Understanding the Herbert Hoover Dike Rehabilitation Spillway, Plan 6 and EAA Storage Flow way Alternatives
|
|
|
- Gwendolyn Webb
- 10 years ago
- Views:
Transcription
1 Understanding the Herbert Hoover Dike Rehabilitation Spillway, Plan 6 and EAA Storage Flow way Alternatives
2 HHD Rehabilitation Public safety is Corps highest priority Analysis of designs to address rehabilitation need is underway Analysis must cover the range of options Design based on lessons learned from New Orleans New design increases redundancy and resiliency Implementation strives to minimize impacts to individuals and communities
3 N 8 INDIAN PRAIRIE CANAL Okeechobee KISSIMMEE RIVER 5 OKEECHOBEE NUBBIN SLOUGH Martin 7 HHD Rehabilitation 6 Glades ST. LUCIE CANAL FISHEATING CREEK 4 MOOREHAVEN Reach Boundary Town/City Lake Okeechobee SAND CUT CALOOSAHATCHEE RIVER CLEWISTON LAKE HARBOR Hendry 2 PORT MAYACA SAND CUT CANAL POINT PAHOKEE BELLE GLADE SOUTH BAY 3 Palm Beach 1 Reaches in miles Project Priorities Reach 1, 2, 3 High
4 Herbert Hoover Dike Rehabilitation Conceptual Design Reach 1 CURRENTCOMPLETED ROW PROJECT ROW Seepage Berm Dike Seepage Berm Lake Fill Sands Peat Drain Swale Existing Toe Ditch Drain Swale Limestone Layers Sands NOT TO SCALE Cutoff Wall (type, depth, & loc TBD) Order of constructing the cutoff wall and seepage berm may vary based on risk reduction, availability of lands, funds and ability to issue construction contracts.
5 Reaches 2 and 3 Rehab Major Rehab Report (MRR) currently being prepared We must consider alternatives to proposed plan in our evaluations Several options under consideration Rehab similar to Reach 1 Fixed crest spillway
6 HHD Rehab Analysis Conceptual Spillway Alternative 2 mi long spillway set at Elevation mi of US Hwy 27 would have to elevated Very large Storm Water Treatment Area (STA) would be required for water treatment Possible relocation of sugar mill and other infrastructure Land acquisition and relocations downstream of flow way and STA Navigation dredging within Lake Okeechobee
7 HHD Rehabilitation Spillway Alternative Concept
8 Spillway Option Advantages Reduced need to rehab Herbert Hoover Dike avoids expensive rehab work Harmful discharges from Lake O to the estuaries greatly reduced
9 Disadvantages Spillway Option Total disruption of water management options and CERP by largely eliminating storage function of Lake O; over 2M acre feet of storage would be lost Low lake levels more common, lasting longer, and more severe. Low lake levels and reduced water storage increases risk of salt water contamination of drinking water. Requires acquisition of large area south of lake, relocation of many existing infrastructure facilities and additional dike construction to contain the southward flows. These would be built to handle water surges.
10 Spillway Option Other Disadvantages (continued) Very large STA required to protect/improve quality of water entering Everglades. 10 year storm: 140,000 acres 25 year storm: 650,000 acres STA would be a water consumer Potential HTRW issues within flow way and STA. Dredging of rim canal for navigation and access to lake during more frequent low water events may expose additional seepage paths in what is left of HHD.
11 Spillway vs. Plan 6 Concept Spillway for HHD Rehabilitation Purpose - evaluated as an option in lieu of rehab of HHD Plan 6 Concept Defined in Recon report for Comprehensive Everglades Restoration Plan as possible component for moving water south from Lake Was not included nor recommended in the Restudy report to Congress
12 HHD Rehabilitation Spillway Concept and Plan 6 Concept
13 Next Steps Northern Everglades program to address additional storage and water quality needs north of lake Will require re-exam of entire flow restoration process from north to south Analyze need for additional storage (eg. EAA Cell 2) and treatment south of lake as well as other alternatives for all potential flow paths needed to reconnect the system.
How To Rehabilitate A Dam In A Lake Dike
Herbert Hoover Dike Rehabilitation Reach 1 Construction Reaches 2 and 3 Major Rehabilitation Report Briefing Purpose Provide a status update of the HHD rehabilitation project and a description of the upcoming
South Florida Everglades Ecosystem Restoration Program
South Florida Everglades Ecosystem Restoration Program Restoration Program and Project Briefings Joint Working Group / Science Coordination Group Meeting April 2, 2014 Howie Gonzales Chief, Ecosystem Branch
LAKE OKEECHOBEE and THE HERBERT HOOVER DIKE. A Summary of the Engineering Evaluation of Seepage and Stability Problems at the Herbert Hoover Dike.
LAKE OKEECHOBEE and THE HERBERT HOOVER DIKE A Summary of the Engineering Evaluation of Seepage and Stability Problems at the Herbert Hoover Dike. The Good Life Lake Okeechobee and the Herbert Hoover Dike
SAME Mobile Post Industry Day
SAME Mobile Post Industry Day Col lalan M. Dodd District Commander US Army Corps of Engineers, Jacksonville District November 13, 2014 US Army Corps of Engineers AGENDA Introduction to Jacksonville District
Managing Complexity: Implementing an Ecosystem Restoration Program*
Managing Complexity: Implementing an Ecosystem Restoration Program* Program Implementation Framework Program Management Tools Lesson Learned *How I Stopped Worrying and Learned to Love Change and Uncertainty!
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues
The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary Water Flows & Current Issues Florida Governor Rick Scott August 20, 2013 Upper Chain of Lakes
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA GA 30303-6801
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA GA 30303-6801 CESAD-RBT MAY MEMORANDUM FOR COMMANDER, JACKSONVILLE DISTRICT SUBJECT:
Evaluation Criteria and Performance Measures for the EAA Storage Reservoirs- Phase 1 Project
Evaluation Criteria and Performance Measures for the EAA Storage Reservoirs- Phase 1 Project What are Evaluation Criteria?! Any factors/standards used in making decisions! Purpose: Used to assess & appraise
Everglades Restoration Progress
S O U T H F L O R I D A W A T E R M A N A G E M E N T D I S T R I C T Everglades Progress JANUARY 2016 BACKGROUND: America s Everglades was once a vibrant, free-flowing River of Grass, extending from the
RISKS THE HERBERT HOOVER DIKE LLOYD S EMERGING RISKS TEAM REPORT
RISKS LLOYD S EMERGING RISKS TEAM REPORT THE HERBERT HOOVER DIKE A DISCUSSION OF THE VULNERABILITY OF LAKE OKEECHOBEE TO LEVEE FAILURE; CAUSE, EFFECT AND THE FUTURE 2 Disclaimer This document is intended
JACKSONVILLE DISTRICT
JACKSONVILLE DISTRICT SAME Savannah Post District Overview Presented by: Mike Rogalski, PE, PMP Deputy Chief, Programs and Project Management Division (PPMD) June 17, 2015 AGENDA INTRODUCTION TO JACKSONVILLE
The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater
The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater stream flowing into the Indian River Lagoon. An inlet
Update on Aquifer Storage and Recovery
Update on Aquifer Storage and Recovery Dean Powell Bureau Chief Water Supply Bureau Governing Board Workshop September 2013 Objectives Discuss the basics of aquifer storage and recovery (ASR) technology
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
Susan Iott U. S. General Accounting Office. Restoration of the South Florida Ecosystem
Susan Iott U. S. General Accounting Office Restoration of the South Florida Ecosystem Presented at The Aspen Global Change Institute June 5-10, 2003 Summer Science Session I Learning from Regions: A Comparative
An Independent Technical Review by the University of Florida Water Institute
Options to Reduce High Volume Freshwater Flows to the St. Lucie and Caloosahatchee Estuaries and Move More Water from Lake Okeechobee to the Southern Everglades An Independent Technical Review by the University
The Human Context for Everglades Restoration: The South Florida Case Study
25 The Human Context for Everglades Restoration: The South Florida Case Study Bonnie Kranzer, Ph.D., AICP, South Florida Water Management District and Former Executive Director, Governor s Commission for
Mouth of the Columbia River Jetties Major Rehabilitation Study
Mouth of the Columbia River Jetties Major Rehabilitation Study PNWA Port of Vancouver January 29, 2010 US Army Corps of Engineers Project Overview Background Corps Guidance for Major Rehab Project Alternatives
Appendix B: Cost Estimates
Appendix B: Estimates This appendix presents the estimated costs of the monitoring and supplemental research components presented in Section 3 of this document. A 20% quality assurance and quality control
Relative Costs and Benefits of Dispersed Water Management (DWM)
Relative Costs and Benefits of Dispersed Water Management (DWM) Prepared by Paul Gray and Charles Lee Introduction: water storage needs and strategies over time Drainage in south Florida has produced increased
Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway
Peters Canyon Channel (OCFCD Facility. F06) from Lead Agency: Agency: Project Director: Address: Orange County, Public Works, Infrastructure Programs, Capital Programs Sam Ali 300 N. Flower Street Santa
Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway
Presentation to the Inland Waterways Users Board Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway by Gary Loss, P.E. Rock Island District July 13, 2006 Chicago Sanitary and Ship Canal A
Building Resilient Infrastructure for the 21 st Century
Building Resilient Infrastructure for the 21 st Century 1 Maria Mehranian Cordoba Corporation & Los Angeles Regional Water Quality Control Board October 19, 2014 24 th Annual Lake Arrowhead Symposium:
Small Dam Hazard Assessment Inventory
Small Dam Hazard Assessment Inventory What would happen if your dam were to fail? This is a question that most dam owners hope they will never have to answer. However it is a question you, as a responsible
Goal 1 To protect the public health, safety and property from the harmful effects of natural disasters.
Plan Framework for Coastal Management The purpose of this element is to provide for the protection of residents and property in within the coastal area of the host community, and to limit expenditures,
Nashville District Workload for Nashville SAME Professional Development Workshop
Nashville District Workload for Nashville SAME Professional Development Workshop Thomas Cayce, PE Chief, Programs and Project Delivery Branch Nashville District 17 August 2011 US Army Corps of Engineers
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods
DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the
BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)
BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA) Catchment area of Chao Phraya River is 160,000 sq.km. or about 1/3 of the country The Chao Phraya River flows passing through Bangkok
Comprehensive Everglades Restoration Plan (CERP) Broward County Water Preserve Areas (BCWPA)
Comprehensive Everglades Restoration Plan (CERP) Broward County Water Preserve Areas (BCWPA) Final Project Implementation Report (PIR) & Environmental Impact Statement (EIS) Briefing to the Civil Works
Moving Small Mountains Vesuvius Dam Rehab
Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,
GENERAL OBLIGATION BONDS
DESCRIPTIONS GENERAL OBLIGATION BONDS Appendix C, page 2 GENERAL OBLIGATION BONDS State Transportation Bonds --- 1968 An amount of $640,000,000 was authorized to improve the public transportation system.
New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012
New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Amherst Dam. Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM
Amherst Dam Public Informational Meeting Michael Juris - Village President Joe Behlen, P.E. WDNR Dam Safety Engineer Gerald Krueger, P.E. AECOM April 3, 2014 Welcome Michael Juris Village President Introduction
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
San Francisco District. U.S. Army Corps of Engineers
San Francisco District U.S. Army Corps of Engineers Dredged Material Management Plan for the Sacramento River Deep Water Ship Channel (SRDWSC) Deepening Project Final March 2012 Sacramento River at Rio
Indicator 2.2 - Water Levels in Lake Okeechobee
Indicator. - Water Levels in Lake Okeechobee What is the desired restoration condition? The desired restoration condition for water levels in Lake Okeechobee is to eliminate harmful high and low water
Sea Level Change. Miami-Dade Sea Level Rise Task Force
Sea Level Change and LongProgram Range Everglades Restoration Climate Water Resources Planning for Florida Change Application Concerns of USACE andguidance Draft Sea Level on Sea Rise Level Planning Change
The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina
The success of the hurricane protection around Chevron s refinery at Pascagoula, MS, during Katrina Dr J.W. van der Meer, Dr C. Cooper, M.J. Warner, H. Adams-Morales and G.J. Steendam Abstract and presentation
SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y
Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana
Ouachita River Floodplain Restoration Upper Ouachita NWR, Louisiana Interior Hydrologic Restoration Plan Mollicy Farms Unit The Nature Conservancy Louisiana Field Office 2011 Cover: Sediment laden water
Managing Our Water Retention Systems
Managing Our Water Retention Systems 29th Annual USSD Conference Nashville, Tennessee, April 20-24, 2009 Hosted by Corps of Engineers On the Cover Wolf Creek Dam is on the Cumberland River in South Central
Home Safe/ Healthy Beginnings Entry Agency (For children ages 0 to 5 in Palm Beach County)
If you are seeking for your child to receive a diagnostic assessment for Autism Spectrum Disorder and/or if they have received a screening from FAU CARD, here are some options for your consideration: Home
DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES BUDGET
DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES BUDGET 1390 SPECIAL CATEGORIES - AGRICULTURAL NONPOINT SOURCES BEST MANAGEMENT PRACTICES IMPLEMENTATION FROM GENERAL REVENUE FUND..... 15,000,000 FROM GENERAL
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Standard Operating Procedures for Flood Preparation and Response
Standard Operating Procedures for Flood Preparation and Response General Discussion Hurricanes, tropical storms and intense thunderstorms support a conclusion that more severe flooding conditions than
FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF FORESTRY FLORIDA WILDFIRE AIR OPERATIONS PLAN
FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES DIVISION OF FORESTRY FLORIDA WILDFIRE AIR OPERATIONS PLAN CONTENTS: Purpose Tactical Operations State-wide Suppression Priorities for Aircraft Temporary
How do you treat water based on water quality from different water sources?
How do you treat water based on water quality from different water sources? Why? Authors: Wendy Lane and Kim Sciarrone Seattle Public Schools; Seattle, WA Water from different sources will contain different
River Management 2013 Colorado Flood
River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,
PART 2 NEW ORLEANS DRAINAGE CANALS
PART 2 NEW ORLEANS DRAINAGE CANALS The Old Basin drainage canal was excavated in the 1790s.. This shows the systems of drainage ditches and canals established by 1829, leading to Bayou St. John. Cross
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Pine Creek Culvert Upgrade $ 560,000. Located at exiting hump dike, just south of Fire Training Center
To: BOS From: Joseph Michelangelo, P.E. Director of Public Works Re: CDBG-DR Pine Creek Culvert Upgrade Date: April 20, 2015 On June 19, 2014, the Town of Fairfield was awarded the above referenced project
REGULATORY GUIDANCE LETTER
REGULATORY GUIDANCE LETTER. 07-02 Date: July 4, 2007 SUBJECT: Exemptions for Construction or Maintenance of Irrigation Ditches and Maintenance of Drainage Ditches Under Section 404 of Clean Water Act 1.
FREIGHT FORCE, INC. (FLORIDA FREIGHT) 8437 NW 72ND ST MIAMI, FL 33166. Cities Served by - MIA [Order by City, State, Zip, Zone]
FREIGHT FORCE, INC. (FLORIDA FREIGHT) 8437 NW 72ND ST MIAMI, FL 33166 MIA Phone: (305) 597-1515 Emergency Phone: (954) 445-8392 Manager: Julio Gonzalez Fax: (305) 597-1514 Hours Monday through Friday:
For Sales of Neopost Brand equipment off the Neopost USA contract, please use your county to find the Authorized dealer near you.
For Sales of Neopost Brand equipment off the Neopost USA contract, please use your county to find the Authorized dealer near you. Alachua Lee Baker Bay Bradford Brevard Broward Calhoun 8369 NW 12 th Street
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
Living Water Care Center Gulf Stream Baptist Association Broward County Health Department Broward County Health Department Chi en agnost & eat ment
Community Assistance Reduced-Fee Dentistry Centers for Low-Income Populations The Atlantic Coast District Dental Association geographic area covers member dentists from Ft. Lauderdale to Sebastian. Counties
April 17, 2015 SUMMARY OF SUBJECT MATTER
April 17, 2015 SUMMARY OF SUBJECT MATTER TO: FROM: RE: Members, Subcommittee on Water Resources and Environment Staff, Subcommittee on Water Resources and Environment Hearing on A Review of the President
NRCS Overview. National Dam Safety Program Technical Workshop #19 February 22-23, 2012
NRCS Overview National Dam Safety Program Technical Workshop #19 February 22-23, 2012 Thomas Brown National Design, Construction, and Soil Mechanics Center (NDCSMC) Fort Worth, Texas NRCS Dam Inventory
30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS
.-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin [email protected] Programs/Project Management
The Buffalo River Restoration Project Frequently Asked Questions
The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Partnership is a public-private collaborative effort to clean up sediment in the Buffalo River. Although discharges
How to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).
Flooding Fast Facts What is a flood? Flooding is the unusual presence of water on land to a depth which affects normal activities. Flooding can arise from: Overflowing rivers (river flooding), Heavy rainfall
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters
Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston
Strategic Beach Management Plan Southeast Atlantic Coast Region
Page 1 of 66 Strategic Beach Management Plan Southeast Atlantic Coast Region Division of Water Resource Management Florida Department of Environmental Protection June 2015 Delray Beach Shore Protection
Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT
ROOSEVELT WATER CONSERVATION DISTRICT RESPONSE TO ARIZONA POWER AUTHORITY REQUEST FOR INFORMATION DATED SEPTEMBER 12, 2012 PRESENTED OCTOBER 24, 2012 RWCD is an irrigation district that was established
Comprehensive Plan Drainage Subelement
Comprehensive Plan Drainage Subelement Adopted January 26, 2010 Ordinance 210-19 Prepared by: CITY OF POMPANO BEACH 100 West Atlantic Boulevard Pompano Beach, Florida 33060 Telephone: 954.786.4600 website:
1. INTRODUCTION 5. THE PERMIT PROCESS
1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed
QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL
QUESTIONS AND ANSWERS WATERS OF THE U.S. PROPOSAL Key Background Congress enacted the modern Clean Water Act in 1972 to address pollution entering the nation s waters to complement statutes such as the
Greater New Orleans Hurricane and Storm Damage Risk Reduction System
Greater New Orleans Hurricane and Storm Damage Risk Reduction System Mike Park Chief Task Force Hope Mississippi Valley Division U.S. Army Corps of Engineers March 15, 2011 US Army Corps of Engineers BUILDING