Visualising the Big Picture: Key Performance Indicators & Sustainable Urban Design

Size: px
Start display at page:

Download "Visualising the Big Picture: Key Performance Indicators & Sustainable Urban Design"

Transcription

1 Visualising the Big Picture: Key Performance Indicators & Sustainable Urban Design Session: 1st Workshop on EeB KPIs -Key Performance Indicators T,. Crosbie, M. Crilly & N Dawood, TEESSIDE UNIVERSITY MIDDLESBROUGH, UK J. Oliveras FOMENT DE LA REHABILITACIO URBANA DE MANRESA, SPAIN N. Niwaz RAMBOLL (ENERGY SUPPLY &PLANNING) COPENHAGEN, DENMARK

2 CONTENTS Some insights from the requirements capture & case study scoping in the SEMANCO project WP2 & WP6. The idea of maintaining the bigger picture Examples of scope & scale of sustainability KPIs Building Scale KPIs Project Scale KPIs Urban Scale KPIs The potential of Semantic Energy Modelling to support integrated KPIs The pitfalls of big data

3 The idea of maintaining the bigger picture Integration around sustainability is more than simply patching together separate KPIs that measure one of the elements of sustainability Coordination between scales of intervention from the macro (city & region) to the micro (buildings & components) is a prerequisite of sustainable design Assessing sustainability also requires thematic integration as there are complex relationships between spatial planning urban regeneration energy policy & technical standards In this context developing sustainability KPIs is far from a simple task

4 Building Scale KPIs - The Code for Sustainable Homes CSH is the accredited approach to sustainability assessments at the project design and post-completion stages in the UK The essential elements - energy & carbon dioxide emissions have KPIs requirements that relate to DER (dwelling emission rate) & the TER (target emission rate) figures used to calculate the FEE (fabric energy efficiency) using thesap (standard assessment procedure) Cross referencing to statutory KPIs provides a common language & reference points for comparison & evaluation. Many UK local planning authorities are refining their sustainability standards in the context of an improvement over the TER However CSH largely limits KPIs to the building scale With the exception of a limited number of urban scale KPIs e.g. site density (gross number of dwellings per hectare) & development mix (gross floor area by land use) It also largely fails to incorporate lifestyle features & designs for behavioural change for live low carbon lifestyles

5 Project Scale KPIs Stakeholder scoping was conducted in three case studies in Spain Denmark and the UK as part of the SEMANCO project to identify relevant indicators or KPIs Despite the fact that each of the case studies are framed by the Covenant of Mayors stakeholders required different KPIs In total 62 separate KPIs were identified- it is hoped that these will be generic & transferable to similar situations & project scenarios The diversity of KPIs identified are typical of project-specific KPIs concentrate on measurable outcomes set within the initial project briefs be it the development of a zero carbon neighbourhood (North Harbour, Copenhagen) or the area-wide removal of fuel poverty (Riverside Dean, Newcastle)

6 Urban Scale KPIs - The Covenant of Mayors This European cooperative movement involves local municipalities making corporate commitments to a target level of a 20% reduction in CO 2 emissions by 2020 These are delivered by Sustainable Energy Action Plans (SEAP) that rely on KPIs to measure a 1990 baseline level of CO 2 emissions & a year on year reduction in emissions Actions within the individual SEAPs vary enormously with each signatory deciding on their own set of measures The approach adopted in each case reflect the statutory responsibilities & areas of control via purchasing & public private partnerships etc. However the relevant indicators shown in a meaningful way are important in moving the municipality towards their CO 2 emissions targets

7 Stakeholder perspective Many stakeholders acknowledged the benefits of integration in the scope & scale of indicators for sustainability Urban designers and town planners are still largely limited to the measurement & assessment of technical issues & scared by the complexity of human interactions preferences values tastes & lifestyles They are also aware of significant problems in scaling up technical solutions one of the most famous attempts at scaling up innovative thinking on sustainable energy & water systems, buildings & lifestyles, Bedzed in Sutton in the UK had serious operational difficulties the greatest saving in carbon emissions arose from collective CHP, car clubs & other behavioural factors which was a result of the high density form of the Bedzed development & because it attracted environmentally aware people Yet aspects of urban density & occupant preferences are not generally considered as sustainability KPIs

8 Integrated KPIs - Semantic Energy Modelling The SEMANCO project applies Semantic Energy Modelling, to support the calculation of a set of energy based KPIs The requirements capture highlighted significant concerns over metadata standards - e.g. sources dates sampling & accuracy The collection of appropriate supporting data considered the data format (spatial / three-dimensional) & the scale(s) of operation This generally reflected the operational scale of the key stakeholders in each case study working in sustainability & energy efficiency Key concerns included the source of data, whether it was actual / monitored or modelled data & the cost-effective use of open-source public data The approach to semantic structuring of data supports KPIs in a toolkit that is pragmatic around the best use of cost-effective data & sharing data at different scales of operation & stages within any project implementation The stakeholder is able to self-select & visualise their own specific energy-related indicators using the platform developed as part of the SEMANCO project

9 The Pitfalls of the use of big data Numbers have no way of speaking for themselves. We speak for them. We give them with meaning It is similar when indicators and measures are used in calculations of climate and carbon emissions. They often ignore the importance of errors & levels of uncertainty as part of making sense of the complex system Planners & policy makers set the semantics for the data. This is why the SEMANCO project has developed front-end tools to facilitate end user involvement in the semantic data modelling underpinning the project & the exploration of semantically modelled data In this way it ensures the outputs of the project are of value to end users

10 The Pitfalls of the use of big data Dealing with urban sustainability means addressing the procedural aspects and varying scales at which decisions are taken that impact on energy consumption and carbon emissions. Activities and KPIs at the urban design / neighbourhood and city scales need to be aligned with and supported by the regional & national governmental structure and cultures. Experience has shown that without consistency between scales of action there will inevitably be a 'gap' between policy and delivery. This will be the case even allowing for some level of flexibility & creativity to achieve the important KPIs at the local level. We need indicators not just to measure processes but as a reminder of the scope and definition of sustainable urbanism

11 Big Picture Example - Water Quality in the River Tees Used blindly KPIs can have unexpected consequences

12 Conclusion As KPIs can have unexpected consequences. Even in the world of big data it needs to be understood that KPIs must be used with caution Planning & managing urban change is complex & contextually contingent We have to accept that when planning sustainable urban change one size does not fill all However SEMANTIC data modelling undoubtedly offers the potential to work more systemically and holistically using existing data sources more effectively across different procedural actions & at different policy scales

KEY PERFORMANCE INDICATORS

KEY PERFORMANCE INDICATORS ICT for a Low Carbon Economy EEBUILDING KEY PERFORMANCE INDICATORS JANUARY 2014 Proceedings of the 1 st Workshop organised by the EEB Data Models Community ICT for Sustainable Places Nice, France, 9 th

More information

3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary)

3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary) 3. Good Practice Example: SEAP (Sustainable Energy Action Plan) (Budapest, Hungary) Keywords Budapest, sustainable energy, CO2 emission reduction, climate protection, action plan Name and location Budapest

More information

WP5.1.1 OUTPUT Baseline Emission Inventory General Abstract

WP5.1.1 OUTPUT Baseline Emission Inventory General Abstract WP5.1.1 OUTPUT Baseline Emission Inventory General Abstract 1 The present document was elaborated in the frame of the MANERGY - Paving the way for self-sufficient regional energy supply based on sustainable

More information

ABERDEEN CITY COUNCIL. Communities, Housing and Infrastructure

ABERDEEN CITY COUNCIL. Communities, Housing and Infrastructure ABERDEEN CITY COUNCIL COMMITTEE Communities, Housing and Infrastructure DATE 20 th January 2016 DIRECTOR TITLE OF REPORT REPORT NUMBER CHECKLIST COMPLETED Pete Leonard Buildings Performance Policy CHI/15/256

More information

Baseline Emission Inventory & Sustainable Energy Action Plan

Baseline Emission Inventory & Sustainable Energy Action Plan Baseline Emission Inventory & Sustainable Energy Action Plan Converting Your Strategy into Action! www.eumayors.eu 1 Publication directed by the Covenant of Mayors Office. It is managed by a consortium

More information

Domestic energy consumption in Barnet has reduced but remains higher than the British average:

Domestic energy consumption in Barnet has reduced but remains higher than the British average: HOME ENERGY EFFICIENCY ACT (HECA) RETURN LB BARNET 31ST MARCH 2013 The following report sets out the energy conservation actions being or proposed to be taken by London Borough of Barnet that it considers

More information

Inventory of existing methodologies and tools

Inventory of existing methodologies and tools Project: RURENER Contract Number: EIE/07/547/SI2.499065 Inventory of existing methodologies and tools Task 2.1.3 & 2.1.4 Sioulas Konstantinos, MSc Centre for Renewable Energy Sources and Saving (CRES)

More information

Driving down corporate carbon emissions through sustainable property management

Driving down corporate carbon emissions through sustainable property management Driving down corporate carbon emissions through sustainable property management Driving down corporate carbon emissions through sustainable property management Challenge IBM proposal Business opportunity

More information

2 nd National Workshop on Global Fuel Economy Initiative (GFEI) in Mauritius. Ministry of Environment and Sustainable Development 27 th November 2014

2 nd National Workshop on Global Fuel Economy Initiative (GFEI) in Mauritius. Ministry of Environment and Sustainable Development 27 th November 2014 2 nd National Workshop on Global Fuel Economy Initiative (GFEI) in Mauritius Ministry of Environment and Sustainable Development 27 th November 2014 1 Global Fuel Economy Initiative Background Estimated

More information

Sustainable Energy Action Plan (SEAP)

Sustainable Energy Action Plan (SEAP) Assessorato alle Politiche Assessorato alle Politiche Ambientali ed Ambientali ed Sustainable Energy Action Plan (SEAP) Davide Frisoni Energy Manager Municipality of Rimini SERN General Assembly 2010 Seminar

More information

Energy policy in Grand Lyon

Energy policy in Grand Lyon Energy policy in Grand Lyon URBAN PLANING AND SUSTAINABLE REFURBISHMENT PROJECT, Zaragoza Final Conference June, 4-5th 2012. Zaragoza, Spain Paraninfo de la Universidad de Zaragoza Béatrice Couturier 1

More information

Siemens CyPT. City Performance Tool. siemens.com

Siemens CyPT. City Performance Tool. siemens.com Siemens CyPT City Performance Tool siemens.com CyPT: Identifies the right technologies for your city Modern cities have an increasingly vital role to play in finding new ways to protect the environment.

More information

Energy prices and bills report Results and key messages for commerce and industry. 10 th December 2014

Energy prices and bills report Results and key messages for commerce and industry. 10 th December 2014 Energy prices and bills report Results and key messages for commerce and industry 10 th December 2014 1 We first discuss commercial prices and bills. The key messages are here. Scope: Commercial sector

More information

Assessment Methods. 15 th November 2010 Huw Jenkins Simon Lannon

Assessment Methods. 15 th November 2010 Huw Jenkins Simon Lannon Assessment Methods 15 th November 2010 Huw Jenkins Simon Lannon Assessment Methods Program Country Year Program Country Year 1 R-2000 Canada 1982 12 LEED US 2000 2 P-mark Sweden 1989 13 ECO-Quantum Netherlands

More information

Smart City Bristol. Dr Lorraine Hudson Bristol Futures Group

Smart City Bristol. Dr Lorraine Hudson Bristol Futures Group Smart City Bristol Dr Lorraine Hudson Bristol Futures Group Bristol challenges & opportunities Population of 441,300 1 of fastest growing UK cities - 31% rise predicted by 2028 Place where young people

More information

On a mission to reduce traffic congestion for all

On a mission to reduce traffic congestion for all On a mission to reduce traffic congestion for all TomTom s Traffic Manifesto TomTom s Traffic Manifesto 1 Foreword Traffic congestion is an issue that virtually every driver has to contend with at some

More information

Options and issues for emissions trading & road transport. Michael Hurwitz Environment Policy and Delivery Department for Transport

Options and issues for emissions trading & road transport. Michael Hurwitz Environment Policy and Delivery Department for Transport Options and issues for emissions trading & road transport Michael Hurwitz Environment Policy and Delivery Department for Transport Outline The Government s transport package on CO2 Why road transport?

More information

Living Labs in Architecture: Open innovation and co-creation towards a more sustainable architecture and lifestyle

Living Labs in Architecture: Open innovation and co-creation towards a more sustainable architecture and lifestyle Living Labs in Architecture: Open innovation and co-creation towards a more sustainable architecture and lifestyle Speakers: Masseck, T., Universitat Politècnica de Catalunya (UPC), BarcelonaTech, Spain,

More information

Renewable and Low Carbon Energy Study for Central Lincolnshire

Renewable and Low Carbon Energy Study for Central Lincolnshire Design + Planning Building Engineering Renewable and Low Carbon Energy Study for Central Lincolnshire November 2011 Executive Summary STUDY OBJECTIVES The Central Lincolnshire Joint Strategic Planning

More information

City Plan Part 1 Sustainability Appraisal Summary February 2012

City Plan Part 1 Sustainability Appraisal Summary February 2012 City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and

More information

Modelling electric vehicle demand in London using the DCE platform

Modelling electric vehicle demand in London using the DCE platform Modelling electric vehicle demand in London using the DCE platform Dr Koen H. van Dam Systems-NET Webinar series 9 April 2014 1 Digital City Exchange 2 A smart city is a connected city: efficient use of

More information

EU study on company car taxation: presentation of the main results

EU study on company car taxation: presentation of the main results European Commission EU study on company car taxation: presentation of the main results Presentation in the OECD workshop on estimating support to fossil fuels, Paris 18-19 November 2010 Katri Kosonen European

More information

Lorraine Hudson Bristol City Council GREEN DIGITAL CITY

Lorraine Hudson Bristol City Council GREEN DIGITAL CITY Lorraine Hudson Bristol City Council GREEN DIGITAL CITY Green Digital Charter Bristol signed in 2010 Bristol s 2 strand approach: Green ICT: improving energy efficiency in ICT Smart City Bristol: using

More information

GLOBAL RISK IDENTIFICATION PROGRAMME. Better Risk Information for Sound Decision Making DISASTER RISK ASSESSMENT TRAINING PACKAGE INTRODUCTORY COURSES

GLOBAL RISK IDENTIFICATION PROGRAMME. Better Risk Information for Sound Decision Making DISASTER RISK ASSESSMENT TRAINING PACKAGE INTRODUCTORY COURSES GLOBAL RISK IDENTIFICATION PROGRAMME Better Risk Information for Sound Decision Making DISASTER RISK ASSESSMENT TRAINING PACKAGE INTRODUCTORY COURSES GRIP Global Risk Identification Programme 2012 GRIP

More information

How to implement renewable energy and energy efficiency options

How to implement renewable energy and energy efficiency options How to implement renewable energy and energy efficiency options Support for South African local government solar water heaters energy efficient lighting energy efficient buildings public transport How

More information

D.3.2: Methodology for resource consumption forecasting (WP3)

D.3.2: Methodology for resource consumption forecasting (WP3) Deliverable Report on D.3.2: Methodology for resource consumption forecasting (WP3) Authors: Affiliation: Christos Nakos CRES (WP3 leader) Monica Salvia CNR-IMAA Hrvoje Maras, REGEA REGEA Sashe Panevski

More information

Commissioning and Financial Plan Guidance 2013/14

Commissioning and Financial Plan Guidance 2013/14 Page 127 Agenda Item 6 Appendix C Commissioning and Financial Plan Guidance 2013/14 Agenda Item 6 Page 128 INTRODUCTION 1. This document sets out the formal guidance to the London Borough of Sutton for

More information

Transport Mobility Management: Small Changes - Big Impacts

Transport Mobility Management: Small Changes - Big Impacts Transport Mobility Management: Small Changes - Big Impacts Understanding TMM in the Urban Context Damian PRICE and Amy LEATHER Abstract Although Transport Mobility Management (TMM) is still considered

More information

Proposal for a Demonstration Exemplar at British Sugar, York

Proposal for a Demonstration Exemplar at British Sugar, York Executive 21 July 2009 Report of the Director of City Strategy URBAN ECO SETTLEMENT Proposal for a Demonstration Exemplar at British Sugar, York Summary 1. This paper outlines a proposal for funding a

More information

Contents. Newcastle as a future smart city. Volume 1: 2015-16. www.ncl.ac.uk/sciencecentral

Contents. Newcastle as a future smart city. Volume 1: 2015-16. www.ncl.ac.uk/sciencecentral Illustrations by 1 Contents Page 3 Page 4 Page 6 Page 8 Page 10 Newcastle as a future smart city Smart energy network Local energy supply and storage Green flood management Integrated transport Newcastle

More information

Sustainable Development Strategy

Sustainable Development Strategy Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for

More information

RESOURCE EFFICIENCY SCOREBOARD DATA CENTRE ON NATURAL RESOURCES

RESOURCE EFFICIENCY SCOREBOARD DATA CENTRE ON NATURAL RESOURCES RESOURCE EFFICIENCY SCOREBOARD DATA CENTRE ON NATURAL RESOURCES NETGREEN thematic policy workshop 'Maximizing resource efficiency throughout the EU economy' 11 March 2015, CEPS, Brussels Evi Ford-Alexandraki

More information

Rail Mileage Network Marketing - 10 Tips to Calculate Horsepower & biomass

Rail Mileage Network Marketing - 10 Tips to Calculate Horsepower & biomass Panel 1 Energy Efficiency Management Knowledge Base, Decision Support Tool & Roland Nolte, IZT Berlin Energy Efficiency Days 2009, Railenergy Conference Tours, 23.9.2009 How do I get access to Railenergy

More information

ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS. UK Building Regulations and EU Directives

ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS. UK Building Regulations and EU Directives ZERO CARBON HOMES AND NEARLY ZERO ENERGY BUILDINGS UK Building Regulations and EU Directives This leaflet summarises the UK s proposed Zero Carbon Standard for Homes, and the EU s new Nearly Zero- Buildings

More information

INTERNATIONAL ENERGY AGENCY. UpcomingIEA Publications

INTERNATIONAL ENERGY AGENCY. UpcomingIEA Publications INTERNATIONAL ENERGY AGENCY UpcomingIEA Publications March 2009 2009 Spring Energy Policies of Luxembourg: 2008 Review Luxembourg has reformed its energy policies since the last IEA in-depth review in

More information

The project site is located in the dock industrial area of Rotterdam Nieuw-Mathenesse and focuses entirely on the SOM s Marconi Towers.

The project site is located in the dock industrial area of Rotterdam Nieuw-Mathenesse and focuses entirely on the SOM s Marconi Towers. START SMART Innovative strategy for an evolving start-up office space SMART SMART researches an innovative strategy for evolving and adaptive emerging technologies start-up campus as an answer to the constantly

More information

Charnwood Borough Council

Charnwood Borough Council Charnwood Borough Council 2015-2020 Version: 1.0 Owner: Strategic Director of Housing Planning Regeneration and Regulatory Services Approval Route: Carbon Management Board Approval Status: Draft Page 1

More information

Eastern Partnership, Black Sea Synergy, Central Asia, Pivex Energy Municipality Oil Gaz Infrastructure Smart Grid Smart City Convenat of Mayors.

Eastern Partnership, Black Sea Synergy, Central Asia, Pivex Energy Municipality Oil Gaz Infrastructure Smart Grid Smart City Convenat of Mayors. PIVEX Convenant of mayors Black Sea SMART GRID- SMART CITY PIVEX SMART GRID BLACK SEA President CEO Dr. Iulia Platona +79254420425, +32489131377, +40754384543, +403590787704 Iulia.platona@pivexplattformblacksea.eu,

More information

Quantifying the energy and carbon effects of water saving summary report

Quantifying the energy and carbon effects of water saving summary report Quantifying the energy and carbon effects of water saving summary report Domestic water use in the UK is around 150 litres per person per day. Taking water from the environment, treating it, distributing

More information

Covenant Territorial Coordinators:

Covenant Territorial Coordinators: re Covenant Territorial Coordinators: Crucial contributors to the Covenant of Mayors success Covenant Territorial Coordinators (CTCs) are those public administrations which provide strategic guidance,

More information

Organisational Change Management. Fusing People, Process and Technology www.h3partners.co.uk

Organisational Change Management. Fusing People, Process and Technology www.h3partners.co.uk Organisational Change Management Fusing People, Process and Technology www.h3partners.co.uk 3 OUR CREDENTIALS At H3 Partners, our mission is to provide clients with improved systems and processes to meet

More information

Rise of the Intelligent City: Accenture Vision and Business Approach

Rise of the Intelligent City: Accenture Vision and Business Approach Rise of the Intelligent City: Accenture Vision and Business Approach Giuseppe Gorla Responsabile Offerta Technology Consulting Milan, July 2nd, 2012 Global trends present an urgent need for action & opportunities

More information

Retrofitting District Heating Systems

Retrofitting District Heating Systems Retrofitting District Heating Systems Creating Replicable Retrofit Models in Hackbridge A report from BioRegional Funded by: April 2012 Contents 1 Executive Summary... 4 2 Introduction... 6 2.1 What is

More information

Smart Cities and Sustainable Technology

Smart Cities and Sustainable Technology Smart Cities and Sustainable Technology Liam Mulligan Head of Mobility and Sustainability Siemens Ltd. Cities are the growth engines for their national economies Megatrends imply significant challenges

More information

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning 2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3

More information

C I CSI EUROPE CASE STUDY ELENA EUROPEAN LOCAL ENERGY ASSISTANCE URBACT II A CSI EUROPE CASE STUDY ON TECHNICAL ASSISTANCE

C I CSI EUROPE CASE STUDY ELENA EUROPEAN LOCAL ENERGY ASSISTANCE URBACT II A CSI EUROPE CASE STUDY ON TECHNICAL ASSISTANCE S C I Making financial instruments work for cities CSI EUROPE CASE STUDY ELENA EUROPEAN LOCAL ENERGY ASSISTANCE A CSI EUROPE CASE STUDY ON TECHNICAL ASSISTANCE URBACT II ELENA - EUROPEAN LOCAL ENERGY ASSISTANCED

More information

In our member surveys, the following themes are repeatedly mentioned as concerns:

In our member surveys, the following themes are repeatedly mentioned as concerns: The Rt Hon George Osborne MP Chancellor of the Exchequer HM Treasury 1 Horse Guards Road London SW1A 2HQ 22 November 2013 Growth and Britain's Number One Manufacturing Exporter From the Chief Executive

More information

Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain

Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain assets. It is simple to use and provides instant reporting

More information

Disaster Risk Assessment:

Disaster Risk Assessment: Disaster Risk Assessment: Understanding the Process Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline What is Risk Assessment? What are the issues & challenges? How to design a disaster

More information

Planning and Design for Sustainable Urban Mobility

Planning and Design for Sustainable Urban Mobility 1 Planning and Design for Sustainable Urban Mobility 2 1 UrbanizationUrbanization Rapid pace, largely uncontrolled growth, taking place mainly in developing countries 3 Global Urbanization Trends World

More information

NetVision. NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management. Solution Datasheet

NetVision. NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management. Solution Datasheet Version 2.0 - October 2014 NetVision Solution Datasheet NetVision: Smart Energy Smart Grids and Smart Meters - Towards Smarter Energy Management According to analyst firm Berg Insight, the installed base

More information

Inaccurate and Biased: Cost-Benefit Analyses of Transport Infrastructure Projects

Inaccurate and Biased: Cost-Benefit Analyses of Transport Infrastructure Projects Inaccurate and Biased: Cost-Benefit Analyses of Transport Infrastructure Projects Presentation at the workshop Critically Examining the Current Approaches to Transport Appraisal Petter Næss Professor in

More information

Climate and Environment Advisers Competency Framework

Climate and Environment Advisers Competency Framework Climate and Environment Advisers Competency Framework Climate Change and Environment issues are fundamentally linked. Climate change causes and exacerbates the loss of biodiversity. The loss of biodiversity

More information

Sustainability Appraisal of the Lichfield Local Plan: Strategy

Sustainability Appraisal of the Lichfield Local Plan: Strategy Lichfield District Council Sustainability Appraisal of the Lichfield Local Plan: Strategy Post Adoption Statement February 2015 U R S U S C O N S U L T I N G L T D Quality Management URSUS Consulting Ltd

More information

Big Data for Transportation: Measuring and Monitoring Travel

Big Data for Transportation: Measuring and Monitoring Travel 1 Big Data for Transportation: Measuring and Monitoring Travel Frank Franczyk, MSc. P.Eng., Benoit Coupal, MSc. Persen Technologies Incorporated (PERSENTECH) Introduction Relevant and reliable transportation

More information

BENCHMARKING IN THE SOUTH AFRICAN EDI CONTEXT

BENCHMARKING IN THE SOUTH AFRICAN EDI CONTEXT BENCHMARKING IN THE SOUTH AFRICAN EDI CONTEXT Author and Presenter: Dr. W. J de Beer PhD; MBA; GCC Electrical; GCC Mechanical Chief Operations Officer EDI Holdings Co-authors: Mr. N Waters BA; B Ed; M

More information

BUILDING ENERGY DEMAND AGGREGATION AND SIMULATION TOOLS A DANISH CASE STUDY

BUILDING ENERGY DEMAND AGGREGATION AND SIMULATION TOOLS A DANISH CASE STUDY BUILDING ENERGY DEMAND AGGREGATION AND SIMULATION TOOLS A DANISH CASE STUDY P. Gianniou; A. Heller; C. Rode Department of Civil Engineering, Technical University of Denmark, Kgs. Lyngby ABSTRACT Nowadays,

More information

Paolo Musso, Stam S.r.l. p.musso@stamtech.com

Paolo Musso, Stam S.r.l. p.musso@stamtech.com Paolo Musso, Stam S.r.l. p.musso@stamtech.com This project has received funding from the European Union's Seventh Framework Programme for research, technological development and demonstration under grant

More information

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers

Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers Revealing the costs of air pollution from industrial facilities in Europe a summary for policymakers A new European Environment Agency (EEA report, Revealing the costs of air pollution from industrial

More information

TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS

TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS TRIPLE BOTTOM LINE ASSESSMENT OF UR-3R PROCESS Q: What is the Triple Bottom Line Assessment of the UR- 3R Process? The Triple Bottom Line Assessment of the UR-3R Process is a study whose overall aim was

More information

METROPOLITAN GOVERNANCE AND STRATEGIC PLANNING ALLIANCES AND AGREEMENTS

METROPOLITAN GOVERNANCE AND STRATEGIC PLANNING ALLIANCES AND AGREEMENTS 8 METROPOLITAN GOVERNANCE AND STRATEGIC PLANNING ALLIANCES AND AGREEMENTS An important task of the continuation work of the Greater Helsinki Vision 2050 ideas competition is to envision processes and institutional

More information

Next steps to zero carbon homes

Next steps to zero carbon homes Next steps to zero carbon homes Small sites exemption November 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown.

More information

http://ec.europa.eu/europeangreencapital PRESS KIT Green cities - fit for life

http://ec.europa.eu/europeangreencapital PRESS KIT Green cities - fit for life http://ec.europa.eu/europeangreencapital PRESS KIT Green cities - fit for life European Green Capital Award an initiative of the European Commission Green cities - fit for life What is the European Green

More information

Summary of the Qualitative Decision Support Model 7 STEPS TOWARDS TRANSFORMATION AGENDA

Summary of the Qualitative Decision Support Model 7 STEPS TOWARDS TRANSFORMATION AGENDA Summary of the Qualitative Decision Support Model 7 STEPS TOWARDS AGENDA This Qualitative Decision Support Model, the Generic Transformation Agenda, has been developed during the TRANSFORM project between

More information

RELATIONSHIP OF NATURE AND LIVING

RELATIONSHIP OF NATURE AND LIVING 3 RELATIONSHIP OF NATURE AND LIVING The vicinity of sea and abundance of natural and cultural landscapes are clear assets of Greater Helsinki. Good utilisation of that asset warrants a regional landscape

More information

Resource efficiency. United Nations Environment Programme

Resource efficiency. United Nations Environment Programme Resource efficiency United Nations Environment Programme An overview Economic growth and social development cannot be sustained with our current consumption and production patterns. Globally, we are extracting

More information

SAP 2012 IN A NUTSHELL

SAP 2012 IN A NUTSHELL SAP 2012 IN A NUTSHELL The consultation version of the SAP 2012 methodology was published by the Department of Energy and Climate Change (DECC) on January 4th 2012. This article from Dyfrig Hughes of National

More information

Renewable Energy for Kent

Renewable Energy for Kent Design + Planning Building Engineering Renewable Energy for Kent Part I: Overview and Action Plan April 2012 Updated Version 1 Committing a Path The development of low carbon and renewable energy sources

More information

Workforce capacity planning model

Workforce capacity planning model Workforce capacity planning model September 2014 Developed in partnership with 1 Workforce capacity planning helps employers to work out whether or not they have the right mix and numbers of workers with

More information

Call to Action on Smart Sustainable Cities

Call to Action on Smart Sustainable Cities Call to Action on Smart Sustainable Cities 1. Introduction Achieving sustainable urbanization, along with the preservation of our planet, has been recognized as one of the major challenges of our society

More information

Where to start: Understanding building energy use

Where to start: Understanding building energy use Buildings energy efficiency sessions done in partnership with: Energy Efficiency Training Week Where to start: Understanding building energy use Buildings Session 1 Energy Efficiency Training Week Buildings:

More information

RESSÒ: energy efficiency urban rehabilitation

RESSÒ: energy efficiency urban rehabilitation RESSÒ: energy efficiency urban rehabilitation Authors: Bodelon, Carmen 1 ; Gascón, Eduardo 1 ; Ramon, Guillem 1 ; Obiols, Martí 1 ; Palomar, Pablo 1 ; Escoda, Quim 1 ; Prat, Sandra 1 ; Illa, Sergi 1 ;

More information

London Borough of Croydon

London Borough of Croydon London Borough of Croydon Introduction The London Borough of Croydon is located 10.4 miles (15 km) to the south of London, England. The area is 34 square miles (87 km 2 ) and houses a population of 342,700.

More information

Overview of UK Carbon Pricing Policies

Overview of UK Carbon Pricing Policies Partnership for Market Readiness PA11 Overview of UK Carbon Pricing Policies Paul van Heyningen, Department of Energy & Climate Change 10 March 2015 UK approach to emissions reduction Set legally binding

More information

2009 Energy Policy. Background

2009 Energy Policy. Background 2009 Energy Policy Background The citizens of Fort Collins created the municipal electric utility in 1935. In 1973, Fort Collins joined with Estes Park, Longmont and Loveland to create Platte River Power

More information

2030 DISTRICT PERFORMANCE METRIC BASELINES

2030 DISTRICT PERFORMANCE METRIC BASELINES 2030 DISTRICT PERFORMANCE METRIC BASELINES The Seattle 2030 District is a groundbreaking high-performance building district in downtown Seattle that aims to dramatically reduce the environmental impacts

More information

11. Monitoring. 11.1 Performance monitoring in LTP2

11. Monitoring. 11.1 Performance monitoring in LTP2 178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the

More information

Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy

Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy A The Business Cycle, London, mapping of commuter cycle routes and hotspots, 2000. A It is refreshing to see an

More information

Case Study: Population and Public Health Program of the BC Provincial Health Services Authority i

Case Study: Population and Public Health Program of the BC Provincial Health Services Authority i Case Study: Population and Public Health Program of the BC Provincial Health Services Authority i Wayne Foster and Christopher Wilson. Originally published in Illustrations in Public Health of a More Collaborative

More information

Bespoke ECO2 software for calculating savings: features for software development

Bespoke ECO2 software for calculating savings: features for software development Bespoke ECO software for calculating savings: features for software development When a supplier notifies us of a measure under the Energy Company Obligation (ECO), it must provide the carbon saving or

More information

STEPS 2015-2018: Understanding Critical Transition Dynamics for Sustainable Transportation

STEPS 2015-2018: Understanding Critical Transition Dynamics for Sustainable Transportation STEPS 2015-2018: Understanding Critical Transition Dynamics for Sustainable Transportation Technological innovations are transforming the energy and vehicle industries. The shale revolution is producing

More information

CCS Regulatory Test Toolkit

CCS Regulatory Test Toolkit CCS Regulatory Test Toolkit Derek M. Taylor WWW.GLOBALCCSINSTITUTE.COM Regional Representative - Europe THE POTENTIAL FOR CCS CCS could make a significant contribution to reducing global greenhouse gas

More information

City of Toronto Electric Vehicle Working Group

City of Toronto Electric Vehicle Working Group City of Toronto Electric Vehicle Working Group Mobilizing Internally to Develop EV Friendly Policies and Programs for City of Toronto Residents and Businesses By: Cecilia Fernandez, Research Analyst Toronto

More information

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop

Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Black Country Local Enterprise Partnership Report of the Level 1 LEED Workshop Held on 20 March 2014 at the Black Country Consortium The Deckhouse Brierley Hill, Dudley. Produced on behalf of the Black

More information

Fleet management system as actuator for public transport priority

Fleet management system as actuator for public transport priority 10th ITS European Congress, Helsinki, Finland 16 19 June 2014 TP 0226 Fleet management system as actuator for public transport priority Niels van den Bosch 1, Anders Boye Torp Madsen 2 1. IMTECH Traffic

More information

Michigan Nuclear Power Plants Contribution to the State Economy

Michigan Nuclear Power Plants Contribution to the State Economy Michigan Nuclear Power Plants Contribution to the State Economy PREPARED FOR PREPARED BY Mark Berkman, Ph.D. Dean Murphy, Ph.D. September 2015 This report was prepared for Nuclear Matters. All results

More information

TEC Capital Asset Management Standard January 2011

TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining

More information

Slums and informal settlements An evidence-based approach to sustainable upgrading and development

Slums and informal settlements An evidence-based approach to sustainable upgrading and development Slums and informal settlements An evidence-based approach to sustainable upgrading and development 1 billion people currently live in slums, this is set to double over the next 30 years. Slums are a physical

More information

Monitoring Social Impact: How does business measure up?

Monitoring Social Impact: How does business measure up? BUSINESS INTELLIGENCE FOR CORPORATE RESPONSIBILITY AND SUSTAINABILITY Monitoring Social Impact: How does business measure up? 1 Monitoring Social Impact: How does business measure up? Executive summary

More information

Aspects of Helsinki s Local Agenda 21 and sustainability indicators and monitoring Kari Silfverberg, June 2008

Aspects of Helsinki s Local Agenda 21 and sustainability indicators and monitoring Kari Silfverberg, June 2008 Aspects of Helsinki s Local Agenda 21 and sustainability indicators and monitoring Kari Silfverberg, June 2008 Contents: The Local Agenda (LA21) process of the City of Helsinki 1998-2002 The sustainability

More information

Using Urban Design to Reduce the Cost of Infrastructure. May 26, 2015, University of Chicago Centre, New Delhi

Using Urban Design to Reduce the Cost of Infrastructure. May 26, 2015, University of Chicago Centre, New Delhi Using Urban Design to Reduce the Cost of Infrastructure May 26, 2015, University of Chicago Centre, New Delhi SMART URBANISATION SERIES The YES Institute Smart Urbanisation series seeks to involve Government

More information

Key Solutions CO₂ assessment

Key Solutions CO₂ assessment GE Capital Key Solutions CO₂ assessment CO₂ emissions from company car fleets across Europe s major markets between 2008 and 2010 www.gecapital.eu/fleet Contents Introduction and key findings Reduction

More information

SIRXCCS408 Build retail relationships and sustain customer loyalty

SIRXCCS408 Build retail relationships and sustain customer loyalty SIRXCCS408 Build retail relationships and sustain customer loyalty Release: 1 SIRXCCS408 Build retail relationships and sustain customer loyalty Modification History The version details of this endorsed

More information

Viet Nam Green Growth Strategy!

Viet Nam Green Growth Strategy! Support towards! Viet Nam Green Growth Strategy! in Thanh Hoa Scott Muller Low Emissions Asian Development (LEAD) Program Institute for Sustainable Communities (USAID Contractor) Thanh Hoa, Vietnam 11

More information

What needs to be considered when developing a low carbon energy system that uses hydrogen?

What needs to be considered when developing a low carbon energy system that uses hydrogen? What needs to be considered when developing a low carbon energy system that uses hydrogen? Introduction How can hydrogen be used in low carbon energy systems for a whole city? One of the key issues in

More information

A model for evaluating the CO2 emissions of the Operational Programmes in European Regions. Seminario Roma novembre 2013

A model for evaluating the CO2 emissions of the Operational Programmes in European Regions. Seminario Roma novembre 2013 Evaluation of the Costs and Benefits of Public Investment in terms of impact on CO2 emissions. fromtheregiontothecity A model for evaluating the CO2 emissions of the Operational Programmes in European

More information

PERSPECTIVE. Setting Public Goals, Defining Public Value, Securing Public Support the challenge for Europe s PSBs. 25 April 2008 Tim Suter

PERSPECTIVE. Setting Public Goals, Defining Public Value, Securing Public Support the challenge for Europe s PSBs. 25 April 2008 Tim Suter Part of the Ingenious Consulting Network Setting Public Goals, Defining Public Value, Securing Public Support the challenge for Europe s PSBs 25 April 2008 Tim Suter Strasbourg, July 2008 Part of the Ingenious

More information

1. MASTER S DEGREE PROGRAMME IN ENVIRONMENTAL TECHNOLOGY 60 ECT credits... 2 1.1 Framework of the studies 10 ECTS... 3 1.1.1 RESEARCH PROCESS AND

1. MASTER S DEGREE PROGRAMME IN ENVIRONMENTAL TECHNOLOGY 60 ECT credits... 2 1.1 Framework of the studies 10 ECTS... 3 1.1.1 RESEARCH PROCESS AND 1. MASTER S DEGREE PROGRAMME IN ENVIRONMENTAL TECHNOLOGY 60 ECT credits................................ 2 1.1 Framework of the studies 10 ECTS.........................................................................

More information

Air quality and biomass installations. A briefing for local authorities

Air quality and biomass installations. A briefing for local authorities Air quality and biomass installations A briefing for local authorities March 2011 Published by BioRegional Development Group BedZED Centre, 24 Helios Road, Wallington, Surrey SM6 7BZ. www.bioregional.com

More information

Pilot Analysis of the Government's New Green Deal Initiative

Pilot Analysis of the Government's New Green Deal Initiative Penwithick Green Deal Pilot project: Green Deal and costbenefit analysis Prepared for: The BRE Trust January 2013 Report number: 284 814 1 Penwithick Green Deal Pilot: Green Deal and cost-benefit analysis

More information