1 Calculating Plumbing Fixture Counts By Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP In 2005, New York City s legislature unanimously passed the Women s Restroom Equity Bill, which essentially requires that in assembly-type buildings, female toilets shall be provided at a ratio of 2 to 1 when compared to male toilets and urinals. Restroom ratios have been an issue for some time, as evidenced by the first state legislative actions on this issue taken by California and Virginia in In 1990, an article published in The National Law Journal by George Washington University Law School professor John F. Banzhaf III, otherwise known as the Father of Potty Parity, stressed the need to provide equity in public restrooms not based on floor area, but on number of fixtures. Titled Final Frontier for the Law?, Banzhaf s article asked the questions: Can women truly be said to be liberated when they often stand on interminable lines at the theater, concerts, some restaurants, and in other public places to perform a necessary and often compelling biological function that men usually accomplish with virtually no wait? Does this problem, which certainly can be corrected by adding additional toilet facilities, amount to unfair discrimination? This is a situation that can easily be handled via the building code without separate legislation, even though past model building codes had an obviously poor track record for providing toilet fixture equity. Individual laws fragment building requirements, making compliance difficult if the separate laws are not incorporated by amendments during the local building code adoption process. The Legacy Codes Prior to the introduction of the International Codes in 2000, the three legacy model codes had provisions for regulating the number of fixtures, but the methods were different and generally did not provide the higher fixture counts required by states enacting restroom equity laws. For example, jurisdictions that adopted the 1994 or 1997 Uniform Building Code (UBC) also needed to specifically adopt Appendix Chapter 29, which included a table that assigned number of fixtures for males and females based on occupant loads; otherwise, the UBC set forth very little in the way of minimum fixture count requirements. UBC editions earlier than the 1994 edition had no plumbing requirements, let alone requirements for minimum number of fixtures. To cover the minimum fixture gap created by the building code, the UBC s companion plumbing code at the time, the Uniform Plumbing Code (UPC), included a recommended list of minimum fixtures, but recommended did not mean required. Interestingly, in the UBC, occupant loads determined for plumbing fixtures count, were different than the occupant loads determined for means of egress. Thus, for some assembly occupancies, the occupant load required for plumbing fixtures could be from 1/2 to less than 1/4 of the means of egress occupant load, depending on the egress occupant load factor used. This could have little to great impact on the minimum number of fixtures required depending on the specific situation. The International Building Code Potty parity laws aside, the International Building Code (IBC) * does provide some fairness in plumbing fixture distribution between males and females. Unlike the UBC, the IBC incorporates the * Specific code references used in this article are from the 2009 edition of the IBC unless otherwise indicated RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 1
2 minimum fixture table in the main body of the code. Therefore, when the IBC is adopted by a jurisdiction, the table (Table ) is automatically a part of the requirements (unless amended by the jurisdiction) without specifically identifying it in the adopting ordinance like an appendix. It should be pointed out that the plumbing systems chapter in the IBC is actually maintained by the International Plumbing Code Development Committee, and the content provided in the IBC is replicated in the International Plumbing Code (IPC). Therefore, if the IBC and IPC are adopted and if Chapter 29 is amended in the IBC, then identical amendments will be necessary for Chapter 4 of the IPC. In addition to water closets (plumbing parlance for toilets ) and urinals, the IBC also establishes requirements for lavatories, bathtubs and showers, drinking fountains, service sinks, kitchen sinks, and automatic clothes washer connections. Calculating the number of plumbing fixtures for each type of fixture is not a difficult task, but prior to the 2009 IBC, there were some gray areas that caused some confusion among design professionals namely the determination of fixture counts for mixed occupancies. Fortunately, that problem was clarified in the 2009 IBC. But before addressing mixed uses, let us proceed with a basic review of calculating fixture counts and the variations based on uses with different occupancy groups. Basic Fixture Count Calculations Before you can calculate the number of plumbing fixtures, you have to determine what the occupant load is for the occupancy group. To minimize duplication of work effort, the IBC requires the use of the occupant load determined for the means of egress. Now, here is the important question: what determines the number of males and females? That is rather simple; you just divide the total occupant load in half. The IBC does not address how to handle odd number occupant loads. For this situation, you can use the fractional number for each sex (See Example 2) or round the occupant load for each sex up to the next whole number. Regarding number of occupants for each sex, the IBC does provide an exception that allows the adjustment of male and female occupant distribution if statistical data supports a ratio other than 50 percent of each sex. Of course, this must be approved by the building official prior to proceeding with an alternate male to female ratio. The two examples below illustrate two types of simple ratios used in the IBC. Example 1 shows a simple ratio that is applied equally to both males and females, and Example 2 uses separate ratios for males and females. Where a simple ratio is applied equally to males and females, calculations can be determined by dividing the total occupant load in half and applying the ratio to each male and female load, or by applying the ratio to the total occupant load and dividing the number of fixtures evenly between males and females. The latter method is used Example 1. Please note that fixture count numbers are rounded up to the next whole number per footnote a of Table Example 1 - Group M store with 2,000 total occupants Water Closets: ratio 1 per 500 2,000 x 1/500 = 4 water closets 4 x 50% = 2 2 water closets for males 2 water closets for females Drinking Fountains: ratio 1 per ,000 x 1/1000 = 2 drinking fountains Lavatories: ratio 1 per 750 2,000 x 1/750 = x 50% = 1.33 = 2 2 lavatories for males 2 lavatories for females 2010 RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 2
3 Example 2 - Group A-1 theater with 1,155 total occupants 1,155 x 50% = males females Water Closets: ratios 1 per 125 (males) and 1 per 65 (females) Males: x 1/125 = 4.62 = 5 water closets Females: x 1/65 = 8.88 = 9 water closets Lavatories: ratio 1 per 200 Males: x 1/200 = 2.89 = 3 lavatories Females: x 1/200 = 2.89 = 3 lavatories Drinking Fountains: ratio 1 per 500 1,155 x 1/500 = 2.31 = 3 drinking fountains Another method of calculation used by the IBC to determine fixture counts is the graduated ratio. This method uses one ratio for an initial number of occupants and another ratio for the remaining number of occupants. In Example 3 below, the graduated method is used for the water closets and lavatories. Water Closets: ratios 1 per 25 for first 50 and 1 per 50 for remainder exceeding 50 Example 3 - Group B office building with 250 total occupants 50 x 1/25 = 2 water closets (250-50) x 1/50 = 4 water closets = 6 water closets 6 x 50% = 3 (3 water closets for males and 3 water closets for females) Drinking Fountains: ratio 1 per x 1/100 = 2.5 = 3 drinking fountains Fixture Count Calculations for Mixed Occupancies Lavatories: ratio 1 per 40 for first 80 and 1 per 80 for remainder exceeding x 1/40 = 2 water closets (250-80) x 1/80 = 2.13 water closets = 4.13 water closets 4.13 x 50% = 2.06 = 3 (3 water closets for males and 3 water closets for females) As mentioned earlier, editions of the IBC prior to the 2009 edition did not explain how to determine fixture count calculations for buildings with mixed occupancies. The confusion centers on how to sum up the fixtures to determine the total number of fixtures for a building. The typical method used by design professionals is to sum the rounded fixture numbers for each occupancy group to obtain a total fixture count for the building. Fortunately, that was not the intent. By summing the rounded fixture count numbers, the total fixture count may include additional fixtures that are not required. Although, from a building department s and the public s points of view, this is not a problem; from an owner s and a design professional s perspective it could be a problem additional fixtures cost money and require additional space. It is important that design professionals understand the code s intent so they are not misdirected to provide more fixtures than what the code requires, unless requested by the owner to do so. The 2006 IBC Code and Commentary provided some guidance to help with mixed occupancy situations; however, the code provisions in the 2006 IBC did not change. So, without a copy of the Commentary at hand, many design professionals continued to do things the way they always had. During the code development cycle a proposal was introduced to add content that would explain how to handle fractional numbers for fixture counts in buildings with multiple occupancies. This was approved and included in the 2009 IBC in section as follows: Fractional numbers resulting from applying the fixture ratios of Table shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall first be summed and then rounded up to the next whole number RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 3
4 Thus, the rounding only occurs after summing the fractional fixture counts for each occupancy group, keeping the total fixture count as low as permissible. Example 4 illustrates how to calculate the number of plumbing fixtures for a mixed occupancy building. Fixture Count Calculations Not Based on Occupant Load There are a few occupancy groups that do not use occupant loads as a basis for determining the number of plumbing fixtures. These include I-2, I-3, R-1, R-2, and R-3. Plumbing fixtures for those occupancy groups are based on the number of rooms, cells, sleeping units, or dwelling units and are not assigned to either sex. Example 4 includes an application for a Group R-1. Example 4 - Hotel Building with Groups A-3, B, M, and R-1 Group A-3 with 500 total occupants 500 x 50% = 250 (250 males and 250 females) Water Closets: ratios 1 per 125 (males) and 1 per 65 (females) Males: 250 x 1/125 = 2 water closets Females: 250 x 1/65 = 3.8 water closets Lavatories: ratio 1 per 200 Males: 250 x 1/200 = 1.25 lavatories Females: 250 x 1/200 = 1.25 lavatories Drinking Fountains: ratio 1 per x 1/500 = 1 drinking fountain Group B with 75 total occupants Water Closets: ratios 1 per 25 for first 50 and 1 per 50 for remainder exceeding x 1/25 = 2 water closets (75-50) x 1/50 = 0.5 water closets = 2.5 water closets 2.5 x 50% = 1.25 (1.25 water closets for males and 1.25 water closets for females) Lavatories: ratio 1 per 40 for first 80 and 1 per 80 for remainder exceeding x 1/40 = 1.88 lavatories 1.88 x 50% = 0.94 (0.94 lavatories for males and 0.94 lavatories for females) Drinking Fountains: ratio 1 per x 1/100 = 0.75 drinking fountains Group M with 50 total occupants Water Closets: ratio 1 per x 1/500 = 0.1 water closets 0.1 x 50% = 0.05 (0.05 water closets for males and 0.05 water closets for females) Lavatories: ratio 1 per x 1/750 = 0.06 lavatories 0.06 x 50% = 0.03 (0.03 lavatories for males and 0.03 lavatories for females) Drinking Fountains: ratio 1 per x 1/1000 = 0.05 drinking fountains Group R-1 with 150 sleeping units Water Closets: ratio 1 per sleeping unit = 150 Lavatories: ratio 1 per sleeping unit = 150 Bathtubs or Showers: ratio 1 per sleeping unit = 150 Drinking Fountains: Not applicable Summary Water Closets: Males: = 3.3 = 4 Females: = 5.1 = 6 Sleeping Units: 150 Lavatories: Males: = 2.22 = 3 Females: = 2.22 = 3 Sleeping Units: 150 Drinking Fountains: = 1.8 = 2 Service Sink: 1 per building The service sink is another fixture that is also not based on occupant load, but can be a conumdrum for the design professional. For most occupancy groups, Table indicates one service sink. The Commentary states that except for hospitals and nursing homes, one service sink is all that the code 2010 RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 4
5 intends to require in a building where all potential users of the fixture have access to it. However, this is not clearly reflected in the IBC provisions, thereby leaving it open for building official interpretation. Urinal Substitution Table directs the code user to Section of the IPC for substitution of water closets with urinals. The IPC allows up to 67% of the water closets in assembly and educational occupancies to be substituted and up to 50% in all other occupancies. The substitution is limited to the fixtures within a toilet room or bathroom and not for overall fixtures. Therefore, if 9 water closets are required, up to 6 may be converted to urinals if they are all located in a single toilet room; but if two toilet rooms are provided, one cannot have 6 urinals and the other with 3 water closets. See Example 5 for some typical substitution applications. Make note that in the case of urinal substitutions, fractional numbers are rounded down, not up; otherwise the percentage would exceed that permitted. Example 5 - Urinal Substitutions Assembly Occupancy: 12 water closets required Arrangement #1: Single toilet room 12 x 67% = 8.04 = 8 4 water closets 8 urinals Arrangement #2: Multiple toilet rooms Toilet Room A: 8 fixtures 8 x 67% = 5.36 = 5 3 water closets 5 urinals Toilet Room B: 4 fixtures 4 x 67% = 2.68 = 2 2 water closets 2 urinals Notice that only a total of 7 urinals are allowed under this arrangement Business Occupancy: 7 water closets required Arrangement #1: Single toilet room 7 x 50% = water closets 3 urinals Arrangement #2: Multiple toilet rooms Toilet Room A: 4 fixtures 4 x 50% = 2 2 water closets 2 urinals Toilet Room B: 3 fixtures 3 x 50% = water closets 1 urinal Surprisingly, the IPC does not limit the substitution to male toilet rooms or bathrooms only. Therefore, in international locations where they are used if the IPC is adopted or when they become more popular in the US, the substitution provision may be applicable to female urinals, as well. Also, in response to the movement towards sustainable buildings, the 2009 IPC now references ASME A , Vitreous China Nonwater Urinals, (i.e. waterless urinals) as an acceptable fixture. Distribution of Plumbing Fixtures Required plumbing fixtures cannot be lumped into a single toilet room or be separated into a series of unisex toilet rooms. Separate facilities for males and females must be provided with the number of fixtures as determined by the calculations covered above. Exceptions to those requirements include structures or tenant spaces that do not have more than 15 occupants (includes customers and employees) and mercantile occupancies that do not have more than 50 occupants. Furthermore, plumbing fixtures must be located where occupants can reasonably access them. Customers, patrons and visitors must have access to toilet facilities in buildings intended for public use and must include the required plumbing fixtures calculated. Thus, if it is determined that an assembly 2010 RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 5
6 occupancy is required to have 20 fixtures, those 20 fixtures need to be accessible to the assembly occupants. Toilet facilities for employees may be separate or combined with public toilet facilities. The path of travel to a toilet facility cannot exceed 500 feet, or 300 feet for covered mall buildings. The distance for covered malls is measured from the entrance of a store or tenant space to the central toilet facility; but if employee facilities are not provided, then the distance is measured from the employee work area. Further, in multi-story buildings, a story that is required to have access to toilet facilities must not have those facilities located more than one story above or below. For covered mall buildings, the IBC also mentions that required toilet facilities shall be based on total square footage. However, there are no details on how this is to be applied and the Commentary provides no additional insight as to the intent of that statement. However, it is this author s opinion that the intent was to ensure proportionate distribution of the toilet facilities, and the number of fixtures in each, throughout the mall based on the area served. It other words, it was meant to prohibit the intentional location of all but a few of the plumbing fixtures in one location and place the remaining few fixtures at locations just to comply with the path of travel distance, even though the number of occupants in those areas would demand more fixtures. Family or assisted-use toilets and bathing rooms (formally called unisex toilet and bathing rooms in earlier IBC editions) required by Section for mercantile and assembly occupancies are permitted to be included in the total count of required fixtures. A fixture in such a toilet or bathing room can be considered one of the fixtures required for males or females, but not both. Family or assisted-use toilets are limited to a single water closet and a single lavatory. Family or assisted-use bathing rooms are also limited to that required for toilet rooms, but may also include a single bathtub or shower. Continual Improvement When it comes to building codes, it would be much simpler if people would use common sense, thus minimizing the intrusiveness of building regulations. But, as history has shown, people tend not to do something if they are not required to do it. As demonstrated through code development, the early codes with their recommendations were not sufficient to provide the number of fixtures to make the call of nature more convenient for women; so the recommendations became requirements and have been marginally revised ever since. Although the process for determining the required number of plumbing fixtures has improved to the point where potty parity is on the verge of achievement, some people may argue that building codes still have a way to go to achieve that elusory equity; and as a result, states and municipalities will continue to legislate toilet distribution among women and men. Hopefully, there will be a point in time when codes and individual laws converge to a happy middle ground, and a single source for regulating minimum fixtures lies somewhere between the covers of the building code. To comment on this article, suggest other topics, or submit a question regarding codes, contact the author at [email protected]. About the Author: Ronald L. Geren, AIA, CSI, CCS, CCCA, SCIP, is an ICC Certified Building Plans Examiner, and is the principal of RLGA located in Scottsdale, Arizona, which provides specifications and code consulting services to architects, engineers, owners, and product manufacturers. A 1984 graduate of the University of Arizona, Ron has over 26 years of experience with military, public, and private agencies RLGA LLC No. 33 (Fall 2010) Calculating Plumbing Fixture Counts Page 6
CHAPTER 29 PLUMBING SYSTEMS
CHAPTER 29 SYSTEMS Note: The amendments to Chapter 29 are different than the 2009 Seattle Building Code and are not marked with margin bars or arrows. SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions
CHAPTER 29 PLUMBING SYSTEMS. [P] TABLE 2902.1 MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES a (See Sections 2902.2 and 2902.3) 1 per 40 for the
CHAPTER 29 PLUMBING SYSTEMS > SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions of this chapter and the Phoenix Plumbing Code shall govern the erection, installation, alteration, repairs, relocation,
Revised: Previously Issued As: P/BC 2011-095 PLUMBING FIXTURES
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC Sec. 2901 Effective: 01-01-2014 DOCUMENT NO. P/BC 2014-095 Revised: Previously Issued As: P/BC 2011-095 PLUMBING FIXTURES Section 2901
BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION
BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC #135 2902 Article 1 01-26-15 Page 1 of 6 MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES
PLUMBING FIXTURES GUIDELINES
COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING & SAFETY DIVISION 2902 BUILDING CODE MANUAL Article 3 12-20-02 Page 1 of 6 PLUMBING FIXTURES GUIDELINES The following policy establishes guidelines
New York City Department of Buildings
The New NYC Building Code Chapter 11 Accessibility New York City Department of Buildings Technical Affairs Keith Wen, R.A. Copyright Materials This presentation is protected by US and International Copyright
ACCESSIBILITY CHAPTER 11
CHAPTER 11 ACCESSIBILITY SECTION 1101 GENERAL 1101.1 Scope. The provisions of this chapter shall control the design and construction of facilities for accessibility to physically disabled persons. 1101.2
Georgia State Amendments to the International Plumbing Code
Georgia State Amendments to the International Plumbing Code (2006 Edition) Georgia Department of Community Affairs Local Government Assistance Division 60 Executive Park South, N.E. Atlanta, Georgia 30329-2231
(1) (a) through (1) (e) (iv) Remain the same.
24.301.301 CORPORO BY REFERECE OF UFORM PLUMBG CODE (1) he Department of Labor and ndustry adopts and incorporates by reference the Uniform Plumbing Code, 2006 2009 Edition, referred to as the Uniform
THE PEOPLE OF THE CITY OF LOS ANGELES DO ORDAIN AS FOLLOWS: Section 1. Article V of Chapter XII of the Los Angeles Municipal Code is added to read:
ORDINANCE NO. 1,;...8_U_8_2_2_ An ordinance adding Article V to Chapter XII, and amending Section 94.103.1.2.9, of the Los Angeles Municipal Code establishing water efficiency requirements for new development
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
City of Riverside Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov BUILDING CODE REQUIREMENTS FOR CHILD DAY CARE The purpose of this document is to provide the user with a basic level
PLUMBING CODE REQUIREMENTS AND SIZING GUIDE FOR RESIDENTIAL WATER SOFTENERS. Second Edition. Prepared by
PLUMBING CODE REQUIREMENTS AND SIZING GUIDE FOR RESIDENTIAL WATER SOFTENERS Second Edition Prepared by NAHB Research Center, Inc. 400 Prince Georges Boulevard Upper Marlboro, MD 20774-8731 DISCLAIMER This
PLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES
PLAN REVIEW AND APPROVAL FOR FOOD ESTABLISHMENTS PLUMBING REQUIREMENTS FOR FOOD ESTABLISHMENT PREMISES Health Systems Protection Rev. 07/2006 35-05-20/06/07/18 OFFICE OF FOOD PROTECTION 417 FEDERAL ST
CHAPTER 2: The Plumbing System
CHAPTER 2: The Plumbing System SECTION I: SIZING REQUIREMENTS Establish building dimensions Building height can be determined either by architectural drawings or # of floors times height/floor. (ex: 1
Chapter 16.130 PLUMBING CODE
DISSCUSSION ITEM 3 ATTACHMENT E Chapter 16.130 PLUMBING CODE 16.130.100 Plumbing Code - Incorporation. There is incorporated by reference, for purpose of adopting regulations, provisions, conditions, terms,
R432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. R432-5-2. Purpose.
R432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. This rule is promulgated pursuant to Title 26, Chapter 21. R432-5-2. Purpose. The
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected]
Dominic i Barbato Dpt. Of Building and Safety (818) 374 4361 [email protected] b 2011 Los Angeles Plumbing Code LAPC changes from 2008 2011 Los Angeles Plumbing Code Consists of the following:
2010 ADA Standards for Accessible Design. Department of Justice
2010 ADA Standards for Accessible Design Department of Justice September 15, 2010 Reproduction of this document is encouraged. This publication may be viewed or downloaded from the ADA website (www.ada.gov).
AB 715 COVERS: Toilets and Urinals CHAPTERED AS: Health and Safety Code 17921.3
Interactions Among AB 715 (Laird 2007), SB 407 (Padilla 2009), and CALGreen Building Standards Assessing for Provisions of Water Use Efficiency Regulations Existing law provides for the following: requires
SUBCHAPTER H: UTILITY SUBMETERING AND ALLOCATION 291.121-291.127 Effective January 6, 2011
Texas Commission on Environmental Quality Page 1 SUBCHAPTER H: UTILITY SUBMETERING AND ALLOCATION 291.121-291.127 Effective January 6, 2011 291.121. General Rules and Definitions. (a) Purpose and scope.
KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings
KBC Chapter 34 : Applying the Kentucky Building Code to Existing and Historic Buildings Presented by: Kentucky Department of Housing, Buildings, and Construction Kentucky Heritage Council Louisville Metro
2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS
2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS IBC CODE DESIGN CHECKLIST (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Transfer the resulting data on the building plans Life Safety & Building
ONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since 1920. Wet Venting. Incorporating Stack Venting and NPC Harmonization
ONTARIO PLUMBING INSPECTORS ASSOCIATION INC. In the public service since 1920 Wet Venting Incorporating Stack Venting and NPC Harmonization Presented by: Rainier Bratsch-Blundel, CPSI Plumbing Professor
Plumbing Code Sections For Commercial Food Facilities
Plumbing Code Sections For Commercial Food Facilities SCOPE The following list of requirements summarizes the plumbing issues that are commonly addressed in commercial retail food facilities by health
WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION
WELCOME INTERNATIONAL RESIDENTIAL CODE 2009 EDITION PLUMBING SECTION 1 HOUSEKEEPING 2 CHANGES We will be covering the significant changes to the International Residential Code and the changes common to
WATER & SEWER SERVICES
WATER/SEWER ENGINEERING SECTION PHONE (703) 228-3677 WATER & SEWER SERVICES INFORMATION & APPLICATION PACKAGE REVISED MAY 2014 1 MAY 2014 Dear Customer: Thank you for taking the time to read this information
FIXTURES, FAUCETS AND FIXTURE FITTINGS
CHAPTER 4 FIXTURES, FAUCETS AND FIXTURE FITTINGS SECTION 401 GENERAL 401.1 Scope. This chapter shall govern the materials, design and installation of plumbing fixtures, faucets and fixture fittings in
This presentation premiered at WaterSmart Innovations. watersmartinnovations.com
This presentation premiered at WaterSmart Innovations watersmartinnovations.com Green Plumbing and Mechanical Code Supplement David Viola IAPMO Director of Special Services 1 IAPMO Group Association of
HEALTH FACILITY CHECKLIST SECTION 1226 [OSHPD 3] CLINICS 1226.6 PRIMARY CARE CLINICS
Compliance Checklist: [OSHPD 3] Primary Care Clinics Page 1 of 7 HEALTH FACILITY CHECKLIST SECTION 1226 [OSHPD 3] CLINICS 1226.6 PRIMARY CARE CLINICS Primary Care Clinics are Health Facilities licensed
Chapter 20 Polk County Construction Code
Chapter 20 Polk County Construction Code 20.1 Purpose and Scope 20.2 Codes Adopted by Reference, and Amendments 20.3 Permits 20.4 Inspections and Investigations 20.5 Occupancy 20.6 Records 20.7 Debris
Research of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008
What is Grey Water? Research of Grey Water for Use in Residential Applications Original date of publication: 12-14-2007 Updated: 8-06-2008 Grey water comes from many sources. Grey water, gray water, greywater,
APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM
APPENDIX A RECOMMENDED RULES FOR SIZING THE WATER SUPPLY SYSTEM Because of the variable conditions encountered, it is impractical to lay down definite detailed rules of procedure for determining the sizes
Top 10+ Mistakes of DWV plumbing design
Top 10+ Mistakes of DWV plumbing design Listed below are the some of the most frequently missed items, noticed by our inspectors, at plumbing rough-in when non-plumbers attempt plumbing design. Most of
Water Use Reduction Additional Guidance
December 1, 2009 (Updated July 6, 2012) Version 7 Water Use Reduction Additional Guidance This guidance applies to Water Efficiency (WE) Prerequisite 1 and WE Credit 3 in LEED 2009 for New Construction,
INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section 1101.1 2013 Green Building Standards Code
INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section 1101.1 2013 Green Building Standards Code In 2009, the California State Legislature passed Senate Bill SB 407 which
DRAFT ONLY ORDINANCE NO.
ORDINANCE NO. An ordinance amending certain provisions of Articles 4 and 9 of Chapter IX of the Los Angeles Municipal Code to establish citywide water efficiency standards and require water-saving systems
NEW YORK. Downloaded 01.15.11
Nurses Station & Resident Call System PRE 1975: NEW YORK Downloaded 01.15.11 713 1.3 Nursing units. Each nursing unit shall include the following service areas and shall meet the following minimum requirements:
Plumbing Code Statutes and Regulations February 2011 Labor Standards and Safety Division Mechanical Inspection
Plumbing Code Statutes and Regulations February 2011 Labor Standards and Safety Division Mechanical Inspection Jobs are Alaska s Future MECHANICAL INSPECTION CUSTOMER COUNTER LOCATIONS Main Office MI Anchorage
DESIGN GUIDELINES FOR SUBSTANTIAL REHABILITATION.
1 DESIGN GUIDELINES FOR SUBSTANTIAL REHABILITATION. I. APPLICABILITY OF GUIDELINES. The design guidelines apply to the rehabilitation of multi-family buildings, subject to H.P.D. review and approval. The
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)
CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner
PLUMBING ROUGH IN INSPECTION
This Program is made Possible through the Code Officials Education & Training Fund. Revenue for the Fund comes from Assessments on Building Permits. Please turn down cell phones and put pagers on vibrate.
ACCESSIBILITY CHAPTER 11
CHAPTER 11 ACCESSIBILITY SECTION BC 1101 GENERAL 1101.1 Scope. The provisions of this chapter and Appendices E, N and P shall control the design and construction of facilities for accessibility to persons
2016 BUILDING PERMIT FEES*
2016 PERMIT FEES* Fees are based on the cost of construction and shall be based on a value not less than the value determined using the Building Valuation Data Report published by ICC. Application Fee
Guideline for Implementation of California Civil Code Sections 1101.1 1101.8 Water-Conserving Plumbing Fixtures
Guideline for Implementation of California Civil Code Sections 1101.1 1101.8 Water-Conserving Plumbing Fixtures Information Bulletin No. IB-021 Effective: January 1, 2014 By: Chief Building Official For
Plumbing Supply Piping Planning Tool Reducing Water Wasted Waiting for Hot
Plumbing Supply Piping Planning Tool Reducing Water Wasted Waiting for Hot Craig Selover Selover Consulting [email protected] H:248 542-3010 C:248 917-1380 Floor Plan Floor Plan All Piping WaterSense,HERS,
Carriers, Fixtures & Piping
Regardless of application and/or installation needs, there are fixture supports available to meet even the harshest design requirements. by William M. Smith Over the years, I m sure that each of you in
2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes. Questions. 1004.1 Design Occupant Load. 1005 - Means of Egress Capacity Determination
2012 IBC & 2012 NFPA 101 Significant Means of Egress Changes Clay Aler, P.E. Principal [email protected] Andrew M. Schneider, P.E. Senior Fire Protection Engineer [email protected] Questions Submit
Amendments to the 2012 International Plumbing Code
Amendments to the 2012 International Plumbing Code North Central Texas Council of Governments region The following sections, paragraphs, and sentences of the 2012 International Plumbing Code are hereby
One of the fundamental design elements that every
Preliminary Design Information Before starting the water system design, you must assemble a collection of information. This includes information from the owner, the local utility, and the architect. Things
Accessibility Guide for Small Businesses
. Accessibility Guide for Small Businesses June 2015 Second Edition Preface This document is intended to provide explanation and technical guidance to assist owners of small businesses of the accessibility
Editorial Note: bold and underline denotes added text, strikethrough denotes deleted text
Code Amendment 12/20/12 2011 Oregon Plumbing Specialty Code, Grease Interceptors & Fats, Oils and Greases Editorial Note: bold and underline denotes added text, strikethrough denotes deleted text 204.0
Special Use Commercial Properties
Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding
ADA Scoping: New Construction
U. S. A CCESS B O A R D T E C H N I C A L G U I D E ADA Scoping: This guide provides an introduction to the scoping requirements that form the basis for the Department of Justice s 2010 ADA Standards and
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
FIRE SPRINKLERS IN TOWNHOMES/CONDOMINIUMS
CITY OF BLAINE SAFETY SERVICES Fire Inspections 10801 Town Square Drive Blaine MN 55449 Business Phone 763-785-6187 Fax 763-717-2634 City of Blaine Fire Prevention Inspection Policy FIRE SPRINKLERS IN
BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC
BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC #145 106.4 Article 3 04-01-14 Page 1 of 7 PLUMBING FIXTURE REPLACEMENT ISSUE:
SIZING OF WATER PIPING SYSTEM
SIZING OF WATER PIPING SYSTEM SECTION E101 GENERAL E101.1 Scope. E101.1.1 This appendix outlines two procedures for sizing a water piping system (see Sections E103.3 and E201.1). The design procedures
New Ontario Building Code Highlights
New Ontario Building Code Highlights Part 9 This summary highlights items that are believed to be significant changes to the 2012 OBC and is not intended to include all changes made within this or other
PMA ONLINE TRAINING Venting for Plumbing Systems
PMA ONLINE TRAINING Venting for Plumbing Systems One Hour Continuing Education Venting PMA training disclaimer The information provided in this document is intended for use as a guideline and is not intended
REQUIREMENTS FOR SINGLE FAMILY DWELLINGS
REQUIREMENTS FOR SINGLE FAMILY DWELLINGS New Single Family Dwelling Additions or Renovations to Single Family Dwelling An application for a building permit, when adding plumbing fixtures to a new single
F1000 VITREOUS CHINA URINAL BENEFITS FEATURES
F1000 create more hygienic, odor-free restrooms. Our patented three part system, including vitreous china bowl, sloped housing and cartridge, eliminates the need for water, conserving up to an average
BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS
CITY OF MONTRÉAL BY-LAW 03-096 BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS As the municipal administration seeks to ensure that all Montrealers benefit from acceptable housing conditions;
Response to Standard Exceedances of Lead in Drinking Water Supplies under O.Reg.170/03
Response to Standard Exceedances of Lead in Drinking Water Supplies under O.Reg.170/03 Public Health Division Ministry of Health and Long-Term Care December 2008 Table of Contents 1. PURPOSE.. 2 2. BACKGROUND.
INTERNATIONAL RESIDENTIAL PLUMBING CODE
INTERNATIONAL RESIDENTIAL PLUMBING CODE RP2-06/07 P2705.1 Proponent: Guy Tomberlin, Fairfax County, Virginia, representing Virginia Plumbing and Mechanical Revise as follows: P2705.1General. The installation
M E M O R A N D U M. To: Partnership for Safer Buildings Date: 21 March 2003
M E M O R A N D U M To: Partnership for Safer Buildings Date: 21 March 2003 From: Codes Assessment Subcommittee Walter Smittle III, Chairman Re: Building Code Fire Safety Concerns: NFPA 5000, Building
City of Elk River BASEMENT Office Use Only
City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single
BUILDING PERMIT SPECIFICATIONS
BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide
CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.
CHAPTER 9 VENTS 901 GENERAL 901.1 Scope The provisions of this chapter shall govern the materials, design, construction, and installation of vents. 901.2 Protection of Trap Seals The protection of trap
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
*** THIS FILE INCLUDES ALL REGULATIONS ADOPTED AND PUBLISHED THROUGH THE *** *** NEW JERSEY REGISTER, VOL. 41, NO. 4, FEBRUARY 17, 2009 ***
5:23-7.1 Applicability The provisions of this subchapter shall apply to all buildings, including their associated sites and facilities, and portions thereof, unless exempted by this subchapter. This subchapter
When Should Examination Preparation Begin?
Texas State Board of Plumbing Examiners Tradesman Plumber-Limited Licensee Examination Review Course The following Examination Review Course is designed to assist a registered Plumber s Apprentice in preparing
The emergency provisions affect the following Building Code sections:
On August 1, 2012 new emergency chapter 11B code provisions became effective. Attached are copies of the emergency express terms and the applicable figures. The new requirements are underlined and deleted
CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY
Draft CITY of LOS ANGELES DEPARTMENT of BUILDING and SAFETY Draft Los Angeles Plumbing Code (LAPC) 2008 California Plumbing Code (CPC) 2007 Uniform Plumbing Code (UPC) 2006 Major Code Changes Preliminary
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or
9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing
Basic Principles for Sizing Grease Interceptors
Basic Principles for Sizing Grease Interceptors Grease Interceptor is an overall term. It is a product category much like faucet. I am sure you can think of several types of faucets like, kitchen, bath
How To Reduce Lead Content In Plumbing
An Overview of Regulations for Lead Levels in Drinking Water System Components An Overview of Regulations for Lead Levels in Drinking Water System Components Since the establishment of the federal Safe
Water Distress in Growing Cities Issues & Challenges. Presented by: Neeta Sharma Managing Director IAPMO India
Water Distress in Growing Cities Issues & Challenges Presented by: Neeta Sharma Managing Director IAPMO India Source: UNESCO Green Approach- A MUST today- for Sustainability (better life cycle costs and
Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit
COMPLIANCE CHECKLIST Page 1 of 6 > Long Term Care Facility - Nursing Unit The following checklist is for plan review of new long-term care facilities and new additions to existing long-term care facilities.
Isometric Plumbing Drawings
Building Inspections Isometric Plumbing Drawings All commercial building permit applications, in which the plumbing system has not been designed by a mechanical engineer, must include two sets of isometric
Water Conservation and the State s New Green Building Code for Residential Construction
Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners
APPLICATION FOR NEW CONSTRUCTION
CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT
1 2006 International Building Code, International Code Council, Country Club Hills, IL, p. 23
APPLYING MIXED USE, ACCESSORY USE AND INCIDENTAL PROVIONS OF THE 2006 INTERNAITONAL BUILDING CODE By: Carroll Lee Pruitt, FAIA, NCARB, ICC William Rakatansky, AIA, CSI, LEED AP Just when you thought that
Inspection Item COMMENTS
APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:
CHAPTER 4 PLUMBING FIXTURES AND FIXTURE FITTINGS
CHAPTER 4 PLUMBING FIXTURES AND FIXTURE FITTINGS Note: In addition the requirements of this chapter, which provide access to, or egress from, buildings or facilities where accessibility is required for
NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02
NC Rehab Code Case Study Cheerwine Building January 17, 2002; rev 4/12/02 PART A: Project Data and Classification 1. Project name & location Renovation of the Cheerwine Building, 322 East Council St.,
RESIDENTIAL WINDOW REPLACEMENT
3S258 MANNING AVENUE WARRENVILLE, IL 60555 PH: 630.393.9050 FAX 630.393.1531 RESIDENTIAL WINDOW REPLACEMENT A building permit is required for the installation or replacement of windows in a residence.
Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings
Community Development Department Building Division 39550 Liberty Street, PO Box 5006, CA 94537-5006 510-494-4460 ph www.fremont.gov Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential,
KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the
Lest We Forget, a Short History of Housing in the United States
Lest We Forget, a Short History of Housing in the United States James D. Lutz, Lawrence Berkeley National Laboratory ABSTRACT Many changes in historical housing practices and demographics may be surprising
Plumbing Code. City of San Diego 2013 Plumbing Regulations - Proposed Code Changes (revised 5/15/15)
"Portions of this publication reproduce excerpts from the 2013 California Mechanical Code, Title 24, Part 4 and 2013 California Plumbing Code, Title 24, Part 5, reprinted with the permission of the International
In-Patient Radioactive Iodine ( 131 I) Treatment
In-Patient Radioactive Iodine ( 131 I) Treatment Information for patients and families Princess Margaret Read this booklet to learn: what radioactive iodine treatment is what to expect instructions to
Land Use and Environmental Service Agency (Code Enforcement) NC Plumbing Code. Table of Contents
Chapter 1 Administration Chapter 3 General Regulations Chapter 5 Water Heaters Chapter 7 Sanitary Drainage Chapter 9 Vents Chapter 11 Storm Drainage Policy Statements Table of Contents Chapter 2 Definitions