efforts, while collaborating with each other, with an eye towards ultimately combining their various strategies to achieve the best overall solution for the region from an economic, environmental and social perspective. 5

6 GAME PLAN Flood Risk Reduction for the Galveston Bay area The SSPEED Center and Texas A&M University at Galveston will coordinate their modelling work and analyses so that the knowledge gained by all efforts can be shared and utilized to more efficiently and effectively reach the development of a regional surge defence strategy for the entire Houston-Galveston area. Each institution is committed to finding the best overall solution for the entirety of Galveston Bay and will work together to achieve that result. As the two groups work together, more synergies and common interests will appear. It is in everyone s interest to see that the very best academic research and thinking is fully included in the actionable plans developed for suppressing surge in the Galveston Bay region. As one step in this process, SSPEED researchers have been invited to participate in the December 14-17, 2014 meeting of Ike dike researchers. 6

7 GAME PLAN Flood Risk Reduction for the Galveston Bay area Section 2 Framework for risk reduction for the Galveston Bay area 2.1 General This section provides an outline of a general framework for an integrated feasibility study of risk reduction in the Houston Galveston bay. The framework shows the most relevant aspects and interactions which need to be addressed for considering such large-scale strategic interventions. It is used in Section 3 to address current knowledge and studies to date / identify gaps in our current knowledge and present a roadmap for further work in Section 4. In Section 2, we first highlight lessons from earlier and comparable large-scale coastal interventions in the Netherlands (e.g. the Eastern Scheldt and Maeslant barriers). Next, we develop a framework for considering risk reduction of large-scale coastal protection systems. 2.2 Lessons from earlier large-scale coastal interventions Various large scale integrated coastal interventions from the Netherlands (Zuiderzee werken, Deltawerken, Room for Rivers) have been briefly reviewed to determine lessons learned in terms of vision, flood risk concepts and design approach. Some main conclusions are summarized below including some reflections with regards to the Ike Dike/Coastal Barrier: Vision/purpose The large-scale Dutch interventions for flood management in 20 th century (Zuiderzeewerken, Deltawerken, Ruimte voor de Rivier) are characterized by a multi-purpose vision for the area of interest. Flood risk reduction was (and still is) the most important objective, but improving fresh water supply, creating better road connections, nature restoration and economic development of reclaimed land have been purposes of these plans as well. So far, the Coastal Barrier/Ike Dike solution has been mainly focused on flood risk reduction thus far. It might be considered to widen this viewpoint and include other interests more prominently in the overarching vision/purpose of the Ike Dike. Examples are the improvement of the ecosystem in the bay and the significant reduction of flood insurance premiums due to improved protection of homes in the region Flood Risk Reduction A cornerstone of the various Dutch interventions has been the use of a risk-based decision framework. This framework was developed after the 1953 flood disaster and has been applied to define flood safety standards for the Netherlands. In this framework, the costs or investments of upgrading the protection level (through prevention measures) are compared to the benefits, consisting of the reduction in risk (= probability x consequences). An optimal safety level can be found at which the total costs of the systems are minimal (i.e. economic optimum). It is noted that these safety levels are different for different sub-systems in the Netherlands. A similar approach may be considered for the Galveston Bay area to determine an adequate level of protection for the proposed intervention, and to justify benefits and costs. 7

8 GAME PLAN Flood Risk Reduction for the Galveston Bay area Textbox: Risk, CBA and economic optimization Several definitions of risk exist, but in this document risk is considered as the product of flood frequency (per year) and flooding impacts. Several types of flood impacts should be considered in planning and risk analysis, such as life loss and economic, environmental and societal impacts. The focus in current studies is on economic risk, meaning that risk can be expressed in $/year or as a net present value in dollars. This also implies that the costs of a certain risk reduction scheme can be compared with the benefits of risk reduction. All these items can thus be expressed in monetary terms. In addition to economic risk (reduction), risk to life can be considered as a separate perspective. For example, one of the leading criteria for deriving the new flood defence standard in the Netherlands (introduced in 2014) has been a threshold for individual fatality risk of 1/100,000 per year. In addition, criteria have been derived by USACE and USBR for dams based on societal risk, the probability of exceedance of multi-fatality events. A key question in designing and planning flood management systems is the level of protection (or safety standard) that a system should provide. Upgrading the safety level (or flood protection level) will require increasing investments. These investments will contribute to a reduction of the risk (probability x consequences). Since both items are expressed in monetary terms, the risk reduction benefits can be compared with the costs of the risk reduction measures. It is noted that in some countries with limited budgets for flood management, e.g. in the UK, Benefit Cost (B/C) ratios of more than 3 to 5 are required to invest in projects. In addition, an optimal level of protection can be found (see figure below) in which the total costs of both investments and risks are minimal. This analysis was made in the 1960 s to derive the safety standards for the flood defences in the Netherlands, which has resulted in the 1/10,000 per year protection level for the most valuable areas along the coast. Results of cost benefit analysis and optimization will also be dependent on the discounting rate and the optimization period that are chosen for determining the net present value of risk reduction benefits. Figure 2: Approach for economic optimization 8

9 GAME PLAN Flood Risk Reduction for the Galveston Bay area The Dutch interventions along the coast are based on the concept of shortening the coastline by closing off large estuaries/tidal basins permanently (for example the Zuiderzee (sea) became lake IJssel) or during a storm only (Eastern Scheldt, Haringvliet, Rotterdam area). A similar strategy was followed in New Orleans after Hurricane Katrina by closing off the 17 th Street and London Avenue drainage canals and building a storm surge barrier in the Inner Harbour Navigation Canal (IHNC). The major barrier plans in the Netherlands have been motivated based on comparisons of closing or shortening the coastline with other flood risk reduction alternatives at strategic level. For example, the Eastern Scheldt storm surge barrier alternative ( semi-closed system ) was compared with raising the levees along the Eastern Scheldt ( open system ) and building a dam in the opening of the Eastern Scheldt ( fully closed system ). A similar study has been carried out in the past for the Rotterdam area in the decision-making process of the Maeslant Barrier (see textbox below). Textbox: Protection of the greater Rotterdam area: barrier vs. dike reinforcement After the disastrous flood of 1953 in the South-Western part of the Netherlands, the Delta plan was made. This textbox will explain why a barrier is chosen to protect the greater Rotterdam area. More information on other barriers is included in the appendix. Initially, it was intended to strengthen the levees near Rotterdam and Dordrecht to protect these cities against coastal floods. In the 1980s, however, levee strengthening proved to be very difficult, due to housing in and near levees. To avoid this costly way of protecting against floods, the Dutch government studied the possibility of a storm surge barrier in the New Waterway. The study showed that constructing a storm surge barrier had many advantages: the costs were lower and more accurate; the construction period was shorter and more certain; the length of the primary coastal defence was shorter, and the impact on environment and culture was limited. Table 3 presents the main results of the EIA. Table 1: Results EIA (see appendix) Based on the EIA, the Dutch Government chose to construct a storm surge barrier. As technical feasibility of a storm surge barrier was doubted, a contest between contractors was held. Five contractors were invited to submit designs and budgets. The first of October in 1987, only three months after the contest was initiated, six designs were received (see Figure 3) the year 1988 was used to draw up the environmental impact assessment (EIA) and to develop some of the designs in more detail (Rijkswaterstaat, 2014). The design with two floating sector doors prevailed, as maintenance of this option is relatively easy. The barrier was constructed between 1989 and Although it is closed yearly for testing, there has been only one closure required to prevent flooding during its operation. 9

10 GAME PLAN Flood Risk Reduction for the Galveston Bay area Figure 3: Maeslant barrier designs proposed by contractor Design approach The planning and design of large flood protection structures includes the traditional steps, viz. setting design objectives, requirements and boundary conditions, defining alternatives, investigating impacts and costs and selecting a preferred alternative. This process has an iterative character: it converges towards an optimal solution. The impacts on the ecosystem of (partly) closing off tidal basins in the Netherlands have been (and are still) a major concern. Since the Coastal Barrier concept also includes a partial closure of Galveston Bay, potential negative impacts on the ecosystem and associated functions of this system need to be studied in detail to minimize negative impact and/or find proper mitigation or even improving strategies. Another important lesson from the planning Netherlands is that public perception and support are extremely important to successfully realize these plans. For example, the design of the Eastern Scheldt barrier (initially proposed as a closed dam) was totally changed during the construction phase after environmental concerns were raised against this option, causing years of delay Integrated assessment tools Detailed modelling of alternatives with state-of-the-art modelling tools is generally an important component of planning and design studies. Numerical modelling is often applied to investigate the impacts of interventions on the natural processes such as hydrodynamics, morphology, ecology, etc. Also, modelling is applied to estimate the benefits of coastal interventions through analysis of the (prevented) economic damage and also more recently estimating the reduction in loss of life. A lesson learned from the Room for Rivers and Delta programs in the Netherlands is the benefit of an integrated assessment tool in which all modelling efforts are combined and visualized by a dashboard. Such an integrated tool is a very powerful way of showing the impacts of multiple interventions on the overarching objective(s). It appears to be a very effective way for communication with a wider public including communities and decision makers. A good example of an integrated assessment tool is the planning kit ( in Dutch: blokkendoos ) developed for the Room for Rivers program. It contains a database with the results of time-consuming detailed hydraulic models, together with situation sketches, aerial photographs, cost estimates, ecological effects, etc. This tool allows the user to make a 10

11 GAME PLAN Flood Risk Reduction for the Galveston Bay area selection among all the available measures and immediately visualize the result of implementing these measures. The Planning Kit has proven to be very effective in facilitating discussion in the planning, design and decision making phases for the Rhine River. Another example of an integrated assessment tool that is more focused on risk reduction is the Simdelta dashboard visualized in figure 4. For the Rotterdam area it shows which levee sections are safe and not safe for a given intervention and future scenario. Figure 4: Screenshot of Simdelta (developed by T. Rijcken). 2.3 National Research Council Report In the last decade, the United States have faced severe hurricanes (Katrina in New Orleans, Ike in Houston, Sandy in New York/New Jersey) with very significant damage and loss of life. The United States National Research Council released a report recently, Reducing Coastal Risks on the East and Gulf Coasts, which contains a number of conclusions directly pertinent to surge suppression strategies in the Houston- Galveston region. The study was funded by the USACE. In particular the following three conclusions are important and fully supportive of our larger strategy of flood risk reduction as well as Coastal/Barrier Ike Dike research. Hard structures are likely to become increasingly important to reduce coastal risk in densely populated urban areas. Many large coastal cities lack the space necessary to take advantage of nature-based risk reduction approaches alone and will instead need additional hard structures to substantially reduce coastal hazards. Adverse environmental impacts commonly accompany the construction of hard structures, although modified designs are possible to reduce these effects. Coupling nature-based approaches with hard structures to buffer the structures against wave attack provides an effective coastal risk reduction strategy if space allows. There is no solid basis of evidence to justify a default 1-percent annual chance (100-year) design level of coastal risk reduction. The 100-year flood criterion used in the National Flood Insurance Program was established for management purposes, not to 11

12 GAME PLAN Flood Risk Reduction for the Galveston Bay area achieve an optimal balance between risk and benefits. There is also no evidence that reducing risk to a 1-percent-annual-chance event is in the best interests of society or that this level is necessarily acceptable to the general public. This level of risk reduction may be appropriate in some settings, unwarranted or excessive in others, and inadequate in highly developed urban areas. Such decisions should, instead, be informed by risk-constrained benefit-cost analyses reflecting site-specific conditions. Benefit-cost analysis constrained by acceptable risk and social and environmental dimensions provides a reasonable framework for evaluating coastal risk management investments. Investments in coastal risk reduction should be informed by net benefits, which include traditional risk reduction benefits (e.g., reduced structural damages, reduced economic disruption) and other benefits (e.g., life-safety, social, and environmental benefits), minus the costs of investment in risk reduction and environmental costs. However, because it is difficult to quantify and monetize some benefits and costs, it is important to expand the analysis to include considerations of difficult-to-measure benefits or costs through constraints on what is considered acceptable in social, environmental, and risk reduction dimensions. Such unacceptable levels of risk may include a level of individual risk of fatality, the risk of a large number of deaths from a single event (societal risk), or adverse impacts on social and environmental conditions that may be difficult to quantify in monetary terms. It is difficult, however, to establish societally acceptable risk standards and requires extensive stakeholder engagement. Setting such a standard requires value judgments, on which not all individuals or groups will necessarily agree. Comparing the aforementioned conclusions by the NRC with the lessons learnt from earlier large-scale coastal interventions in the Netherlands (see section 2.2), one can find several similarities. The necessity of hard structures to reduce risks is recommended in both cases, as well as the need for a risk based approach to determine the optimal balance between risk and benefits (which is not by default a 1/100yr design level). Furthermore, the life-loss aspect needs to be addressed in terms of individual risk and societal risk. In conclusion, these aspects will be taken in to account in developing an integrated risk reduction framework. 12

13 GAME PLAN Flood Risk Reduction for the Galveston Bay area 2.4 Integrated Risk Reduction framework Our starting point for the integrated framework to reduce flood risk in the Galveston Bay area is to make a distinction between three sub-systems: the natural system, the flood risk reduction infrastructural system and the societal system (Figure 5). The natural system includes the abiotic and biotic processes in the Houston-Galveston area. Flood risk reduction infrastructural systems (e.g. sea wall and barriers) are human interventions in this area to protect the area of interest. The societal system includes the various ways how society uses the environment (navigation, industry, housing, etc.) together with the institutional side of society (e.g. laws, regulations, governance, etc.). Figure 5: Generic framework for flood risk reduction infrastructure The various sub-systems interact with each other through various mechanisms. For example, the natural system poses boundary conditions to the engineering and societal system. Hurricane winds and surge are examples of this. Reversely, engineering systems can have a significant impact on the natural processes. A coastal barrier system will impact the surge levels in the Galveston Bay, but may also alter the tidal behaviour in the bay during normal conditions. From the societal system, requirements are put forward for engineering systems. An example of such a requirement is the level of protection that the engineering system should provide. Decision-making about risk reduction measures in the various sub-systems is positioned in the centre of the framework. Flood risk reduction infrastructure in the system have impacts (both positive and sometimes negative) and the trade-offs of these impacts are weighted in a decision-making process. Ax explained, a common tool in the decision-making process is a 13

14 GAME PLAN Flood Risk Reduction for the Galveston Bay area cost-benefit analysis in which the costs of certain risk reduction measures are weighed against the benefits of these measures. Because of the complexity due to interactions between subsystems, the design process of Flood risk reduction infrastructure has an interactive and iterative character. A certain solution is first designed at a conceptual or sketch level, and will normally be adapted at a later stage to maximize risk reduction, minimize costs and negative effects on other functions (e.g. environment). For example, the opening (or gated area) of a storm surge barrier might need to be increased after more detailed study shows that the initial design will reduce flows into the bay leading to negative environmental effects. The location of storm surge might have to be changed to optimize navigation. 2.5 Application to Galveston Bay area In this section the framework is applied to the Galveston Bay area. Figure 6: Generic framework applied to the Coastal Barrier Plan. In this diagram, the various sub-systems have been detailed with relevant components for the Galveston Bay area. Each part is discussed in detail below. Section 3 elaborates on the studies which have been carried out to address part of these components and identifies gaps in our current knowledge. Strategic alternatives and the Coastal Barrier plan: The left hand corner of this diagram identifies a set of alternatives at a strategic and conceptual level. For example, for the Galveston Bay area such alternatives would include Do nothing, the Ike Dike / Coastal Barrier Plan (i.e. shorten the coastline) and one (or more) alternative(s) that focus on 14

15 GAME PLAN Flood Risk Reduction for the Galveston Bay area perimeter protection within the bay ( Open Coast Plan ). In addition, combinations of coastal protection and additional risk reduction measures within the bay could be required to form a multiple layers of defence strategy for protection against outer surge and wind-set up in the bay. Recently Texas A&M at Galveston and SSPEED have agreed to work together to study various (combined) strategies for the region. Eventually, it is desirable to compare these alternatives for the decision-making process (cf. Eastern Scheldt, Maeslant Barrier) on aspects such as costs, risk reduction, environmental, economic and social effects. Figure 7: Sketch of strategic alternatives and interventions for flood risk reduction in the Galveston Bay area: coastal protection (1) and protection measures along and in the Bay (2). Combinations will also be investigated. Once a preferred strategy has been identified at strategic level, it needs to be elaborated to a subsystem and component level. Further analysis below focuses on the coastal barrier concept, since this has been the main focus of the Ike Dike research team. Different subsystems can be identified within the Coastal Barrier plan such as the storm surge barrier and the land barrier. Sketch or conceptual designs of these components are necessary to determine investment and operation & maintenance costs. Also a design of the management and organizations of these infrastructural components has to be made, including funding mechanisms, roles and responsibilities (see textbox). In the Netherlands so-called water boards are responsible for management and maintenance of coastal and river levees, and Rijkswaterstaat (Dutch USACE) for most of the barriers and dams. 15

16 GAME PLAN Flood Risk Reduction for the Galveston Bay area Textbox: Operations & Maintenance of storm surge barriers The design life of a movable barrier is generally 100 to 200 years. During this long period of time, it is important to keep the barrier in good condition to meet the requirements in terms of safety and the environment at an acceptable cost. Experience shows that the average annual cost for maintenance are between a few tenths of a percent and a few percent of the initial construction costs, which over the entire life (even as net present value) adds up to a considerable expense. Figure 8: Examples of storm surge barriers in the Netherlands with the Ramspol Barrier in The Netherlands (left) and Ems Sperrwerk in Germany (right). Aspects like aging components, climate change and socio-economic developments make the O&M of a movable storm surge barrier a complex task, which requires a sophisticated and object-specific approach. We need to know what mechanisms and/or events could threaten the required functions of the barrier, such as rust, salt intrusion, (hairline) cracks, lightning, ship collision, human errors, software failure, etc. Obviously, not all mechanisms and events occur with certainty and they will not have the same impact. In order to optimize efficiency it is therefore highly recommended to choose a risk-based approach, in which we tune in the O&M to the probabilities and consequences of the potential mechanisms and events. In the Netherlands, all large movable storm surge barriers are riskbased operated and maintained. Starting point for this risk-based O&M approach is a (Quantitative) Risk & Reliability Analysis. Then it is important to choose the optimal maintenance strategy for each of the systems and/or components, i.e. failure-based, time-based or condition-based maintenance, resulting in an optimal set of O&M measures in order to (continuously) satisfy the requirements at minimum cost. Finally we need to monitor the barrier s performance. Observed failures, and even the fact that no failures occurred, will be used to update the initial Risk & Reliability Analysis and derive an updated O&M strategy for the next period. A crucial condition is a well-equipped O&M organization. The characteristic of a movable barrier is that it is normally used with a relatively low frequency, varying from a few times a year to only once per 10 or more years. To illustrate: the Maeslant barrier in Rotterdam since its completion in 1997 has never performed a 'real' storm closure. The biggest risk for the O&M organization is that not only little knowledge and experience is gained, but eventually also the sense of urgency disappears, resulting in an increasing contribution of human errors to the probability of failure of the barrier. Again, as an example the Maeslantkering, where human error as much as 30% contributes to the (calculated) probability of failure of the barrier. It is therefore of utmost importance to train the O&M staff, whether through simulations, on a regular basis on the closure procedure and repair of potential failures. 16

17 GAME PLAN Flood Risk Reduction for the Galveston Bay area In Asset Management theory, one distinguishes the roles of asset owner, asset manager and service provider. In many cases, the federal government or the state owns the flood protection assets; whereas the local water board or flood protection authority (FPA) serves as asset manager. This means that the FPA is responsible for the barrier s performance in terms of providing the required safety level and preserving the environment. Agreements on the required performance level and necessary budgets between the asset owner and the FPA should be governed by a service level agreement (SLA). In most cases the FPA will hire private parties as service providers to do the necessary maintenance of the barrier. Natural processes: The upper part of Figure 5 shows the natural (abiotic and biotic) processes. These processes are relevant since they are both boundary conditions for design (e.g. hurricane surge) and they are affected by the interventions (e.g. tidal flow into Galveston Bay). Since the hydrodynamics are affected by the storm surge barrier during extreme and normal conditions, there might also be impacts on other related aspects such as sediment transport and water quality aspects. On the other hand, green infrastructure (or Building with Nature) interventions in the Galveston Bay area may even have a positive impact on the ecological processes. Furthermore, a coastal barrier can serve as a connector of vulnerable natural areas. Houston-Galveston society: The right hand corner in Figure 5 visualizes the Houston- Galveston society with its activities and governance structure. The area is densely populated and has a dense infrastructure network. A key economic activity is the petrochemical industry with shipping to and from the ports in the region. These activities are linked with the Coastal Barrier intervention because it provides a certain protection against flooding of industrial facilities (e.g. petrochemical sector) and communities along the Bay. The Coastal Barrier intervention may also have other benefits. For example, an indirect benefit of a better coastal protection may be that this area becomes (even) more attractive for private industry. Also, green infrastructure interventions within the Galveston bay could have a positive impact on recreation and fisheries in this area. Risk Reduction: The central part in Figure 5 defines the objective(s) of the Coastal Barrier Plan. Flood risk reduction is obviously one of the key purposes of this plan. To quantify flood risk reduction, the various corners of this diagram provide different inputs. The total costs of the Coastal Barrier Plan can be estimated once designs of all relevant features are available. Usually a design at a conceptual level (quantities, dimensions, types of interventions) will allow estimation of investment costs at a reasonable accuracy. Also, operations and maintenance (O&M) costs have to be included. The probability of flooding and the associated inundation characteristics follow from a detailed regional analysis of hurricanes, flooding and the return periods. These characteristics are combined with the societal system to estimate economic damage and loss of life. By doing this analysis with and without a coastal barrier plan, the risk reduction benefits can be identified. Note that some barrier systems will also involve benefits, e.g. improved transportation routes and positive spin off for the regional economy. 17

18 GAME PLAN Flood Risk Reduction for the Galveston Bay area Section 3. Ike Dike Research program As part of the Ike Dike research program, various studies have been carried out in the past years to investigate certain aspects or components of the Coastal Barrier solution. This section provides an overview and discussion of the work using the framework of the previous section. Summaries of the extensive multi-disciplinary research work on the Coastal barrier are included in the appendix. The figure below shows the various studies in the framework as proposed in Section 2. This figure also highlights which aspects have been studied (dark colour) and have not been addressed yet (light colour) to our current knowledge. This is further elaborated in the next sections. Figure 9: Generic framework applied to the Coastal Barrier Plan, with indications of focus of current research efforts. 3.1 Coastal Barrier Solution Various components of the Coastal Barrier solution have been studied in the past years. Most of this work has been carried out by MSc students at Delft University. The work is summarized in Appendix 1. The main findings are presented in this section. The Coastal Barrier consists of land barriers on the Galveston Island and Bolivar peninsula and a storm surge barrier in the Bolivar Roads. 18

19 GAME PLAN Flood Risk Reduction for the Galveston Bay area Storm surge barrier The proposed storm surge barrier consists of two parts: a navigational section, which facilitates navigation during normal conditions, and an environmental section, which allows sufficient tidal exchange through the Bolivar Road to preserve ecology. A minimal opening of about 70% of the original opening is aimed for. Due to the large size of the Galveston Bay, there is an opportunity to construct a barrier that only partly blocks the surge, leading to cost savings. The key hydraulic parameter for this design is the maximum head difference between the bay and the open coast (both positive and negative). Another important aspect for the design of the barrier is the subsoil, upon which the barrier will be built. The subsoil in Bolivar Roads consists mainly of soft and firm clay layers, before reaching a strong bearing sand layer at MSL-40m. The most suitable gate types for the navigational section of the storm surge barrier are a barge gate and a sector gate, which was applied for the Maeslant barrier). A major disadvantage of applying sector gates to this case is that they cannot easily deal with negative hydraulic heads. TU Delft, RHDHV and IV Infra made a sketch design of a steel barge gate for the navigational section. Karimi investigated options for a barge gate consisting of concrete. An alternative was investigated by M. van Breukelen, who looked at inflatables as storm surge barriers. Figure 10: Impression of the barge gate (left) and proposed gate in the next phase of the study (right) (Jonkman et al., 2013). In an initial design a shallow-founded caisson barrier with vertical doors appeared to be the most appropriate barrier type for the environmental section in the thesis of de Vries (2014). However, during the design process it was concluded that the clay layers give foundation issues. Given these issues, other alternatives for the environmental barrier should be investigated. It is noted that the design is made to allow navigation by Post-Panamax vessels, which requires the channel to have sufficient depth and width. This will influence the flow patterns through the Bolivar Roads, which will have to be accounted for in future studies. 19

20 GAME PLAN Flood Risk Reduction for the Galveston Bay area Figure 11: Birds eye sectional view of caisson barrier with vertical drain soil improvement (de Vries, 2014) Land barrier Studies have been performed on various aspects of the land barrier(s). These include a design for the Bolivar peninsula. The thesis from Nick West has investigated various concepts for a coastal levee by means of protype experiments. It showed that a fortified dune or levee in dune would be a promising option. The architectural integration has been addressed by Texas A&M (Bardenhagen and Newman). Furthermore, sketch designs of the land barrier on Galveston Island have been made by a MSc project group of the Delft University of Technology. The (civil) engineering and landscape design need to be combined to come to an integrated design, and a design analysis at the system level (both for Galveston and Bolivar islands) is recommended. Figure 12: Engineering design of land barrier (Figlus, 2014) Figure 13: Architectural design of land barrier (Newman, 2014) 20

21 GAME PLAN Flood Risk Reduction for the Galveston Bay area At this moment, the scales of the available civil engineering design of the land barrier (sketch / concept level, no system-wide proposal) and the architectural design (very detailed renderings) do not seem to match yet. This requires further design of the land barrier Next steps From this overview, it can be concluded that sketch or conceptual designs of parts of the Coastal barrier system are available (e.g. parts of the storm surge barrier). Also very rough cost calculations have been made of these components. However, no comprehensive system design at a sketch / conceptual level is yet available. This is required for estimating costs, the analysis of effects and communication of the Ike Dike system to a broader public. Elements of the barrier system that require further elaboration to come to a first conceptual design are: - Sketch designs have been made for the navigational section of the storm surge barrier. Further engineering is required regarding the foundation, scour protection, hinge, wave impacts and dynamic stability. - The environmental section of the storm surge barrier, for which the existing caisson design (MSc thesis De Vries) gives issues for the foundation due to the presence of weak subsoil in the Bolivar Roads. This aspect needs further attention in the next step. - The engineering design of the land barrier. Important aspects include the required dimensions, type of coastal levee (fortified dune and other alternatives etc.) and cost estimate depending on type of structure and material availability. This would have to build on existing studies by Texas A&M to come to a system level design. - The architectural design/landscape integration of the barrier. For the land barrier initial steps have been made, but this aspect is not studied thus far for the navigation/environmental sections of the barrier. This needs attention in the next step. - Design and costs of small barriers in the passes / inlets, and the need for additional interventions within the bay for protection against the local surge. Possible features include local barriers, e.g. in some of the bayous, protection of Galveston against back-surge. - In addition to research on protection measures, additional research and design work is required on mitigation measures that are used in the United States. It could be investigated how measures such as land use planning, adapting existing buildings, building codes, insurance and evacuation can be a part of the overall strategy for risk reduction for the region. - Also, different ongoing studies on elements of the system use different boundary conditions w.r.t. level of protection and surge. One set of boundary conditions is desirable to come to a consistent design. It is recommended to elaborate these features at a sketch or conceptual level to come to an overall plan. Based on evaluation with surge and flood risk models, adaptations to the designs will likely have to be made (iterative design process). 21

22 GAME PLAN Flood Risk Reduction for the Galveston Bay area 3.2 Natural system Regarding the natural system, the studies by the various members of the Ike Dike team have focused thus far on the hydrodynamic behaviour of the Texas coast and Galveston Bay during extreme conditions Normal conditions Ruijs (2011) studied the effects of the Ike Dike Plan during non-storm conditions. A 2DH numerical model was set up to quantify the hydrodynamic impact of the restricted Bolivar Roads opening due to the presence of the gates. This model has been forced with timedependent wind (uniform in the area), offshore tidal constituents and fresh water inflow. Based on detailed verification, the model has proven to be reliable for the central part of the Bay. The results from the East Bay and West Bay should be handled with some caution due to some discrepancies between modelling results and measurements. Figure 14: Galveston Bay model setup for non-storm conditions (Ruijs, 2011). Using this model, Ruijs (2011) investigated the impact of gates in Bolivar Roads on both the vertical and the horizontal tidal movement in the Bay. The constriction due to the gates was assumed to be 40 60% in this work but no design had been made at that time. For this constriction range, the tidal range decreases with 10 40% according to the model results, see Figure 9. The maximum current speeds during the tidal cycle in the opening increase up 22

23 GAME PLAN Flood Risk Reduction for the Galveston Bay area to 1.3 1/6 m/s, whereas the maximum current speeds inside the Bay decrease with 20 40%. Figure 15: Model results of reduction in tidal amplitudes as function of %original flow area in Bolivar Roads (Ruijs, 2011). Other aspects such as effects on morphology, water quality and ecology were studied with much less depth and in a qualitative way. Hence, these conclusions have a preliminary character. Ruijs (2011) hypothesized that the marsh and coastline erosion within the Bay may be further enhanced due to the blocking of sediments and reduction in current speeds/tidal prism within the Bay. Also, the residence time might go up with a factor 2 3 according to Ruijs (2011). Potential mitigation strategies to reduce these impacts are 1) to maximize the opening and/or 2) to study the potential of compartment dams in the Bay (e.g. Eastern Scheldt). Based on the results from Ruijs (2011), the various design efforts (e.g. for the navigation and environmental opening, see section 3.1) have been focusing on maximizing the opening to at least 70% of the original opening (i.e. design criterion). The impact on the tidal amplitudes is less than 10% if this design criterion can be met (see Figure 15) Hurricane conditions Stoeten (2013) developed a simplified probabilistic hurricane surge model for Galveston Bay. In this model, the meteorological forcing is coupled with the hydrodynamic response resulting in a first-order estimate of the surge in Galveston Bay. The hydrodynamic behaviour but also the geometry of the Bay (circular Bay with constant depth) was simplified in order to be able to evaluate a large number (10 6 ) of storm scenarios. Hind casts of historical storms show that the model has a typical error of +/- 0.5m for an individual storm at a certain location. The model simulations show that the surge within the Bay is a combination of local wind setup and inflow. The local wind setup can contribute up to 50% of the total setup in the Bay depending on storm track and intensity. The computational results at the open coast near Galveston show a good match with the numbers based on extrapolated measurements. 23

24 GAME PLAN Flood Risk Reduction for the Galveston Bay area For the current situation without Ike Dike, it follows from the probabilistic computations that the extreme surge levels ( yrs.) at the northern and western part of Galveston Bay are higher than at the open coast and eastside of the Bay. The Coastal barrier reduces the surge levels within the Bay with 2 3 meters depending on the return period. Figure 16: Extreme surge level statistics with and without Coastal barrier (Stoeten, 2013). The simplified hurricane surge model of Stoeten (2013) has also been applied to investigate the required crest elevation of the storm surge barrier, and this is also addressed in ongoing work by Rippi at TU Delft. The original elevation of the barrier was set at the same height of the Galveston sea wall (about 5m+MSL). A lower barrier elevation probably reduces the costs, but it results in more inflow into the Bay because the storm surge peak will then overtop the barrier crest. It turns out that a lower barrier with a height of 1-2m+MSL still provides the same surge reduction compared to a 5m+MSL barrier elevation. The small extra inflow during the peak of the storm can easily be stored within the Bay without raising the surge levels significantly. Jackson State & ERDC (2014) have been working since 2013 on detailed hurricane surge and wave modelling for the Texas area. For this purpose, the Coastal Storm (CSTORM) modelling system has been applied for with and without Ike Dike conditions. To date, 26 storms have been evaluated including Hurricane Ike, 21 severe storms with a 900mbar central pressure on various tracks, and 4 storms ranging from mbar making a direct hit over the City of Galveston. The Ike Dike has been modelled as a monolithic barrier with the same crest height as the Galveston sea wall. The modelling results provide very detailed insight in the hydrodynamic functioning of the Texas Coast and Galveston Bay during extreme conditions. Similar to Stoeten (2013), the tilting effect due to local wind setup and filling effect due to inflow are recognized as two important processes for understanding the surge in Galveston Bay. Also, the feedback between these processes (i.e. more inflow results in less tilting because of larger water depths) is highlighted. Initial results provide insight in the 100-yr and 500-yr surge levels without Ike Dike. From a limited number of storms (#121, #122, #155), the surge reduction in the Bay is 1 3 meter due to the Coastal barrier (see e.g. Figure 17) An assessment of the surge level statistics with and without Coastal barrier is not yet available. 24

25 GAME PLAN Flood Risk Reduction for the Galveston Bay area Figure 17: Surge suppression due to Ike Dike for storm #121 (Jackson State & ERDC, 2014). Jackson State & ERDC (2014) also provide guidance on the use of sea level rise scenarios. It is concluded that the low, intermediate and high scenarios of relative sea level rise are +1, +1.5 and +3ft in 2070, respectively. For feasibility purposes, the intermediate scenario is recommended (+1.5ft) for a 50-year time span Next steps From the various studies presented above, it can be concluded that the main focus has been on hydrodynamics (both for normal conditions and hurricane conditions). Two different modelling approaches have been followed to define the impact of the Ike Dike on hurricane surge in Galveston Bay thus far: detailed ADCIRC modelling (Jackson State & ERDC) and a simplified hurricane surge model (Stoeten, 2013). Other models are used by other groups, e.g. by the SSPEED center. To compare both approaches, the 100-yr surge levels at similar locations along the Bay have been listed in the table below. It turns out that except for the bayside of Galveston the 100yr values of both models are very similar. An initial assessment suggests, however, that the model of Stoeten (2013) predicts lower surge levels for higher return periods than the results from Jackson State & ERDC (2014). It should be noted that Stoeten did not look at the impact on water levels in the Houston Ship Channel. 100yr surge levels Jackson & ERDC (2014) Place Latitude (N) La Porte 29 38' 46'' Texas City levee 29 27' 35'' Galveston (bayside) 29 18' 10'' Galveston 29 17' (Oceanside) 07'' Longitude (W) 95 00' 42'' 94 56' 24'' 94 49' 44'' 94 47' 16'' 100yr surge levels Stoeten et al. (2013) 100yr (m) Place 100yr (m) 4.3 North West South Open Coast 3.9 Table 2: Comparison between 100yr surge levels in Galveston Bay area. 25

26 GAME PLAN Flood Risk Reduction for the Galveston Bay area Thus far, solid baseline information about the hurricane surge probabilities for the situation without and with a Coastal Barrier solution for a large range of return intervals is not yet available. Further analysis on the impact of the recurrence intervals and also the impact of different design optimizations (e.g. lowering the barrier) on the surge levels are required. Both hurricane surge modelling approaches presented above have advantages and disadvantages regarding accuracy, computation time, physical insight, etc. It is recommended to develop both modelling tracks further in the next steps of this research. Other aspects (morphology, ecology) have not been studied in depth thus far. Ruijs (2011) provided some hypotheses how the barrier could impact these aspects. Especially the environmental effects (impact on habitats, organisms) of the Coastal barrier solution (both positive and negative!) are important. This needs to be further studied in detail in the next steps. Also, the short-term and long-term morphological behaviour of the Texas coast - Galveston bay system needs careful attention in the next steps. The storm surge barrier may affect the tidal behaviour/prism which probably results in a morphological response inside but also outside the Galveston Bay. Also, the morphodynamic behaviour of a land barrier during hurricanes and non-hurricane conditions needs to be studied in more detail. 3.3 Houston-Galveston Society So far, the various studies by the Ike Dike team have mainly focused on economic impacts of flooding around the Bay. The study by Texas A&M (Brody and Atoba) investigates the reduction of direct flood damages to residential and industrial properties due to the Ike Dike. It shows that the building losses due to a coastal barrier could be reduced from $ 3.7 billion to $ 1.2 billion (for storm A). More detailed and higher resolution studies are available for specific areas, such as the Clear Creek watershed (Brody et al). The institute of economic forecasting (Gilmer et al.) are setting up a study to determine the potential storm damage to the Houston-Galveston area industrial base, particularly the natural gas processing, refining and petrochemical complex. The IMPLAN model, a standard and widely-used input output model of the U.S. economy would be used to determine the indirect and induced economic impacts. The IMPLAN model has also been used in a study by Texas A&M (Meri Davlasheridze et al.). Preliminary findings show that indirect and induced economic damages can be substantial (around 30%) when compared to direct losses to buildings and infrastructure. The approaches developed will also give insight in damage reduction in terms of savings on flood insurance and disaster programs Next steps In order to come up with a comprehensive analysis for the damage and risk reduction of the Ike Dike one set of damage models and approaches, as well as a standardized data basis for the region has to be developed. Results of the various studies have to integrated and aggregated to come up with total damage and risk reduction of proposed solutions. The studies (will) provide important insights in the (avoided) economic damages for the region. To do this in terms of risk reduction, return periods of various flood scenarios need to 26

27 GAME PLAN Flood Risk Reduction for the Galveston Bay area be identified 2 (see discussion on the risk framework in the next section). In an integrated assessment by Texas A&M (Brody and Blessing) for Galveston Island, the costs of interventions, economic impacts and functional and aesthetic implications are addressed. Currently, economic damages of flooding have been considered. It would be highly relevant to assess life loss (reduction) as one of the main aims of the Ike Dike is to protect people. Life loss models have been developed based on hurricane Katrina, but these can be further refined and applied to HG Bay. Also, other functions have not yet been addressed in detail (e.g. recreation, fisheries, etc.) in relation to the Ike Dike and this would be a topic for further work. 3.4 Flood risk One of the main objectives of the Coastal Barrier Plan is to reduce flood risk in the Galveston Bay area. For this region, Stoeten (2013) has set up a preliminary risk model in his MSc thesis. In a simplified manner, it includes the hurricane surge probabilities and the potential damage, which are coupled to evaluate different risk reduction strategies and an optimal level of protection In ongoing Ike Dike studies the underlying building blocks of risk are being investigated (such as hurricane surge, damages and interventions - see previous sections). However, no fully integrated model has been developed yet to integrate these findings in order to quantify the flood risk (reduction) for a given system configuration. This implies that there is no clear insight in the current risk (do-nothing option) and the reduction of risk to an optimal or desired level by certain interventions. In order to quantify benefits of the Ike Dike (or some other) solution, risk reduction would have to be calculated. In such an analysis the risk in the current (do nothing) situation would be compared with residual risk under various system interventions Next steps It is therefore recommended to develop a simplified risk model that could be used to evaluate various interventions and system configurations. It would integrate and couple outcomes of the hurricane, damage and intervention studies 3. This type of model framework has also proven to be very beneficial for New Orleans and other situations (see textbox). The model frameworks of New Orleans and Stoeten could serve as a starting point for setting up an integrated risk model for the Galveston Bay area. Database and GIS components will be a part of this modelling approach and the initial analysis on reduction of economic losses (Texas A&M) could be extended. 2 For example, in the study on economic impacts by Brody and Atoba, one question for future work is which return periods are associated with the storms (A to D) that are investigated. 3 The alternative is to couple existing sets of (complex) models for surge and economic impact. Since a probabilistic approach is needed with many scenarios, coupling existing complex models would likely result in model framework that is less suitable to evaluate various system configurations relatively quickly. 27

28 GAME PLAN Flood Risk Reduction for the Galveston Bay area (Simplified) flood risk models for New Orleans The advantage of these simplified risk models has been shown for the New Orleans area in the aftermath of Katrina. A risk modeling framework was developed as part of the studies by the Interagency Performance Evaluation Taskforce (IPET). This model integrates the information from underlying modeling studies on hurricane surge, economic impacts etc Instead of using the underlying models, the risk framework often uses extracted and simplified data such as databases with return periods of surge levels for a given location. This information is based on more complex and rigorous underlying models for hurricane surge, levee safety and flood damage. Such a risk model can be used to evaluate the risk in a system and the effect of proposed interventions in a relatively quick manner. An example has been the evaluation of the cost effectiveness of building inner levees (compartimentalization) in New Orleans against raising the outer perimeter of the system. Figure 18: Risk modelling framework used in the IPET study for New Orleans (IPET, 2009). Also, a simplified risk model was set up of the New Orleans East area to study the investments and the reduced risk in order to find the optimal safety level. In this study, both hurricane and rainfall hazard were included in the analysis. The national risk study in the Netherlands (VNK) uses a framework similar to that used by IPET to assess local and national flood risk levels for the nation. 28

29 GAME PLAN Flood Risk Reduction for the Galveston Bay area Section 4. Outlook and recommendations This section provides an outlook and recommendations for next steps. A distinction is recommended between three phases: Short term (March 2015): Indicative Benefit/Cost ratio Coastal Barrier Plan Midterm (July/August 2015): Feasibility Study for a Coastal Barrier Plan Long term (July/August 2016): Integrated Risk Reduction study for the Galveston Bay area These phases are discussed in detail below as a basis for discussion and planning. Exact timing and contents of these phases will eventually depend on various processes and boundary conditions. 4.1 Short-term focus: Indicative Costs and Benefits Coastal Barrier Plan (March 2015) The main objective on the short term (March 2015) of the research consortium led by Texas A&M Galveston is to give an indication of costs and benefits (+/- 50%) of the proposed Coastal Barrier Strategy (see figure 19). In view of what has been done to date, insight is needed in the following: - The costs of the proposed Coastal Barrier Strategy: This requires a design of the entire system (storm surge barrier, land barrier, interventions within the bay) at a sketch or conceptual level. Main focus to date has been on the storm surge barrier in the Bolivar Roads including a rough cost estimate of this element. However, at this moment not all elements of the barrier system have been designed at a system level. Further research and design of the land barriers is needed, as well as an analysis of the need for interventions in the bay (e.g. protection of the back side of Galveston Island) to provide an indicative cost estimate of the Coastal Barrier strategy. - The benefits consist of risk reduction due to the Coastal Barrier Strategy: It also has to be determined how much the proposed Coastal Barrier Strategy reduces (the probability of) flooding within the bay. By linking this to damage modelling, the risk reduction (in terms of avoided damages) can be estimated, determining the benefits of the proposed solution. It is recommended to assess and quantify the effects of the Ike Dike on the return periods of flooding and damages. It is expected that this results in a positive benefit/cost ratio of the Coastal Barrier Strategy based on earlier work. This result may feed into the request for additional funding for the mid-term and long-term objectives. 29

30 GAME PLAN Flood Risk Reduction for the Galveston Bay area Figure 19: Short term focus on Benefit/Cost ratio Coastal Barrier Plan. 4.2 Mid-term focus: Comprehensive Feasibility Study Coastal Barrier Plan (July/August 2015) The mid-term objective (July/August 2015) of the research consortium led by Texas A&M Galveston is to provide a comprehensive feasibility study of the proposed Ike Dike / coastal spine strategy. Next to a more detailed analysis of costs and benefits (+/- 30%), also the impacts (negative and positive) of the Coastal Barrier Plan should be well documented. The following items need attention in this phase: The design of the Coastal Barrier strategy may be further fine-tuned to a conceptual and detailed level through several optimizations/designs (e.g. crest elevation of the storm surge barrier). Additional geotechnical information is recommended to finetune the foundation and thereby narrow down the cost estimate of the surge barrier. Also, it is recommended to put effort into the landscape integration and architectural design of this Coastal Barrier and create an attractive design/architecture of the barrier. Risk reduction can be optimized through the Coastal Barrier strategy configuration. For example, tolerable overflow over and leakage through storm surge and land barriers has to be determined, as well as the added value of protection features within the bay. In doing so, a required/optimal level of protection of the system can be chosen, based on the earlier mentioned benefit cost ratio. To support planning, optimization and Cost Benefit Analysis of the Ike Dike it is recommended to set up a simplified risk model which couples (reduction of) surge and wave probabilities, damages and effects of interventions. Additional surge and wave modeling is recommended for a larger suite of storms. Also, detailed wave and flow modeling around the barrier to define more accurately 30

31 GAME PLAN Flood Risk Reduction for the Galveston Bay area the static and dynamic loadings at the structure (both in closed position but also during opening and closing). Environmental changes of proposed Coastal Barrier strategy have to be evaluated using models for water quality and environmental effects. Also options have to be investigated to optimize the system configuration and/or to improve the environment (e.g. Building with Nature interventions in the Bay). Effects on other functions, such as navigation, tourism etc. would have to be investigated too. It would be highly relevant to assess life loss (reduction), as one of the main aims of the Ike Dike is to protect people. Life loss models have been developed based on Hurricane Katrina, but these can be further refined and applied to the Galveston Bay area. Public perception and support of this strategy needs to be further elaborated. Also, impacts on other functions in the region (fisheries, recreation) must be further assessed. Figure 20: Midterm focus on Feasibility Coastal Barrier Plan. 4.3 Long-term focus: Integrated Risk Reduction Study for the Houston/Galveston area (July/August 2016) The long-term objective (July/August 2016) is to provide a comprehensive report of the various strategic alternatives for the Houston-Galveston area including the Do Nothing option. The objective of this report is to provide a sound scientific basis for decision-making on the preferred risk reduction strategy in the region. Each strategic alternative needs to have the same level of detail and a relatively accurate estimate is required of costs and benefits to make this decision. The following items may require further study in this phase: Detailed surge and wave modelling is required in this phase to make more detailed designs and provide accurate cost estimates. Also, a detailed analysis is 31

32 GAME PLAN Flood Risk Reduction for the Galveston Bay area recommended how different climate change scenarios affect the choice of certain strategies. The risk reduction of the various strategies (Coastal Barrier, Open Coast, Do nothing, other) must be compared with the same level of detail. It is also recommended to look at other goals next to risk reduction. For example, an ecological improvement of the Bay could be an additional goal of the overall strategy. Further fine-tuning of the design elements is required to provide a more accurate cost estimate for both the initial investment costs but also the operation & maintenance costs. This may require more detailed geotechnical (e.g. detailed borings for the foundation of the storm surge and/or land barrier) and hydraulic (e.g. detailed wave modelling near the structure) information. In this phase, the simplified risk model can be extended with other strategies ( Do nothing, Open Coast Plan ). The results of this simplified risk model for the different strategies can also be visualized in an interactive way to provide a platform for communication with communities/decision-makers. Figure 21: Long term focus on Integrated Risk Reduction for the Houston-Galveston area. 32

33 GAME PLAN Flood Risk Reduction for the Galveston Bay area 5. List of references Brody, S.D., Blessing, R., Sebastian, A., Bedient, P. (2014). Examining the impact of land use/land cover characteristics on flood losses. Journal of Environmental Planning and Management 57(9): Brody, S.D., Blessing, R., Sebastian, A., Bedient, P. Where Will It flood? (Under Review) Identifying the impacts of residential location on flood risk and loss. Journal of Flood Risk Management. Brody, S.D., Blessing, R., Sebastian, A., Bedient, P. (2013). Delineating the Reality of Flood Risk and Loss in Southeast, Texas. Natural Hazards Review 14: Ebersole, B (PI), Richardson, T., 2014, Feasibility Study of the Ike Dike Concept Flood Risk Reduction, version dated 11/??/2014 De Vries, P.A.L The Bolivar Roads Surge Barrier: A Conceptual Design for the Environmental Section. MSc Thesis, Delft University of Technology, Delft, The Netherlands. Highfield, W., Brody, S.D., Blessing, R. (2014). Measuring the Impact of Mitigation Activities on Flood Loss Reduction at the Parcel Level: The Case of the Clear Creek watershed along the upper Texas coast. Natural Hazards, DOI: /s : IPET, 2009, Performance Evaluation of the New Orleans and Southeast Louisiana Hurricane Protection System, Final Report of the Interagency Performance Evaluation Task Force, Volume III, USA Jonkman S.N., Kok M., van Ledden M., Vrijling J.K. (2009) Risk-based design of flood defence systems: a preliminary analysis of the optimal protection level for the New Orleans metropolitan area. Journal of Flood Risk Management Vol. 2 Issue 3, p Karimi, I. (2013) The Conceptual Design of the Bolivar Roads Navigational Surge Barrier. MSc Thesis. PDENG. Delft University of Technology, Delft, The Netherlands. Lendering K. van der Toorn A., de Vries P., Mooyaart L., van Ledden M., Willems A., Jonkman S.N. (2014) Report Galveston Bay: Barge gate design phase 3. Technical Report. Delft University of Technology. Merrell WJ, Graham Reynolds L, Cardenas A, Gunn JR, Hufton AJ (2011) The Ike Dike: A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge. In: Badescu V, Cathcart R (eds.) Macro-engineering Seawater in Unique Environments Environmental Science and Engineering, 2011, pp , Springer. National Research Council, Reducing Coastal Risk on the East and Gulf Coasts, ISBN: , Washington, USA Newman, G. Brody, S. & Smith, A. (under review). Integral Resiliency: Regenerating Vacant Land through Ecological Connectivity with Geodesign. Landscape and Urban Planning, special edition on Geodesign 33

34 GAME PLAN Flood Risk Reduction for the Galveston Bay area Ruijs, M The Effects of the Ike Dike Barriers on Galveston Bay. MSc Thesis, Delft University of Technology, Delft, The Netherlands. Rijkswaterstaat, 1976, Policy-analysis Eastern Scheldt, the Netherlands Rijkswaterstaat, 1986, Design documents Eastern Scheldt barrier, the Netherlands Smulders, J Dynamic Assessment of the Bolivar Roads Navigational Barge Gate Barrier, MSc Thesis, Delft University of Technology, Delft, The Netherlands. Stoeten, K.J., Hurricane Surge Risk Reduction For Galveston Bay. MSc Thesis, Delft University of Technology, Delft, The Netherlands. Thijsse, J. Th., 1972, 'Een halve eeuw Zuiderzeewerken', the Netherlands Van Breukelen, M.C Improvement and scale enlargement of the inflatable rubber barrier concept: A case study applicable to the Bolivar Roads barrier, Texas, USA. MSc Thesis, Delft University of Technology, Delft, The Netherlands. 34

35 Report Galveston Bay Barge barrier design: phase 3 Draft Authors: K. Lendering, A. van der Toorn, P. de Vries, L. Mooyaart, M. van Ledden, A. Willems, S.N. Jonkman Date: July 10 th, 2014 Version: 1.0

36 Contents 1. Introduction Background Objective of the study Approach Report Outline Note: Datum Design considerations Barge gate design Barge gate dimensions Closure procedure Closure regime and resulting hydraulic loads Introduction Hydraulic boundary conditions for different landfall locations Nautical boundary conditions Conclusions and recommendations Structural design Load conditions Load Cases Results Discussion Design optimizations Technical results Recommendations for further research Bibliography Appendix A Hydraulic model results A.1 Surge blocking barrier A.2 Barrier at MSL+3m A.3 Barrier at MSL Appendix B Stability of floating empty barge gate B.1 Static stability normal conditions B.2 Required ballast for submerging the gate B.3 Resulting head over internal wall after calamity

37 1. Introduction 1.1 Background On September 13, 2008, hurricane Ike made landfall near Galveston Island, Texas. Ike s devastating storm surge and category 2 winds resulted in an estimated $24.9 billion dollars of damage (Berg, 2009). After Hurricane Ike Texas A&M University at Galveston proposed the Ike Dike (Merrell 2010), a conceptual coastal protection system devised to protect the Galveston Bay area against storm surge. In 2013, Texas A&M University at Galveston and Delft University of Technology agreed to mutually work on the aspect of flood risk reduction for coastal systems. As part of the agreement TU Delft, Royal HaskoningDHV and IV Infra (Jonkman, et al. 2013) performed two studies on the Bolivar Roads Barrier. The first study discussed suitable candidate solutions for the barrier and concluded that a barge gate would be the preferred type. A conceptual design of the barge gate is developed in the second study, which aimed to assess the feasibility of this option and to address possibilities for further research. Figure 1: Concept of the barge gate as proposed in the earlier stages of the studies for Bolivar Roads (Jonkman, et al. 2013) The first study (Jonkman, et al. 2013) addressed both opportunities and technical difficulties of the proposed Bolivar Roads Barrier and concluded that; i) the barrier requires a navigational section (about 200m wide) and an environmental section (about 2800m wide), ii) the large surface area of the Galveston Bay allows limited inflow without significant impact on bay elevation, iii) local soil conditions are poor, consisting largely of soft clays iv) both a barge gate and a sector gate are considered feasible solutions for the navigational section. After further evaluation it appeared thata barge gate can solve some problems experienced with the Maeslant barrier, which is a sector gate. Especially the load situation with negative head was important in that consideration. Therefore a conceptual design of the barge gate was made in the second study (Toorn, et al. 2014), which concluded that: 3

38 v) the barge gate will distrubute the horizontal forces towards the embankments, will have valves within the main gate for stability during swinging of the gate, and is kept afloat because limited inflow is allowed. vi) because of the thickness of the loose sand and soft clay layers (20-30 meters) in combination with the offshore-like working conditions a deep pile foundation or a deep foundation realized by (pneumatic) caissons or cellular cofferdams are possibilities for the foundation of the barrier. Based on additional soil data a design decision can be made for the most appropriate foundation type. vii) the closure regime requires further investigation, especially the effect of the closure regime on the hydraulic boundary conditions and shipping. Complementary to abovementioned study additional thesis studies have been completed including: the applicability of inflatable barriers for the both sections (Breukelen 2013), the use of caisson barriers for the environmental section (P. Vries 2014), the impact of a barrier on bay hydrodynamics (Ruijs 2011) and bay behavior under hurricane forcing (Stoeten 2013). Currently a MSc student group of the TU Delft is doing research on the Ike Dike land barriers at Texas A&M Galveston. 1.2 Objective of the study This report will elaborate on the aforementioned conclusions. The objective of this study is twofold. Firstly, the effects of the closure regime on the hydraulic boundary conditions on the barge gate are investigated. The optimal closure regime is chosen taking into account flow through the barrier, the hydraulic head, the wave loads and the effect on shipping. Secondly, based on the updated hydraulic conditions a new design is made of the barge gate, which will replace the proposed design of the second barrier study. 1.3 Approach The present study is performed by staff from the Delft University of Technology, and experts from Iv-Infra and Royal HaskoningDHV. These organizations are based in the Netherlands and have been involved in barrier designs and studies in the Netherlands and other countries. The following consecutive steps are carried out to achieve the objective; Step 1: Main design considerations The main considerations for the design of a barge gate barrier in the navigational section of the Bolivar roads barrier are discussed. Further, by integrating the results of previous studies on the Bolivar roads barrier more detailed design considerations are made which are used to determine the optimal closure regime and design of the barge gate. Step 2: Determine closure regime and resulting hydraulic boundary conditions The aim of this chapter is to recognize possibilities for optimizing the design of the Bolivar Roads Surge Barrier by looking into the closure regime and its effects on the loads. Simplified hydraulic studies will be used for different landfall locations of hurricanes to determine the optimal closure regime of the barrier, based on the effects on water levels in and outside the bay (not on local surge). The resulting hydraulic loads on the barge gate are determined. 4

39 Step 3: Further engineering of barge gate Using the Finite Element (FE) model created in the previous study, a new design of the barge gate is made taking the aforementioned hydraulic loads in to account. A static calculation is made based on the governing hydraulic loads, in a later phase we will look at the dynamic response of the gate. 1.4 Report Outline The design considerations are described in Chapter 2. Chapter 3 discusses the closure regime optimization and resulting hydraulic loads on the structure. Chapter 4 covers further engineering of the barge gate including engineering of the steel structure. Finally chapter 5 offers a brief reflection on the results, a discussion, concluding remarks and recommendations for further research 1.5 Note: Datum Unless noted otherwise vertical reference with respect to North American Vertical Datum 1988 (NAVD88) is used. Mean Sea Level (MSL) is equal to NAVD feet. 5

40 2. Design considerations In this chapter the main design considerations for a barge gate in the navigational section of the Bolivar roads storm surge barrier are discussed. Further, by integrating the results of previous studies on the Bolivar roads barrier more detailed design considerations are made which are used to determine the optimal closure regime and design of the barge gate. The following studies have been completed and have contributed to the design considerations treated in this chapter: Barrier team reports Report Galveston Bay, Bolivar roads flood risk reduction barrier: a sketch design. July (Jonkman, et al. 2013) Report Galveston bay: barge barrier design. February (Toorn, et al. 2014) Masters Theses The Bolivar roads surge barrier: a conceptual design for the environmental section. January (P. d. Vries 2014) Hurricane surge risk reduction for Galveston bay. October (Stoeten 2013) Improvement and scale enlargement of the inflatable barrier concept. December (Breukelen 2013) The effects of the Ike Dike barriers on Galveston Bay. June (Ruijs 2011) The design of the Bolivar roads navigational surge barrier. July (Karimi, 2014) 2.1 Barge gate design For the navigational section of the Bolivar roads barrrier a barge gate (also known as a swing gate ) is proposed in (Toorn, et al. 2014). Various options for the design of the barge gate were assessed, which are shown in Table 1. The preferred option is indicated with the red box. 6

41 Table 1: Matrix swing gate main design options Based on the second study a barge gate which distributes the forces towards the embankments and is kept floating is preferred. In principle it is a floating box / ship hull that is floated into place to block the waterway. Hydraulic pressure pushes the gate against the embankments. The main advantages of this barge gate are: Simple closure and therefore a reliable closure; Simple and inexpensive sill design (when forces are only diverted to the embankments); The straight gate reduces the hydraulic forces in respect to a horizontal sector gate. (However: a straight gate introduces large bending forces in the structure resulting in more use of steel); Insensitivity to settlements of the sill (by keeping the gate afloat); Negative head is not an issue if the gate stays afloat, in the worst-case the gate will swing open if a negative head occurs without damaging the structure; Maintenance of the gate is possible off site under controlled conditions; No submerged mechanical elements like rail, carriage, large hinge and socket joints. 2.2 Barge gate dimensions Due to the expected thickness of the loose sand and soft clay layers (20-30 meters) in the Bolivar roads it is preferred to minimize the loads on the foundation. This is obtained by allowing leakage through the barrier, which will make the barrier more cost effective. Both 7

42 under- and overflow are allowed, the amount of under- and overflow allowed will determine the retaining height of the barrier. An opening of one meter is assumed under the barge gate. After assessing the effect of a leaking barrier on the water levels inside the bay it is found that the fore runner surge of hurricanes needs to be blocked, which results in a minimum water retaining height level of +3m MSL. The definitive water retaining level is determined in chapter 3. Based on the dimensions of the ship channel in the navigational section the following dimensions are determined for the barge gate; see (P. d. Vries 2014): The ship channel requires a depth of at least 17 meter, which is determined by the minimum required depth for New Panamax ships (17 meter). The embankments of the barge gate will lie at a level of MSL -17 m these ships. The ship channel requires a width of 220 meters, which is determined using the PIANC rules for shipping channel dimensions (P. Vries 2014) The barge gate will have a total length of 240 meters, which consists of a navigational width of 220 meter, an additional 10 meter on each side for the embankments and an additional 10 meter margin on each side for additional constraints. For stability a minimum width of twice the height is assumed, which is 40 meters assuming the minimum height of the gate is 20 meters (with a minimum depth of 17 meter below MSL and a retaining level of +3m MSL). 8

43 2.3 Closure procedure In the second study (Toorn, et al. 2014) the closure operation is proposed based on a tender design with a barge gate for the Maeslant barrier (Dehousse 1992). The following sequence is foreseen: 1) In the open position the barge gate lies parallel to the banks of the navigation channel. It is ballasted such that it lies stable on the bottom only several meters below sea level. The closure starts with setting the barge gate up to float; 2) The barge gate rotates around its hinge point through propellers and under control of cables. This procedure (phase 1 and 2) takes approximately 20 minutes; 3) The gate is submerged by filling it with water. A series of valves on both sides, see Figure 1, of the gate are required to be able to submerge the gate in a controlled manner. Furthermore the water level in the barge gate is monitored to control this procedure. This procedure lasts about 40 minutes; 4) The valves are closed and the barge gate is in its final position. After closure of the barge gate the environmental section will close its gates. Figure 2: Closure operation of barge gate External hinge The barge gate will swing around an external hinge, which should allow several degrees of freedom. The following motions are discussed, see Figure 3: - Surge: a horizontal translation along the longitudinal x-axis of the body; - Sway: a horizontal translation along the transversal y-axis of the body; - Heave: a vertical translation along the vertical z-axis of the body; - Roll: a rotation around the longitudinal x-axis of the body; - Yaw: a rotation around the vertical z-axis of the body; - Pitch: a rotation around the transversal y-axis of the body. 9

44 Figure 3: Motions of a floating body The external hinge of the barge gate should allow the gate to freely rotate about all axes (roll, yaw, pitch) and allow for movements in vertical direction (heave). Horizontal translations should not be possible (sway and surge). It is therefore only fixed in the horizontal direction. The hinge will be placed at Mean Sea Level, because the stresses on the hinge are expected to be the lowest at this level. An example of such a hinge is shown in Figure 4, which shows the pivot arm for the Bayou Lafourche Swing gate. Figure 4: Bayou Lafourche Swing gate s swing pivot arm section view (top) and plan view (bottom) (Miller 2006) 10

45 3. Closure regime and resulting hydraulic loads 3.1 Introduction Hurricanes in the Gulf of Mexico can cause severe flooding in the Houston and Galveston area. However, as hurricanes have different characteristics, there are also hurricanes which cause no or small floods. The retaining height of the Bolivar Roads Surge Barrier and the moment of closure of the barrier determine to a large extent the surge levels inside the Galveston bay. The closure regime therefore has a large influence on the hydraulic boundary conditions of the barrier. The aim of this chapter is to recognize possibilities for optimizing the design of the Bolivar Roads Surge Barrier by looking into the closure regime and its effect on the water levels in and outside of the Galveston bay. The critical hydraulic boundary conditions for the conceptual design of the barge gate are determined for the optimal closure regime. This is done by assessing the hydraulic boundary conditions in time for different hurricane landfall locations. Different landfall locations induce a different development of the water level in front of the barrier (Gulf of Mexico side) and behind the barrier (Galveston Bay side). The objective is to determine the governing water levels for 1/10,000 yr -1 conditions for three different landfall locations around the Galveston bay: East, West and a direct hit. Furthermore, with the construction of the Bolivar Roads Surge Barrier closing the barrier implies that no ship transport from and to Houston is possible. This has large financial consequences the closure regime therefore requires serious studies. The effect on shipping to and from Houston is assessed depending on the moment of closure of the Bolivar roads barrier. 3.2 Hydraulic boundary conditions for different landfall locations The total water head on the barrier is determined by the water levels in the Gulf of Mexico and the water level in the Galveston Bay. Gulf of Mexico surge (open coast side) The Gulf of Mexico surge is composed by the summing of the following components: - Seasonal uplift of 0.1m - M2-tide with an amplitude of 0.35m - Hurricane forced surge - Forerunner surge The hurricane forced surge and forerunner surge are described below. 11

46 Hurricane forced surge The hurricane forced surge on the Gulf of Mexico side of the barrier is determined using the model by Holland (1980). This model describes the pressure and wind velocity in the gradient and cyclostrophic regions of the hurricane wind field. The storm surge height is a function of the parameters listed below. h "#$% ='(),+,, -,. %,/,0,1,2 3,2 4 ) In this analysis the distance between landfall location and Bolivar Roads [)] will be taken as variable. This will generate different storm scenarios for different landfall locations, serving as boundary conditions for the storm surge barrier design. The other parameters are: - Radius to maximum winds + =50 [;<] - Core pressure, - =880 [<>? ] - Forward speed. % =6.7 [</%] - Holland parameter / =1.27 [ ] - Angle of approach 0 =0 [ ] - Gravitational constant 1 =9.81 [</% * ] - Mass density air 2 3 =1.15 [;1/< + ] - Mass density water 2 4 =1025 [;1/< + ] The first five parameter values determine the characteristics of the schematized hurricane. Parameter values are obtained from literature. Resio et al. (2009) concluded that hurricanes in the Gulf of Mexico are well represented by a constant Holland / value of Research of Emanuel (1987) shows that hurricanes have a theoretical minimum pressure of 880 mbar. From NOAA (1979) is obtained that the radius to maximum winds is inversely proportional to the central pressure. According to this report, a value of 50 km seems a good estimation with respect to a central pressure of 880 mbar. For the forward speed, the value of hurricane Ike is chosen. Model results are not very sensitive to this parameter. Finally, the angle of approach is set to 0 degrees, since this value results in the largest surge (conservative assumption). In this study, the suggested combination of core pressure and radius to maximum winds is assumed to generate a governing combination of high internal surge in the bay and a high open coast surge. It is not sure whether this is entirely true; another combination, for example with higher core pressure and larger radius to maximum winds, could result in a different governing load case on the barrier. Forerunner surge The forerunner surge is determined by extrapolating historical water level data from hurricane Ike. Figure 5 shows the development of the forerunner surge component through time with respect to landfall. 12

47 Figure 5: Forerunner surge component Galveston Bay internal surge (enclosed basin model) For the internal surge in the Galveston Bay an approximation for enclosed basins is used. The internal surge height is a function of the variables listed below. h,3- ='(.,. 4,+,3-,/,3-,1,2 4 ) - Flow over or through the barrier. (variable, but assumed 0 for a fully closed barrier. Wave overtopping is not taken into account.) - Hurricane wind field. 4 (variable, depends on landfall location) - Fetch length +,3- =30 [;<] - Average depth of Galveston Bay /,3- =3 [<] - Gravitational constant 1 =9.81 [</% * ] - Mass density water 2 4 =1025 [;1/< + ] The total water head on the barrier is determined by the difference of the bay water level and the gulf water level. Results For five different storm tracks the water levels around the storm surge barrier are computed. This is done for the following landfall locations: km west of Bolivar Roads - 50 km west of Bolivar Roads - A direct hit on Bolivar Roads - 50 km east of Bolivar Roads km east of Bolivar Roads These landfall locations are based on the largest occurring hydraulic heads. The complete results are presented in Appendix A. A division is made for different barriers; 13

48 1. A barrier that fully blocks the incoming surge; 2. A barrier at MSL+3m, blocking the fore runner surge; 3. A barrier at MSL. The latter two are vastly overflown during storm conditions and will result in a higher bay level during storms. However, it appears that the total head over the barrier does not significantly change for these different barrier heights. Underflow is not taken into account. Water head for complete surge blocking barrier The landfall location 50 km west of Bolivar Roads is governing for the maximum positive head on the barrier, while 250 km east results in the maximum negative head. For this landfall location the forerunner surge is omitted to obtain the maximum negative head, see Figure 6. Figure 6: Water levels for different landfall locations for complete surge blocking barrier (+6m MSL). Left: landfall location 50 km west of Bolivar Roads. Right: landfall location +250km east of Bolivar Roads. The design water levels are presented in Table 2. It is found that the barrier needs to be closed approximately 32 hours prior to landfall and should be closed for a minimum of 48 hours in order to sufficiently block the forerunner surge. Table 2: Design water head for surge blocking barrier Landfall location Water level [m MSL] Head [m] Closure duration [hrs] Gulf side Bay side West of Bolivar Roads +6.0m -4.5m 10.5m (positive) 48 East of Bolivar Roads -1.0m +2.0m 3.0m (negative) 11 Using the 1D model a maximum negative head of 1.0m is obtained, which is expected to be an underestimate of the total negative head. When considering a broader spectrum of different hurricanes (varying in size, landfall location, core pressure etc) a larger negative 14

49 head could occur. With expert judgment a design value of 3.0m for the negative head is proposed. Note 1: Table 2 presents the combination of water levels that result in the maximum head. It must be emphasized that these water levels do not concern the peak surge height or lowest water level on the bay side of the barrier. Note 2: for all positive heads the setdown behind the barrier is beneath the average bay depth of 3m (see Table 7, Table 8 and Table 9). As the bottom of the navigation channel is at MSL-17m it is assumed this setdown of 4.5m is possible. Water head for partial surge blocking barriers As is discussed in chapter 2 the barrier can be made more cost effective by allowing leakage through the barrier with under- and overflow. With a retaining height below the maximum surge level the barrier is vastly overflown during storms, but the Bay s retention capacity could ensure the flood hazard along the Galveston Bay shores to remain acceptable. The governing water heads for two non-surge blocking barriers, at MSL+3m and MSL+0m, are presented in Table 3 and Table 4. Figure 7: Water levels for different landfall locations for fore runner surge blocking barrier (+3m MSL). Left: landfall location 50 km west of Bolivar Roads. Right: landfall location +250km east of Bolivar Roads. Table 3: Design water head for barrier at MSL+3m Landfall location Water level [m MSL] Head [m] Closure duration [hrs] Gulf side Bay side West of Bolivar Roads +6.0m -4.0m 10.0m (positive) 48 East of Bolivar Roads -1.0m +2.0m 3.0m (negative) 11 15

50 Figure 8: Water levels for different landfall locations for barrier at Mean Sea Level. Left: landfall location 50 km west of Bolivar Roads. Right: landfall location +250km east of Bolivar Roads. Table 4: Design water head for barrier at MSL Landfall location Water level [m MSL] Head [m] Closure duration [hrs] Gulf side Bay side West of Bolivar Roads +6.0m -3.5m 9.5m (positive) 48 East of Bolivar Roads -1.0m +2.0m 3.0m (negative) 11 From these numbers it can be concluded that constructing barriers that accept water overflow result in a moderate decrease in positive head of 0.5m and 1.0m respectively. The negative head does not change at all. Therefore, a lower barrier might be an attractive option. Not only is a lower construction height less costly, also a large part of the water head is just overflown during storm surge, which decreases the loads on the barrier which have to be resisted. A barrier that may be overflown however, must be able to deal with the dynamics of the overflowing water. This requires further investigation. 3.3 Nautical boundary conditions This section discusses the nautical boundary conditions that are relevant for the barrier opening and closure regime. The drafted conditions are based on the development of vessel movement activity in the Houston Shipping Channel during Hurricane Ike, see 16

51 Table 5. This is not specifically for the Bolivar Roads waterway, but gives a good indication. 17

52 Table 5: Vessel activity in the Houston Shipping Channel from September 9th 20th. Based on information by R.W. Welch, VTS Houston (personal communication ). Date, time Time prior to Action/event or landfall after September 9 th, 14:00 74 hours prior Vessels begin departing or making arrangements to stay in Port of Houston September 10 th, 10:00 September 11 th, 11:00 September 11 th, 23:00 September 12 th, 10:00 September 13 th, 02:00 54 hours prior Vessel-facilities continue to prepare for Ike 39 hours prior Vessel fleeting, departing or make arrangements to stay 27 hours prior Ferry operations come to hold. No other movements than commercial fishing 16 hours prior Terminals shut down Landfall of Hurricane Ike at Galveston September 14 th 1 day Information gathered to resume shipping September 15 th 2 days Tows begin moving September 17 th 4 days Ships begin moving September 20 th 7 days Shipping resumed; 250 vessel movements According to this information the following can be concluded with respect to hindrance of navigation in Bolivar Roads due to barrier closure: Barrier closure earlier than 27 hours before landfall likely results in hindrance of navigation. After 27 hours before landfall the majority of navigation will come to a hold. Additional downtime for navigation due to barrier closure can be expected. Navigation will be resumed not earlier than 2 days after landfall. The moment of opening the barrier after a closure is therefore not decisive. 18

53 3.4 Conclusions and recommendations Conclusions 1. According to the model results, for 1/10,000 yr -1 hurricanes expected to make landfall within 250km (east or west) from Bolivar Roads the barrier should be closed approximately 32 hours prior to landfall to prevent substantial inflow of the forerunner surge. It should remain closed for at least 48 hours (yet apart from closing/opening at low tide). 2. As navigation is estimated to come to a hold 27 hours before landfall barrier closure could hinder navigation for a few hours. 3. Closing the barrier at low tide results in a lower internal water level which reduces the flood hazard along the Galveston Bay shores. As Bolivar Roads experiences a semidiurnal tide this would mean an increase of closure duration of at most another 12 hours. The maximum closure duration taking low tide into account will therefore be 60 hours (44 hours prior to landfall). Closure further in advance of landfall, e.g. another day extra, is expected not to make any difference for the governing hydraulic loading. It will only increase hindrance for navigation and is therefore not advised. 4. Opening of the barrier will be done when the water level has dropped back to normal (tidal) levels or when a negative head occurs (see concluding remark 8). 5. With a retaining height of +3m MSL the barrier should be designed for a maximum positive head of 10.5m and a maximum negative head of 3.0m. 6. In case of positive head the wave conditions are assumed as: =5.9 <, 1 4 =3.3 < and 5 6 =7.9 %. These numbers are based on (Jin 2010), see also hydraulic boundary conditions in (P. d. Vries 2014). It is advised to close the navigational barrier before closing the environmental barrier. When opening again the environmental section should be opened first. This is to avoid closing/opening in high flow velocities. 7. In case negative head occurs it is recommended to open the barrier to release the head. The best way to do so would be to open the environmental barrier, to avoid the opening of the navigational barrier in high flow velocities. 8. Currently, between 27 hours before landfall and landfall commercial fishing still passes Bolivar Roads. In case of a closed barrier they could blame this closure for their downtime, even while they weren t even planning on setting sail due to the severe weather conditions. Recommendations 1. The surge in the bay is currently modelled using a semi-stationary approach. A more appropriate approach would be to model the internal surge by using a numerical model which incorporates non stationary effects like inertia and bottom friction. 2. Currently, this study focusses on extreme hurricanes with a relative small radius and very low atmospheric pressure. In future research, focus can be extended to relative large hurricanes with less extreme central pressure. 3. The constant parameters in these calculations are assumed to be deterministic. By identifying probabilistic distributions for these parameters the worst case water heads can be determined more accurately. Subsequently a 2D model should be run for this worst case to determine the exact water heads. 4. Information about navigation activity during Hurricane Ike is based on information for the Houston Shipping Channel and not specifically for Bolivar Roads. It is recommended to further investigate the hindrance for navigation due to barrier closure for Bolivar Roads specifically. 19

54 4. Structural design The critical hydraulic boundary conditions for a fore runner surge blocking barrier in the Bolivar Roads are determined in chapter 3, see Table 3. This chapter will further elaborate on the design of the barge gate taking all different load combinations, following from an analyses of the closure procedure, in to account. Using the Finite Element (FE) model created in the previous study, a new design of the barge gate is made taking the revised critical loads in to account. A static calculation is made based on the governing hydraulic loads for every load combination. In a later phase we will look at the dynamic response of the gate. 4.1 Load conditions The different phases of the closure procedure are described in chapter 2. Following from an analysis of these phases it became clear that distinction should be made between two conditions for the barge gate: 1. During the closing procedure the barge gate behaves as a moving, floating structure; 2. In closed position, during hurricane loading, the barge gate behaves as a fixed civil structure. The static and dynamic stability of both the floating and fixed condition needs to be assessed in further engineering of the barge gate. The static stability needs to be assessed during all phases, the dynamic stability during rotation of the gate in to position and when there is a positive head over the barrier. Table 6: Load conditions in closing procedure (the X s represent the conditions which need to be assessed) Floating structure: moving Civil structure: fixed Set afloat Rotation to closed position Submerge procedure Submerged on sills During storm: positive head Static stability X X X X X Dynamic stability X X Ad 1) Design of the barge gate as a moving floating structure During closure of the barge gate it is set afloat, rotated in position and submerged in a controlled manner (see chapter 2). During floating condition both the static and dynamic stability of the barge gate need to be assessed, as shown in Table 6. 20

55 For static stability of a floating structure a certain rotation of the element should be compensated by an up righting moment caused by the buoyant forces and the weight of the element. A measure for the sensitivity to tilting is the metacentric height [h m ]. For a preliminary design the metacentric height should have a minimum height of 0.5 meter during floating and submerging of the structure. During the closure procedure when the empty barrier is set afloat and rotated in position, it will have a draught of 3.7 meter and a metacentric height well over 0.5 meter, see Appendix B. The static stability is sufficient. The stability during the submerging process and dynamic stability during closure (sway and resonance) still require further investigation. Calamities A floating structure should be able to resist certain amounts of flooding without consequences for the stability. According to DNV rules (DNV 2013) the structure should have sufficient freeboard and be subdivided by means of watertight decks and bulkheads to provide sufficient buoyancy and stability to withstand the flooding of any watertight compartment (completely or partially) below the waterline in question in any operating or transit condition. The separation walls inside the barge gate should therefore be designed to retain the horizontal pressure as a result of a flooded compartment. The resulting water head over one separation wall is estimated at 4 meters, see Appendix B. The stability of the barge gate after flooding of one compartment will be assessed in a later phase. Ad 2) Design of the barge gate as a fixed civil structure When the gate is submerged it will behave as a fixed or static civil structure. The static stability of the structure is checked for normal loading and a positive head. The negative head is not taken in to account as it is advised to open the barrier when a negative head occurs. The following assumptions were made for the design of the barge gate (Toorn, et al. 2014): The material used is S355. The rough weight of the barge is increased by 20% so it can accommodate extra details, paint, etc; The hydrostatic loads on the structure are applied as line loads; The gate consists of an external shell (skin plates, side plates, top and bottom plate), the buoyancy chambers, and the frame structure: columns, beams along two directions and diagonals. Plate stiffeners will be used to optimize the thickness of the steel structure; The plate stiffeners are not modelled; instead an equivalent thickness is given to the plates, taking in to account the area of the stiffeners; For the check of the Structure the EN :2006 and the Dutch National Annex has been used. The beams (for the stability checks) are assumed to be non-sway. For the concept design a FE model is created in SCIA Engineer Further optimization of the cross section of the barge gate resulted in the following alterations. 21

56 The cross section will consist of 4 compartments which reduce global bending in the bottom of the gate and improve stability during the submerge process, due to the use of smaller ballast compartments. The under pressure proved to be dominant in a rectangular cross section, which was assumed in the first design stage. As a result the static displacement of the bottom due to bending was already 0.7 meter, which reduced the opening between the gate and bottom to 0.3 meter. To reduce the under pressure a more catamaran type cross section is advised (see Figure 9), with a release cavity under the gate. The resulting displacement due to bending is reduced significantly which allows for maintaining a gap under the gate of 1 meter. The outer compartments will have a width of 8 meter and the inner compartments a width of 12 meter for a total width of 40m, the buoyancy chambers are placed in the outer compartments (see Figure 9 and Figure 10). The resulting under pressure under the structure is estimated as 62 ;7/< * in the outer sections and 10 ;7/< * in the cavity, which is a significant reduction. The hydrodynamic loading is similar to the hydrostatic, equal to 20% of it, based on a significant wave height of 3.3 m (Hmax is 5.9m) and a significant wave period of 7.9s. The resulting load cases are described and shown in the following paragraph. The dynamic stability during storm conditions with a positive head requires further investigation. Release cavity Buoyancy chambers Figure 9: 3D view of half of the barge gate, in the cross section the release cavity is visible 22

57 Figure 10: Detail of dimensions of cross section of the barge gate 4.3 Load Cases Based on an assessment of all hydrostatic loads on the structure three load cases are identified for a situation in which the barge is submerged and resting on its abutments. 1. LC1 Pressure due to flow: The under pressure resulting from overflow over the barrier during a positive head: 62 ;7/< * in the outer sections and 10 ;7/< * in the release cavity; 2. LC2 External hydrostatic pressure: The external horizontal loads (both hydrostatic and hydronamic) resulting from the positive head over the barge gate of 10.5 meter and the wave loads, which are taken in to account through an increase of the hydrostatic pressure with 20%; 3. Ballast load A: The ballast load consists of the ballasting required to submerge the barge gate on the abutments and an additional internal load of 4 meter water head over the internal separation walls. The additional internal load is the result of a calamity, such as a leak in a compartment which floods the compartment. 23

58 Figure 11: Load cases: top down: LC1, LC2 and Ballast A 24

59 4.4 Results Taking the aforementioned load cases in to account further engineering with the FEM model was done. This provided the following results. - The maximum global vertical displacement in the bottom of the gate is reduced to 445mm, which is a significant reduction compared to the 700mm found in the second barrier study. The release cavity under the barge gate has the desired effect of reducing the pressures significantly and thus reducing the displacements; - The total weight of the barge gate is increased to a total of 36,462 tons, taking local bending of the compartments in to account and the increase of the total weight with 20% for welds, details, extra plates, paint, brackets etc.; - In many cases the unity checks are moderate (i.e. there is a large amount of safety in the design), allowing for further optimisation of the structure. There are cases where the unity checks are quite low ( ), such as in skin plates A1 to A3 in the gulf side. There the minimum thickness of the plate (12mm) in order to achieve cross section class 3 (and therefore no plate buckling) has been applied. - There are small areas in some of the plates where the global stress is higher than the yield stress; this, taking into account also the local stress due to local bending, would lead to unity checks above However, within the same zone or adjacent zones, there are areas with the same thickness where the UC's are low (such as ). This means that with further optimisation and by applying more zones of different thickness, the areas where the stress is higher will be thicker and the areas where the stress is low will be thinner; this will not affect the total weight. - The engineering calculations were made with conservative values for the load factors (1.35) which are subject to discussion as the load cases are already the most extreme cases for the barge gate. Further optimization with lower values for the load factors can result in a more cost effective structure. - The vertical reaction forces have reduced to a total of 144,393 kn (half of the barge), to be transferred to the abutments. In the second study a deep pile foundation with a mixed group batter piles (tension and pressure) or a deep foundation realized by (pneumatic) caissons or (coupled pair of) cellular cofferdams were proposed (Toorn, et al. 2014). Based on additional soil data a design decision can be made for the most appropriate foundation type, given the total vertical reaction forces computed. 25

60 5. Closing Discussion In this chapter the most important conclusions drawn in this report are summarized and recommendations are given for further research. 5.1 Design optimizations Based on the second study (Toorn, 2014) a barge gate appeared to be preferred for the barrier in the navigational section of the Bolivar Roads storm surge barrier. The barge gate will distribute the forces towards the embankments. In principle it is a floating box / ship hull that is floated into place to block the waterway. Hydraulic pressure pushes the gate against the embankments. An opening of one meter under the barge gate is assumed. After assessing the effect of a leaking barrier on the water levels inside the bay it is found that the fore runner surge of hurricanes needs to be blocked, which results in a minimum water retaining height level of +3m MSL. The gate will swing around an external hinge which should allow the gate to freely rotate about all axes (roll, yaw, pitch) and allow for movements in vertical direction (heave). Horizontal translations should not be possible (sway and surge). It is therefore only fixed in horizontal direction. The cross section will consist of 4 compartments which reduce global bending in the bottom of the gate and improve stability during the submerge process, due to the use of smaller ballast compartments. The under pressure proved to be dominant in a rectangular cross section, which was assumed in the first design stage. To reduce the under pressure a more catamaran type cross section is advised (see Figure 9), which provides a release cavity under the gate. The outer compartments will have a width of 8 meter and the inner compartments a width of 12 meter for a total width of 40m, the buoyancy chambers are placed in the outer compartments (see Figure 9and Figure 10). 5.2 Technical results Closure regime and hydraulic loads - According to the model results, the barrier should be closed approximately 32 hours prior to landfall for 1/10,000 yr -1 hurricanes expected to make landfall within 250km (east or west) from Bolivar Roads. It should remain closed for at least 48 hours (yet apart from closing/opening at low tide). If closed at low tide an increase of at most 12 hours is required, so the closure should be minimal 44 hours prior to landfall and remain closed for 60 hours. - As navigation is estimated to come to a hold 27 hours before landfall barrier closure could hinder navigation for a few hours. - Opening of the barrier will be done when the water level has dropped back to normal (tidal) levels or when a negative head (i.e. higher water levels in the bay than in the gulf of Mexico) occurs. 26

61 - In case a negative head occurs it is recommended to open the barrier to release the head. The best way to do so would be to open the environmental barrier, to avoid the opening of the navigational barrier in high flow velocities. - With a retaining height of +3m MSL the barrier should be designed for a maximum positive head of 10.5m and a maximum negative head of 3.0m. - In case of positive head the wave conditions are assumed as: =5.9 <, 1 4 =3.3 < and 5 6 =7.9 %. Engineering results Structural analysis of the barrier focussed on the submerged / fixed load case: - The hydrostatic loads on the barge gate are shown in the different load cases described in chapter 4. The hydrodynamic loading is similar to the hydrostatic, equal to 20% of it, based on the significant wave height and period. - The maximum global vertical displacement of the gate is reduced to 445mm, which is a significant reduction compared to the 700mm found in the previous barrier study. The release cavity under the barge gate has the desired effect of reducing the pressures significantly and thus reducing the displacements; - The total weight of the barge gate is increased to a total of 36,462 tons, taking local bending of the compartments in to account and the increase of the total weight with 20% for welds, details, extra plates, paint, brackets etc.; - The static and dynamic stability of both the floating and fixed condition needs to be assessed in further engineering of the barge gate. 5.3 Recommendations for further research A distinction is made between the more technical recommendations for the Bolivar Roads surge barrier and the general recommendations for flood risk reduction in the Galveston Bay. Technical recommendations: Hydraulic boundary conditions The surge in the bay is currently modelled using a semi-stationary and simplified approach. A more appropriate approach would be to model the internal surge by using a numerical model which incorporates non stationary effects like inertia and bottom friction. Furthermore, this study focusses on extreme hurricanes with a relative small radius and very low atmospheric pressure. In future research, focus can be extended to relative large hurricanes with less extreme central pressure. The constant parameters in these calculations are assumed to be deterministic. By identifying probabilistic distributions for these parameters the worst case water heads can be determined more accurately. 27

62 Technical recommendations: Engineering of barge gate Several engineering design aspects of the barrier require further attention: - Design of the external hinge of the barge gate; - Design of the scour protection of the complete surge barrier; - Design of the abutments / foundation of barge gate: based on additional soil data a design decision can be made for the most appropriate foundation type, given the total vertical reaction forces computed; - Investigation of wave impacts on the structure: currently the significant wave height is taken in to account which is much lower than the maximum wave height. The wave loads are taken in to account with 20% extra hydrostatic loading, which might be an underestimate when considering large swell waves occurring during hurricanes. - An optimization of the cross section to reduce wave impacts is advised (more leveelike structure on the top of the barrier?). Also, other shapes of the barrier could be investigated to look for a more efficient and elegant structure than the proposed barge; - Investigate the dynamic stability of the gate during the closure operation, submerging procedure and during storm conditions. Dynamic instability, such as fluttering and dancing of the gate due to overflowing, can occur which would lead to the recommendation of an increase of the retaining height (full surge blocking barrier); - A reassessment of the load cases is advised when more insight is gained in the aforementioned hydraulic boundary conditions (water levels and waves) and dynamic behaviour of the gate. - In many cases the unity checks are moderate (i.e. the design is relatively safe_, allowing for further optimisation of the structure. By applying more zones of different thickness, the areas where the stress is higher will be thicker and the areas where the stress is low will be thinner; this will not affect the total weight. Furthermore, optimization of the load factors can result in a more cost effective structure as the values used are considered conservative. 28

63 General recommendations - A flood risk assessment of the whole system as a proof of concept is advised This model framework could be used for the comparison of different flood risk reduction strategies and to determine the optimal level of protection. - For a broader such risk assessments it is needed to analyse and map flooding for various surge levels and return periods in the Galveston Bay. This will provide a) a basis for damage and risk assessment and an indication of hotspots; b) a basis for evaluation of risk reduction options; c) a powerful visualization and communication of areas at risk (with and without interventions); - The cost effectiveness of different retaining heights of the surge barrier could be investigated in terms of (barrier) cost savings but additional flooding and costs in the bay - Investigate alternative barrier concepts for the environmental section, taking poor soil conditions in to account. In past studies a caisson type of barrier was proposed, but providing a good foundation would be critical given the soil conditions; - Assess environmental impact of the Bolivar Roads surge barrier on ecological system in the Galveston Bay; - Design of the land barriers of on Galveston island and the Bolivar peninsula. Aim of the study is to come to the most suitable design of the coastal dike that is part of the Ike Dike system, as well as integration in the urban and rural landscape; 29

64 Bibliography Breukelen, Marjolein van. Improvement and scale enlargement of the inflatable rubber barrier concept: A case study applicable to the Bolivar Roads barrier, Texas, USA. Delft: Delft University of Technology, Dehousse, N.M., Rodriguez, S., Rigo, Ph.,. The biggest one-span floating gate designed todate. International Congres, innovative large span structures DNV. Stability and water tight integrity Emanuel, K. The dependence of hurricane intensity on climate. Nature, 1987: Holland, G.J. An analytic model of the wind and pressure profiles in hurricanes. Monthly Weather Review, 1980: Jin, J., Jeong, C., Chang, K.-A., Song, Y. K., Irish, J., and Edge, B. Site Specific Wave Parameters for Texas Coastal Bridges: Final Report. 2010, 61, 67. Jonkman, S, et al. Report Galveston Bay: Flood Risk Reduction Barrier. Delft: Delft University of Technology, Merrell, W. The Ike Dike: A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge. CIGMAT. Houston: CIGMAT, Miller, D. Bayou Lafourche Swing Gate. WG 26 PIANC, NOAA. Meteorological Criteria for Standard Project Hurricane and Probable Maximum Hurricane Windfields, Gulf and East Coasts of the United States. Washington: NOAA, Resio, D.T., J.L. Irish, en M Cialone. A surge response function approach to coastal hazard assesment - part 1: basic concepts. Nat. Hazards, 2009: Ruijs, Maarten. The effects of the Ike Dike barriers on Galveston Bay. Delft: Delft University of Technology, Stoeten, Kasper. Hurricane Surge Risk Reduction for Galveston Bay. Delft: Delft University of Technology, Toorn, A. van der, et al. Report Galveston bay: Barge gate design. Delft: TU Delft, Vries, P.A.L. de. The Bolivar Roads Surge Barrier: a Conceptual Design for the Environmental Section Vries, Peter. n/a. Delft: Delft University of Technology,

65 Appendix A Hydraulic model results In this appendix the results of the water levels for different landfall locations are presented. The landfall location 250km east is modelled without a forerunner surge, to obtain the negative head. A.1 Surge blocking barrier Table 7: Governing head for different landfall locations with (surge blocking) barrier Landfall location Water level [m MSL] Head [m] Closure [hr] duration Gulf side Bay side -250 km (west) km (west) (1) km (direct hit) km (east) km (east) (2) (neg.) 11 (1) Lower than bottom level of bay (2) Modelled without forerunner surge 31

66 Figure 12: Water levels for different landfall locations with (surge blocking) barrier. Landfall location +250km (east) modelled without forerunner surge. 32

67 A.2 Barrier at MSL+3m Table 8: Governing head for different landfall locations with barrier at MSL+3m Landfall location Water level [m MSL] Head [m] Closure duration [hr] Gulf side Bay side -250 km (west) km (west) (1) km (direct hit) km (east) km (east) (2) (neg.) 11 (1) Lower than bottom level of bay (2) Modelled without forerunner surge 33

68 Figure 13: Water levels for different landfall locations with barrier at MSL+3m. Landfall location +250km (east) modelled without forerunner surge. 34

69 A.3 Barrier at MSL Table 9: Governing head for different landfall locations with barrier at MSL Landfall location Water level [m MSL] Head [m] Closure duration [hr] Gulf side Bay side -250 km (west) km (west) (1) km (direct hit) km (east) km (east) (2) (neg.) 11 (1) Lower than bottom level of bay (2) Modelled without forerunner surge 35

70 Figure 14: Water levels for different landfall locations with barrier at MSL. Landfall location +250km (east) modelled without forerunner surge. 36

71 Appendix B Stability of floating empty barge gate B.1 Static stability normal conditions Static stability refers to the sensitivity of the element to tilting. For static stability rotation of the element should be compensated by a righting moment caused by the buoyant force and the weight of the element. A measure for the sensitivity to tilting is the metacentric height [h m ]. In this appendix the check is done for an empty barge gate, which is the case during closure of the navigational barrier. The draught of the empty barge gate is found with the following calculation: %%Dimensions barge gate L = 240; %Length of barge = 240 meter H = 20; %Height of barge = 20 meter W = 40; %Width of barge = 40 meter G = ; %Weight of barge in kn %% Draught of empty barge gate Vw = G/ys; %Volume of under water body = 36,000 m3 d = Vw/(L*W) %Draught of barge gate = 3.7 meter Figure 15: Static stability of a symmetrical floating structure, Source: CT3330 Lecture notes For stability a minimum metacentric height of 0.5 meter is required which is calculated with the following equations: h m = KB + BM KG (1) KB = ½ * d, (the center of gravity of the body under water) (2) BM = I/V w, (the moment of inertia divided by the volume of the body under water) (3) KG = ½ * h, (the center of gravity of the body) (4) ys = 10.25; %Volumetric weight of salt water kn/m3 %% Static stability check empty barge (metacentric height > 0.5 meter) I = 1/12*L*W^3; %Smallest moment of inertia = m4 KG = 0.5*H; %Center of gravity of barge gate = 10 meter KB = 0.5*d; %Center of gravity of under water body = 1.85 meter BM = I/Vw; %BM = 35 m hm = KB+BM-KG %Metacentric height = 25 meter > 0.5 meter! stable. 37

72 B.2 Required ballast for submerging the gate The required amount of ballast water will be calculated in this appendix. - The gate has a total weight of 36,462 tons, which is 364,620 kn. - The weight of the water replaced by the barge gate during maximum loading is 1,849,920 kn. - The required ballast weight for the barge gate to stay submerged is therefore: (1,849,920kN-364,620kN) 1,485,300 kn. This equals a water volume of 145,000 m 3. - The resulting water level inside the gate is 15 meter. To account for the release cavity of 1 meter height a minimum required inner water level of 16 meters for ballasting of the gate is assumed. This will result in minimal weight on the abutments as the gate is just submerged / floating on the abutments. Figure 16: Load case 'Ballast A' resulting from ballasting the gate with water and a one flooded compartment due to a calamity B.3 Resulting head over internal wall after calamity According to DNV rules (DNV 2013) the structure should have sufficient freeboard and be subdivided by means of watertight decks and bulkheads to provide sufficient buoyancy and stability to withstand the flooding of any watertight compartment (completely or partially) below the waterline in question in any operating or transit condition. If one compartment is flooded a hydraulic head over the internal separation wall will occur, as can be seen in see Figure 16. The maximum head over the internal wall will be 4 meters. 38

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection

More information

A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge

A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge A Coastal Barrier Protecting the Houston/Galveston Region from Hurricane Storm Surge 1/20/2011 The Houston/Galveston Region Is home to about 2 Million people and may double by 2050 Galveston Bay provides

More information

SSPEED Center Phase III: Developing a Houston- Galveston Area Protection System (H-GAPS)

SSPEED Center Phase III: Developing a Houston- Galveston Area Protection System (H-GAPS) Center Phase III: Developing a Houston- Galveston Area Protection System (H-GAPS) The Center 6100 Main St., MS317 Houston, Texas 77005 June 2, 2014 DPCAC meeting Center Phase I & II Recap (2009-2014) Phase

More information

Water Management in the Netherlands

Water Management in the Netherlands Water Management in the Netherlands Eric Boessenkool Senior Advisor to the Management Board of RIjkswaterstaat Ministry of Infrastructure and the Environment New ministry since end of 2010 Merger of Ministry

More information

Flood Risk Assessment in the Netherlands: A Case Study for Dike Ring South Holland

Flood Risk Assessment in the Netherlands: A Case Study for Dike Ring South Holland Risk Analysis, Vol. 28, No. 5, 2008 DOI: 10.1111/j.1539-6924.2008.01103.x Flood Risk Assessment in the Netherlands: A Case Study for Dike Ring South Holland Sebastiaan N. Jonkman, 1,2 Matthijs Kok, 1,3

More information

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003

Sediment and Dredged Material Management - Relevance and Objectives 18 September 2003 - Relevance and Objectives 1. Scope of the Dutch German Exchange (DGE) The Netherlands and Germany have large river systems such as Danube, Rhine, Meuse, Elbe, Weser and Ems, which have important hydrological

More information

The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina

The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina Dr J.W. van der Meer, Dr C. Cooper, M.J. Warner, H. Adams-Morales and G.J. Steendam Abstract and presentation

More information

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps 4.14 Netherlands The Netherlands is flood prone for about 60% of its surface. 95 so-called dike-rings protect the polders from being flooded from the North Sea, rivers or lakes. The protection level has

More information

Martine Jak 1 and Matthijs Kok 2

Martine Jak 1 and Matthijs Kok 2 A DATABASE OF HISTORICAL FLOOD EVENTS IN THE NETHERLANDS Martine Jak 1 and Matthijs Kok 2 1 Department of Transport, Public works and Water Management Road and Hydraulic Engineering Division P.O. Box 5044

More information

Aligning Natural and Built Infrastructure for

Aligning Natural and Built Infrastructure for Aligning Natural and Built Infrastructure for Houston Climate Resilience National Exercise Program (NEP) Houston Climate Change Preparedness & Resilience Workshop Edmond J. Russo, Jr., PhD, PE, D.CE, D.NE,

More information

Greater New Orleans Hurricane and Storm Damage Risk Reduction System

Greater New Orleans Hurricane and Storm Damage Risk Reduction System Greater New Orleans Hurricane and Storm Damage Risk Reduction System Mike Park Chief Task Force Hope Mississippi Valley Division U.S. Army Corps of Engineers March 15, 2011 US Army Corps of Engineers BUILDING

More information

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide. INTRODUCTION TO STORM SURGE Introduction to Storm Surge BOLIVAR PENINSULA IN TEXAS AFTER HURRICANE IKE (2008) What is Storm Surge? Inland Extent Storm surge can penetrate well inland from the coastline.

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide.

Storm tide is the water level rise during a storm due to the combination of storm surge and the astronomical tide. INTRODUCTION TO STORM SURGE Introduction to Storm Surge National Hurricane Center Storm Surge Unit BOLIVAR PENINSULA IN TEXAS AFTER HURRICANE IKE (2008) What is Storm Surge? Inland Extent Storm surge can

More information

Hurricanes and Storm Surge www.hcfcd.org/tropicalweather

Hurricanes and Storm Surge www.hcfcd.org/tropicalweather Hurricanes and Storm Surge www.hcfcd.org High-level winds fl ow outward Strong surface winds spiral inward EYE Calm, sometimes cloudfree, sinking air Air sinks in calm area at the storm s eye THUNDERSTORMS

More information

Policy & Management Applications of Blue Carbon. fact SHEET

Policy & Management Applications of Blue Carbon. fact SHEET Policy & Management Applications of Blue Carbon fact SHEET Policy & Management Applications of Blue Carbon Coastal Blue Carbon - An Important Wetland Ecosystem Service Coastal Blue Carbon refers to the

More information

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we

More information

Coastal Restoration Spending in Louisiana Economic Impact Analysis

Coastal Restoration Spending in Louisiana Economic Impact Analysis Coastal Restoration Spending in Louisiana Economic Impact Analysis Louisiana Workforce Commission www.lmi.laworks.net/green September 2011 In 2009, Louisiana and Mississippi partnered to research economic

More information

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.

Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property. 6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment

More information

A New Coastal Engineering Graduate Program

A New Coastal Engineering Graduate Program Paper ID #12157 A New Coastal Engineering Graduate Program Dr. Robert W. Whalin, Jackson State University Dr. Robert W. Whalin, Professor of Civil and Environmental Engineering, and Director, Coastal Hazards

More information

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005

Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Flood Emergency Response Planning: How to Protect Your Business from a Natural Disaster RIC005 Speakers: Tom Chan, CEO, Global Risk Miyamoto Greg Bates, Principal, Global Risk Consultants Learning Objectives

More information

Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I)

Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I) Comprehensive Recommendations Supporting the Use of the Multiple Lines of Defense Strategy to Sustain Coastal Louisiana 2008 Report (Version I) This report recommends integrated coastal projects and levee

More information

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou Discussion about the practicability of implementing flood risk management and urban flood insurance in China Longhua Gao, Xiaoqing Zhou Abstract: This paper explains the flood risk management at first,

More information

Appendix J Online Questionnaire

Appendix J Online Questionnaire Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date

More information

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model BY Dr. Leo Brewster, Director Coastal Zone Management Unit, Barbados Presented At UNFCCC Expert

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Assessment of flood risks in polders along the Dutch lakes F. den Heijer* & A.P. de LoofP WL\delft hydraulics ^Ministry of Transport, Public Works and Water Management, Directorate General of Public Works

More information

Resolution XII.13. Wetlands and disaster risk reduction

Resolution XII.13. Wetlands and disaster risk reduction 12 th Meeting of the Conference of the Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Punta del Este, Uruguay, 1-9 June 2015 Resolution XII.13 Wetlands and disaster risk reduction 1. RECALLING

More information

Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston

Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston Texas Universities Recover from Hurricane Ike University of Texas Medical Branch Galveston and Texas A&M University Galveston Business Continuity and Disaster Recovery State of Texas Executive Summary

More information

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015 N a t i o n a l O c e a n i c a n d A t m o s p h e r i c A d m i n i s t r a t i o n ( N O A A ) C o a s t a l S e r v i c e s C e n t e r March

More information

Sec. 22a-1a page 1 (4-97)

Sec. 22a-1a page 1 (4-97) Department of Environmental Protection Sec. 22a-1a page 1 (4-97) TABLE OF CONTENTS Connecticut Environmental Policy Act Definitions... 22a-1a- 1 Determination of sponsoring agency.... 22a-1a- 2 Determination

More information

Guideline for Stress Testing the Climate Resilience of Urban Areas

Guideline for Stress Testing the Climate Resilience of Urban Areas Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier

Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier Future of our coasts: Potential for natural and hybrid infrastructure to enhance ecosystem and community resilience Ariana Sutton-Grier University of Maryland & National Oceanic and Atmospheric Administration

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Tradeoffs of Ecosystem Services from Wetlands in the Houston Region

Tradeoffs of Ecosystem Services from Wetlands in the Houston Region Tradeoffs of Ecosystem Services from Wetlands in the Houston Region L. James Lester 1, Gregory R. Biddinger 1 and Lisa A. Gonzalez 1 1 HARC, The Woodlands, TX, USA The Starting Point: ES Workshop Galveston

More information

Impacts of Global Warming on Hurricane-related Flooding in Corpus Christi,Texas

Impacts of Global Warming on Hurricane-related Flooding in Corpus Christi,Texas Impacts of Global Warming on Hurricane-related Flooding in Corpus Christi,Texas Sea-level Rise and Flood Elevation A one-foot rise in flood elevation due to both sea-level rise and hurricane intensification

More information

Darja Tretjakova MANAGING FLOOD RISK IN INTERNATIONAL HARBOURS

Darja Tretjakova MANAGING FLOOD RISK IN INTERNATIONAL HARBOURS Darja Tretjakova MANAGING FLOOD RISK IN INTERNATIONAL HARBOURS Outline Origins and reasons Methodology Results Conclusions 2 Why this research? Increasing flood risk: CC, socio-economic development Port

More information

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy

Melbourne Water s Submission. Draft Victorian Floodplain Management Strategy Melbourne Water s Submission Draft Victorian Floodplain Management Strategy Waterways, drainage and floodplains are essential to life and liveability. The rivers, creeks, estuaries, wetlands and floodplains

More information

Delta development. Teunis Louters Delta Development, the Netherlands

Delta development. Teunis Louters Delta Development, the Netherlands Delta development Teunis Louters Delta Development, the Netherlands Jasper Fiselier DHV, date 10 June 2011 Active worldwide Over 5.500 employees DHV Group Expertise: - Water - Mobility including Airports

More information

SARASOTA COUNTY Dedicated to Quality Service

SARASOTA COUNTY Dedicated to Quality Service SARASOTA COUNTY Dedicated to Quality Service Florida Flood Map Updates and the National Flood Insurance Program Joy Duperault, CFM State of Florida NFIP Coordinator Desiree (Des) Companion, CFM CRS Coordinator

More information

Risk Analysis, GIS and Arc Schematics: California Delta Levees

Risk Analysis, GIS and Arc Schematics: California Delta Levees Page 1 of 7 Author: David T. Hansen Risk Analysis, GIS and Arc Schematics: California Delta Levees Presented by David T. Hansen at the ESRI User Conference, 2008, San Diego California, August 6, 2008 Abstract

More information

Gulf Intracoastal Waterway

Gulf Intracoastal Waterway TEXAS DEPARTMENT OF TRANSPORTATION Gulf Intracoastal Waterway Photo by TexasGulfCoastOnline.com Gulf Intracoastal Waterway in Texas Figure 1 - Texas GIWW Executive Summary The Texas Department of Transportation

More information

The Army Corps of Engineers and the Flood Risk Challenge

The Army Corps of Engineers and the Flood Risk Challenge The Army Corps of Engineers and the Flood Risk Challenge Presentation to Association of State Flood Plain Managers Steven L. Stockton, P.E. Director of Civil Works June 12, 2013 US Army Corps of Engineers

More information

Standard Operating Procedures for Flood Preparation and Response

Standard Operating Procedures for Flood Preparation and Response Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than

More information

Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection. fact SHEET

Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection. fact SHEET Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection fact SHEET Using the Carbon Market to Provide Financial Support for Coastal Restoration and Protection Coastal

More information

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration

Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Future of our coasts: Potential for natural and hybrid infrastructure Ariana Sutton-Grier, Holly Bamford & Kateryna Wowk University of Maryland and National Oceanic and Atmospheric Administration Green

More information

The Dutch Delta Approach

The Dutch Delta Approach Sweden Mission from Skane The Dutch Delta Approach Future proof flood risk management in the Netherlands Martien Beek Special advisor to Delta Program Commissioner 18 September 2013 1 The Netherlands exposure

More information

USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect?

USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? National Waterways Conference Legislative Summit Steven L. Stockton, P.E. Director of Civil Works, U.S. Army Corps of Engineers

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency. Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.

More information

Tropical Storm Allison 2001

Tropical Storm Allison 2001 Texas State Senate Subcommittee on Flooding and Evacuations Testimony of Robert Eckels 18 October 2010 The challenges of Hurricanes and Flooding can best be illustrated in the Tale of Two Storms. Tropical

More information

Risk Analysis within Coastal Zone Management

Risk Analysis within Coastal Zone Management Risk Analysis within Coastal Zone Management Nicole von Lieberman and Stephan Mai University of Hannover, Franzius-Institut for Hydraulic, Waterways and Coastal Engineering Hannover, Germany Summary Natural

More information

U.S. Army Corps of Engineers

U.S. Army Corps of Engineers Walla Walla District U.S. Army Corps of Engineers Hurricane Katrina Response Briefer: Joseph Saxon Today s Briefing U.S. Army Corps of Engineers Mission Events leading up to New Orleans flooding Corp s

More information

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.

Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters. Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,

More information

Climate Change Long Term Trends and their Implications for Emergency Management August 2011

Climate Change Long Term Trends and their Implications for Emergency Management August 2011 Climate Change Long Term Trends and their Implications for Emergency Management August 2011 Overview A significant amount of existing research indicates that the world s climate is changing. Emergency

More information

Most Vulnerable US Cities to Storm Surge Flooding. August 2015 2 COPLEY PLACE BOSTON, MA 02116 T: 617.423.2800 F: 617.423.2808

Most Vulnerable US Cities to Storm Surge Flooding. August 2015 2 COPLEY PLACE BOSTON, MA 02116 T: 617.423.2800 F: 617.423.2808 Most Vulnerable US Cities to Storm Surge Flooding August 2015 2 COPLEY PLACE BOSTON, MA 02116 T: 617.423.2800 F: 617.423.2808 Introduction Hurricane Katrina was a stark reminder that strong winds are only

More information

Flood Risk Management Plans

Flood Risk Management Plans Flood Risk Management Plans Main topics of interest and the workshop programme Jos van Alphen 26-01-2010 Content 1. Floods in Europe and related measures 2. The Floods Directive and Flood Risk Management

More information

5 Year Strategic Plan

5 Year Strategic Plan Mid Atlantic Fishery Management Council 5 Year Strategic Plan 2014 2018 DRAFT 5/31/2013 Table of Contents Table of Contents... 1 Introduction... 2 The Mid Atlantic Fishery Management Council... 2 Rationale

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Section 6 Benefit-Cost Analysis

Section 6 Benefit-Cost Analysis 6.1 Introduction For the preferred storage alternatives, a benefit-cost analysis (BCA) was conducted to evaluate the economic feasibility of implementation. The economic evaluation was conducted using

More information

MITIGATION STRATEGY OVERVIEW

MITIGATION STRATEGY OVERVIEW ALL-HAZARDS MITIGATION PLAN MITIGATION STRATEGY Code of Federal Regulations (CFR) Requirement 44 CFR Part 201.6(c)(3)(i): The mitigation strategy shall include a description of mitigation goals to reduce

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Mike Spranger, PhD. Professor, University of Florida [email protected]

Mike Spranger, PhD. Professor, University of Florida spranger@ufl.edu Mike Spranger, PhD. Professor, University of Florida [email protected] Outline What is Resiliency? Background on Clean and Resilient Marina Initiative Elements of the Clean and Resilient Marina Initiative

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Using Insurance Catastrophe Models to Investigate the Economics of Climate Change Impacts and Adaptation

Using Insurance Catastrophe Models to Investigate the Economics of Climate Change Impacts and Adaptation Using Insurance Catastrophe Models to Investigate the Economics of Climate Change Impacts and Adaptation Dr Nicola Patmore Senior Research Analyst Risk Management Solutions (RMS) Bringing Science to the

More information

Pay Later: The Cost of Inaction. Climate change will have a negative impact on many of the industries that 3500 3000 2500 2000 1500 1000 500 5.

Pay Later: The Cost of Inaction. Climate change will have a negative impact on many of the industries that 3500 3000 2500 2000 1500 1000 500 5. FACTS CONNECTICUT A M E R I C A N S E C U R I T Y P R O J E C T Pay Now, Pay Later: Connecticut The Environmental Protection Agency estimates that the cost of protecting Connecticut s coast from the potential

More information

Most informed people realize that cumulative impacts have had

Most informed people realize that cumulative impacts have had Welcome to the First Issue of Rivers & Coast! The goal of the new Rivers & Coast newsletter is to keep readers well informed of current scientific understanding behind key environmental issues related

More information

Building Resilient Infrastructure for the 21 st Century

Building Resilient Infrastructure for the 21 st Century Building Resilient Infrastructure for the 21 st Century 1 Maria Mehranian Cordoba Corporation & Los Angeles Regional Water Quality Control Board October 19, 2014 24 th Annual Lake Arrowhead Symposium:

More information

How To Be Sustainable With Tourism

How To Be Sustainable With Tourism QUÉBEC DECLARATION ON ECOTOURISM In the framework of the UN International Year of Ecotourism, 2002, under the aegis of the United Nations Environment Programme (UNEP) and the World Tourism Organization

More information

sample The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation

sample The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation sample The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation A changing climate leads to changes in extreme weather and climate events 2 Impacts

More information

Section E2 Coastal Engineering: Reconstruction Management and Mitigation

Section E2 Coastal Engineering: Reconstruction Management and Mitigation 271 Section E2 Coastal Engineering: Reconstruction Management and Mitigation 272 Objectives To familiarize the assessor with the process that should be followed in organizing any reconstruction efforts.

More information

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES

5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES 5.0 OVERVIEW OF FLOOD DAMAGE REDUCTION MEASURES Flood damage reduction consists of two basic techniques structural and non-structural. Structural methods modify the flood and take the flood away from people

More information

Structural Damage Due to Floods

Structural Damage Due to Floods Structural Damage Due to Floods By Craig D. Rogers, P.E. The Federal Emergency Management Agency (FEMA) reports that each year approximately 90 percent of all disaster-related property damage results from

More information

Why does Kittitas County want to form a Flood Control Zone District?

Why does Kittitas County want to form a Flood Control Zone District? KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government

More information

Chapter 6: Mitigation Strategies

Chapter 6: Mitigation Strategies Chapter 6: Mitigation Strategies This section of the Plan describes the most challenging part of any such planning effort the development of a Mitigation Strategy. It is a process of: 1. Setting mitigation

More information

Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY

Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY Post-Sandy Municipal Needs Assessment for Long-Term Recovery and Resiliency Planning EXECUTIVE SUMMARY Prepared by Nathaly Agosto Filión, Resiliency Manager for the New Jersey Resiliency Network, a program

More information

Restoring Ecosystems. Ecosystem Restoration Services

Restoring Ecosystems. Ecosystem Restoration Services Restoring Ecosystems Ecosystem Restoration Services 2 Ecosystem Restoration Services AECOM s integrated approach sciencebased planning, with innovative design and execution delivers sustainable and cost-effective

More information

At War with the Weather Managing Large-Scale Risks in a New Era of Catastrophes

At War with the Weather Managing Large-Scale Risks in a New Era of Catastrophes At War with the Weather Managing Large-Scale Risks in a New Era of Catastrophes Howard C. Kunreuther and Erwann O. Michel-Kerjan with Neil A. Doherty, Martin F. Grace, Robert W. Klein, and Mark V. Pauly

More information

Real-time Ocean Forecasting Needs at NCEP National Weather Service

Real-time Ocean Forecasting Needs at NCEP National Weather Service Real-time Ocean Forecasting Needs at NCEP National Weather Service D.B. Rao NCEP Environmental Modeling Center December, 2005 HYCOM Annual Meeting, Miami, FL COMMERCE ENVIRONMENT STATE/LOCAL PLANNING HEALTH

More information

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS Turkey s position in the World Prof. Dr. Veysel EROĞLU Minister of Forestry and Water Affairs The Ministry of Forestry and Water Affairs, formerly

More information