1 Sound Transit Internal Audit Report - No Maturity Assessment: Information Technology Division Disaster Recovery Planning Report Date: June 5, 2015 Table of Contents Page Executive Summary 2 Background 3 Audit Approach and Methodology 3 Maturity Assessment 4 Management Response 7 Audit Timeline Audit Entrance Meeting 02/13/15 First draft report issued 06/05/15 Exit Meeting 06/04/15 Final Management responses received 08/12/15 Final report issued 08/19/15 Presented to Audit & Reporting Committee 10/15/15

2 Executive Summary The Information Technology Division s Disaster Recovery Plan was included on the Internal Audit Division s Work Plan in 2012, 2013 and The audit was deferred in both 2012 and 2013 because the IT Division was in the of updating their plan. When we were advised that the IT Disaster Recovery Plan was to be updated again in 2014, we again considered deferring the audit, but instead determined to conduct a maturity assessment of the current state of disaster recovery planning in the IT Division. To perform the assessment, we used two well-established industry standards. First, we used COBIT 5 as the framework for establishing disaster recovery requirements. Second, we utilized the capability ratings standards established by the International Standards Organization. According to IT Division management, their 2014 effort was focused on their data center as an expedient method to develop a disaster recovery plan for the most critical agency applications. The agency built two new data centers in 2013 and 2014, which provide fail-over redundancy. Our maturity assessment found that the 2014 Data Center Disaster Recovery Plan did not score well in terms of COBIT 5 requirements, primarily for three reasons. First, it was developed utilizing a top-down approach that assumed all agency business needs would be captured within the data center, when in fact they were not. Second, the plan assumed recovery time objectives, 1 rather than analyzing business practices to determine how long agency personnel could operate while awaiting service restoration following a disruption. Third, it assumed all applications within the data center were of equal criticality, thus it did not provide guidance regarding the priority to restore service to each application. Because of these limitations, the current IT Division disaster recovery planning effort scored low in this assessment. Please refer to the detailed reporting within. Note that IT Division management is aware of this and has contracted with a consulting firm to create a new Disaster Recovery Plan. We will plan to review this effort and report a revised maturity assessment in future years. This audit only pertains to information technology under the control of the IT Division, which includes information technology infrastructure located in the data center and certain transit systems located throughout the region (TVM, CCTV). This audit does not include the Supervisory Control and Data Acquisition or Positive Train Control, because disaster recovery planning for these systems is the responsibility of the Operations Department and is considered outside the scope of this maturity assessment. 1 Recovery Time Objective: the targeted duration of time and a service level within which a business must be restored after a disaster (or disruption) in order to avoid unacceptable consequences associated with a break in business continuity. Page 2 of 11

3 Background IT Division management is currently in the of aligning business es with the COBIT 5 framework and also with division strategic planning and performance monitoring. COBIT 5 provides a manageable and logical structure for internal controls. The COBIT 5 business that aligns with the IT Division Disaster Recovery Program at Sound Transit is DSS04, which is titled, Manage Continuity. The main focus of the IT Division Disaster Recovery Program is to continue agency operations effectively and efficiently after a disaster or unexpected business interruption. Prior to the 2014 Data Center disaster recovery planning effort the program was last updated in A plan to update the program was presented to the Technology Governance Team (TGT) in June The plan included a threeyear, three-phase that focused on IT infrastructure in year one, IT business applications in year two and Supervisory Control and Data Acquisition (SCADA) in year three. In 2014, the IT Division worked with an IT disaster recovery consultant to complete the Data Center Disaster Recovery Plan. In 2015, the IT Division is working with a new IT disaster recovery planning consultant to complete the IT business applications and SCADA disaster recovery plans. The consultant will: 1. Define and document the IT Continuity/Disaster Recovery Program policy, objectives and scope. 2. Maintain a continuity strategy. 3. Develop and implement a business continuity response. 4. Manage backup arrangements. Audit Approach & Methodology Internal Audit approached the audit by gaining an understanding of the current plans and es described above. We reviewed COBIT 5 guidance and other resources to gain an understanding of industry best practices in disaster recovery planning. We met with management to discuss audit scope, objectives, timing and to obtain general knowledge of current practices. Based on analysis of the data gathered and discussion with ST management, the following objective was developed: 1. Perform a COBIT 5 maturity assessment regarding IT Division disaster recovery planning and management. During the fieldwork phase of the audit, all collected information was examined, including the IT Data Center Disaster Recovery Plan, TGT presentations and IT Division procedure documents. All information collected was used to formulate conclusions and recommendations. The final phase was reporting. All information was summarized and organized. Preliminary results were communicated with management, findings were clarified, and conclusions and recommendations were presented. The report was provided for appropriate Sound Transit personnel for review and comment. The report was revised to include the required management responses. We conducted this performance audit in accordance with Generally Accepted Government Auditing Standards and the International Standards for the Professional Practice of Internal Auditing. Those standards require that we plan and perform the audit to obtain sufficient, appropriate evidence to provide a reasonable basis for our findings and conclusions based on our audit objectives. We believe that the evidence obtained provides a reasonable basis for our findings and conclusions based on our audit objectives. Page 3 of 11

4 IT Division Disaster Recovery Planning Maturity Assessment This audit evaluated the maturity of eight management activities within the COBIT 5, Manage Continuity (see Table below). According to COBIT 5 standards and ISO rating methodology 2, seven management activities are rated Level 1 (Partial) and one is rated Level 0. The management activities with maturity levels rated Level 1 are qualified as partially achieved because controls within the es are not adequate to ensure predictable outcomes. The key to achieving Levels 2 and 3 is improved documentation and development of self-audit es that evaluate the effectiveness of control es. The following table describes the current state of the eight defined management activities applicable to the COBIT 5, Manage Continuity, which is described as Establish and maintain a plan to enable the business and IT to respond to incidents and disruptions in order to continue operation of critical business es and required IT services and maintain availability of information at a level acceptable to the enterprise. Management Activity 1 Define the business continuity policy, objectives and scope. 2 Maintain a continuity strategy. 3 Develop and implement a business continuity response. 4 Exercise, test & review the Business Continuity Plan. 5 Review, maintain & improve the continuity plan. 6 Conduct continuity plan training. 7 Manage backup arrangements. 8 Conduct postresumption review. Description of Current State The Data Center Disaster Recovery Plan is not aligned with the agency-wide Emergency Management Plan because: It was not developed based on analysis of agency services/business es that are critical to the agency. All business es and systems are not included. Performance metrics to track progress of the Data Center Disaster Recovery Plan have not been developed. The Data Center Disaster Recovery Plan does not assess the likelihood of disasters, is not based on business impact analyses or recovery time objectives for critical agency services and business es. The Data Center Disaster Recovery Plan does not include agency operational continuity plans, key suppliers or outsourced partner s plans or backup requirements. Annual continuity testing plan has not been developed, documentation of existing testing should be improved, and performance metrics should be used to determine whether test results were addressed adequately and timely. The Data Center Disaster Recovery Plan has not been reviewed and approved and needs further improvement. A continuity training program has not been developed. Staff competencies required for continuity training and testing have not been defined or training plans documented. The IT Division procedure document addressing backup and retention requirements was last reviewed in The Data Center Disaster Recovery Plan includes steps to conduct post-resumption review, however it does not address all applicable systems, and the procedures have not been tested. Capability Level Refer to Appendix I for detailed description of rating system. Page 4 of 11

5 Recommendations: Based on interviews with management and analysis of the two consultant agreements for Disaster Recovery Planning (the 2014 effort and the current contract) it appears that IT Division management understands the current plan needs improvement. As noted previously in this report, the current plan is deficient primarily because it was based upon three incorrect assumptions. First, it was developed utilizing a top-down approach, assuming that all agency business needs would be captured. Second, the plan assumed recovery time objectives, 3 rather than analyzing business practices to determine how long agency personnel could operate while awaiting service restoration following a disruption. Third, it assumed all applications within the data center were of equal criticality, thus it did not provide guidance regarding the priority to restore service to each application. We recommend the Information Technology Division consider the following: Planning 1. In order to better align the IT Business Continuity and Disaster Recovery Plan with the ST Emergency Management Plan, identify IT responsibilities and document the policies and procedures required to continue business operations after a disaster. 2. Assess the likelihood of business disruption for each incident type. This can help focus training and preparation based on incident type. 3. Develop a backup and restore test plan that includes periodic testing of on-site and off-site data for critical systems. 4. Develop an annual business continuity and disaster recovery testing plan. A testing plan should include a schedule of types of testing, systems to test and a full test of the Disaster Recovery Plan. Monitoring 5. Identify all internal IT services and business es that are critical to the agency. Creating and maintaining this list will help IT focus its resources. 6. The IT Business Continuity and Disaster Recovery plan development should be reported to the TGT and executive management annually, to improve management controls and agency involvement in the. The three-year, three-phase to develop the plan was last presented to the TGT in June Review the IT Data Center Disaster Recovery Plan on a regular basis against major changes to: agency organization, business es, outsourcing arrangements, technologies, infrastructure, operating systems and application systems. Track and report the frequency of updates to the risk profile. 8. Ensure business impact assessments are revised when changes to agency business practices are identified. 9. Ensure that all changes in policy, plans, procedures, infrastructure, and roles and responsibilities are approved by agency management and communicated to appropriate agency staff. 10. Develop, track and report performance metrics for the IT Business Continuity and Disaster Recovery plan development project. The COBIT 5 framework for managing continuity recommends many performance metrics, which we have provided for consideration in Appendix II. 11. Periodically assess adherence to the documented Disaster Recovery Plan. 12. Determine the effectiveness of the plan, continuity capabilities, roles and responsibilities, skills and competencies, resilience to incidents, technical infrastructure, and organizational structures and relationships. 13. Identify weaknesses or omissions in the plan and capabilities and make recommendations for 3 Recovery Time Objective: the targeted duration of time and a service level within which a business must be restored after a disaster (or disruption) in order to avoid unacceptable consequences associated with a break in business continuity. Page 5 of 11

6 improvement. Track and report percent of agreed-on improvements to the plan that have been reflected in the plan and percent of issues identified that have been subsequently addressed in the plan. Documenting 14. Determine whether agency divisions have developed operational business continuity plans for critical business es and/or temporary ing arrangements, including links to plans of outsourced service providers. Track and report percent of agency divisions satisfied that IT service delivery required in their continuity plans meet agreed-upon service levels. 15. Develop adequate Business Impact Assessments and Recovery Time Objectives (RTO). The assessments should include input from relevant stakeholders of each IT system and business function and should be documented and approved by stakeholders. The business impact assessment and RTO are listed as required outputs by COBIT Ensure that key suppliers and outsource partners have effective continuity plans in place. Track and report the percent of critical key suppliers and outsource partners who do not have effective continuity plans in place. 17. Review and update the Information Technology Procedure No. 9, Backup and Retention Requirements: Production Environment. 18. Include a reference to system backup requirements in policy and procedures required to support the IT Data Center Disaster Recovery Plan. 19. Include systems, applications, data and documentation maintained or ed by third parties in the ST Procedure No. 9, Backup and Retention Requirements: Production Environment Improve the documentation of test results by: a. Recording the date of the test b. Recording the roles and responsibilities of test participants c. Labeling recommendations identified from the post-test debriefing and analysis d. Including review and approval signature from IT management 21. Document post-resumption review following the successful resumption of business es after service interruption. 22. Obtain management approval of the post-resumption review documentation. Training 23. Create an IT business continuity and disaster recovery training program. Track and report percent of issues identified that have been subsequently addressed in the training materials. 24. Define training requirements for agency staff performing continuity planning, impact assessments, risk assessments, media communication and incident response. Ensure that the training plans consider frequency of training and training delivery mechanism. Track and report the percent of internal and external stakeholders that have received training. 25. Document agency staff competencies in business continuity and disaster recovery based on completed trainings and participation in business continuity tests. Page 6 of 11

7 Management Response Recommendation - Planning 1. In order to better align the IT Business Continuity and Disaster Recovery Plan with the ST Emergency Management Plan, identify IT responsibilities and document the policies and procedures required to continue business operations after a disaster. 2. Assess the likelihood of business disruption for each incident type. This can help focus training and preparation based on incident type. 3. Develop a backup and restore test plan that includes periodic testing of on-site and off-site data for critical systems. 4. Develop an annual business continuity and disaster recovery testing plan. A testing plan should include a schedule of types of testing, systems to test and a full test of the Disaster Recovery Plan. Recommendation - Monitoring 5. Identify all internal IT services and business es that are critical to the agency. Creating and maintaining this list will help IT focus its resources. 6. The IT Business Continuity and Disaster Recovery plan development should be reported to the TGT and executive management annually, to improve management controls and agency involvement in the. The three-year, three-phase to develop the plan was last presented to the TGT in June Review the IT Data Center Disaster Recovery Plan on a regular basis against major changes to: agency organization, business es, outsourcing arrangements, technologies, infrastructure, operating systems and application systems. Track and report the frequency of updates to the risk profile. 8. Ensure business impact assessments are revised when changes to agency business practices are identified. 9. Ensure that all changes in policy, plans, procedures, infrastructure, and roles and responsibilities are approved by agency management and communicated to appropriate agency staff. Management Response Party Agree: Disaster Recovery/Business Continuity should be an Agency-level policy. Procedures for IT recovery will be in the form of updated Runbooks, as part of deliverables of the DR Program. Partly Agree: Incident types have been described in IT Vulnerability Assessment Report in This assessment will influence how much investment we make in the DR program going forward. It will not be likely used for classifying incident response es or training. This is not intended to be repetitive task in the DR program. Partly Agree: Procedure #9 will be updated to include Backup and Recovery will be completed by the end of July Not Agree: IT will conduct a planned DR test annually, beginning Jan IT does not have the resources to fully test the DR plan annually. Partly Agree: A Business Impact Analysis and was completed in the 2015 deliverables of the DR Program. This is not intended to be a repetitive task in the DR Program. Partly Agree: The DR plan is scheduled to be presented to the TGT by 3Q2016. Partly Agree: The DR Plan will be reviewed at a minimum every 3 years, beginning Partly Agee: Business impacts will be identified as part of new application/system rollouts. The BIA s are not intended to be a repetitive task. Partly Agree: Changes in DR/BC policy will be communicated as part of the Agency policy. Internal to IT communication may not take on a formal communication channel. The DR program will not be Page 7 of 11

8 10. Develop, track and report performance metrics for the IT Business Continuity and Disaster Recovery plan development project. The COBIT 5 framework for managing continuity recommends many performance metrics, which we have provided for consideration in Appendix II. 11. Periodically assess adherence to the documented Disaster Recovery Plan. 12. Determine the effectiveness of the plan, continuity capabilities, roles and responsibilities, skills and competencies, resilience to incidents, technical infrastructure, and organizational structures and relationships. 13. Identify weaknesses or omissions in the plan and capabilities and make recommendations for improvement. Track and report percent of agreed-on improvements to the plan that have been reflected in the plan and percent of issues identified that have been subsequently addressed in the plan. Recommendation - Documenting 14. Determine whether agency divisions have developed operational business continuity plans for critical business es and/or temporary ing arrangements, including links to plans of outsourced service providers. Track and report percent of agency divisions satisfied that IT service delivery required in their continuity plans meet agreed-upon service levels. requesting approval other than IT management; and the policy committee for policy changes. Partly Agree: Given IT resources, this will not occur other than as a result of the annual IT DR exercise which will provide Pass/Fail on the exercise and lessons learned. Agree: This will be completed with annual DR exercises. Agree: The effectiveness of the plan will be determined by the success or failure of annual DR exercises. Not Agree: Tracking and reporting on a percentage basis will be overly cumbersome for the available resources and Agency commitment to the DR Program and therefore will not be developed. Partially Agree: During the Business Impact Analysis developed in the DR Program, IT has documented whether plans for business continuity exist. It will be the Agency COOP who provides continued oversight with the business to keep critical business es updated. 15. Develop adequate Business Impact Assessments and Recovery Time Objectives (RTO). The assessments should include input from relevant stakeholders of each IT system and business function and should be documented and approved by stakeholders. The business impact assessment and RTO are listed as required outputs by COBIT Ensure that key suppliers and outsource partners have effective continuity plans in place. Track and report the percent of critical key suppliers and outsource partners who do not have effective continuity plans in place. 17. Review and update the Information Technology Procedure No. 9, Backup and Retention Requirements: Production Environment. 18. Include a reference to system backup requirements in policy and procedures required to support the IT Data Center Disaster Recovery Plan. Completed: This task was completed during Phase 1 of the DR Program. Stakeholders filled out and went through thorough review of the Business Processes and desired RTO s. Agree: This task is being planned as part of 2017 deliverables of the DR Program development. Agree: Updated as part of 2015 DR Program Reference item Include systems, applications, data and documentation Agree: Will be updated in 2016 DR Page 8 of 11

9 maintained or ed by third parties in the ST deliverables. Procedure No. 9, Backup and Retention Requirements: Production Environment Improve the documentation of test results by: Agree: This will be included as part of the annual IT DR exercises. a. a. Recording the date of the test Blank b. b. Recording the roles and responsibilities of test Blank participants c. a. Labeling recommendations identified from the Blank post-test debriefing and analysis d. a. Including review and approval signature from Blank IT management 21. Document post-resumption review following the successful resumption of business es after service interruption. 22. Obtain management approval of the post-resumption review documentation. Agree: This will be included as part of annual IT DR exercises and any significant actual incidents. Agree: This will be included as part of the annual IT DR exercise and any significant incident(s). Recommendation - Training 23. Create an IT business continuity and disaster recovery training program. Track and report percent of issues identified that have been subsequently addressed in the training materials. 24. Define training requirements for agency staff performing continuity planning, impact assessments, risk assessments, media communication and incident response. Ensure that the training plans consider frequency of training and training delivery mechanism. Track and report the percent of internal and external stakeholders that have received training. 25. Document agency staff competencies in business continuity and disaster recovery based on completed trainings and participation in business continuity tests. Not Agree: Developing a training program, tracking and reporting on a percentage basis will be overly cumbersome for the available resources and Agency commitment to the DR Program. Partly Agee: IT will develop and maintain a DR training program for appropriate staff. Developing a training program, tracking and reporting on a percentage basis will be overly cumbersome for the available resources and Agency commitment to the DR Program. Partly Agree: IT will maintain a training inventory for staff to insure key DR personnel have received proper training. However, developing a training program, tracking and reporting on a percentage basis will be overly cumbersome for the available resources and Agency commitment to the DR Program. Page 9 of 11

10 Appendix I: Description of COBIT 5 and ISO Ratings In COBIT 5, an ISO/IEC compliant capability assessment system is used to assess whether goals have been achieved. The capability level of a is determined on the basis of the achievement of specific attributes. Table COBIT 5 Process Capability Ratings (based on ISO/IEC 15504) Capability Level Level Name 5 Optimizing 4 Predictable 3 Established 2 Managed 1 Performed 0 Incomplete Description The level 4 predictable is continuously improved to meet relevant current and projected business goals. The level 3 established now operates within defined limits to achieve its outcomes. The level 2 managed is now implemented using a defined that is capable of achieving its outcomes. The level 1 performed is now implemented in a managed fashion (planned, monitored and adjusted) and its work products are appropriately established, controlled and maintained. The implemented achieves its purpose. The is not implemented or fails to achieve its purpose. Attributes may also be rated with a standard qualification scale that is also defined in the ISO/IEC standard: Rating Symbol N P L F Rating Not achieved. Partially achieved. Largely achieved. Fully achieved. Description There is little or no evidence of achievement of the defined attribute in the assessed. There is some evidence of an approach to, and some achievement of, the defined attribute in the assessed. Some aspects of achievement of the attribute may be unpredictable. There is evidence of a systematic approach to, and significant achievement of, the defined attribute in the assessed. Some weakness related to this attribute may exist in the assessed. There is evidence of a complete and systematic approach to, and full achievement of, the defined attribute in the assessed. No significant weaknesses related to this attribute exist in the assessed. Page 10 of 11

11 Appendix II: The COBIT 5 framework for managing continuity recommends many performance metrics, including the following: a. Percent of critical business es, IT services and IT-enabled business programs covered by risk assessment. b. Number of significant IT-related incidents that were not identified in risk assessment. c. Frequency of update or risk profile. d. Number of business disruptions due to IT service incidents. e. Percent of business stakeholders satisfied that IT service delivery meets agreed-on service levels. f. Percent of users satisfied with the quality of IT service delivery. g. Level of business user satisfaction with quality and timeliness (or availability) of management information. h. Number of business incidents caused by non-availability of information. i. Ratio and extent of erroneous business decisions where erroneous or unavailable information was a key factor. j. Percent of IT services meeting uptime requirements. k. Percent of successful and timely restoration from backup or alternate media copies. l. Percent of backup media transferred and stored securely. m. Number of critical business systems not covered by the plan. n. Number of exercise and tests that have achieved recovery objectives. o. Frequency of tests. p. Percent of agreed-on improvements to the plan that have been reflected in the plan. q. Percent of issues identified that have been subsequently addressed in the plan. r. Percent of internal and external stakeholders that have received training. s. Percent of issues identified that have been subsequently addressed in the training materials. Page 11 of 11

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

Domain 1 The Process of Auditing Information Systems

Domain 1 The Process of Auditing Information Systems Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge

More information

CONTINUITY OF OPERATIONS AUDIT PROGRAM EVALUATION AND AUDIT

CONTINUITY OF OPERATIONS AUDIT PROGRAM EVALUATION AND AUDIT CONTINUITY OF OPERATIONS AUDIT PROGRAM EVALUATION AND AUDIT April 16, 2014 INTRODUCTION Purpose The purpose of the audit is to give assurance that the development of the Metropolitan Council s Continuity

More information

Virginia Commonwealth University School of Medicine Information Security Standard

Virginia Commonwealth University School of Medicine Information Security Standard Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Business Continuity Management Standard for IT Systems This standard is applicable to all VCU School of Medicine

More information

Documentation. Disclaimer

Documentation. Disclaimer HOME UTORprotect DOCUMENTATION AMS/ROSI SERVICES CONTACT Documentation Disaster Recovery Planning Disaster Recovery Planning Disclaimer The following project outline is provided solely as a guide. It is

More information

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA

PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA 1 Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-1 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand

More information

AUDIT REPORT INTERNAL AUDIT DIVISION. Audit of business continuity and disaster recovery planning at UNON

AUDIT REPORT INTERNAL AUDIT DIVISION. Audit of business continuity and disaster recovery planning at UNON INTERNAL AUDIT DIVISION AUDIT REPORT Audit of business continuity and disaster recovery planning at UNON Overall results relating to business continuity and disaster recovery planning at UNON were initially

More information

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT

CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT CENTRAL BANK OF KENYA (CBK) PRUDENTIAL GUIDELINE ON BUSINESS CONTINUITY MANAGEMENT (BCM) FOR INSTITUTIONS LICENSED UNDER THE BANKING ACT JANUARY 2008 GUIDELINE ON BUSINESS CONTINUITY GUIDELINE CBK/PG/14

More information

Business Continuity Planning and Disaster Recovery Planning

Business Continuity Planning and Disaster Recovery Planning 4 Business Continuity Planning and Disaster Recovery Planning Basic Concepts 1. Business Continuity Management: Business Continuity means maintaining the uninterrupted availability of all key business

More information

The PNC Financial Services Group, Inc. Business Continuity Program

The PNC Financial Services Group, Inc. Business Continuity Program The PNC Financial Services Group, Inc. Business Continuity Program subsidiaries) 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis

More information

Disaster Recovery and Business Continuity Plan

Disaster Recovery and Business Continuity Plan Disaster Recovery and Business Continuity Plan Table of Contents 1. Introduction... 3 2. Objectives... 3 3. Risks... 3 4. Steps of Disaster Recovery Plan formulation... 3 5. Audit Procedure.... 5 Appendix

More information

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY

NEEDS BASED PLANNING FOR IT DISASTER RECOVERY The Define/Align/Approve Reference Series NEEDS BASED PLANNING FOR IT DISASTER RECOVERY Disaster recovery planning is essential it s also expensive. That s why every step taken and dollar spent must be

More information

Proposal for Business Continuity Plan and Management Review 6 August 2008

Proposal for Business Continuity Plan and Management Review 6 August 2008 Proposal for Business Continuity Plan and Management Review 6 August 2008 2008/8/6 Contents About Newton IT / Quality of our services. BCM & BS25999 Overview 2. BCM Development in line with BS25999 3.

More information

The Weill Cornell Medical College and Graduate School of Medical Sciences. Responsible Department: Information Technologies and Services (ITS)

The Weill Cornell Medical College and Graduate School of Medical Sciences. Responsible Department: Information Technologies and Services (ITS) Information Technology Disaster Recovery Policy Policy Statement This policy defines acceptable methods for disaster recovery planning, preparedness, management and mitigation of IT systems and services

More information

Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four

Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four Joint Universities Computer Centre Limited ( JUCC ) Information Security Awareness Training- Session Four Data Handling in University Business Impact Analysis ( BIA ) Agenda Overview Terminologies Performing

More information

MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION

MANAGEMENT AUDIT REPORT DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION MANAGEMENT AUDIT REPORT OF DISASTER RECOVERY PLAN DEPARTMENT OF FINANCE AND ADMINISTRATIVE SERVICES INFORMATION TECHNOLOGY SERVICES DIVISION REPORT NO. 13-101 City of Albuquerque Office of Internal Audit

More information

Success or Failure? Your Keys to Business Continuity Planning. An Ingenuity Whitepaper

Success or Failure? Your Keys to Business Continuity Planning. An Ingenuity Whitepaper Success or Failure? Your Keys to Business Continuity Planning An Ingenuity Whitepaper May 2006 Overview With the level of uncertainty in our world regarding events that can disrupt the operation of an

More information

CISM ITEM DEVELOPMENT GUIDE

CISM ITEM DEVELOPMENT GUIDE CISM ITEM DEVELOPMENT GUIDE Updated January 2015 TABLE OF CONTENTS Content Page Purpose of the CISM Item Development Guide 3 CISM Exam Structure 3 Writing Quality Items 3 Multiple-Choice Items 4 Steps

More information

Flinders University IT Disaster Recovery Framework

Flinders University IT Disaster Recovery Framework Flinders University IT Disaster Recovery Framework Establishment: Flinders University, 1 August 2013 Last Amended: Manager, ITS Security Services, 4 October 2013 Nature of Amendment: Initial release Date

More information

State of South Carolina Policy Guidance and Training

State of South Carolina Policy Guidance and Training State of South Carolina Policy Guidance and Training Policy Workshop All Agencies Business Continuity Management Policy June 2014 Agenda Questions & Follow-Up Policy Workshop Overview & Timeline Policy

More information

ISMS Implementation Guide

ISMS Implementation Guide atsec information security corporation 9130 Jollyville Road, Suite 260 Austin, TX 78759 Tel: 512-615-7300 Fax: 512-615-7301 www.atsec.com ISMS Implementation Guide atsec information security ISMS Implementation

More information

Internal Audit Department NeighborWorks America. Audit Review of the Business Continuity Plan (BCP) Management and Documentation

Internal Audit Department NeighborWorks America. Audit Review of the Business Continuity Plan (BCP) Management and Documentation Department NeighborWorks America Audit Review of the Business Continuity Plan (BCP) and Documentation Project Number: ADMN.BCP.2013 Audit Review of of BCP Table of Contents Project Completion Letter...

More information

SCOPE; ENFORCEMENT; AUTHORITY; EXCEPTIONS

SCOPE; ENFORCEMENT; AUTHORITY; EXCEPTIONS Title: DRAFT USG Continuity of Operation Plan Policy Policy Number: 2009-Julian Date Topical Security Area: Document Type: Standard Pages: Words: Lines: 5 1,387 182 Issue Date: May-09 Effective Date: Immediately

More information

Creating a Business Continuity Plan for your Health Center

Creating a Business Continuity Plan for your Health Center Creating a Business Continuity Plan for your Health Center 1 Page Left Intentionally Blank 2 About This Manual This tool is the result of collaboration between the Primary Care Development Corporation

More information

Chapter 3: Audit of business Continuity plan... 3 Learning Objectives... 3 3.1 Introduction... 3 3.2 Steps of BCP Process... 3 3.2.

Chapter 3: Audit of business Continuity plan... 3 Learning Objectives... 3 3.1 Introduction... 3 3.2 Steps of BCP Process... 3 3.2. Chapter 3: Audit of business Continuity plan... 3 Learning Objectives... 3 3.1 Introduction... 3 3.2 Steps of BCP Process... 3 3.2.1 Step 1: Identifying the mission or business-critical functions... 4

More information

Montgomery County, Maryland Offices of the County Executive Office of Internal Audit

Montgomery County, Maryland Offices of the County Executive Office of Internal Audit Montgomery County, Maryland Offices of the County Executive Office of Internal Audit Continuity of Operation Planning July 30, 2014 MCIA-15-2 Highlights Why MCIA Did This Audit Our audit objective was

More information

University of Massachusetts Medical School's Data Center Relocation For the period July 1, 2008 through August 31, 2010

University of Massachusetts Medical School's Data Center Relocation For the period July 1, 2008 through August 31, 2010 ` Official Audit Report Issued September 30, 2011 University of Massachusetts Medical School's Data Center Relocation For the period July 1, 2008 through August 31, 2010 State House Room 230 Boston, MA

More information

Course: Information Security Management in e-governance. Day 1. Session 3: Models and Frameworks for Information Security Management

Course: Information Security Management in e-governance. Day 1. Session 3: Models and Frameworks for Information Security Management Course: Information Security Management in e-governance Day 1 Session 3: Models and Frameworks for Information Security Management Agenda Introduction to Enterprise Security framework Overview of security

More information

AUDITING A BCP PLAN. Thomas Bronack Auditing a BCP Plan presentation Page: 1

AUDITING A BCP PLAN. Thomas Bronack Auditing a BCP Plan presentation Page: 1 AUDITING A BCP PLAN Thomas Bronack Auditing a BCP Plan presentation Page: 1 What are the Objectives of a Good BCP Plan Protect employees Restore critical business processes or functions to minimize the

More information

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus Information Technology Engineers Examination Information Technology Service Manager Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination

More information

SOUTH LAKELAND DISTRICT COUNCIL INTERNAL AUDIT FINAL REPORT IT 11-02. IT Backup, Recovery and Disaster Recovery Planning

SOUTH LAKELAND DISTRICT COUNCIL INTERNAL AUDIT FINAL REPORT IT 11-02. IT Backup, Recovery and Disaster Recovery Planning SOUTH LAKELAND DISTRICT COUNCIL INTERNAL AUDIT FINAL REPORT IT 11-02 IT Backup, Recovery and Disaster Recovery Planning Executive Summary Introduction As part of the 2011/12 Audit Plan and following discussions

More information

Audit of the Disaster Recovery Plan

Audit of the Disaster Recovery Plan Audit of the Disaster Recovery Plan Report # 11-05 Prepared by Office of Inspector General J. Timothy Beirnes, CPA, Inspector General Kit Robbins, CISA, CISM, CRISC, Lead Information Systems Auditor TABLE

More information

Does it state the management commitment and set out the organizational approach to managing information security?

Does it state the management commitment and set out the organizational approach to managing information security? Risk Assessment Check List Information Security Policy 1. Information security policy document Does an Information security policy exist, which is approved by the management, published and communicated

More information

The University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1

The University of Iowa. Enterprise Information Technology Disaster Plan. Version 3.1 Version 3.1 November 22, 2004 TABLE OF CONTENTS PART 1: DISASTER RECOVERY EXPECTATIONS... 3 OVERVIEW...3 EXPECTATIONS PRIOR TO AN INCIDENT OCCURRENCE...3 EXPECTATIONS PRIOR TO A DISASTER OCCURRENCE...4

More information

hi Information Technologies Change Management Standard

hi Information Technologies Change Management Standard hi Information Technologies Change Management Standard Classification Service Delivery Standard # SVD-002 Approval Authority Chief Information Officer Implementation Authority Director, Service Delivery

More information

OUTSOURCING GUIDELINES FOR BANKS AND FINANCIAL INSTITUTIONS, 2008

OUTSOURCING GUIDELINES FOR BANKS AND FINANCIAL INSTITUTIONS, 2008 OUTSOURCING GUIDELINES FOR BANKS AND FINANCIAL INSTITUTIONS, 2008 BANK OF TANZANIA PART I PRELIMINARY 1 These guidelines may be cited as the Outsourcing Guidelines for Banks and Financial Institutions,

More information

Services Providers. Ivan Soto

Services Providers. Ivan Soto SOP s for Managing Application Services Providers Ivan Soto Learning Objectives At the end of this session we will have covered: Types of Managed Services Outsourcing process Quality expectations for Managed

More information

Vendor Management. Outsourcing Technology Services

Vendor Management. Outsourcing Technology Services Vendor Management Outsourcing Technology Services Objectives Board and Senior Management Responsibilities Risk Management Program Risk Assessment Service Provider Selection Contracts Ongoing Monitoring

More information

Business Continuity Management Governance. Frank Higgins Abu Dhabi March 2015

Business Continuity Management Governance. Frank Higgins Abu Dhabi March 2015 Business Continuity Management Governance Frank Higgins Abu Dhabi March 2015 Different Names Same Concept BCM (Business Continuity Management) BSI 25999 IPOCM (Incident Preparedness & Operational Continuity

More information

(Instructor-led; 3 Days)

(Instructor-led; 3 Days) Information Security Manager: Architecture, Planning, and Governance (Instructor-led; 3 Days) Module I. Information Security Governance A. Introduction to Information Security Governance B. Overview of

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

IT Risk Identification and Disaster Recovery. Mark Fenech BSc MBA CRISC CBCI January 2014

IT Risk Identification and Disaster Recovery. Mark Fenech BSc MBA CRISC CBCI January 2014 IT Risk Identification and Disaster Recovery Mark Fenech BSc MBA CRISC CBCI January 2014 ISO 31000:2009 Risk Management Standard Risk Assessment Process Risk Context Risk Identification Risk Analysis

More information

Validating Enterprise Systems: A Practical Guide

Validating Enterprise Systems: A Practical Guide Table of Contents Validating Enterprise Systems: A Practical Guide Foreword 1 Introduction The Need for Guidance on Compliant Enterprise Systems What is an Enterprise System The Need to Validate Enterprise

More information

SCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com

SCADA Business Continuity and Disaster Recovery. Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com SCADA Business Continuity and Disaster Recovery Presented By: William Biehl, P.E. 913-601-0104 (mobile) Bill.Biehl@we-inc.com Business Continuity Planning, a Sound Process A Business Continuity Plan: "A

More information

Application Support Solution

Application Support Solution Application Support Solution White Paper This document provides background and administration information on CAI s Legacy Application Support solution. PRO00001-MNGMAINT 080904 Table of Contents 01 INTRODUCTION

More information

By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd

By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd BS 25999 Business Continuity Management By. Mr. Chomnaphas Tangsook Business Director BSI Group ( Thailand) Co., Ltd 1 Contents slide BSI British Standards 2006 BS 25999(Business Continuity) 2002 BS 15000

More information

CISM ITEM DEVELOPMENT GUIDE

CISM ITEM DEVELOPMENT GUIDE CISM ITEM DEVELOPMENT GUIDE TABLE OF CONTENTS CISM ITEM DEVELOPMENT GUIDE Content Page Purpose of the CISM Item Development Guide 2 CISM Exam Structure 2 Item Writing Campaigns 2 Why Participate as a CISM

More information

Technology Resilience and Failover policy

Technology Resilience and Failover policy Technology Resilience and Failover policy Status: Approved Contents 1 Introduction... 4 2 Technology Resilience and Failover policy... 6 2.1 Policy scope... 6 2.2 Policy statements... 6 2.3 Exception management...

More information

PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA

PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA Chapter-4: Business Continuity Planning and Disaster Recovery Planning PAPER-6 PART-5 OF 5 CA A.RAFEQ, FCA Learning Objectives 2 To understand the concept of Business Continuity Management To understand

More information

CRISC Glossary. Scope Note: Risk: Can also refer to the verification of the correctness of a piece of data

CRISC Glossary. Scope Note: Risk: Can also refer to the verification of the correctness of a piece of data CRISC Glossary Term Access control Access rights Application controls Asset Authentication The processes, rules and deployment mechanisms that control access to information systems, resources and physical

More information

Disaster Recovery Journal Spring World 2014

Disaster Recovery Journal Spring World 2014 Disaster Recovery Journal Spring World 2014 What works: Services and service supply chain business continuity risk management Don Hall, CBCP, Cisco Services Business Continuity Analyst Cisco Systems, Inc.

More information

Why Should Companies Take a Closer Look at Business Continuity Planning?

Why Should Companies Take a Closer Look at Business Continuity Planning? whitepaper Why Should Companies Take a Closer Look at Business Continuity Planning? How Datalink s business continuity and disaster recovery solutions can help organizations lessen the impact of disasters

More information

The PNC Financial Services Group, Inc. Business Continuity Program

The PNC Financial Services Group, Inc. Business Continuity Program The PNC Financial Services Group, Inc. Business Continuity Program 1 Content Overview A. Introduction Page 3 B. Governance Model Page 4 C. Program Components Page 4 Business Impact Analysis (BIA) Page

More information

Company Management System. Business Continuity in SIA

Company Management System. Business Continuity in SIA Company Management System Business Continuity in SIA Document code: Classification: Company Project/Service Year Document No. Version Public INDEX 1. INTRODUCTION... 3 2. SIA S BUSINESS CONTINUITY MANAGEMENT

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Internal Audit 2011-12: Business Continuity Review Last updated 6 February 2012 Will Simpson Senior Manager

More information

December 2014 Report No. 15-017. An Audit Report on The Telecommunications Managed Services Contract at the Health and Human Services Commission

December 2014 Report No. 15-017. An Audit Report on The Telecommunications Managed Services Contract at the Health and Human Services Commission John Keel, CPA State Auditor An Audit Report on The Telecommunications Managed Services Contract at the Health and Human Services Commission Report No. 15-017 An Audit Report on The Telecommunications

More information

Ohio Supercomputer Center

Ohio Supercomputer Center Ohio Supercomputer Center IT Business Continuity Planning No: Effective: OSC-13 06/02/2009 Issued By: Kevin Wohlever Director of Supercomputer Operations Published By: Ohio Supercomputer Center Original

More information

DRAFT Disaster Recovery Policy Template

DRAFT Disaster Recovery Policy Template DRAFT Disaster Recovery Policy Template NOTE: This is a boiler plate template much information is needed from to finalizeconsider this document pre-draft FOREWARD... 3 Policy Overview...

More information

Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits

Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits Keys to Narrowing Business Continuity Planning Gaps: Training, Testing & Audits Betty A. Kildow, CBCP, FBCI, Emergency Management Consultant Kildow Consulting 765/483-9365; BettyKildow@comcast.net 95 th

More information

Unit Guide to Business Continuity/Resumption Planning

Unit Guide to Business Continuity/Resumption Planning Unit Guide to Business Continuity/Resumption Planning (February 2009) Revised June 2011 Executive Summary... 3 Purpose and Scope for a Unit Business Continuity Plan(BCP)... 3 Resumption Planning... 4 Assumptions

More information

Temple university. Auditing a business continuity management BCM. November, 2015

Temple university. Auditing a business continuity management BCM. November, 2015 Temple university Auditing a business continuity management BCM November, 2015 Auditing BCM Agenda 1. Introduction 2. Definitions 3. Standards 4. BCM key elements IT Governance class - IT audit program

More information

Disaster Recovery Plan (Business Continuity) Template

Disaster Recovery Plan (Business Continuity) Template Brochure More information from http://www.researchandmarkets.com/reports/2786932/ Disaster Recovery Plan (Business Continuity) Template Description: The Disaster Planning Template is over 200 pages and

More information

Certified Information Security Manager (CISM)

Certified Information Security Manager (CISM) Certified Information Security Manager (CISM) Course Introduction Course Introduction Domain 01 - Information Security Governance Lesson 1: Information Security Governance Overview Information Security

More information

PARKES SHIRE COUNCIL BUSINESS CONTINUITY POLICY

PARKES SHIRE COUNCIL BUSINESS CONTINUITY POLICY PARKES SHIRE COUNCIL BUSINESS CONTINUITY POLICY PARKES SHIRE COUNCIL BUSINESS CONTINUITY POLICY CONTENTS INTRODUCTION... 1 PURPOSE... 1 POLICY... 1 DEFINITIONS... 1 RESPONSIBILITY... 1 RELATED DOCUMENTATION...

More information

ITSM Governance In the world of cloud computing

ITSM Governance In the world of cloud computing ITSM Governance In the world of cloud computing Housekeeping Welcome to the Webinar Use the control panel to ask questions Can you see & hear us? enter your name & city to confirm Type Your Questions Here

More information

ISO 27001 Controls and Objectives

ISO 27001 Controls and Objectives ISO 27001 s and Objectives A.5 Security policy A.5.1 Information security policy Objective: To provide management direction and support for information security in accordance with business requirements

More information

Microsoft s Compliance Framework for Online Services

Microsoft s Compliance Framework for Online Services Microsoft s Compliance Framework for Online Services Online Services Security and Compliance Executive summary Contents Executive summary 1 The changing landscape for online services compliance 4 How Microsoft

More information

IT General Controls Domain COBIT Domain Control Objective Control Activity Test Plan Test of Controls Results

IT General Controls Domain COBIT Domain Control Objective Control Activity Test Plan Test of Controls Results Acquire or develop application systems software Controls provide reasonable assurance that application and system software is acquired or developed that effectively supports financial reporting requirements.

More information

OFFICE OF AUDITS & ADVISORY SERVICES IT DISASTER RECOVERY AUDIT FINAL REPORT

OFFICE OF AUDITS & ADVISORY SERVICES IT DISASTER RECOVERY AUDIT FINAL REPORT County of San Diego Auditor and Controller OFFICE OF AUDITS & ADVISORY SERVICES IT DISASTER RECOVERY AUDIT FINAL REPORT Chief of Audits: Juan R. Perez Audit Manager: Lynne Prizzia, CISA, CRISC Senior Auditor:

More information

1.0 Policy Statement / Intentions (FOIA - Open)

1.0 Policy Statement / Intentions (FOIA - Open) Force Policy & Procedure Reference Number Business Continuity Management D269 Policy Version Date 23 July 2015 Review Date 23 July 2016 Policy Ownership Portfolio Holder Links or overlaps with other policies

More information

Business Continuity Plan

Business Continuity Plan Business Continuity Plan October 2007 Agenda Business continuity plan definition Evolution of the business continuity plan Business continuity plan life cycle FFIEC & Business continuity plan Questions

More information

ISO27001 Controls and Objectives

ISO27001 Controls and Objectives Introduction This reference document for the University of Birmingham lists the control objectives, specific controls and background information, as given in Annex A to ISO/IEC 27001:2005. As such, the

More information

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION

TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION TREASURY INSPECTOR GENERAL FOR TAX ADMINISTRATION Disaster Recovery Testing Is Being Adequately Performed, but Problem Reporting and Tracking Can Be Improved May 3, 2012 Reference Number: 2012-20-041 This

More information

IT Infrastructure Audit

IT Infrastructure Audit IT Infrastructure Audit Office of the Chief Audit and Evaluation Executive Audit and Assurance Services Directorate June 2011 Cette publication est également disponible en français. This publication is

More information

Business Continuity Planning 101. +1 610 768-4120 (800) 634-2016 www.strohlsystems.com info@strohlsystems.com

Business Continuity Planning 101. +1 610 768-4120 (800) 634-2016 www.strohlsystems.com info@strohlsystems.com Business Continuity Planning 101 Presentation Overview What is business continuity planning Plan Development Plan Testing Plan Maintenance Future advancements in BCP Question & Answer What is a Disaster?

More information

Office of Inspector General

Office of Inspector General DEPARTMENT OF HOMELAND SECURITY Office of Inspector General Security Weaknesses Increase Risks to Critical United States Secret Service Database (Redacted) Notice: The Department of Homeland Security,

More information

Department of Information Technology Data Center Disaster Recovery Audit Report Final Report. September 2006

Department of Information Technology Data Center Disaster Recovery Audit Report Final Report. September 2006 Department of Information Technology Data Center Disaster Recovery Audit Report Final Report September 2006 promoting efficient & effective local government Executive Summary Our audit found that a comprehensive

More information

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery

Dacorum Borough Council Final Internal Audit Report. IT Business Continuity and Disaster Recovery Dacorum Borough Council Final Internal Audit Report IT Business Continuity and Disaster Recovery Distribution list: Chris Gordon Group Manager Performance, Policy and Projects John Worts ICT Team Leader

More information

Application for CISA Certification

Application for CISA Certification Application for CISA Certification 4/2015 Requirements to Become a Certified Information Systems Auditor become a Certified Information Systems Auditor (CISA), an applicant must: 1. Score a passing grade

More information

(Instructor-led; 2 Days)

(Instructor-led; 2 Days) Protecting Your Revenues: A Risk Management Approach to Business Continuity Planning (Instructor-led; 2 Days) Module I. Project Initiation and Management A. DRII/BCI Project initiation and control B. Business

More information

Continuity of Operations Planning. A step by step guide for business

Continuity of Operations Planning. A step by step guide for business What is a COOP? Continuity of Operations Planning A step by step guide for business A Continuity Of Operations Plan (COOP) is a MANAGEMENT APPROVED set of agreed-to preparations and sufficient procedures

More information

Audit of Physical Security Management

Audit of Physical Security Management Audit of Physical Security Management Natural Sciences and Engineering Research Council of Canada Social Sciences and Humanities Research Council Approved by the President on March 18, 2015 1 Her Majesty

More information

IBM Internet Security Systems October 2007. FISMA Compliance A Holistic Approach to FISMA and Information Security

IBM Internet Security Systems October 2007. FISMA Compliance A Holistic Approach to FISMA and Information Security IBM Internet Security Systems October 2007 FISMA Compliance A Holistic Approach to FISMA and Information Security Page 1 Contents 1 Executive Summary 1 FISMA Overview 3 Agency Challenges 4 The IBM ISS

More information

REPORT 2015/112 INTERNAL AUDIT DIVISION

REPORT 2015/112 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/112 Audit of information and communication technology hosting services provided by third parties to the Office of the United Nations High Commissioner for Refugees Overall

More information

Security Architecture. Title Disaster Planning Procedures for Information Technology

Security Architecture. Title Disaster Planning Procedures for Information Technology Category Applicability Title Disaster Planning Procedures for Information Technology All Public Entities (See the Applicability section below.) Standard - A degree or level of requirement that all jurisdictions

More information

SAMPLE IT CONTINGENCY PLAN FORMAT

SAMPLE IT CONTINGENCY PLAN FORMAT SAMPLE IT CONTINGENCY PLAN FORMAT This sample format provides a template for preparing an information technology (IT) contingency plan. The template is intended to be used as a guide, and the Contingency

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy St Mary Magdalene Academy V1.0 / September 2014 Document Control Document Details Document Title Document Type Business Continuity Policy Policy Version 2.0 Effective From 1st

More information

Client information note Assessment process Management systems service outline

Client information note Assessment process Management systems service outline Client information note Assessment process Management systems service outline Overview The accreditation requirements define that there are four elements to the assessment process: assessment of the system

More information

Business Continuity Trends, Requirements and Expectations in 2009. Brian Zawada (MBCP) Director of Consulting Services Avalution Consulting

Business Continuity Trends, Requirements and Expectations in 2009. Brian Zawada (MBCP) Director of Consulting Services Avalution Consulting Business Continuity Trends, Requirements and Expectations in 2009 Brian Zawada (MBCP) Director of Consulting Services Avalution Consulting Overview What Is Business Continuity? The Value Proposition What

More information

An organization properly establishes and operates its control over risks regarding the information system to fulfill the following objectives:

An organization properly establishes and operates its control over risks regarding the information system to fulfill the following objectives: p. 1 System Management Standards Proposed on October 8, 2004 Preface Today, the information system of an organization works as an important infrastructure of the organization to implement its management

More information

Polish Financial Supervision Authority. Guidelines

Polish Financial Supervision Authority. Guidelines Polish Financial Supervision Authority Guidelines on the Management of Information Technology and ICT Environment Security for Insurance and Reinsurance Undertakings Warsaw, 16 December 2014 Table of Contents

More information

10 Keys to a Successful DCAA Audit

10 Keys to a Successful DCAA Audit www.tdgovernmentsolutions.biz 814-242-2410 tim.diguiseppe@tdgovernmentsolutisn.biz 10 Keys to a Successful DCAA Audit Tim Di Guiseppe 2001 All Rights Reserved Page 1 What is a successful DCAA audit? From

More information

2014 Audit of the Board s Information Security Program

2014 Audit of the Board s Information Security Program O FFICE OF I NSPECTOR GENERAL Audit Report 2014-IT-B-019 2014 Audit of the Board s Information Security Program November 14, 2014 B OARD OF G OVERNORS OF THE F EDERAL R ESERVE S YSTEM C ONSUMER FINANCIAL

More information

Advisory Guidelines of the Financial Supervisory Authority. Requirements regarding the arrangement of operational risk management

Advisory Guidelines of the Financial Supervisory Authority. Requirements regarding the arrangement of operational risk management Advisory Guidelines of the Financial Supervisory Authority Requirements regarding the arrangement of operational risk management These Advisory Guidelines have established by resolution no. 63 of the Management

More information

Business continuity management policy

Business continuity management policy Business continuity management policy health.wa.gov.au Effective: XXX Title: Business continuity management policy 1. Purpose All public sector bodies are required to establish, maintain and review business

More information

Business Continuity Management Program Development Guide

Business Continuity Management Program Development Guide Business Continuity Management Program Development Guide Prepared by The NS Emergency Management Office, Winter 2012 Version 1.1 Page 2 of 24 Document Revision History Date Author Revision Notes Fall 2011

More information

SHARED ASSESSMENTS PROGRAM STANDARD INFORMATION GATHERING (SIG) QUESTIONNAIRE 2014 MAPPING TO OCC GUIDANCE (2013-29) ON THIRD PARTY RELATIONSHIPS

SHARED ASSESSMENTS PROGRAM STANDARD INFORMATION GATHERING (SIG) QUESTIONNAIRE 2014 MAPPING TO OCC GUIDANCE (2013-29) ON THIRD PARTY RELATIONSHIPS SHARED ASSESSMENTS PROGRAM STANDARD INFORMATION GATHERING (SIG) QUESTIONNAIRE 2014 MAPPING TO OCC GUIDANCE (2013-29) ON THIRD PARTY RELATIONSHIPS An overview of how the Shared Assessments Program SIG 2014

More information

Network Monitoring Handbook

Network Monitoring Handbook The purpose of this handbook is to inform network providers on what to expect before, during, and after an on-site monitoring visit by Central Florida Cares Health System, Inc. Network Monitoring Handbook

More information

Audit of IMS Disaster Recovery Plan

Audit of IMS Disaster Recovery Plan Audit of IMS Disaster Recovery Plan Internal Audit 378-1-615 April 29, 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY...II 1.0 INTRODUCTION...5 2.0 AUDIT OBJECTIVES AND SCOPE...7 3.0 AUDIT APPROACH AND METHODOLOGY...7

More information