1 Asset Management Plan Development and Gap Analysis Katie Erickson, City of Wyoming
2 What is an Asset Management Plan? A comprehensive plan for long-term sustainability A tool to help utility managers make better decisions about repairing or replacing equipment and CIP projects Connects level of service with the condition of the system, improvement plans, and funding
3 What is an Asset Management Plan? Revenue Structure Asset Inventory A way to put all the pieces together Level of Service A future NPDES permit requirement for major systems. Criticality of Assets Capital Improvement Projects
4 How Do We Start? Where are we? Where should we be? How do we get there? How do we make sure others understand why we are here now?
5 Gap Analysis Determines current position Clarifies future vision Develops a plan to fill the gap
6 Gap Analysis Determining current position Examine present policy and procedure Gather existing data Examine current IT capabilities Assess current skills, knowledge and culture
7 Gap Analysis Clarify future vision Review and integrate regulations Examine standards or best practices Discuss desired expectations and outcomes Determine what data would be useful
8 Gap Analysis Develop a plan to fill the gap Identify gaps between current practices and future needs Research possible skills, tools, and systems that can close the gaps Decide what processes will work best for your organization Develop an implementation plan and timetable
9 City of Wyoming Case Study Needed a quick turnaround due to SAW grant application due date RFP sent out in the first week of October Received 2 proposals Chose Black & Veatch Began the project in late October
10 Project Scope Strategic Asset Management (SAM) questionnaire Independent data review of current systems by B&V Interview workshops with key staff Confirm plan vision Identify gaps Complete assessment and implementation plan
11 Standards Used Proposed NPDES permit language WERF Strategic Asset Management (SAM) assessment tool Publically Available Specification 55 (PAS 55) Produced by the Institute for Asset Management in the United Kingdom Was being developed into the International (ISO55000)
12
13 NPDES Language 4 Requirement Maintenance staff Sufficient but needs documentation Collection map Mapping fairly complete, staff training needed to implement fully Inventory and assessment of fixed assets Condition, cost, depreciated value. risk evaluation not complete OM&R budget and rate sufficiency for the sewer and treatment works No replacement fund started and CIP needs to be included in rate methodology
14 NPDES Language Yearly Reporting Need policy, frameworks, strategy and objectives Procedure for reviewing and changing plan Track AM related activities
15 SAM Gap Assessment Most substantial gaps identified: Developing and documenting AMP strategy and policy including Explicit linkage of AMP to level of service commitment Including AMP roles and responsibilities into the organizational structure Formally connecting risk assessment to AM decisions Training and professional development for staff on asset management
16 PAS 55 Average score: 1.6 Section No Section Name Avg Score Average score of 1.6 indicates that we are aware of Asset Management and in the process of developing a program General Requirements 4.2 Asset Management Policy Asset Management Strategy Asset Management Objectives Asset Management Plans Contingency Planning Structure, authority and responsibilities Outsourcing of asset management activites Training, Awareness and Competence Communication, participation and consultation Asset Management System and Documentation Information Management Risk Management Processes Risk Management Methodology Risk Identification and assessment Use and Maintenance of asset risk information Legal and other requirements Management of Change Life Cycle Activities Tools, facilities and equipment Performance and Condition Monitoring Investigation of Asset Related Failures, Incidents and Non-Comformities Evaluation of compliance Audit Corrective and Preventative Action Continual Improvement Records Management Review 2.0
17 Conclusion 4 Focuses, 27 Action Items Asset Management Program Structure Asset Risk Management Operational Improvements Information Management 27 Action items identified Including: Strategic Asset Management planning, increase documentation, assign roles and responsibilities, establish risk framework, execute business risk evaluation, procure software and hardware for IT system, staff training
18 We didn t win the lottery What now? Focus on fulfilling NPDES permit requirements Make educated guesses about grant acquirement and timeline Get started
19 Moving Forward Strategic Asset Management Plan Implement Asset Management Program Build Asset Inventory Database Performance evaluation and improvements
20 Moving Forward Strategic Asset Management Plan Policy Strategy Objectives Key Performance Indicators
21
TULSA'S UTILITY ENTERPRISE INITIATIVE: USING TECHNOLOGY, STRATEGY AND ASSET MANAGEMENT TO DRIVE LONG TERM PERFORMANCE
TULSA'S UTILITY ENTERPRISE INITIATIVE: USING TECHNOLOGY, STRATEGY AND ASSET MANAGEMENT TO DRIVE LONG TERM PERFORMANCE Lauren Brookey, UEI Chair, Board Steve Steckler, Project Manager, IMG Rebel Group Matt
Preparation for ISO 45001 OH&S Management Systems
Preparation for ISO 45001 OH&S Management Systems HEALTH & SAFETY MANAGEMENT QUALITY MANAGEMENT ACCESSIBILITY ENVIRONMENTAL MANAGEMENT ENERGY MANAGEMENT ISO 45001 TIMELINE ISO project committee ISO PC
Process Management: Creating Supply Chain Value
Process Management: Creating Supply Chain Value Carol L. Marks, C.P.M., Director of Purchasing and Business Management Systems Industrial Distribution Group, Southern Division 704/398-5666; [email protected]
EHR Readiness Assessment
EHR Assessment Overview This tool is designed to help physicians assess where they are in their readiness to implement an EHR. With a more accurate portrait of their readiness, their practice will be better
Detroit Water and Sewerage Department Wastewater Operations Group. Asset Management Program
Detroit Water and Sewerage Department Wastewater Operations Group Asset Management Program December 2013 TABLE OF CONTENTS ATTACHMENT II: PREVENTIVE MAINTENANCE PLAN... II ATTACHMENT III: PREDICTIVE MAINTENANCE
About This Document. Response to Questions. Security Sytems Assessment RFQ
Response to Questions Security Sytems Assessment RFQ Posted October 1, 2015 Q: Which specific security assessment processes are sought for this engagement? The RFQ mentions several kinds of analysis and
Identity & Access Management new complex so don t start?
IT Advisory Identity & Access Management new complex so don t start? Ing. John A.M. Hermans RE Associate Partner March 2009 ADVISORY Agenda 1 KPMG s view on IAM 2 KPMG s IAM Survey 2008 3 Best approach
und http://www.it-pruefungen.de/
-Echte und Originale Prüfungsfragen und Antworten aus Testcenter -Machen Sie sich fit für Ihre berufliche Zukunft! http://www.it-pruefungen.de/ Exam Exam : 70-673 Title : TS: Designing, Assessing, and
Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry. Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3
Criticism of Implementation of ITSM & ISO20000 in IT Banking Industry Presented by: Agus Sutiawan, MIT, CISA, CISM, ITIL, BSMR3 Outline What is IT Service Management What is ISO 20000 Step by step implementation
Chapter 1. The ISO 9001:2000 Standard and Certification Process
CH01_pp.001-008 15/08/01 12.15 pm Page 1 Chapter 1 The ISO 9001:2000 Standard and Certification Process Overview Introduction This chapter describes the ISO 9000 Standards, ISO 9001:2000 concepts, and
70-673 Q&A. DEMO Version
TS: Designing, Assessing, and Optimizing Software Asset Management (SAM) Q&A DEMO Version Copyright (c) 2010 Chinatag LLC. All rights reserved. Important Note Please Read Carefully For demonstration purpose
How To Audit A Health And Safety Management System
Introduction to Auditing 2015 Safety Groups Advantage Program 1 ! Emergency! Phones! Break(s)! Questions OVERVIEW! Objective! Principles of Auditing! Audit Process! Audit Review 3 OBJECTIVE To provide
OPTIMAL MANAGEMENT OF PHYSICAL ASSETS PAS 55 COMPLIANCE
www.ifsworld.com OPTIMAL MANAGEMENT OF PHYSICAL ASSETS PAS 55 COMPLIANCE Michael Blalock Global Industry Director - Energy & Utility IFS GREAT NEWS! FOR IFS ASSET MANAGEMENT CUSTOMERS THE GREAT NEWS...
Human Diversity Management Systems. Diversity-Management Sytems based on ÖNORM S 2501
Human Diversity Management Systems Certification Scheme EN Diversity-Management Sytems based on ÖNORM S 2501 Date of issue: V1.0, 2013-05-01 Heinestrasse 38, A-1020 Vienna, Austria Management [email protected]
Getting Started with Business Intelligence
Getting Started with Business Intelligence Tips and Tools to Ensure Success 153 Kearny St., San Francisco, CA [email protected] (866) 940-1496 Introduction Identifying and selecting a Business Intelligence
VISION FOR LEARNING AND DEVELOPMENT
VISION FOR LEARNING AND DEVELOPMENT As a Council we will strive for excellence in our approach to developing our employees. We will: Value our employees and their impact on Cardiff Council s ability to
Olav Mo, Cyber Security Manager Oil, Gas & Chemicals, 28.09.2015 CASE: Implementation of Cyber Security for Yara Glomfjord
Olav Mo, Cyber Security Manager Oil, Gas & Chemicals, 28.09.2015 CASE: Implementation of Cyber Security for Yara Glomfjord Implementation of Cyber Security for Yara Glomfjord Speaker profile Olav Mo ABB
ISO 14001:2015: Key Changes
ISO 14001:2015: Key Changes Susan LK Briggs Convenor, ISO TC207/SC1/WG5 TC207 Workshop, 9/8/15 Topics for Discussion Background on ISO 14001 Revision Highlight of key changes in ISO 14001:2015 Top Management
MANUSCRIPT THE DETROIT WATER AND SEWERAGE DEPARTMENT S PERFORMANCE AND DASHBOARD SYSTEM (PADS): STRATEGIES, ACTIONS, AND MEASURES FOR OPTIMAL RESULTS
ABSTRACT MANUSCRIPT THE DETROIT WATER AND SEWERAGE DEPARTMENT S PERFORMANCE AND DASHBOARD SYSTEM (PADS): STRATEGIES, ACTIONS, AND MEASURES FOR OPTIMAL RESULTS Authors: Ryan W. Nagel, Senior Consultant,
How To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
Business Continuity Management Governance. Frank Higgins Abu Dhabi March 2015
Business Continuity Management Governance Frank Higgins Abu Dhabi March 2015 Different Names Same Concept BCM (Business Continuity Management) BSI 25999 IPOCM (Incident Preparedness & Operational Continuity
REQUEST FOR PROPOSALS for EMPLOYEE BENEFITS BROKER/ CONSULTING SERVICES
Kansas City, Kansas Housing Authority 1124 North Ninth Street Kansas City, KS 66101-2197 (913) 281-3300 FAX (913) 279-3428 REQUEST FOR PROPOSALS for EMPLOYEE BENEFITS BROKER/ CONSULTING SERVICES Date RFP
Strategic Direction 7 Vision for Shared Administrative Services
Strategic Direction 7 Vision for Shared Administrative Services Strategic Direction 7 - Centralize the System s business/administrative functions, where appropriate, in order to leverage resources and
Sound Transit Internal Audit Report - No. 2014-6
Sound Transit Internal Audit Report - No. 2014-6 Maturity Assessment: Information Technology Division Disaster Recovery Planning Report Date: June 5, 2015 Table of Contents Page Executive Summary 2 Background
M a r k e t i n g. About managing the doing of marketing for management roles
Professional Diploma in M a r k e t i n g About managing the doing of marketing for management roles Fully sponsored by the HRD Fund for Banking & Financial Sector employees only Professional Diploma in
Is ITIL All Theory and No Practice?
Is ITIL All Theory and No Practice? Carolyn M. Hennings PMP, IT Service Manager ITIL is a Registered Trade Mark, and a Registered Community Trade Mark of the Office of Government Commerce, and is Registered
Certificate in procurement and supply operations Unit content guide. Leading global excellence in procurement and supply
Certificate in procurement and supply operations Unit content guide Leading global excellence in procurement and supply Introduction The Chartered Institute of Procurement & Supply qualifications ladder
An Overview of Information Security Frameworks. Presented to TIF September 25, 2013
An Overview of Information Security Frameworks Presented to TIF September 25, 2013 What is a framework? A framework helps define an approach to implementing, maintaining, monitoring, and improving information
Approaches to Successfully Implementing Statewide ERP
Approaches to Successfully Implementing Statewide ERP August 24, 2015 NASACT Clark Partridge, State of Arizona Michael J. Smarik, State of Arizona Daniel Keene, CGI James Colbert, CGI Agenda Statewide
Business Continuity Plan
Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions
DNS Security, Stability and Resiliency
DNS Security, Stability and Resiliency John Crain Chief Technical Officer April 21st 2009 Garmisch 1 Agenda The Global DNS SSR Symposium Problems and Opportunities Questions? 2 The Organization Sponsors:
Software Asset Management (SAM) and ITIL Service Management - together driving efficiency
Software Asset Management (SAM) and ITIL Service Management - together driving efficiency Ian Preskett MIET C.Eng. MBCS CITP Software Asset Management Consultant [email protected] Agenda
Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology.
Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology December 18, 2014 Enterprise Resource Planning (ERP) definition ERP is a business system
Practitioner Certificate Software Asset Management Syllabus. Version 2.0
Practitioner Certificate Software Asset Management Syllabus Version 2.0 June 2010 Practitioner Certificate in Software Asset Management The ISEB Practitioner Certificate in Software Asset Management (SAM)
Department of Children and Families (DCF) Request for Information (RFQ) #01U013DS1 HIPAA Compliance Review DCF Answers to Vendor Questions
Department of Children and Families (DCF) Request for Information (RFQ) #01U013DS1 HIPAA Compliance Review s to Vendor Questions Questions as Submitted by Vendors (Duplicates omitted) 1. Have controls
RFP 2013-16: Change Management Consulting for Enrollment Functionality Improvements Final Response to Questions 5/7/2014
1 Has Covered California performed any high level assessments of the changes for the upcoming open enrollment? If yes, please share the relevant details. 2 Please describe activities under post Go-live
Security and privacy standardization for the SME community
Security and privacy standardization for the SME community NLO meeting, Athens, March 4th 2015 European Union Agency for Network and Information Security www.enisa.europa.eu PROJECT CONTEXT European Union
Chapter 6 Implementation Planning
Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work
PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT
PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT Jeffrey B. Stillman, P.E., Practice Leader (Main Author/Presenter) Kevin T. Laptos, P.E., Regional Planning Leader Kent A. Lackey,
High-Performing Information Systems Aligned With Utility Business Strategy [Project #4316]
High-Performing Information s Aligned With Utility Business Strategy [Project #4316] ORDER NUMBER: 4316 DATE AVAILABLE: June 2013 PRINCIPAL INVESTIGATORS: David W. Harris, Esteban Azagra, Rod van Buskirk,
The SME Engagement Handbook
The SME Engagement Handbook The purpose of this document is to help microbusinesses and small to medium enterprises ( SMEs ) interact more effectively when bidding to supply goods or services to larger
Dodging Breaches from Dodgy Vendors: Tackling Vendor Risk Management in Healthcare
Dodging Breaches from Dodgy Vendors: Tackling Vendor Risk Management in Healthcare Strengthening Cybersecurity Defenders #ISC2Congress Healthcare and Security "Information Security is simply a personal
Introduction. What is ITIL? Automation Centre. Tracker Suite and ITIL
1 Introduction The Information Technology Infrastructure Library (ITIL) aims to improve the management of IT services within the organization, for lowered costs, improved efficiency and productivity. But
City of Pittsburg 65 Civic Avenue Pittsburg, CA 94565-3814
City of Pittsburg 65 Civic Avenue Pittsburg, CA 94565-3814 February 4, 2016 The City of Pittsburg (City) is distributing the enclosed Request for Proposals (RFP) for Geographic Information System Support
City of Naperville Strategic Technology Plan. August 26, 2014
City of Naperville Strategic Technology Plan August 26, 2014 How We Arrived Here Progression from the City s Strategic Plan Be recognized as an egovernment innovator Examine technology Citywide Study the
IT Vendor Due Diligence. Jennifer McGill CIA, CISA, CGEIT IT Audit Director Carolinas HealthCare System December 9, 2014
IT Vendor Due Diligence Jennifer McGill CIA, CISA, CGEIT IT Audit Director Carolinas HealthCare System December 9, 2014 Carolinas HealthCare System (CHS) Second largest not-for-profit healthcare system
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value Professor Mustafa Alshawi Improving Project Performance Current Project Portfolio 1.83 B UAED ($500M) Award Winning
CGAM022.1/12/10. Asset Management Improvement Strategy 2010
Asset Management Improvement Strategy 2010 Version Control Version No. Date Details Author/s 1.0 July 2009 Adopted Strategy 2.0 October 2010 Update TABLE OF CONTENTS OF CONTENTS 4 OF THE ASSET MANAGEMENT
Office of the Auditor General AUDIT OF IT GOVERNANCE. Tabled at Audit Committee March 12, 2015
Office of the Auditor General AUDIT OF IT GOVERNANCE Tabled at Audit Committee March 12, 2015 This page has intentionally been left blank Table of Contents Executive Summary... 1 Introduction... 1 Background...
Looking back on how desktop support has evolved, it s interesting to see how tools
DECEMBER 2013 Desktop Support Technology Written by Michael Hanson Data analysis by Jenny Rains Looking back on how desktop support has evolved, it s interesting to see how tools have changed. Many years
Capital Maintenance Planning From a historical and future perspective
Capital Maintenance Planning From a historical and future perspective This paper has been written by Anglian Water as a contribution to Water 2020, Ofwat s programme for determining the form of the 2019
Intelligent Infrastructure Management System (IIMS)
Intelligent Infrastructure Management System (IIMS) Introduction The requirements of today s rapidly growing and changing enterprise infrastructures are no longer fully satisfied by traditional process-based
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT
CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14
OC Chapter. Vendor Risk Management. Cover the basics of a good VRM program, standards, frameworks, pitfall and best outcomes.
OC Chapter Vendor Risk Management. Cover the basics of a good VRM program, standards, frameworks, pitfall and best outcomes. 2 Why Assess a Vendor? You don t want to be a Target for hackers via your vendors
Key Criteria for Choosing an Enterprise Asset Management System
Key Criteria for Choosing an Enterprise Asset Management System February, 2013 E-ISG Asset Intelligence, LLC 3500 Boston Street Suite 316 Baltimore, MD 21224 Phone: 866.845.2416 Website: www.e-isg.com
The CMDB at the Center of the Universe
The CMDB at the Center of the Universe Reg Harbeck CA Wednesday, February 27 Session 5331 Purpose Clarify origin of CMDB concept and what it is Understand difference and equivalence between CMDB and Asset
AUDIT OF ACCOUNTING INFORMATION SYSTEM USING COBIT 4.1 FOCUS ON DELIVER AND SUPPORT DOMAIN
AUDIT OF ACCOUNTING INFORMATION SYSTEM USING COBIT 4.1 FOCUS ON DELIVER AND SUPPORT DOMAIN 1 NI PUTU SRI MERTA SURYANI, 2 GUSTI MADE ARYA SASMITA, 3 I KETUT ADI PURNAWAN 1 Under Graduate Student, Department
IT Governance: framework and case study. 22 September 2010
IT Governance: framework and case study Presenter Yaowaluk Chadbunchachai Advisory Services Ernst & Young Corporate Services Limited Presentation topics ERM and IT governance IT governance framework IT
Information Technology Engineers Examination. Information Security Specialist Examination. (Level 4) Syllabus
Information Technology Engineers Examination Information Security Specialist Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination
Hillsborough County Water
0407 FWRJ 3/20/07 4:23 PM Page 54 Selecting & Implementing a Comprehensive Asset Management System Celine A. Hyer Hillsborough County Water Resource Services (WRS) provides water, wastewater, and reclaimed
UC Davis - RFP Questions for Perioperative Services Supply Chain Redesign Services. 1. How long is the project implementation estimated to be?
UC Davis - RFP Questions for Perioperative Services Supply Chain Redesign Services 1. How long is the project implementation estimated to be? The Infor/Lawson project timeline is approximately 18 months
Improvements Across the Continuum of Care at a National Top 10 Academic Medical Center
Improvements Across the Continuum of Care at a National Top 10 Academic Medical Center A national top 10 academic medical center and leader in healthcare innovation engaged Tefen to improve the efficiency
ACG s Growth Strategy and High Performance Business Consulting Services
ACG s Growth Strategy and High Performance Business Consulting Services ACG delivers telecom market share/forecast reports, consulting services, business case analysis, product and service message testing.
PROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
About PROXC Consulting. PROXC Services Domains
COMPANY PROFILE About PROXC Consulting Introduction PROXC is a key regional player in business consulting and advisory services field within the Europe, Middle East & Africa regions; bridging gaps between
IAM Certificate in Asset Management Ver1.2 January 2013
IAM Certificate in Asset Management Ver1.2 January 2013 Introduction 1.1 The IAM Certificate is aimed primarily at new entrants and those with some experience in asset management roles and seeking to achieve
A project management consultancy
A project management consultancy is a professional consulting firm with knowledge and experience in the specialized area of assisting organizations to improve their practice of project, program and/or
CABLE COMMUNICATIONS POLICY ACT OF 1984. as amended by the CABLE TELEVISION CONSUMER PROTECTION AND COMPETITION ACT OF 1992
CABLE COMMUNICATIONS POLICY ACT OF 1984 as amended by the CABLE TELEVISION CONSUMER PROTECTION AND COMPETITION ACT OF 1992 Section 626(a) Commencement of Proceedings; Public Notice and Participation (1)
IT Governance. What is it and how to audit it. 21 April 2009
What is it and how to audit it 21 April 2009 Agenda Can you define What are the key objectives of How should be structured Roles and responsibilities Key challenges and barriers Auditing Scope Test procedures
Business Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems
Business Continuity Management and BS 25999 by Steve Chan, Head of Training - HK, BSI Management Systems 9 April, 2008 2 Presentation content Drivers for Business Continuity Standards and definitions.
The Sourcing Canvas: A Strategic Approach to Sourcing Decisions. By Ralph Loftin, Richard Lynch and Jack Calhoun
The Sourcing Canvas: A Strategic Approach to Sourcing Decisions By Ralph Loftin, Richard Lynch and Jack Calhoun Contents Abstract... 3 Role of Business Capabilities in Sourcing... 4 Decision Logic for
International Transmission Asset Management Study (ITAMS)
International Transmission Asset Management Study (ITAMS) Measuring and Comparing TSO s Asset Management Performance February, 2014 Johan Huisma, Program manager ITAMS UMS Group Europe region Confidentiality
Certified Change Management Professional (CCMP )
The Association of Change Management Professionals Certified Change Management Professional (CCMP ) Chapter One The Beginning ACMP: Advancing the discipline of change management CCMP Presentation Page:
ISO 55001:2014 Asset Management System 5-Day Training Course (IAM Certified)
ISO 55001:2014 Asset Management System 5-Day Training Course (IAM Certified) TÜV SÜD Introduction ISO 55001: 2014 is a newly released best practice standard for asset management. This standard helps to