REGIOTRAM UTRECHT OPERATIONAL MODELLING FINAL REPORT BASE MODEL JANUARY 2016 REGIOTRAM UTRECHT - OPERATIONAL MODELLING JANUARY 2016

Size: px
Start display at page:

Download "REGIOTRAM UTRECHT OPERATIONAL MODELLING FINAL REPORT BASE MODEL JANUARY 2016 REGIOTRAM UTRECHT - OPERATIONAL MODELLING JANUARY 2016"

Transcription

1 REGIOTRAM UTRECHT OPERATIONAL MODELLING FINAL REPORT BASE MODEL

2 LIST OF CONTENT Process Methodology Previous model work Scenarios Input data Schematic open track infrastructure diagrams Vehicles Run times Results Scenario C1 Results Scenario C2 Conclusion

3 PROCESS

4 OPERATIONAL MODELLING PROCESS Prior consultant: Analysis from operational modelling Modifications of operational requirements Built-up of a complete new OpenTrack model Base scenarios (C1 and C2) to be modelled Analysis of operational key numbers

5 METHODOLOGY

6 METHODOLOGY Collection and documentation of all infrastructure changes (against the November 2013 version) for the operational model (based on Project Step 1 Modification Speed Profile) Implementing the line infrastructure in a new OpenTrack model (no update) Building of the two operational schemes (Phase C1 and C2) for the through running services on the SUNIJ- and Uithof line Calculation of operational numbers run times number of vehicles system efficiency turnaround times

7 PREVIOUS MODEL WORK

8 PREVIOUS MODEL WORK The following BRU reports form the main input for this updated model work Utrecht_dynamic_modelling_phase 1_report, February 2013 Utrecht_dynamic_modelling_phase 2_part A_B_v1, November 2013 Utrecht_dynamic_modelling_phase 2_part C 2020_v1, November 2013 They are referred to in this report as Prior Ops study

9 MODIFICATIONS OF BASE DATA COMPARED TO PRIOR OPS STUDY Alignment of Uithof lijn Modifications on SUNIJ-Lijn Speed profile considering modifications agreed in Project Step 1 Uithof lijn (no modifications) SUNIJ lijn (significant modifications on Ijsselstein branch and section Nieuwegein Stadscentrum Utrecht Centraal)

10 SPECIAL REQUIREMENTS TAKEN OVER FROM PREVIOUS MODEL Regulation at Utrecht OVT to assure needed punctuality Influence of bus traffic at Utrecht OVT Critical: Turnaround in Utrecht OVT to permit short shuttle between Uithof and Utrecht Turn around time: OVT minimum 175 s plus 85 s for passenger exchange P+R De Uithof max. 300 s Prior track layout

11 TURNAROUND TIMES Turnaround time: Technical minimum turnaround time: Technical minimum turnaround Dwell time for boarding and alighting Buffer time Minimum planned turnaround time Vehicle shut down: Driver changing cab: Vehicle ramp up: Total: 20 sec about 2 min 20 s 3 min 4 min minimum turnaround time including Sum of turnaround times at both ends of line shall be between 10% and 20% of overall runtime Dwell time for boarding and alighting Distribution depending on traffic demand and platform access Can be allowed while driver is changing the cab (at least in case of delay) Additional buffer time Remaining time to start at planned departure time

12 DUTY ROASTER EFFICIENCY Efficiency Definition: Runtime / (Runtimes + turnaround times) Shall ideally be between 80% and 90% 80 % or lower In case the value is below 80 % the (non-productive) turn-around time is compared to the (productive) run time too high The number of vehicles will increase leading to finally higher investment and higher operational cost The system robustness on the other hand is high as delays can be quickly re-covered 90 % or higher In case the value is 90 % or higher the (non-productive) turn-around time is compared to the (productive) run time too low The system robustness drops as delays cannot be re-covered anymore On the other hand the number of vehicles will decrease leading to lower investment and eventually lower operational cost But the system is not reliable anymore and the attractiveness for passengers goes down

13 DUTY ROSTER OF PRIOR OPS STUDY Operational Scenario C Nieuwegein Zuid P+R De Uithof: Ijsselstein Zuid P+R De Uithof: OVT P+R De Uithof: Headway 12 min Headway 12 min Headway 2x 12 min Duty roster as follows: Ijsselstein Zuid Nieuwegein Stadscentrum OVT P+R De Uithof Nieuwegein Zuid

14 KEY NUMBERS FROM PRIOR OPS STUDY Nieuwegein Ijsselstein Runtime PRU NWG/ISS (including dwell times) 47 min 54 min 30 sec Runtime ISS/NWG PRU (including dwell times) 47 min 56 min Turnaround time min 7-8 min Runtime Uithof Line To PRU 17 min 20 sec To OVT 16 min 20 sec Turnaround time P+R Uithof Turnaround time OVT Uithof Line 4-5 min 6 min Duty roster 156 min 168 min Duty roster performance 83% 87% Number of vehicles (without reserve) 13*2 units 14*2 units

15 SCENARIOS

16 2 OPERATIONAL SCENARIOS TO BE MODELLED Scenarios based on prior scenario C (see report Utrecht_dynamic_modelling_phase 2_part C 2020_v1, November 2013) Morning peak hour to be modelled (6:00-8:00) to generate all operational numbers (e.g. run times, number of vehicles, system efficiency, turnaround times) Scenario C1 with reduced headway (not modelled before): 8 veh/h/direction on the SUNIJ line (7,5 min headway OVT Nieuwegein Stadscentrum, 15 min on branches to Ijsselstein and Nieuwegein), 16 veh/h/direction on the Uithof line (3,75 min headway). Scenario C2 (as modelled before Scenario C): 10 veh/h/direction on the SUNIJ line (6 min headway OVT Nieuwegein Stadscentrum, 12 min on branches to Ijsselstein and Nieuwegein), 20 veh/h/direction on the Uithof line (3 min headway).

17 SCENARIO C1 Nieuwegein Zuid P+R De Uithof: Ijsselstein Zuid P+R De Uithof: OVT P+R De Uithof: Headway 15 min Headway 15 min Headway 2x 15 min Ijsselstein Zuid 4/h Nieuwegein Stadscentrum 8/h OVT 16/h P+R De Uithof 4/h Nieuwegein Zuid

18 SCENARIO C2 Nieuwegein Zuid P+R De Uithof: Ijsselstein Zuid P+R De Uithof: OVT P+R De Uithof: Headway 12 min Headway 12 min Headway 2x 12 min Ijsselstein Zuid 5/h Nieuwegein Stadscentrum 10/h OVT 20/h P+R De Uithof 5/h Nieuwegein Zuid

19 INPUT DATA

20 BUILT-UP OF A NEW OPENTRACK-MODEL Infrastructure: Uithof-Lijn: Alignment plans with few changes compared to elder planning ( ) SUNIJ-Lijn: Alignment plans ( ) Operation: Consideration of modified speed profiles ( ) Dwell times as in prior Ops study No negative effects of bus traffic at OVT and University considered Rolling stock: Implementation of new CAF vehicles

21 NEW TRACK LAYOUT AT UTRECHT OVT Diamond crossover allows an efficient operation at the OVT intermediate terminus Turnaround of short line from P&R Uithof to OVT No left side operation for departing courses to P&R Uithof necessary New track layout

22 BOUNDARY CONDITIONS: SPEED MODIFICATION Nieuwegein Zuid Stadscentrum: No change of maximum speed because of local restrictions No change of runtime in this section

23 BOUNDARY CONDITIONS: SPEED MODIFICATION Stadscentrum Utrecht OVT C: No significant effect on runtime No change of runtime

24 SPEED COMPARISON Stadscentrum Ijsselstein Zuid Significant modifications of maximum speed

25 NEW OPENTRACK-MODEL: INPUT DATA (1/3) Alignment Uithof line Description Date Source 01_JBP-OVT.pdf Situatie Tracédeel Doorkoppeling ITC Ontwerpverantwoording VO+ incl. bijllagen I-XIV and additional documents Ontwerpverantwoording Movares RVT Schets Uithoflijn.pdf Railverkeerstechnische Shets De Uithof Lijn Movares DSM UHL DO _ACAD_3D.dwg Alignment Uithofline Nov 12 Uithoflijn_overview.pdf Nov 12 WP119-BNS-200-0##_C30-FKU-AU-1300###_v5.0.pdf Contracttekening Traminfrastructuur Situatie fietspad Cambridgelaan De Uithof Movares Alignment SUNIJ line Description Date Source pdf, pdf PVS-meting SUNIJ ProRail C30-HBE-AU #_V1.0.pdf SUNIJ-Lijn: Grootschalige Verwanging Infrastructuur Definitief Ontwerp Baan en spoor Movares C30-FKU-AU _v3.0.dwg Jaarbeursplein Overzichtstekening Sporenplan Tijdelijke eindhalte SUNIJ-lijn Definitief Ontwerp ITC 330_BN~1.PDF - 330_BN~4.PDF, Vraagsspecificatie Tijdelijke Eindhalte Jaarbeursplein ITC ORblad #.pdf OR-Bladen Bestuur Regio Utrecht OBE blad 0x #,### - #,### -... #.pdf OBE-Blads Bestuur Regio Utrecht

26 NEW OPENTRACK-MODEL: INPUT DATA (2/3) Speed profile SUNIJ line Description Date Source snelheden SUNIJ versie 3JV.xls Baanvak snelheid SUNIJ Feb 13 Bestuur Regio Utrecht SUNIJ lijn snelheden.xlsx Baanvak snelheid SUNIJ Dez 14 Bestuur Regio Utrecht Operation SUNIJ + Uithofline Description Date Source OPERATIONAL DYNAMIC SIMULATION OF SNELTRAM SUNIJ AND UITHOF LINES Utrecht_dynamic_modelling_phase 1_report.pdf Report Phase 1 Feb 13 TTK 1311_Utrecht_SUNIJ_PHAB_vehicles.pdf OPERATIONAL DYNAMIC SIMULATION OF SNELTRAM SUNIJ AND UITHOF LINES Phase A and B - working day ( ) Number of rolling stock required TTK Utrecht_dynamic_modelling_phase 2_part A_B_v1.pdf OPERATIONAL DYNAMIC SIMULATION OF SNELTRAM SUNIJ AND UITHOF LINES Report Project-phase 2 Phases A and B (Network from 2016/2018 on) TTK Utrecht_dynamic_modelling_phase 2_part C 2020_v1.pdf OPERATIONAL DYNAMIC SIMULATION OF SNELTRAM SUNIJ AND UITHOF LINES Report Project-phase 2 Phase C (Network from 2020 on) TTK E82-RWÖ-KA versie 1.0.pdf Dynamische simulatie stationsgebied Utrecht Movares

27 NEW OPENTRACK-MODEL: INPUT DATA (3/3) Vehicles SUNIJ + Uithofline Description Date Source Sneltram vehicles sunij maatvoering schoon.pdf Algemeen Plan Sneltram NS Beschrijving Treinstellen Sunij Def.pdf Beschrivingen Treinstellen 1989 NS CAF vehicles Q A0_T_CJTO_GENERAL_UNIDAD_5_MODULOS - UTRECHT-_H1.pdf Overzicht Basis Variant Tramvoertuig CAF Q A0_T_CJTO_GENERAL_UNIDAD_7_MODULOS - UTRECHT-_H1.pdf Overzicht Lange Variant Tramvoertuig CAF Tramontwerp.pdf TRAMONTWERP CAF Bijlage TECHNISCHE BESCHRIJVING TRACTIEAPPARATUUR.pdf TECHNICAL DESCRIPTION TRACTION EQUIPMENT FOR UTRECHT TRAM CAF Gewichten.pdf Gewichten standaard/lange tramstel CAF Overzichtstekening Standaard Tram (33m).pdf Overzichtstekening (Draft) CAF

28 SCHEMATIC OPEN TRACK INFRASTRUCTURE DIAGRAMS

29 NEW OPENTRACK MODEL: IJSSELSTEIN ZUID - DOORSLAG To Nieuwegein Stadscentrum Ijsselstein Zuid

30 NEW OPENTRACK MODEL: ST. ANTONIUS ZIEKEHUIS / NIEUWEGEIN ZUID NIEUWEGEIN STADSCENTRUM From Ijsselstein Zuid Nieuwegein Stadscentrum To Wijkersloot Nieuwegein Zuid

31 NEW OPENTRACK MODEL: WIJKERSLOOT - ZUILENSTEIN To Jaarbeursplein From Nieuwegein Stadscentrum

32 NEW OPENTRACK MODEL: GRAADT VAN ROGGENWEG VASCO DA GAMALAAN Jarbeursplein To OVT From Westraven

33 OPENTRACK MODEL: VAARTSCHE RIJN OVT UTRECHT C To P+R De Uithof Utrecht OVT From Jaarbeursplein

34 OPENTRACK MODEL: GALGENWAARD P+R DE UITHOF P+R De Uithof From OVT

35 (MAX) SPEED VS. DISTANCE DIAGRAM IJSSELSTEIN ZUID OVT

36 (MAX) SPEED VS. DISTANCE DIAGRAM SUNIJ LINE NIEUWEGEIN ZUID P+R DE UITHOF

37 (MAX) SPEED VS. DISTANCE DIAGRAM OVT IJSSELSTEIN ZUID

38 (MAX) SPEED VS. DISTANCE DIAGRAM SUNIJ LINE P+R DE UITHOF NIEUWEGEIN ZUID

39 VEHICLES

40 VEHICLE PARAMETERISATION AS IN PRIOR OPS STUDY 32 m single unit m single unit combined to a 75 m double unit

41 NEW CAF VEHICLE PARAMETERISATION Traction effort curve: Acceleration Traction effort EL 4 (4 standees per m 2 ) identical with curve EL 6.67 Acceleration limited for comfort reasons to 1,2 m/s 2 (Force) 33 m single unit m single unit

42 NEW CAF VEHICLE PARAMETERISATION Can be coupled to a double unit (simulated as one vehicle train)

43 SHORT AND LONG VEHICLES The CAF vehicles tested are 33 m long vehicles. In the case extended vehicle would be used, they would need one motorised bogie more. From experience the performance would be in this case the same as for the short vehicle.

44 RUN TIMES

45 OPERATIONAL KEY NUMBERS: CALIBRATION RUNTIME Comparison of runtimes based on vehicle and infrastructure from Prior Ops Study New OpenTrack model: New model with similar runtimes compared with Prior Ops Study 2014 with the same vehicles assumed

46 SPEED COMPARISON Maximum speed adapted in the model Simulation results: No significant change of runtime

47 VEHICLE EFFECTS ON RUNTIME Comparison of undisturbed runtimes (to compare vehicle influence): Single line one-directional simulation Remark: Run times without operational effects are shorter than system runtimes CAF vehicle shows shorter runtimes than prior reference vehicle of about 1 min between P&R De Uithof and Ijsselstein and Nieuwegein respectively From To Reference vehicle CAF vehicle Difference P+R De Uithof Ijsselstein Zuid 00:52:45 00:51:32 00:01:13 Ijsselstein Zuid P+R De Uithof 00:54:07 00:53:05 00:01:03 From To Reference vehicle CAF vehicle Difference P+R De Uithof Nieuwegein Zuid 00:47:17 00:45:55 00:01:22 Nieuwegein Zuid P+R De Uithof 00:47:22 00:46:17 00:01:05

48 CHARACTERISTIC RUNTIMES ALONG SPECIFIC SECTIONS

49 RESULTS SCENARIO C2

50 SCENARIO C2 (12 MIN): TRAIN GRAPH OF NEW MODEL IJSSELSTEIN ZUID P+R DE UITHOF

51 SCENARIO C2 (12 MIN): TRAIN GRAPH OF NEW MODEL NIEUWEGEIN ZUID P+R DE UITHOF

52 OVT PLATFORM OCCUPANCY Tracks 1 & 2 respectively 3 & 4 use the same platform between the two tracks. From the safety point of view considering the amount of passengers at one point of time on a platform there boarding and alighting at the same time shall be avoided. Scenario C1: Tracks 1 & 2: No occupancy at the same time OVT Platform occupancy Arrival at track 3 just after departure at track 4 Scenario C2: Arrival and departure at track 2 while track 1 is not used Arrival and departure at track 3 while track 4 is not used

53 KEY NUMBERS NEW AND ADAPTED MODEL SCENARIO C2 (MODIFIED OVT LAYOUT, SPEED MODIFICATIONS, CAF VEHICLE) HEADWAY 12 / 6 / 3 MIN Nieuwegein Ijsselstein Runtime PRU NWG/ISS (including dwell times) 46,5 min 54 min Runtime ISS/NWG PRU (including dwell times) 47 min 54 min Turnaround time 13,5 min 11 min Runtime Uithof Line To PRU 17 min To OVT 16 min Turnaround time P+R Uithof Turnaround time OVT Uithof Line 5 min 6 min Duty roster 156 min 168 min Duty roster performance 80% 83% Number of vehicles (without reserve) 13*2 units 14*2 units

54 RISK ANALYSIS SCENARIO C2 Ramboll/MMD have calculated 54 vehicles without reserve for the scenario C2 With sufficient turnaround times a reliable operation can be assured. This implies the avoiding the change of line (Ijsselstein/Nieuwegein) at the turnaround in P+R De Uithof A further optimisation would not be recommended regarding the risk of longer dwell times as a result of different door opening and closing times of the CAF vehicles. Precondition for this operational concept would be: Using a short turnaround at OVT and The change of line at P+R De Uithof for the intermediate short line service P+R OVT (combination of Nieuwegein and Ijsselstein line).

55 RESULTS SCENARIO C1

56 SCENARIO C1 (15 MIN): TRAIN GRAPH OF NEW MODEL IJSSELSTEIN ZUID P+R DE UITHOF

57 SCENARIO C1 (15 MIN): TRAIN GRAPH OF NEW MODEL NIEUWEGEIN ZUID P+R DE UITHOF

58 KEY NUMBERS NEW AND ADAPTED MODEL SCENARIO C1 (MODIFIED OVT LAYOUT, SPEED MODIFICATIONS, CAF VEHICLE) HEADWAY 15 / 7,5 / 3,75 MIN Nieuwegein Ijsselstein Runtime PRU NWG/ISS (including dwell times) 46,5 min 53,5 min Runtime ISS/NWG PRU (including dwell times) 47 min 54 min Turnaround time 10,5 min 11,5 min Runtime Uithof Line To PRU 17 min To OVT 16 min Turnaround time P+R Uithof Turnaround time OVT Uithof Line 4,5 min 4 min Duty roster 150 min 165 min Duty roster performance 83% 84% Number of vehicles (without reserve) 10*2 units 11*2 units

59 RISK ANALYSIS SCENARIO C1 So far Regiotram calculated with 27 for the Uithof start operation and then 26 options on top of this, in total 53, 26 vehicles are today operating on the SUNIJ-line. But this takes not the efficiency gains of the combined operation into account. Ramboll/MMD have calculated 42 vehicles for this without reserve Short turn-around times at P+R and OVT High efficiency There is a risk is that due to higher stop times (the doors at the SIG trams are now opening at a speed below 3 km/h, the new CAF trams will have to go down to 0 km/h) the gain in run times can be lost again. In this case a reliable operation can be assured by using 2 more vehicles and longer turn-around times.

60 CONCLUSION

61 CONCLUSION New OpenTrack model: New model infrastructure built-up Model results of Prior Ops Study confirmed Runtime of CAF vehicles in preliminary model runs slightly shorter than reference vehicle from Prior Ops Study Effect of runtime on key number of scenario C2 with 12 / 6 / 3 min headway (shorter runtime, longer turnaround) Concept of scenario C1 with 15 / 7,5 / 3-4 min headway implemented Modification of speed profile does not affect the runtime significantly Model ready to use for further analysis and new scenarios

62 Click to edit Master text styles Nils Jänig, Director Ramboll Transport T +49 (0) E nij@ramboll.com Joost Bolck, Business Development Manager Mott MacDonald T E joost.bolck@mottmac.nl

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV

Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV Operating Concept and System Design of a Transrapid Maglev Line and a High-Speed Railway in the pan-european Corridor IV A. Stephan & E. Fritz IFB Institut für Bahntechnik GmbH, Niederlassung, Germany

More information

OpenTrack + SimWalk Transport Closing the gap between railway network and passenger simulation

OpenTrack + SimWalk Transport Closing the gap between railway network and passenger simulation OpenTrack + SimWalk Transport Closing the gap between railway network and passenger simulation Transport Alex Schmid, Savannah Simulations AG Contents SimWalk Transport and passenger simulation Passenger

More information

Analysing the Metro Cityring in Copenhagen

Analysing the Metro Cityring in Copenhagen Computers in Railways XI 45 Analysing the Metro Cityring in Copenhagen A. H. Kaas & E. M. Jacobsen Atkins, Denmark Abstract When planning new infrastructure it is important that the infrastructure is well

More information

Simulation of modified timetables for high speed trains Stockholm Göteborg

Simulation of modified timetables for high speed trains Stockholm Göteborg 17 18 May 2010, Opatija, Croatia First International Conference on Road and Rail Infrastructure Simulation of modified timetables for high speed trains Stockholm Göteborg H. Sipilä Division of Traffic

More information

Appendix A. About RailSys 3.0. A.1 Introduction

Appendix A. About RailSys 3.0. A.1 Introduction Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research

More information

Chapter 2. Estimated Timetable. 2.1 Introduction. 2.2 Selected Timetable: Spoorboekje 1999-2000

Chapter 2. Estimated Timetable. 2.1 Introduction. 2.2 Selected Timetable: Spoorboekje 1999-2000 Chapter 2 Estimated Timetable 2.1 Introduction A suitable starting point from where to do capacity evaluation and further cogitate upon alternative upgraded scenarios ought to be defined. This chapter

More information

OpenTrack simulation for suburban tunnel in Paris (RER B & D)

OpenTrack simulation for suburban tunnel in Paris (RER B & D) OpenTrack simulation for suburban tunnel in Paris (RER B & D) Presentation Opentrack Viriato workshop January 24th, 2008 Zurich, Switzerland EGIS - ERIC BENARD Table of contents Introduction Overall context

More information

Railway Technical Web Pages Infopaper No. 3. Rules for High Speed Line Capacity or, Summary

Railway Technical Web Pages Infopaper No. 3. Rules for High Speed Line Capacity or, Summary Railway Technical Web Pages Infopaper No. 3 One of a series of papers on technical issues published by RTWP from time to time. Rules for High Speed Line Capacity or, How to get a realistic capacity figure

More information

Alighting and boarding times of passengers at Dutch railway stations

Alighting and boarding times of passengers at Dutch railway stations Alighting and boarding times of passengers at Dutch railway stations Analysis of data collected at 7 railway stations in October 2000 TRAIL Research School, Delft, December 2001 Author: Ir. Paul B.L. Wiggenraad

More information

Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects. R N Dumolo Mott MacDonald Limited

Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects. R N Dumolo Mott MacDonald Limited Application of Systems Engineering to Enhance Safety and Risk Management in Railway Projects R N Dumolo Mott MacDonald Limited Overview of paper The following will be discussed: The need for a systems

More information

RandstadRail: Increase in Public Transport Quality by Controlling Operations

RandstadRail: Increase in Public Transport Quality by Controlling Operations RandstadRail: Increase in Public Transport Quality by Controlling Operations Niels van Oort HTM, Urban public transport, Research and development P.O. Box 28503, 2502 KM The Hague, The Netherlands, e-mail:

More information

Closure of the Train Departing Process

Closure of the Train Departing Process COUNTDOWN ON A PLATFORM: HIGHER PUNCTUALITY AND INCREASED SAFETY AT LEVEL CROSSINGS Melcher Zeilstra 1, Marit Wilms 1, Paul Kootwijk 2, Sybolt Welle Donker 3 1 Intergo, consultancy in human factors and

More information

Trapeze Rail System Simulation and Planning

Trapeze Rail System Simulation and Planning trapeze Rail System English Software for Rail Modelling and Planning Trapeze Rail System Simulation and Planning www.trapezegroup.com Enabling future railway plans Cost reductions through integrated planning

More information

Alignment design for Citybanan in Stockholm

Alignment design for Citybanan in Stockholm Alignment design for Citybanan in Stockholm B. Kufver Halcrow, Vineyard House, 44 Brook Green, Hammersmith, London W6 7BY, United Kingdom Abstract The Western Main Line into Stockholm Central Station was

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document to be withdrawn as of 03/12/11 To be superseded by GKRT0075 Iss 2 published on 03/09/11 Date March 11 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that

More information

Lineside Signal Spacing and Speed Signage

Lineside Signal Spacing and Speed Signage Document comes into force on 05/12/15 Supersedes GKRT0075 Iss 3 on 05/12/15 Date September 15 Lineside Signal Spacing and Speed Synopsis This document specifies the minimum distances that must be provided

More information

The power of PPP in light rail

The power of PPP in light rail The power of PPP in light rail About the increasing need for light rail systems in urban areas, the benefits of public-private partnerships and how Strukton combines its strengths in this market. Strukton

More information

Thameslink new Class 700 trains

Thameslink new Class 700 trains Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,

More information

Lower emissions, lower fuel consumption.

Lower emissions, lower fuel consumption. FULL HYBRID RANGE The new hybrid buses Lower emissions, lower fuel consumption. Our well-know battery series hybrid concept is ideal for urban operations. And numerous studies have recently confirmed this,

More information

Simulation of Railway Networks

Simulation of Railway Networks began a few years ago as a research project at the Swiss Federal Institute of Technology. The aim of the project, Object-Oriented Modeling in Railways, was to develop a userfriendly tool to answer questions

More information

Train scheduling of Shinkansen and relationship to reliable train operation

Train scheduling of Shinkansen and relationship to reliable train operation Computers in Railways XII 133 Train scheduling of Shinkansen and relationship to reliable train operation S. Sone & Y. Zhongping Beijing Jiaotong University, China Abstract This paper explains why security

More information

NEW REGULAR INTERVAL TIMETABLES IN OPERATION ON THE SUBURBAN LINES OF THE HUNGARIAN STATE RAILWAYS

NEW REGULAR INTERVAL TIMETABLES IN OPERATION ON THE SUBURBAN LINES OF THE HUNGARIAN STATE RAILWAYS NEW REGULAR INTERVAL TIMETABLES IN OPERATION ON THE SUBURBAN LINES OF THE HUNGARIAN STATE RAILWAYS Viktor Borza 1, László Kormányos 2, Béla Vincze 3 Summary: This paper presents the introduction of the

More information

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015 GE/RT8000/M3 Rule Book Module M3 Managing incidents, floods and snow Issue 2 September 2015 Comes into force 5 December 2015 Published by: RSSB The authoritative version of this document is available at

More information

High speed railway principles

High speed railway principles High speed railway principles Ignacio Barrón de Angoiti, Director High Speed, International Railway Association (UIC) Professional Conference on High Speed In the World and in the Czech Republic Praha,

More information

Using customer s views to improve business processes and operations

Using customer s views to improve business processes and operations Perugia Koen De Broeck market research manager De Lijn Using customer s views to improve business processes and operations Mission De Lijn De Lijn wants to be the smart travelling companion throughout

More information

Høyhastighetstog i Norge Vurdering av noen kapasitetsmessige forhold. 28.Oktober 2008. Ove Skovdahl Railconsult AS

Høyhastighetstog i Norge Vurdering av noen kapasitetsmessige forhold. 28.Oktober 2008. Ove Skovdahl Railconsult AS Høyhastighetstog i Norge Vurdering av noen kapasitetsmessige forhold. 28.Oktober 2008 Ove Skovdahl Railconsult AS Background VWI 2007 High Speed Report JBV summary of comments to this report. Purpose of

More information

Technology and System Layout of the Transrapid Maglev Project

Technology and System Layout of the Transrapid Maglev Project Technology and System Layout of the Transrapid Maglev Project Christian Rausch Transrapid International GmbH & Co. KG, Berlin ABSTRACT: At the start of the project planning, the basic requirements for

More information

The new system for door control and command: implementation and tests on a UIC project Doct. Eng.Gianfranco Cau*

The new system for door control and command: implementation and tests on a UIC project Doct. Eng.Gianfranco Cau* The new system for door control and command: implementation and tests on a UIC project Doct. Eng.Gianfranco Cau* FS - Trenitalia - Unità Tecnologie Materiale Rotabile TRENITALIA has been charged by UIC

More information

PRAGUE AIRPORT KLADNO RAILWAY LINK

PRAGUE AIRPORT KLADNO RAILWAY LINK PRAGUE AIRPORT KLADNO RAILWAY LINK Investor: SŽDC s.o. (Railway Infrastructure Administration) Project manager: METROPROJEKT Praha a.s. (some parts in consortium with SUDOP Praha a.s.) PRAGUE AIRPORT KLADNO

More information

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos

Seagull Intersection Layout. Island Point Road - A Case Study. Authors: John Harper, Wal Smart, Michael de Roos Seagull Intersection Layout. Island Point Road - A Case Study Authors: John Harper, Wal Smart, Michael de Roos Presented by Mr John Harper, Road Safety and Traffic Services Manager Phone: 4221 2456 Mobile:

More information

RijnGouweLijn trials. Sintropher WP1 workshop, 18 March 2010 Chris Mineur

RijnGouweLijn trials. Sintropher WP1 workshop, 18 March 2010 Chris Mineur RijnGouweLijn trials Sintropher WP1 workshop, 18 March 2010 Chris Mineur Contents Periferal railway lines in the Netherlands RijnGouweLijn trials Aim of the trials, findings and conclusions ProRail - ambities

More information

High Speed Railway Capacity

High Speed Railway Capacity High Speed Railway Capacity Understanding the factors affecting capacity limits for a high speed railway by Piers Connor 1 Abstract High Speed Rail is the new railway. Around the world, proposals for new

More information

The train-path pricing system. Who pays how much to rail infrastructure?

The train-path pricing system. Who pays how much to rail infrastructure? The train-path pricing system. Who pays how much to rail infrastructure? SBB Infrastructure, July 2015 The train-path price covers 40 percent of infrastructure costs. SBB Infrastructure receives CHF 1.1

More information

ENERGY MODELS FOR LIFTS by Dr Gina Barney

ENERGY MODELS FOR LIFTS by Dr Gina Barney ENERGY MODELS FOR LIFTS by Dr Gina Barney Abstract The intention of this paper is to explain some work which is being carried out at the International Standards Organisation level, to propose a simple

More information

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs

Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs Doing More with the Same: How the Trinity Railway Express Increased Service without Increasing Costs W. T. "Bill" Farquhar Trinity Railway Express Irving, TX Abstract The Trinity Railway Express (TRE)

More information

CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE

CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE CONTROLLING OPERATIONS OF PUBLIC TRANSPORT TO IMPROVE RELIABILITY: THEORY AND PRACTICE Niels van Oort HTM Urban Transport Company Department of Research and Development P.O. Box 28503 2502 KM The Hague,

More information

Right of way for mobility. The Bus Rapid Transit (BRT) traffic concept. MAN kann.

Right of way for mobility. The Bus Rapid Transit (BRT) traffic concept. MAN kann. Right of way for mobility. The Bus Rapid Transit (BRT) traffic concept. MAN kann. Crowded roads, traffic jams and stress are typical of the traffic situation in big cities the whole world over. The increasing

More information

Improving punctuality by adjusting timetable design

Improving punctuality by adjusting timetable design Improving punctuality by adjusting timetable design Joost Smits* * MSc graduate, Logistics domain of System Engineering, Policy Analysis and Management at Delft University of Technology, Faculty of Technology,

More information

Bus Holding Control Strategies: A Simulation-Based Evaluation and Guidelines for Implementation

Bus Holding Control Strategies: A Simulation-Based Evaluation and Guidelines for Implementation Bus Holding Control Strategies: A Simulation-Based Evaluation and Guidelines for Implementation Oded Cats, Anahid Nabavi Larijani, Ásdís Ólafsdóttir, Wilco Burghout, Ingmar Andreasson, Haris N. Koutsopoulos

More information

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division

Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion Siemens Rolling Stock Portfolio in Great Britain We have some of the most reliable trains in UK.. Over 350 trains

More information

Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital

Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital Elevator Simulation and Scheduling: Automated Guided Vehicles in a Hospital Johan M. M. van Rooij Guest Lecture Utrecht University, 31-03-2015 from x to u The speaker 2 Johan van Rooij - 2011 current:

More information

One of a series of papers on technical issues published by RTWP from time to time.

One of a series of papers on technical issues published by RTWP from time to time. Railway Technical Web Pages Infopaper No. 2 2 nd August 2011 One of a series of papers on technical issues published by RTWP from time to time. Introduction An overview of the way railway vehicle capacity

More information

RailML use in the project

RailML use in the project French institute of science and technology for transport, spatial planning, development and networks RailML use in the project Grégory Marlière Optimal Networks for Train Integration Management across

More information

The Shanghai Maglev Route

The Shanghai Maglev Route The Shanghai Maglev Route 1 Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional

More information

SIMPLIFIED METHOD FOR ESTIMATING THE FLIGHT PERFORMANCE OF A HOBBY ROCKET

SIMPLIFIED METHOD FOR ESTIMATING THE FLIGHT PERFORMANCE OF A HOBBY ROCKET SIMPLIFIED METHOD FOR ESTIMATING THE FLIGHT PERFORMANCE OF A HOBBY ROCKET WWW.NAKKA-ROCKETRY.NET February 007 Rev.1 March 007 1 Introduction As part of the design process for a hobby rocket, it is very

More information

AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS

AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS Benoit Bienfait and Patrick Zoetardt, Alstom Transport, Belgium Bob Barnard, Signalling Solutions Ltd, UK SUMMARY European Main

More information

SYDNEY TRAMWAY MUSEUM HEALTH RISK ASSESSMENT

SYDNEY TRAMWAY MUSEUM HEALTH RISK ASSESSMENT HEALTH RISK ASSESSMENT DECEMBER 2006JULY 2013 Document Control Record 1. Document Details: Name: Health Risk Assessment Number STM 6016 Version Number: 1.43 Document Status: Working Draft X Approved for

More information

Welkom. Dutch Track. IRSE Seminar: Delivering Business Performance. More Capacity, Less Complexity. Vincent Weeda 29 maart 2012

Welkom. Dutch Track. IRSE Seminar: Delivering Business Performance. More Capacity, Less Complexity. Vincent Weeda 29 maart 2012 Welkom IRSE Seminar: Delivering Business Performance Dutch Track More Capacity, Less Complexity Vincent Weeda 29 maart 2012 Agenda ProRail and our Challenge Recent years: Optimise existing capacity Benchmark

More information

Guideline. Date: 12.06.2013

Guideline. Date: 12.06.2013 Guideline Detailed definition and clarification of open points in the aerodynamic requirements of TSI HS RST 2008 and TSI CR LOC&PAS 2011 in 4.2.6.2.1 passengers on platform, 4.2.6.2.2 workers at the track

More information

IVU PUBLIC TRANSPORT Overview of IVU and the IVU.suite. Han Hendriks

IVU PUBLIC TRANSPORT Overview of IVU and the IVU.suite. Han Hendriks IVU PUBLIC TRANSPORT Overview of IVU and the IVU.suite Han Hendriks IVU Traffic Technologies AG 1976 Founded 2000 Floated on the stock exchange 2013 Revenue 45 Mio approx. 350 employees approx. 500 customers

More information

SCALAR VS. VECTOR QUANTITIES

SCALAR VS. VECTOR QUANTITIES SCIENCE 1206 MOTION - Unit 3 Slideshow 2 SPEED CALCULATIONS NAME: TOPICS OUTLINE SCALAR VS. VECTOR SCALAR QUANTITIES DISTANCE TYPES OF SPEED SPEED CALCULATIONS DISTANCE-TIME GRAPHS SPEED-TIME GRAPHS SCALAR

More information

Single Axle Running Gears FEBA - a New Concept of Radial Steering

Single Axle Running Gears FEBA - a New Concept of Radial Steering Single Axle Running Gears - a New Concept of Radial Steering Oldrich Polach DaimlerChrysler Rail Systems (Switzerland) Ltd, Winterthur OP BWED, 8-Mai- - Seite 1 - _Milan.ppt Contents Introduction of Adtranz

More information

TRANSIT SCHEDULING: ADVANCED MANUAL

TRANSIT SCHEDULING: ADVANCED MANUAL TRANSIT SCHEDULING: ADVANCED MANUAL CONTENTS 1 CHAPTER 1 Service Policies and Schedule Development I. Introduction, 3 II. Types of Data, 3 III. Data Collection Techniques, 8 IV. Using Data as a Diagnostic

More information

Investigation and Estimation of Train Dwell Time for Timetable Planning. Sinotech Engineering Consultants, Inc., Taipei, Taiwan (R.O.C.

Investigation and Estimation of Train Dwell Time for Timetable Planning. Sinotech Engineering Consultants, Inc., Taipei, Taiwan (R.O.C. Investigation and Estimation of Train Dwell Time for Timetable Planning 1 Jyh-Cherng JONG, 1 En-Fu CHANG Sinotech Engineering Consultants, Inc., Taipei, Taiwan (R.O.C.) 1 Abstract The determination of

More information

Modeling Cooperative Lane-changing and Forced Merging Behavior

Modeling Cooperative Lane-changing and Forced Merging Behavior Modeling Cooperative Lane-changing and Forced Merging Behavior Charisma Choudhury, Anita Rao, Gunwoo Lee Advisors: Moshe Ben-Akiva, Tomer Toledo ITS Program February 10, 2006 Outline Motivation Model structure

More information

Is Truck Queuing Productive? Study of truck & shovel operations productivity using simulation platform MineDES

Is Truck Queuing Productive? Study of truck & shovel operations productivity using simulation platform MineDES Is Truck Queuing Productive? Study of truck & shovel operations productivity using simulation platform MineDES Dmitry Kostyuk Specialist Scientist, Group Resource and Business Optimisation 25 November

More information

Ahmet Sami KILINÇ, Tamer BAYBURA. Presented by Ahmet Sami KILINÇ

Ahmet Sami KILINÇ, Tamer BAYBURA. Presented by Ahmet Sami KILINÇ Determination of Minimum Horizontal Curve Radius Used in the Design of Transportation Structures, Depending on the Limit Value of Comfort Criterion Lateral Jerk Ahmet Sami KILINÇ, Tamer BAYBURA Presented

More information

Tram Concept for Skåne

Tram Concept for Skåne Basic vehicle parameters REPORT 2012:13 VERSION 1.3 2012-11-09 Document information Title Report no. 2012:13 Authors Nils Jänig, Peter Forcher, Steffen Plogstert, TTK; PG Andersson & Joel Hansson, Trivector

More information

ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA

ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA www.arpapress.com/volumes/vol12issue3/ijrras_12_3_14.pdf ACCELERATION CHARACTERISTICS OF VEHICLES IN RURAL PENNSYLVANIA Robert M. Brooks Associate Professor, Department of Civil and Environmental Engineering,

More information

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS.

BV has developed as well as initiated development of several simulation models. The models communicate with the Track Information System, BIS. Simulation models: important aids for Banverket's planning process M. Wahlborg Banverket Swedish National Rail Administration, Planning Department, S-781 85 Borlange, Sweden Abstract When making decisions

More information

ATTACHMENT A SHUTTLE SERVICE ROUTES

ATTACHMENT A SHUTTLE SERVICE ROUTES Page 1 of 32 Attachment A ATTACHMENT A SHUTTLE SERVICE ROUTES The shuttle service is detailed as follows: Employee Parking Lots Shuttle The Employee Shuttle transports Authority employees between the Employee

More information

Departures to the south from Runways 16L and 16R.

Departures to the south from Runways 16L and 16R. Mode 5 Method of operation Departures to the south from Runways 16L and 16R. Arrivals from the east on Runway 25. Arrivals from the north for those aircraft requiring to use the long runway. This runway

More information

Summary ... 113 Summary

Summary ... 113 Summary Summary... Train travel increases During the 2000-2020 period, train travel is expected to increase by an average of 0.9% to 1.5% per year. Although outpacing actual growth during the 1991-2006 period

More information

Application for the UIC Sustainability Awards 2010 Category: "Energy Efficiency and CO2" Ecotrainbook Driver assistance system

Application for the UIC Sustainability Awards 2010 Category: Energy Efficiency and CO2 Ecotrainbook Driver assistance system Application for the UIC Sustainability Awards 2010 Category: "Energy Efficiency and CO2" Ecotrainbook Driver assistance system DB RegioNetz Verkehrs GmbH Manuela Kusche, Steffen Geipert P.R-RNV Frankfurt,

More information

1 st RESOLUTE Workshop Florence 15.12.2015

1 st RESOLUTE Workshop Florence 15.12.2015 1 st RESOLUTE Workshop 15.12.2015 Dr. Alexandros Deloukas, Attiko Metro S.A. Evangelos Karagkounis, Metro Operations Expert Athens Metro System Overview System Description, Practices and Interdependencies

More information

TRUCKNOR AS Frode Myre Sales Manager

TRUCKNOR AS Frode Myre Sales Manager TRUCKNOR AS Frode Myre Sales Manager Volvo Truck & Bus distributor Western and south part of Norway 7 dealerships 14 workshops Van Hool bus importer for Norway Public Transport Strømberg Gruppen Trucks

More information

Report on structure and functionalities of the new online energy efficiency screening tool for railways

Report on structure and functionalities of the new online energy efficiency screening tool for railways Railenergy Calculator Report on structure and functionalities of the new online energy efficiency screening tool for railways Project No. FP6 031458 Railenergy Innovative Integrated Energy Efficiency Solutions

More information

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

Agenda. 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits A Case study from Denmark Danish Signalling Programme Bent Ahlgren, Banedanmark and Anders Møller, Rambøll Agenda 1. The basis for the Danish Signalling Programme 2. Procurement Phase 3. Way ahead 4. Benefits

More information

From Big Data to Smart Data How to improve public transport through modelling and simulation.

From Big Data to Smart Data How to improve public transport through modelling and simulation. From Big Data to Smart Data How to improve public transport through modelling and simulation. Dr. Alex Erath, Pieter Fourie, Sergio Ordó ~ nez, Artem Chakirov FCL Research Module: Mobility and Transportation

More information

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS

4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP 4.5-1 ESTIMATION OF TRIP REDUCTIONS WITH TIMP TRANSIT AND TDM PROGRAMS Draft Environmental Impact Report State Clearinghouse No. 2002061090 City of LA EIR No. 2003-1922-EIR CPC No. 98-0010 (CPU) 4.5 TRANSPORTATION - YEAR 2025 TRAFFIC CONDITIONS WITH PROPOSED TIMP This chapter

More information

English. Trapeze Rail System. www.trapezegroup.com

English. Trapeze Rail System. www.trapezegroup.com English Trapeze Rail System www.trapezegroup.com Trapeze Rail System Enabling future railway, tram and metro transport The worldwide growth in demand for travel and increasing competition between all modes

More information

2.1 The performance of bus air conditioning system is evaluated in the following operating conditions

2.1 The performance of bus air conditioning system is evaluated in the following operating conditions 1.0 Scope:- This test procedure is applicable for testing the Air Conditioning system performance at hot ambient and very hot ambient condition on intracity urban bus in a climatic hot chamber. This procedure

More information

Railway-vehicle Technologies for European Railways

Railway-vehicle Technologies for European Railways Hitachi Review Vol. 57 (2008), No. 1 61 Railway-vehicle Technologies for European Railways Takeshi Kawasaki, Dr. Eng. Takashi Yamaguchi, Dr. Eng. Toshihiko Mochida OVERVIEW: At Hitachi, Ltd. a bulk order

More information

Research for High Speed. Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France

Research for High Speed. Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France Research for High Speed Pierre-Etienne Gautier INEXIA, Scientific Director St Denis la Plaine, France Presentation Outline Learning from the speed record (574,8 km/h=357.2 mph) Tests on Duplex trainsets

More information

Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail

Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail MAXIMIZING THE RETURN ON INVESTMENT FROM ETCS OVERLAY Dominic Taylor CEng MIET MIMechE MIRSE MCMI, Invensys Rail SUMMARY ETCS Level 2 offers many benefits to rail from reduced infrastructure costs, through

More information

Acceleration Introduction: Objectives: Methods:

Acceleration Introduction: Objectives: Methods: Acceleration Introduction: Acceleration is defined as the rate of change of velocity with respect to time, thus the concepts of velocity also apply to acceleration. In the velocity-time graph, acceleration

More information

Railway Simulation & Timetable Planning

Railway Simulation & Timetable Planning Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation

More information

Capacity Statement for Railways

Capacity Statement for Railways Capacity Statement for Railways Alex Landex, al@ctt.dtu.dk Centre for Traffic and Transport, Technical University of Denmark 1 Abstract The subject Railway capacity is a combination of the capacity consumption

More information

3. Locate the different selections of Styles from the Home Tab, Styles Group

3. Locate the different selections of Styles from the Home Tab, Styles Group Outlining in MS Word 2007 Microsoft Word 2007 provides users with an Outline View and Outlining toolbar, which allows us to create outlines. Outlines in Word are based on Styles. For instance if a line

More information

Documents guide. We can accept your latest renewal notice or an official No Claims Bonus document as long as it contains:

Documents guide. We can accept your latest renewal notice or an official No Claims Bonus document as long as it contains: Documents guide Admiral Van may request you send in documents in order to validate your policy. You can now upload these documents quickly and easily using your online account. Below is a guide to help

More information

Procurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock")

Procurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock (Rolling Stock) Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock") November 2013 1 Request for Information ( RFI ) Concerning the Procurement of Electrified Rolling Stock

More information

USING THE IBUS SYSTEM TO PROVIDE IMPROVED PUBLIC TRANSPORT INFORMATION AND APPLICATIONS FOR LONDON

USING THE IBUS SYSTEM TO PROVIDE IMPROVED PUBLIC TRANSPORT INFORMATION AND APPLICATIONS FOR LONDON USING THE IBUS SYSTEM TO PROVIDE IMPROVED PUBLIC TRANSPORT INFORMATION AND APPLICATIONS FOR LONDON Alan Wong and Nick Hounsell Transportation Research Group, School of Civil Engineering and the Environment,

More information

Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org

Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Planning and Managing Software Projects 2010-11 Session 6 Microsoft Project From the WBS to a Complete Schedule Emanuele Della Valle, Lecturer: Dario Cerizza http://emanueledellavalle.org Credits 2 These

More information

Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima

Opening of Tohoku Shinkansen Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima Opening of Extension to Shin Aomori and Development of New Faster Carriages Overview of Series E5/E6 Shinichiro Tajima Introduction In preparation for the December 2010 opening of the Tohoku Shinkansen

More information

Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques

Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques Automated planning of timetables in large railway networks using a microscopic data basis and railway simulation techniques A. Radtke 1 & D. Hauptmann 2 1 Institut für Verkehrswesen, Eisenbahnbau und betrieb,

More information

Public Transportation: There are also public transit trains that run from both airports (blue line from O Hare, orange from Midway).

Public Transportation: There are also public transit trains that run from both airports (blue line from O Hare, orange from Midway). General Information Traveling to Chicago Air Travel: Chicago is served by O Hare International Airport (ORD) and Midway International Airport (MDW). Cab rides from the airports can take anywhere from 30

More information

How To Understand The Relationship Between A Line And A Passenger Car

How To Understand The Relationship Between A Line And A Passenger Car MESTRADO INTEGRADO DE ENGENHARIA CIVIL MESTRADO EM URBANISMO E ORDENAMENTO DO TERRITÓRIO MESTRADO EM PLANEAMENTO E OPERAÇÃO DE TRANSPORTES LICENCIATURA EM ENGENHARIA DO TERRITÓRIO Course: Urban Mobility

More information

Molinari Rail Company Presentation Consulting Engineering Systems

Molinari Rail Company Presentation Consulting Engineering Systems A PASSION FOR RAILWAY SOLUTIONS Molinari Rail Company Presentation Consulting Engineering Systems 1 Mission «At Molinari Rail we want to use our broad technology knowledge to design cost-efficient solutions,

More information

Tendering of passenger rail traffic in Norway

Tendering of passenger rail traffic in Norway Tendering of passenger rail traffic in Norway Rail passenger service tender 1: «Sør» Overview of current services and traffic Sørlandsbanen line Jærbanen line Arendalsbanen line Rail passenger service

More information

Motion. Complete Table 1. Record all data to three decimal places (e.g., 4.000 or 6.325 or 0.000). Do not include units in your answer.

Motion. Complete Table 1. Record all data to three decimal places (e.g., 4.000 or 6.325 or 0.000). Do not include units in your answer. Labs for College Physics: Mechanics Worksheet Experiment 2-1 Motion As you work through the steps in the lab procedure, record your experimental values and the results on this worksheet. Use the exact

More information

TLIB3078A Inspect, prepare and start an electric tram

TLIB3078A Inspect, prepare and start an electric tram TLIB3078A Inspect, prepare and start an electric tram Release: 1 TLIB3078A Inspect, prepare and start an electric tram Modification History Not Applicable Unit Descriptor Unit Descriptor This unit involves

More information

How to Configure and Use MRP

How to Configure and Use MRP SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business

More information

OPENTRACK: Simulation of complex nodes

OPENTRACK: Simulation of complex nodes OPENTRACK: Simulation of complex nodes Case Studies in Italy Zurich, 21st January 2010 About Us Important railway university in Italy OT Users since 2004 Spin-off since 2007 Cloose Cooperation with RFI

More information

INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION

INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION INTEGRATION AND REGULATORY STRUCTURES IN PUBLIC TRANSPORT CASE STUDY BRUSSELS CAPITAL REGION Brussels, July 2003 1- GENERAL INFORMATION ON THE CASE STUDY A/ General statistics on the case study - Area

More information

Automatic Wheel Profile Measuring Device for Tramway Vehicles

Automatic Wheel Profile Measuring Device for Tramway Vehicles Automatic Wheel Profile Measuring Device for Tramway Vehicles Technical description The automatic wheel profile measuring device is used to measure the wheel profile and diameter whilst a tramway vehicle

More information

Germany s largest fleet management system

Germany s largest fleet management system DB Regio Bus Bavaria Germany s largest fleet management system Covering all key public transportation processes for the major part of Bavaria in one single system? To difficult? Not with an integrated

More information

UK Railway Systems Reliability - Modelling the Future a case study. Nigel Best, Bradley Hyland Network Rail 7 th March 2012

UK Railway Systems Reliability - Modelling the Future a case study. Nigel Best, Bradley Hyland Network Rail 7 th March 2012 UK Railway Systems Reliability - Modelling the Future a case study Nigel Best, Bradley Hyland Network Rail 7 th March 2012 Modelling the Future - Introduction Why did we do the work? What approach do we

More information

GTA Cordon Count Program

GTA Cordon Count Program Transportation Trends 2001-2011 Executive Summary Project No. TR12 0722 September 2013 1.0 Introduction The Cordon Count program was established to collect traffic data as a tool for measuring travel trends

More information

Design Simulations Deliver Measurable Performance

Design Simulations Deliver Measurable Performance Design Simulation for TransCar Automated Guided Vehicle System (AGVS) Forecast the ability of an automated material transport system design to perform the defined workload within the available space and

More information

Self-driving transport, On rails. SimTrans-IDA RISK Seminar June 6 th 2016

Self-driving transport, On rails. SimTrans-IDA RISK Seminar June 6 th 2016 Self-driving transport, On rails SimTrans-IDA RISK Seminar June 6 th 2016 siemens.dk Agenda q Introduction q Grade of Automation definition q Concept q Safety Aspects q What are the benefits? q What are

More information