IPMA Certification Yearbook 2000

Size: px
Start display at page:

Download "IPMA Certification Yearbook 2000"

Transcription

1 Certification Programmes 1 Editors Hans Knoepfel, Klaus Pannenbäcker, Gilles Caupin, Chris Seabury IPMA Certification Yearbook 2000 International Project Management Association

2 Certification Programmes 2

3 Certification Programmes 3 Content 1 Preface IPMA Certification Programme Status Four-Level Certification Programmes Overview Certification System General Structure and Principles Organisation and Administration Worldwide Cooperation National Competence Baselines Standards IPMA Competence Baseline (ICB) Number of Certificates IPMA Level A IPMA Level B IPMA Level C IPMA Level D Certificated Individuals per National Association AUSTRIA DENMARK EGYPT FINLAND FRANCE GERMANY ICELAND INDIA ITALY NETHERLANDS PORTUGAL RUSSIA SLOVENIA SPAIN SWITZERLAND UKRAINE UNITED KINGDOM...69

4 Certification Programmes 4 7 Assessors of the Certification Bodies List of First Assessors List of Actual Assessors Certification Bodies IPMA Validation Liaison to the IPMA Executive Board Certification Validation Management Board List of Validators for Certification Validation Panel

5 Certification Programmes 5 1 Preface After several years of development our National Associations started in 1998 officially and world-wide with the universal IPMA Four Level Certification (4-L-C) system. The national associations usually start with the nomination of their first assessors, with the establishment of their certification body engaging important sectors of the economy, and the transfer of the IPMA Competence Baseline (ICB) to the National Competence Baseline (NCB). Their own assessors are trained during the first certification cycle with the assistance of an experienced assessor from an existing certification body. The year 2000 proved how much energy could be mobilized by the IPMA Competence Baseline (ICB): Ten National Competence Baselines (NCB) were established, and at least six more countries are developing their NCB right now. The "source" National Competence Baselines in the United Kingdom, Switzerland, Germany and France were revised based on the ICB and past experience. The ICB as a global standard, the National Competence Baselines and the certification programmes of the national certification bodies are major flywheels for the project management promotion worldwide. Other empowering components are the bilateral co-operations between existing certification bodies and certification bodies that start a new programme. The most remarkable set-up took place in Egypt by our long-time member MES-PM and Klaus Pannenbäcker. Most countries that started their certification with a heavy outside influence went into a crisis in the first years. Countries mobilizing important grass-root project management competence had a more stable and powerful development. PM-ZERT, the certification body of the German Project Management Association (GPM) is the first national certification body world-wide that was validated for all four IPMA levels. It has the right to bear the title IPMA Validated Certification Programme for the Levels A, B, C and D. It owns the ISO 9001 certificate as well. The PMA-Zertifizierungsstelle of PMA in Austria was validated in the years 1999 and 2000 by the IPMA Certification Validation Management Board for the three IPMA Levels B, C and D. The accreditation of VZPM, the certification body of the Swiss Project Management Society, was extended from IPMA Level B to the three IPMA levels B, C and D by SAS (Swiss member of the European Accreditation) at the beginning of More and more project managers prefer IPMA's four level system which fits to the personal development and career of individuals the competitiveness of the companies and the competence of their personnel. The Editors Hans Knoepfel Klaus Pannenbäcker Gilles Caupin Chris Seabury CVM Board Chairman IPMA Vice President Council Chairman IPMA General Manager Note The information in this yearbook may contain errors or non-actual information due to an imperfect retrieval, transfer or interpretation of data from the national certification bodies. IPMA endeavours to present correct data. However, IPMA does not accept any liability for the completeness and correctness of the information. To be sure it is necessary to contact the national certification body for getting the latest information.

6 Certification Programmes 6 2 IPMA Certification Programme Status Status March 2001 Country agree- valida- Level 3) (nat. assoc. / certif. body) ment 1) tion 2) A B C D Austria (PMA-Zertifizierungsstelle) S R P RV RV RV China P.R. (PMRCC) S P P P Czech Republic (SPR) S R P P Croatia (CAPM / Cert) P Denmark (FDP / Cert) S R R P Egypt (MES / Cert) S P R R R Finland (PR) S P R R P France (AFITEP) S P R R R P Germany (GPM / PM-ZERT) S R RI 4) V 6) RIV RIV RIV Greece (HPMI) S Hungary (MFS) S P Iceland (VSFI) S R P India (PMA) S P R Ireland (IPMI) S P P Italy (ANIMP / PM-Sect) S P P R Latvia (LNPVA) P P P Netherlands (PMI-NL) S P R R R Norway (NFP) P Portugal (APOGEP / Cert) S R P P Russia (SOVNET / Cert) S P R R R Slovak Republic (SPMA) S P R Slovenia (ZPM / SLOCERT) S R P South Africa P Spain (AEIPRO / OCDP) S P R R Sweden (SPF) P Switzerland (SPM / VZPM) S P RA 5) RA RA Ukraine (UPMA / Cert) S P R R R R United Kingdom (APM) S R R R Yugoslavia (YUPMA) S P Total IPMA 24 (+5) 2+(6) 3 (+2) 15 (+4) 12 (+9) 12 (+10) 1) S: signed at the end of 2000 or P: planned in 2001 or no plans (empty) 2) R: realised at the end of 2000 or P: planned in 2001 or no plans (empty) 3) R: realised at the end of 2000 or P: planned in 2001 or no plans (empty) 4) I: ISO 9001 certificated 5) A: Accredited (European accreditation) 6) V: Validated by IPMA

7 Certification Programmes 7 3 Four-Level Certification Programmes 3.1 Overview The International Project Management Association (IPMA) is a non-profit organisation, whose function is to be the prime promoter of project management internationally. IPMA started in 1965, under its former name of INTERNET, as a forum for the exchange of experience amongst project managers of international projects. It hosted its first international conference in 1967 in Vienna, and since that time has developed steadily, as indeed has the discipline of project management itself. The membership of IPMA is primarily of national project management associations. These about 30 national member associations serve the specific needs of project management professionals in their own country in their own language. IPMA develops those needs at the international and global levels. To achieve this aim IPMA has developed a number of products and services encompassing research and development, education and training, standards and certification as well as conferences, seminars and workshops supported by a range of publications. In addition to its member associations, there are a number of other cooperating organisations and individual members who work with IPMA to promote project management internationally. An individual or company automatically supports IPMA if they become a member of a national project management association which is a member of IPMA. Where this is not possible or desirable, or if there is no member Association in a country, then direct international membership is available to them. The benefits of membership include: Extensive networking opportunities Workshops for National Associations Promotion and support for conferences Participation in international research projects Bi-monthly International Journal Quarterly Newsletter Internationally recognised certification programme Reduced entry fee for conferences. 3.2 Certification System On June 14, 1998 in Ljubljana, Slovenia, the IPMA Council confirmed the establishment of IPMA's universal four level system. The certification programmes in project management were then going to be realised by the National Associations. The certification programmes of the certification bodies shall be an incentive for the project managers and the members of the project management teams (i.e. the project management personnel) to expand and improve their knowledge, experience and personal attitude continue their education and long life learning improve the quality of project management last but not least achieve the project objectives better.

8 Certification Programmes 8 The benefits of the certification programmes are for the project management personnel: an internationally acknowledged certificate of their qualification and competence for the suppliers of project management services: a demonstration of their employees' professional qualification and competence for the clients: more certainty to get the state-of-the-art services from project management professionals. For these purposes, a variety of qualifications and competences concerning the knowledge, the experience, the personal attitude and the general impression of the project management personnel are assessed. IPMA developed the following four-level concept for the certification programmes shown in the figure below. The programme of a certification body that abides by the rules of IPMA will be validated and revalidated on a regular basis by IPMA. The main requirements for each level are derived from typical activities, responsibilities and requirements from practice. The IPMA four level certification system is now shown as follows: Title Capabilities Certification Process Validity Stage 1 Stage 2 Stage 3 Certificated Projects Director (IPMA Level A) A Optional Project report 3-5 years Certificated Project Manager (IPMA Level B) Competence = knowledge + experience + personal attitude B Application, curriculum vitae, self assessment references project list e.g. workshop, seminar Interview Certificated Project Management Professional (IPMA Level C) C e.g. workshop, report Exam time limited Certificated Project Management Practitioner (IPMA Level D) Knowledge D Application, curriculum vitae, self assessment Exam not time limited option: timelimited Figure 1 IPMA Four Level Certification System IPMA Level A Certificated Projects Director Shall be able to direct all projects of a company or branch or all projects of a programme. IPMA Level B Certificated Project Manager Shall be able to manage complex projects him / herself. IPMA Level C Certificated Project Management Professional Shall be able to manage non-complex projects him / herself and / or to assist the manager of a complex project in all elements and aspects of project management. IPMA Level D Certificated Project Management Practitioner Shall have the project management knowledge in all elements and aspects.

9 Certification Programmes 9 The levels are not restrained to hierarchical thinking. A project management specialist on the level D may be, apart from his fundamental knowledge in project management, a highly qualified, experienced and recognised expert in a special field. For example, he or she may own an additional credential in cost management. On each level most professional work can be done for the respective range of tasks and decisions, in a local or regional or national or in an international context. The levels are suitable for career track and maturity models as well as for personnel development and benchmarking programmes of companies and other organisations. The level D represents the requirements of the professional associations for project management knowledge provided by the education and training in project management for its use in practice. The national associations are responsible for developing and managing their own project management qualification and competence programme and for establishing their certification bodies. IPMA owns and maintains its universal system for validating the national programmes to coordinate and harmonise the certifications regarding the IPMA general structure and principles. In 2000 the IPMA Certification Validation Management Board validated PM-ZERT, the certification body of the German Project Management Association (GPM). It is the first national certification body worldwide that is validated for all four IPMA levels. It has the right to bear the title IPMA Validated Certification Programme for the Levels A, B, C and D. It owns the ISO 9001 certificate as well. The PMA-Zertifizierungsstelle of PROJEKT MANAGEMENT AUSTRIA was validated in the years 1999 and 2000 by the IPMA Certification Validation Management Board for the three IPMA Levels B, C and D. The accreditation of VZPM, the certification body of the Swiss Project Management Society, was extended from IPMA Level B to the three IPMA levels B, C and D by SAS (Swiss member of the European Accreditation) at the beginning of 2001 (SCES 036). 3.3 General Structure and Principles The general structure for all levels is shown in the IPMA Competence Baseline (ICB) which includes the description of the fields of project management qualification and competence and the taxonomy for the assessment of the project management personnel. The criteria are from the competence ranges of the basics of project management, the organisational and social competence, the methods and procedures, the general management, the personal attitudes, and the general impression of the project management personnel. The principles for an IPMA validated project management qualification and competence programme are the content of the Agreement between IPMA and a national association and the IPMA Certification Regulations and Guidelines (ICRG). The following stages are the compulsory elements of the qualification and certification processes: Levels A and B application, summary of experience, self-assessment, project proposal project report interview. Level C application, project experience, self-assessment formal examination with direct questions and intellectual tasks interview. Level D application formal examination with direct questions and open essays.

10 Certification Programmes 10 The organisation, the procedures and the forms shall be described in the quality handbook of the certification body including annexes. They should fulfill the requirements of the standard EN 45'013. It is recommended that each certification body is accredited by the national governmental institute which ideally should be a member of the European Accreditation (EA). 3.4 Organisation and Administration The Council of IPMA set up the certification validation organisation shown in the figure below. IPMA Council IPMA Executive Board IPMA Certification Validation Management Board Network of National Associations Validators Network of National Certification Bodies with IPMA Certification Validation Panel Figure 2 IPMA Validation Organisation The organisational units are the national certification bodies which are designated by the national associations and are responsible for the qualification and certification programme the IPMA certification validation panel, consisting of the representants of the national certification bodies and their assessors, for exchanging experience and making recommendations for improving IPMA's certification and validation system the validators who visit the national certification bodies, audit their qualification and competence programme and recommend improvements the IPMA certification validation management board (CVM Board) which is operating and improving IPMA's universal system for validating project management qualification and competence programmes the IPMA Executive Board and the IPMA Council of Delegates who make the general decisions concerning the qualification and competence programme and appoint the management board.

11 Certification Programmes 11 IPMA maintains a register of all acknowledged certificates of individuals and organisations awarded by the bodies for certification of all national associations. The certification bodies administer their confidential documentation of the candidates and the personnel of the certification body including the assessors. They process and provide the information about their qualification and competence programme and their certification. 3.5 Worldwide Cooperation 24 National Associations have now signed the agreement with IPMA about the qualification and certification programmes. The certification of project management personnel on one or several IPMAlevels is in operation in 17 countries. Several more countries are on the way to their certification programme according to the 4-L-C system of IPMA and other countries are extending their certification programme to more IPMA-levels. In the universal system of IPMA the certification is on four conceptual levels. The competence is definitely more than project management knowledge only. The assessment is made by experienced and independent experts (assessors) who know well the relevant project management practice. In addition to evidence in writing, the candidates present themselves in person to the assessors. The qualification and competence programmes are a major point of discussion for project management associations around the globe for several years. The three main partners in the world-wide cooperation for the qualification and certification of project management personnel are IPMA (International Project Management Association) PMI (Project Management Institute) AIPM (Australian Institute for Project Management) The Steering Committee has organised one or two Global Forum meetings per year. On the the 9th Global Project Management Forum was held in London on the occasion of the 15th IPMA World Congress on Project Management. On the the 10th Global Project Management Forum took place in Cairns, Australia. In February 1999 the Global Working Groups (on Standards, Education, Certification / Accreditation, Research, and Global Forum) were convened for the first time in East Horsley near London. Their discussions continued at the Global Fora in 2000 and in meetings of the International Standards Committee. 3.6 National Competence Baselines United Kingdom Body of Knowledge, Association of Project Management (APM), version 2000, U.K., published first in 1992 Switzerland Beurteilungsstruktur, Verein zur Zertifizierung im Projektmanagement (VZPM), Zürich, Version 2.00, July 2000, published first in 1996 France Matrice d'évaluation en management du projet, AFITEP, version October 2000, Paris, published first in 1996

12 Certification Programmes 12 Germany PM-Kanon, Bewertungsunterlagen zur Beurteilung der PM-Kompetenz, PM-ZERT, Germany, version 04, , published first in Austria pm baseline, Wissenselemente zum Projektmanagement und zum Management Projektorien tierter Unternehmen, PMA, Version 1.1, December 2000, Vienna, published first in China National Competence Baseline in preparation Czech Republic Projektové rizeni, Project Management, Spolecnost pro projektove rízeni, ED 03.0, Denmark National Competence Baseline in preparation Egypt Egyptian Competence Baseline, Version 1.0, MES PM CERT, Cairo, 1999 (new version in Arabic in preparation). Finland Projektin Johdon Pätevyys - Project Management Body of Knowledge, National Comeptence Baseline, Version 2, April 2001 (in Finnish and English) Hungary National Competence Baseline in preparation Ireland National Competence Baseline in preparation Italy Manuale delle Competenze di Project Management, ANIMP-PM, Edizione 1, Milano, 2000 Latvia National Competence Baseline in preparation Netherlands Nederlandse Competence Baseline, Version 1.0, El Naarden (in preparation), 2001 Portugal Especificação de competentências para gestores de proyecto, version 2.0, APOGEP, Septembro de 1999 Russia SOVNET National Competence Baseline, Version 1.2, Moscow, April 2000 Spain Bases para la competencia en dirección de Proyectos, version 1.15, OCDP, Zaragoza, October 2000 Slovak Republic Súbor pozadovaných schopností (SPS) pre OPR, Version 2.0.5, SPPR, Trnava, February 2000

13 Certification Programmes 13 Slovenia SZPM Competence Baseline, ZPM, Version 1.0, Ljubljana, 1998 Ukraine Ukraine National Competence Baseline, UKRNET, Version 1.0, Kiew, Standards IPMA Competence Baseline (ICB), Version 2.0, Bremen, 1999, International Project Management Association European Standard EN 45'013 : 1989, General criteria for certification bodies operating certification of personnel.

14 Certification Programmes 14 4 IPMA Competence Baseline (ICB) Editorial Committee Gilles Caupin, Hans Knoepfel, Peter Morris, Erhard Motzel, Olaf Pannenbäcker. Summary To be professional, the discipline of Project Management has to have rigorous standards and guidelines to define the work of the project management personnel. These requirements are defined by collecting, processing and institutionalising the accepted and applied competence in project management. In the IPMA Competence Baseline (ICB), the knowledge, experience and personal attitudes expected from the project managers and their staff (project management personnel) are presented by a description and a taxonomy. The ICB contains basic terms, tasks, practices, skills, functions, management processes, methods, techniques and tools that are commonly used in project management, as well as specialist knowledge, where appropriate, of innovative and advanced practices used in more limited situations. The ICB is not a textbook and not a cookbook. It offers an access to the knowledge, experience and personal attitudes in project management. It is the basis for all certification programmes of the national associations and their certification bodies that are validated by the International Association of Project Management (IPMA). In 1985 the Project Management Institute (PMI) in North America elaborated a Body of Knowledge (BOK) for Project Management. This document and later versions until the actual Guide to the Project Management Body of Knowledge have been the basis for the knowledge test for the Project Management Professional (PMP). IPMA (at that time called INTERNET) made an inquiry with their members about the need for certification in The majority of the answers were positive. The leading professional project management associations were then establishing their baselines for the assessment of project management competence during the last ten years. The Association of Project Managers (APM) in the United Kingdom published the first version of its BOK in In other European countries, similar projects and development work were done in the first half of the nineties, sometimes in connection with training material. A general distinction has been made between the content (ICB) and the organisation (responsibilities and procedures) of the certification programme. From 1993 the IPMA Certification Core Team (CCT) was charged with the coordination and harmonisation of the national projects and achievements. A first agreement was elaborated to establish an international framework for developing the national documents for the certification. In this process the sunflower was used as an instrument for the harmonisation and finally as the logo for the ICB. The emphasis is not on the ranges of project management competence but on the elements of project management knowledge and experience. In 1997 the IPMA Certification Validation Management Board (CVM Board) took over the further developments and the co-ordination of the national associations qualification and certification programmes. In 1998 the IPMA Council accepted the standard agreement of the national association and IPMA, approved the universal four level system and appointed the five members of the CVM Board. The ICB was submitted to the National Associations as version 1.0 for comments in 1998 and then published the first time by IPMA as version 2.0 in February 1999.

15 Certification Programmes 15 The ICB consists of the following chapters A. Introduction B. Knowledge and Experience C. Personal Attitude D. Taxonomy E. Standards and Guidelines, References F. Literature. The actual version of the ICB is in three languages: English, German and French. It was established on the basis of the National Competence Baselines of APM (the U.K. Body of Knowledge), VZPM (the Swiss Assessment Structure), PM-ZERT (the German Projektmanagement-Kanon) and AFITEP (the French Assessment Criteria). From these National Competence Baselines as much elements as possible were adopted or slightly modified. In any case a high closeness of meaning was sought. For traceability reasons the origin of each paragraph is clearly marked (numbers in brackets) and related to the reference list. The IPMA Competence Baseline is used as a reference basis for all substantial normative documents for the IPMA validated certification programmes as well as for referencing of the project management competence in theory and practice (e.g. project management literature, research projects, education, training and continuing professional development and reports about the management of projects). The ICB reflects the principles for the project management competence assessment that are commonly accepted within the IPMA. By consequence, it influences, and is influenced, by developments on the national competence baselines. Each national association is responsible for establishing its own detailed documents for its certification, especially the National Competence Baseline (NCB). This documentation is valid for the certification. A certain freedom shall be available for including national cultures and the advancement of the project management competence. On the other hand the IPMA harmonisation is responding to the requirements of companies and organisations that are active internationally. The ICB consists of 42 elements for knowledge and experience in project management (28 core elements and 14 additional elements) as well as 8 aspects for personal attitudes and 10 aspects for the general impression. IPMA requires that all 28 core elements and at least 6 additional elements chosen by the nation as well as the aspects for personal attitudes and the general impression are accepted in a NCB. However up to eight of the additional elements for knowledge and experience (i.e. about 20% of the 42 elements) can be eliminated or replaced by new elements for taking the national characteristics and new developments in project management into account.

16 Certification Programmes 16 5 Number of Certificates First number in tables 5.1 to 5.4: new certificates. Second number: renewed certificates. 5.1 IPMA Level A Country (nat. acssoc. / certif. body) Austria (PMA / Zert.stelle) China P.R. (PMRCC) Czech Republic (SPR) Denmark (FDP / Cert) Egypt (MES / Cert) Finland (PR) France (AFITEP) Germany (GPM / PM-ZERT) Greece (HPMI) Hungary (MFS) Iceland (VSFI) India (PMA) Ireland (APPM) Italy (ANIMP / PM-Sect) Latvia (LNPVA / Cert) Macedonia (MAPM) Netherlands (PMI-NL) Norway (NFP) Portugal (APOGEP / Cert) Russia (SOVNET / Cert) 0 2 Slovak Republic (SPMA) Slovenia (ZPM / SLOCERT) Spain (AEIPRO / OCDP) Sweden (SPF) Switzerland (SPM / VZPM) Ukraine (UPMA / Cert) United Kingdom (APM) Yugoslavia (YUPMA) Total IPMA Level A Numbers in italic letters are estimates.

17 Certification Programmes IPMA Level B Country (nat. acssoc. / certif. body) Austria (PMA / Zert.stelle) China P.R. (PMRCC) Czech Republic (SPR) 0 10 Denmark (FDP / Cert) Egypt (MES / Cert) Finland (PR) France (AFITEP) Germany (GPM / PM-ZERT) Greece (HPMI) Hungary (MFS) Iceland (VSFI) India (PMA) 0 0 Ireland (APPM) Italy (ANIMP / PM-Sect) 0 0 Latvia (LNPVA / Cert) Netherlands (PMI-NL) Norway (NFP) Portugal (APOGEP / Cert) Russia (SOVNET / Cert) Slovak Republic (SPMA) 0 0 Slovenia (ZPM / SLOCERT) Spain (AEIPRO / OCDP) 0 0 Sweden (SPF) Switzerland (SPM / VZPM) Ukraine (UPMA / Cert) United Kingdom (APM) (119)* Yugoslavia (YUPMA) Total IPMA Level B Numbers in italic letters are estimates. ()* Total to date.

18 Certification Programmes IPMA Level C Country (nat. acssoc. / certif. body) Austria (PMA / Zert.stelle) China P.R. (PMRCC) Czech Republic (SPR) 0 10 Denmark (FDP / Cert) Egypt (MES / Cert) Finland (PR) France (AFITEP) Germany (GPM / PM-ZERT) Greece (HPMI) Hungary (MFS) Iceland (VSFI) 0 0 India (PMA) 0 10 Ireland (APPM) Italy (ANIMP / PM-Sect) 0 10 Latvia (LNPVA / Cert) Netherlands (PMI-NL) Norway (NFP) Portugal (APOGEP / Cert) Russia (SOVNET / Cert) Slovak Republic (SPMA) 0 10 Slovenia (ZPM / SLOCERT) 0 0 Spain (AEIPRO / OCDP) 0 25 Sweden (SPF) Switzerland (SPM / VZPM) 0 10 Ukraine (UPMA / Cert) United Kingdom (APM) (94)* Yugoslavia (YUPMA) Total IPMA Level C Numbers in italic letters are estimates. ()* Total to date.

19 Certification Programmes IPMA Level D Country (nat. acssoc. / certif. body) Austria (PMA / Zert.stelle) China P.R. (PMRCC) Czech Republic (SPR) 0 20 Denmark (FDP / Cert) 0 10 Egypt (MES / Cert) 9 44 Finland (PR) 0 10 France (AFITEP) 8 80 Germany (GPM / PM-ZERT) Greece (HPMI) Hungary (MFS) Iceland (VSFI) 0 0 India (PMA) Ireland (APPM) Italy (ANIMP / PM-Sect) Latvia (LNPVA / Cert) Netherlands (PMI-NL) Norway (NFP) Portugal (APOGEP / Cert) Russia (SOVNET / Cert) Slovak Republic (SPMA) 0 10 Slovenia (ZPM / SLOCERT) 0 0 Spain (AEIPRO / OCDP) Sweden (SPF) Switzerland (SPM / VZPM) 2 20 Ukraine (UPMA / Cert) United Kingdom (APM) (5300)* Yugoslavia (YUPMA) Total IPMA Level D Numbers in italic letters are estimates. ()* Total to date.

20 Certification Programmes 20 6 Certificated Individuals per National Association 6.1 AUSTRIA IPMA LEVEL B Certified Project Manager (Zertifizierter Projektmanager), recertificated 2 Ing. Wolfgang Lerchenfelder Dr. Gerhard Krömer DI Helmut Berger Klaus Heidinger DI Reinhard Bacher Hansjörg Zahradnik DI Wolfgang Gary Mag. Wolfgang Schraick Ing. Christian Panhofer Gerhard Zimmert DI Klaus Zink IPMA LEVEL B Certified Project Manager (Zertifizierter Projektmanager) 62 Dip. Ing. Josef Wolf 17-May Mag. Wolfgang Schraick 18-Aug Ing. Christian Panhofer 17-May Rene Weiss 17-May Ing. Michael Chytracek 17-May DI. Christoph Gauss 17-May Gerhard Zimmert Dip.Ing. Dr. Werner Obermann 18-Aug certificate not awarded 71 Ing. Peter Rosenauer 07-Dec Dip. Ing. Werner Jansky 07-Dec Ing. Walter Kirchner 07-Dec

21 Certification Programmes Thomas Kolarik 07-Dec Dip. Ing. Stan Manca 07-Dec Christian Schieb 07-Dec Mag. Astrid Schmidberger 07-Dec Dip. Ing. Johannes Seppi 07-Dec Ing. Rolf Walden 07-Dec Ing. Peter Bicher 07-Dec Robert Donner 28-Oct Oct Peter Erdt 07-Dec Dip. Ing. Herbert Frey 07-Dec Michael Hajek 07-Dec Mag. Harald Hilscher 07-Dec Eric Höhl 07-Dec Stefan Eder 07-Dec Ing. Roman Pilchbauer 07-Dec Karl Piermayer 07-Dec Reinhold Raith 07-Dec certificates not awarded 100 Ing. Gottfried Simon 07-Dec Klaus Zink 07-Dec Ursula Gillhofer 04-Jun May Gerhard Engelbrecht 04-Jun May Robert Peszt 04-Jun May Werner Schönfeldinger 04-Jun May Oliver Lindlbauer 04-Jun May Thomas Ernst 04-Jun May Ulrike Huber 04-Jun May Hans Pleininger 21-Jul Jun Hermann Scsepka 21-Jul Jun Robert Herbacek 21-Jul Jun * Albert Hafenscher 09/09/98 09/09/ Eveline Stellmann 09/09/98 09/09/ John David Nolan 19/09/98 19/09/ Johann Hilke 19/09/98 19/09/ Erwin Gerstenmayer 09/11/98 09/11/ Ing. Bernhard Schaller 09/11/98 09/11/ Ing. Werner Bachler 09/11/ /11/2001

22 Certification Programmes Heinrich Unger 09/11/98 09/11/ DI Günther Polz 10/12/98 10/12/ DI Günter Albert 10/12/98 10/12/ DI Peter Jaunecker 10/12/98 10/12/ Ing. Alfred Gürentz 10/12/98 10/12/ Ing. Walter Haidenhofer 10/12/98 10/12/ Martin Stössl 10/12/98 10/12/ Ernst Knoll 10/12/98 10/12/ Hermann Wogowitsch 10/12/98 10/12/ Turid Thormodsen 19/09/98 19/09/ Kari Gro Johanson 19/09/98 19/09/ Ing. Günther Lauer 28/04/99 28/04/ Ing. Hans Jörg Klapf 28/04/99 28/04/ Ole Jorgen Melleby 30/06/99 30/06/ Mag. Christian Enzenberger 08/07/99 08/07/ Georg Wöber 08/07/99 08/07/ Ing. Rudolf Illetschko 30/09/99 30/09/ Odd Instefjord 09/09/99 09/09/ DI Christian Handler 30/09/99 30/09/ Mag. Karin Nissl 30/09/99 30/09/ Dr. Peter Sonntagbauer 30/09/99 30/09/ Ing. Roman Prachar 30/09/99 30/09/ Christian Schallhofer 30/09/99 30/09/ Jon Erik Hogberg 16/11/99 16/11/ Walter Goerner 02/12/99 02/12/ DI Roderich Resch 02/12/99 02/12/ Franz Pavlik 02/12/99 02/12/ Ing. Franz Jank DI Arkad Kuhnle Ing. Michael Bachler Hannes Leybold Robert Kurz Dr. Johannes Hohenauer Ad Van der Waal Gerard Geurtjens Mag. Christian Frey Ernst Jankulik

23 Certification Programmes Udo Müller Wolfgang Müller Gernot Singer DI Martin Meusburger DI Gerhard Stefka DI Michael Pühringer Günther Rainalter Gunter Gruhser Ing. Gerhard Pap Bernd Lauer Dr. Franz Räthel Peter Minar-Hödl Erich Babitsch Mag. Hubert Binder Alois Schneider Ing. Ralph Leblhuber Stefan Weigl IPMA LEVEL C: Certificated Project Management Professional (Zertifizierter Projektleiter) Junior Projektmanager 1 Mag. Sigrid Nina Karlich 08/07/99 08/07/ Ulrich Aigner 30/09/99 30/09/ Mag. Thomas Schleiss 30/09/99 30/09/ Matthias Scharer 30/09/99 30/09/ Birgit Reiner 02/12/99 02/12/ Mag. Rupert Promintzer DI Christian Schintlmeister Alexander Niel Dr. Irene Pichler Ing. Franz Andritsch Helmut Degen Ing. Ernst Feldmayer Oskar Schmidt Hubert Wassertheurer

24 Certification Programmes Ing. Hermann Wechselberger Karl Freund Mag. Alfred Wintschnig Felix Ratcliff Ralf Wallner Mag. Andreas Bauer Petra Karl Bernd Schopper Hannes Fröch DI Peter Lang Mag. Johannes Buchberger Mag. Harald Haghofer Mag. Stefan Hanl Mag. Georg Hessel Dr. Eva Kasper Alexandra Köpke Mag. Christine Muck Mag. Harald Niederhuber Mag. Franz Noll Mag. Irene Plank Mag. Kornel Csajtai Mag. Maria Auchmann Mag. Monika Timm Mag. Christoph Berger MMag. Karin Schubert Mag. Ruth Petz MMag. Helmut Pscheidl-Schubert Mag. Beate Spitzer Mag. Helga Berger Mag. Alexandra Valny Mag.Dr. Rosa Buchmann Mag.Dr. Wolfgang Schmut Mag. Renate Gmoser Prof.Mag.Dr. Helene Rucker Mag. Reinhard Bodlak Ingrid Lebersorger Sandra Turek

25 Certification Programmes Mag. Christian Mair Ing. Andreas Pfaffenlehner Mag. Astrid Titz Franz Hub Markus Fletischbacher DI Dr. Helmut Steiner Mag. Elisabeth Bauer Judith Berger Ing. Thomas Kubacek Elke Heinrich Dr. Martin Geser DI Margot Weismann Martha Kleedorfer Ing. Gerhard Buchgehrer Anton Steinkellner Roland Schramm certificate not awarded 69 Bernhard Rieder Anton Bruckner Christoph Überegger Ing. Werner Lauterer Christian Hanreich Günther Doleschal Paul Weisz Roland Schmidt Alois Stabauer Ing.Mag. Rudolf Stütz DI Wolfgang Wurzinger Mag. Georg-Lenz Kaminski Mag. Michael Melzer Engelbert Seik Wolfgang Kaufmann Alexandra Rathswohl Andrej Kiendl Robert Weigl Ernst Widni

26 Certification Programmes 26 IPMA LEVEL D: Certificated Project Management Prcitioner (Zertifizierter Projektmanagement Fachmann), PM Assistent, keine Gültigkeitslimit 1. Christian Altinger 19/07/99 2. Stefan Aumüller 19/07/99 3. Alfred Berger 19/07/99 4. Harald Boitllehner 19/07/99 5. Günther Boxhofer 19/07/99 6. Bernd Brauner 19/07/99 7. Ing. Karl-Heinz Edelbauer 19/07/99 8. Josef Edl 19/07/99 9. Harald Fritschek 19/07/ Daniel Gahleitner 19/07/ Stefan Gaigg 19/07/ Ernest Geyer 19/07/ Franz Gruber 19/07/ Markus Hauser 19/07/ Manuel Hillinger 19/07/ Gerald Hinteramskogler 19/07/ Roland Jax 19/07/ Walter A. Klement 19/07/ Harald Knoll 19/07/ Klaus Neumüller 19/07/ Werner Pamminger 19/07/ Gottfried Peer 19/07/ Klaus Prechtl 19/07/ Markus Preining 19/07/ Josef Raxendorfer 19/07/ Peter Staudinger 19/07/ Herbert Teufel 19/07/ Bernhard Theischinger 19/07/ Herbert Voglhuber 19/07/ Sonja Wiesmüller 19/07/ Willibald Windhager 19/07/ Martin Winkelbauer 19/07/ Philipp Winkler-Ebner 19/07/99

27 Certification Programmes Werner G. Wolfschluckner 19/07/ Siegfried Zauner 19/07/ Martin Zwiellehner 19/07/ Siegfried Zwing 19/07/ Andrea Frohner 15/07/ Mag. Maria Auchmann 07/09/ Mag. Monika Timm 07/09/ Mag. Peter Hofmann 22/09/ Mag. Harald Lakatha 22/09/ Dr. Peter Lang 22/09/ Mag. Heiko Matschek 22/09/ Mag. Harald Niederhuber 22/09/ Mag. Franz Noll 22/09/ Michael Steiner 06/10/ Roman Thanhofer 06/10/ Mag. Georg Hessel 06/10/ Mihurko Simone 06/10/ Ritzberger René 06/10/ Rudolf Nesler 06/10/ Kubicek Marie-Luise 06/10/ Valentin Kassin 06/10/ Amabel Akwa-Asare 06/10/ Werner Weiss 06/10/ Mag. Sonja Liegler 22/11/ Mag. Michael Stummer Astrid Schmiedmaier Silvia Leonhard Katja Kapfer Tanja Machacek Stephan Kothgasser Andrea Cerny MMag. Martina Freyer MMag. Andrea Eitler Mag. Frederike Hall Mag. Irene Kuschei MMag. Eva Kitzinger Mag. Ursula Kauer

28 Certification Programmes Mag. Elisabeth Hudolin Mag. Barbara Gettinger MMag. Rupert Gassner Mag. Thomas Racher Dr. Kurt Traar Mag. Karl Gleiss Roland Braunstein Geworg Woschnagg Sylvia Nimmervoll Doris Hartmann Doris Friesenegger Manfred Burdis Manuela Badic Cornelia Baumann Alexandra Rajnoha Werner Wohlmuth Hannes Affenzeller Stefan Aichinger Michael Aigner Walter Angerer Karl Angleitner Norbert Angleitner Paul Ecker Astrid Ehrnleitner Gerhard Gründig Jürgen Hager Brigitte Hamar Helmut Heftberger Simon Hiebl Micheal Hofer Robert Huber Bernhard Kaltenböck Manfred Kienberger Armin Kopplhuber Bernhard Kothmayr Christian Lauber Karlheinz Loistl

29 Certification Programmes Thomas Lugmayr Andreas Mair Antoinette Maurer Christian Maurer Dietmar Oberndorfer Norbert Pesendorfer Erhard Pichler Stefan Radner Daniel Schafferzick Maria Schwab Markus Sokic Ulrich Track Thomas Uhl Harald Umgeher Mario Urmann Christian Wildhager Markus Wintersteller Andreas Zimmermann Ursula Hartweger Walter Wagner Lothar Taverne Gernot Johannes Maczek Danijela Juric

30 Certification Programmes DENMARK IPMA LEVEL B Certificated Project Manager DEN0001 Peter Snedker DEN0002 Steen Andreasen DEN0003 Allan Rømeling DEN0004 Bjørn Vestergaard DEN0005 Allan Krüger-Jensen DEN0006 Leif Brandt DEN0007 Torben Jørgensen DEN0008 Erling Hvid DEN0009 Per Jensen DEN0010 Jakob Sucksdorff DEN0011 Michael Steen Flemming DEN0012 Søren Truelsen DEN0013 Hans Holmgren DEN0014 Bente Roed Jensen DEN0015 Klaus Busck DEN0016 Nicky Roland Brandt DEN0017 Jørgen Steffensen DEN0018 Mikael J. Erthmann DEN0019 Jens Øivind Nielsen DEN0020 Lars Romerdahl DEN0021 Kenneth Jørgensen DEN0022 Jes Hagemann DEN0023 John Zachariassen DEN0024 Ketty Jepsen DEN0025 Aage Albrechtsen DEN0026 Leif Andersen DEN0027 Kim Christiansen DEN0028 Erik Søgaard DEN0029 Kenneth Schørring DEN0030 Paul Lysholdt Rasmussen DEN0031 Anders Høst

31 Certification Programmes 31 DEN0032 Steen Skovholm DEN0033 Ib Andersen DEN0034 Bjarne Hagesø DEN0035 Finn Pedersen DEN0036 Alex Blom DEN0037 Charlotte Bundgaard DEN0038 Tommy Dyhr DEN0039 Tommy Bach Eisensee DEN0040 Jette G. Elvekjær DEN0041 Jesper Knudsen DEN0042 Finn Lund DEN0043 Dorte Brandt Møller DEN0044 Jesper Philipp DEN0045 Tina Willendrup DEN0046 Tyge Pedersen DEN0047 Anders Heine Jensen IPMA LEVEL C: Certificated Project Management Professional DEN3001 Claus Anker DEN3002 Peter Bastholm DEN3003 John Friese DEN3004 Sven Haseman DEN3007 Susanne Hass DEN3008 Hans Jørn Nielsen DEN3009 Per Fixen DEN3010 Finn Hansen DEN3011 Gunnar Agergaard DEN3012 Henrik Liebe DEN3013 Ulla Østergaard DEN3014 Peder Aagaard DEN3015 Jørgen Meedom DEN3016 Frank Tolstrup DEN3017 Preben Knudsen

32 Certification Programmes 32 DEN3018 Anne Kruse Bernbom DEN3019 Ib Larsen DEN3010 John Borelli DEN3021 Merja Aarnio DEN3022 Bente Thernøe DEN3023 Bent Andresen DEN3024 Christian Østergaard DEN3025 Pia Sonne Rasmussen DEN3026 Alex Bisgaard Kristensen DEN3027 Lars Bo Jepsen DEN3028 Sonja L. Pedersen DEN3029 Lilli Andersen DEN3030 Lars Udsen DEN3031 Allan Winther DEN3032 Bo Olsen DEN3033 Henrik Nøhr DEN3034 Michael Yde DEN3035 Piet C.E. Syhler DEN3036 Ole Kudsk DEN3037 Eggert Cederholm DEN3038 Michael Tvermoes DEN3039 Tommy Larsen DEN3040 Kjeld Arildsen DEN3041 Anne Margrethe Hansen DEN3042 Jakob Edens DEN3043 Poul-Erik Dyrmose DEN3044 Ann-Cecilie Pedersen DEN3045 Peter Kastberg DEN3046 Svend Mathiesen

33 Certification Programmes EGYPT IPMA LEVEL B: Certificated Project Manager EG-0001 Adel Agib Wassif EG-0002 Mohamed El-Sayed El-Amir EG-0003 Mohamed Abd / El Hamid / El-Megid IPMA LEVEL C: Certificated Project Management Professional EG-0001 Mohamed Rafaat El-Shershaby EG-0002 Hesham Abd / El-Fattah Habib EG-0003 Wael Abou Bakr Abd / El-Salem EG-0004 Shreif Esmat Abd / El-Hamid EG-0005 Khaled Abd-Alla Baker EG-0006 Fouad Mohamed Hamed EG-0007 Maher Mohamed Shaaban EG-0008 Mostafa Abd / El-Hindia EG-0009 Aleya Abd / El-Azim Zaher EG-0010 Al-Zayed-Aly Mohamed Aridah EG-0011 Awatef Abd / Allah Fam EG-0012 Aymen Mohamed El-Mawardi EG-0013 El-Sayed Tawfik El-Daly EG-0014 Mamdouh Makram Ahmed EG-0015 Mohamed Ahmed Deif EG-0016 Saadia Sayed-Ahmed EG-0017 Taher Abd / El-Aziz EG-0018 Mohamed Salah Ismail El-Shamy EG-0019 Samir Saad Abd El-Megid EG-0020 Hassan Saad El-Sayed EG-0021 Osama Abd El-Razk El-Ragabany

34 Certification Programmes 34 EG-0022 Ahmed Hamed Mohamed Abu El- Ata EG-0023 Mohamed Reda Amer El-Sayed EG-0024 Adel Abd El-Mksoud Abd El-Wahed EG-0025 Ashraf Ashraf Abd El-Gaffar Khater EG-0026 Hisham Kamal Abd El-Ghany Osama EG-0027 Bade Diaa El-Din Mohamed EG-0028 Nasser Adel Ahmed Atia Zohnny EG-0029 Sherif Hussien Mohamed Ghanem EG-0030 Khaled Ali Mohamed Skena EG-0031 Magdy Abd El-Hady EG-0032 Gamal Abdalla El-Sayed EG-0033 Sahar Zaky Mohamed EG-0034 Manasseh Ameen Zakhary EG-0035 Gamal El-Din Amin Mostafa EG-0036 Ashraf Motwaly Abdalla EG-0037 Hussein Taha Ali Mannaa EG-0038 Osama Ebraheem Hassan El-Barawy EG-0039 Ashraf Ahmed Abd El-Karim EG-0040 Hazem Elewa Elewa Rabea EG-0041 Tarek Abd El-Khallk Lasheen EG-0042 El-Sayed Ahmed Ali El-Sehily EG-0043 Gamal El-Said Amyn Saba EG-0044 Ahmed Mohamed El-Kerm EG-0045 not awarded EG-0046 Ibrahim Osaman Helmy EG-0047 Yasser Yousif Ibrahim El-Arid EG-0048 Sherif Ahmed Abd El-Razek Hammad EG-0049 Kamal Saad Abdallah EG-0050 Fathy Aly Esmaeel El-Yazby EG-0051 Amr Ahmed Rizk EG-0052 Mohamed Abd El-Hady Abd El-Fattah EG-0053 Gamal El-Din Mohamed Abd El-Monem EG-0054 Samy Adly Maxy EG-0055 Magdy Mourice Fahmy EG-0056 Ihab Pochra Guirguis EG-0057 Ibrahim Mahmoud Abd El-Hady EG-0058 Shehata Sief Aly

Status quo des 'Memorandum of Understanding' zwischen APMG und IPMA. Mag. Brigitte Schaden, IPMA Chairman pma Vorstandsvorsitzende

Status quo des 'Memorandum of Understanding' zwischen APMG und IPMA. Mag. Brigitte Schaden, IPMA Chairman pma Vorstandsvorsitzende Status quo des 'Memorandum of Understanding' zwischen APMG und IPMA Mag. Brigitte Schaden, IPMA Chairman pma Vorstandsvorsitzende Köln, 26. April 2012 IPMA Komplexität in Projekten - Zertifizierungslevel

More information

History of IPMA (INTERNET)

History of IPMA (INTERNET) History of IPMA (INTERNET) History of IPMA International Project Management Association (1965-2005) and it's National Associations. Events, data and photos on 40Y of IPMA: Chapter 1: Organization & Officers

More information

Contextual competences. Behavioural competences. Technical competences

Contextual competences. Behavioural competences. Technical competences ICB - IPMA Competence Baseline Version 3.0 Contextual competences Behavioural competences Technical competences The Eye of Competence Behavioural competences Leadership Engagement & motivation Self-control

More information

Protecting IP Assets Worldwide Material Science & Technology 2004

Protecting IP Assets Worldwide Material Science & Technology 2004 Protecting IP Assets Worldwide Material Science & Technology 2004 Norbert Hansen Korbinian Kopf September 26-29, 2004 New Orleans, Louisiana Page 1 Protecting IP Assets Worldwide National Patent Protection

More information

GLOBAL ORGANISATIONAL STRUCTURE

GLOBAL ORGANISATIONAL STRUCTURE GLOBAL ORGANISATIONAL STRUCTURE President, CEO Sten Kjelstrup Executive, CFO Secretary to the Management Jeanette Dyekjær Product Development Henning Jørgensen Executive Vice President, CFO Global Finance,

More information

Strong in service. Worldwide. CHOOSE THE NUMBER ONE.

Strong in service. Worldwide. CHOOSE THE NUMBER ONE. Strong in service. Worldwide. CHOOSE THE NUMBER ONE. We are always there for you! Our most important asset is our commitment and our technical expertise. Peter Pauli, Head of After Sales (middle) Roland

More information

INTERNATIONAL EDUCATION, QUALIFICATION AND CERTIFICATION SYSTEMS IN WELDING

INTERNATIONAL EDUCATION, QUALIFICATION AND CERTIFICATION SYSTEMS IN WELDING L.Quintino a R.Ferraz b I. Fernandes c a TU Lisbon (Portugal), EWF-IAB/IIW Chief Executive b ISQ (Portugal), IAB Chief Executive c ISQ (Portugal), EWF-IAB/IIW System Manager ABSTRACT Welding technology

More information

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50.

41 T Korea, Rep. 52.3. 42 T Netherlands 51.4. 43 T Japan 51.1. 44 E Bulgaria 51.1. 45 T Argentina 50.8. 46 T Czech Republic 50.4. 47 T Greece 50. Overall Results Climate Change Performance Index 2012 Table 1 Rank Country Score** Partial Score Tendency Trend Level Policy 1* Rank Country Score** Partial Score Tendency Trend Level Policy 21 - Egypt***

More information

Updated development of global greenhouse gas emissions 2013

Updated development of global greenhouse gas emissions 2013 Updated development of global greenhouse gas emissions 2013 Hans-Joachim Ziesing Low Carbon Markets and the Legacy of Nuclear Power 19 th REFORM Group Meeting, Schloss Leopoldskron, Salzburg September

More information

The forum for electrical innovation

The forum for electrical innovation The forum for electrical innovation International Council on Large Electric Systems Joining forces for the power system of today and of tomorrow Power systems are the heart of the electricity business.

More information

Reporting practices for domestic and total debt securities

Reporting practices for domestic and total debt securities Last updated: 4 September 2015 Reporting practices for domestic and total debt securities While the BIS debt securities statistics are in principle harmonised with the recommendations in the Handbook on

More information

INTERNATIONAL WELDING QUALIFICATION AND CERTIFICATION SYSTEMS FOR PERSONS AND COMPANIES

INTERNATIONAL WELDING QUALIFICATION AND CERTIFICATION SYSTEMS FOR PERSONS AND COMPANIES INTERNATIONAL WELDING QUALIFICATION AND CERTIFICATION SYSTEMS FOR PERSONS AND COMPANIES Author, Germán Hernández, IAB Chairman and IIW Director CESOL Spanish Association of Welding and Joining Technologies.

More information

PM STANDARDS AND CERTIFICATION MODELS. Ing. Jan Doležal, Ph.D.

PM STANDARDS AND CERTIFICATION MODELS. Ing. Jan Doležal, Ph.D. PM STANDARDS AND CERTIFICATION MODELS Ing. Jan Doležal, Ph.D. Agenda 2 Basic information about main standards Certification models Added value of certification Options in The Czech Republic Ing. Jan Doležal,

More information

Size and Development of the Shadow Economy of 31 European and 5 other OECD Countries from 2003 to 2015: Different Developments

Size and Development of the Shadow Economy of 31 European and 5 other OECD Countries from 2003 to 2015: Different Developments January 20, 2015 ShadEcEurope31_January2015.doc Size and Development of the Shadow Economy of 31 European and 5 other OECD Countries from 2003 to 2015: Different Developments by Friedrich Schneider *)

More information

TOWARDS PUBLIC PROCUREMENT KEY PERFORMANCE INDICATORS. Paulo Magina Public Sector Integrity Division

TOWARDS PUBLIC PROCUREMENT KEY PERFORMANCE INDICATORS. Paulo Magina Public Sector Integrity Division TOWARDS PUBLIC PROCUREMENT KEY PERFORMANCE INDICATORS Paulo Magina Public Sector Integrity Division 10 th Public Procurement Knowledge Exchange Platform Istanbul, May 2014 The Organization for Economic

More information

AMADEUS: Analyse MAjor Databases from EUropean Sources - A financial database of 4 million European companies, including Eastern Europe MODULE.

AMADEUS: Analyse MAjor Databases from EUropean Sources - A financial database of 4 million European companies, including Eastern Europe MODULE. AMADEUS http://amadeus.bvdep.com/ip AMADEUS: Analyse MAjor Databases from EUropean Sources - A financial database of 4 million European companies, including Eastern Europe MODULE. General AMADEUS contains

More information

Future and investment opportunities in new and renewable energy conference

Future and investment opportunities in new and renewable energy conference Under the auspices of: H.E. Eng. Sherif Ismail Minister of Petroleum Resources H.E. Eng. Ahmed Emam Minster of Electricity and Energy Future and investment opportunities in new and renewable energy conference

More information

ÖNORM EN 1504-8. The European Standard EN 1504-8 has the status of an Austrian Standard. Edition: 2005-02-01. Standards group B

ÖNORM EN 1504-8. The European Standard EN 1504-8 has the status of an Austrian Standard. Edition: 2005-02-01. Standards group B ÖNORM EN 1504-8 Edition: 2005-02-01 Standards group B Identical (IDT) with EN 1504-8:2004 ICS 91.080.40 Products and systems for the protection and repair of concrete structures Definitions, requirements,

More information

Danske Bank s organisation 2013

Danske Bank s organisation 2013 Danske Bank s organisation 2013 CEO Thomas F. Borgen Chairman of the Executive Board Personal Banking Tonny Thierry Andersen* Banking Lars Mørch* Corporates & Institutions Thomas F. Borgen* Group Risk

More information

PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS. October 2007

PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS. October 2007 PROJECT: EURO-AUDITS THE EUROPEAN ROAD SAFETY AUDITOR TRAINING SYLLABUS APPENDIX E SURVEY RESULTS October 2007 A European Commission co-funded project Appendix E Survey Results Contents: Survey Results

More information

The European Organisation For Insolvency Professionals

The European Organisation For Insolvency Professionals The European Organisation For Insolvency Professionals Visit our website at www.insol-europe.org Insolvency Advice, Valuations and Auctions since 1930 Headoffice: Overschiestraat 59, 1062 XD Amsterdam,

More information

What Is the Total Public Spending on Education?

What Is the Total Public Spending on Education? What Is the Total Public Spending on Education? Indicator On average, OECD countries devote 12.9% of total public expenditure to, but values for individual countries range from less than 10% in the Czech

More information

Working Holiday Maker visa programme report. 31 December 2014

Working Holiday Maker visa programme report. 31 December 2014 Working Holiday Maker visa programme report 31 December 2014 Contents Page About this report 1 Enquiries 1 Definition of terms 2 Background to the Working Holiday Maker programme 3 Recent developments

More information

First estimate for 2014 Euro area international trade in goods surplus 194.8 bn 24.2 bn surplus for EU28

First estimate for 2014 Euro area international trade in goods surplus 194.8 bn 24.2 bn surplus for EU28 30/2015-16 February 2015 First estimate for 2014 Euro area international trade in goods surplus 194.8 bn 24.2 bn surplus for EU28 The first estimate for the euro area 1 (EA18) trade in goods balance with

More information

Office Rents map EUROPE, MIDDLE EAST AND AFRICA. Accelerating success.

Office Rents map EUROPE, MIDDLE EAST AND AFRICA. Accelerating success. Office Rents map EUROPE, MIDDLE EAST AND AFRICA Accelerating success. FINLAND EMEA Office Rents H2 212 NORWAY Oslo 38.3 5.4% 7.% 295, SWEDEN Stockholm 44.7 4.5% 3.% 5, Tallinn 13.4 44,2 21. 5.25% 1.% 12,

More information

Working Holiday Maker visa programme report

Working Holiday Maker visa programme report Working Holiday Maker visa programme report 30 June 2015 This page is left blank intentionally. Table of Contents About this report 1 Enquiries 1 Definition of terms 2 Background to the Working Holiday

More information

BEST PRACTICES/ TRENDS/ TO-DOS

BEST PRACTICES/ TRENDS/ TO-DOS Online Insurance Europe: S/ TRENDS/ TO-DOS New success guidelines WHAT TO DO N D E EW IO IT N Your Benefits EUROPE S S/ TRENDS/ TO-DOS: The new and only study about the best online insurance solutions

More information

International Compliance

International Compliance YOUR FREE COPY - NEW - Additional countries outside European Union LEGAL WHITE PAPER International Compliance Legal requirements international einvoicing European Union & Selected Countries Worldwide International

More information

Camden Asset Recovery Inter-Agency Network (CARIN)

Camden Asset Recovery Inter-Agency Network (CARIN) Camden Asset Recovery Inter-Agency Network (CARIN) The History, Statement of Intent, Membership and Functioning of CARIN MANUAL CARIN MANUAL Secretariat, Camden Asset Recovery Inter-Agency Network (CARIN)

More information

Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air. Special leaflet SP/1/EN/7

Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air. Special leaflet SP/1/EN/7 Product Summary KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue The art of handling air Special leaflet SP/1/EN/7 Components and systems for ventilation and air conditioning C As an internationally

More information

Radiological Training Programmes in Europe. www.esr-online.org. EAR Education Survey Analysis of Results

Radiological Training Programmes in Europe. www.esr-online.org. EAR Education Survey Analysis of Results P E u r o p e a n S o c i e t y o f R a d i o l o g y P u b l i c a t i o n s & M e d i a C o n g r e s s E d u c a t i o n I n d u s t r y R e l a t i o n s M e m b e r s h i p R e s e a r c h S o c i

More information

How many students study abroad and where do they go?

How many students study abroad and where do they go? From: Education at a Glance 2012 Highlights Access the complete publication at: http://dx.doi.org/10.1787/eag_highlights-2012-en How many students study abroad and where do they go? Please cite this chapter

More information

ENTERING THE EU BORDERS & VISAS THE SCHENGEN AREA OF FREE MOVEMENT. EU Schengen States. Non-Schengen EU States. Non-EU Schengen States.

ENTERING THE EU BORDERS & VISAS THE SCHENGEN AREA OF FREE MOVEMENT. EU Schengen States. Non-Schengen EU States. Non-EU Schengen States. ENTERING THE EU BORDERS & VISAS THE SCHENGEN AREA OF FREE MOVEMENT An area without internal borders where EU citizens and non-eu nationals may move freely EU Schengen States Non-Schengen EU States IS Azores

More information

IMMIGRATION TO AND EMIGRATION FROM GERMANY IN THE LAST FEW YEARS

IMMIGRATION TO AND EMIGRATION FROM GERMANY IN THE LAST FEW YEARS IMMIGRATION TO AND EMIGRATION FROM GERMANY IN THE LAST FEW YEARS Bernd Geiss* Germany, Destination for Migrants Germany is in the middle of Europe and has common borders with nine countries. Therefore,

More information

RWI : Discussion Papers

RWI : Discussion Papers Michael Fertig and Robert E. Wright No. 9 RWI : Discussion Papers RWI ESSEN Rheinisch-Westfälisches Institut für Wirtschaftsforschung Board of Directors: Prof. Dr. Christoph M. Schmidt, Ph.D. (President),

More information

AEROSPACE SERIES - QUALIFICATION AND APPROVAL OF PERSONNEL FOR NON-DESTRUCTIVE TESTING IRISH STANDARD I.S. EN 4179:2006.

AEROSPACE SERIES - QUALIFICATION AND APPROVAL OF PERSONNEL FOR NON-DESTRUCTIVE TESTING IRISH STANDARD I.S. EN 4179:2006. IRISH STANDARD I.S. EN 4179:2006 ICS 49.020 National Standards Authority of Ireland Glasnevin, Dublin 9 Ireland AEROSPACE SERIES - QUALIFICATION AND APPROVAL OF PERSONNEL FOR Tel: +353 1 807 3800 Fax:

More information

ArmeSFo EUGridPMA initiative for implementation of PKI in NATO Partner and Mediterranean Dialogue Countries

ArmeSFo EUGridPMA initiative for implementation of PKI in NATO Partner and Mediterranean Dialogue Countries ArmeSFo EUGridPMA initiative for implementation of PKI in NATO Partner and Mediterranean Dialogue Countries Ara Grigoryan 1, David Groep 2, Arsen Hayrapetyan 1 1 Armenian e-science Foundation, 49 Komitas

More information

ISO/TC 258, ISO Technical Committee for Project, Program, and Portfolio Management, convenes in Pretoria, South Africa

ISO/TC 258, ISO Technical Committee for Project, Program, and Portfolio Management, convenes in Pretoria, South Africa ISO/TC 258, ISO Technical Committee for Project, Program, and Portfolio Management, convenes in Pretoria, South Africa By jouko.vaskimo@aalto.fi ISO/TC 258, the Technical Committee (TC) of the International

More information

Development aid in 2015 continues to grow despite costs for in-donor refugees

Development aid in 2015 continues to grow despite costs for in-donor refugees OECD Paris, 13 April 2016 Development aid in 2015 continues to grow despite costs for in-donor refugees 2015 Preliminary ODA Figures In 2015, net official development assistance (ODA) flows from member

More information

T wo EA-M - Enhancing Attractiveness of Environmental Assessment and Management Higher Education

T wo EA-M - Enhancing Attractiveness of Environmental Assessment and Management Higher Education T wo EA-M - Enhancing Attractiveness of Environmental Assessment and Management Higher Education 1. Introduction Thomas Fischer, Urmila Jha-Thakur, Ingrid Belcakova, Ralf Aschemann The European Commission

More information

World Consumer Income and Expenditure Patterns

World Consumer Income and Expenditure Patterns World Consumer Income and Expenditure Patterns 2014 14th edi tion Euromonitor International Ltd. 60-61 Britton Street, EC1M 5UX TableTypeID: 30010; ITtableID: 22914 Income Algeria Income Algeria Income

More information

INSOL Europe. The professional association for European restructuring and insolvency specialists. Become a member

INSOL Europe. The professional association for European restructuring and insolvency specialists. Become a member INSOL Europe The professional association for European restructuring and insolvency specialists Become a member the creation of a network of specialists Our story In 1980 a French association headed by

More information

On What Resources and Services Is Education Funding Spent?

On What Resources and Services Is Education Funding Spent? Indicator On What Resources and Services Is Education Funding Spent? In primary, secondary and post-secondary non-tertiary education combined, current accounts for an average of 92% of total spending in

More information

1. Perception of the Bancruptcy System... 2. 2. Perception of In-court Reorganisation... 4

1. Perception of the Bancruptcy System... 2. 2. Perception of In-court Reorganisation... 4 Bankruptcy Systems and In-court Reorganisation of Firms, 2010 Content: 1. Perception of the Bancruptcy System... 2 2. Perception of In-court Reorganisation... 4 3. Perception of Creditor Committees, Fast

More information

APPLICATION FORM FOR POST OF SENIOR CLINICAL BIOCHEMIST. NB: 5 Curriculum Vitae (unbound) must accompany this Application Form

APPLICATION FORM FOR POST OF SENIOR CLINICAL BIOCHEMIST. NB: 5 Curriculum Vitae (unbound) must accompany this Application Form COOMBE WOMEN AND INFANTS UNIVERSITY HOSPITAL APPLICATION FORM FOR POST OF SENIOR CLINICAL BIOCHEMIST NB: 5 Curriculum Vitae (unbound) must accompany this Application Form Closing date: FRIDAY, 22 ND JANUARY

More information

Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22

Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22 Dividends Tax: Summary of withholding tax rates per South African Double Taxation Agreements currently in force Version: 2 Updated: 2012-05-22 Note: A summary of the rates and the relevant provisions relating

More information

relating to household s disposable income. A Gini Coefficient of zero indicates

relating to household s disposable income. A Gini Coefficient of zero indicates Gini Coefficient The Gini Coefficient is a measure of income inequality which is based on data relating to household s disposable income. A Gini Coefficient of zero indicates perfect income equality, whereas

More information

ARE ENTREPRENEURS BORN OR MADE? AMWAY GLOBAL ENTREPRENEURSHIP REPORT ITALY AND UNITED STATES IN COMPARISON

ARE ENTREPRENEURS BORN OR MADE? AMWAY GLOBAL ENTREPRENEURSHIP REPORT ITALY AND UNITED STATES IN COMPARISON ARE ENTREPRENEURS BORN OR MADE? AMWAY GLOBAL ENTREPRENEURSHIP REPORT AND UNITED STATES IN COMPARISON INTRO AND OBJECTIVES SURVEY DESIGN Fieldwork: April July 2014 Sample: 43.902 men and women aged 14-99

More information

Editorial for Summer Edition

Editorial for Summer Edition Editorial for Summer Edition of the SOCIETAS ET IURISPRUDENTIA 2015 Dear readers and friends, let me introduce the second issue of the third volume of SOCIETAS ET IURISPRUDENTIA, an international scientific

More information

General requirements for bodies operating assessment and certificationlregistration of quality systems (ISOIIEC Guide 6ZA996)

General requirements for bodies operating assessment and certificationlregistration of quality systems (ISOIIEC Guide 6ZA996) Edition: 1998-05-01 ldentical (IDT) with ÖVE EN 4501 2: I998 ISOIIEC 62 Guide: 1996 Supersedes ÖNORM EN 4501 2: 1990-06-08 ÖNORM EN 45012 Bbl 1:1990 08 ICS 03.1 20.20 General requirements for bodies operating

More information

HYGROTHERMAL PERFORMANCE OF

HYGROTHERMAL PERFORMANCE OF IRISH STANDARD I.S. EN ISO 15927-5:2005 ICS 07.060 91.120.10 HYGROTHERMAL PERFORMANCE OF BUILDINGS - CALCULATION AND PRESENTATION OF CLIMATIC DATA - PART National Standards Authority of Ireland Glasnevin,

More information

Overview of the OECD work on transfer pricing

Overview of the OECD work on transfer pricing Overview of the OECD work on transfer pricing Written contribution to the Conference Alternative Methods of Taxation of Multinationals (13-14 June 2012, Helsinki, Finland) by Marlies de Ruiter, Head of

More information

Has 32 years of various experiences with 9 first years in site construction projects & other 23

Has 32 years of various experiences with 9 first years in site construction projects & other 23 Consultant. Dr. Reda Sabry, PMP,RMP,SP,PMOC,CCP,PSP,IPMA L-A,PRINCE2. M.Sc. of Construction Management Doctor of Business Administration, DBA Certified Programme & Portfolio Management Consultant (IPMA

More information

Guidelines for Applicants: Advanced Training Course

Guidelines for Applicants: Advanced Training Course Emerging Security Challenges Division Guidelines for Applicants: Advanced Training Course Introduction The NATO (SPS) seeks to enhance cooperation and dialogue with all partners through civil science and

More information

Communications.» Employer Branding. Becoming an Employer of Choice

Communications.» Employer Branding. Becoming an Employer of Choice Communications» Employer Branding Becoming an Employer of Choice » Recruitment and retention Managers and candidates have different perspectives on the same topic What recruiters think: We are a family-owned

More information

GUIDE TO STUDENTSHIP ELIGIBILITY

GUIDE TO STUDENTSHIP ELIGIBILITY BBSRC GUIDE TO STUDENTSHIP ELIGIBILITY 1. General Information 2. Residence Criteria 3. Qualifications Criteria 4. Enquiries Issued February 2005 (revised October 2015) BBSRC GUIDE TO STUDENTSHIP ELIGIBILITY

More information

Edith Soghomonyan National Erasmus+ Office Armenia. American University of Armenia

Edith Soghomonyan National Erasmus+ Office Armenia. American University of Armenia Edith Soghomonyan National Erasmus+ Office Armenia American University of Armenia 1 OUTLINE Erasmus Mundus Joint Master Degrees (EMJMD) General overview How to participate as an Organisation/ Selection

More information

An introduction to the World Federation of Occupational Therapists (WFOT)

An introduction to the World Federation of Occupational Therapists (WFOT) An introduction to the World Federation of Occupational Therapists (WFOT) WHAT IS THE WORLD FEDERATION OF OCCUPATIONAL THERAPISTS? The key international representative for occupational therapists and occupational

More information

Brochure More information from http://www.researchandmarkets.com/reports/1339929/

Brochure More information from http://www.researchandmarkets.com/reports/1339929/ Brochure More information from http://www.researchandmarkets.com/reports/1339929/ The 2011 World Forecasts of Machine Tools That Remove Material by Laser or Light, Photon, Ultrasonic, Electro-Discharge,

More information

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels

Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels international energy agency agence internationale de l energie Energy Efficiency Indicators for Public Electricity Production from Fossil Fuels IEA Information paper In Support of the G8 Plan of Action

More information

E-Justice and E-Law Conference. Rome. 13 14 October 2014. Corte di Cassazione. Madalina Adam (Ministry of Justice, Romania)

E-Justice and E-Law Conference. Rome. 13 14 October 2014. Corte di Cassazione. Madalina Adam (Ministry of Justice, Romania) E-Justice and E-Law Conference Rome 13 14 October 2014 Corte di Cassazione Monday 13 October 2014 Cross border evidence, 16:15 17:15 Convenor: Panellists: Madalina Adam (Ministry of Justice, Romania) Joseph

More information

Delegation in human resource management

Delegation in human resource management From: Government at a Glance 2009 Access the complete publication at: http://dx.doi.org/10.1787/9789264075061-en Delegation in human resource management Please cite this chapter as: OECD (2009), Delegation

More information

Publikationsliste PROJEKTMANAGEMENT GROUP (seit 2000) Status Jänner 2004

Publikationsliste PROJEKTMANAGEMENT GROUP (seit 2000) Status Jänner 2004 Publikationsliste PROJEKTMANAGEMENT GROUP (seit ) Status Jänner 2004 Bücher: Gareis, R.: Happy Projects, Manz Verlag, Wien, 2004 Huemann, M.: Individuelle Projektmanagement - Kompetenzen in Projektorientierten

More information

Erasmus Mundus Master in Membrane Engineering EM 3 E Third Call for Applications

Erasmus Mundus Master in Membrane Engineering EM 3 E Third Call for Applications Erasmus Mundus Master in Membrane Engineering EM 3 E Third Call for Applications Master edition 2013-2015 Erasmus Mundus is a cooperation and mobility programme in the field of higher education, promoted

More information

EN ISO 14121-1. Safety of machinery Risk assessment. Sicherheit von Maschinen Risikobeurteilung Teil 1: Leitsätze (ISO 14121-1:2007)

EN ISO 14121-1. Safety of machinery Risk assessment. Sicherheit von Maschinen Risikobeurteilung Teil 1: Leitsätze (ISO 14121-1:2007) ÖNORM EN ISO 14121-1 Edition: 2008-01-01 Safety of machinery Risk assessment Part 1: Principles (ISO 14121-1:2007) Sicherheit von Maschinen Risikobeurteilung Teil 1: Leitsätze (ISO 14121-1:2007) Sécurité

More information

Latvian National Project Management Association (LNPMA) and its major directions of operation during 10 years

Latvian National Project Management Association (LNPMA) and its major directions of operation during 10 years Latvian National Project Management Association (LNPMA) and its major directions of operation during 10 years Prof. Dr.oec. Žanete Ilmete, LNPMA Board Chairwoman 1 Factors promoting rapid development of

More information

ONR CEN/TS 16555-5. Innovation management Part 5: Collaboration management (prcen/ts 16555-5:2014) DRAFT ICS 03.100.40; 03.100.50

ONR CEN/TS 16555-5. Innovation management Part 5: Collaboration management (prcen/ts 16555-5:2014) DRAFT ICS 03.100.40; 03.100.50 ICS 03.100.40; 03.100.50 DRAFT ONR CEN/TS 16555-5 Innovation management Part 5: Collaboration management (prcen/ts 16555-5:2014) Innovationsmanagement Teil 5: Partnermanagement (prcen/ts 16555-5:2014)

More information

EMBO Short Term Fellowships Information for applicants

EMBO Short Term Fellowships Information for applicants EMBO Short Term Fellowships Information for applicants - Purpose - Duration - Eligibility - How to apply - Selection procedure - End of fellowship report - Benefits - EMBC Member States - Contact details

More information

Office of Economic Development Düsseldorf Offers and Services

Office of Economic Development Düsseldorf Offers and Services Office of Economic Development Düsseldorf Offers and Services Welcome to Düsseldorf! Düsseldorf is one of the most successful business locations in Europe. This international business hub offers ideal

More information

SP/1/EN/5. Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air

SP/1/EN/5. Product Summary. KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue. The art of handling air SP/1/EN/5 Product Summary KLIMA 1 Catalogue KLIMA 2 Catalogue FILTER Catalogue The art of handling air Components and Systems for Ventilation and Air Conditioning As an internationally leading manufacturer

More information

Overview of FAA Bilateral Agreements

Overview of FAA Bilateral Agreements Overview of FAA Bilateral Agreements Presented to: Aviation Suppliers Association Conference By: Chris Carter, Manager, AIR International Office Date: June 16, 2014 Objective Discuss the challenges that

More information

Class 1B. Form tutor: Mag. Ruth Plessl-Studeny. Deputy form tutor: Mag. Monika Pessicka

Class 1B. Form tutor: Mag. Ruth Plessl-Studeny. Deputy form tutor: Mag. Monika Pessicka Class 1B Form tutor: Mag. Ruth Plessl-Studeny Deputy form tutor: Mag. Monika Pessicka Arts Mag. Bettina Nagy-Rumpf Wednesday, 09:55-10:45 Biology Mag. Ruth Plessl-Studeny Tuesday, 08:55-09:45 Crafts (technical)

More information

EBA REPORT ON THE BENCHMARKING OF DIVERSITY PRACTICES. EBA-Op-2016-10 08 July 2016

EBA REPORT ON THE BENCHMARKING OF DIVERSITY PRACTICES. EBA-Op-2016-10 08 July 2016 EBA REPORT ON THE BENCHMARKING OF DIVERSITY PRACTICES EBA-Op-2016-10 08 July 2016 BENCHMARKING OF DIVERSITY PRACTICES AT THE EU LEVEL Benchmarking of diversity practices at the European Union level List

More information

Labour Force Survey 2014 Almost 10 million part-time workers in the EU would have preferred to work more Two-thirds were women

Labour Force Survey 2014 Almost 10 million part-time workers in the EU would have preferred to work more Two-thirds were women 75/2015-27 April 2015 Labour Force Survey 2014 Almost 10 million part-time workers in the EU would have preferred to work more Two-thirds were women Among the 44.1 million persons in the European Union

More information

DIRECT MARKETING STRATEGY. Web & Software Development Services

DIRECT MARKETING STRATEGY. Web & Software Development Services DIRECT MARKETING STRATEGY Web & Software Development Services Document created by : Rakesh Negi Business Development & Market Research Consultant New Delhi, India Skype: rakesh_negi1 MSN: rakesh_negi1@hotmail.com

More information

How To Run A Power Station In Danesborg

How To Run A Power Station In Danesborg Presentation of Energinet.dk April 2008 1 Presentation of Energinet.dk Agenda 10:00 12:00 Welcome and presentation of Energinet.dk /Peter Jørgensen Wind integration - challenges /Antje Orths R&D in environment-friendly

More information

Operational Companies VAT Indirect Taxes. Why Luxembourg: VAT advantages for commercial companies*

Operational Companies VAT Indirect Taxes. Why Luxembourg: VAT advantages for commercial companies* Operational Companies VAT Indirect Taxes Why : VAT advantages for commercial companies* Why : VAT advantages for commercial companies as an international decision-making, financing or distribution hub:

More information

THE INTERNATIONAL FEDERATION OF PURCHASING AND SUPPLY MANAGEMENT. Your global network of procurement professionals

THE INTERNATIONAL FEDERATION OF PURCHASING AND SUPPLY MANAGEMENT. Your global network of procurement professionals THE INTERNATIONAL FEDERATION OF PURCHASING AND SUPPLY MANAGEMENT Your global network of procurement professionals A Global Network Do you want to reach a market of 250,000 procurement professionals internationally?

More information

The big pay turnaround: Eurozone recovering, emerging markets falter in 2015

The big pay turnaround: Eurozone recovering, emerging markets falter in 2015 The big pay turnaround: Eurozone recovering, emerging markets falter in 2015 Global salary rises up compared to last year But workers in key emerging markets will experience real wage cuts Increase in

More information

COST Presentation. COST Office Brussels, 2013. ESF provides the COST Office through a European Commission contract

COST Presentation. COST Office Brussels, 2013. ESF provides the COST Office through a European Commission contract COST Presentation COST Office Brussels, 2013 COST is supported by the EU Framework Programme ESF provides the COST Office through a European Commission contract What is COST? COST is the oldest and widest

More information

Employee eligibility to work in the UK

Employee eligibility to work in the UK Employee eligibility to work in the UK This document details legal requirements that apply to ALL new members of staff All employers in the UK are legally bound to comply with the Asylum and Immigration

More information

Where science & ethics meet. The EFGCP Report on The Procedure for the Ethical Review of Protocols for Clinical Research Projects in Europe and Beyond

Where science & ethics meet. The EFGCP Report on The Procedure for the Ethical Review of Protocols for Clinical Research Projects in Europe and Beyond Where science & ethics meet The EFGCP Report on The Procedure for the Ethical Review of Protocols for Clinical Research Projects in Europe and Beyond Question 21 What training programmes are available

More information

The Importance of Educational Access for MS Nurses: Integrating Knowledge & Skills MS Nurse PROfessional

The Importance of Educational Access for MS Nurses: Integrating Knowledge & Skills MS Nurse PROfessional The Importance of Educational Access for MS Nurses: Integrating Knowledge & Skills MS Nurse PROfessional Vicki Matthews, RIMS Specialist Nurse Advisor This activity is supported by educational grants from:

More information

Descendants of Friedrich Ohlhausen Sr. Family History

Descendants of Friedrich Ohlhausen Sr. Family History Descendants of Friedrich Ohlhausen Sr. Family History Generation One 1. Friedrich OHLHAUSEN Sr. was born on 5 Apr 1863 in Belz, Bessarabia. He was confirmed on 9 Jun 1878 in Bortscheag, Bessarabia. Friedrich

More information

Supported Payment Methods

Supported Payment Methods Supported Payment Methods Global In the global payments market, credit cards are the most popular payment method. However, BlueSnap expands the payment selection by including not only the major credit

More information

Curriculum for the University Graduate Programme Master of Engineering in Traffic Accident Research (TAR)

Curriculum for the University Graduate Programme Master of Engineering in Traffic Accident Research (TAR) Graz University of Technology Curriculum for the University Graduate Programme Master of Engineering in Traffic Accident Research (TAR) On 18 October 2010, the Senate of Graz University of Technology approved

More information

Association of the Councils of State and Supreme Administrative Jurisdictions of the EU

Association of the Councils of State and Supreme Administrative Jurisdictions of the EU Association of the Councils of State and Supreme Administrative Jurisdictions of the EU (ACA-Europe) Information provided by the ACA-Europe July, 2014 A. General information Name of network Association

More information

Among the 34 OECD countries, Belgium performed above the OECD average in each of

Among the 34 OECD countries, Belgium performed above the OECD average in each of BELGIUM ***Note- Some results for Belgium published today (3 December 2013) in the PISA 2012 international reports are in need of revision due to a technical error. An erratum is available from the PISA

More information

Towards a Cloud Computing Strategy for Europe Digital Assembly, June 17, Brussels. www.eurocloud.org

Towards a Cloud Computing Strategy for Europe Digital Assembly, June 17, Brussels. www.eurocloud.org Towards a Cloud Computing Strategy for Europe Digital Assembly, June 17, Brussels Pierre-José Billotte, Chairman www.eurocloud.org June 2011 EuroCloud www.eurocloud.org 1 My personal Belief Cloud Computing

More information

INTERNATIONAL COMPARISONS OF PART-TIME WORK

INTERNATIONAL COMPARISONS OF PART-TIME WORK OECD Economic Studies No. 29, 1997/II INTERNATIONAL COMPARISONS OF PART-TIME WORK Georges Lemaitre, Pascal Marianna and Alois van Bastelaer TABLE OF CONTENTS Introduction... 140 International definitions

More information

10th International Trade Fair for Cine Equipment and Technology. 21-23 September 2014 MOC Munich, Germany

10th International Trade Fair for Cine Equipment and Technology. 21-23 September 2014 MOC Munich, Germany 10th International Trade Fair for Cine Equipment and Technology 21-23 September 2014 MOC Munich, Germany Outline Trade Fair Profile Developments 2002-2012 Exhibitor Field 2012 Visitor Field 2012 Perfomance

More information

MALTA TRADING COMPANIES IN MALTA

MALTA TRADING COMPANIES IN MALTA MALTA TRADING COMPANIES IN MALTA Trading companies in Malta 1. An effective jurisdiction for international trading operations 410.000 MALTA GMT +1 Located in the heart of the Mediterranean, Malta has always

More information

Architecture. Young Talent. Award 2016. Rules. January 2016. Organised by:

Architecture. Young Talent. Award 2016. Rules. January 2016. Organised by: Young Talent Architecture Award 2016 Rules. January 2016 Organised by: Founding partner: Sponsored by: Supported by: i Contents YTAA Presentation YTAA - EU Mies Award YTAA Concept What is it about? YTAA

More information

Supported Payment Methods

Supported Payment Methods Sell Globally in a Snap Supported Payment Methods Global In the global payments market, credit cards are the most popular payment method. However, BlueSnap expands the payment selection by including not

More information

GfK PURCHASING POWER INTERNATIONAL

GfK PURCHASING POWER INTERNATIONAL GfK PURCHASING POWER INTERNATIONAL 1 Agenda 1. Europe 3 2. Americas 45 3. Asia & Near East 54 4. Afrika 66 5. Australia 68 6. Overview of countries and available levels 70 2 2 EUROPE 4 GfK

More information

GLOBAL ORGANISATIONAL STRUCTURE

GLOBAL ORGANISATIONAL STRUCTURE GLOBAL ORGANISATIONAL STRUCTURE President, CEO Sten Kjelstrup Secretary to the Management Jeanette Dyekjær President, CEO HR Sten Kjelstrup Vice President Product Development & Technical Service Henning

More information

4. We understand this to mean that each provider state will need to ensure indemnity arrangements are in place to cover healthcare provided in that

4. We understand this to mean that each provider state will need to ensure indemnity arrangements are in place to cover healthcare provided in that Medical Defence Union response to consultation on European Commission s proposals for Directive on the application of patients rights in cross-border healthcare Introduction 1. The Medical Defence Union

More information

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace

DSV Air & Sea, Inc. Aerospace Sector. DSV Air & Sea, Inc. Aerospace DSV Air & Sea, Inc. Aerospace Sector DSV Air & Sea, Inc. Aerospace Introduction to DSV DSV is a global supplier of transport and logistics services. We have offices in more than 70 countries and an international

More information

ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT

ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT 2 OECD RECOMMENDATION OF THE COUNCIL ON THE PROTECTION OF CRITICAL INFORMATION INFRASTRUCTURES ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT The OECD is a unique forum where the governments of

More information

Plants Plants Plants Plants Plants

Plants Plants Plants Plants Plants Students Presentation: Nina Wachendorf 1 Structure Company Structure Company Coordination Company Distribution EWC Structure EWC Distribution EWC Coordination EWC Parts Company Structure Corporation Country

More information